DE129065C - - Google Patents
Info
- Publication number
- DE129065C DE129065C DENDAT129065D DE129065DA DE129065C DE 129065 C DE129065 C DE 129065C DE NDAT129065 D DENDAT129065 D DE NDAT129065D DE 129065D A DE129065D A DE 129065DA DE 129065 C DE129065 C DE 129065C
- Authority
- DE
- Germany
- Prior art keywords
- sheet pile
- floating
- shaft
- base
- mountains
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011435 rock Substances 0.000 claims description 2
- 230000000149 penetrating effect Effects 0.000 claims 1
- 239000004744 fabric Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/08—Sinking shafts while moving the lining downwards
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
KAISERLICHESIMPERIAL
PATENTAMT.PATENT OFFICE.
Das Wesen der vorliegenden Einrichtung zum Abteufen von Schächten im schwimmenden Gebirge besteht darin, dafs durch Fugen in der bedeckenden Sohle des Schachtes gebogene Spundwandpfähle in das Gebirge eingetrieben werden, welche das Schwimmende abhalten, in den Schacht einzudringen, sobald die Sohlbretter herausgenommen werden.The essence of the present facility for sinking shafts in the floating Mountains consist in the fact that they are curved by joints in the covering floor of the shaft Sheet pile piles are driven into the mountains, which prevent the floating to penetrate into the shaft as soon as the sole boards are removed.
In der beiliegenden Zeichnung ist die Erfindung dargestellt, und zwar zeigt Fig. 1 einen senkrechten Schnitt durch die Bolzenschrotzimtnerung, Fig. 2 einen wagerechten Schnitt nach A-B der Fig. 1, Fig. 3 einen senkrechten Schnitt durch den Boden des Schachtes mit gebogenen Spundwänden, Fig. 4 die obere Ansicht einer doppelten Spundwand, Fig. 5 einen senkrechten Schnitt durch dieselbe nach C-D der Fig. 4, Fig. 6 die tiefer gebrachte Sohle, Fig. 7 das Einbringen der Spundwandtheile. The invention is shown in the accompanying drawing, namely: Fig. 1 shows a vertical section through the bolt chuck trim, Fig. 2 shows a horizontal section according to AB of Fig. 1, Fig. 3 shows a vertical section through the bottom of the shaft with curved sheet piling, 4 shows the upper view of a double sheet pile wall, FIG. 5 shows a vertical section through the same according to CD of FIG. 4, FIG. 6 shows the base that has been brought deeper, FIG. 7 shows the insertion of the sheet pile wall parts.
Die Sohle des Schachtes ist durch die Bretter/ abgedichtet, welche zwischen sich Fugen frei lassen (Fig. 3). Durch die Fugen werden gebogene Spundwandpfähle g so weit eingetrieben, dafs sie sich mit ihrer scharfen Kante im Innern des schwimmenden Gebirges treffen, wobei die äufseren Spundwandpfähle an die eingetriebenen Stofspfähle e anstofsen.The bottom of the shaft is sealed by the boards /, which leave joints free between them (Fig. 3). Curved sheet pile piles g are driven through the joints so far that they meet with their sharp edge in the interior of the floating mountain range, the outer sheet pile piles sticking to the driven-in fabric piles e.
Die eingetriebenen Spundwandpfähle werden durch die Kloben h zusammengehalten, welche mit ihren Enden gegen die Schachtjoche abgesteift sind und so den Auftrieb des schwimmenden Gebirges auf die Schachtzimmerung übertragen. Nach dem Eintreiben werden die Schachtbretter ff entfernt und das von den Spundwandpfählen g eingeschlossene Erdreich so weit ausgehoben, dafs eine niedere Sohle aus Sohlbrettern i (Fig. 6) gebildet werden kann, welche mit der Schrotzimmerung an ihren Enden fest verbunden wird, worauf die Spundwandpfähle herausgezogen und in der durch Fig. 7 erläuterten Weise wieder eingetrieben werden. Um hierbei eine Winde oder Presse benutzen zu können, werden an die Spundwandpfähle g Kloben k angesetzt, an welchen die Winde oder Presse angreift.The driven sheet pile piles are held together by the clamps h , which are stiffened with their ends against the shaft yokes and thus transfer the buoyancy of the floating mountains to the shaft timbering. After driving in, the shaft boards ff are removed and the earth enclosed by the sheet pile piles g is excavated so far that a lower base can be formed from base boards i (Fig. 6), which is firmly connected to the woodwork at its ends, whereupon the sheet pile piles pulled out and driven in again in the manner illustrated by FIG. In order to be able to use a winch or press here, clamps k are attached to the sheet pile piles g , on which the winch or press engages.
Durch die Verwendung der vorbeschriebenen Spundwand ist es ermöglicht, die Schachtsohle zu schliefsen, bevor die Deckung der Sohle geöffnet ist. Ferner kann man mit der Spundwand die Sohlendeckung tiefer bringen, ohne dafs die Gebirgsmassen aus der Sohle, durch den Druck herausgetrieben, hervorquellen. Gerade das Hervorquellen der Gebirgsmassen mufs vermieden werden, da sich sonst hinter den Stofspfählen e hohle oder weniger belastete Räume bilden, welche der Schachtzimmerung gefährlich werden können. "'By using the sheet pile wall described above, it is possible to close the shaft bottom before the cover of the bottom is opened. Furthermore, the sheet pile wall can be used to bring the bottom cover deeper, without the rock masses emerging from the bottom, being driven out by the pressure. Especially the emergence sources of mountain masses must, avoided, as otherwise hollow behind the Stofspfählen e or make less congested areas, which the Schachtzimmerung can be dangerous. "'
Claims (1)
Eine Einrichtung zum Schachtabteufen im schwimmenden Gebirge, gekennzeichnet durch gebogene Spundwandpfähle fg), die durch Fugen der Sohle ffJ so eingeführt werden, dafs sie vom schwimmenden Gebirge Theile abtrennen, welche nach Entfernen der Sohle ff) herausgenommen werden können, worauf die Sohle ff) tiefer gelegt werden kann, ohne dafs das schwimmende Gebirge in den Schacht eindringt. Patent claim:
A device for sinking shafts in floating mountains, characterized by curved sheet pile piles fg), which are introduced through joints in the base ffJ in such a way that they separate parts from the floating rock which can be taken out after removing the base ff) , whereupon the base ff) deeper can be laid without the floating mountains penetrating the shaft.
Publications (1)
Publication Number | Publication Date |
---|---|
DE129065C true DE129065C (en) |
Family
ID=397553
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DENDAT129065D Active DE129065C (en) |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE129065C (en) |
-
0
- DE DENDAT129065D patent/DE129065C/de active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2158764A1 (en) | Method for producing an underground wall | |
DE3590196T (en) | Offshore construction | |
DE69000562T2 (en) | METHOD AND DEVICE FOR DETACHING A SEAL ADHESIVE TO THE CONCRETE OF A WALL SECTION IN THE GROUND. | |
DE2057548B2 (en) | Process for the production of sheet pile walls and steel sheet pile that can be used for this purpose | |
DE129065C (en) | ||
DE2824562A1 (en) | ARTICULATED DEVICE FOR STRENGTHENING THE WALLS OF BUILDING DITCHES, PIPE DITCHES, etc. | |
DE594473C (en) | Process for the dismantling of large deposits | |
EP1328687B1 (en) | Device and method for producing columns of particulate matter in the ground of bodies of water | |
DE3339965A1 (en) | METHOD AND DEVICE FOR PRODUCING A CONCRETE PILE | |
DE2250635C3 (en) | Method of making a tunnel | |
DE568333C (en) | Process for the production of press concrete piles | |
DE1934170A1 (en) | Removal of mineral oil impregnant from - vicinity of bore holes | |
DE3336153C2 (en) | Hollow body that can be filled with building material | |
DE10258300B4 (en) | Method and device for stabilizing abandoned mine shafts | |
DE2322468C2 (en) | Device for creating galleries, channels or tunnels | |
CH597438A5 (en) | Support shuttering for deep trenches | |
DE3307392A1 (en) | METHOD FOR CONSTRUCTION OF CONCRETE LINED UNDER CONCRETE | |
DE63841C (en) | An embodiment of the devices for the sinking of shafts in floating rock protected by the patents No. 29230 and the addition No. 52348 | |
DE275933C (en) | ||
DE4108873A1 (en) | Machine forming foundation slit wall - has two endless cutter chains mounted side by side and equipped with buckets | |
DE66174C (en) | Process for dismantling flutes | |
DE221882C (en) | ||
DE2342887A1 (en) | Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling out | |
DE4032646A1 (en) | Prevention of seepage from refuse dump - by digging narrow trench around dump and filling it with sealing compound | |
DE1944686A1 (en) | Method for sinking earth bores and device for carrying out the same |