Sugimori et al.
1977
Toyota production system and kanban system materialization of just-in-time and respect-for-human system
Fried et al.
1972
Man-machine interaction and absenteeism.
EP1557797A3
(de )
2006-01-18
Anlageninformationssystem und Verfahren für dasselbe
DE1467904U
(enExample )
DE216415C
(enExample )
1900-01-01
DE252376C
(enExample )
Chairul et al.
2023
The Effect of Perceived Organizational Support on Sales Employee's Organizational Commitment in PT X
DE1489626U
(enExample )
Crathorne
1922
Calculation of the correlation ratio
Sitohang et al.
2023
Technical Skill, Work Experience, Work Discipline and Its Influence on Craftsmen Performance at Pottery Cluster in Tulungagung Regions
DE1381276U
(enExample )
Zudak
1970
Productivity, labor demand and cost in a continuous production facility
SALVEXDY
1986
Conference paper. Human aspects in integrated manufacturing systems
DE78869C
(de )
Aus einzelnen Musterplättchen zusammengesetzte Musterkarte für Jacquard- und Schaftmaschinen
DE503936C
(de )
1930-07-30
Verfahren zum Raffinieren von Erdoelen
Amelia et al.
0
THE IMPROVEMENT ABILITY OF CALCULATING DIVISION USED UNO CARD IN MATHEMATIC
DE1684463C
(de )
Einrichtung zum Fordern von Beton
AT20595B
(de )
1905-07-10
Teigwalkmaschine für Rollgebäck.
AIROV
1961
Review 12--No Title
Cho
0
Occupational Health Problems in Small
DE95813C
(enExample )
DE22384C
(de )
Aufzugsvorrichtung für Zuckerfabriken
Straight
1930
BONUS METHODS OF WAGE PAYMENT AS RELATED TO PRODUCTION 1
DE1368864U
(enExample )
DE1356210U
(enExample )