CN109214682A
(zh )
2019-01-15
一种对员工的工作绩效进行定量评价的方法及系统
DE1353674U
(Direct )
CN109242577A
(zh )
2019-01-18
一种光伏发电成本计算方法及装置
CN106548271A
(zh )
2017-03-29
一种电力客户用电信用的复合评价方法
Patterson
1962
Practical water rate determination
Berkemer et al.
1993
A prototype of a decision support system for river basin water quality management in Central and Eastern Europe
Taylor et al.
2007
Simulation applied to a court system
Swarth
1913
Birds Collected or Observed on the Expedition of the Alpine Club of Canada to Jasper Park, Yellowhead Pass, and Mount Robson Region
DE216853C
(Direct )
Sasaki
2002
through the translation of their works in the early 1910s. 2 Time and motion
Cooke
1925
A note on rates for rural electric service
SATHAYE
1974
OPTIMIZATION OF DESIGN CAPACITY OF AN AQUEDUCT WITH INTERMEDIATE STORAGE.
Pecek et al.
2018
Contract of Employment and Contract for Services: The Scope of Application of Employment Legislation
DE146212C
(Direct )
Swarth
0
Birds Collected or Observed on the Expedition of the Alpine Club of Canada to Jasper Park, Yellowhead Pass, and Mount Robson Region by Jh Riley
Israeloff
1989
Look at the Time
DE1383393U
(Direct )
DE1327015U
(Direct )
Henson
1976
Monthly Billing on the Mag Card II-Automation without Computerization
Freedman et al.
1968
Changing Manpower Needs in Telephone Offices
Richter et al.
2003
Specifying water flow requirements to support river health
Campbell
1961
Effects of Electric Rates on Power Expenses of Cotton Gins: Arkansas, Oklahoma, Texas
Lindberg
1961
Procedures at California Water Service Company
DE1352570U
(Direct )
DE1383395U
(Direct )