DE112015003535T5 - On-board device, train and signaling security system - Google Patents

On-board device, train and signaling security system Download PDF

Info

Publication number
DE112015003535T5
DE112015003535T5 DE112015003535.4T DE112015003535T DE112015003535T5 DE 112015003535 T5 DE112015003535 T5 DE 112015003535T5 DE 112015003535 T DE112015003535 T DE 112015003535T DE 112015003535 T5 DE112015003535 T5 DE 112015003535T5
Authority
DE
Germany
Prior art keywords
block
train
board device
telegram
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE112015003535.4T
Other languages
German (de)
Other versions
DE112015003535B4 (en
Inventor
Keiichi Katsuta
Kiwamu Sato
Kenji Imamoto
Kenichi Sakai
Hiroyuki Tani
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of DE112015003535T5 publication Critical patent/DE112015003535T5/en
Application granted granted Critical
Publication of DE112015003535B4 publication Critical patent/DE112015003535B4/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L15/00Methods, circuits, or devices for controlling the traction-motor speed of electrically-propelled vehicles
    • B60L15/40Adaptation of control equipment on vehicle for remote actuation from a stationary place
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L11/00Operation of points from the vehicle or by the passage of the vehicle
    • B61L11/08Operation of points from the vehicle or by the passage of the vehicle using electrical or magnetic interaction between vehicle and track
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L15/00Indicators provided on the vehicle or train for signalling purposes
    • B61L15/0018Communication with or on the vehicle or train
    • B61L15/0027Radio-based, e.g. using GSM-R
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/22Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails
    • B61L23/24Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails using token systems, e.g. train staffs, tablets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/22Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails
    • B61L23/26Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails with means for actuating signals from the vehicle or by passage of the vehicle
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/22Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails
    • B61L23/30Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails using automatic section blocking
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/04Automatic systems, e.g. controlled by train; Change-over to manual control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L2205/00Communication or navigation systems for railway traffic
    • B61L2205/02Global system for mobile communication - railways [GSM-R]

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

In einem Signalisierungssicherheitssystem einer herkömmlichen Technik war Raum für Verbesserung vorhanden durch Reduzieren der Zeit ab dem Zeitpunkt, zu dem eine bordinterne Vorrichtung eines vorausgehenden Zugs das Recht zum Besetzen eines Blocks freigegeben hat, bis zu dem Zeitpunkt, zu dem der folgende Zug in dem Block fahren kann. Die bordinterne Vorrichtung empfängt ein Telegramm und sendet das Telegramm zu einer weiteren Vorrichtung, wobei das Telegramm durch Züge und Vorrichtungen seitlich der Gleise, die in einem Bereich vorhanden sind, der durch einen oder mehrere Blöcke gebildet ist, auf die das Besetzungsrecht des Zugs eingestellt ist, zirkuliert und die Blockbesetzungsrechtinformationen enthält, die das Einstellen des Rechts zum Besetzen eines Blocks für einen Zug ermöglichen. Das Telegramm enthält Blockbesetzungsrechtreservierungsinformationen, die einen Zug angeben, für den das Recht zum Besetzen eines Blocks als nächstes eingestellt werden soll nach einem Zug, für den das Recht zum Besetzen des Blocks durch die Blockbesetzungsrechtinformationen eingestellt worden ist. Die bordinterne Vorrichtung ist konfiguriert, um in Reaktion auf die Freigabe des Rechts zum Besetzen eines Blocks, das durch die Blockbesetzungsrechtinformationen für den Zug, auf dem die bordinterne Vorrichtung montiert ist, eingestellt ist, die Blockbesetzungsrechtinformationen für den Block neu zu schreiben, so dass das Recht zum Besetzen des Blocks für den Zug eingestellt wird, der durch die Blockbesetzungsrechtreservierungsinformationen, die dem Block entsprechen, angegeben ist.In a signaling security system of a conventional art, there was room for improvement by reducing the time from the time when an on-board apparatus of a preceding train released the right to occupy a block to the time when the following train is traveling in the block can. The on-board device receives a telegram and transmits the telegram to another device, the telegram being provided by trains and devices on the side of the tracks formed in an area formed by one or more blocks to which the train's occupancy right is set , circulates, and contains the block occupancy information enabling the setting of the right to populate a block for a train. The telegram contains block occupation reservation information indicating a train for which the right to populate a block is to be set next after a train for which the right to populate the block has been set by the block occupation right information. The on-board device is configured to rewrite the block occupation right information for the block in response to the release of the right to occupy a block set by the block occupation right information for the train on which the on-board device is mounted Right is set to occupy the block for the train indicated by the block occupancy reservation reservation information corresponding to the block.

Description

Technisches GebietTechnical area

Ein technisches Gebiet der vorliegenden Offenbarung bezieht sich auf eine bordinterne Vorrichtung, einen Zug und ein Signalisierungssicherheitssystem.A technical field of the present disclosure relates to an on-board device, a train and a signaling security system.

Stand der TechnikState of the art

Die japanische Patentveröffentlichung Nr. 2006-232106 , d. h. die Patentliteratur 1, bezieht sich auf ein Signalisierungssicherheitssystem, das die Tatsache als technische Probleme erkennt, dass ein hoher Aufwand erforderlich ist zum Durchführen einer Vorrichtungswartung in einer Gleisschaltungsvorrichung, die konfiguriert ist, eine Schiene elektrisch zu isolieren, um eine Stromversorgung mit einem Ende der Schiene und ein Relais mit dem anderen Ende an der entgegengesetzten Seite zu verbinden, um einen Kurzschluss zwischen Schienen aufgrund eines Zugs zu detektieren (siehe [0006] von Patentliteratur 1) und stellt eine Lösung bereit, in der in einem Signalisierungssicherheitssystem, das die Sicherheit eines Zugs, der innerhalb eines vorbestimmten Abstands fährt, basierend auf einem Telegramm sicherstellt, wobei eine Zirkulation des Telegramms durch Züge oder am Wege gelegene Einrichtungen, die in dem vorbestimmten Abstand existieren, bewirkt wird und Blockbesetzungsinformationen, in denen das Besetzungsrecht des Zugs eingestellt werden kann, in Bezug auf jeden von mehreren Blöcken, in die der Abstand unterteilt ist, aufweist (siehe [0010] von Patentliteratur 1).The Japanese Patent Publication No. 2006-232106 That is, Patent Literature 1 relates to a signaling security system that recognizes the fact that technical problems require a lot of effort to perform a device maintenance in a track circuit device configured to electrically isolate a rail to a power supply having one end to connect the rail and a relay to the other end on the opposite side to detect a short circuit between rails due to a train (see [0006] of Patent Literature 1) and provides a solution in which in a signaling security system, the security a train traveling within a predetermined distance based on a telegram, wherein circulation of the telegram is effected by trains or on-road facilities existing at the predetermined distance, and block occupation information in which the occupancy of the train can be set ann, with respect to each of a plurality of blocks in which the pitch is divided (see [0010] of Patent Literature 1).

EntgegenhaltungslisteCitation List

Patentliteraturpatent literature

  • Patentliteratur 1: Japanische Patentveröffentlichung Nr. 2006-232106 Patent Literature 1: Japanese Patent Publication No. 2006-232106

Zusammenfassung der ErfindungSummary of the invention

Technisches ProblemTechnical problem

In dem Signalisierungssicherheitssystem von Patentliteratur 1 ist jedoch immer noch Raum für Verbesserung bei der Reduktion einer Zeitspanne ab dem Zeitpunkt, zu dem eine bordinterne Vorrichtung eines vorhergehenden Zugs das Recht zum Besetzen des Blocks freigibt, bis zu dem Zeitpunkt, zu dem ein folgender Zug auf dem Block fahren kann.However, in the signaling security system of Patent Literature 1, there is still room for improvement in reducing a period of time from when an on-board apparatus of a preceding train releases the right to occupy the block to the time when a following train on the Block can drive.

Lösung des Problemsthe solution of the problem

Um das vorstehend beschriebene Problem zu lösen, werden Konfigurationen wie in den Ansprüchen angegeben verwendet.In order to solve the problem described above, configurations as specified in the claims are used.

Die vorliegende Anmeldung enthält mehrere Mittel zum Lösen des Problems und Beispiele für Mittel enthalten eine bordinterne bzw. On-board Vorrichtung zum Empfangen eine Telegramms und Übertragen des Telegramms zu einer weiteren Vorrichtung, wobei das Telegramm eine Zugausrüstung oder eine am Weg gelegene Ausrüstung, die sich innerhalb eines Bereichs befindet, der aus einem oder mehreren Blöcken zusammengesetzt ist, der Reihe nach anläuft, in dem ein Recht zum Besetzen des Zugs eingestellt ist und das Blockbesetzungsinformationen enthält, die imstande sind, ein Recht zum Besetzen des Blocks in einem Zug einzustellen, wobei das Telegramm Blockbesetzungsreservierungsinformationen enthält, die einen Zug angeben, in dem ein Recht zum Besetzen des Blocks eingestellt ist, nachfolgend zu einem Zug, in dem das Recht zum Besetzen des Blocks durch die Blockbesetzungsinformationen eingestellt ist, und wenn das Recht zum Besetzen des Blocks, das in dem Zug eingestellt ist, auf dem die bordinterne Vorrichtung montiert ist, durch die Blockbesetzungsinformationen freigegeben wird, schreibt die bordinterne Vorrichtung die Blockbesetzungsinformationen des Blocks neu, so dass das Recht zum Besetzen des Blocks in einem Zug eingestellt wird, der durch die Blockbesetzungsreservierungsinformationen angegeben ist, die dem Block entsprechen.The present application includes several means for solving the problem, and examples of means include an on-board device for receiving a telegram and transmitting the telegram to another device, the telegram comprising train equipment or on-the-way equipment that may be is within a range composed of one or more blocks, which starts in order, in which a right to set the train is set and which contains block occupation information capable of setting a right to occupy the block in one go, wherein the message contains block occupation reservation information indicating a train in which a right to occupy the block is set, subsequent to a train in which the right to occupy the block is set by the block occupation information, and if the right to populate the block, the set in the train on which the bor is mounted on the internal device by which block occupation information is released, the on-board device rewrites the block occupation information of the block, so that the right to occupy the block is set in a train indicated by the block occupation reservation information corresponding to the block.

Vorteilhafte Effekte der ErfindungAdvantageous Effects of the Invention

Gemäß den vorstehend beschriebenen Mitteln ist es möglich, eine Zeitspanne ab dem Zeitpunkt, zu dem die bordinterne Vorrichtung eines vorhergehenden Zugs das Recht zum Besetzen des Blocks freigibt, bis zu dem Zeitpunkt, zu dem eine Weiche, die zu dem Block gehört, Umstellung zu einer Stellung einer Strecke, auf der ein nachfolgender Zug fährt, initiiert, zu reduzieren. Die Probleme, Konfigurationen und Effekte, die nicht die vorstehend genannten sind, werden unter Verwendung der folgenden Ausführungsformen erläutert.According to the above-described means, it is possible to change over from the time when the on-board apparatus of a previous train releases the right to occupy the block to the time when a switch belonging to the block converts to one Position of a route on which a subsequent train drives initiates to reduce. The problems, configurations and effects other than those mentioned above will be explained using the following embodiments.

Kurzbeschreibung der ZeichnungenBrief description of the drawings

1 zeigt ein Diagramm, das ein Beispiel eines Signalisierungssicherheitssystems repräsentiert. 1 shows a diagram representing an example of a signaling security system.

2 zeigt ein Diagramm, das Bereiche und Blöcke in Ausführungsform 1 repräsentiert. 2 FIG. 15 is a diagram representing regions and blocks in Embodiment 1. FIG.

3 zeigt ein Diagramm, das eine Zugstrecke in Ausführungsform 1 repräsentiert. 3 FIG. 12 is a diagram representing a trajectory in Embodiment 1. FIG.

4 zeigt ein Diagramm, das Inhalt eines Signalisierungstelegramms in Ausführungsform 1 zeigt. 4 FIG. 10 is a diagram showing contents of a signaling message in Embodiment 1. FIG.

5 zeigt Inhalt eines Signalisierungstelegramms der Schritte 1 bis 4 in Ausführungsform 1. 5 shows contents of a signaling message of steps 1 to 4 in embodiment 1.

6 zeigt Inhalt eines Signalisierungstelegramms der Schritte 5 bis 9 in Ausführungsform 1. 6 shows contents of a signaling message of steps 5 to 9 in embodiment 1.

7 zeigt ein Diagramm, das eine Position eines Zugs in Schritt 7 von Ausführungsform 1 repräsentiert. 7 FIG. 15 is a diagram representing a position of a train in step 7 of embodiment 1. FIG.

Beschreibung von AusführungsformenDescription of embodiments

In einem Signalisierungssicherheitssystem, das Zirkulation eines Telegramms verwendet, ist eine bordinterne Vorrichtung, die auf einem Zug montiert ist, konfiguriert, ein Recht zum Besetzen eines Blocks auf einer Strecke sicherzustellen, auf der der Zug fahren wird, durch Aktualisieren von Informationen eines Telegramms, das zirkuliert werden soll, und die Sperrstellungsanweisungen zu einer Weiche, die zu dem Block gehört, zu geben. Deshalb, in einem Fall, wenn mehrere Züge nacheinander auf einer nicht gleichzeitig zulässigen Strecke in der Reihenfolge fahren werden, gibt, nachdem ein erster Zug den nicht gleichzeitig zulässigen Block verlassen hat, eine bordinterne Vorrichtung, die auf dem Zug montiert ist, das Recht zum Besetzen des nicht gleichzeitig zulässigen Blocks in dem Telegramm frei, und nachfolgend stellt eine bordinterne Vorrichtung, die auf einem zweiten Zug montiert ist, die das Telegramm empfangen hat, das Recht zum Besetzen des Blocks in dem Telegramm sicher und gibt Sperrstellunganweisungen zu einer Weiche, die zu dem Block gehört. Ferner wird das Telegramm zu einer Weichenvorrichtung übertragen, und die Weiche beginnt, zu einer Sperrstellung auf der Strecke, auf der der zweite Zug fährt, umgestellt zu werden.In a signaling security system that uses circulation of a telegram, an on-board apparatus mounted on a train is configured to ensure a right to occupy a block on a route on which the train will travel by updating information of a telegram to circulate, and to give the lock position instructions to a switch belonging to the block. Therefore, in a case where a plurality of trains will successively travel on a non-simultaneous route in sequence, after a first train has left the non-simultaneous block, an on-board device mounted on the train gives the right to Occupying the non-concurrent block in the telegram, and subsequently, an on-board device mounted on a second train that has received the telegram ensures the right to populate the block in the telegram and provides lock position instructions to a switch that belongs to the block. Further, the telegram is transmitted to a switch device, and the switch begins to be switched to a blocking position on the route on which the second train travels.

In diesem Fall, falls die Reihenfolge der Zirkulation des Telegramms die Reihenfolge der bordinternen Vorrichtung des ersten Zugs, der Weichenvorrichtung und der bordinternen Vorrichtung des zweiten Zugs ist, durchläuft das Telegramm, bis die bordinterne Vorrichtung des zweiten Zugs die Weichenumstellungsanweisung gibt, nachdem die bordinterne Vorrichtung des ersten Zugs das Recht zum Besetzen des Blocks freigibt, die Weichenvorrichtung, und deshalb sind zwei Übertragungen und Empfangsvorgänge erforderlich. Außerdem, um die Umstellungsanweisung zu der Weichenvorrichtung zu übertragen, durchläuft die Umstellungsanweisung die bordinterne Vorrichtung des ersten Zugs und deshalb sind zwei Übertragungen und Empfangsvorgänge erforderlich. Dementsprechend sind insgesamt vier Übertragungs- und Empfangsvorgänge des Telegramms erforderlich, das heißt mehr als eine Zirkulation des Telegramms wird benötigt.In this case, if the order of the circulation of the telegram is the order of the on-board device of the first train, the switch device and the on-board device of the second train, the telegram passes until the on-board device of the second train gives the switch change instruction after the on-board device of the first train releases the right to occupy the block, the switch device, and therefore two transmissions and receptions are required. In addition, in order to transmit the changeover instruction to the route device, the changeover instruction traverses the on-board device of the first train and therefore two transmissions and receptions are required. Accordingly, a total of four transmission and reception operations of the telegram are required, that is, more than one circulation of the telegram is required.

Das heißt, die Weichensteuervorrichtung muss zwei Zirkulationen des Telegramms lang warten, bis eine neue Umstellungsanweisung empfangen wird, abhängig von der Reihenfolge der Telegrammzirkulation. Das bedeutet, dass eine Zeit für das Telegramm, um Vorrichtungen, die in einem Steuerbereich existieren, einmal oder häufiger der Reihe nach anzulaufen, bis eine Weiche, die zu dem Block gehört, beginnt, zu einer Sperrstellung einer Strecke, auf der ein nachfolgender Zug fährt, umzustellen, nachdem eine bordinterne Vorrichtung eines vorhergehenden Zugs das Recht zum Besetzen des Blocks freigibt. Die Zeit kann Unterbrechung für den Betrieb von Zügen mit hoher Dichte verursachen.That is, the turnout control device must wait two rounds of the telegram until a new changeover instruction is received, depending on the order of the telegram circulation. This means that a time for the telegram to start up devices that exist in a control area once or more frequently in turn until a switch belonging to the block starts to a blocking position of a route on which a subsequent train It will then move after an on-board device of a previous train releases the right to occupy the block. Time can cause disruption to the operation of high density trains.

In der vorliegenden Ausführungsform ist ein Signalisierungssicherheitssystem offenbart, in dem, nachdem eine bordinterne Vorrichtung eines vorhergehenden Zugs das Recht zum Besetzen des Blocks freigibt, eine Weiche, die zu dem Block gehört, eine Zeit bis zu einem Zeitpunkt, um die Richtung einer Fahrstrecke eines folgenden Zugs zu drehen, verkürzt und es Zügen ermöglicht, mit hoher Dichte zu fahren ohne die Reihenfolge des Umlaufs eines Telegramms.In the present embodiment, there is disclosed a signaling security system in which, after an on-board apparatus of a preceding train releases the right to occupy the block, a switch belonging to the block, one time to one time, the direction of a following one route Turning trains, shortens and allows trains to drive at high density without the order of circulation of a telegram.

Gemäß der vorliegenden Ausführungsform gibt in einem Fall, wenn mehrere Züge auf einer nicht gleichzeitig zulässigen Strecke der Reihe nach fahren werden, nachdem ein erster Zug die nicht gleichzeitig zulässige Strecke verlassen hat, eine bordinterne Vorrichtung, die auf dem Zug montiert ist, das Recht zum Besetzen des nicht gleichzeitig zulässigen Blocks in dem Telegramm frei und aktiviert sowohl Blockbesetzungsreservierungsinformationen und Umstellungsanweisungsreservierungsinformationen zu einer Weiche, die zu einer Fahrstrecke eines zweiten Zugs gehört, zur gleichen Zeit. Deshalb kann, nachdem der erste Zug den nicht gleichzeitig zulässigen Block verlassen hat, unabhängig von der Zirkulationsreihenfolge des Telegramms, die Weichensteuerungseinrichtung das Umstellen der Weiche auf die Sperrstellung einer Strecke, auf der der zweite Zug fährt, basierend auf der Umstellungsanweisung des Telegramms, das durch den ersten Zug empfangen wird, beginnen.According to the present embodiment, in a case where a plurality of trains on a non-simultaneous route are consecutively driven after a first train has left the non-simultaneous route, an on-board device mounted on the train gives the right to Occupy the non-concurrent block in the telegram and activate both block occupation reservation information and change instruction reservation information to a switch belonging to a second train route at the same time. Therefore, regardless of the circulation order of the telegram, after the first train has left the non-simultaneous block, the switch control means can switch the switch to the blocking position of a route on which the second train is traveling, based on the change instruction of the telegram the first train is received, begin.

Nachstehend wird eine ausführliche Beschreibung mit Bezug auf die Zeichnungen gegeben.Hereinafter, a detailed description will be given with reference to the drawings.

Ausführungsform 1Embodiment 1

Bezug nehmend auf 1 enthält das Signalisierungssicherheitssystem der vorliegenden Ausführungsform eine bordinterne Vorrichtung 101, die auf einen Zug 1 montiert ist, eine bordinterne Vorrichtung 102, die auf einen Zug 2 montiert ist, eine Weichensteuerungseinrichtung 103, die eine Weiche 3 steuert, und ein Signalisierungstelegramm 201 das ein Telegramm ist, das zwischen den bordinternen Vorrichtungen und der Weichensteuereinrichtung zirkuliert.Referring to 1 For example, the signaling security system of the present embodiment includes an on-board device 101 on a train 1 is mounted, an on-board device 102 on a train 2 is mounted, one Soft control device 103 that a switch 3 controls, and a signaling message 201 which is a telegram circulating between the on-board devices and the switch controller.

Die gesamte Strecke, auf der ein Zug fährt, ist in mehrere vorbestimmte Bereiche unterteilt, und weiter ist ein Bereich in Einheiten eingeteilt, die zu besetzen nur einem Zug erlaubt ist. Die unterteilten Intervalle sind als Blöcke bezeichnet. In der vorliegenden Ausführungsform, wie in 2 dargestellt, ist die gesamte Strecke in drei Bereiche aus einem Bereich 10, einem Bereich 20 und einem Bereich 30 unterteilt, und der Bereich 10 ist in vier Blöcke aus einem Block 11, einem Block 12, einem Block 13 und einem Block 14 unterteilt.The entire route on which a train travels is subdivided into a plurality of predetermined areas, and further, an area is divided into units, which is allowed to occupy only one train. The subdivided intervals are called blocks. In the present embodiment, as in 2 shown, the entire route is in three areas from one area 10 , an area 20 and an area 30 divided, and the area 10 is in four blocks from a block 11 a block 12 a block 13 and a block 14 divided.

In 3 bezeichnet ein fetter Pfeil eine Strecke eines Zugs in dem Bereich 10. Die Strecke ist ein Weg, auf dem ein Zug fährt, und die Strecke 15 ist ein Weg von dem Block 11 zu dem Block 13 über den Block 12, und die Strecke 16 ist ein Weg von dem Block 14 zu dem Block 11 über den Block 12. Außerdem ist in Bezug auf die Sperrstellung der Weiche 3 eine Sperrstellung zum Freimachen der Strecke 15 als eine Normalstellung bezeichnet, und eine Sperrstellung zum Freimachen der Strecke 16 ist als eine umgelegte Stellung bezeichnet. Außerdem sind die Normalstellung und die umgelegte Stellung Begriffe, die Sperrstellungen von Weichen repräsentieren. Die Normalstellung bezeichnet die Normalstellung der Weiche. Die umgelegte Stellung ist der Gegensatz zu der Normalstellung.In 3 a bold arrow indicates a distance of a train in the area 10 , The track is a path on which a train travels and the track 15 is a way from the block 11 to the block 13 over the block 12 , and the track 16 is a way from the block 14 to the block 11 over the block 12 , In addition, with respect to the blocking position of the switch 3 a blocking position to clear the route 15 as a normal position, and a blocking position to clear the route 16 is referred to as a transferred position. In addition, the normal position and the folded position are terms that represent blocking positions of points. The normal position denotes the normal position of the switch. The folded position is the opposite of the normal position.

Ferner werden Informationen über die Besetzung jedes aller Blöcke in dem Bereich 10 und ihre Reservierungsinformationen, alle Weichensperrstellungsanweisungsinformationen und ihre Reservierungsinformationen, und alle Weichenstellungsstatus mit einem einzelnen Signalisierungstelegramm gemanagt, und das Signalisierungstelegramm wird zwischen bordinternen Vorrichtungen aller Züge, die in dem Bereich fahren, und allen Weichenvorrichtungen in dem Bereich zirkuliert.Further, information about the occupation of each of all blocks in the area 10 and its reservation information, all turnout instruction information and its reservation information, and all switch statuses are managed with a single signaling message, and the signaling message is circulated between on-board devices of all trains traveling in the area and all switch devices in the area.

Obwohl das Signalisierungstelegramm die vorstehend beschriebenen Informationen mit jeder Form managen kann, wird in der vorliegenden Ausführungsform, wie in 4 dargestellt, das Signalisierungstelegramm durch Verwenden einer Bereichsidentifizierungsspalte 211, einer Mitgliederlistenspalte 212, einer Blockbesetzungsspalte 213, einer Blockbesetzungsreservierungsspalte 214, einer Weichensperrstellungsanweisungsspalte 215, einer Weichensperrstellungsanweisungsreservierungsspalte 216 und einer Weichenstellungsstatusspalte 217 gemanagt.Although the signaling telegram can manage the information described above with each form, in the present embodiment, as in FIG 4 shown, the signaling message by using a range identification column 211 , a member list column 212 , a block occupation column 213 , a block occupation reservation column 214 , a turnout instruction column 215 , a turnout instruction reservation reservation column 216 and a switch status status column 217 managed.

Die Bereichsidentifizierungsspalte 211 enthält die Identifizierungsdaten des Bereichs unter der Steuerung des Signalisierungstelegramms. Die Mitgliederlistenspalte 212 enthält eine Liste von Vorrichtungen, die in dem Signalisierungstelegramm zirkulieren dürfen, und die Zirkulationsreihenfolge davon.The area identification column 211 Contains the identification data of the area under the control of the signaling telegram. The members list column 212 contains a list of devices allowed to circulate in the signaling message and the circulation order thereof.

Die Blockbesetzungsspalte 213 enthält Identifizierungsinformationen von Zügen, von denen jeder das Recht zum Besetzen des Blocks besitzt. Das Recht zum Besetzen des Blocks ist das, was erforderlich ist, damit ein Zug in einem Block einfahren darf. Nur eine Reihe von Zügen kann das Recht zum Besetzen des Blocks in Bezug auf einen Block sichern. In einem Fall, wenn das Signalisierungstelegramm empfangen wird, ist es, solange kein Schreiben durch einen weiteren Zug vorhanden ist, möglich, das Recht zum Besetzen des Blocks durch Schreiben von Identifizierungsinformationen eines Host-Zugs zu sichern.The block occupation column 213 contains identification information of trains, each of which has the right to occupy the block. The right to populate the block is what is required for a train to enter a block. Only a series of moves can secure the right to occupy the block with respect to a block. In a case where the signaling telegram is received, unless there is writing by another train, it is possible to secure the right to occupy the block by writing identification information of a host train.

Die Blockbesetzungsreservierungsspalte 214 enthält Identifizierungsinformationen eines Zugs, der das Recht zum Besetzen eines Blocks reserviert hat. In einem Fall, wenn ein Signalisierungstelegramm empfangen wird, wenn das Recht zum Besetzen des Blocks nicht gesichert werden kann, weil ein Schreiben eines anderen Zugs vorhanden ist, ist es möglich, das Recht zum Besetzen des Blocks durch Schreiben von Identifizierungsinformationen eines Zugs in der Blockbesetzungsreservierungsspalte zu reservieren. Wenn das Recht zum Besetzen des Blocks freigegeben wird, wird diese Reservierung durch Umschreiben der Identifizierungsinformationen des Zugs, die in die Reservierungsspalte geschrieben werden, in die Blockbesetzungsspalte, die der Reservierungsspalte entspricht, durch die bordinterne Vorrichtung, die freigegeben hat, ausgeführt.The block occupation reservation column 214 contains identification information of a train that has reserved the right to occupy a block. In a case where a signaling message is received, if the right to occupy the block can not be secured because a letter of another train exists, it is possible to have the right to occupy the block by writing identification information of a train in the block occupation reservation column to reserve. When the right to populate the block is released, this reservation is executed by rewriting the train's identification information written to the reservation column to the block occupation column corresponding to the reservation column by the on-board device that has released.

In der Weichensperrstellungsanweisungsspalte 215 werden durch die bordinterne Vorrichtung des Zugs, die das Recht zum Besetzen des Blocks, zu dem die Weiche gehört, besitzt, die Anweisungsinformationen zum Anweisen der Stellung für die Weiche geschrieben. Die Weichensteuerungseinrichtung liest die Anweisungsspalte und sperrt die Weiche gemäß der Anweisung.In the turnout instruction statement column 215 are written by the on-board device of the train having the right to occupy the block to which the switch belongs, the instruction information for instructing the position for the switch. The switch controller reads the instruction column and locks the switch according to the instruction.

In der Weichensperrstellungsanweisungsreservierungsspalte 216 werden durch die bordinterne Vorrichtung des Zugs, die das Recht zum Besetzen des Blocks, zu dem die Weiche gehört, reserviert hat, die Anweisungsreservierungsinformationen zum Reservieren der Stellunganweisung für die Weiche geschrieben. Wenn das Recht zum Besetzen eines Blocks, zu dem die Weiche gehört, freigegeben wird, wird diese Reservierung durch Umschreiben der Weichenanweisung, die in die Reservierungsspalte geschrieben wird, in die Weichensperrstellungsanweisungsspalte, die der Reservierungsspalte entspricht, durch die bordinterne Vorrichtung, die freigegeben hat, ausgeführt.In the turnout instruction reservation reservation column 216 are written by the on-board device of the train, which has reserved the right to occupy the block to which the switch belongs, the instruction reservation information for reserving the position instruction for the switch. If the right to populate a block to which the switch belongs is released, that reservation is made by rewriting the switch instruction written to the reservation column into Turnout instruction column corresponding to the reservation column executed by the on-board device that has released.

Die Weichenstellungsstatusspalte 217 enthält Informationen über den Zustand der Weiche durch die Weichensteuerungseinrichtung. Normalstellungssperre wird in dem Fall geschrieben, wenn sie in einer Normalstellung gesperrt ist, Sperre in der umgelegten Stellung wird in dem Fall geschrieben, wenn sie in einer umgelegten Stellung gesperrt ist, und keine Sperre wird geschrieben in dem Fall der Umstellung oder in anderen Fällen. Wenn ein Signalisierungstelegramm empfangen wird, kann die bordinterne Vorrichtung die Sperrstellung der Weiche durch Überprüfen der Weichenstellungsstatusspalte überprüfen.The switch status status column 217 contains information about the state of the switch through the switch controller. Normal position lock is written in the case when it is locked in a normal position, lock in the shifted position is written in the case when it is locked in a folded position, and no lock is written in the case of changeover or in other cases. When a signaling message is received, the on-board device can check the blocking position of the switch by checking the switch position status column.

Nachfolgend wird eine Konfiguration, in der das Signalisierungssicherheitssystem der vorliegenden Ausführungsform Abstandssteuerung des Zugs, Exklusivsteuerung und Konfigurationssteuerung einer Strecke in einem Steuerbereich realisiert durch Verwenden eines Falls als ein Beispiel, in dem ein Zug 1 auf einer Strecke 15, die in 3 gezeigt ist, fährt. Außerdem ist der Inhalt des Signalisierungstelegramms in jedem Schritt in 5 gezeigt.Hereinafter, a configuration in which the signaling security system of the present embodiment, distance control of the train, exclusive control, and configuration control of a route in a control area is realized by using a case as an example in which a train 1 on a track 15 , in the 3 shown drives. In addition, the content of the signaling telegram is in each step in 5 shown.

Schritt 1: Wenn der Zug 1 auf der Strecke 15 fahren wird, sichert die bordinterne Vorrichtung 101, die auf dem Zug 1 montiert ist, das Recht zum Besetzen des Blocks der Blöcke 11, 12 und 13 in der Blockbesetzungsspalte des empfangenen Signalisierungstelegramms 201, schreibt eine Stellungsänderungsanweisung für eine Weiche 3 auf der Strecke in die Weichensperrstellungsanweisungsspalte des empfangenen Signalisierungstelegramms 201 und überträgt das Signalisierungstelegramm 201 zu einer nachfolgenden Vorrichtung.Step 1: When the train 1 on the route 15 drive, secures the on-board device 101 on the train 1 mounted, the right to occupy the block of blocks 11 . 12 and 13 in the block occupation column of the received signaling message 201 , writes a position change instruction for a switch 3 on the route in the turnout instruction column of the received signaling message 201 and transmits the signaling telegram 201 to a subsequent device.

Schritt 2: Die Weichensteuerungseinrichtung 103 initiiert die Umsetzung der Weiche 3 zu einer Normalstellung basierend auf den Weichensperrstellungsanweisungsinformationen, die in die Weichensperrstellungsanweisungsspalte des Signalisierungstelegramms 201 geschrieben sind, wenn das Signalisierungstelegramm 201 empfangen wird.Step 2: The point control device 103 initiates the implementation of the switch 3 to a normal position based on the turnout instruction information included in the turnout instruction column of the signaling telegram 201 are written when the signaling telegram 201 Will be received.

Schritt 3: Danach überprüft die Weichensteuerungseinrichtung 103 den Status der Weiche 3 jedes Mal, wenn das Signalisierungstelegramm 201 empfangen wird, und in dem Fall, wenn die Weiche auf eine Normalstellung gesperrt ist, wird in die Weichenstellungsstatusspalte geschrieben, dass die Weiche 3 des Signalisierungstelegramms 201 in der Normalstellung gesperrt ist.Step 3: Thereafter, the point controller checks 103 the status of the switch 3 every time the signaling telegram 201 is received, and in the case where the diverter is locked to a normal position, the diverter status column is written to the diverter 3 of the signaling telegram 201 is locked in the normal position.

Schritt 4: Zusätzlich, wenn das Signalisierungstelegramm 201 zu der bordinternen Vorrichtung 101 zirkuliert wird, überprüft die bordinterne Vorrichtung 101, dass die Weiche 3 in der Normalstellung gesperrt ist, und erlaubt dem Zug 1, auf der Strecke 15 zu fahren.Step 4: Additionally, if the signaling telegram 201 to the on-board device 101 is circulating, checks the on-board device 101 that the switch 3 is locked in the normal position, and allows the train 1 , on the route 15 to drive.

Wenn ein Signalisierungstelegramm ausgetauscht wird, ist es notwendig, die Prozedur zu verwenden, die imstande ist sicherzustellen, dass das Telegramm sicher zu dem anderen Beteiligten gesendet worden ist, und dadurch mögliche Unterbrechung oder Störung von Funkwellen und Verfälschen, Kopieren und Verlust von Daten zu vermeiden. Diese Prozedur enthält Verschlüsseln und Entschlüsseln der Nachricht, Hinzufügen von Folgenummern und chronologischen Informationen, Überprüfen der Kommunikationszeit, Vorüberprüfung und Nachfolgeprüfung der Sende- und Empfangsenden, Rückmeldung der Daten und Überprüfen der Gültigkeit der Daten durch Fehlerdetektionscode für die Daten.When a signaling message is exchanged, it is necessary to use the procedure capable of ensuring that the message has been securely transmitted to the other party, thereby avoiding possible interruption or disturbance of radio waves and falsification, copying and loss of data , This procedure includes encrypting and decrypting the message, adding sequence numbers and chronological information, checking the communication time, pre-checking and subsequent checking of the send and receive ends, replying to the data and verifying the validity of the data by error detection code for the data.

Als Nächstes wird das Signalisierungssicherheitssystem der vorliegenden Ausführungsform durch Verwenden eines Falls als Beispiel, in dem ein erster Zug auf einer in 3 gezeigten Strecke 15 fährt und danach ein zweiter Zug auf einer in 3 gezeigten Strecke 16 fährt, beschrieben, wobei das Signalisierungssicherheitssystem so konfiguriert ist, dass in einem Fall, in den mehrere Züge auf einer nicht gleichzeitig zulässigen Strecke der Reihe nach fahren werden, nachdem ein erster Zug das Recht zum Besetzen eines nicht gleichzeitig zulässigen Blocks freigegeben hat, unabhängig von der Reihenfolge der Zirkulation des Signalisierungstelegramms, die Weichensteuerungseinrichtung mit dem Umstellen der Weiche auf die Sperrstellung einer Strecke, auf der der zweite Zug fährt, basierend auf der Umstellungsanweisung des Signalisierungstelegramms, das beim ersten Mal empfangen wird, beginnen kann. Außerdem ist der Inhalt des Signalisierungstelegramms in jedem Schritt in 6 dargestellt.Next, the signaling security system of the present embodiment will be described by taking a case as an example in which a first train on an in 3 shown route 15 and then a second train on a in 3 shown route 16 The signaling security system is configured such that, in a case where multiple trains will travel in sequence on a non-simultaneous route, after a first train has cleared the right to occupy a non-concurrent block, regardless of the order of circulation of the signaling telegram, the switch control means with the switchover of the switch to the blocking position of a route on which the second train is traveling, based on the change instruction of the signaling telegram, which is received the first time can begin. In addition, the content of the signaling telegram is in each step in 6 shown.

Zuerst ist die Konfiguration, bis der Zug 1 auf der Strecke 15 fahren darf, gleich den Schritten 1 bis 4, wie vorstehend beschrieben.First, the configuration, until the train 1 on the route 15 the same as steps 1 to 4 as described above.

Als Nächstes wird der Betrieb des Systems in einem Fall beschrieben, in dem der Zug 2, der auf der Strecke 16 fahren wird, das Recht zum Besetzen des Blocks und Weichensperrstellungsanweisungen reserviert, und dieses Recht und die Anweisungen werden durch eine bordinterne Vorrichtung, die auf dem Zug 1 montiert ist, aktiviert.Next, the operation of the system will be described in a case where the train 2 on the track 16 the right to occupy the block and turnout instructions is reserved, and this right and instructions are provided by an on-board device operating on the train 1 is mounted, activated.

Schritt 5: Die bordinterne Vorrichtung 102, die auf den Zug 2 montiert ist, überprüft das Recht zum Besetzen der Blöcke 14, 12 und 11, wenn das Signalisierungstelegramm 201 empfangen wird. Als ein Ergebnis ist das Recht zum Besetzen des Blocks 14 gesichert, aber das Recht zum Besetzen der Blöcke 12 und 11, das durch den Zug 1 gesichert ist, kann gesichert werden. In diesem Fall reserviert die bordinterne Vorrichtung 102 das Recht zum Besetzen des Blocks durch Schreiben der Identifizierungsinformationen des Host-Zugs in die Blockbesetzungsreservierungsspalten des Blocks 12 und des Blocks 11. Außerdem wird eine Umstellungsanweisung für umgelegte Stellung in der Weichensperrstellungsanweisungsreservierungsspalte 2, die zu dem Block 12 gehört, reserviert.Step 5: The on-board device 102 on the train 2 is mounted, checks the right to occupy the blocks 14 . 12 and 11 if the signaling telegram 201 Will be received. As a result, the right to occupy the block 14 secured, but the right to occupy the blocks 12 and 11 that by the train 1 is secured, can be secured. In this case, the on-board device reserves 102 the right to populate the block by writing the identification information of the host train into the block occupation reservation columns of the block 12 and the block 11 , In addition, a switch-over change instruction is made in the turnout instruction reservation column 2 leading to the block 12 belongs, reserved.

Schritt 6: Nachdem das hintere Ende des Zugs 1, der auf der Strecke 1 fährt, den Block 11 verlassen hat, gibt die bordinterne Vorrichtung 101 das Recht zum Besetzen des Blocks 11 frei, wenn das Signalisierungstelegramm 201 empfangen wird, überprüft die Reservierungsspalte, schreibt die Identifizierungsinformationen des reservierten Zugs 2 in die Blockbesetzungsspalte, löscht die Identifizierungsinformationen des Zugs 2 in der Reservierungsspalte des Blocks 11 und überträgt das Telegramm zu der nachfolgenden Vorrichtung. Außerdem ist es nicht notwendig, die Identifizierungsinformationen des Zugs 2 in der Reservierungsspalte des Blocks 11 zu löschen, und wenn dieselben Identifizierungsinformationen des Zugs in die Blockbesetzungsspalte und die Reservierungsspalte des Blocks 11 geschrieben sind, kann ein weitere Zug oder die Weichensteuerungseinrichtung konfiguriert sein, die Identifizierungsinformationen, die in die Reservierungsspalte geschrieben sind, zu löschen.Step 6: After the back end of the train 1 on the track 1 drives, the block 11 has left the on-board device 101 the right to occupy the block 11 free, if the signaling telegram 201 is received, checks the reservation column, writes the identification information of the reserved train 2 into the block occupancy column, clears the identification information of the train 2 in the reservation column of the block 11 and transmits the telegram to the subsequent device. In addition, it is not necessary to provide the identification information of the train 2 in the reservation column of the block 11 and if the same identification information of the train in the block occupation column and the reservation column of the block 11 may be configured, another train or the turnout control device may be configured to delete the identification information written in the reservation column.

Schritt 7: Ähnlich gibt, nachdem das hintere Ende des Zugs 1 den Block 12 verlassen hat, wie in 7 gezeigt, die bordinterne Vorrichtung 101 das Recht zum Besetzen des Blocks 12 frei, wenn das Signalisierungstelegramm 201 empfangen wird, überprüft eine dadurch begleitete Reservierungsspalte, schreibt die Identifizierungsinformationen des reservierten Zugs 2 in die Blockbesetzungsspalte und löscht die Identifizierungsinformationen des Zugs 2 der Reservierungsspalte des Blocks 12. Außerdem wird die Weichensperranweisungsreservierungsspalte der Weiche 3, die zu dem Block 12 gehört, überprüft, die Anweisung für die reservierte Sperrstellung auf die umgelegte Stellung wird in die Weichensperrstellungsanweisungsspalte der Weiche 3 geschrieben, die Sperrstellungsanweisung für die umgelegte Stellung wird in der Weichensperrstellungsanweisungsreservierungsspalte der Weiche 3 gelöscht und das Signalisierungstelegramm wird zu der Weichensteuerungseinrichtung 103, die eine nachfolgende Einrichtung ist, übertragen. Außerdem ist es nicht notwendig, die Sperrstellungsanweisung der Weiche 3 oder die Sperrstellungsanweisung der umgelegten Stellung zu löschen, und wenn dieselbe Weichensperrstellungsanweisung in die Weichensperrstellungsanweisungsspalte und die Weichensperrstellungsanweisungsreservierungsspalte geschrieben ist, kann ein weiterer Zug oder die Weichensteuerungseinrichtung konfiguriert sein, die Identifizierungsinformationen, die in die Weichensperrstellungsanweisungsreservierungsspalte geschrieben sind, zu löschen.Step 7: Similarly, after the rear end of the train 1 the block 12 has left, as in 7 shown, the on-board device 101 the right to occupy the block 12 free, if the signaling telegram 201 is received, checks a reservation column accompanied thereby, writes the identification information of the reserved train 2 into the block occupation column and clears the identification information of the train 2 the reservation column of the block 12 , In addition, the turnout reservation column becomes the turnout 3 leading to the block 12 is checked, the instruction for the reserved lock position on the folded position is in the turnout instruction column of the switch 3 The turn position instruction is written in the turnout instruction reservation column of the switch 3 cleared and the signaling message becomes the switch controller 103 , which is a subsequent device, transmitted. In addition, it is not necessary, the lock position instruction of the switch 3 or clearing the stowed position inhibited instruction, and when the same turnout instruction is written in the turn inhibit instruction column and turn inhibit instruction reserving column, another train or the turnout control means may be configured to clear the identification information written in the turnout instruction reservation column.

Schritt 8: Wenn das Signalisierungstelegramm 201 empfangen wird, initiiert die Weichensteuerungseinrichtung 103 die Umsetzung der Weiche 3 auf eine angewiesene umgelegte Weichensperrstellung und aktualisiert die Weichenstellungsstatusspalte des Signalisierungstelegramms 201 auf entsperrt.Step 8: If the signaling telegram 201 is received, initiates the switch control device 103 the implementation of the switch 3 to a commanded assigned turnout position and updates the turnout status column of the signaling telegram 201 unlocked.

Schritt 9: Nachdem die Umsetzung zu der umgelegten Weichensperrstellung der Weiche 3 und das Sperren fertiggestellt sind, aktualisiert die Weichensteuerungseinrichtung 103 die Weichenstellungsstatusspalte des Signalisierungstelegramm auf eine umgelegte Sperrstellung, und die bordinterne Vorrichtung 102, die sie empfangen hat, erlaubt dem Zug 2, auf der Strecke 16 zu fahren.Step 9: After the conversion to the folded turnout position of the switch 3 and the locks are completed, the point controller updates 103 the switch position status column of the signaling telegram to a folded blocking position, and the on-board device 102 that she has received allows the train 2 , on the route 16 to drive.

Auf diese Weise sind in Bezug auf den Zug 1, der auf der Strecke 15 fährt, und den Zug 2, der versucht, auf der Strecke 16 zu fahren, die Abstandssteuerung der Züge, die Exklusivitätssteuerung und Konfigurationssteuerung realisiert. Insbesondere aktiviert in Schritt 7, da die bordinterne Vorrichtung 101, die auf den Zug 1 montiert ist, nicht die bordinterne Vorrichtung 102, die auf Zug 2 montiert ist, die Reservierung der Sperrstellungsanweisung für die Weiche 3 für den Zug 2 begleitet durch die Freigabe des Rechts zum Besetzen des Blocks 12. Selbst wenn das Signalisierungstelegramm 201 in der Reihenfolge auf eine solche Weise zirkuliert, dass das Signalisierungstelegramm 2β1 durch die bordinterne Vorrichtung 102 zirkuliert wird, bevor sie durch die Weichensteuerungseinrichtung 103 zirkuliert wird, kann die Weichensteuerungseinrichtung 103 die Umsetzung der Weiche 3 auf eine Weiche, die durch die bordinterne Vorrichtung 102 angegeben ist, basierend auf dem beim ersten Mal empfangenen Signalisierungstelegramm beginnen.That way, in terms of the train 1 on the track 15 drives, and the train 2 who is trying on the track 16 to drive, the distance control of the trains, the exclusivity control and configuration control realized. In particular, activated in step 7, since the on-board device 101 on the train 1 is mounted, not the on-board device 102 that on train 2 is mounted, the reservation of the blocking instruction for the switch 3 for the train 2 accompanied by the release of the right to occupy the block 12 , Even if the signaling telegram 201 is circulated in the order in such a way that the signaling telegram 2β1 is circulated through the on-board device 102 is circulated before passing through the turnout control device 103 is circulated, the point control device 103 the implementation of the switch 3 on a switch, through the on-board device 102 is specified based on the signaling message received the first time.

Außerdem, obwohl beschrieben ist, dass zwei bordinterne Vorrichtungen und eine einzelne Weichensteuerungseinrichtung in einem Bereich in der vorliegenden Ausführungsform existieren, können drei oder mehr bordinterne Vorrichtungen oder Weichensteuerungseinrichtungen existieren. Außerdem kann es, obwohl ein Bereich 10 in vier Blöcke unterteilt ist, möglich sein, den Bereich 10 in fünf oder mehr Blöcke fein zu unterteilen. Obwohl alle Rechte zur Blockbesetzung, Sperrstellungsanweisungen an alle Weichen und Statusinformationen in einem Bereich mit einem einzelnen Signalisierungstelegramm gemanagt sind, kann Management mit mehreren Signalisierungstelegrammen ausgeführt werden, wenn Inhalte, die gemanagt werden sollen, nicht dupliziert sind.In addition, although it is described that two on-board devices and a single point control device exist in one area in the present embodiment, three or more on-board devices or point controllers may exist. Besides, it may, though an area 10 divided into four blocks, be possible the area 10 to subdivide into five or more blocks. Although all block occupation rights, lockout instructions to all switches and status information are managed in a single signaling telegram area, management may be performed with multiple signaling telegrams if content to be managed is not duplicated.

In dem Fall des Anwendens des Signalisierungssicherheitssystems der vorliegenden Ausführungsform auf eine Strecke, in der Züge mit hoher Dichte betrieben werden, ist, da eine Anzahl der bordinternen Vorrichtungen oder Weichensteuerungseinrichtungen in einem Bereich existieren und ein Signalisierungstelegramm unter diesen Vorrichtungen zirkuliert wird, eine Zeit, um das Signalisierungstelegramm unter den Vorrichtungen zu zirkulierten, länger, wenn die Anzahl der Vorrichtungen ansteigt. Selbst in dem vorstehenden Fall aktiviert das Signalisierungssicherheitssystem der vorliegenden Ausführungsform die Reservierung der Blockbesetzung durch eine bordinterne Vorrichtung eines folgenden Zugs und die Reservierung der Umsetzungsanweisung zu einer Weiche, die zu einer Fahrstrecke davon gehört, begleitet durch die Freigabe des Rechts zum Besetzen des Blocks durch eine bordinterne Vorrichtung eines vorhergehenden Zugs, und deshalb kann, unabhängig von der Zirkulationsreihenfolge des Signalisierungstelegramms, die Weichensteuerungseinrichtung die Umsetzung der Weiche auf eine Stellung einer Strecke eines folgenden Zugs zu einem Zeitpunkt, wenn das Signalisierungstelegramm zum ersten Mal empfangen wird, beginnen. Das heißt, in dem Fall des Betreibens einer Anzahl von Zügen ist es möglich, einen Betriebsabstand davon zu verkürzen und die Züge mit hoher Dichte zu betreiben.In the case of applying the signaling security system of the present embodiment to a route in which high density trains are operated, since a number of the on-board devices or point controllers exist in one area and a signaling message is circulated among these devices, one time is the signaling telegram among the devices to circulate, longer as the number of devices increases. Even in the above case, the signaling security system of the present embodiment activates the reservation of the block occupation by an on-board apparatus of a following train and the reservation of the conversion instruction to a switch belonging to a route thereof accompanied with the release of the right to occupy the block by one Thus, irrespective of the circulation order of the signaling telegram, the switch control means may begin to translate the switch to a position of a following train at a time when the signaling telegram is received for the first time. That is, in the case of operating a number of trains, it is possible to shorten an operating distance thereof and to operate the trains at a high density.

Obwohl beschrieben ist, dass eine einzelne Reservierungsspalte in einem Telegramm in der vorliegenden Ausführungsform bereitgestellt ist, kann es möglich sein, mehrere Reservierungsspalten mit unterschiedlichen Prioritäten bereitzustellen und die Reservierungsausführung einer Reservierungsspalte mit der höchsten Priorität zu aktivieren und die Prioritäten der anderen Reservierungsspalten zu erhöhen, begleitet durch Freigabe des Rechts zum Besetzen des Blocks eines vorausgehenden Zugs.Although it is described that a single reservation column is provided in a telegram in the present embodiment, it may be possible to provide multiple reservation columns with different priorities and to activate the reservation execution of a reservation column with the highest priority and to increase the priorities of the other reservation columns by releasing the right to occupy the block of a previous train.

Zusätzlich ist die vorliegende Erfindung nicht auf die vorstehend beschriebenen Ausführungsformen beschränkt und enthält verschiedene Modifikationsbeispiele. Die vorstehend beschriebenen Ausführungsformen beschreiben im Einzelnen die vorliegende Erfindung, so dass sie leicht verstanden werden kann, und die Erfindung ist nicht notwendigerweise auf die eine beschränkt, in der alle vorstehend beschriebenen Konfigurationen bereitgestellt sind.In addition, the present invention is not limited to the above-described embodiments and includes various modification examples. The above-described embodiments describe in detail the present invention so that it can be easily understood, and the invention is not necessarily limited to the one in which all the configurations described above are provided.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

1, 21, 2
Zugtrain
33
Weicheswitch
10, 20, 3010, 20, 30
BereichArea
11, 12, 13, 1411, 12, 13, 14
Blockblock
15, 1615, 16
Streckeroute
101, 102101, 102
bordinterne Vorrichtungon-board device
103103
WeichensteuerungseinrichtungSoft control device
201201
SignalisierungstelegrammSignaling telegram

Claims (6)

Bordinterne Vorrichtung zum Empfangen eines Telegramms und Übertragen des Telegramms zu einer weiteren Vorrichtung, wobei das Telegramm einen Zug oder eine am Weg gelegene Ausrüstung, die sich innerhalb eines Bereichs befindet, der aus einem oder mehreren Blöcken zusammengesetzt ist, in der ein Recht zum Besetzen des Blocks des Zugs eingestellt ist, der Reihe nach anläuft und eine Blockbesetzungsinformation enthält, die ein Recht zum Besetzen des Blocks in einem Zug einstellen kann, wobei das Telegramm Blockbesetzungsreservierungsinformationen enthält, die einen Zug angeben, in dem ein Recht zum Besetzen des Blocks eingestellt ist, nachfolgend einem Zug, in dem das Recht zum Besetzen des Blocks durch die Blockbesetzungsinformationen eingestellt ist, und wenn das Recht zum Besetzen des Blocks, das in dem Zug eingestellt ist, auf dem die bordinterne Vorrichtung montiert ist, durch die Blockbesetzungsinformationen freigegeben wird, schreibt die bordinterne Vorrichtung die Blockbesetzungsinformationen neu, so dass das Recht zum Besetzen des Blocks in einem Zug eingestellt wird, der durch Blockbesetzungsreservierungsinformationen angegeben ist, die dem Block entsprechen.On-board apparatus for receiving a telegram and transmitting the telegram to another apparatus, the telegram comprising a train or on-the-way equipment located within an area composed of one or more blocks in which a right to occupy the Block of the train, starting in sequence and containing block occupation information that can set a right to occupy the block in one go, the message containing block occupation reservation information indicating a train in which a right to populate the block is set, following a train in which the right to populate the block is set by the block occupation information, and When the right to occupy the block set in the train on which the on-board device is mounted is released by the block occupation information, the on-board device rewrites the block occupation information, so that the right to occupy the block is set in one go indicated by block occupation reservation information corresponding to the block. Bordinterne Vorrichtung nach Anspruch 1, wobei das Telegramm Weichensperrstellungsanweisungsinformationen enthält, die eine Weichensperrstellungsanweisung angeben, und Weichensperrstellungsanweisungsreservierungsinformationen, die eine Weichensperrstellungsanweisung angeben, nachdem eine bordinterne Vorrichtung eines Zugs, in der ein Recht zum Besetzen des Blocks, in dem die Weiche installiert ist, eingestellt ist, das Recht zum Besetzen des Blocks freigibt, und wenn das Recht zum Besetzen des Blocks in dem Zug, auf dem die bordinterne Vorrichtung montiert ist, eingestellt ist, freigegeben wird, die bordinterne Vorrichtung die Weichensperrstellungsanweisungsinformationen einer Weiche neu schreibt, so dass eine Weichensperrstellungsanweisung, die durch die Weichensperrstellungsanweisungsreservierungsinformationen einer Weiche, die in dem Block montiert ist, angegeben ist, in den Weichensperrstellungsanweisungsinformationen eingestellt wird.An on-board apparatus according to claim 1, wherein the telegram includes turnout instruction information indicating a turnout instruction and turnout instruction reservation information indicating a turnout instruction after an on-board device of a train in which a right to occupy the block in which the turnout is installed is given the right to occupy the block releases, and when the right to occupy the block in the train on which the on-board device is mounted is released, the on-board device rewrites the turnout instruction information of a turnout, such that a turnout instruction issued by the turnout instruction reservation information of a switch shown in FIG Block is specified, is set in the turnout instruction information. Bordinterne Vorrichtung nach Anspruch 1 oder 2, wobei die bordinterne Vorrichtung Blockbesetzungsinformationen des Telegramms überprüft, und wenn das Recht zum Besetzen des Blocks, auf dem Fahren versucht wird, in den Blockbesetzungsinformationen durch einen weiteren Zug eingestellt ist, die bordinterne Vorrichtung Informationen über einen Zug, auf dem die bordinterne Vorrichtung montiert ist, in die Besetzungsreservierungsinformationen des Blocks schreibt.The on-board device of claim 1 or 2, wherein the on-board device checks block occupation information of the message, and if the right to occupy the block on which driving is attempted is entered in the Block occupation information is set by another train, the on-board device writes information about a train on which the on-board device is mounted in the occupation reservation information of the block. Bordinterne Vorrichtung nach Anspruch 2, wobei die bordinterne Vorrichtung die Weichensperrstellungsanweisungsinformationen des Telegramms überprüft, und wenn die Weichensperrstellungsanweisungsinformationen einer Weiche, die in einem Block installiert ist, auf dem Fahren versucht wird, durch einen weiteren Zug eingestellt sind, die bordinterne Vorrichtung die Sperrstellung, an der der Zug fährt, in die Weichensperrstellungsanweisungsreservierungsinformationen der Weiche schreibt.The on-board apparatus according to claim 2, wherein the on-board device checks the turn-off instruction information of the telegram, and when the turn-inhibit instruction information of a turnout installed in a block is attempted to travel is set by another train, the on-board device sets the lock position the train is driving, writes in the turnout switch instruction reservation information of the switch. Zug, auf dem die bordinterne Vorrichtung nach einem der Ansprüche 1 bis 4 montiert ist.Train on which the on-board device according to one of claims 1 to 4 is mounted. Signalisierungssicherheitssystem, das Folgendes umfasst: einen Zug, auf dem die bordinterne Vorrichtung nach einem der Ansprüche 1 bis 4 montiert ist; und eine Weichensteuerungseinrichtung, die konfiguriert ist, eine Weichensperrstellung einer Weiche basierend auf Weichensperrstellungsanweisungsinformationen, die in dem Telegramm enthalten sind und eine Weichensperrstellungsanweisung angeben, umzustellen.A signaling security system comprising: a train on which the on-board device according to any one of claims 1 to 4 is mounted; and a switch controller configured to switch a switch lock position of a switch based on switch lock instruction information included in the telegram indicating a switch lock instruction.
DE112015003535.4T 2014-09-01 2015-05-18 Onboard device, train and signaling security system Active DE112015003535B4 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2014-176716 2014-09-01
JP2014176716A JP6239469B2 (en) 2014-09-01 2014-09-01 On-board equipment, trains, and signal security systems
PCT/JP2015/064132 WO2016035390A1 (en) 2014-09-01 2015-05-18 On-board device, train, and signaling safety system

Publications (2)

Publication Number Publication Date
DE112015003535T5 true DE112015003535T5 (en) 2017-08-17
DE112015003535B4 DE112015003535B4 (en) 2022-01-13

Family

ID=55439464

Family Applications (1)

Application Number Title Priority Date Filing Date
DE112015003535.4T Active DE112015003535B4 (en) 2014-09-01 2015-05-18 Onboard device, train and signaling security system

Country Status (5)

Country Link
JP (1) JP6239469B2 (en)
CN (1) CN106573552B (en)
DE (1) DE112015003535B4 (en)
GB (1) GB2544221B (en)
WO (1) WO2016035390A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3786027A1 (en) * 2019-08-27 2021-03-03 Siemens Mobility GmbH Operating method for vehicles in a driving area

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6258167B2 (en) * 2014-09-12 2018-01-10 株式会社日立製作所 On-board equipment, trains, and signal security systems
JP6534624B2 (en) * 2016-02-16 2019-06-26 株式会社日立製作所 On-vehicle apparatus, train equipped with on-vehicle apparatus and signal security system
JP6713357B2 (en) * 2016-06-28 2020-06-24 株式会社日立製作所 On-board equipment, train, and signal security system
JP6568830B2 (en) * 2016-08-22 2019-08-28 株式会社日立製作所 Signal security system
JP6946053B2 (en) * 2017-05-23 2021-10-06 株式会社東芝 Vehicle communication system
CN109878556B (en) * 2019-02-01 2021-06-08 卡斯柯信号有限公司 Management method and device for rail transit resources
JP7190975B2 (en) * 2019-06-26 2022-12-16 三菱重工エンジニアリング株式会社 Train control device, method and program
CN113264086B (en) * 2021-06-08 2022-08-26 卡斯柯信号有限公司 Train interval protection control method and device based on TACS (train operating System)

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3474709B2 (en) * 1996-07-30 2003-12-08 株式会社東芝 Train operation control device
JP3311986B2 (en) * 1998-03-10 2002-08-05 日本信号株式会社 Train control device
JP2006137337A (en) * 2004-11-12 2006-06-01 Toshiba Corp Train control system and train control method
JP4375253B2 (en) 2005-02-25 2009-12-02 株式会社日立製作所 Signal security system
CN1986314B (en) * 2005-12-22 2012-07-25 株式会社日立制作所 Signaling vigilance system
US8214091B2 (en) * 2007-10-18 2012-07-03 Wabtec Holding Corp. System and method to determine train location in a track network
JP5023052B2 (en) * 2008-12-25 2012-09-12 株式会社日立製作所 Signal security system
FR2958248B1 (en) * 2010-04-01 2012-06-15 Alstom Transport Sa METHOD FOR MANAGING THE MOVEMENT OF VEHICLES ON A RAILWAY NETWORK AND ASSOCIATED SYSTEM
JP5683254B2 (en) * 2010-12-21 2015-03-11 公益財団法人鉄道総合技術研究所 Driving security method, driving security system and management device
JP6104901B2 (en) * 2011-06-14 2017-03-29 タレス・カナダ・インコーポレイテッド Automatic vehicle control that does not require interlocking devices along the railway

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3786027A1 (en) * 2019-08-27 2021-03-03 Siemens Mobility GmbH Operating method for vehicles in a driving area

Also Published As

Publication number Publication date
CN106573552A (en) 2017-04-19
JP2016052194A (en) 2016-04-11
JP6239469B2 (en) 2017-11-29
GB2544221A (en) 2017-05-10
CN106573552B (en) 2019-03-01
GB2544221B (en) 2020-08-19
GB201702579D0 (en) 2017-04-05
DE112015003535B4 (en) 2022-01-13
WO2016035390A1 (en) 2016-03-10

Similar Documents

Publication Publication Date Title
DE112015003535B4 (en) Onboard device, train and signaling security system
DE102014210190A1 (en) Driving license for a rail vehicle
EP1552997B1 (en) Train management system with change of the train control system
DE102015204769A1 (en) Method and device for automatically influencing track-bound vehicles
EP2879936B1 (en) Control of rail vehicles
DE102008045050A1 (en) Method for automatic train control in European train control system track, involves using identical procedures for formation of telegrams to control balises for point-like automatic train control and wireless-based automatic train control
EP2555959B1 (en) Method and device for determining the train length of a plurality of coupled railway traction vehicles
EP2870047B1 (en) Operation of a rail vehicle
DE602005006081T2 (en) Device for the protection of track workers
EP3400161B1 (en) Track installation and method for operating a track installation
EP3013666B1 (en) Method for operating a train control system and train control system
EP0920391B1 (en) Process of controlling and monitoring a traffic control system
DE2940551C2 (en) Operating and display device for computer-controlled railway signal systems
DE102017212933A1 (en) Track layout with balises
EP0407875B1 (en) Method and arrangement for the configuration of a control system for track installations
DE112015003770B4 (en) Telegram recovery device and signaling security system
DE102020133048A1 (en) System for securing maintenance tracks in rail traffic
DE2902238A1 (en) Train monitoring control system - has transmitter located on train to detect passage and indicate that track section is clear
EP3943363B1 (en) Railway control system with restriction
WO2018210475A1 (en) Method for operating a track system and signal box for a track system
DE102005037801A1 (en) Railway system and method for forwarding data for a railway system
DE102015217596A1 (en) Communication device and method for the automated exchange of messages in a railway installation
EP3786027A1 (en) Operating method for vehicles in a driving area
DE102014214918A1 (en) Method and device for operating a railway safety system
DE568138C (en) Safety device for reconstruction work on double-track railway lines

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R082 Change of representative

Representative=s name: MERH-IP MATIAS ERNY REICHL HOFFMANN PATENTANWA, DE

R016 Response to examination communication
R016 Response to examination communication
R018 Grant decision by examination section/examining division
R020 Patent grant now final