DE1399982U
(enExample )
DE60120807T2
(de )
2006-12-28
Schaltvorrichtung und Verfahren
Ayyappan et al.
2022
A MAP/PH1, PH2/1 system with two types of heterogeneous service, setup, closedown, vacation, immediate feedback, breakdown and repair
NL9101755A
(nl )
1993-05-17
Bewakingssysteem voor het bewaken van een telecommunicatienetwerk met een of meer abonneecentrales.
JP4685225B2
(ja )
2011-05-18
情報表示装置における故障検知時の表示方法
Dixon et al.
1993
On the nature of the span of apprehension
Dinara
2025
MARKETINGDA SUN’IY INTELLEKTDAN FOYDALANISH SAMARADORLIGI
Möller-Acuña et al.
2022
Artificial Intelligence Applied to the Backward Seismic Analysis Method
Kutrib et al.
0
Eingabeverfahren f ur parallele Automaten
Raxmatov
2025
FAVQULODDA HOLATLARDA JAMOAT XAVFSIZLIGINI TA’MINLASH USULI SIFATIDA FAVQULODDA TARTIBLAR (REJIMLAR) TUSHUNCHASI
Kumar et al.
2010
Optimal strategy Analysis of an N-policy two-phase Mx/M/1 gated queueing system with server startup and breakdowns
DE1465378U
(enExample )
Seenivasan et al.
2024
Markovian queueing model with single working vacation, vacation interruption and partial breakdown
KR960001087B1
(ko )
1996-01-18
음성 사서함 시스템의 메세지 교환장치
Leroy et al.
2022
Parameter estimation for a degradation-based imperfect maintenance model with different information levels
DE1403816U
(enExample )
DE1345656U
(enExample )
Anugrahini
0
Istikh dan al-al'aab al-lughawiyah fi ta'limil iasyima'(dirasah ajribiyah bimadrasah al-khairiyah al-muthawasithah al-Islamiyah Jakarta)
Halizah et al.
2023
Promosi Kesehatan Dan Perilaku Penanganan Hipertensi Di Oro-Oro Tengah Rt 01 Rw 03, Triyagan, Kecamatan Mojolaban, Kabupaten Sukoharjo
Melikyan
2009
The railway information system as a queueing system
Peitsch
1993
Difficulties in estimating mortality rates of Eurytemora affinis in the brackish water region of the Elbe estuary
Sayfiyeva
2025
ESHITUV VA MUVOZANAT AʼZOLARI PATOLOGIYASI VA YANGI DIAGNOSTIKA USULLARI
DE1388061U
(enExample )
DE1384649U
(enExample )
Younes
0
Communication between Client and Server