DE1298460C2 - PROFILE SUPPORT FOR A FOUNDATION PILE - Google Patents

PROFILE SUPPORT FOR A FOUNDATION PILE

Info

Publication number
DE1298460C2
DE1298460C2 DE19661298460 DE1298460A DE1298460C2 DE 1298460 C2 DE1298460 C2 DE 1298460C2 DE 19661298460 DE19661298460 DE 19661298460 DE 1298460 A DE1298460 A DE 1298460A DE 1298460 C2 DE1298460 C2 DE 1298460C2
Authority
DE
Germany
Prior art keywords
profile
foundation pile
flanges
profile support
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19661298460
Other languages
German (de)
Other versions
DE1298460B (en
Inventor
Der Anmelder Ist
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19661298460 priority Critical patent/DE1298460C2/en
Application granted granted Critical
Publication of DE1298460C2 publication Critical patent/DE1298460C2/en
Publication of DE1298460B publication Critical patent/DE1298460B/de
Expired legal-status Critical Current

Links

Description

Die Erfindung betrifft einen Profilträger für einen Gründungspfah! zu dessen Herstellung der mit mindestens einem über sein Profil hinausragenden Verdrängerelement versehene Prcfi.lträger unter fortlaufender Zuführung von Füllmaterial von oben in den von dem Verdrängerelernent iiachgeformten Erdschacht eingetrieben wird.The invention relates to a profile beam for a foundation pile! for the production thereof, provided with at least one projecting beyond their profile displacement Prc .lträger fi with continuous supply of filling material from above is driven into the iiachgeformten of the Verdrängerelernent earth well.

Die britische Patentschrift 287 447 zeigt einen Profilträger in Form eines Betonpfahls für einen Gründungspfahl, bei dem das Füllmaterial während des Rammvorganges fortlaufend von oben zugeführt wird. Der Betonpfahl weist unten eine Spitze auf und besitzt in Abständen übereinander angeordnete, rundumlaufende Verdrängerelemente. Dieser Betonpfahl weist den Nachteil auf, daß das von den Verdrängerelcmenten während des Rammvorganges ringsum zur Seite gedruckte Erdreich im Boden einen Gegendruck erzeugt, unter dessen Wirkung das Erdreich oberhalb der Verdrängerelemente sofort wieder gegen den Betonpfahl zurückdrängt und damit das fortlaufende Zuführen von Füllmaterial während des Rammvorganges behindert. Es sind zwar mehrere übereinander angeordnete Verdrängcrelemente vorgesehen, die das Erdreich jedesmal wieder nach außen zurückdrängen sollen, jedoch hat die Praxis gezeigt, daß mit der Anordnung mehrerer Verdrängerelcmente allein dem Übel des sofort wieder zurückdrängenden Erdreichs nicht abgeholfen werden kann.British patent specification 287 447 shows a profile beam in the form of a concrete pile for one Foundation pile in which the filling material is continuously fed in from above during the pile-driving process will. The concrete post has a point at the bottom and is spaced around one another Displacement elements. This concrete pile has the disadvantage that that of the Verdrängerelcmenten During the ramming process all around to the side printed soil in the ground created a counter pressure generated, under the effect of which the soil above the displacement elements immediately again against the Concrete pile pushes back and with it the continuous supply of filling material during the pile-driving process with special needs. There are several displacement elements arranged one above the other Earth should push back outwards each time, but practice has shown that with the Arrangement of several Verdrängerelcmente alone the evil of the soil immediately pushing back again cannot be remedied.

Die britische Patentschrift 431 069 zeigt einen ähnlichen Profilträger in Form eines zusammengesetzten runden Pfahls mit einem Pfahlschuh und darüber in Abständen angeordneten Verdrängerelementen. Auch bei diesem Pfahl wird das Erdreich vom Pfahlschuh und nachfolgend von den rundumlaufenden Vcrdrängerelementen ringsum abgedrängt mit der Folge, daß das Erdreich oberhalb des Pfahlschuhs bzw. oberhalb der Verdrängcrelemente sofort wieder von allen Seiten in die gebildeten Erdschächte zurückdrängt.British patent specification 431 069 shows a similar sectional beam in the form of a composite round post with a post shoe and above spaced displacement elements. Also With this pile, the soil is removed from the pile shoe and then from the circumferential displacement elements pushed all around with the result that the soil above the pile shoe or above the displacement elements immediately pushes back into the formed earth shafts from all sides.

Der Erfindung liegt die Aufgabe zugrunde, einen Profilträger der eingangs angegebenen Gattung bei einfachster Konstruktion derart auszubilden, daß die Gefahr des Zusammendrückens der Erdschächte weitgehend verhindert wird, so daß die während des Rammvorganges einzubringende Füllung satt am Erdreich anliegt und bis zum unteren Ende des Profilträgers herabreicht, wodurch der damit gebildete Gründungspfahl auch zur Aufnahme erheblicher Zugkräfte geeignet ist.The invention is based on the object of providing a profile beam of the type specified at the beginning Simplest construction to train in such a way that the risk of compressing the earth shafts is largely prevented, so that the filling to be introduced during the ramming process is fed to the ground rests and extends down to the lower end of the profile beam, whereby the thus formed Foundation pile is also suitable for absorbing considerable tensile forces.

Diese Aufgabe ist dadurch gelost worden, daß das Profil des Profilträgers einander gegenüberliegende Flansche aufweist, die am unteren Ende keilförmig zusammengebogen sind und eine Schneide bilden, die in der Mittellinie des Profilträgers und parallel zu den Flanschen verläuft.This task has been achieved in that the profile of the profile beam is opposite to one another Has flanges which are bent together in a wedge shape at the lower end and form a cutting edge that runs in the center line of the profile beam and parallel to the flanges.

Die erfindungsgemäße Ausrichtung der Schneide ergibt beim Rammvorgang den Vorteil, daß das Erdreich nur nach den beiden Flanschseiten des Profi! trägers abgedrängt wird. Diese Druckverteilung im Erdboden hat zur Folge, daß in den den Ausnehmun gen des Profilträger und den darin von den Verdrärv eerelementen gebildeten Erdschächten gegenüberliegenden Bereichen des Erdbodens nur ein gering/ Gegendruck vorhanden ist. so daß das Erdreich nicl, in die Erdschächte zurückdrängt.The inventive alignment of the cutting edge has the advantage during the ramming process that the soil only after the two flange sides of the Profi! carrier is pushed away. This pressure distribution in the Soil has the consequence that the conditions in the recesses of the profile girder and that of the Verdrärv Eerelemente formed earth shafts opposite Areas of the ground only have a low / counter pressure. so that the earth is not pushed back into the earth shafts.

Als Füllmittel kommen alle geeigneien Materialiei. wie etwa Beton oder Kies in Frage, aber auch an sie' bekannte, vorzugsweise aus Beton vorgefertigte Eir. legeelemente. die beim Niederbringen des Profilträger fortlaufend in die Querschnittsausnehmungen ein gesetzt werden. Die Einlegeelemente legen sich gleichfalls sau an das Erdreich an und erzeugen eine Reih Schlußverbindung zwischen dem Profilträger und der Erdreich.All suitable materials can be used as fillers. such as concrete or gravel in question, but also of them ' known Eir, preferably prefabricated from concrete. laying elements. which continuously enter the cross-sectional recesses when the profile girder is lowered be set. The insert elements also lay cleanly against the ground and create a row Final connection between the profile beam and the ground.

Nach einer Weiterbildung der Erfindung ist d;: Verdrängerelement, das in den einander abgekehrte; Ausnehmungen des einen Mittelsteg aufweisender· Profilträeers" angeordnet ist, an seiner freien Außen kante bogenförmig ausgebildet. Mit dieser Ausbii dune des Verdrängerelements ritt an den Erdschacht wänden ein zusätzlicher Versteifungseffekt auf. de· ein Einstürzen der im Erdreich gebildeten Hohlräume zusätzlich verhindert.According to a further development of the invention, d; : Displacement element that faces away from each other; Recesses of the "Profilträeers" having a central web is arranged, formed arc-shaped at its free outer edge. With this configuration of the displacement element, an additional stiffening effect occurred on the walls of the earth shaft, which additionally prevents the cavities formed in the earth from collapsing.

Ein Ausführungsbeispiel der Erfindung ist in dei Zeichnung schematisch dargestellt. Es zeigtAn embodiment of the invention is in dei Drawing shown schematically. It shows

F i g. 1 eine Seitenansicht des als Doppel-T-Träger ausgebildeten Profilträgers während des Rammvorganges bei gleichzeitigem Hinzugeben von Beton.F i g. 1 is a side view of the as a double T-beam formed profile beam during the ramming process with simultaneous addition of concrete.

F i g. 2 einen Schnitt längs der Linie H-II in F i g. 1.F i g. 2 shows a section along the line H-II in FIG. 1.

Fig. 3 die konische Ausbildung des Unterendes des Doppel-T-Profilträgers undFig. 3 shows the conical design of the lower end of the double-T profile beam and

Fig. 4 eine perspektivische Ansicht des unteren Bereichs des Profilträgers gemäß Fi g. 1 bis 3.Fig. 4 is a perspective view of the lower one Area of the profile support according to Fi g. 1 to 3.

In Fig. 1 ist der im Zeitpunkt des Einrammens dargestellte Doppel-T-Profiiträger mit 1 bezeichnet. Der Profilträger ist unten konisch ausgebildet, wie aus F i g. 3 und 4 ersichtlich. Dazu werden aus dem Steg 2 des Profilträgers Dreiecke 3 herausgeschnitten und die Flansche 4 umgebogen und an dem Steg festgeschweißt. Die Unterkanten der Flansche 4 bilden damit eine Schneide 8, die zum Steg quer verläuft.In Fig. 1 is at the time of driving The illustrated double-T profile support is designated by 1. The profile support is conical at the bottom, as shown in FIG. 3 and 4 can be seen. To do this, the Web 2 of the profile support triangles 3 cut out and the flanges 4 bent over and welded to the web. The lower edges of the flanges 4 thus form a cutting edge 8 which runs transversely to the web.

Dicht oberhalb der konischen Abbiegung der Flansche 4 sind in den Profilträger beidseitig als Bleche ausgebildete Verdrängerelemente 5 eingesetzt und festgeschweißt. Wie insbesondere aus Fig. 2 ersichtlich, füllen die vorzugsweise waagerecht liegenden Vcrdrängerelemente 5 einmal die Querschnittsausnehmungen zwischen den Flanschen 4 und dem Steg 2 aus und stehen zum anderen außen bogenförmig vor.Just above the conical bend of the flanges 4 are in the profile carrier on both sides as Displacement elements 5 formed from sheets are inserted and welded in place. As can be seen in particular from Fig. 2, the preferably horizontally lying displacement elements 5 fill the cross-sectional recesses once between the flanges 4 and the web 2 and are on the other outside arcuate before.

Beim Niederbringen des Profilträgers drückt die Schneide 8 das Erdreich nach den Flanschseiten weg, so daß der rückwirkende Gegendruck des Erdreichs von den Flanschen 4 aufgefangen wird. Die bogen- Kies, e»neegeDe"· "IC~ r*"^«" förmjgen Verdrängerelemente S bilden beim Nieder- s sackt mit dem Nieaergenc» « gehen des Profilträgers die vom Trägerunterende aus- Erdboden em.When the profile beam is lowered, the cutting edge 8 pushes the soil away towards the flange sides, so that the back pressure of the soil is absorbed by the flanges 4. The curved pebbles, e »neeg eDe " · " IC ~ r *" ^ «" shaped displacement elements S form the ground from the lower end of the girder when the profile girder sinks down.

Hierzu 1 Blatt Zeichnungen1 sheet of drawings

Claims (2)

i 298 Patentansprüche:i 298 claims: 1. Profilträger für einen Gründungspfahl, zu dessen Herstellung der mit mindestens einem s über sein Profil hinausragenden Verdrängerelement versehene Profilträger unter fortlaufender Zuführung von Füllmaterial von oben in den von dem Verdrängerelement nachgeformten Erdschacht eingetrieben wird, dadurchgekennzeichnet, daß das Profil des Profilträgers (1) einander gegenüberliegende Flansche (4) aufweist, die am unteren Ende keilförmig zusammengebogen sind und eine Schneide (8) bilden, die in der Mittellinie des Profilträgers und parallel zu den Flanschen verläuft.1. Profile beam for a foundation pile, for the production of which the at least one s over its profile protruding displacement element provided profile beams under continuous Feeding of filler material from above into the earth shaft post-formed by the displacement element is driven in, characterized that the profile of the profile beam (1) has opposing flanges (4), which are bent together in a wedge shape at the lower end and form a cutting edge (8) which is in the Center line of the profile beam and runs parallel to the flanges. 2. Profilträger nach Anspruch 1 mit einem Mittelsteg, dadurch gekennzeichnet, daß das Verdrängerebment (5), das in den einander abgekehrten Ausnehmungen des Profilträgers angeordnet ist, an seiner freien Außenkante bogenförmig ausgebildet ist.2. Profile support according to claim 1 with a central web, characterized in that the Verdrängerebment (5), which is arranged in the facing recesses of the profile support is, is arcuate at its free outer edge.
DE19661298460 1966-09-07 1966-09-07 PROFILE SUPPORT FOR A FOUNDATION PILE Expired DE1298460C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19661298460 DE1298460C2 (en) 1966-09-07 1966-09-07 PROFILE SUPPORT FOR A FOUNDATION PILE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19661298460 DE1298460C2 (en) 1966-09-07 1966-09-07 PROFILE SUPPORT FOR A FOUNDATION PILE

Publications (2)

Publication Number Publication Date
DE1298460C2 true DE1298460C2 (en) 1974-07-11
DE1298460B DE1298460B (en) 1974-07-11

Family

ID=5663289

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19661298460 Expired DE1298460C2 (en) 1966-09-07 1966-09-07 PROFILE SUPPORT FOR A FOUNDATION PILE

Country Status (1)

Country Link
DE (1) DE1298460C2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US975488A (en) * 1910-09-26 1910-11-15 American Concrete Piling Company Pile.
GB191003723A (en) * 1910-02-15 1911-02-15 Richard Henry Annison Improvements in Piles, Sheeting or similar Members for Constructional Work.
GB335620A (en) * 1929-06-29 1930-09-29 Alexander George Rotinoff Improvements relating to piles and pile driving
US2035217A (en) * 1932-06-11 1936-03-24 Ver Stahlwerke Ag Iron pile
US2057310A (en) * 1932-12-28 1936-10-13 Prielipp Walther Metal pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191003723A (en) * 1910-02-15 1911-02-15 Richard Henry Annison Improvements in Piles, Sheeting or similar Members for Constructional Work.
US975488A (en) * 1910-09-26 1910-11-15 American Concrete Piling Company Pile.
GB335620A (en) * 1929-06-29 1930-09-29 Alexander George Rotinoff Improvements relating to piles and pile driving
US2035217A (en) * 1932-06-11 1936-03-24 Ver Stahlwerke Ag Iron pile
US2057310A (en) * 1932-12-28 1936-10-13 Prielipp Walther Metal pile

Also Published As

Publication number Publication date
DE1298460B (en) 1974-07-11

Similar Documents

Publication Publication Date Title
DE3017064C2 (en) Embankment block
DE2633752A1 (en) EARTH DRAINAGE DEVICE
DE2420173A1 (en) ANCHORED SUPPORTING WALLS IN PRE-FABRICATED DESIGN
DE2107932A1 (en) Earth compacting vehicle
DE2167029A1 (en) PROCESS FOR MANUFACTURING CONCRETE STRUCTURES, SUCH AS DITCH FACES MADE OF LIQUID CONCRETE OR SIMILAR
DE202020105707U1 (en) Photovoltaic system for anchoring in the ground
DE2057548B2 (en) Process for the production of sheet pile walls and steel sheet pile that can be used for this purpose
DE2618459A1 (en) METHOD OF FASTENING FLOOR TO EMBROIDERY
DE1931537B2 (en) Cement filled bank protecting panels - with alternate panels filled first creating convex edges for keyed contact with adjoining panels
DE1298460C2 (en) PROFILE SUPPORT FOR A FOUNDATION PILE
DE2019029C3 (en) Foundation pile
DE2844629A1 (en) PREFABRICATED COMPONENT FOR WALLS
DE814873C (en) Contiguous pile construction
DE1658744B1 (en) Gear box for tunnels or the like.
CH657651A5 (en) Method and arrangement for constructing a retaining wall having external slabs
AT368222B (en) WATER CONSTRUCTION
DE2603515A1 (en) Reinforcement for fixing dykes and riverbanks - uses car tyres filled with dense concrete or bitumen
CH597438A5 (en) Support shuttering for deep trenches
DE202007017342U1 (en) Kit for sheet pile walls
DE1942793A1 (en) Device for broadening the shaft of a driven pile
DE2650930C3 (en) Tunnel expansion
DE2363937A1 (en) LINING AND / OR REINFORCEMENT PLATE FOR UNDERGROUND AND / OR OPEN BUILDINGS
DE10024995C2 (en) Sheet pile with the belt holding the sheet piles
DE1609878A1 (en) Hollow column made of steel with a base plate for use in steel frame buildings
DE2459691C3 (en) Heaped earth dam as well as process for the production of the core seal

Legal Events

Date Code Title Description
E77 Valid patent as to the heymanns-index 1977
EHJ Ceased/non-payment of the annual fee