DE1140690B - Climbing crane - Google Patents
Climbing craneInfo
- Publication number
- DE1140690B DE1140690B DESCH19592A DESC019592A DE1140690B DE 1140690 B DE1140690 B DE 1140690B DE SCH19592 A DESCH19592 A DE SCH19592A DE SC019592 A DESC019592 A DE SC019592A DE 1140690 B DE1140690 B DE 1140690B
- Authority
- DE
- Germany
- Prior art keywords
- crane
- tower
- climbing
- support
- compensating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
- B66C23/28—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
- B66C23/32—Self-hoisting cranes
Description
Kletterkran Die in Geschäftszentren erkennbare Konzentration der Bauwerke auf engstem Raum macht die Errichtung von Hochhäusern mehr und mehr erforderlich. Solche Hochhäuser lassen sich mit den bekannten Turmdrehkranen nicht wirtschaftlich errichten, selbst wenn diese entsprechend dimensioniert würden.Climbing crane The concentration of structures that can be seen in business centers The construction of high-rise buildings in a confined space is becoming more and more necessary. Such high-rise buildings are not economical with the known tower cranes erect, even if these were dimensioned accordingly.
Solche Krane erfordern zu ihrer Standsicherheit eine entsprechend vergrößerte Basis auf dem Boden bzw. eine entsprechend breite Fahrbahn.Such cranes require a correspondingly for their stability enlarged base on the ground or a correspondingly wide roadway.
Da aber die Hochhäuser meistens aus der Raumnot erforderlich werden, stehen nur in den seltensten Fällen ausreichende Flächen für die Aufstellung solcher Krane unmittelbar neben den Bauwerken zur Verfügung. Hinzukommt, daß mit zunehmender Höhe ein präzises Absetzen der Last auf der jeweiligen hochgelegenen Decke bzw. das Absetzen großflächiger Schalungstafeln, das Einlassen von Armierungen und das Füllen senkrechter Schalungen bei neben dem Bauwerk stehenden Kran fragwürdig erscheint.However, since the high-rise buildings are usually required due to the lack of space, Only in the rarest of cases are there sufficient areas for the installation of such Cranes are available right next to the structures. In addition, with increasing Height a precise placement of the load on the respective high ceiling or the setting down of large formwork panels, the insertion of reinforcements and that Filling vertical formwork with a crane standing next to the structure seems questionable.
Oftmals kann mit dem Ausleger die Last nur noch auf der Baukante, abgesetzt und muß von dort weitertransportiert werden, was aber bei dem oft recht erheblichen Gewicht, z. B. der auf dem Erdboden vorgefertigten Armierungskörbe, mit großem Kraft- und Zeitaufwand verbunden ist.Often with the boom, the load can only be carried on the building edge, deposited and has to be transported from there, which is often the case with that considerable weight, e.g. B. the reinforcement cages prefabricated on the ground, is associated with great effort and time.
Es ist darum erwünscht, mit dem Ausleger die jeweilige, Arbeitsfläche bestreichen zu können und die meist nur geringen Freiflächen am Bau weitgehendst der Materiallagerung vorzubehalten.It is therefore desirable to use the boom for the respective work surface to be able to paint and to a large extent the mostly only small open spaces on the building reserved for material storage.
Dieser Forderung tragen Krane mit Klettereinrichtung Rechnung, die in einem Schacht, welcher durch iii den Decken freigehaltene öffnungen gebildet ist, hineingestellt werden und gemäß dem Emporwachsen des Bauwerks jeweils nachgezogen werden können.This requirement is met by cranes with climbing equipment in a shaft formed by openings kept free in the ceilings is to be placed in it and drawn as the building grows up can be.
Es ist auch eine Konstruktion mit einer außenam Bauwerk befestigten Säule bekanntgeworden. Diese erfordert einen erheblichen Aufwand hinsichtlich der Montage, der Befestigung und bei dem jeweiligen Verlängern des Krantunnes nach oben.It is also a construction with an exterior attached to the structure Pillar became known. This requires a considerable effort in terms of Assembly, the fastening and the respective lengthening of the crane tunnel upwards.
Bei anderen, in das Bauwerk hineingestellten Kranen sind Hubvorrichtungen bekannt, die aus hydraulischen Arbeitszylindern bestehen, welche den Klettervorgang des Kranes nur in ihrer fesfliegenden maximalen Hubhöhe ermöglichen. Bei fehlender Abstützmöglichkeit auf Zwischendecken, die oft bei Industriebauten fehlen oder nur in größeren Ab- ständen folgen, werden kostspielige Zwischenkonstruktionen zur Ermöglichung des Klettervorganges erforderlich.In other cranes placed in the structure, lifting devices are known which consist of hydraulic working cylinders which allow the crane to climb only at their maximum lifting height. In the absence of support possibility of false ceilings that are often lacking in industrial or follow stands only in larger payoffs, costly intermediate structures to enable the climbing process are required.
Eine etwa erforderlich werdende Turinverlängerung nach unten ist nur mit großem Aufwand möglich. Bei weiter bekanntgewordenen selbststeigenden Turmkranen besteht die Hubeinrichtung aus Windwerken und Flaschenzügen. Für den Klettervorgang wird ein den Kranmast umschließender Kastenrahmen auf dem Bauwerk aufgesetzt. Die zwischen dem Kastenrahmen und dem Fußträger wirksam werdende Hubvorrichtung bewegt den Krantunn in dem Kastenträger aufwärts bis die Fußträger, die während des 1-Jubvorganges verkürzt werden, ein neues Auflager finden.A downward extension of Turin that may become necessary is only possible with great effort. With self-climbing tower cranes that have become more popular the lifting device consists of winches and pulleys. For the climbing process a box frame surrounding the crane mast is placed on the structure. the between the box frame and the foot support effective lifting device is moved the crane tunnel in the box girder up to the foot girders, which during the 1-jubilee process be shortened, find a new support.
Diese Kranart erfordert entsprechend geeignete, Bauwerke, da die öffnungen in den Decken so groß sein müssen, daß die über den Mastquerschnitt hinausvorstehenden Teile, Fußträger und Flaschenzüge, zwischen ihnen bewegt werden können. Die sich für den Aufstellort anbietenden Fahrstuhlschächte liegen nur selten in dem Bereich, der für die beste Ausnutzung des Auslegers gewählt -werden müßte.This type of crane requires suitable structures, as the openings in the ceilings must be so large that those protruding beyond the mast cross-section Parts, foot supports and pulleys, can be moved between them. Which The elevator shafts for the installation site are rarely located in the area which would have to be chosen for the best utilization of the boom.
Es sind auch bereits Kletterkrane mit einer innerhalb des Kranturtnes untergebrachten Hubvorrichtung zum Anheben des Kranes, die zwischen dem Kranturm einerseits und auf tragfähigen Bauwerksteilen ruhenden, als Vertikalführungen für den Kranturm dienenden Widerlagern andererseits wirksam ist, bekannt. Für Krane dieser Art wird vorgeschlagen, daß als Hubvorrichtung in an sich bekannter Weise ein Flaschenzug verwendet wird, der über ein Ausgleichsorgan an einem Tragseil angreift, das von einem an einer Seite des Kranturmes auf einem tragfähigen Bauwerksteil ruhenden Widerlagerteil über ein an dem Kranturm gehaltertes Tragrollenpaar zu dem gegenüberliegenden Widerlagerteil geführt ist, wobei der Angriffspunkt des über das Ausgleichsorgan wirksamen Flaschenzuges am Tragseil zwischen den Tragrollen dieses Rollenpaares liegt. Durch die erfindungsgemäße Führung und Verbindung der Seile kann der Kran über die gleichmäßig belasteten Tragseile durch nur kleine öffnungen in den Geschoßdecken gehoben werden. Dadurch, daß die Tragseile über das Ausgleichsorgan gleichmäßig belastet werden, treten keine einseitigen Hubkräfte am Turm auf unä die Widerlager stützen sich gleichmäßig auf den Decken ab, so daß eine maximale Sicherheit beim Mettervorgang des Kranes erreicht wird.There are already climbing cranes with one inside the crane belt housed lifting device for lifting the crane, which is between the crane tower on the one hand and resting on load-bearing parts of the structure, as vertical guides for the crane tower serving abutments on the other hand is effective, known. For cranes of this type it is proposed that as a lifting device in a manner known per se a block and tackle is used, which engages a suspension rope via a compensating element, the one resting on one side of the crane tower on a load-bearing part of the structure Abutment part via a supporting roller pair held on the crane tower to the opposite one Abutment part is guided, the point of application of the over the compensating member effective pulley block on the carrying rope between the carrying rollers of this pair of rollers lies. By guiding and connecting the ropes according to the invention can the crane over the evenly loaded suspension ropes through only small openings in the floor slabs are lifted. The fact that the suspension ropes over the compensating member are evenly loaded, there are no unilateral lifting forces on the tower the abutments are supported evenly on the ceilings, so that a maximum Safety is achieved during the Metter process of the crane.
Die Zeichnungen geben einigeAusführungsbeispiele wieder. Die Fig. 1 bis 5 zeigen im Bauwerk angeordnete Krane und derenKlettervorgang.The drawings show some exemplary embodiments. Figures 1 to 5 show cranes arranged in the building and their climbing process.
Fig. 1 zeigt den Kran vor Beginn des Kletterns. Die Decken des angenommenen Bauwerks sind mit 1 bis 4 bezeichnet. Der Turm 6 ist mit seinem Fußende auf der Decke 1 mittels der Unterlage 7 gelagert und bei den Decken 2 und 3 von zur Vertikalführung des Mastes dienenden Widerlagern 8-8' und 9-9' seitlich gehalten, die mit Unterlagen 10, 11 verbunden und auf den Decken 2 und 3 angeordnet sind. Die gestrichelt angedeutete Decke 4 wird als noch nicht tragfähig, aber zur Aufnahme horizontaler Kräfte geeignet, angenommen, so daß bis zum Beginn des Kletterns der Turm hier durch Keile oder Abstützungen erforderlichenfalls gehalten würde.Fig. 1 shows the crane before climbing begins. The ceilings of the assumed structure are labeled 1 to 4. The tower 6 is supported with its foot end on the ceiling 1 by means of the support 7 and at the ceilings 2 and 3 held laterally by abutments 8-8 ' and 9-9' serving for the vertical guidance of the mast, which are connected to the supports 10, 11 and on the ceilings 2 and 3 are arranged. The ceiling 4 indicated by dashed lines is assumed to be not yet stable, but suitable for absorbing horizontal forces, so that the tower would be held here by wedges or supports, if necessary, until the beginning of climbing.
Das Tragseil 12 oder ein anderes geeignetes Tragmittel, z. B. ein Gurt oder eine Kette, ist an dem Widerlager 8 befestigt und umschlingt die Tragrollen 13 und die Ausgleichsrolle 14. Letztere ist bei 15 mit der Unterflasche16 des Seilzuges 17 lösbar verbunden. Die Oberffasche 18 des Seilzuges 17, der mehrsträngig ausgeführt ist, ist samt dem Festpunkt des Seilzuges 17 im Turm 6 fest eingebaut. Das andere Ende des Seilzuges wird beim Klettern auf der Trommel der Seilwinde 19 aufgewickelt. Hierdurch wird die Unterflasche 16 mit der Ausgleichsrolle 14 angehoben, so daß über das Tragseil 12 der mit den Tragrollen 13 verbundene Kranturm 6 angehoben wird.The support cable 12 or another suitable support means, e.g. B. a belt or a chain is attached to the abutment 8 and wraps around the support rollers 13 and the compensating roller 14. The latter is releasably connected at 15 to the bottom block 16 of the cable 17. The upper pulley 18 of the cable 17, which is designed with multiple strands, is permanently installed in the tower 6 together with the fixed point of the cable 17. The other end of the cable is wound onto the drum of the cable winch 19 when climbing. As a result, the bottom block 16 with the compensating roller 14 is raised, so that the crane tower 6 connected to the supporting rollers 13 is raised via the supporting cable 12.
Das Turmende gelangt dadurch (s. Fig. 2) in die Höhe der Decke 2, wo es durch die Stützunterlage 10 abgefangen wird. Der Turm kann bis zum nächsten Klettern bei der Decke 5 seitlich verkeilt oder ausgesteift werden. Zum weiteren Klettern wird der Seilzug 17 abgelassen, das Tragseil 12 bei den Führungen 8 gelöst und an den Führungen 9 auf der Decke 3 befestigt.As a result, the end of the tower (see FIG. 2) reaches the level of the ceiling 2, where it is intercepted by the support pad 10. The tower can be wedged or stiffened at the side of the ceiling 5 until the next climb. For further climbing, the cable 17 is lowered, the support cable 12 is released from the guides 8 and attached to the guides 9 on the ceiling 3 .
Die Unterlage 7 auf der Decke 1 und die Führungen 8 auf der Decke 2 werden auf die Decke 4 versetzt. Sie sind dort als 7' und 8' gestrichelt angedeutet.The base 7 on the ceiling 1 and the guides 8 on the ceiling 2 are moved onto the ceiling 4. They are there indicated by dashed lines as 7 ' and 8'.
Durch das nun folgende Klettern gelangt das Turmende auf Decke 3. Dieses abwechselnde Klettern und Abfangen wird der Bauwerkshöhe entsprechend wiederholt. Das Abwärtsklettem vollzieht sich in umgekehrter Reihenfolge. Während beim Aufwärtsklettern der Ausleger ständig auf dem Turm verbleibt und mit gehoben wird, wird er bei im Bauwerk angeordneten Kranen vor dem Abwärtsklettern abgebaut.With the climbing that now follows, the end of the tower reaches ceiling 3. This alternating climbing and interception is repeated according to the height of the building. The downward climbing is done in reverse order. While the jib remains on the tower when climbing upwards and is lifted with it, it is dismantled before climbing downwards in the case of cranes arranged in the structure.
Es ist üblich, bei Betonbauten die Decken untereinander durch Stützen oder Stempel zu verbinden. Die Anzahl der Führungen und Seilbefestigungen wird so gewählt, daß die Kräfte mit Sicherheit auf tragfähige Bauteile abgeleitet werden. Um eine gute 'Verteilung der Vertikalkräfte auf die einzelnen Decken zu erreichen, werden die Unterlagen 7, 10 und 11 mittels geeigneter Zwischenlagen 26, z. B. aus elastischem Material, auf die Decken aufgelegt. It is common practice in concrete structures to connect the ceilings to one another by means of supports or stamps. The number of guides and rope attachments is chosen so that the forces are reliably transferred to load-bearing components. In order to achieve a good 'distribution of the vertical forces on the individual ceilings, the documents 7, 10 and 11 by means of suitable intermediate layers 26, for. B. made of elastic material, placed on the blankets.
In Fig. 3 ist dargestellt, daß die Tragrollen 13 nicht am Turmfuß selbst, sondern in einem Tragkörper 27 eingebaut sind, der auch im Innern des Turmes be--wegt werden und angreifen kann. Der Tragkörper 27 greift am Stoßflansch des Turmes 6 an. Um den durch Anfügen eines Turmteiles 6' verlängerten Turm auszuschieben, wird das Tragseil 12 auf einer Seite von seinem Befestigungspunkt an der Führung 8 gelöst und dann der Tragkörper samt Rollen im Turm mittels des Flaschenzuges 17 abgelassen, bis er in die gestrichelt gezeichnete Lage gekommen ist. Während des Ablassens stellt sich der Tragkörper schief, so daß er innerhalb des Turmes genügend Spielraum hat. Nachdem das andere Ende des Tragseiles 12 ebenfalls gelöst und dann beide Seilenden unterhalb des Stoßes zwischen den Turmteilen 6 und 6' nach außen geführt und wieder am Widerlager 8 befestigt wurden, wird beim Anziehen des Flaschenzuges 17 der Tragkörper in Eingriff mit dem Turm, z. B. am Flanschring des Stoßes, gebracht. Er hat dann wieder die Normallage, wie im oberen Teil der Fig. 3 dargestellt.' Je nach der ausziehbaren Länge des Flaschenzuges können mehrere Verlängerungsstücke auf die beschriebene Art nachgezogen und dann der ganze Kran weiter ausgeschoben werden.In FIG. 3 it is shown that the support rollers 13 are not installed at the base of the tower itself, but rather in a support body 27 which can also be moved and attacked inside the tower. The support body 27 engages the butt flange of the tower 6 . To extend the tower lengthened by adding a tower part 6 ' , the support cable 12 is released from its attachment point on the guide 8 on one side and then the support body and rollers in the tower are lowered by means of the pulley block 17 until it is in the position shown in dashed lines . During the lowering, the support body is tilted so that it has enough leeway within the tower. After the other end of the support cable 12 has also been released and then both ends of the cable below the joint between the tower parts 6 and 6 'have been guided to the outside and again attached to the abutment 8 , when the pulley block 17 is tightened, the support body is in engagement with the tower, for. B. on the flange of the joint, brought. He has then again the normal position, as shown in the upper part of FIG. 3. ' Depending on the extendable length of the pulley system, several extension pieces can be tightened in the manner described and then the entire crane can be extended further.
Die Ausgleichsrolle 14 ist in Fig. 4 durch eine Schwinge 28 ersetzt, welche auch die Unterflasche 16 träg Das Tragseil 12, 12' ist hierbei zweiteilig und mit den Enden an der Schwinge, leicht lösbar befestigt. Wie die Fig. 5 und 5 a zeigen, kann die Anzahl der Tragseile 12, 12' vergrößert, z. B. verdoppelt, werden, so daß dann auch die doppelte Zahl der Ausgleichsrollen 14, an der Schwinge 28 angeordnet, angewendet wird, an deren Stellen aber auch, bei geteilten Tragseilen, wieder Schwingen vorgesehen sein können. Der Tragkörper 27 ist in Fig. 5 als Rahmen etwa in den Abmessungen des Turmquerschnittes dargestellt, der die eingebauten Tragrollen 13 umschließt und mit dem Turm verbindbar ist.The compensating roller 14 is replaced in FIG. 4 by a rocker 28 , which also supports the bottom block 16. The support cable 12, 12 'is in two parts and is easily detachably attached to the rocker with the ends. As FIGS. 5 and 5 a show, the number of suspension cables 12, 12 'can be increased, for. B. doubled, so that then also twice the number of compensating rollers 14, arranged on the rocker 28 , is used, but at the points of which, in the case of split support ropes, rockers can be provided again. The support body 27 is shown in Fig. 5 as a frame approximately in the dimensions of the tower cross-section, which surrounds the built-in support rollers 13 and can be connected to the tower.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DESCH19592A DE1140690B (en) | 1956-02-20 | 1956-02-20 | Climbing crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DESCH19592A DE1140690B (en) | 1956-02-20 | 1956-02-20 | Climbing crane |
Publications (1)
Publication Number | Publication Date |
---|---|
DE1140690B true DE1140690B (en) | 1962-12-06 |
Family
ID=7428524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DESCH19592A Pending DE1140690B (en) | 1956-02-20 | 1956-02-20 | Climbing crane |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE1140690B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE272622C (en) * | ||||
GB655013A (en) * | 1900-01-01 | |||
FR1023182A (en) * | 1950-08-09 | 1953-03-16 | Crane | |
FR1062850A (en) * | 1951-09-25 | 1954-04-27 | Device allowing the distance so to be carried at any height? hook tower cranes |
-
1956
- 1956-02-20 DE DESCH19592A patent/DE1140690B/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE272622C (en) * | ||||
GB655013A (en) * | 1900-01-01 | |||
FR1023182A (en) * | 1950-08-09 | 1953-03-16 | Crane | |
FR1062850A (en) * | 1951-09-25 | 1954-04-27 | Device allowing the distance so to be carried at any height? hook tower cranes |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2814930C2 (en) | climbing frame | |
EP0501140A1 (en) | Erecting scaffold moveable along an elevator shaft for erecting shaft equipment | |
DE2265460C2 (en) | Height-adjustable support foot for formwork framework | |
EP3679206B1 (en) | Anti-fall safeguard with supporting base | |
DE3136102C2 (en) | Small crane for laying in layers, especially large-format bricks | |
DE4005997C1 (en) | ||
DE3824921A1 (en) | Arrangement for travelling beneath bridges | |
DE1140690B (en) | Climbing crane | |
AT213946B (en) | Scaffolding for repair work on bridges | |
DE8414857U1 (en) | CONSTRUCTION DEVICE FOR PUTTING FINISHED PARTS, IN PARTICULAR FIREPLACES | |
DE2629253C3 (en) | Device for conveying building material through an opening in a wall into a building | |
WO2001002674A1 (en) | Work scaffolding for constructing round reinforced concrete towers | |
AT397495B (en) | LIFT | |
DE3911044C2 (en) | ||
DE806840C (en) | Transport device consisting of a conveyor belt, in particular for construction purposes | |
DE1174033B (en) | Construction crane with a tower assembled from a number of elements | |
AT232257B (en) | Equipment for transporting and laying prefabricated components | |
DE2238565A1 (en) | DEVICE FOR SPREADING CONCRETE | |
DE2444170C3 (en) | Weather protection roof with side protective cover | |
CH417903A (en) | Construction crane system | |
DE1126094B (en) | Construction crane or the like | |
AT97751B (en) | Construction elevator. | |
DE2756390B2 (en) | Climbing armor for building cooling tower shells made of reinforced concrete with horizontal stiffening rings | |
DE2042337A1 (en) | Climbing crane | |
AT350228B (en) | LOAD ELEVATOR |