Ding et al.
1998
Oscillatory nuclear movement in fission yeast meiotic prophase is driven by astral microtubules, as revealed by continuous observation of chromosomes and microtubules in living cells
DE1466566U
(enrdf_load_stackoverflow )
EP1249775A2
(en )
2002-10-16
Logistics management system managing distribution and schedule of products from order-acceptance to delivery, using a computer
DE1041982T1
(de )
2001-06-07
HEMMUNG DER p38 KINASE AKTIVITÄT DURCH SUBSTITUIERTEN HETEROCYCLISCHEN HARNSTOFFEN
CN107169656A
(zh )
2017-09-15
成本管理系统及方法
Jang et al.
2007
Using the kanban for construction production and safety control
JP5403196B1
(ja )
2014-01-29
圧延順序決定システムおよび圧延順序決定方法
AU611147B2
(en )
1991-06-06
Bisphenylalkylpiperazine derivatives, a method of their preparation and a pharmaceutical preparation
Dumont
2025
A procedure for the semi-analytical evaluation of generally singular integrals that occur in the three-dimensional boundary element analysis
CN110322227A
(zh )
2019-10-11
一种项目进度监理控制系统
Byerly
1993
State population estimates by age and sex: 1980 to 1992
Tamura et al.
1995
Designing customer oriented production planning system (COPPS)
Short et al.
1991
Timeliness costs for machinery selection
Goyal
1973
Optimal decision rules for producing greeting cards
EP3893068A1
(de )
2021-10-13
Verfahren zur dynamischen produktionsplanung bei strangguss anlagen
Hmede et al.
2023
Optimal control of the temperature by the laser path and the thermal treatment time in selective laser melting process
JPH02205457A
(ja )
1990-08-15
Fmsラインにおける生産指示方法およびその装置
JP2001202442A
(ja )
2001-07-27
計画立案システム及び計画立案方法
Awate
1989
Analysis of propagation of stochastic errors through an MRP system, and an industrial case study
CN108408320B
(zh )
2019-08-09
一种基于人工介入的钢板分配方法
Huang
2017
Components of Control Premium and Its Allocation
Smits et al.
2002
Approximations for the waiting time in (s, nQ)-inventory models for different types of consolidation policies
RU43666U1
(ru )
2005-01-27
Автоматизированная система контроля в реальном времени за движением оборотных средств предприятия в процессе производства и обращения (варианты)
DE1357772U
(enrdf_load_stackoverflow )
CN120325679A
(zh )
2025-07-18
双高棒作业计划智能管理方法