DE137717C - - Google Patents
Info
- Publication number
- DE137717C DE137717C DE1901137717D DE137717DA DE137717C DE 137717 C DE137717 C DE 137717C DE 1901137717 D DE1901137717 D DE 1901137717D DE 137717D A DE137717D A DE 137717DA DE 137717 C DE137717 C DE 137717C
- Authority
- DE
- Germany
- Prior art keywords
- wire
- edged
- wire mesh
- distribution
- distribution supports
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000002131 composite material Substances 0.000 claims description 5
- 238000004519 manufacturing process Methods 0.000 claims 1
- 239000000969 carrier Substances 0.000 description 2
- 238000007688 edging Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000003068 static Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/10—Load-carrying floor structures formed substantially of prefabricated units with metal beams or girders, e.g. with steel lattice girders
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Wire Processing (AREA)
Description
KAISERLICHESIMPERIAL
PATENTAMT.PATENT OFFICE.
Den Gegenstand der vorliegenden Erfindung bildet ein Verfahren zur Erzeugung einer Anfangsspannung in den Drahteinlagen von Verbundkonstruktionen, welches in der Zeichnung in einigen Ausführungsfonnen veranschaulicht ist.The subject of the present invention is a method for generating an initial tension in the wire inserts of composite structures, which is illustrated in the drawing in some embodiments is.
Zwischen festen Hauptträgern α werden, wenn erforderlich, auf Schablonen d (Fig. 4a) Vertheilungsträger b flach und um ihre Längsachse drehbar verlegt, alsdann wird die Drahteinlage c und C1 eingeschossen, und mit dem Fortschreiten des Drahteinschusses werden die Schablonen wieder entfernt. Nach Vollendung des Einschusses wird der in statischer Hinsicht gewünschte Verlauf der Drahteinlage, sowie die erforderliche Steifigkeit und Streckung des Einschusses durch das Hochkanten der Vertheilungsträger b bewirkt. Um dabei ein seitliches Weggleiten der Vertheilungsträger b zu verhüten, wird der Draht in gröfseren Abständen auch in der Richtung C1 durchgezogen.If necessary, distribution supports b are laid flat and rotatable about their longitudinal axis on templates d (Fig. 4a) between fixed main beams α , then the wire insert c and C 1 is shot in, and the templates are removed again as the wire insertion progresses. After completion of the entry, the course of the wire insert, which is desired from a static point of view, as well as the required rigidity and elongation of the entry is brought about by the edging of the distribution carrier b. In order to prevent the distribution supports b from sliding away to the side, the wire is also pulled through in the direction C 1 at larger intervals.
Ist das beabsichtigte Bauwerk, z. B. eine Decke, nur Belastungen von einer Seite ausgesetzt, so kann auf die Beanspruchung der Verbundkonstruktion beim Einziehen des Drahtwerks schon in der Weise Rücksicht genommen werden, dafs der Zugzone der Verbundkonstruktion eine beträchtlich gröfsere Anzahl von Drähten zugewiesen wird als der Druckzone. In dieser können, wie aus Fig. 3 ersichtlich ist, die Drähte auch ganz wegfallen, falls die Vertheilungsträger b durch Aussparungen e oder andere Vorkehrungen eine geeignete Führung erhalten.Is the intended structure, e.g. B. a ceiling, only exposed to loads from one side, the stress on the composite structure when pulling in the wire work can be taken into account in such a way that the tensile zone of the composite structure is assigned a considerably larger number of wires than the pressure zone. In this, as can be seen from FIG. 3, the wires can also be omitted entirely if the distribution supports b receive a suitable guide through recesses e or other provisions.
Erfährt das beabsichtigte Bauwerk Belastungen, welche bald von der einen, bald von der anderen Seite angreifen, so wird der Drahteinschufs oberhalb und unterhalb der Träger nach Mafsgabe der in der Verbundkonstruktion auftretenden , wechselnden Beanspruchungen vertheilt (Fig. 1).If the intended structure experiences loads, some from one, now from the other Attack side, so the wire insert is above and below the carrier after Distributed according to the changing loads occurring in the composite structure (Fig. 1).
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT12731D AT12731B (en) | 1901-01-02 | 1902-12-06 |
Publications (1)
Publication Number | Publication Date |
---|---|
DE137717C true DE137717C (en) |
Family
ID=405576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE1901137717D Expired - Lifetime DE137717C (en) | 1901-01-02 | 1901-01-02 |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE137717C (en) |
-
1901
- 1901-01-02 DE DE1901137717D patent/DE137717C/de not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE803800C (en) | Wire cable for metallic inserts of pneumatic tires | |
DE1173823B (en) | Safety mountain rope | |
DE137717C (en) | ||
DE2613579A1 (en) | METHOD FOR CREATING A LEVEL OR SPATIAL REINFORCEMENT STRUCTURE OR STRUCTURAL STRUCTURE AND DEVICE FOR CARRYING OUT THE PROCEDURE | |
DE2738559A1 (en) | PROCESS FOR PULLING PIPES WITH INTERNAL SUPPORT | |
DE102007047616A1 (en) | Lattice girder for concrete reinforcement, has lower chord extending parallel to upper chord in latitudinal direction, which is perpendicular to longitudinal direction, where girder exhibits height of hundred millimeter | |
DE1435220A1 (en) | Synthetic thread ropes | |
AT211767B (en) | Process for the production of reinforcing steel grooved transversely on parts of its circumference | |
DE2300733C2 (en) | Method of making a composite beam | |
EP0006085B1 (en) | Process for the fabrication of anchoring rods or anchoring wires and their use in earth or rock anchor devices | |
DE88067C (en) | ||
DE659692C (en) | Anchoring clamp for high-voltage electrical lines and a method of manufacturing the clamp | |
DE2741530C2 (en) | Warp mat for pit lining with high flexibility and a high tensile strength connection | |
DE3405693C2 (en) | Method and device for reworking strands for Bowden cables | |
DE2255137A1 (en) | PREFABRICATED SHUTTER REINFORCEMENT FOR REINFORCED CONCRETE COMPONENTS | |
DE199771C (en) | ||
DE230114C (en) | ||
AT40294B (en) | Method of armoring electrical cables of uneven diameter with wires. | |
DE564194C (en) | Method of weaving ribbons and belts | |
DE149555C (en) | ||
EP0041258A1 (en) | Method and means for bending a wire for use in correcting the position of teeth | |
AT70765B (en) | Process for the production of non-circular ropes, mainly with a wedge-shaped cross-section. | |
DE111836C (en) | ||
DE85676C (en) | ||
DE381574C (en) | Device for the production of intermediate tape, in particular of so-called conductor tape |