US6463346B1
(en )
2002-10-08
Workflow-scheduling optimization driven by target completion time
Hsu et al.
1998
The TOC-based algorithm for solving product mix problems
CN109242184B
(zh )
2022-03-22
一种基于层次聚类的订单拣货优化方法
DE3942977A1
(de )
1991-06-27
Verfahren zum wiederherstellen der richtigen zellfolge, insbesondere in einer atm-vermittlungsstelle, sowie ausgangseinheit hierfuer
Cheng et al.
1993
Tandem queues with general blocking: a unified model and comparison results
DE1497374U
(enExample )
WO2007097345A1
(ja )
2007-08-30
光学ガラス
JP2022167990A5
(enExample )
2023-04-24
Baik
1999
Rent‐seeking firms, consumer groups, and the social costs of monopoly
US7727344B2
(en )
2010-06-01
Copper alloy suitable for an IC lead pin for a pin grid array provided on a plastic substrate
Zagler
2017
Producer services, innovation and outsourcing in the new economy
US20200327480A1
(en )
2020-10-15
Organization capability evaluation system
Hewett et al.
1972
Two-stage chi square goodness-of-fit test
Cuadrado
2023
An analysis of hours worked per worker in Spain: trends and recent developments
Laxton et al.
1989
Seriation by similarity and consistency
DE1783412U
(de )
1959-02-19
Wandplatte.
Burrell
1992
A simple model for linked informetric processes
Sudtachat et al.
2017
The queuing model for perishable inventory with lost sale under random demand, lead time and lifetime
Li et al.
2000
The multistage service facility start-up and capacity model
JP2003308109A
(ja )
2003-10-31
生産計画システム
Brander et al.
2002
Production planning for products with complex product structure
CN120492762A
(zh )
2025-08-15
一种带钢生产线转动惯量计算与补偿方法、设备及介质
DE1401153U
(enExample )
DE1385909U
(enExample )
DE1457884U
(enExample )