DE10351688A1 - Chain scraper conveyor for use in mining and tunneling has troughs attached to side frames mounted on rollers which move along double-T-section rails, auxiliary rollers being mounted between top of trail and base of side frame - Google Patents

Chain scraper conveyor for use in mining and tunneling has troughs attached to side frames mounted on rollers which move along double-T-section rails, auxiliary rollers being mounted between top of trail and base of side frame Download PDF

Info

Publication number
DE10351688A1
DE10351688A1 DE2003151688 DE10351688A DE10351688A1 DE 10351688 A1 DE10351688 A1 DE 10351688A1 DE 2003151688 DE2003151688 DE 2003151688 DE 10351688 A DE10351688 A DE 10351688A DE 10351688 A1 DE10351688 A1 DE 10351688A1
Authority
DE
Germany
Prior art keywords
chain scraper
rails
scraper conveyor
track
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE2003151688
Other languages
German (de)
Inventor
Reinold Krohm
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE2003151688 priority Critical patent/DE10351688A1/en
Publication of DE10351688A1 publication Critical patent/DE10351688A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/06Transport of mined material at or adjacent to the working face
    • E21F13/066Scraper chain conveyors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The chain scraper conveyor for use in mining and tunneling has troughs (2) attached to side frames (3) mounted on rollers (7) which move along double-T-section rails (8). Auxiliary rollers (23, 24) are mounted between the top (18) of the rail and the base (15) of the side frame.

Description

Die Erfindung betrifft einen Kettenkratzförderer für den Massenguttransport im untertägigen Berg- und Tunnelbau, bestehend aus miteinander verbundenen Rinnenschüssen und den innenliegenden Förderelementen, denen beidseitig galgenartige Hubstützen mit Hubzylindern, Laufrädern und Laufschienen zugeordnet sind, wobei wechselweise der Förderer und die Laufschienen senkrecht zur Streckenquerrichtung bewegbar sind.The The invention relates to a chain scraper conveyor for bulk transport in underground Mining and tunneling, consisting of interconnected channel shots and the internal conveyor elements, on both sides gallows-like jacks with lifting cylinders, wheels and Runners are assigned, with alternately the conveyor and the rails are perpendicular to the track transverse direction movable.

Im untertägigen Berg- und Tunnelbau werden Kettenkratzförderer für den Massenguttransport insbesondere im Bereich der Gewinnung eingesetzt. Dabei werden um Strebförderer die hereingewonnenen Mengen auf den in der Strecke verschiebbaren Förderer übergeben. Dabei wird der Streckenförderer in der Regel über den mit ihm verbundenen Strebförderer mit verfahren, wobei es für den Bereich der Übergabe des Streckenförderers verschiedene Lösungen gibt, die alle eine einwandfreie Übergabe auf das nachfolgende Förderband sicherstellen sollen. Aufgrund des hohen Eigengewichtes des Förderers und immer größerer Überfahrlängen muss eine entsprechende Vorschubvorrichtung sehr gut dimensioniert ausgebildet werden, zumal ja der Kettenkratzförderer auf dem Liegenden Verschoben wird. Um die dazu notwendigen Kräfte möglichst in Grenzen zu halten, ist nach der DE-PS 40 47 941 vorgeschlagen worden, dass dem Streckenförderer zu beiden Seiten im Abstand paarweise angeordnete Laufräder zugeordnet sind, die auf einem unter dem Streckenförderer verlegten Vierlingsgleis mit Ober- und Unterschienen abrollend ausgebildet sind. Außerdem sind dem Streckenförderer beidseitig galgenartig ausgebildete Hubstützen mit Hubzylindern zugeordnet, über die der Förderer angehoben werden kann, wenn die Laufschienen nach dem Vorrücken des Kettenkratzförderers nachgeholt werden müssen. Während des Verfahrens der Streckenförderers selbst rollt dieser auf den Unterschienen ab, so dass eine relativ geringe Reibung auftritt. Nachteilig dabei ist, dass bei den bekannten rollend verfahrbaren Förderern eine Bauweise vorgesehen ist, die den Streckenförderer wesentlich verbreitert. Die Hubstützen sind noch außerhalb der seitlich der Rinnenschüsse angeordneten Laufräder positioniert, wobei weiter nachteilhaft ist, dass hier Vierlingsgleise zum Einsatz kommen, die unterhalb des Streckenförderers verlegt sind. Insgesamt gesehen ist diese Bauweise verhältnismäßig aufwendig.in the underground Mining and tunneling are chain scraper conveyors for bulk transport in particular used in the field of extraction. These are to Strebförderer the Transferred quantities are transferred to the conveyors that can be moved along the route. This is the track conveyor usually over the longwall conveyor associated with it with procedure, it being for the area of the transfer of the track conveyor different solutions there, all a flawless transfer to the subsequent conveyor belt to make sure. Due to the high weight of the conveyor and ever greater Überfahrlängen must a corresponding feed device formed very well dimensioned be, especially since the Kettenkratzförderer moved on the beach becomes. To the necessary forces preferably to keep within limits, has been proposed in DE-PS 40 47 941, that the track promoter assigned on both sides in the distance paired wheels are on a run under the track conveyor Vierlingsgleis formed rolling with top and bottom rails. Besides, they are the track conveyor bilateral gallows-shaped lifting supports associated with lifting cylinders over which the promoter can be raised when the rails after the advance of the Chain conveyor must be made up. While the process of the track conveyor even this rolls on the lower rails, so that a relative low friction occurs. The disadvantage here is that in the known rolling conveyors a design is provided, which broadens the track conveyor significantly. The jacks are still outside the side of the trough shots arranged wheels positioned, which is further disadvantageous that here Vierlingsgleise are used, which are laid below the track conveyor. All in all Seen this construction is relatively expensive.

Der Erfindung liegt daher die Aufgabe zu Grunde, einen rollend verfahrbaren Kettenkratzförderer zu schaffen, der auch unter beengten Streckenverhältnissen sicher einsetzbar ist.Of the The invention is therefore based on the object, a rolling movable Chain conveyor to create, even in cramped track conditions is safe to use.

Die Aufgabe wird gemäß der Erfindung dadurch gelöst, dass die Laufschienen als Doppel-T-Träger ausgebildet und zusammen mit den auf ihnen rollenden Laufrädern in einem Tragrahmen angeordnet sind, der unterhalb der Hubzylinder und gelenkig damit verbunden positioniert ist, wobei der Unterflansch der Laufschienen mit einem Teil des Steges zusammen durch den Boden des Tragrahmens vorsteht und zwischen Oberflansch und Boden des Tragrahmens Tragrollen vorgesehen sind.The Task is according to the invention solved by that the rails are designed as double T-beams and together arranged with the wheels rolling on them in a support frame which are below the lifting cylinder and hinged to it is positioned, wherein the lower flange of the rails with a Part of the web projecting together through the bottom of the support frame and provided between the upper flange and the bottom of the support frame support rollers are.

Bei einem derart ausgebildeten Kettenkratzförderer können die Laufräder und die Laufschienen übereinander und seitlich des Strebförderers angeordnet werden. Unter den Rinnenschüssen besteht keine Verbindung zwischen den beidseitig angeordneten Hubstützen und Laufschienen, sondern vielmehr handelt es sich hier um jeweils eine Einheit, die als solche mit den vor- und nachgeordneten Einheiten dafür sorgt, dass der gesamte Kettenkratzförderer während des Betriebes auf den Laufschienen abrollend verfahren werden kann, während nach Erreichen der Endposition die Laufschienen einfach dadurch nachgeholt werden, dass sie selbst auf den Tragrollen und dem Oberflansch in Streckenlängsrichtung verschoben oder verfahren werden. Dabei dienen sowohl für das Vorziehen des Strebförderers wie auch gegebenenfalls für das Vorziehen der Laufschienen entweder Vorrückzylinder oder die den Strebförderer bewegenden Bauteile oder aber auch falls vorhanden eine Vortriebsmaschine, dann nämlich, wenn ein derartiger Kettenkratzförderer im Streckenvortrieb eingesetzt wird. Auf jeden Fall können so wesentlich schmalere Baueinheiten für den Streckenförderer zur Verfügung gestellt werden, die unter Umständen etwas höher bauen, als die bekannten Hubstützen, wobei dies aber nur geringfügig ist, weil ja bei dieser Ausführung auf das untergreifende Vierlingsgleis verzichtet werden kann und der Streckenförderer bzw. Kettenkratzförderer direkt auf dem Liegenden aufliegt.at Such a trained chain scraper conveyor, the wheels and the rails on top of each other and side of the longwall conveyor to be ordered. There is no connection among the channel shots between the reciprocating jacks and rails, but rather, these are each a unit, as such with the upstream and downstream units ensures that the entire chain scraper during the Operation can be moved on the rails rolling, while after reaching the end position, the rails simply by be made up for themselves on the idlers and the top flange in the longitudinal direction be moved or moved. Serve both for the preference of the longwall conveyor like also possibly for the advancing of the rails either advancing cylinder or moving the longwall conveyor Components or, if available, a tunneling machine, then namely, if such a chain scraper conveyor is used in the route propulsion. In any case, you can do so much narrower units for the track conveyor to disposal that may be put a little bit higher build, as the known jacks, but this only slightly is because yes in this embodiment can be dispensed with the underarchive Vierlingsgleis and the track conveyor or chain scraper conveyor rests directly on the footwall.

Bei einer zweckmäßigen Weiterbildung der Erfindung ist vorgesehen, dass die Hubzylinder in Streckenlängsrichtung vor oder hinter dem Tragrahmen angeordnet und mit den Seitenwänden des Tragrahmens gelenkig verbunden sind. Auf diese Weise kann die Bauhöhe reduziert werden, da die Hubzylinder nicht oberhalb der Laufschiene angeordnet sind, sondern praktisch in gleicher Höhe. Auch bei dieser Ausführung ist es möglich, den Streckenförderer anzuheben, wenn er auf den Laufrädern rollend in Streckenlängsrichtung verfahren werden soll. Dies kann problemlos auch während des Betriebes geschehen, so dass er sicher über den Strebförderer mit in Streckenlängsrichtung bewegt werden kann.at an appropriate training The invention provides that the lifting cylinder in the longitudinal direction arranged in front of or behind the supporting frame and with the side walls of the Support frame are hingedly connected. In this way, the height can be reduced be because the lifting cylinder is not located above the track are, but practically at the same height. Also in this design is it is possible the track conveyor lift when he is on the wheels rolling in the longitudinal direction should be moved. This can easily happen during the Operation done so that he is safe with the longwall conveyor in the longitudinal direction can be moved.

Eine weitere zweckmäßige Ausführung ist die, bei der die Laufschienen einen Aufsatz aufweisen, dass die Laufräder tonnenförmig und seitliche Laufkragen aufweisend ausgebildet sind, so dass der Aufsatz als Führung für die gesamten Laufräder dient. Damit ist ein seitliches Hin- und Herbewegen ausgeschlossen, weil die die Laufkragen aufweisenden tonnenförmigen Laufräder sicher auf dem Aufsatz des Oberflansches geführt werden.Another expedient embodiment is the, in which the rails have an attachment that the wheels are barrel-shaped and lateral yokes are formed having, so that the attachment serves as a guide for the entire wheels. Thus, a lateral reciprocating is excluded because the running collar having barrel-shaped wheels are securely guided on the top of the upper flange.

Gegen Querkräfte können die Hubzylinder auf einfache und sichere Art und Weise dadurch geschützt werden, dass die Hubstütze innenseitig eine Schlitzführung aufweist, in der ein angepasstes, senkrechtes Aufsatzblech des Tragrahmens geführt ist. Diese besondere Führung ist eine Zwangsführung, die über die gesamte Länge am Streckenförderer vorgegeben ist, so dass damit sichergestellt ist, dass Querkräfte wie Hubzylinder nicht beeinträchtigen können.Versus transverse forces can the lifting cylinders are protected in a simple and safe way, that the lift support inside a slot guide in which a matched, vertical top plate of the support frame is guided. This particular leadership is a forced tour, the over the whole length at the track conveyor is predetermined, so as to ensure that lateral forces such as Do not interfere with the lifting cylinder can.

Auch größte Lasten können durch die als Doppel-T-Träger ausgebildeten Laufschienen aufgenommen werden, zumal nach einer Weiterbildung vorgesehen ist, dass der Steg der Laufschienen beidseitig über Zusatzbleche verstärkt ist. Diese Zusatzbleche sind zweckmäßigerweise mit dem Steg verschweißt oder auf andere zweckmäßige Weise verbunden.Also biggest loads can by as a double-T-carrier trained rails are included, especially after a Further development is provided that the web of the rails on both sides via additional sheets reinforced is. These additional sheets are conveniently welded to the web or in another convenient way connected.

Weiter vorn ist bereits darauf hingewiesen worden, dass am Tragrahmen Tragrollen vorgesehen sind, auf denen die Laufschiene abrollen kann, wenn sie nachgezogen werden muss. Um eine Überlastung dieser Tragrollen zu vermeiden, sieht die Erfindung vor, dass die zwischen Oberflansch der Laufschiene und Boden des Tragrahmens angeordneten Tragrollen, sich auf der Oberseite des Bodens abstützend angeordnet und ausgebildet sind. Sie rollen dementsprechend auf der Oberseite des Bodens und sorgen damit dafür, dass die Laufschiene sicher in Längsrichtung des Streckenförderers bewegt werden kann.Further front has already been pointed out that on the support frame idlers are provided, on which the running rail can roll when they must be tightened. To overload these idlers To avoid, the invention provides that between the upper flange the running rail and bottom of the support frame arranged carrying rollers, arranged and formed on the top of the ground supporting are. They roll accordingly on the top of the floor and worry for that, that the running rail safely in the longitudinal direction of the track conveyor can be moved.

Da diese Laufschienen das Doppel-T-Profil aufweisen, eignen sie sich besonders für diesen Einsatz, da sich der Oberflansch zum Nachziehen der Laufschiene vorteilhaft auswirkt und zum anderen der Unterflansch mit dem Oberflansch beim Tragen des Streckenförderers die Einleitung entsprechender Kräfte in die Sohle sicherstellt.There These rails have the double-T profile, they are suitable especially for this use, since the upper flange for tightening the track advantageous and on the other hand, the lower flange with the upper flange while carrying the track conveyor the introduction of appropriate forces ensures in the sole.

Dort, wo besonders große Kräfte auftreten bzw. von den Hubstützen und dem Tragrahmen übernommen werden müssen, ist eine andere Lösung der Aufgabe vorteilhaft, nach der die Laufschienen als U-Profil ausgebildet sind, dessen Verbindungssteg gelenkig mit dem Hubzylinder verbunden ist und an dessen beiden Seitenflanschen den Oberflansch der Laufschiene tragende Kombi-Tragrollen drehbar befestigt sind.There, where especially big personnel occur or from the jacks and the supporting frame Need to become, is another solution the task advantageous after the rails as a U-profile are formed, the connecting web articulated with the lifting cylinder is connected and on the two side flanges the top flange the running rail carrying combination idlers are rotatably mounted.

Diese Lösung baut zwar etwas breiter als die weiter vorn beschriebene Lösung, hat aber den Vorteil, dass man nicht mehrere Tragrollen oder Laufräder benötigt, sondern nur noch die Kombi-Tragrollen, die sowohl zum Vorwärtsbewegen des Streckenförderers dienen, wie auch zum Nachziehen der Laufschienen selbst. Vorgesehen werden diese verbreiterten Tragrahmen insbesondere im Bereich der Brecher, weil damit entsprechend höhere Gewichte sicher übertragen bzw. aufgenommen werden können. Auch hier ist wieder eine Zwangsführung vorgesehen, so dass die Hubzylinder gegen Querkräfte gesichert bzw. davon entlastet sind. Vorteilhaft ist bei dieser Lösung weiter, dass mit einer relativ geringen Bauhöhe gearbeitet werden kann.These solution builds something wider than the solution described earlier, has but the advantage that you do not need multiple idlers or wheels, but only the combi idlers that move both forward of the track conveyor serve, as well as for retightening the rails themselves. Intended These widened supporting frames will be particularly in the field of Breaker, because with it correspondingly higher weights transmit or can be recorded. Also Here again is a forced tour provided so that the lifting cylinder against lateral forces secured or relieved of it are. Another advantage of this solution is that with a relatively low height can be worked.

Zweckmäßigerweise sind die Kombi-Tragrollen über Anschraubplatten mit den Seitenflanschen lösbar verbunden. Dadurch besteht die Möglichkeit, diese Einheiten der Kombi-Tragrollen bei Bedarf auszutauschen oder auch zu reparieren, wenn dies notwendig ist. Außerdem ist dadurch die Montage erleichtert.Conveniently, are the combination idlers over Screw-on plates detachably connected to the side flanges. This exists the possibility of this Units of the combination carrier roles to exchange if necessary or also to repair if necessary. In addition, this is the assembly facilitated.

Zur Verstärkung des Unterflansches ist vorgesehen, dass der Unterflansch der Laufschiene über eine Verstärkungsplatte verfügt. Aufgrund der großen Kräfte, die im Bereich des schweren Brechers aufzunehmen sind, kann auf diese Art und Weise eine Beeinflussung des Unterflansches sicher vermieden werden. Die Kombi-Tragrollen werden gerade im Streckenvortrieb häufiger durch auf dem Unterflansch liegenden Schmutz beeinflusst werden. Um dies zu vermeiden, sieht die Erfindung vor, dass in Laufrichtung vor den Kombi-Tragrollen auf der Oberseite des Unterflansches reibende Reinigungsschaber angeordnet sind. Diese Reinigungsschaber drücken den aufliegenden Dreck bzw. die Steine weg, so dass die Kombi-Tragrollen immer einwandfrei auf dem Unterflansch abrollen können. Aufgrund der großen Gewichte ist zwar davon auszugehen, dass der größte Teil des auflagernden Dreckes weggequetscht wird, doch ist ein Reinigungsschaber auf jeden Fall vorteilhaft.to reinforcement the lower flange is provided that the lower flange of the running rail over a reinforcing plate features. Because of the big one forces which can be absorbed in the area of the heavy crusher can open this way of influencing the under flange safely be avoided. The combination idlers are currently in the way tunneling frequently be influenced by lying on the lower flange dirt. To avoid this, the invention provides that in the running direction rubbing in front of the combi carrier rollers on top of the lower flange Cleaning scrapers are arranged. These cleaning scrapers push the lying dirt or the stones away, so that the combi-carrying rollers can always roll properly on the lower flange. by virtue of the big Although weights are assumed to be the major part of the overlying dirt is squeezed, but a cleaning scraper is definitely advantageous.

Weiter vorne ist bereits darauf hingewiesen worden, dass diese schwerere Ausführungsform insbesondere für den Brecherbereich vorgesehen ist, wobei die Erfindung vorsieht, dass die mit U-Profil ausgerüsteten Tragrahmen parallel zum Außenrand des Gehäuses + Hubbereich des Brechers verlaufend angeordnet und mit den Tragrahmen der schmaleren Bauart über Senkrecht-Tragrahmen gelenkig verbunden sind. Am Brecher selbst wird also nichts geändert, sondern es ist lediglich vorgesehen, dass um ihn herum die mit U-Profil ausgerüsteten Tragrahmen vorgesehen werden, um die hohen Gewichte sicher aufnehmen zu können. Durch die gelenkige Verbindung ist beim Vorziehen bzw. Nachziehen der Laufschienen eine negative Beaufschlagung vermieden.Earlier it has already been pointed out that this heavier embodiment is provided in particular for the crusher area, wherein the invention provides that the U-profile equipped with supporting frame parallel to the outer edge of the housing + stroke of the crusher and arranged with the support frame of the narrower design are articulated via vertical support frame. At the crusher itself so nothing is changed, but it is only intended that around him equipped with U-shaped support frame are provided to accommodate the high weights safely. Due to the articulated connection, advancing or retightening the rails is a negative action avoided.

Nach einer weiteren Ausführung ist schließlich möglich, dass der Tragrahmen der schmaleren Bauart tunnelartig durch das Gehäuse des Brechers verlegt ist, so dass dann über die gesamte Länge der gleiche Tragarm zum Einsatz kommen kann. Damit ist diese Ausführung von der Verlegerei her natürlich von Vorteil und reicht in aller Regel auch für normale Brechertypen aus. Dabei ist es durchaus denkbar, dass die Brecherauflage auf der Sohle wie üblich ist oder aber dass der Brecher sich auch mit auf der normalen Laufschiene abstützt.To another embodiment is finally possible, that the support frame of the narrower design tunnel-like through the casing the crusher is laid, so that over the entire length of the same Support arm can be used. This is the execution of of the publisher of course from Advantage and usually sufficient for normal breaker types. It is quite possible that the crusher pad on the sole as usual or that the breaker is also on the normal track supported.

Die Erfindung zeichnet sich insbesondere dadurch aus, dass eine Lösung geschaffen ist, die den jeweiligen Verhältnissen in der Strecke gut anpassbar ist. Es steht genügend Platz nach Oben hin zur Verfügung, so werden die Laufräder und die Laufschiene übereinander angeordnet und die notwendigen Bewegungen sowohl des Streckenförderers, d. h. also der miteinander verbundenen Rinnenschüsse, wie auch die Bewegung der Laufschiene kann problemlos vorgenommen werden. Ist wenig Bauhöhe vorhanden, so können die Hubstützen auch so aufgebaut sein, dass die Hubzylinder in Fahrtrichtung vor oder hinter den Tragrahmen positioniert und mit ihnen verbunden werden. Schließlich kann auch eine besonders starke bzw. große Lasten aufnehmende Ausführung dadurch geschaffen werden, dass die Laufrollen gleichzeitig auch die Aufgabe der Laufräder mit übernehmen und innerhalb des Profils des Doppel-T-Trägers angeordnet sind. Damit baut diese Einheit zwar etwas breiter, als bei der übereinander Anordnung der Laufräder und der Laufrollen und auch der Hubstützen, kann aber vom Prinzip her mit weniger Aufwand hergestellt werden und kann extrem hohe Gewichte tragen.The Invention is characterized in particular by the fact that a solution is created is, according to their circumstances Well adaptable in the track. There is enough space to the top available that's how the wheels get and the running rail over each other arranged and the necessary movements of both the track conveyor, d. H. So the interconnected channel shots, as well as the movement The track can be made easily. Is low height available, so can the jacks also be constructed so that the lifting cylinder in the direction of travel before or positioned behind the support frame and connected to them become. After all can also a particularly strong or large loads receiving design thereby be created, that the rollers at the same time also the task the wheels with take over and are disposed within the profile of the double-T-beam. In order to builds this unit, although somewhat wider than in the superimposed arrangement the wheels and the rollers and also the jacks, but can by principle can be manufactured with less effort and can be extremely high Wear weights.

Weitere Einzelheiten und Vorteile des Erfindungsgegenstandes ergeben sich aus der nachfolgenden Beschreibung de zugehörigen Zeichnung, in der ein bevorzugtes Ausführungsbeispiel mit den dazu notwendigen Einzelheiten und Einzelteilen dargestellt ist. Es zeigen:Further Details and advantages of the subject invention arise from the following description de associated drawings, in which preferred embodiment presented with the necessary details and individual parts is. Show it:

1 einen Kettenkratzförderer mit Tragrahmen, mit der Laufschiene als Widerlager, 1 a chain scraper conveyor with supporting frame, with the running track as an abutment,

2 die Ausführung des Kettenkratzförderers nach 1 mit Förderer als Widerlager für das Nachziehen der Laufschiene, 2 the execution of the chain scraper conveyor after 1 with conveyor as an abutment for tightening the track,

3 eine weitere Ausführung des Kettenkratzförderers mit Laufschiene in der Verfahrposition des Förderers, 3 a further embodiment of the chain scraper conveyor with running rail in the movement position of the conveyor,

4 der Kettenkratzförderer nach 3 mit Förderer als Widerlager, 4 the chain scraper after 3 with conveyor as abutment,

5 Verlegung des Tragrahmens im Bereich des Brechers mit schmaler Ausführung, 5 Laying of the support frame in the area of the crusher with a narrow design,

6 Verlegung des Tragrahmens im Bereich des Brechers mit verstärkter Laufschienenausführung und 6 Laying of the support frame in the area of the crusher with reinforced track design and

7 Verlegung der schmalen Ausführung des Tragrahmens/Laufschiene durch das Gehäuse des Brechers hindurch. 7 Laying the narrow design of the support frame / track through the crusher housing.

1 zeigt einen Kettenkratzförderer in Teilansicht, wobei nur eine Seite eines Rinnenschusses 2 mit Hubstütze 3 und Hubzylinder 4 wiedergegeben ist. Erkennbar ist, dass der Hubzylinder 4 über ein Gelenk 5 mit der galgenartigen Hubstütze 3 verbunden ist. 1 shows a chain scraper conveyor in partial view, with only one side of a channel shot 2 with lifting support 3 and lifting cylinders 4 is reproduced. It can be seen that the lifting cylinder 4 about a joint 5 with the gallows-like jack 3 connected is.

Die galgenartige Hubstütze 3 ist mit dem Rinnenschuss fest verbunden, wobei unterhalb der Hubstütze 3 Laufräder 7 und eine Laufschiene 8 angeordnet ist. Dadurch ist die Möglichkeit gegeben, dass der gesamte Förderer 1 auf der Laufschiene 8 in der in 1 gezeigten Position rechtwinklig zur dargestellten Strecke Querrichtung 9 verschoben bzw. bewegt werden kann. Sowohl das Laufrad 7 wie die Laufschiene 8 ist in einem Tragrahmen 10 angeordnet und mit dessen Seitenwänden 11, 12 verbunden. Der Deckel 13 dieses Tragrahmens 10 verfügt über ein Gelenkauge, so dass de Hubzylinder 4 auch mit diesem Bauteil gelenkig verbunden ist. Das Gelenkauge 14 liegt genau in der Längsachse des Hubzylinders 4 und auch des gesamten Tragrahmens 10.The gallows-like jack 3 is firmly connected to the channel shot, being below the lifting support 3 impellers 7 and a running track 8th is arranged. This gives the possibility that the entire conveyor 1 on the track 8th in the in 1 shown position at right angles to the illustrated path transverse direction 9 can be moved or moved. Both the impeller 7 like the running track 8th is in a support frame 10 arranged and with its side walls 11 . 12 connected. The lid 13 this support frame 10 has a joint eye, so that de lifting cylinder 4 also hinged to this component. The joint eye 14 lies exactly in the longitudinal axis of the lifting cylinder 4 and also the entire support frame 10 ,

Wie schon erwähnt, sind die Laufräder 7 drehbar an den Seitenwänden 11, 12 festgelegt. Die Laufräder 7 sind tonnenartig ausgebildet und weisen beidseitig Laufkragen 28, 9 und 20 auf, so dass eine sichere Führung durch den Aufsatz 27 auf den Oberflansch 18 der Laufschiene 8 erreicht ist.As already mentioned, the wheels are 7 rotatable on the side walls 11 . 12 established. The wheels 7 are barrel-shaped and have on both sides collar 28 . 9 and 20 on, allowing a safe guidance through the essay 27 on the top flange 18 the track 8th is reached.

Die Laufschiene 8 ist als Doppel-T-Träger ausgebildet, wobei der Oberflansch 18 und Unterflansch 20 verbindende Steg 19 über Zusatzbleche 34 verstärkt ist.The track 8th is designed as a double-T-carrier, wherein the upper flange 18 and under flange 20 connecting bridge 19 over additional sheets 34 is reinforced.

Die Doppel-T förmige Laufschiene 8 ragt mit dem Steg 19 und dem Unterflansch 20 aus dem Boden 19 bzw. durch eine entsprechende Ausnehmung 16 hindurch aus dem eigentlichen Tragrahmen 10 heraus. Dadurch ist die Abstützposition, die in 1 wiedergegegen ist, sicher zu erreichen, d. h. die Laufschiene 8 liegt auf dem Liegenden 21 bzw. der Streckensohle auf, so dass sich der gesamte Förderer 1 mit dem Tragrahmen 10 und dem Laufrad 7 darauf abstützen und in Streckenlängsrichtung verfahren werden kann.The double-T shaped track 8th juts with the jetty 19 and the under flange 20 from the soil 19 or by a corresponding recess 16 through from the actual support frame 10 out. As a result, the support position that is in 1 is again to reach safely, ie the running rail 8th is located on the beach 21 or the track sole, so that the entire conveyor 1 with the support frame 10 and the impeller 7 supported on it and can be moved in the longitudinal direction.

Um nun nach dem Verfahren des Förderers 1 selbst auch die Laufschiene 8 nachholen zu können, sind zwischen dem Oberflansch 18, der Laufschiene 8 und der Oberseite 17 des Bodens 15 Tragrollen 23, 24 angeordnet. Diese verfügen über eine Drehachse 25, so dass beim Verfahren der Laufschiene 8 ein Mitdrehen dieser Tragrollen 23, 24 sichergestellt ist. Sie können in einem gewissen Abstand zur Oberseite 17 des Bodens 15 angeordnet sein oder so, dass sie auf der Oberseite 17 abrollen.Order now according to the procedure of the conveyor 1 even the track 8th to catch up are between the top flange 18 , the running track 8th and the top 17 of the soil 15 idlers 23 . 24 arranged. These have a rotation axis 25 , so when moving the track 8th a turning of these idlers 23 . 24 is ensured. You can be at a certain distance to the top 17 of the soil 15 be arranged or so that they are on top 17 roll.

Die Lauffläche 30 der Laufräder 7 ist so bemessen, dass sie etwas breiter als der Aufsatz 27 ist, so dass ein Verkanten des Laufrades 7 beim Bewegen des Förderers 1 nicht auftreten kann.The tread 30 the wheels 7 is sized so that it is slightly wider than the essay 27 is, allowing a tilting of the impeller 7 when moving the conveyor 1 can not occur.

Der Hubzylinder 4 wird dadurch gegen Querkräfte gesichert, dass seitlich der galgenartigen Hubstütze 3 eine Schlitzführung 32 vorgesehen ist, in der ein entsprechend senkrecht hochstehendes Aufsatzblech 33 zwangsgeführt ist, wenn der Hubzylinder 4 eingezogen wird, wie dies aus 2 entnommen werden kann. Die in 3 wiedergegebene Position ist die, bei der die Laufschiene 8 nachgeholt wird, wobei dies über einen in der Strecke angeordneten Hub- oder Schubzylinder erfolgen kann oder durch eine Maschine o. Ä., je nachdem was gerade zur Verfügung steht. Der Kettenkratzförderer 1 selbst wird dagegen in der Regel über den Strebförderer mitgezogen, wobei aufgrund der nur geringen Reibkräfte sicher mitgenommen wird, wie dies in 1 wiedergegeben ist.The lifting cylinder 4 is thereby secured against lateral forces that the side of the gallows-like lifting support 3 a slot guide 32 is provided, in a corresponding vertically upstanding attachment plate 33 Forced is when the lift cylinder 4 is fed, like this 2 can be removed. In the 3 reproduced position is the one in which the running rail 8th This can be done, which can be done via a arranged in the route lifting or pushing cylinder or by a machine o. Ä., Depending on what is currently available. The chain scraper conveyor 1 On the other hand, it is generally carried along by means of the longwall conveyor, whereby, due to the low frictional forces, it is taken along safely, as is described in US Pat 1 is reproduced.

Bei den Ausführungsformen nach den 1 und 2 erreicht man eine relativ schmale Bauweise des gesamten Kettenkratzförderers 1. Ist es erforderlich, entsprechend besonders hohe Gewichte bzw. Belastungen aufzunehmen, kann es zweckmäßig sein, die aus den 3 und 4 ersichtliche Ausführung zu verwirklichen, wobei hier der Tragrahmen 10 einen U-förmige Ausbildung erhält und wobei die besonders ausgebildeten Kombi-Tragrollen 44, 45 gleichzeitig auch mit die Funktion der Laufräder übernehmen. Erkennbar ist in den 3 und 4, dass diese Kombi-Tragrollen 44, 45 eine entsprechend größere Ausbildung und auch Tragkraft haben, wobei sie lösbar mit den Seitenwänden 11, 12 bzw. den Seitenflanschen 41, 42 über Anschraubplatten 46 verbunden sind. Diese Anschraubplatten 46 werden über Halteschrauben 47 mit den Seitenflanschen 41, 42 verbunden. Weil diese besondere Ausführung eine doch abweichende Form des Tragrahmens 10 ausweist, erhält sie ein besonderes Bezugszeichen, nämlich 38. Der Verbindungssteg 39 dieses U-Profils 38 ist mit einem Auge 40 ausgerüstet, um die gelenkige Verbindung mit dem Hubzylinder 4 herzustellen. Die beiden Seitenflanschen 41, 42 sind entsprechend stark ausgebildet und nehmen die Anschraubplatten 46 mit den Kombi-Tragrollen 44, 45 auf. Erkennbar ist weiter, dass unterhalb des Unterflansches 20 oder auf dessen Unterseite eine Verstärkungsplatte 48 vorgesehen ist, um die Einleitung bzw. Überleitung der entsprechenden Kräfte in die Laufschiene 8 sicherzustellen. Auch hier hat die Laufschiene wie erkennbar ist, die Form eines Doppel-T-Trägers. Weiter ist erkennbar, dass hier wiederum mit der Schlitzführung 32 bzw. dem Aufsatzblech 33 gearbeitet wird, um eine einwandfreie Führung und den Schutz vor Querkräften sicherzustellen.In the embodiments of the 1 and 2 one achieves a relatively narrow construction of the entire chain scraper conveyor 1 , If it is necessary to record correspondingly high weights or loads, it may be appropriate to use the 3 and 4 to realize apparent embodiment, in which case the support frame 10 receives a U-shaped training and where the specially designed combination support rollers 44 . 45 at the same time take over the function of the wheels. Is recognizable in the 3 and 4 that these combination carrier roles 44 . 45 have a correspondingly larger training and carrying capacity, being releasable with the side walls 11 . 12 or the side flanges 41 . 42 over mounting plates 46 are connected. These mounting plates 46 Be about holding screws 47 with the side flanges 41 . 42 connected. Because this particular design a different shape of the support frame 10 identifies, it receives a special reference, namely 38 , The connecting bridge 39 this U-profile 38 is with one eye 40 equipped to articulate with the lift cylinder 4 manufacture. The two side flanges 41 . 42 are trained accordingly strong and take the mounting plates 46 with the combination idlers 44 . 45 on. It is further recognizable that below the lower flange 20 or on the underside of a reinforcing plate 48 is provided to initiate or transfer of the corresponding forces in the track 8th sure. Again, the track has as recognizable, the shape of a double-T-beam. It can also be seen that here again with the slot guide 32 or the top plate 33 is worked to ensure proper guidance and protection against lateral forces.

Die 5 bis 7 zeigen Möglichkeiten der Ausbildung der Laufschienen nach dem Bereich des Brechers 50. Nach 5 werden die Laufschienen bzw. die Tragrahmen 10 nach 1 am Außenrand 52 des Gehäuses 51 des Brechers 50 entlanggeführt, so dass sich der Brecher 50 zusammen mit dem Kettenkratzförderer 1 bewegen lässt.The 5 to 7 show ways of forming the rails after the area of the crusher 50 , To 5 be the rails or the support frame 10 to 1 on the outer edge 52 of the housing 51 of the crusher 50 guided along, so that the crusher 50 together with the chain scraper conveyor 1 lets move.

Die gleiche Beweglichkeit ist auch nach 6 möglich, wobei hier im Hub-Bereich 53 und im Bereich des Brechers 50 die schwerere Ausführung nach den 3 und 4 vorgesehen ist, die über Senkrechttragrahmen 54 und ein Gelenk 55 mit der leichteren Ausführung verbunden ist. Der Brecher 50 wird somit praktisch auf eigenem Gleis verfahren.The same flexibility is also after 6 possible, being here in the hub area 53 and in the area of the crusher 50 the heavier version after the 3 and 4 is provided, the above vertical support framework 54 and a joint 55 associated with the lighter version. The crusher 50 is thus practically handled on its own track.

7 schließlich zeigt eine Ausführung, bei der die leichtere Ausführung der Laufschienen 8 und des Tragrahmens 10 durchgehend zum Einsatz kommt, wobei diese im Bereich des Brechers durch Tunnel 56, 56' verlegt sind, so dass mit dem durchgehend gleichen Gleis bzw. den gleichen Laufschienen 8 gearbeitet werden kann. 7 Finally, shows an embodiment in which the lighter design of the rails 8th and the support frame 10 is used throughout, with these in the crusher through tunnel 56 . 56 ' are laid so that with the same track or the same rails 8th can be worked.

Alle genannten Merkmale, auch die den Zeichnungen allein zu entnehmenden, werden allein und in Kombination als erfindungswesentlich angesehen.All mentioned features, including the drawings to be taken alone, are considered alone and in combination as essential to the invention.

Claims (12)

Kettenkratzförderer für den Massenguttransport im untertägigen Berg- und Tunnelbau, bestehend aus miteinander verbundenen Rinnenschüssen (2) und den innenliegenden Förderelementen, denen beidseitig galgenartige Hubstützen (3) mit Hubzylindern (4), Laufrädern (7) und Laufschienen (8) zugeordnet sind, wobei wechselweise der Förderer (1) und die Laufschienen (8) senkrecht zur Streckenquerrichtung (9) bewegbar sind, dadurch gekennzeichnet, dass die Laufschienen (8) als Doppel-T-Träger ausgebildet und zusammen mit den auf ihnen rollenden Laufrädern (7) in einem Tragrahmen (10) angeordnet sind, der unterhalb der Hubzylinder (4) und gelenkig damit verbunden positioniert ist, wobei der Unterflansch (20) der Laufschienen (8) mit einem Teil des Steges (19) zusammen durch den Boden (15) des Tragrahmens (10) vorsteht und zwischen Oberflansch (18) und Boden (15) des Tragrahmens (10) Tragrollen (23, 24) vorgesehen sind.Chain scraper conveyor for bulk transport in underground mining and tunneling, consisting of interconnected channel shots ( 2 ) and the inner conveyor elements, on both sides gallows-like jacks ( 3 ) with lifting cylinders ( 4 ), Wheels ( 7 ) and rails ( 8th ), whereby alternately the conveyor ( 1 ) and the rails ( 8th ) perpendicular to the track transverse direction ( 9 ) are movable, characterized in that the rails ( 8th ) formed as a double-T-carrier and together with the wheels running on them ( 7 ) in a supporting frame ( 10 ) are arranged below the lifting cylinder ( 4 ) and hinged thereto, the under flange ( 20 ) of the rails ( 8th ) with a part of the bridge ( 19 ) together through the ground ( 15 ) of the support frame ( 10 ) and between the upper flange ( 18 ) and ground ( 15 ) of the support frame ( 10 ) Carrying rollers ( 23 . 24 ) are provided. Kettenkratzförderer nach Anspruch 1, dadurch gekennzeichnet, dass die Hubzylinder (4) in Streckenlängsrichtung (9) vor oder hinter dem Tragrahmen (10) angeordnet und mit den Seitenwänden (11, 12) des Tragrahmens (10) gelenkig verbunden sind.Chain scraper conveyor according to claim 1, characterized in that the lifting cylinders ( 4 ) in the longitudinal direction ( 9 ) in front of or behind the supporting frame ( 10 ) and with the side walls ( 11 . 12 ) of the support frame ( 10 ) are hingedly connected. Kettenkratzförderer nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Laufschienen (8) einen Aufsatz (27) aufweisen, dass die Laufräder (7) tonnenförmig und seitliche Laufkragen (28, 29) aufweisend ausgebildet sind, so dass der Aufsatz (27) als Führung für die gesamten Laufräder (7) dient.Chain scraper conveyor according to one of the preceding claims, characterized in that the rails ( 8th ) an essay ( 27 ) that the wheels ( 7 ) barrel-shaped and lateral collar ( 28 . 29 ) are formed, so that the article ( 27 ) as a guide for the entire wheels ( 7 ) serves. Kettenkratzförderer nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Hubstütze (3) innenseitig eine Schlitzführung (32) aufweist, in der ein angepasstes, senkrechtes Aufsatzblech (33) des Tragrahmens (10) geführt ist.Chain scraper conveyor according to one of the preceding claims, characterized in that the lifting support ( 3 ) inside a slot guide ( 32 ), in which a matched, vertical top plate ( 33 ) of the support frame ( 10 ) is guided. Kettenkratzförderer nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Steg (19) der Laufschienen (8) beidseitig über Zusatzbleche (34) verstärkt ist.Chain scraper conveyor according to one of the preceding claims, characterized in that the web ( 19 ) of the rails ( 8th ) on both sides via additional sheets ( 34 ) is reinforced. Kettenkratzförderer nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die zwischen Oberflansch (18) der Laufschiene (8) und Boden (15) des Tragrahmens (10) angeordneten Tragrollen (23, 24), sich auf der Oberseite (17) des Bodens (15) abstützend angeordnet und ausgebildet sind.Chain scraper conveyor according to one of the preceding claims, characterized in that between the upper flange ( 18 ) of the track ( 8th ) and ground ( 15 ) of the support frame ( 10 ) arranged carrying rollers ( 23 . 24 ), on the top ( 17 ) of the soil ( 15 ) are arranged supporting and formed. Kettenkratzförderer für den Massenguttransport im untertägigen Berg- und Tunnelbau, bestehend aus miteinander verbundenen Rinnenschüssen (2) und den innenliegenden Förderelementen, denen beidseitig galgenartige Hubstützen (3) mit Hubzylindern (4), Laufrädern (7) und Laufschienen (8) zugeordnet sind, wobei wechselweise der Förderer (1) und die Laufschienen (8) senkrecht zur Streckenquerrichtung (9) bewegbar sind, dadurch gekennzeichnet, dass die Laufschienen (8) als U-Profil (38) ausgebildet sind, dessen Verbindungssteg (39) gelenkig mit dem Hubzylinder (4) verbunden ist und an dessen beiden Seitenflanschen (41, 42) den Oberflansch (18) der Laufschiene (8) tragende Kombi-Tragrollen (45. 45) drehbar befestigt sind.Chain scraper conveyor for bulk transport in underground mining and tunneling, consisting of interconnected channel shots ( 2 ) and the inner conveyor elements, on both sides gallows-like jacks ( 3 ) with lifting cylinders ( 4 ), Wheels ( 7 ) and rails ( 8th ), whereby alternately the conveyor ( 1 ) and the rails ( 8th ) perpendicular to the track transverse direction ( 9 ) are movable, characterized in that the rails ( 8th ) as a U-profile ( 38 ) are formed, the connecting web ( 39 ) articulated with the lifting cylinder ( 4 ) and at its two side flanges ( 41 . 42 ) the top flange ( 18 ) of the track ( 8th ) carrying combi carrying rollers ( 45 , 45 ) are rotatably mounted. Kettenkratzförderer nach Anspruch 7, dadurch gekennzeichnet, dass die Kombi-Tragrollen (44, 45) über Anschraubplatten (46) mit den Seitenflanschen (41, 42) lösbar verbunden sind.Chain scraper conveyor according to claim 7, characterized in that the combination carrying rollers ( 44 . 45 ) via mounting plates ( 46 ) with the side flanges ( 41 . 42 ) are releasably connected. Kettenkratzförderer nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Unterflansch (20) der Laufschiene (8) über eine Verstärkungsplatte (48) verfügt.Chain scraper conveyor according to one of the preceding claims, characterized in that the lower flange ( 20 ) of the track ( 8th ) via a reinforcing plate ( 48 ). Kettenkratzförderer nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass in Laufrichtung vor den Kombi-Tragrollen (44, 45) auf der Oberseite (17) des Unterflansches (20) reibende Reinigungsschaber angeordnet sind.Chain scraper conveyor according to one of the preceding claims, characterized in that in the direction of the combi-carrying rollers ( 44 . 45 ) on the top ( 17 ) of the lower flange ( 20 ) rubbing scraper are arranged. Kettenkratzförderer nach Anspruch 1 und Anspruch 7, dadurch gekennzeichnet, dass die mit U-Profil (38) ausgerüsteten Tragrahmen (10) parallel zum Außenrand (52) des Gehäuses (51) und Hubbereich (53) des Brechers (50) verlaufend angeordnet und mit den Tragrahmen (10) der schmaleren Bauart über Senkrecht-Tragrahmen (54) gelenkig verbunden sind.Chain scraper conveyor according to claim 1 and claim 7, characterized in that the U-profile ( 38 ) ( 10 ) parallel to the outer edge ( 52 ) of the housing ( 51 ) and stroke range ( 53 ) of the crusher ( 50 ) and arranged with the support frame ( 10 ) of the narrower design over vertical support frames ( 54 ) are hingedly connected. Kettenkratzförderer nach Anspruch 1, dadurch gekennzeichnet, dass der Tragrahmen (10) der schmaleren Bauart tunnelartig durch das Gehäuse (51) des Brechers (50) verlegt ist.Chain scraper conveyor according to claim 1, characterized in that the supporting frame ( 10 ) of the narrower design tunnel-like through the housing ( 51 ) of the crusher ( 50 ).
DE2003151688 2003-11-06 2003-11-06 Chain scraper conveyor for use in mining and tunneling has troughs attached to side frames mounted on rollers which move along double-T-section rails, auxiliary rollers being mounted between top of trail and base of side frame Withdrawn DE10351688A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE2003151688 DE10351688A1 (en) 2003-11-06 2003-11-06 Chain scraper conveyor for use in mining and tunneling has troughs attached to side frames mounted on rollers which move along double-T-section rails, auxiliary rollers being mounted between top of trail and base of side frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE2003151688 DE10351688A1 (en) 2003-11-06 2003-11-06 Chain scraper conveyor for use in mining and tunneling has troughs attached to side frames mounted on rollers which move along double-T-section rails, auxiliary rollers being mounted between top of trail and base of side frame

Publications (1)

Publication Number Publication Date
DE10351688A1 true DE10351688A1 (en) 2005-06-09

Family

ID=34559357

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2003151688 Withdrawn DE10351688A1 (en) 2003-11-06 2003-11-06 Chain scraper conveyor for use in mining and tunneling has troughs attached to side frames mounted on rollers which move along double-T-section rails, auxiliary rollers being mounted between top of trail and base of side frame

Country Status (1)

Country Link
DE (1) DE10351688A1 (en)

Similar Documents

Publication Publication Date Title
DE4000200C1 (en)
DE3017046C2 (en)
DE2907818A1 (en) MOBILE SLEEPER LAYING DEVICE
DE2426986A1 (en) DEVICE FOR PUMPING THICK LIQUID MASSES, IN PARTICULAR FROM CONCRETE, AT HIGH POINTS REMOVED FROM A CONSTRUCTION SITE
DE3531552C2 (en) Tension reversals
DE2558884C2 (en)
DE19704800B4 (en) Belt reversal with automatic balancing scale
DE3501509C2 (en) Conveyor with feeder and passage crusher for tunneling of underground operations
DE10351688A1 (en) Chain scraper conveyor for use in mining and tunneling has troughs attached to side frames mounted on rollers which move along double-T-section rails, auxiliary rollers being mounted between top of trail and base of side frame
DE19531808A1 (en) Guide and drive bar arrangement for mining extraction machine, partic. roller cutting machine running over chain crab conveyor
DE3338900C2 (en) Device for tunneling
DE2845680A1 (en) Stripped road asphalt sweeper - has adjustable frame linked to stripper, with collector, remover and conveyor mechanisms
DE3431412A1 (en) Shifting device actuated by pressure medium for conveying means in underground mining, in particular for chain conveyors in underground haulage
DE3717874A1 (en) Shortwall machine, in particular a dinting machine
DE2836839C2 (en) Partial tunneling machine with attached walking gear
DE3644687C2 (en) Belt reversers with crawler tracks
DE3617794C2 (en)
DE3121074C2 (en) Conveyor device for loading work in underground mining, in particular for removing scrap
DE8317386U1 (en) CHAIN CONVEYOR FOR UNDERGROUND MINING
DE4027941C2 (en)
DE19852624A1 (en) Conveyor with continuous conveyor belt over rollers
DE3742439A1 (en) Road-driving machine and the like, in particular dinting machine
DE1248589B (en) Extraction and jacking machine
DE2217765C2 (en) Tunneling machine with cutter boom - has inclined trough beneath boom with conveyor on each side
DE7246259U (en) Guide for roller scraping machines

Legal Events

Date Code Title Description
8181 Inventor (new situation)

Inventor name: KROHM, REINOLD, 44623 HERNE, DE

Inventor name: NEUHAUS, TILL, 44577 CASTROP-RAUXEL, DE

8139 Disposal/non-payment of the annual fee