Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites–Field Sampling Plan (FSP) BRES No. 8–Belle of Butte (dated August 2, 2022)
Re: Approval for the Request for Change BG-2023-01 to Final BPSOU Hydrocarbon Sampling and Treatability Study, Quality Assurance Project Plan (QAPP)(dated May 15, 2023)