DE1283179B - Device for introducing the blown material into mining struts - Google Patents

Device for introducing the blown material into mining struts

Info

Publication number
DE1283179B
DE1283179B DEM72139A DEM0072139A DE1283179B DE 1283179 B DE1283179 B DE 1283179B DE M72139 A DEM72139 A DE M72139A DE M0072139 A DEM0072139 A DE M0072139A DE 1283179 B DE1283179 B DE 1283179B
Authority
DE
Germany
Prior art keywords
pipe
pipe section
connecting piece
offset
blowing direction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DEM72139A
Other languages
German (de)
Inventor
Rainer Borgfeld
Alfred Heidemann
Heinrich Schnelle
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Brieden & Co Maschf K
Original Assignee
Brieden & Co Maschf K
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Brieden & Co Maschf K filed Critical Brieden & Co Maschf K
Priority to DEM72139A priority Critical patent/DE1283179B/en
Publication of DE1283179B publication Critical patent/DE1283179B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/08Filling-up hydraulically or pneumatically

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Supports For Pipes And Cables (AREA)

Description

Vorrichtung zum Einbringen des Blasversatzes in Abbaustreben Beim Ausfüllen des ausgekohlten Strebraumes mit Blasversatz kommt von dem aus einzelnen Rohren aufgebauten, über die ganze Streblänge verlaufenden Rohrstrang zunächst aus dem letzten Rohr das Versatzgut. Ist der zugehörige Feldabschnitt gefüllt, so wird das betreffende Rohr abgekuppelt, und das davorliegende Rohr bläst aus. Dieses wiederholt sich über die Länge des ganzen Strebes. Aus den über die Streblänge verteilten Rohren muß, sobald der Abbau entsprechend fortgeschritten ist, mittels der Kupplungen ein neuer Rohrstrang aufgebaut werden. Dies bedingt einen erheblichen Aufwand an Handarbeit, die überdies zur Erzielung eines zuverlässig dichten Rohrstranges sorgfältig auszuführen ist.Device for introducing the blow offset in dismantling struts when Filling the charred longwall space with blow-off comes from the individual Pipes built up over the entire length of the face pipe string initially the backfill material to the last pipe. If the associated field section is filled, then the pipe in question is disconnected and the pipe in front of it blows out. This is repeated extending over the length of the entire strut. From the pipes distributed over the length of the face must, as soon as the dismantling has progressed accordingly, by means of the couplings new pipe string to be built. This requires a considerable amount of manual labor, which, moreover, must be carried out carefully in order to achieve a reliably leak-proof pipe string is.

Es hat nicht an Bemühungen gefehlt, diesen Arbeitsaufwand dadurch zu vermeiden oder herabzusetzen, daß von dem Rohrstrang während des Blasens nicht die einzelnen Rohrschüsse oder Rohrabschnitte abgetrennt zu werden brauchen, sondern bei abschnittsweisem Verblasen des Versatzes der Zusammenhang des Rohrstranges erhalten bleibt und der Rohrstrang als Ganzes nach genügendem Abbaufortschritt im Streichen weitergerückt werden kann.There has been no lack of effort to reduce this amount of work to avoid or minimize that of the tubing string during blowing the individual pipe sections or pipe sections need to be separated, but if the offset is blown in sections, the relationship of the pipe string is maintained remains and the pipe string as a whole is being painted after sufficient progress has been made can be advanced.

Bei einer Einrichtung zum schwebenden Einbringen von Blasversatz in mit schreitendem Ausbau ausgerüsteten Strebräumen werden aus einer größeren Anzahl von Rohrschüssen aufgebaute Rohrabschnitte durch Kugelgelenkkupplungen verbunden; wird eine Kupplung gelöst, so wird der Rohrstrang unterbrochen, und der von der Unterbrechungsstelle liegende Rohrstrang läßt sich nach dem Versatzfeld zu schwenken. Bei dieser Einrichtung wird der Zusammenhang des Rohrstranges immer von neuem aufgehoben; die Kugelgelenkkupplungen müssen von Hand ständig wieder so verschlossen werden, daß ein dichter Abschluß gewährleistet ist.In the case of a device for the floating introduction of blow offset in with progressive expansion equipped face walls are made of a larger number pipe sections built up from pipe sections connected by ball joint couplings; if a coupling is released, the pipe string is interrupted, and that of the Pipe string lying at the point of interruption can be pivoted after the offset field. With this device, the connection of the pipe string is always canceled anew; the ball joint couplings have to be locked again by hand so that that a tight seal is guaranteed.

Bei einer anderen bekannten Einrichtung sind sämtliche Kupplungen zwischen den Blasversatzrohren als umstellbare Rohrweichen ausgebildet; in der einen Stellung der Weiche ist eine Verbindung zwischen den Rohren gegeben, in der anderen soll, während der nachfolgende Rohrstrang tot liegt, der Versatz über einen Rohrstutzen, der sich an der Weiche befindet, in ein zum Verblasen bestimmtes Düsenrohr gelangen.In another known device, all are clutches designed as adjustable pipe switches between the blow-off pipes; in one In the position of the switch there is a connection between the pipes, in the other should, while the following pipe string is dead, the offset via a pipe socket, which is located on the switch, get into a nozzle tube intended for blowing.

Es sind ferner Rohrstränge bekannt, bei denen - etwa in einem der Länge eines Rohrschusses entsprechenden Abstand -seitliche Blasöffnungen vorgesehen und diese durch abnehmbare Deckel verschließbar sind. Um das seitliche Austreten des Blasgutes aus dem Rohrstrang zu erreichen, ist bei einer vorbekannten Einrichtung im Innern des Rohrstranges ein über die ganze Länge desselben verschiebbarer Ablenkkörper geführt, der an den Stellungen unmittelbar hinter einer seitlichen Öffnung jeweils durch einen Anschlag abstützbar sein soll. Bei einer anderen vorbekannten Einrichtung sind Austragsflächen bildende Bügel vorgesehen, die sich in die seitlichen Rohröffnungen einschwenken lassen und mittels deren das im Rohrstrang ankommende Blasgut abgelenkt und unmittelbar, d. h. im wesentlichen im Streichen verblasen werden soll.There are also pipe strings known in which - for example in one of the Distance corresponding to the length of a pipe section - lateral blower openings provided and these can be closed by removable lids. To the side exit to reach the blown material from the pipe string, is in a previously known device inside the pipe string a deflecting body which can be displaced over its entire length out of the positions immediately behind a side opening should be supported by a stop. In another previously known facility Straps forming discharge surfaces are provided, which are located in the side tube openings Let it swing in and use it to deflect the blown material arriving in the pipe string and immediately, d. H. should essentially be blown by brushing.

Die genannten Einrichtungen verwenden Elemente, wie Rohrweichen, schwenkbare Ablenkkörper und arretierbare Anschlagkörper, deren sicheres Funktionieren bei einem so sperrigen Gut, wie es der zum Ausfüllen der Hohlräume im Streb verwendete Versatz darstellt, nicht gegeben sein dürfte.The devices mentioned use elements such as transfer tubes, pivotable Deflection body and lockable stop body, their safe functioning in a as bulky as the offset used to fill the cavities in the longwall represents, should not be given.

Es ist das Ziel der vorliegenden Erfindung, eine Vorrichtung zum Einbringen des Blasversatzes in Abbaustreben zu schaffen, die aus konstruktiv einfachen, dem rauhen Betrieb unter Tage entsprechenden und den besonderen Verhältnissen des mit hoher Geschwindigkeit arbeitenden und einen starken Verschleiß bedingenden Blasbetriebes angepaßten Elementen aufgebaut ist. Dabei soll der Zusammenhang des ganzen, aus einzelnen Rohrabschnitten bestehenden Rohrstranges ständig erhalten bleiben und die Umstellungen, die für das abschnittsweise Verfüllen der einzelnen Versatzabschnitte erforderlich sind, entweder in einfacher Weise von Hand oder auch ma- schinell vorgenommen werden können, ohne daß der dichte Abschluß in den Teilen des Rohrstranges, durch die das Gut mittels Druckluft gefördert wird, in Frage gestellt ist. Auch sollen die für das Verbinden und Lösen der einzelnen Rohrabschnitte bestimmten Elemente das gegebenenfalls maschinell unter Umständen auch unter Fernsteuerung durchzuführende Nachschieben des Rohrstranges im Streichen entsprechend dem Abbaufortschritt ermöglichen.It is the aim of the present invention to create a device for introducing the blow offset in mining struts, which is constructed from structurally simple elements which correspond to the rough operation underground and the special conditions of the blowing operation working at high speed and causing heavy wear. The aim is the whole, consisting of individual pipe sections pipe string be maintained throughout and the changes that are necessary for the sectional filling the individual offset sections can be made either in a simple manner by hand or by machine without the tight seal of the connection is in question in the parts of the pipe string through which the material is conveyed by means of compressed air. The elements intended for connecting and disconnecting the individual pipe sections are also intended to enable the pipe string to be pushed in by brush, possibly also by machine, under certain circumstances under remote control, in accordance with the progress of mining.

Gemäß der Erfindung sieht eine Vorrichtung zum Einbringen des Blasversatzes in Abbaustreben zwischen aufeinanderfolgenden Rohrabschnitten, wobei jeder Rohrabschnitt aus einem oder mehreren Rohrschüssen besteht, ein im Streichen verschiebbares an sich bekanntes Verbindungsstück vor. In einem derartigen Verbindungsstück ist das Ende des einen in der Blasrichtung rückwärts liegenden Rohrabschnittes schwenkbar gelagert; für die Querverschiebung des Endes des- -in der Blasrichtung folgenden Rohrabschnittes ist in dem Verbindungsstück eine Führung in Gestalt eines Kreisaussehnittes vorgesehen, wobei der Halbmesser des Kreises etwa gleich der Länge des Rohrabschnittes ist.According to the invention provides a device for introducing the blow charge in struts between successive pipe sections, each pipe section consists of one or more pipe sections, one that can be moved by painting known connector. In such a connector that is The end of the one pipe section lying backwards in the blowing direction is pivotable stored; for the transverse displacement of the end of the following in the blowing direction Pipe section is a guide in the form of a circular section in the connecting piece provided, the radius of the circle being approximately equal to the length of the pipe section is.

In der einen Stellung des zweiten Rohrabschnittes liegt das Ende des ersten Rohrabschnittes für den Austritt des Blasstrahles frei, in der anderen Stellung sind beide Rohrabschnitte miteinander gekuppelt, so daß der Blasstrahl ungehindert in den folgenden Rohrabschnitt eintreten kann.In one position of the second pipe section is the end of the first pipe section free for the blower jet to exit, in the other position Both pipe sections are coupled together so that the blower jet is unhindered can enter the following pipe section.

Die Lagerung des Endes des ersten Rohrabschnittes in dem Verbindungsstück soll eine Schwenkung um einen Winkel zulassen, der etwa dem Größtmaß der möglichen Schrägstellungen aufeinanderfolgender Rohrabschnitte entspricht.The storage of the end of the first pipe section in the connector should allow pivoting by an angle that is about the largest possible Corresponds to inclinations of successive pipe sections.

Das Verblasen des Versatzes kann, wenn durch Querverschiebung des nachfolgenden Rohrabschnittes in dem Verbindungsstück die Öffnung des vorhergehenden Rohrabschnittes freigelegt ist, unmittelbar im Schweben erfolgen. Es ist aber auch möglich, auf die Öffnung des Rohrabschnittes ein Ablenkrohr aufzusetzen. Ein solches Ablenkrohr kann in dem Verbindungsstück derart verstellbar angeordnet sein, daß es sich mit der Querverschiebung des in der Blasrichtung folgenden Rohrabschnittes, wenn dieser dadurch die Öffnung des ersten Rohrabschnittes freigibt, vor diese Austrittsöffnung legt. Ein solches Ablenkrohr kann dabei. um eine senkrechte Achse schwenkbar gelagert werden, so daß der Versatz mehr in streichender oder mehr in schwebender Richtung zum Verblasen kommt. Es kann auch um die Achse des Rohrabschnittes schwenkbar gelagert sein, auf den es aufgesetzt wird, um die Ausblasrichtung mehr nach dem Hangenden oder mehr nach dem Liegenden zu zu legen.The displacement can be blown out, if by transverse displacement of the subsequent pipe section in the connecting piece the opening of the previous one Pipe section is exposed, take place directly in the levitation. It is also possible to place a deflection pipe on the opening of the pipe section. One such The deflection pipe can be arranged in the connecting piece so that it is adjustable it is the transverse displacement of the pipe section following in the blowing direction, if this thereby releases the opening of the first pipe section, in front of this outlet opening lays. Such a baffle can. mounted pivotably about a vertical axis so that the offset is more in the trending or more in the floating direction comes to fade. It can also be mounted pivotably about the axis of the pipe section on which it is placed so that the discharge direction is more towards the hanging wall or more to lay after the lying.

Eine . einfache Konstruktion des Verbindungsstückes ergibt sich dadurch, daß es aus einer flachen Bodenplatte und .einer- entsprechenden Kopfplatte besteht, die durch -senkrechte Stützen starr miteinander verbunden sind; in den zwischen Kopf- und Bodenplatte liegenden Raum ragen die Enden der beiden Rohrabschnitte hinein; die Führungen für die Querverschiebung -des in der Blasrichtung folgenden Rohrabschnittes befinden sich in der Kopfplatte und in der Bodenplatte. -Bei Verwendung der neuen Vorrichtung ist es nicht nötig, immer neue Versatzmatten für das Verblasen- eines .Feldes zu-benutzen. Man kann vielmehr versatzseitig an jedem Rohrabschnitt eine Versatzmatte von der Länge-des Rohrabschnittes befestigen, die beim Verblasen den Versatz festhält und abschirmt und mit der Weiterführung des Rohrstranges in Richtung auf den Kohlenstoß sich mitbewegt, um beim Verblasen der nächsten Reihe von Versatzfeldern wieder zur Abstützung des Versatzes zu dienen.One . simple construction of the connecting piece results from that it consists of a flat base plate and a corresponding top plate, which are rigidly connected to each other by vertical supports; in the between The ends of the two pipe sections protrude into the space lying on the top and bottom plates; the guides for the transverse displacement of the pipe section following in the blowing direction are located in the top plate and in the base plate. -When using the new Device, it is not necessary, always new offset mats for the blown one .Field to-use. Rather, one can have one on the offset side on each pipe section Fasten the offset mat of the length of the pipe section that the Offset holds and shields and with the continuation of the pipe string in the direction on the coal face moves with the blowing of the next row of offset fields to serve again to support the offset.

Das Verbindungsstück kann entweder als auf dem Liegenden verfahrbaren Schlitten ausgebildet sein. Man kann es auch an besonderen Stützelementen lagern, die mit dem Hangenden und Liegenden verspannbar sind. Jedem Verbindungsstück ist in diesem Falle ein derartiges Stützelement zugeordnet, und das Verbindungsstück ist daran in der Höhe verschiebbar und feststellbar gelagert. Soll das Verbindungsstück auf den Kohlenstoß zu um ein bestimmtes Stück verstellt werden, so wird das Stützelement gelöst und in der neuen Stellung wieder verspannt. Die Verstellbarkeit in der Höhe dient insbesondere dazu, sich Unterschieden in der Flözmächtigkeit anzupassen und dafür Sorge zu tragen, daß der Rohrstrang gerade verläuft, d. h. die Achsen aller aneinandergefügter Rohrabschnitte zusammenfallen.The connecting piece can either be moved as lying on the bed Be formed slide. It can also be stored on special support elements, which can be braced with the hanging and lying walls. Every connector is in this case, such a support element is assigned, and the connecting piece is mounted on it in a height-adjustable and lockable manner. Should the connector be adjusted to the coal face by a certain distance, so the support element released and tightened again in the new position. The adjustability in height serves in particular to adapt to differences in seam thickness and ensure that the pipe string is straight, d. H. the axes of all butted pipe sections coincide.

Für das Verschließen der in einem Verbindungsstück aneinandergefügten Rohrabschnitte kommt entweder eine Ringdichtung in Frage, diese kann in einer Ringnut am Ende entweder des davorliegenden Rohres oder des in der Blasrichtung folgenden Rohres gelagert sein. Sie ist vorzugsweise als hohler Schlauch ausgebildet, damit sie in der Schließlage zusammengedrückt werden kann. Der Schwenkpunkt des in der Blasrichtung vorhergehenden Rohres befindet sich in diesem Falle nicht in der Nähe der Rohrachse, sondern liegt in dem Verbindungsstück weiter nach dem Versatz zu, wenigstens etwa am Umfang des Rohres; auf diese Weise läßt sich das mit der Dichtung versehene Ende glatt abheben und aufschieben.For closing the junction pieces that are joined together in a connector Pipe sections are either a ring seal, this can be in an annular groove at the end of either the pipe in front of it or the one following in the blowing direction Be stored pipe. It is preferably designed as a hollow tube so that it can be compressed in the closed position. The pivot point of the In this case, the blowing direction of the preceding pipe is not in the vicinity the pipe axis, but lies in the connection piece further after the offset, at least approximately on the circumference of the pipe; in this way it can be done with poetry Lift off the provided end smoothly and slide it on.

Eine andere Art der Abdichtung besteht aus Halbschalen, die sich dichtend aufeinanderlegen, wobei sich an dem Ende des ersten Rohres auf der Versatzseite, an dem Ende des zweiten Rohres auf der Kohlenstoßseite eine Halbschale befindet. Diese Halbschalen legen sich beim Aufeinandersetzen der Rohre mit ihrem oberen und unteren Ende dichtend aneinander und dichten ebenfalls am Umfang ab.Another type of seal consists of half-shells that seal on top of each other, at the end of the first tube on the offset side, a half-shell is located at the end of the second tube on the coal face side. These half-shells lay down when the pipes are placed on top of each other with their upper and lower end sealing against each other and also seal on the circumference.

In den Zeichnungen ist die neue Vorrichtung zum Einbringen des Blasversatzes in ihrem Aufbau und ihrer Wirkungsweise an beispielhaften Ausführungsformen erläutert.In the drawings is the new device for introducing the blow charge explained in their structure and mode of operation using exemplary embodiments.

A b b. 1 zeigt im Grundriß einen sich über die Länge mehrerer Blasrohrabschnitte erstreckenden Teil eines Strebes; A b b. 2 zeigt in größerem Maßstabe zwei aufeinanderfolgende Verbindungsstücke und den dazwischenliegenden Rohrabschnitt; A b b. 3 zeigt eines der beiden Verbindungsstücke in einer von der der A b b. 2 abweichenden Stellung des quer verschieblichen Rohrendes; A b b. 4 stellt einen im Streichen verlaufenden senkrechten Schnitt durch das Verbindungsstück mit Blick in der Blasrichtung dar; A b b. 5 ist eine der A b b. 2 entsprechende Darstellung einer anderen Ausführungsform des Verbindungsstückes, bei der die aufeinanderfolgenden Rohrabschnitte miteinander verbunden sind; A b b. 6 zeigt die gleiche Anordnung bei aufgehobener Verbindung der Rohrabschnitte; A b b. 7 ist ein der A b b. 4 entsprechender, im Streichen verlaufender senkrechter Schnitt durch ein Verbindungsstück gemäß A b b. 6; A b b. 8 zeigt zwei Rohrenden in der Schließstellung mit einer Dichtung durch Halbschalen; A b b. 9 stellt in einer Seitenansicht zwei Stützelemente mit einem daran aufgehängten Rohrstrang dar; A b b. 10 zeigt zwei aufeinanderfolgende Rohrabschnitte in fünf zeitlich nacheinanderliegenden Arbeitsstellungen I bis V.A b b. 1 shows a plan view of several blowpipe sections extending over the length extending part of a strut; A b b. 2 shows two consecutive ones on a larger scale Connecting pieces and the pipe section therebetween; A b b. 3 shows one of the two connecting pieces in one of the A b b. 2 different position the transversely displaceable pipe end; A b b. 4 represents a running in strike vertical section through the connector looking in the blowing direction; A b b. 5 is one of the A b b. 2 corresponding representation of another embodiment of the connecting piece, in which the successive pipe sections with each other are connected; A b b. 6 shows the same arrangement with the connection broken the pipe sections; A b b. 7 is one of the A b b. 4 corresponding, running in the deletion vertical section through a connector according to A b b. 6; A b b. 8 shows two Pipe ends in the closed position with a seal through half-shells; A. b b. 9 shows, in a side view, two support elements with one suspended therefrom Tubing string; A b b. Figure 10 shows two consecutive pipe sections in five Working positions I to V, one after the other.

Zum Aufbau des für das Verblasen benutzten Rohrstranges dienen Rohre 5, 5', die aus einem oder mehreren Rohrschüssen aufgebaut sind, und Verbindungsstücke 9.Pipes are used to build the pipe string used for blowing 5, 5 ', which are constructed from one or more pipe sections, and connecting pieces 9.

Der Aufbau eines einzelnen Verbindungsstückes ist am besten aus den A b b. 4 und 7 zu erkennen. Jedes Verbindungsstück hat eine Kopfplatte 14 und eine Bodenplatte 15. Durch senkrechte Stützen sind Kopfplatte und Bodenplatte miteinander verbunden. Die Pfeile 10 bezeichnen die Richtung, in der das Gut verblasen wird.The construction of a single connector is best shown in A b b. 4 and 7 can be seen. Each connecting piece has a top plate 14 and a base plate 15. The top plate and base plate are connected to one another by vertical supports. The arrows 10 indicate the direction in which the material is blown.

In A b b. 2 sind die Rohrabschnitte in der Richtung des Blasversatzes mit 5, 5' und 5", die aufeinanderfolgenden Verbindungsstücke mit 9 und 9' bezeichnet. In dem Verbindungsstück 9 ist das Ende des Rohres 5 in dem mit A bezeichneten Punkt drehbar gelagert, ebenso das Rohr 5' in dem mit A' bezeichneten Punkt in dem Verbindungsstück 9'. An den Rohren 5, 5' usw. befindet sich an einem Ende ein Flansch 11, am anderen Ende ein Flansch 12. In jedem Verbindungsstück ist weiterhin ein Krümmer 13 angeordnet, an dem sich ein Flansch 16 befindet. Der Flansch 16 des in einem Verbindungsstück 9 gelagerten Krümmers und der Flansch 12 des Rohres 5' sind - um einen kleinen Winkel schwenkbar - miteinander verbunden. Mit C ist der Schwenkpunkt bezeichnet, in dem sich das Gelenk befindet. Dabei wird der Flansch 12 des Rohres 5' mittels der im Punkt B drehbar gelagerten Führungszapfen 8 in der Bodenplatte 15 und der Kopfplatte 14 geführt, und zwar in je einem Langloch 17, das im wesentlichen die Form eines Ausschnittes aus einer Kreisbahn hat; es handelt sich um einen Kreis, dessen Radius gleich der Länge des Rohrabschnittes 5' und dessen Mittelpunkt der Punkt A' des folgenden Verbindungsstückes ist.In A b b. 2 the pipe sections in the direction of the blow offset are denoted by 5, 5 'and 5 ", the successive connecting pieces are denoted by 9 and 9'. In the connecting piece 9, the end of the tube 5 is rotatably mounted at the point denoted by A, as is the tube 5 'in which a' designated point in the connecting piece 9 '. to the pipes 5, 5', etc. is located at one end, a flange 11, 12 at the other end a flange in each connecting piece, a manifold 13 is further arranged, on which there is a flange 16. The flange 16 of the elbow mounted in a connection piece 9 and the flange 12 of the tube 5 'are connected to one another - pivotable through a small angle. The pivot point C is the pivot point at which the joint is located The flange 12 of the tube 5 'is guided in the base plate 15 and the top plate 14 by means of the guide pins 8 rotatably mounted at point B, in each case in an elongated hole 17 which essentially has the shape of a cutout ittes from a circular path; it is a circle, the radius of which is equal to the length of the pipe section 5 ' and the center of which is the point A' of the following connecting piece.

Zur Führung des Flansches 16 des Krümmers 13 ist eine Führungsleiste 18 vorgesehen.To guide the flange 16 of the bend 13 is a guide bar 18 provided.

Die miteinander verbundenen Flansche 16 und 12 können also in jedem Verbindungsstück 9 zwischen den beiden Endstellungen verschoben werden, die in A b b. 2 einerseits, in A b b. 3 andererseits erkennbar sind. Um die Querverschiebung durchzuführen, greift in einer Gelenkverbindung 21 die Kolbenstange 19 eines mit einem Druckmittel betriebenen Zylinders 22 an den Flansch 12 an. In der einen Endstellung sind die Rohre 5 und 5' (Ab b. 2) miteinander so verbunden, daß eine Förderung des Blasversatzes möglich ist. Die Abdichtung der Rohre erfolgt durch eine ringförmige Gummidichtung 7, die sich in dem Flansch 12 befindet.The interconnected flanges 16 and 12 can therefore be moved in each connecting piece 9 between the two end positions shown in A b b. 2 on the one hand, in A b b. 3 on the other hand are recognizable. In order to carry out the transverse displacement, the piston rod 19 of a cylinder 22 operated with a pressure medium engages the flange 12 in an articulated connection 21. In one end position, the tubes 5 and 5 ' (Ab b. 2) are connected to one another in such a way that the blow offset can be promoted. The pipes are sealed by an annular rubber seal 7, which is located in the flange 12.

Die andere Endstellung ergibt sich aus A b b. 3. Hier ist das Rohr 5' um den Punkt A' geschwenkt worden, und an das Rohr 5 schließt sich der Krümmer 13 an.The other end position results from A b b. 3. Here the pipe 5 'has been pivoted about the point A', and the bend 13 connects to the pipe 5.

In A b b. 1 ist der Ablauf der Verfüllung des Versatzfeldes mit Blasversatz erkennbar. Vor dem mit 1 bezeichneten Kohlenstoß liegt der Förderer 2, mit 3 sind die Ausbaugespanne bezeichnet. Der Blasrohrstrang besteht aus den einzelnen Rohren 5, die mittels der Verbindungsstücke 9 zusammengesetzt sind. Das mit 9F bezeichnete Verbindungsstück befindet sich in der in A b b. 3 dargestellten Stellung. Ein Krümmer 13 ist an die ankommende Blasleitung angeschlossen und hat gerade- den mit 4 bezeichneten Teil des Versatzfeldes gefüllt. Mit 6 ist der bereits mit Versatz gefüllte Teil des Feldes bezeichnet, mit 7 die alte Versatzwand. Ist das Versatzfeld 4 fertig verblasen, so wird das in der Blasrichtung vorhergehende Verbindungsstück 9 in die der A b b. 3 entsprechende Stellung gebracht und alsdann mit dem hier befindlichen Krümmer 13 geblasen. Das Verbindungsstück ruht, wie A b b. 4 erkennen läßt, nach Art eines Schlittens auf dem Liegenden, so daß ein Verschieben im Streichen möglich ist. Der Zylinder 22, der zur Querverschiebung der Rohrenden in dem Verbindungsstück dient, ist an der Platte 24 befestigt, die mittels entsprechender Zapfen 25 in Langlöchern der Kopfplatte 14 und der Bodenplatte 15 geführt ist.In A b b. 1 the process of backfilling the offset field with blow offset can be seen. The conveyor 2 is located in front of the coal pile designated by 1 , and the extension spans are designated by 3. The blowpipe consists of the individual pipes 5, which are put together by means of the connecting pieces 9. The connector labeled 9F is located in the in A b b. 3 position shown. A bend 13 is connected to the incoming blower line and has just filled the part of the offset field labeled 4. The part of the field already filled with the offset is designated with 6, the old offset wall with 7. When the offset field 4 is finished blowing, the connecting piece 9 preceding in the blowing direction is inserted into the A b b. 3 brought the corresponding position and then blown with the manifold 13 located here. The connector rests, as A b b. 4 shows, in the manner of a sledge on the lying position, so that it can be moved by stroking. The cylinder 22, which is used to move the pipe ends transversely in the connecting piece, is fastened to the plate 24, which is guided by means of corresponding pins 25 in elongated holes in the top plate 14 and the base plate 15.

Der Krümmer 13 kann um seine eigene Achse gedreht werden, so daß er beispielsweise die in A b b. 4 ausgezogen gezeichnete Stellung oder die gestrichelt gezeichnete Stellung einnehmen kann. Danach richtet sich der Winkel, unter dem das Gut austritt.The manifold 13 can be rotated about its own axis, so that it, for example, in A b b. 4 can assume the position shown in solid lines or the position shown in dashed lines. Then the angle at which the good emerges is determined.

Um eine unbeabsichtigte Querverschiebung der Rohrflansche 12 und 16 auszuschließen, ist ein federbelasteter Sicherungsbolzen 26 vorgesehen und in der Kopfplatte 14 gelagert. Eine Bewegung der Rohrflansche kann nur stattfinden, wenn der handbetätigte Sicherungsbolzen 26 den Weg freigibt. Nach Passieren des Ablenkstückes 13 und dessen Flansch 16 rastet der Bolzen 26 wieder ein. Bei mechanisiertem Betrieb muß natürlich die Handbetätigung des Sicherungsbolzens durch eine mechanische Betätigung ersetzt werden.In order to prevent unintentional transverse displacement of the pipe flanges 12 and 16, a spring-loaded securing bolt 26 is provided and mounted in the head plate 14. A movement of the pipe flanges can only take place when the manually operated locking bolt 26 releases the path. After passing the deflector 13 and its flange 16, the bolt 26 engages again. In the case of mechanized operation, the manual actuation of the safety bolt must of course be replaced by a mechanical actuation.

Bei der Ausführungsform nach den A b b. 5 bis 10 wird auf das Aufsetzen eines besonderen Krümmers verzichtet. Auch bei der Anordnung nach A b b. 5 bis 7 ist ein Zylinder 22 vorgesehen, der mittels einer Kolbenstange 19 den Flansch 12 angreift. Auch hier können Gummidichtungen 7 vorgesehen sein, die zu einem dichten Abschluß führen.In the embodiment according to A b b. 5 to 10 there is no need to put on a special elbow. Even with the arrangement according to A b b. 5 to 7 a cylinder 22 is provided which engages the flange 12 by means of a piston rod 19. Here, too, rubber seals 7 can be provided, which lead to a tight seal.

Statt den Abschluß mittels einer ringförmigen Gummidichtung zu erzielen, können auch Halbschalen mit Dichtungen benutzt werden, wie sie in A b b. 8 dargestellt sind. Dabei sitzt die eine Halbschale 27 an dem Flansch 12 des in der Blasrichtung folgenden Rohres 5', die andere Halbschale 28 an dem Flansch des in der Blasrichtung vorhergehenden Rohres 5. Beim Einschwenken in diejenige Stellung, bei der beide Rohre miteinander verbunden sind, erfolgt so ein dichter Abschluß.Instead of achieving the conclusion by means of an annular rubber seal, half-shells with seals can also be used, as shown in A b b. 8 are shown. One half-shell 27 is seated on the flange 12 of the pipe 5 ' following in the blowing direction, the other half-shell 28 on the flange of the preceding pipe 5 in the blowing direction a tight seal.

Die Verbindungsstücke können entweder auf dem Liegenden in Form eines Schlittens verschiebbar sein, man kann aber auch besondere Stützelemente dazu benutzen, den zum Blasen dienenden Rohrstrang zu tragen. Solche Stützelemente sind in A b b. 9 dargestellt. Sie können die Form von Grubenstempeln haben mit einem Fuß 29, einem Unterstempel 30, einem Oberstempel 31 und einem Stempelkopf 32. Die Verspannung des Oberstempels kann hydraulisch oder mechanisch erfolgen. An dem Stempelschloß 33 ist nun das Verbindungsstück 9 mittels einer höhenverstellbaren Halterung 34 gelagert. Das Verblasen eines Strebes kann mittels einer derartigen Einrichtung in der in A b b. 10 näher dargestellten Weise erfolgen: an den hier dargestellten Rohrabschnitten 51, 52, 53 ist versatzseitig jeweils eine Versatzmatte 35 aufgehängt, die mit dem Verschieben des Rohres 51, 52, 53 weiterwandert. Die Verbindungsstücke sind der Reihe nach mit 91, 92, 93 bezeichnet. 36 ist ein Verschlag, der nach der Kopfstrecke zu zunächst den Versatz abgrenzt. Soll das an diesen Verschlag 36 sich anschließende Feld verblasen werden, so wird bei dem in der Stellung I befindlichen Rohrstrang zunächst in dem Verbindungsstück 92 das Rohr 51 so quer verschoben, daß die Mündung des Rohres 52 offenliegt (Stellung II).The connecting pieces can either be slidable on the lying surface in the form of a slide, but special support elements can also be used to carry the pipe string used for blowing. Such support elements are in A b b. 9 shown. They can be in the form of pit punches with a foot 29, a lower punch 30, an upper punch 31 and a punch head 32. The upper punch can be braced hydraulically or mechanically. The connecting piece 9 is now mounted on the ram lock 33 by means of a height-adjustable holder 34. The blowing of a strut can by means of such a device in the A b b. 10 take place in the manner shown in more detail: on the pipe sections 51, 52, 53 shown here, an offset mat 35 is suspended on the offset side, which moves on with the displacement of the pipe 51, 52, 53. The connecting pieces are labeled 91, 92, 93 in sequence. 36 is a shed that initially delimits the offset after the head section. If the field adjoining this crate 36 is to be blown out, the pipe 51 is first displaced transversely in the connecting piece 92 in the pipe string located in position I, so that the mouth of pipe 52 is exposed (position II).

Alsdann wird durch entsprechendes Versetzen des Stützelementes, an dem das Verbindungsstück 91 angebracht ist, das Rohr 51 wieder parallel zu dem Rohr 52 gestellt. Nunmehr kann mittels des Rohres 52 das mit 37 bezeichnete erste Feld verblasen werden (Stellung III).Then, by moving the support element accordingly, on to which the connecting piece 91 is attached, the pipe 51 again parallel to the pipe 52 posed. Now, by means of the tube 52, the first field, designated 37 be blown (position III).

Dieses Spiel wiederholt sich nun von Feld zu Feld. Zunächst wird in dem Verbindungsstück 93 durch Querverschiebung des Endes des Rohres 52 die Mündung des Rohre 53 freigegeben (Stellung IV).This game is now repeated from field to field. First, in the connector 93 by transverse displacement of the end of the tube 52 the mouth of the tubes 53 released (position IV).

Alsdann wird durch Versetzen des Stützelementes, an dem das Verbindungsstück 92 aufgehängt ist, der Zustand hergestellt, der sich aus der Darstellung V ergibt, und nunmehr auch das mit 38 bezeichnete Feld verblasen.Then by moving the support element on which the connecting piece 92 is suspended, the state is established, which results from the representation V, and now also blow the field marked 38.

Die neue Vorrichtung bietet den besonderen Vorteil, daß bei zusammenhängend bleibendem Versatzstrang auch beim Querverschieben der einzelnen Rohrenden bzw. Krümmer in den Verbindungsstücken die Förderung des Versatzgutes, d. h. der Blasbetrieb selbst, keine Unterbrechung erfährt. Eine wesentliche Anpassungsfähigkeit an die übrigen Vorgänge der Gewinnung und Förderung ergibt sich dadurch, daß die Verbindungsstücke nicht, wie bekannte Einrichtungen, an den Ausbaugestellen befestigt sind, vielmehr unabhängig von den sonstigen im Streb vorhandenen Stützelementen und Gewinnungs- und Fördergeräten verstellbar sind.The new device has the particular advantage that when connected permanent offset line even when moving the individual pipe ends or Elbows in the connecting pieces the conveyance of the backfill material, d. H. the blowing operation himself, does not experience any interruption. A substantial adaptability to the other operations of extraction and promotion results from the fact that the connecting pieces not, as known devices, are attached to the support frames, rather independent of the other supporting elements and mining and conveyors are adjustable.

Claims (7)

Patentansprüche: 1. Vorrichtung zum Einbringen des Blasversatzes in Abbaustreben mittels eines immer im Zusammenhang bleibenden Stranges miteinander kuppelbarer, aus einem oder mehreren Rohren bestehender Rohrabschnitte, zwischen denen im Streichen verschiebbare Verbindungsstücke vorgesehen sind, dadurch gekennzeichnet, daß das Ende des einen Rohrabschnittes (5) in dem Verbindungsstück (9) schwenkbar gelagert, für die Querverschiebung des Endes des in der Blasrichtung folgenden Rohrabschnittes (5@ in dem Verbindungsstück (9) eine Führung (17) in Gestalt eines Kreisausschnittes vorgesehen ist, wobei der Halbmesser des Kreises etwa gleich der Länge des Rohrabschnittes (5') ist. Claims: 1. Device for introducing the blow offset in Striving for degradation by means of a strand that always remains connected to one another couplable pipe sections consisting of one or more pipes, between which are slidable connecting pieces in the brush, characterized in that, that the end of one pipe section (5) is pivotable in the connecting piece (9) stored, for the transverse displacement of the end of the pipe section following in the blowing direction (5 @ in the connecting piece (9) a guide (17) in the form of a segment of a circle is provided, the radius of the circle being approximately equal to the length of the pipe section (5 ') is. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Lagerung des Endes des ersten Rohrabschnittes (5) in dem Verbindungsstück (9) eine Schwenkung um einen Winkel zuläßt, der etwa dem Größtmaß der möglichen Schrägstellung aufeinanderfolgender Rohrabschnitte (5, 5') entspricht. 2. Apparatus according to claim 1, characterized in that the storage of the end of the first pipe section (5) in the connecting piece (9) a pivot allows about an angle which is about the greatest possible inclination of the consecutive Pipe sections (5, 5 ') corresponds. 3. Vorrichtung nach Anspruch 1 und 2, dadurch gekennzeichnet, daß eine mit der Achse im wesentlichen im Streichen liegende Kolben-Zylinder-Anordnung (19, 22) vorzugsweise kohlenstoßseitig in dem Verbindungsstück (9) drehbar gelagert ist. 3. Apparatus according to claim 1 and 2, characterized characterized in that a piston-cylinder arrangement lying essentially in line with the axis (19, 22) rotatably mounted in the connecting piece (9), preferably on the carbon joint side is. 4. Vorrichtung nach Anspruch 1 bis 3, dadurch gekennzeichnet, daß zum Halten des gesamten Rohrstranges eine Reihe von besonderen, mit dem Hangenden und Liegenden verspannbaren Stützelementen (29 bis 32) dient, wobei an dem einzelnen Stützelement ein Verbindungsstück (9) in der Höhe verschiebbar und feststellbar gelagert ist. 4. Apparatus according to claim 1 to 3, characterized in that for holding of the entire pipe string a number of special ones, with the hanging and lying braced support elements (29 to 32) is used, on the individual support element a connecting piece (9) is mounted so that it can be moved in height and locked. 5. Vorrichtung nach Anspruch 1 bis 4, dadurch gekennzeichnet, daß versatzseitig an jedem Rohrabschnitt (5) eine Versatzmatte (35) gleicher Länge angeordnet ist. 5. Apparatus according to claim 1 to 4, characterized in that the offset side an offset mat (35) of the same length is arranged on each pipe section (5). 6. Vorrichtung nach Anspruch 1 bis 4, dadurch gekennzeichnet, daß in dem Verbindungsstück (9) ein Ablenkrohr (13) derart verstellbar angeordnet ist, daß es sich mit der Querverschiebung des in der Blasrichtung folgenden Rohrabschnittes (5') aus der Flucht des ersten Rohrabschnittes (5') vor dessen Austrittsende legt. 6. Apparatus according to claim 1 to 4, characterized in that in the connecting piece (9) a deflection tube (13) is arranged so that it can be adjusted so that it can cope with the transverse displacement of the pipe section (5 ') following in the blowing direction from the alignment of the first Pipe section (5 ') sets in front of its outlet end. 7. Vorrichtung nach Anspruch 6, dadurch gekennzeichnet, daß das Ablenkrohr (13) an dem Ende des in Blasrichtung folgenden Rohrabschnittes (5@ um eine senkrechte Achse schwenkbar gelagert ist. B. Vorrichtung nach Anspruch 1 bis 7, dadurch gekennzeichnet, daß das Verbindungsstück (9) aus einer flachen Bodenplatte (15) und einer entsprechenden Kopfplatte (14) besteht und diese durch senkrechte Stützen starr verbunden sind, wobei die Enden der Rohrabschnitte (5, 5') in den zwischen Kopf- und Bodenplatte (14,15) liegenden Raum hineinragen und die Langlöcher (17) für die Querverschiebung des in der Blasrichtungen folgenden Rohrabschnittes (5') in der Kopf- und Bodenplatte (14,15) liegen. In Betracht gezogene Druckschriften: Deutsche Patentschrift Nr. 811341; deutsche Auslegeschriften Nr. 1016 211, 1119 204, 1185 565.7. Apparatus according to claim 6, characterized in that the deflection tube (13) at the end of the blowing direction following pipe section (5 @ is mounted pivotably about a vertical axis. B. Apparatus according to claim 1 to 7, characterized in that the connecting piece (9) from a flat base plate (15) and a corresponding top plate (14) exists and these are rigidly connected by vertical supports, the ends of the pipe sections (5, 5 ') in the between the top and bottom plates (14, 15) Space protrude and the elongated holes (17) for the transverse displacement of the in the blowing directions following pipe section (5 ') lie in the top and bottom plate (14,15). Into consideration Printed publications: German Patent No. 811341; German interpretative publications No. 1016 211, 1119 204, 1185 565.
DEM72139A 1966-12-22 1966-12-22 Device for introducing the blown material into mining struts Pending DE1283179B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEM72139A DE1283179B (en) 1966-12-22 1966-12-22 Device for introducing the blown material into mining struts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEM72139A DE1283179B (en) 1966-12-22 1966-12-22 Device for introducing the blown material into mining struts

Publications (1)

Publication Number Publication Date
DE1283179B true DE1283179B (en) 1968-11-21

Family

ID=7314334

Family Applications (1)

Application Number Title Priority Date Filing Date
DEM72139A Pending DE1283179B (en) 1966-12-22 1966-12-22 Device for introducing the blown material into mining struts

Country Status (1)

Country Link
DE (1) DE1283179B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2826183A1 (en) * 1978-06-15 1979-12-20 Thyssen Industrie Pipe connection for mine dust extraction system - has hydraulically actuated sliding hinge allowing tube to slide before swinging away
DE2845981A1 (en) * 1978-10-21 1980-04-24 Bergwerksverband Gmbh FOREHEAD DISCHARGE FOR A BLOW OFF LINE
DE3002779A1 (en) * 1980-01-26 1981-07-30 Bergwerksverband Gmbh, 4300 Essen MECHANIZED FORE-HEAD DISCHARGE FOR BLOW OFF LINES
DE3046315A1 (en) * 1980-12-09 1982-06-16 Bergwerksverband Gmbh, 4300 Essen Thin seam mine pneumatic backfilling lead - is mounted with advance hydraulic discharges on flat skids, with swivelling guides

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE811341C (en) * 1950-03-18 1951-08-20 Gutehoffnungshuette Oberhausen Method and device for introducing backfill in mining
DE1016211B (en) * 1955-04-01 1957-09-26 Hemscheidt Maschf Hermann Process for the introduction of backfill in Strebraeume equipped with extension frames
DE1119204B (en) * 1958-12-12 1961-12-14 Hemscheidt Maschf Hermann Device for levitating introduction of blown backfill in Strebraeumen equipped with progressive expansion
DE1185565B (en) * 1963-07-31 1965-01-21 Gewerkschaft Reuss Packing material conveying pipeline for blow molding operations

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE811341C (en) * 1950-03-18 1951-08-20 Gutehoffnungshuette Oberhausen Method and device for introducing backfill in mining
DE1016211B (en) * 1955-04-01 1957-09-26 Hemscheidt Maschf Hermann Process for the introduction of backfill in Strebraeume equipped with extension frames
DE1119204B (en) * 1958-12-12 1961-12-14 Hemscheidt Maschf Hermann Device for levitating introduction of blown backfill in Strebraeumen equipped with progressive expansion
DE1185565B (en) * 1963-07-31 1965-01-21 Gewerkschaft Reuss Packing material conveying pipeline for blow molding operations

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2826183A1 (en) * 1978-06-15 1979-12-20 Thyssen Industrie Pipe connection for mine dust extraction system - has hydraulically actuated sliding hinge allowing tube to slide before swinging away
DE2845981A1 (en) * 1978-10-21 1980-04-24 Bergwerksverband Gmbh FOREHEAD DISCHARGE FOR A BLOW OFF LINE
DE3002779A1 (en) * 1980-01-26 1981-07-30 Bergwerksverband Gmbh, 4300 Essen MECHANIZED FORE-HEAD DISCHARGE FOR BLOW OFF LINES
DE3046315A1 (en) * 1980-12-09 1982-06-16 Bergwerksverband Gmbh, 4300 Essen Thin seam mine pneumatic backfilling lead - is mounted with advance hydraulic discharges on flat skids, with swivelling guides

Similar Documents

Publication Publication Date Title
DE1781411C2 (en) Container for bulk goods with a discharge opening that can be closed by means of a slide plate. Eliminated from: 1506438
DD144886A5 (en) DEVICE FOR PRODUCING CROSS-PROFILEED PLASTIC PIPES
DE1921048A1 (en) Apparatus and method for producing sand mold parts
DE2831687A1 (en) DEVICE FOR CLEANING THE UPPER PIPES OF COOK OVEN BATTERIES
DE1283179B (en) Device for introducing the blown material into mining struts
DE2651107A1 (en) METHOD AND DEVICE FOR CLEANING COK OVEN DOORS
DE2402916A1 (en) MOBILE AUTOMATIC IRRIGATION DEVICE
DE1627585A1 (en) Improved pipe bending machine
DE2230187C3 (en) Device for pulling several plastic strands from extrusion nozzles
DE3246089C2 (en) Device for filling sacks
DE3104666C2 (en) Molding sand blow molding machine
DE3642358A1 (en) Process and apparatuses for welding pipes in pipe pre-pressing works
DE1941094A1 (en) Bracing of a face conveyor
DE2642984B2 (en) Discharge line with discharge at the front
DE942386C (en) Device for introducing offset in struts
DE3400772A1 (en) Mobile support combination, in particular for pillar-and-breast work
DE2843055A1 (en) DEVICE FOR EXTRACTION OF MINERALS IN PARTICULARLY UNDERGROUND MINING
DE2735126C3 (en) Device for opening the valves of valve bags and for attaching the bags to a filler neck
DE437488C (en) Free-hanging, mobile molding machine
DE2752295C2 (en) Device for fastening and releasing molded parts on or from molded bases and molded walls for the industrial production of precast concrete parts
DE356161C (en) Shaking channel
DE1185565B (en) Packing material conveying pipeline for blow molding operations
DE1284382B (en) Combined extraction and conveying facility
DE1280788B (en) Intermediate piece with discharge for blow offset line
DE4331517C2 (en) Device with opening and closing devices for several molding tools arranged on a base plate