DE1239452B - Shaft guide, especially steel guide for mining shafts - Google Patents

Shaft guide, especially steel guide for mining shafts

Info

Publication number
DE1239452B
DE1239452B DE1961G0032031 DEG0032031A DE1239452B DE 1239452 B DE1239452 B DE 1239452B DE 1961G0032031 DE1961G0032031 DE 1961G0032031 DE G0032031 A DEG0032031 A DE G0032031A DE 1239452 B DE1239452 B DE 1239452B
Authority
DE
Germany
Prior art keywords
guide
bridging member
sections
pieces
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE1961G0032031
Other languages
German (de)
Inventor
Dr-Ing Anselm Hoischen
Kurt Froebrich
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gutehoffnungshutte Sterkrade AG
Original Assignee
Gutehoffnungshutte Sterkrade AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gutehoffnungshutte Sterkrade AG filed Critical Gutehoffnungshutte Sterkrade AG
Priority to DE1961G0032031 priority Critical patent/DE1239452B/en
Priority to GB1318862A priority patent/GB940756A/en
Priority to BE616216A priority patent/BE616216A/en
Publication of DE1239452B publication Critical patent/DE1239452B/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D7/00Shaft equipment, e.g. timbering within the shaft
    • E21D7/02Arrangement of guides for cages in shafts; Connection of guides for cages to shaft walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Framework For Endless Conveyors (AREA)
  • Nozzles (AREA)

Description

BUNDESREPUBLIK DEUTSCHLANDFEDERAL REPUBLIC OF GERMANY

DEUTSCHESGERMAN

PATENTAMTPATENT OFFICE

AUSLEGESCHRIFTEDITORIAL

Int. CL:Int. CL:

B 66b B 66b

Deutsche Kl.: 35 a-9/05 German class: 35 a -9/05

Nummer: 1239452Number: 1239452

Aktenzeichen: G 32031XI/35 aFile number: G 32031XI / 35 a

Anmeldetag: 11. April 1961Filing date: April 11, 1961

Auslegetag: 27. April 1967Open date: April 27, 1967

Bergbauschächte unterliegen erfahrungsgemäß während des Abbaues der umliegenden Flöze im allgemeinen beträchtlichen Formänderungen, und zwar im wesentlichen einer Verkrümmung der Längsachse und einer Stauchung. Letztere erreicht vor allem dann große Ausmaße, wenn ein Schachtsicherheitspfeiler nicht vorgesehen oder verhältnismäßig schwach bemessen ist bzw. nachträglich weitgehend abgebaut wird. Die Verkürzung der Schachtlänge bedingt einen entsprechenden Längenausgleich ίο der Schachteinbauten, der bei den Schachtführungssträngen zur Aufrechterhaltung einer möglichst stoß- und schwingungsfreien Führung des Förderkorbes besondere Aufmerksamkeit erfordert.Experience has shown that mining shafts are subject to the surrounding seams in the general considerable changes in shape, essentially a curvature of the Longitudinal axis and an upset. The latter is particularly large when there is a shaft safety pier is not intended or is relatively weakly dimensioned or largely retrospectively is dismantled. The shortening of the shaft length requires a corresponding length compensation ίο the manhole internals, which in the case of the manhole guide lines to maintain a and vibration-free guidance of the conveyor cage requires special attention.

Es sind bereits Schachtführungen bekannt, die an verschiedenen Stellen eines jeden Stranges teleskopartig ineinandergreifende Abschnitte aufweisen, von denen der eine ein Hohlkastenprofil besitzt und der andere keilartig verjüngt ausgebildet ist. Diese Anordnung ermöglicht zwar verhältnismäßig große Längenänderungen des Führungsstranges, hat aber den Nachteil, daß die Führungsfläche an der Übergangsstelle der beiden Abschnitte einen Sprung aufweist, der hier grundsätzlich unvermeidlich ist und bei erst teilweise ineinandergeschobenen Abschnitten besonders stark in Erscheinung tritt. Um diesen Sprung bzw. den durch ihn hervorgerufenen Stoß auf den darüber fahrenden Förderkorb gering halten zu können, werden bei einer Schachtführang mittels Hohlprofilen, die an der Stoßstelle durch ein am einen Hohlprofil befestigtes, am anderen HoH-profil axial geführtes Uberbrückungsglied in Längsrichtung nachgiebig miteinander verbunden sind, nach der Erfindung im Bereich zwischen benachbarten Führungsabschnitten bügeiförmige Führungsstücke angeordnet, die das Uberbrückungsglied im frei liegenden Bereich zwischen den Stoßkanten der Hohlprofile umgreifen und deren Außenflächen mit den Führungsflächen des Hohlprofils fluchten. Hierdurch kann eine Längen- 4" änderung des Schachtführungsstranges durch Entfernen oder gegebenenfalls auch Hinzufügen von Führungsstücken ohne Ausbau oder Verändern der Strangabschnitte auf einfache Weise ausgeglichen werden.Manhole guides are already known that telescope at different points on each strand Have interlocking sections, one of which has a hollow box profile and the other is tapered like a wedge. This arrangement allows relatively large Changes in length of the guide strand, but has the disadvantage that the guide surface at the transition point of the two sections has a jump, which is fundamentally inevitable here and is particularly noticeable in sections that are only partially nested. To this one The jump or the impact caused by it on the conveyor cage moving over it is small to be able to hold, are in a shaft guide by means of hollow profiles, which at the joint through a Bridging member attached to one hollow profile and axially guided on the other HoH profile in the longitudinal direction are resiliently connected to each other, according to the invention in the area between adjacent Guide sections arranged bow-shaped guide pieces, which the bridging member reach around in the exposed area between the abutting edges of the hollow profiles and their The outer surfaces are aligned with the guide surfaces of the hollow profile. This allows a length of 4 " Modification of the manhole guide line by removing or, if necessary, adding Guide pieces compensated in a simple manner without expanding or changing the strand sections will.

In der Zeichnung ist ein Ausführungsbeispiel der Erfindung dargestellt. Hierbei zeigt F i g. 1 einen Aufriß,An exemplary embodiment of the invention is shown in the drawing. Here shows F i g. 1 an elevation,

Fig. 2 eine Seitenansicht der Übergangsstelle zweier benachbarter Führungsabschnitte teilweise im Schnitt, währendFig. 2 is a side view of the transition point two adjacent guide sections partially in section, while

Fig. 3 bis 6 Querschnitte ΠΙ-ΙΙΙ, IV-IV, V-V, Schachtführung, insbesondere Stahlführung für
Bergbau-Förderschächte
Fig. 3 to 6 cross-sections ΠΙ-ΙΙΙ, IV-IV, VV, shaft guide, in particular steel guide for
Mining production shafts

Anmelder:Applicant:

Gutehoffnungshütte Sterkrade
Aktiengesellschaft,
Oberhausen (RhId.), Lipperfeld 1
Gutehoffnungshütte Sterkrade
Corporation,
Oberhausen (RhId.), Lipperfeld 1

Als Erfinder benannt:Named as inventor:

Dr.-Ing. Anselm Hoischen, Herne (Westf.);
Kurt Fröbrich, Oberhausen-Sterkrade (RhId.) ■
Dr.-Ing. Anselm Hoischen, Herne (Westphalia);
Kurt Fröbrich, Oberhausen-Sterkrade (RhId.) ■

VI-VI in den inF ig. 2 angedeuteten Ebenen wiedergeben. VI-VI in the inF ig. 2 levels indicated.

Das untere Ende 1 eines durch ein Hohlprofil gebildeten Abschnittes der Schachtführung ist mittels Stegplatte 2 und Kulissenstück 3 an einem Einstrich 4 längsverschieblich gelagert. Das obere Ende 5 des nach unten anschließenden Führungsabschnittes ist an dem Einstrich 6 gegen Längsverschiebung starr befestigt, so daß bei Verkürzung der Führungsstranglänge der gegenseitige Abstand der Endflächen bzw. Stoßkanten benachbarter, die Führungsabschnitte bildender Hohlprofile abnimmt. Der stufenförmige Absatz zwischen beiden Führungsabschnitten bzw. deren Führungsflächen ist durch mehrere einseitig offene, bügeiförmige Führungsstücke? überbrückt, die in ihrem Profil dem der Führungsabschnitte entsprechen. Diese Führungsstücke sind an der im oberen Führungsabschnitt mittels Lasche 8 starr befestigten und im unteren Führungsabschnitt längsverschiebbar gelagerten Schiene 9 geführt und weisen eine solche Wandstärke auf, daß die den Förderkorb führenden Flächen über die Stoßstelle der Führungsprofilschienen hinweg praktisch ohne Absatz durchlaufen. Die Führungsstücke 7 sind an der dem Förderkorb abgewandten Seite mittels Bolzen 10 geschlossen. Die das Uberbrückungsglied darstellende Schiene 9 ist aus mehreren C-förmigen Profilen zusammengesetzt und berührt alle Innenwände des quadratischen Hohlprofils sowohl der benachbarten Führungsstrangenden als auch der Führungsstücke 7 jeweils längs zweier vertikaler Streifen, so daß die Lage der Führungsstücke gegen Querverschiebung und Verdrehung gesichert ist.The lower end 1 of a section of the shaft guide formed by a hollow profile is by means of Web plate 2 and link piece 3 mounted on a single line 4 so as to be longitudinally displaceable. The top 5 of the downwardly adjoining guide section is rigid on the single line 6 against longitudinal displacement attached, so that when the length of the guide strand is shortened, the mutual spacing of the end faces or abutting edges of adjacent hollow profiles forming the guide sections decreases. Of the step-shaped shoulder between the two guide sections or their guide surfaces is through several bow-shaped guide pieces open on one side? bridged that in their profile that of the Correspond to guide sections. These guide pieces are on the one in the upper guide section rigidly fastened by means of tab 8 and mounted so as to be longitudinally displaceable in the lower guide section Rail 9 out and have such a wall thickness that the leading the conveyor cage Run through surfaces over the joint of the guide profile rails with practically no shoulder. The guide pieces 7 are closed by means of bolts 10 on the side facing away from the conveyor cage. The rail 9 representing the bridging member is composed of several C-shaped profiles and touches all inner walls of the square hollow profile as well as the neighboring ones Guide strand ends and the guide pieces 7 each along two vertical strips, so that the The position of the guide pieces is secured against lateral displacement and rotation.

709 577/72709 577/72

Claims (3)

Axiale Verschiebungen der Führungsabschnitte gegeneinander machen sich zunächst durch Vergrößerung oder Verringerung der Spalte 11 zwischen den Führungsstücken 7 bemerkbar, ohne die Korbführung merklich zu beeinflussen. Wenn bei der ohnehin erforderlichen laufenden Überwachung der Schachteinbauten festgestellt wird, daß die Spaltbreite gewisse erfahrungsgemäß zu bestimmende Grenzwerte über- oder unterschreitet, so wird entweder eines der Führungsstücke entfernt bzw. gegen ein anderes geeigneter Höhe ausgetauscht. Aus- und Einbau der Führungsstücke kann nach Entfernen der Bolzen 10 in kürzester Zeit und ohne Lagerveränderung der Führungsabschnitte bzw. der sie bildenden Hohlprofile durchgeführt werden. Patentansprüche:Axial displacements of the guide sections relative to one another are initially noticeable by enlarging or reducing the gaps 11 between the guide pieces 7 without noticeably influencing the guide of the basket. If, during the ongoing monitoring of the manhole installations, which is required anyway, it is found that the gap width exceeds or falls below certain limit values to be determined based on experience, then either one of the guide pieces is removed or replaced with another suitable height. Removal and installation of the guide pieces can be carried out after removing the bolts 10 in a very short time and without changing the bearings of the guide sections or the hollow profiles that form them. Patent claims: 1. Schachtführung, insbesondere Stahlführung für Bergbau-Förderschächte, mittels an anderen Schachteinbauten, z. B. Einstrichen, befestigter Hohlprofile, wobei die einer Stoßstelle benachbarten Führungsabschnitte durch ein am einen Hohlprofil fest angeordnetes, am anderen Hohlprofil axial beweglich geführtes Überbrückungsglied in Längsrichtung nachgiebig verbunden sind, dadurch gekennzeichnet, daß im Bereich zwischen benachbarten Führungsabschnitten bügelförmige Führungsstücke (7) angeordnet sind, die das Überbrückungsglied (9) im frei liegenden Bereich zwischen den Stoßkanten der Hohlprofile umgreifen und deren Außenflächen mit den Führungsflächen des Hohlprofils fluchten.1. Shaft guide, in particular steel guide for mining production shafts, by means of others Manhole installations, e.g. B. stroked, attached hollow profiles, with those adjacent to a joint Guide sections through a hollow profile which is fixedly arranged on one hollow profile and on the other axially movably guided bridging member resiliently connected in the longitudinal direction are characterized in that bow-shaped guide pieces (7) in the area between adjacent guide sections are arranged that the bridging member (9) in the exposed area between the abutting edges grip around the hollow profiles and their outer surfaces are aligned with the guide surfaces of the hollow profile. 2. Schachtführung nach Anspruch 1 unter Verwendung von rechteckigen Hohlprofilen, dadurch gekennzeichnet, daß das Führungsstück (7) das Uberbrückungsglied (9) auf drei Seiten umfaßt, während auf seiner vierten Seite eine Spannvorrichtung (10) zum lösbaren Befestigen des Führungsstückes am Überbrückungsglied vorgesehen ist.2. Shaft guide according to claim 1 using rectangular hollow profiles, characterized characterized in that the guide piece (7) the bridging member (9) on three sides comprises, while on its fourth side a clamping device (10) for releasable fastening of the guide piece is provided on the bridging member. 3. Schachtführung nach Anspruch 1, dadurch gekennzeichnet, daß einer Stoßstelle mehrere Führungsstücke (7) von verschiedener axialer Länge zugeordnet sind.3. shaft guide according to claim 1, characterized in that a joint several Guide pieces (7) of different axial lengths are assigned. Hierzu 1 Blatt Zeichnungen1 sheet of drawings 709 577/72 4.67 © Bundesdruckerei Berlin709 577/72 4.67 © Bundesdruckerei Berlin
DE1961G0032031 1961-04-11 1961-04-11 Shaft guide, especially steel guide for mining shafts Withdrawn DE1239452B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DE1961G0032031 DE1239452B (en) 1961-04-11 1961-04-11 Shaft guide, especially steel guide for mining shafts
GB1318862A GB940756A (en) 1961-04-11 1962-04-05 Improvements in or relating to mine shaft guides
BE616216A BE616216A (en) 1961-04-11 1962-04-10 Guiding device for mine shafts, and slides applied in this device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1961G0032031 DE1239452B (en) 1961-04-11 1961-04-11 Shaft guide, especially steel guide for mining shafts

Publications (1)

Publication Number Publication Date
DE1239452B true DE1239452B (en) 1967-04-27

Family

ID=7124371

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1961G0032031 Withdrawn DE1239452B (en) 1961-04-11 1961-04-11 Shaft guide, especially steel guide for mining shafts

Country Status (3)

Country Link
BE (1) BE616216A (en)
DE (1) DE1239452B (en)
GB (1) GB940756A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0585777A1 (en) * 1992-08-31 1994-03-09 KONE Elevator GmbH Intermediate member for fixing the guide rails to an elevator shaft

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0585777A1 (en) * 1992-08-31 1994-03-09 KONE Elevator GmbH Intermediate member for fixing the guide rails to an elevator shaft

Also Published As

Publication number Publication date
BE616216A (en) 1962-07-31
GB940756A (en) 1963-10-30

Similar Documents

Publication Publication Date Title
DE2302053B2 (en) Mooring device for a cable trench or the like. with a stepped cross-section
DE3150459C2 (en) Conveyor trough, in particular for chain scraper conveyors
DE922754C (en) Double chain scraper conveyor
DE1239452B (en) Shaft guide, especially steel guide for mining shafts
AT221133B (en) Device for concreting long components
DE202022104944U1 (en) Gauge correction device for track laying
EP2865630B1 (en) Method and device for producing a box girder
DE2633150C2 (en) Single chain scraper conveyor
DE3523944C2 (en)
DE3408427C1 (en) Counterweight for a lift car hung on a lifting rope
AT518062B1 (en) Track construction vehicle for carrying out track construction work
DE102009007711B4 (en) Side wall for a rail vehicle
DE102013007271A1 (en) Cleaning device for cleaning of cooling pipes of radiator, has nozzle support system that is arranged on driving profile and cross element
DE3205568C1 (en) Sheet piles and sheet piling made from them
DE633475C (en) Ring or arched track extension from profile iron segments
AT393704B (en) Connecting arrangement
DE973689C (en) Cap joint connection, especially for pit support caps
DE102020204652A1 (en) System for changing a segment in a continuous caster
DE2857781C2 (en) Device for guiding a coal plow on the conveyor trough of a chain conveyor
AT509869A4 (en) METHOD FOR MANUFACTURING A BRIDGE BEARING
DE828387C (en) Locking bar for caps
DE3049702C2 (en) Connection of pontoon sections
DE2753724C3 (en) Method for installing and replacing guide rod strands, as well as device and guide rod for carrying out the method
DE1905877A1 (en) Start-up device in plants for the continuous casting of metals, in particular steel
DE2724588A1 (en) SLIDING BOW REMOVAL

Legal Events

Date Code Title Description
E771 Valid patent as to the heymanns-index 1977, willingness to grant licences
EHJ Ceased/non-payment of the annual fee