Sugimori et al.
1977
Toyota production system and kanban system materialization of just-in-time and respect-for-human system
DE1470987U
(enExample )
EP1557797A3
(de )
2006-01-18
Anlageninformationssystem und Verfahren für dasselbe
Mariska et al.
2025
Pengaruh Pelatihan, Pengalaman dan Kemampuan Kerja Karyawan Terhadap Prestasi Kerja Karyawan Pada PT. Musi Hutan Persada Kabupaten Muara Enim
AT100819B
(de )
1925-08-25
Rechentafel zur Durchführung von Prozentrechnungen, Multiplikationen und Divisionen.
DE1467904U
(enExample )
DE216415C
(enExample )
1900-01-01
DE252376C
(enExample )
DE124822C
(enExample )
DE1489626U
(enExample )
DE314259C
(enExample )
Sitohang et al.
2023
Technical Skill, Work Experience, Work Discipline and Its Influence on Craftsmen Performance at Pottery Cluster in Tulungagung Regions
DE1381276U
(enExample )
DE132912C
(enExample )
Zudak
1970
Productivity, labor demand and cost in a continuous production facility
SALVEXDY
1986
Conference paper. Human aspects in integrated manufacturing systems
DE78869C
(de )
Aus einzelnen Musterplättchen zusammengesetzte Musterkarte für Jacquard- und Schaftmaschinen
DE345512C
(enExample )
Amelia et al.
0
THE IMPROVEMENT ABILITY OF CALCULATING DIVISION USED UNO CARD IN MATHEMATIC
DE78262C
(de )
Absperrventil mit mehreren Kegelscheiben aus verschiedenen Stoffen von verschiedener Härte
DE1684463C
(de )
Einrichtung zum Fordern von Beton
AT20595B
(de )
1905-07-10
Teigwalkmaschine für Rollgebäck.
AIROV
1961
Review 12--No Title
DE95813C
(enExample )
Straight
1930
BONUS METHODS OF WAGE PAYMENT AS RELATED TO PRODUCTION 1