DE112015003535T5 - On-board device, train and signaling security system - Google Patents
On-board device, train and signaling security system Download PDFInfo
- Publication number
- DE112015003535T5 DE112015003535T5 DE112015003535.4T DE112015003535T DE112015003535T5 DE 112015003535 T5 DE112015003535 T5 DE 112015003535T5 DE 112015003535 T DE112015003535 T DE 112015003535T DE 112015003535 T5 DE112015003535 T5 DE 112015003535T5
- Authority
- DE
- Germany
- Prior art keywords
- block
- train
- board device
- telegram
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000011664 signaling Effects 0.000 title claims abstract description 59
- 230000000903 blocking effect Effects 0.000 description 11
- 238000010586 diagram Methods 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 3
- 238000006243 chemical reaction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L15/00—Methods, circuits, or devices for controlling the traction-motor speed of electrically-propelled vehicles
- B60L15/40—Adaptation of control equipment on vehicle for remote actuation from a stationary place
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L11/00—Operation of points from the vehicle or by the passage of the vehicle
- B61L11/08—Operation of points from the vehicle or by the passage of the vehicle using electrical or magnetic interaction between vehicle and track
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L15/00—Indicators provided on the vehicle or train for signalling purposes
- B61L15/0018—Communication with or on the vehicle or train
- B61L15/0027—Radio-based, e.g. using GSM-R
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/22—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails
- B61L23/24—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails using token systems, e.g. train staffs, tablets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/22—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails
- B61L23/26—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails with means for actuating signals from the vehicle or by passage of the vehicle
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/22—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails
- B61L23/30—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails using automatic section blocking
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/04—Automatic systems, e.g. controlled by train; Change-over to manual control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L2205/00—Communication or navigation systems for railway traffic
- B61L2205/02—Global system for mobile communication - railways [GSM-R]
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Power Engineering (AREA)
- Transportation (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Abstract
In einem Signalisierungssicherheitssystem einer herkömmlichen Technik war Raum für Verbesserung vorhanden durch Reduzieren der Zeit ab dem Zeitpunkt, zu dem eine bordinterne Vorrichtung eines vorausgehenden Zugs das Recht zum Besetzen eines Blocks freigegeben hat, bis zu dem Zeitpunkt, zu dem der folgende Zug in dem Block fahren kann. Die bordinterne Vorrichtung empfängt ein Telegramm und sendet das Telegramm zu einer weiteren Vorrichtung, wobei das Telegramm durch Züge und Vorrichtungen seitlich der Gleise, die in einem Bereich vorhanden sind, der durch einen oder mehrere Blöcke gebildet ist, auf die das Besetzungsrecht des Zugs eingestellt ist, zirkuliert und die Blockbesetzungsrechtinformationen enthält, die das Einstellen des Rechts zum Besetzen eines Blocks für einen Zug ermöglichen. Das Telegramm enthält Blockbesetzungsrechtreservierungsinformationen, die einen Zug angeben, für den das Recht zum Besetzen eines Blocks als nächstes eingestellt werden soll nach einem Zug, für den das Recht zum Besetzen des Blocks durch die Blockbesetzungsrechtinformationen eingestellt worden ist. Die bordinterne Vorrichtung ist konfiguriert, um in Reaktion auf die Freigabe des Rechts zum Besetzen eines Blocks, das durch die Blockbesetzungsrechtinformationen für den Zug, auf dem die bordinterne Vorrichtung montiert ist, eingestellt ist, die Blockbesetzungsrechtinformationen für den Block neu zu schreiben, so dass das Recht zum Besetzen des Blocks für den Zug eingestellt wird, der durch die Blockbesetzungsrechtreservierungsinformationen, die dem Block entsprechen, angegeben ist.In a signaling security system of a conventional art, there was room for improvement by reducing the time from the time when an on-board apparatus of a preceding train released the right to occupy a block to the time when the following train is traveling in the block can. The on-board device receives a telegram and transmits the telegram to another device, the telegram being provided by trains and devices on the side of the tracks formed in an area formed by one or more blocks to which the train's occupancy right is set , circulates, and contains the block occupancy information enabling the setting of the right to populate a block for a train. The telegram contains block occupation reservation information indicating a train for which the right to populate a block is to be set next after a train for which the right to populate the block has been set by the block occupation right information. The on-board device is configured to rewrite the block occupation right information for the block in response to the release of the right to occupy a block set by the block occupation right information for the train on which the on-board device is mounted Right is set to occupy the block for the train indicated by the block occupancy reservation reservation information corresponding to the block.
Description
Technisches GebietTechnical area
Ein technisches Gebiet der vorliegenden Offenbarung bezieht sich auf eine bordinterne Vorrichtung, einen Zug und ein Signalisierungssicherheitssystem.A technical field of the present disclosure relates to an on-board device, a train and a signaling security system.
Stand der TechnikState of the art
Die
EntgegenhaltungslisteCitation List
Patentliteraturpatent literature
-
Patentliteratur 1:
Japanische Patentveröffentlichung Nr. 2006-232106 Japanese Patent Publication No. 2006-232106
Zusammenfassung der ErfindungSummary of the invention
Technisches ProblemTechnical problem
In dem Signalisierungssicherheitssystem von Patentliteratur 1 ist jedoch immer noch Raum für Verbesserung bei der Reduktion einer Zeitspanne ab dem Zeitpunkt, zu dem eine bordinterne Vorrichtung eines vorhergehenden Zugs das Recht zum Besetzen des Blocks freigibt, bis zu dem Zeitpunkt, zu dem ein folgender Zug auf dem Block fahren kann.However, in the signaling security system of
Lösung des Problemsthe solution of the problem
Um das vorstehend beschriebene Problem zu lösen, werden Konfigurationen wie in den Ansprüchen angegeben verwendet.In order to solve the problem described above, configurations as specified in the claims are used.
Die vorliegende Anmeldung enthält mehrere Mittel zum Lösen des Problems und Beispiele für Mittel enthalten eine bordinterne bzw. On-board Vorrichtung zum Empfangen eine Telegramms und Übertragen des Telegramms zu einer weiteren Vorrichtung, wobei das Telegramm eine Zugausrüstung oder eine am Weg gelegene Ausrüstung, die sich innerhalb eines Bereichs befindet, der aus einem oder mehreren Blöcken zusammengesetzt ist, der Reihe nach anläuft, in dem ein Recht zum Besetzen des Zugs eingestellt ist und das Blockbesetzungsinformationen enthält, die imstande sind, ein Recht zum Besetzen des Blocks in einem Zug einzustellen, wobei das Telegramm Blockbesetzungsreservierungsinformationen enthält, die einen Zug angeben, in dem ein Recht zum Besetzen des Blocks eingestellt ist, nachfolgend zu einem Zug, in dem das Recht zum Besetzen des Blocks durch die Blockbesetzungsinformationen eingestellt ist, und wenn das Recht zum Besetzen des Blocks, das in dem Zug eingestellt ist, auf dem die bordinterne Vorrichtung montiert ist, durch die Blockbesetzungsinformationen freigegeben wird, schreibt die bordinterne Vorrichtung die Blockbesetzungsinformationen des Blocks neu, so dass das Recht zum Besetzen des Blocks in einem Zug eingestellt wird, der durch die Blockbesetzungsreservierungsinformationen angegeben ist, die dem Block entsprechen.The present application includes several means for solving the problem, and examples of means include an on-board device for receiving a telegram and transmitting the telegram to another device, the telegram comprising train equipment or on-the-way equipment that may be is within a range composed of one or more blocks, which starts in order, in which a right to set the train is set and which contains block occupation information capable of setting a right to occupy the block in one go, wherein the message contains block occupation reservation information indicating a train in which a right to occupy the block is set, subsequent to a train in which the right to occupy the block is set by the block occupation information, and if the right to populate the block, the set in the train on which the bor is mounted on the internal device by which block occupation information is released, the on-board device rewrites the block occupation information of the block, so that the right to occupy the block is set in a train indicated by the block occupation reservation information corresponding to the block.
Vorteilhafte Effekte der ErfindungAdvantageous Effects of the Invention
Gemäß den vorstehend beschriebenen Mitteln ist es möglich, eine Zeitspanne ab dem Zeitpunkt, zu dem die bordinterne Vorrichtung eines vorhergehenden Zugs das Recht zum Besetzen des Blocks freigibt, bis zu dem Zeitpunkt, zu dem eine Weiche, die zu dem Block gehört, Umstellung zu einer Stellung einer Strecke, auf der ein nachfolgender Zug fährt, initiiert, zu reduzieren. Die Probleme, Konfigurationen und Effekte, die nicht die vorstehend genannten sind, werden unter Verwendung der folgenden Ausführungsformen erläutert.According to the above-described means, it is possible to change over from the time when the on-board apparatus of a previous train releases the right to occupy the block to the time when a switch belonging to the block converts to one Position of a route on which a subsequent train drives initiates to reduce. The problems, configurations and effects other than those mentioned above will be explained using the following embodiments.
Kurzbeschreibung der ZeichnungenBrief description of the drawings
Beschreibung von AusführungsformenDescription of embodiments
In einem Signalisierungssicherheitssystem, das Zirkulation eines Telegramms verwendet, ist eine bordinterne Vorrichtung, die auf einem Zug montiert ist, konfiguriert, ein Recht zum Besetzen eines Blocks auf einer Strecke sicherzustellen, auf der der Zug fahren wird, durch Aktualisieren von Informationen eines Telegramms, das zirkuliert werden soll, und die Sperrstellungsanweisungen zu einer Weiche, die zu dem Block gehört, zu geben. Deshalb, in einem Fall, wenn mehrere Züge nacheinander auf einer nicht gleichzeitig zulässigen Strecke in der Reihenfolge fahren werden, gibt, nachdem ein erster Zug den nicht gleichzeitig zulässigen Block verlassen hat, eine bordinterne Vorrichtung, die auf dem Zug montiert ist, das Recht zum Besetzen des nicht gleichzeitig zulässigen Blocks in dem Telegramm frei, und nachfolgend stellt eine bordinterne Vorrichtung, die auf einem zweiten Zug montiert ist, die das Telegramm empfangen hat, das Recht zum Besetzen des Blocks in dem Telegramm sicher und gibt Sperrstellunganweisungen zu einer Weiche, die zu dem Block gehört. Ferner wird das Telegramm zu einer Weichenvorrichtung übertragen, und die Weiche beginnt, zu einer Sperrstellung auf der Strecke, auf der der zweite Zug fährt, umgestellt zu werden.In a signaling security system that uses circulation of a telegram, an on-board apparatus mounted on a train is configured to ensure a right to occupy a block on a route on which the train will travel by updating information of a telegram to circulate, and to give the lock position instructions to a switch belonging to the block. Therefore, in a case where a plurality of trains will successively travel on a non-simultaneous route in sequence, after a first train has left the non-simultaneous block, an on-board device mounted on the train gives the right to Occupying the non-concurrent block in the telegram, and subsequently, an on-board device mounted on a second train that has received the telegram ensures the right to populate the block in the telegram and provides lock position instructions to a switch that belongs to the block. Further, the telegram is transmitted to a switch device, and the switch begins to be switched to a blocking position on the route on which the second train travels.
In diesem Fall, falls die Reihenfolge der Zirkulation des Telegramms die Reihenfolge der bordinternen Vorrichtung des ersten Zugs, der Weichenvorrichtung und der bordinternen Vorrichtung des zweiten Zugs ist, durchläuft das Telegramm, bis die bordinterne Vorrichtung des zweiten Zugs die Weichenumstellungsanweisung gibt, nachdem die bordinterne Vorrichtung des ersten Zugs das Recht zum Besetzen des Blocks freigibt, die Weichenvorrichtung, und deshalb sind zwei Übertragungen und Empfangsvorgänge erforderlich. Außerdem, um die Umstellungsanweisung zu der Weichenvorrichtung zu übertragen, durchläuft die Umstellungsanweisung die bordinterne Vorrichtung des ersten Zugs und deshalb sind zwei Übertragungen und Empfangsvorgänge erforderlich. Dementsprechend sind insgesamt vier Übertragungs- und Empfangsvorgänge des Telegramms erforderlich, das heißt mehr als eine Zirkulation des Telegramms wird benötigt.In this case, if the order of the circulation of the telegram is the order of the on-board device of the first train, the switch device and the on-board device of the second train, the telegram passes until the on-board device of the second train gives the switch change instruction after the on-board device of the first train releases the right to occupy the block, the switch device, and therefore two transmissions and receptions are required. In addition, in order to transmit the changeover instruction to the route device, the changeover instruction traverses the on-board device of the first train and therefore two transmissions and receptions are required. Accordingly, a total of four transmission and reception operations of the telegram are required, that is, more than one circulation of the telegram is required.
Das heißt, die Weichensteuervorrichtung muss zwei Zirkulationen des Telegramms lang warten, bis eine neue Umstellungsanweisung empfangen wird, abhängig von der Reihenfolge der Telegrammzirkulation. Das bedeutet, dass eine Zeit für das Telegramm, um Vorrichtungen, die in einem Steuerbereich existieren, einmal oder häufiger der Reihe nach anzulaufen, bis eine Weiche, die zu dem Block gehört, beginnt, zu einer Sperrstellung einer Strecke, auf der ein nachfolgender Zug fährt, umzustellen, nachdem eine bordinterne Vorrichtung eines vorhergehenden Zugs das Recht zum Besetzen des Blocks freigibt. Die Zeit kann Unterbrechung für den Betrieb von Zügen mit hoher Dichte verursachen.That is, the turnout control device must wait two rounds of the telegram until a new changeover instruction is received, depending on the order of the telegram circulation. This means that a time for the telegram to start up devices that exist in a control area once or more frequently in turn until a switch belonging to the block starts to a blocking position of a route on which a subsequent train It will then move after an on-board device of a previous train releases the right to occupy the block. Time can cause disruption to the operation of high density trains.
In der vorliegenden Ausführungsform ist ein Signalisierungssicherheitssystem offenbart, in dem, nachdem eine bordinterne Vorrichtung eines vorhergehenden Zugs das Recht zum Besetzen des Blocks freigibt, eine Weiche, die zu dem Block gehört, eine Zeit bis zu einem Zeitpunkt, um die Richtung einer Fahrstrecke eines folgenden Zugs zu drehen, verkürzt und es Zügen ermöglicht, mit hoher Dichte zu fahren ohne die Reihenfolge des Umlaufs eines Telegramms.In the present embodiment, there is disclosed a signaling security system in which, after an on-board apparatus of a preceding train releases the right to occupy the block, a switch belonging to the block, one time to one time, the direction of a following one route Turning trains, shortens and allows trains to drive at high density without the order of circulation of a telegram.
Gemäß der vorliegenden Ausführungsform gibt in einem Fall, wenn mehrere Züge auf einer nicht gleichzeitig zulässigen Strecke der Reihe nach fahren werden, nachdem ein erster Zug die nicht gleichzeitig zulässige Strecke verlassen hat, eine bordinterne Vorrichtung, die auf dem Zug montiert ist, das Recht zum Besetzen des nicht gleichzeitig zulässigen Blocks in dem Telegramm frei und aktiviert sowohl Blockbesetzungsreservierungsinformationen und Umstellungsanweisungsreservierungsinformationen zu einer Weiche, die zu einer Fahrstrecke eines zweiten Zugs gehört, zur gleichen Zeit. Deshalb kann, nachdem der erste Zug den nicht gleichzeitig zulässigen Block verlassen hat, unabhängig von der Zirkulationsreihenfolge des Telegramms, die Weichensteuerungseinrichtung das Umstellen der Weiche auf die Sperrstellung einer Strecke, auf der der zweite Zug fährt, basierend auf der Umstellungsanweisung des Telegramms, das durch den ersten Zug empfangen wird, beginnen.According to the present embodiment, in a case where a plurality of trains on a non-simultaneous route are consecutively driven after a first train has left the non-simultaneous route, an on-board device mounted on the train gives the right to Occupy the non-concurrent block in the telegram and activate both block occupation reservation information and change instruction reservation information to a switch belonging to a second train route at the same time. Therefore, regardless of the circulation order of the telegram, after the first train has left the non-simultaneous block, the switch control means can switch the switch to the blocking position of a route on which the second train is traveling, based on the change instruction of the telegram the first train is received, begin.
Nachstehend wird eine ausführliche Beschreibung mit Bezug auf die Zeichnungen gegeben.Hereinafter, a detailed description will be given with reference to the drawings.
Ausführungsform 1
Bezug nehmend auf
Die gesamte Strecke, auf der ein Zug fährt, ist in mehrere vorbestimmte Bereiche unterteilt, und weiter ist ein Bereich in Einheiten eingeteilt, die zu besetzen nur einem Zug erlaubt ist. Die unterteilten Intervalle sind als Blöcke bezeichnet. In der vorliegenden Ausführungsform, wie in
In
Ferner werden Informationen über die Besetzung jedes aller Blöcke in dem Bereich
Obwohl das Signalisierungstelegramm die vorstehend beschriebenen Informationen mit jeder Form managen kann, wird in der vorliegenden Ausführungsform, wie in
Die Bereichsidentifizierungsspalte
Die Blockbesetzungsspalte
Die Blockbesetzungsreservierungsspalte
In der Weichensperrstellungsanweisungsspalte
In der Weichensperrstellungsanweisungsreservierungsspalte
Die Weichenstellungsstatusspalte
Nachfolgend wird eine Konfiguration, in der das Signalisierungssicherheitssystem der vorliegenden Ausführungsform Abstandssteuerung des Zugs, Exklusivsteuerung und Konfigurationssteuerung einer Strecke in einem Steuerbereich realisiert durch Verwenden eines Falls als ein Beispiel, in dem ein Zug
Schritt 1: Wenn der Zug
Schritt 2: Die Weichensteuerungseinrichtung
Schritt 3: Danach überprüft die Weichensteuerungseinrichtung
Schritt 4: Zusätzlich, wenn das Signalisierungstelegramm
Wenn ein Signalisierungstelegramm ausgetauscht wird, ist es notwendig, die Prozedur zu verwenden, die imstande ist sicherzustellen, dass das Telegramm sicher zu dem anderen Beteiligten gesendet worden ist, und dadurch mögliche Unterbrechung oder Störung von Funkwellen und Verfälschen, Kopieren und Verlust von Daten zu vermeiden. Diese Prozedur enthält Verschlüsseln und Entschlüsseln der Nachricht, Hinzufügen von Folgenummern und chronologischen Informationen, Überprüfen der Kommunikationszeit, Vorüberprüfung und Nachfolgeprüfung der Sende- und Empfangsenden, Rückmeldung der Daten und Überprüfen der Gültigkeit der Daten durch Fehlerdetektionscode für die Daten.When a signaling message is exchanged, it is necessary to use the procedure capable of ensuring that the message has been securely transmitted to the other party, thereby avoiding possible interruption or disturbance of radio waves and falsification, copying and loss of data , This procedure includes encrypting and decrypting the message, adding sequence numbers and chronological information, checking the communication time, pre-checking and subsequent checking of the send and receive ends, replying to the data and verifying the validity of the data by error detection code for the data.
Als Nächstes wird das Signalisierungssicherheitssystem der vorliegenden Ausführungsform durch Verwenden eines Falls als Beispiel, in dem ein erster Zug auf einer in
Zuerst ist die Konfiguration, bis der Zug
Als Nächstes wird der Betrieb des Systems in einem Fall beschrieben, in dem der Zug
Schritt 5: Die bordinterne Vorrichtung
Schritt 6: Nachdem das hintere Ende des Zugs
Schritt 7: Ähnlich gibt, nachdem das hintere Ende des Zugs
Schritt 8: Wenn das Signalisierungstelegramm
Schritt 9: Nachdem die Umsetzung zu der umgelegten Weichensperrstellung der Weiche
Auf diese Weise sind in Bezug auf den Zug
Außerdem, obwohl beschrieben ist, dass zwei bordinterne Vorrichtungen und eine einzelne Weichensteuerungseinrichtung in einem Bereich in der vorliegenden Ausführungsform existieren, können drei oder mehr bordinterne Vorrichtungen oder Weichensteuerungseinrichtungen existieren. Außerdem kann es, obwohl ein Bereich
In dem Fall des Anwendens des Signalisierungssicherheitssystems der vorliegenden Ausführungsform auf eine Strecke, in der Züge mit hoher Dichte betrieben werden, ist, da eine Anzahl der bordinternen Vorrichtungen oder Weichensteuerungseinrichtungen in einem Bereich existieren und ein Signalisierungstelegramm unter diesen Vorrichtungen zirkuliert wird, eine Zeit, um das Signalisierungstelegramm unter den Vorrichtungen zu zirkulierten, länger, wenn die Anzahl der Vorrichtungen ansteigt. Selbst in dem vorstehenden Fall aktiviert das Signalisierungssicherheitssystem der vorliegenden Ausführungsform die Reservierung der Blockbesetzung durch eine bordinterne Vorrichtung eines folgenden Zugs und die Reservierung der Umsetzungsanweisung zu einer Weiche, die zu einer Fahrstrecke davon gehört, begleitet durch die Freigabe des Rechts zum Besetzen des Blocks durch eine bordinterne Vorrichtung eines vorhergehenden Zugs, und deshalb kann, unabhängig von der Zirkulationsreihenfolge des Signalisierungstelegramms, die Weichensteuerungseinrichtung die Umsetzung der Weiche auf eine Stellung einer Strecke eines folgenden Zugs zu einem Zeitpunkt, wenn das Signalisierungstelegramm zum ersten Mal empfangen wird, beginnen. Das heißt, in dem Fall des Betreibens einer Anzahl von Zügen ist es möglich, einen Betriebsabstand davon zu verkürzen und die Züge mit hoher Dichte zu betreiben.In the case of applying the signaling security system of the present embodiment to a route in which high density trains are operated, since a number of the on-board devices or point controllers exist in one area and a signaling message is circulated among these devices, one time is the signaling telegram among the devices to circulate, longer as the number of devices increases. Even in the above case, the signaling security system of the present embodiment activates the reservation of the block occupation by an on-board apparatus of a following train and the reservation of the conversion instruction to a switch belonging to a route thereof accompanied with the release of the right to occupy the block by one Thus, irrespective of the circulation order of the signaling telegram, the switch control means may begin to translate the switch to a position of a following train at a time when the signaling telegram is received for the first time. That is, in the case of operating a number of trains, it is possible to shorten an operating distance thereof and to operate the trains at a high density.
Obwohl beschrieben ist, dass eine einzelne Reservierungsspalte in einem Telegramm in der vorliegenden Ausführungsform bereitgestellt ist, kann es möglich sein, mehrere Reservierungsspalten mit unterschiedlichen Prioritäten bereitzustellen und die Reservierungsausführung einer Reservierungsspalte mit der höchsten Priorität zu aktivieren und die Prioritäten der anderen Reservierungsspalten zu erhöhen, begleitet durch Freigabe des Rechts zum Besetzen des Blocks eines vorausgehenden Zugs.Although it is described that a single reservation column is provided in a telegram in the present embodiment, it may be possible to provide multiple reservation columns with different priorities and to activate the reservation execution of a reservation column with the highest priority and to increase the priorities of the other reservation columns by releasing the right to occupy the block of a previous train.
Zusätzlich ist die vorliegende Erfindung nicht auf die vorstehend beschriebenen Ausführungsformen beschränkt und enthält verschiedene Modifikationsbeispiele. Die vorstehend beschriebenen Ausführungsformen beschreiben im Einzelnen die vorliegende Erfindung, so dass sie leicht verstanden werden kann, und die Erfindung ist nicht notwendigerweise auf die eine beschränkt, in der alle vorstehend beschriebenen Konfigurationen bereitgestellt sind.In addition, the present invention is not limited to the above-described embodiments and includes various modification examples. The above-described embodiments describe in detail the present invention so that it can be easily understood, and the invention is not necessarily limited to the one in which all the configurations described above are provided.
BezugszeichenlisteLIST OF REFERENCE NUMBERS
- 1, 21, 2
- Zugtrain
- 33
- Weicheswitch
- 10, 20, 3010, 20, 30
- BereichArea
- 11, 12, 13, 1411, 12, 13, 14
- Blockblock
- 15, 1615, 16
- Streckeroute
- 101, 102101, 102
- bordinterne Vorrichtungon-board device
- 103103
- WeichensteuerungseinrichtungSoft control device
- 201201
- SignalisierungstelegrammSignaling telegram
Claims (6)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014-176716 | 2014-09-01 | ||
JP2014176716A JP6239469B2 (en) | 2014-09-01 | 2014-09-01 | On-board equipment, trains, and signal security systems |
PCT/JP2015/064132 WO2016035390A1 (en) | 2014-09-01 | 2015-05-18 | On-board device, train, and signaling safety system |
Publications (2)
Publication Number | Publication Date |
---|---|
DE112015003535T5 true DE112015003535T5 (en) | 2017-08-17 |
DE112015003535B4 DE112015003535B4 (en) | 2022-01-13 |
Family
ID=55439464
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE112015003535.4T Active DE112015003535B4 (en) | 2014-09-01 | 2015-05-18 | Onboard device, train and signaling security system |
Country Status (5)
Country | Link |
---|---|
JP (1) | JP6239469B2 (en) |
CN (1) | CN106573552B (en) |
DE (1) | DE112015003535B4 (en) |
GB (1) | GB2544221B (en) |
WO (1) | WO2016035390A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3786027A1 (en) * | 2019-08-27 | 2021-03-03 | Siemens Mobility GmbH | Operating method for vehicles in a driving area |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6258167B2 (en) * | 2014-09-12 | 2018-01-10 | 株式会社日立製作所 | On-board equipment, trains, and signal security systems |
JP6534624B2 (en) * | 2016-02-16 | 2019-06-26 | 株式会社日立製作所 | On-vehicle apparatus, train equipped with on-vehicle apparatus and signal security system |
JP6713357B2 (en) * | 2016-06-28 | 2020-06-24 | 株式会社日立製作所 | On-board equipment, train, and signal security system |
JP6568830B2 (en) * | 2016-08-22 | 2019-08-28 | 株式会社日立製作所 | Signal security system |
JP6946053B2 (en) * | 2017-05-23 | 2021-10-06 | 株式会社東芝 | Vehicle communication system |
CN109878556B (en) * | 2019-02-01 | 2021-06-08 | 卡斯柯信号有限公司 | Management method and device for rail transit resources |
JP7190975B2 (en) * | 2019-06-26 | 2022-12-16 | 三菱重工エンジニアリング株式会社 | Train control device, method and program |
CN113264086B (en) * | 2021-06-08 | 2022-08-26 | 卡斯柯信号有限公司 | Train interval protection control method and device based on TACS (train operating System) |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3474709B2 (en) * | 1996-07-30 | 2003-12-08 | 株式会社東芝 | Train operation control device |
JP3311986B2 (en) * | 1998-03-10 | 2002-08-05 | 日本信号株式会社 | Train control device |
JP2006137337A (en) * | 2004-11-12 | 2006-06-01 | Toshiba Corp | Train control system and train control method |
JP4375253B2 (en) | 2005-02-25 | 2009-12-02 | 株式会社日立製作所 | Signal security system |
CN1986314B (en) * | 2005-12-22 | 2012-07-25 | 株式会社日立制作所 | Signaling vigilance system |
US8214091B2 (en) * | 2007-10-18 | 2012-07-03 | Wabtec Holding Corp. | System and method to determine train location in a track network |
JP5023052B2 (en) * | 2008-12-25 | 2012-09-12 | 株式会社日立製作所 | Signal security system |
FR2958248B1 (en) * | 2010-04-01 | 2012-06-15 | Alstom Transport Sa | METHOD FOR MANAGING THE MOVEMENT OF VEHICLES ON A RAILWAY NETWORK AND ASSOCIATED SYSTEM |
JP5683254B2 (en) * | 2010-12-21 | 2015-03-11 | 公益財団法人鉄道総合技術研究所 | Driving security method, driving security system and management device |
JP6104901B2 (en) * | 2011-06-14 | 2017-03-29 | タレス・カナダ・インコーポレイテッド | Automatic vehicle control that does not require interlocking devices along the railway |
-
2014
- 2014-09-01 JP JP2014176716A patent/JP6239469B2/en active Active
-
2015
- 2015-05-18 DE DE112015003535.4T patent/DE112015003535B4/en active Active
- 2015-05-18 WO PCT/JP2015/064132 patent/WO2016035390A1/en active Application Filing
- 2015-05-18 CN CN201580043801.9A patent/CN106573552B/en active Active
- 2015-05-18 GB GB1702579.2A patent/GB2544221B/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3786027A1 (en) * | 2019-08-27 | 2021-03-03 | Siemens Mobility GmbH | Operating method for vehicles in a driving area |
Also Published As
Publication number | Publication date |
---|---|
CN106573552A (en) | 2017-04-19 |
JP2016052194A (en) | 2016-04-11 |
JP6239469B2 (en) | 2017-11-29 |
GB2544221A (en) | 2017-05-10 |
CN106573552B (en) | 2019-03-01 |
GB2544221B (en) | 2020-08-19 |
GB201702579D0 (en) | 2017-04-05 |
DE112015003535B4 (en) | 2022-01-13 |
WO2016035390A1 (en) | 2016-03-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE112015003535B4 (en) | Onboard device, train and signaling security system | |
DE102014210190A1 (en) | Driving license for a rail vehicle | |
EP1552997B1 (en) | Train management system with change of the train control system | |
DE102015204769A1 (en) | Method and device for automatically influencing track-bound vehicles | |
EP2879936B1 (en) | Control of rail vehicles | |
DE102008045050A1 (en) | Method for automatic train control in European train control system track, involves using identical procedures for formation of telegrams to control balises for point-like automatic train control and wireless-based automatic train control | |
EP2555959B1 (en) | Method and device for determining the train length of a plurality of coupled railway traction vehicles | |
EP2870047B1 (en) | Operation of a rail vehicle | |
DE602005006081T2 (en) | Device for the protection of track workers | |
EP3400161B1 (en) | Track installation and method for operating a track installation | |
EP3013666B1 (en) | Method for operating a train control system and train control system | |
EP0920391B1 (en) | Process of controlling and monitoring a traffic control system | |
DE2940551C2 (en) | Operating and display device for computer-controlled railway signal systems | |
DE102017212933A1 (en) | Track layout with balises | |
EP0407875B1 (en) | Method and arrangement for the configuration of a control system for track installations | |
DE112015003770B4 (en) | Telegram recovery device and signaling security system | |
DE102020133048A1 (en) | System for securing maintenance tracks in rail traffic | |
DE2902238A1 (en) | Train monitoring control system - has transmitter located on train to detect passage and indicate that track section is clear | |
EP3943363B1 (en) | Railway control system with restriction | |
WO2018210475A1 (en) | Method for operating a track system and signal box for a track system | |
DE102005037801A1 (en) | Railway system and method for forwarding data for a railway system | |
DE102015217596A1 (en) | Communication device and method for the automated exchange of messages in a railway installation | |
EP3786027A1 (en) | Operating method for vehicles in a driving area | |
DE102014214918A1 (en) | Method and device for operating a railway safety system | |
DE568138C (en) | Safety device for reconstruction work on double-track railway lines |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R012 | Request for examination validly filed | ||
R082 | Change of representative |
Representative=s name: MERH-IP MATIAS ERNY REICHL HOFFMANN PATENTANWA, DE |
|
R016 | Response to examination communication | ||
R016 | Response to examination communication | ||
R018 | Grant decision by examination section/examining division | ||
R020 | Patent grant now final |