DE1515745U
(OSRAM )
US5018A
(en )
1847-03-13
Improvement in machinery for combing wool
WO2002014592A1
(de )
2002-02-21
Verfahren und schlauch zum auskleiden einer hochdruck-rohrleitung
Kim
2008
Structural performance of steel pipe splice for SD500 high-strength reinforcing bar under cyclic loading
DE1399998U
(OSRAM )
Ye ChunXiu et al.
2019
Eco-TILLING analysis of GM4-3-3L gene in cotton mutation germplasm resources.
Amirkhani
2021
A Survey of Bushehr Customs and Its changes (1902–1904), Based on Unpublished Notes by Lambert Molitor
Alyanak
2023
Application of the General Principles of European Union Law to Public Procurements below the Threshold Value
US20240317981A1
(en )
2024-09-26
Long-fiber composite material for solar module
Hegarty
2012
Why should one expect to find long runs of (non)-Ramanujan primes?
DE1470108U
(OSRAM )
DE77811C
(de )
Rückspringender Hammer an Gewehrschlössern mit doppelarmiger Schlag- und Stangenfeder
Rahmadhani
2025
Hubungan Kualitas Pelayanan Administrasi Rumah Sakit Terhadap Kepuasan Pasien Penyakit Dalam di Rumah Sakit TNI AD TK IV Bukittinggi Tahun 2024
Carnegie
1930
The economical production and distribution of steam in large factories
DE1466204U
(OSRAM )
DE1442237U
(OSRAM )
DE1510327U
(OSRAM )
Obaida et al.
2019
Bond Behavior of Fabric-Reinforced Geopolymeric Matrix System–A Pilot Study
DE1622691U
(de )
1951-04-26
Bohrspindel.
DE1758136U
(de )
1957-12-19
Walzenbuerste.
DE1392947U
(OSRAM )
DE1484220U
(OSRAM )
Iloanusi
1987
The Effect of Loom Design and Speed on the Space and Labour Requirements of Weaving Installations
Yuu et al.
2013
Review of Long-Term Creep Behaviors of Geosynthetic Reinforcements by Strain Compatibility
DE1507900U
(OSRAM )