DE102019110854A1 - Method for inspecting at least one sheet and devices for inspecting at least one sheet - Google Patents

Method for inspecting at least one sheet and devices for inspecting at least one sheet Download PDF

Info

Publication number
DE102019110854A1
DE102019110854A1 DE102019110854.3A DE102019110854A DE102019110854A1 DE 102019110854 A1 DE102019110854 A1 DE 102019110854A1 DE 102019110854 A DE102019110854 A DE 102019110854A DE 102019110854 A1 DE102019110854 A1 DE 102019110854A1
Authority
DE
Germany
Prior art keywords
sheet
transport
arch
inspection device
evaluation means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE102019110854.3A
Other languages
German (de)
Inventor
Michael Donnert
Bastian Deppisch
Elmar Klüpfel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Koenig and Bauer AG
Original Assignee
Koenig and Bauer AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Koenig and Bauer AG filed Critical Koenig and Bauer AG
Priority to DE102019110854.3A priority Critical patent/DE102019110854A1/en
Publication of DE102019110854A1 publication Critical patent/DE102019110854A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B41PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
    • B41FPRINTING MACHINES OR PRESSES
    • B41F33/00Indicating, counting, warning, control or safety devices
    • B41F33/0036Devices for scanning or checking the printed matter for quality control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B41PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
    • B41FPRINTING MACHINES OR PRESSES
    • B41F19/00Apparatus or machines for carrying out printing operations combined with other operations
    • B41F19/008Apparatus or machines for carrying out printing operations combined with other operations with means for stamping or cutting out
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B41PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
    • B41FPRINTING MACHINES OR PRESSES
    • B41F19/00Apparatus or machines for carrying out printing operations combined with other operations
    • B41F19/02Apparatus or machines for carrying out printing operations combined with other operations with embossing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B41PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
    • B41FPRINTING MACHINES OR PRESSES
    • B41F21/00Devices for conveying sheets through printing apparatus or machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Controlling Sheets Or Webs (AREA)

Abstract

Die Erfindung betrifft Verfahren zur Inspektion zumindest eines Bogens, wobei der jeweilige Bogen zumindest einen Nutzen und mindestens eine Bogenöffnung aufweist, wobei zumindest eine Inspektionseinrichtung die mindestens eine Bogenöffnung zumindest teilweise erfasst und zumindest die mindestens eine Bogenöffnung mit einer Referenz der mindestens einen Bogenöffnung vergleicht. Die Erfindung betrifft ebenfalls entsprechende Vorrichtungen.The invention relates to a method for inspecting at least one sheet, the respective sheet having at least one panel and at least one sheet opening, at least one inspection device at least partially detecting the at least one sheet opening and comparing at least the at least one sheet opening with a reference of the at least one sheet opening. The invention also relates to corresponding devices.

Description

Die Erfindung betrifft Verfahren zur Inspektion zumindest eines Bogens und Vorrichtungen zur Inspektion zumindest eines Bogens gemäß dem Oberbegriff des Anspruchs 1, 2, 20 bzw. 21.The invention relates to methods for inspecting at least one sheet and devices for inspecting at least one sheet according to the preamble of claims 1, 2, 20 and 21, respectively.

Durch die EP 3 064 327 A1 ist eine Flachbettstanzmaschine mit einer Inspektionseinrichtung zur Überwachung des Substrates auf Registerfehler und einer Bogenweiche zum Ausschleusen von fehlerhaften Bogen bekannt.Through the EP 3 064 327 A1 a flat-bed punching machine with an inspection device for monitoring the substrate for register errors and a sheet switch for ejecting defective sheets is known.

Durch die EP 2 589 494 A1 ist eine Schachtelherstellungsvorrichtung mit einer Inspektionseinrichtung zur Erkennung der Position eines Einschnitts erzeugt durch eine Stanzeinrichtung an einem Musterbogen bekannt.Through the EP 2 589 494 A1 a box manufacturing apparatus is known with an inspection device for detecting the position of an incision generated by a punching device on a sample sheet.

Durch die EP 1 727 679 B1 ist ein Verfahren zur Identifikation eines einzelnen Nutzens mit einem Druckbild von fehlerhafter Qualität auf einem Bedruckstoff mit mehreren Nutzen bekannt. Dabei nimmt ein Inspektionssystem ein Bild des Bedruckstoffes auf und vergleicht Daten des aufgenommenen Bildes mit einem gespeicherten Daten entnommenen Datensatz zur Form der einzelnen Nutzen auf dem Bedruckstoff.Through the EP 1 727 679 B1 a method is known for identifying a single use with a print image of defective quality on a printing material with several uses. An inspection system records an image of the printing material and compares data from the recorded image with a stored data record on the shape of the individual panels on the printing material.

Durch die EP 1 759 845 A2 ist Verfahren zur Regelung von Schnittregister oder Farbregister an einer Druckmaschine bekannt. Es wird ein Istwert eines durch eine Inspektionseinrichtung vermessenen Bogens mit einem druckvorstufebasierten Sollwert verglichen und aufgrund der ermittelten Regelabweichung ein Stellsignal ermittelt.Through the EP 1 759 845 A2 a method for regulating cut register or color register on a printing press is known. An actual value of a sheet measured by an inspection device is compared with a setpoint value based on the prepress stage, and a control signal is determined on the basis of the control deviation determined.

Durch die WO 2019/034289 A1 ist eine Vorrichtung zur Qualitätskontrolle eines Produktes bestehend aus zwei Wellpappenteilen bekannt, wobei die Wellpappenteile durch einen Einschnitt miteinander verbunden sind. Die Vorrichtung umfasst zwei Kameras, welche jeweils den Einschnitt auf einer Seite des Produkts im Auslagestapel erfassen, und eine Auswerteinrichtung, welche eine Abweichung der Position des Einschnitts von einer Seite des Produkts relativ zu der anderen Seite ermittelt.Through the WO 2019/034289 A1 a device for quality control of a product consisting of two corrugated cardboard parts is known, the corrugated cardboard parts being connected to one another by an incision. The device comprises two cameras, which each detect the incision on one side of the product in the delivery stack, and an evaluation device which determines a deviation of the position of the incision from one side of the product relative to the other side.

Der Erfindung liegt die Aufgabe zugrunde, Verfahren zur Inspektion zumindest eines Bogens und Vorrichtungen zur Inspektion zumindest eines Bogens zu schaffen.The invention is based on the object of creating methods for inspecting at least one sheet and devices for inspecting at least one sheet.

Die Aufgabe wird erfindungsgemäß durch die Merkmale des Anspruches 1, 2, 20 bzw. 21 gelöst. Die abhängigen Ansprüche zeigen vorteilhafte Weiterbildungen und/oder Ausführungen der gefundenen Lösung.The object is achieved according to the invention by the features of claims 1, 2, 20 and 21, respectively. The dependent claims show advantageous developments and / or embodiments of the solution found.

Bevorzugt wird ein Verfahren zur Inspektion zumindest eines Bogens. Bevorzugt weist der jeweilige Bogen zumindest einen Nutzen mit mindestens einem Druckbild und mindestens eine Bogenöffnung auf. Bevorzugt erfasst zumindest eine Inspektionseinrichtung die mindestens eine Bogenöffnung zumindest teilweise. Bevorzugt vergleicht die Inspektionseinrichtung zumindest die mindestens eine Bogenöffnung mit einer Referenz der mindestens einen Bogenöffnung.A method for inspecting at least one sheet is preferred. The respective sheet preferably has at least one panel with at least one print image and at least one sheet opening. At least one inspection device preferably detects the at least one arch opening at least partially. The inspection device preferably compares at least the at least one arch opening with a reference of the at least one arch opening.

Zusätzlich oder alternativ wird ein Verfahren zur Inspektion zumindest eines Bogens bevorzugt. Bevorzugt weist der jeweilige Bogen zumindest einen Nutzen und mindestens eine Bogenöffnung auf. Bevorzugt ist der jeweilige Bogen aus Papier oder Pappe oder Karton gebildet. Bevorzugt erfasst zumindest eine Inspektionseinrichtung die mindestens eine Bogenöffnung zumindest teilweise. Bevorzugt vergleicht die Inspektionseinrichtung zumindest die mindestens eine Bogenöffnung mit einer Referenz der mindestens einen Bogenöffnung.Additionally or alternatively, a method for inspecting at least one sheet is preferred. The respective arch preferably has at least one panel and at least one arch opening. The respective sheet is preferably formed from paper or cardboard or cardboard. At least one inspection device preferably detects the at least one arch opening at least partially. The inspection device preferably compares at least the at least one arch opening with a reference of the at least one arch opening.

Bevorzugt wird eine Vorrichtung zur Inspektion zumindest eines Bogens. Bevorzugt weist der jeweilige Bogen zumindest einen Nutzen mit mindestens einem Druckbild und mindestens eine Bogenöffnung auf. Bevorzugt ist zumindest eine Inspektionseinrichtung die mindestens eine Bogenöffnung zumindest teilweise erfassend ausgebildet. Bevorzugt ist die Inspektionseinrichtung zumindest die mindestens eine Bogenöffnung mit einer Referenz der mindestens einen Bogenöffnung vergleichend ausgebildet.A device for inspecting at least one sheet is preferred. The respective sheet preferably has at least one panel with at least one print image and at least one sheet opening. At least one inspection device is preferably designed to at least partially cover the at least one arch opening. The inspection device is preferably designed to compare at least the at least one arched opening with a reference of the at least one arched opening.

Zusätzlich oder alternativ wird eine Vorrichtung zur Inspektion zumindest eines Bogens bevorzugt. Bevorzugt weist der jeweilige Bogen zumindest einen Nutzen und mindestens eine Bogenöffnung auf. Bevorzugt ist der jeweilige Bogen aus Papier oder Pappe oder Karton gebildet. Bevorzugt ist zumindest eine Inspektionseinrichtung die mindestens eine Bogenöffnung zumindest teilweise erfassend ausgebildet. Bevorzugt ist die Inspektionseinrichtung zumindest die mindestens eine Bogenöffnung mit einer Referenz der mindestens einen Bogenöffnung vergleichend ausgebildet.Additionally or alternatively, a device for inspecting at least one sheet is preferred. The respective arch preferably has at least one panel and at least one arch opening. The respective sheet is preferably formed from paper or cardboard or cardboard. At least one inspection device is preferably designed to at least partially cover the at least one arch opening. The inspection device is preferably designed to compare at least the at least one arched opening with a reference of the at least one arched opening.

Es ergibt sich der Vorteil, dass verbliebene Reststücke und/oder Teile von verbliebenen Reststücken in Transportrichtung der Bogen nach der Formgebungseinrichtung durch zumindest ein Separationstransportmittel und/oder durch die Separationseinrichtung in einfacher Weise, insbesondere durch Schwerkraft und zusätzlich oder alternativ durch zumindest eine bevorzugte Ausführung der Separationseinrichtung und/oder des Separationstransportmittels und zusätzlich oder alternativ durch bevorzugte Ausführungen der Separationseinrichtung und/oder des Separationstransportmittels, von den Bogen entfernt werden können. Verbleiben Reststücke und/oder Teile von Reststücken in dem Bogen in Transportrichtung der Bogen nach der Separationseinrichtung, so können diese zumindest teilweise verbliebenen Reststücke im weiteren Verlauf der Behandlung und/oder des Transports der Bogen entlang eines Transportwegs in Transportrichtung von Bogen Probleme verursachen, beispielsweise beim Bilden des Auslagestapels. Durch die Erfassung des jeweiligen Bogens mit der Inspektionseinrichtung können betreffende Bogen mit zumindest einem teilweise verbliebenen Reststück identifiziert und beispielsweise zusätzlich von dem regulären Transportweg ausgeleitet werden und/oder beispielsweise von Bogen ohne zumindest teilweise verbliebene Reststücke getrennt werden. Bevorzugt wird dadurch die Prozesssicherheit der Bogenbearbeitungsmaschine erhöht.There is the advantage that remaining remnants and / or parts of remaining remnants in the transport direction of the sheets after the forming device by at least one separation transport means and / or by the separation device in a simple manner, in particular by gravity and additionally or alternatively by at least one preferred embodiment of the Separation device and / or the separation transport means and additionally or alternatively by preferred embodiments of the separation device and / or the separation transport means, of the sheets can be removed. If remnants and / or parts of remnants remain in the sheet in the transport direction of the sheets after the separation device, these at least partially remaining remnants can cause problems in the further course of the treatment and / or the transport of the sheets along a transport path in the transport direction of sheets, for example when Forming the delivery stack. By detecting the respective sheet with the inspection device, relevant sheets with at least one partially remaining remnant can be identified and, for example, additionally diverted from the regular transport path and / or separated from sheets without at least partially remaining remnants. This preferably increases the process reliability of the sheet processing machine.

Vorteilhafterweise dient der Vergleich des Ist-Zustands des jeweiligen Bogens mit dem Soll-Zustand des betreffenden Bogens der Inspektion der Bearbeitung des jeweiligen Bogens durch die Formgebungseinrichtung, beispielsweise zumindest einer Stanzung und/oder zumindest einer Rillung und/oder zumindest einer Prägung und/oder zumindest einer Perforierung. Bevorzugt dient der Vergleich des Ist-Zustands des jeweiligen Bogens mit dem Soll-Zustand des betreffenden Bogens zusätzlich oder alternativ der Inspektion und/oder Überprüfung einer Entfernung, bevorzugt restlosen Entfernung, von zumindest einem Reststück und/oder einem zumindest teilweise vorhandenen Reststück von dem betreffenden Bogen.The comparison of the actual state of the respective sheet with the target state of the sheet concerned is advantageously used to inspect the processing of the respective sheet by the shaping device, for example at least one punching and / or at least one grooving and / or at least one embossing and / or at least a perforation. Preferably, the comparison of the actual state of the respective sheet with the target state of the sheet concerned additionally or alternatively serves to inspect and / or check a distance, preferably a complete distance, of at least one remaining piece and / or an at least partially existing remaining piece from the relevant one Bow.

Bevorzugt erfolgt die Inspektion der Bogen innerhalb der Bogenbearbeitungsmaschine, insbesondere ohne dass zumindest ein Bogen beispielsweise stichprobenartig zu der Inspektion aus der Bogenbearbeitungsmaschine entnommen wird und/oder entnommen werden muss. Alternativ erfolgt die Inspektion der Bogen außerhalb der Bogenbearbeitungsmaschine, bevorzugt nach zumindest einer Bearbeitung der Bogen in der Bogenbearbeitungsmaschine.The sheets are preferably inspected within the sheet processing machine, in particular without at least one sheet being removed from the sheet processing machine and / or having to be removed, for example in random sampling, for the inspection. Alternatively, the sheets are inspected outside the sheet processing machine, preferably after at least one processing of the sheets in the sheet processing machine.

Bevorzugt erfolgt die Inspektion der Bogen nach der Separationseinrichtung, insbesondere direkt in Anschluss an die Separationseinrichtung. Dadurch ist bevorzugt gewährleistet, dass die Bearbeitung des jeweiligen Bogens durch die Formgebungseinrichtung und nach einer Entfernung von dem zumindest einen Reststück erfolgt. Es ist vorzugsweise möglich, einen fehlerbehafteten Bogen beispielsweise vor einer weiteren Bearbeitungseinrichtung, wie beispielsweise einem Trennen der einzelnen Nutzen, und/oder vor einer Auslage angeordnet in Transportrichtung nach der Separationseinrichtung zu identifizieren und beispielsweise in Transportrichtung vor der weiteren Bearbeitungseinrichtung und/oder vor der Auslage auszuschleusen.The sheets are preferably inspected after the separation device, in particular directly after the separation device. This preferably ensures that the processing of the respective arch takes place by the shaping device and after removal from the at least one remaining piece. It is preferably possible to identify a faulty sheet, for example, in front of a further processing device, such as a separation of the individual copies, and / or in front of a delivery arranged in the transport direction after the separation device and, for example, in the transport direction in front of the further processing device and / or in front of the delivery eject.

Durch eine bevorzugt orthogonale Anordnung der Inspektionseinrichtung zu dem für den Transport von Bogen vorgesehenen Transportweg ist bevorzugt eine Inspektion von Bogen ohne eine zumindest teilweise Beeinträchtigung des Transports der Bogen entlang des Transportwegs möglich.By a preferably orthogonal arrangement of the inspection device to the transport path provided for the transport of sheets, an inspection of sheets is preferably possible without at least partial impairment of the transport of the sheets along the transport path.

In einer bevorzugten Ausführung umfasst die Bogenbearbeitungsmaschine die zumindest eine Auslage. Bevorzugt umfasst die Bogenbearbeitungsmaschine zumindest eine Bogenweiche zum Ausschleusen von zumindest einem Bogen. Bevorzugt können dann Bogen aussortiert und/oder zu Probezwecken entnommen werden, vorzugweise ohne einen Auslagestapel und/oder weitere Behandlung und/oder Bearbeitung der Bogen entlang des Transportwegs zu beeinflussen.In a preferred embodiment, the sheet processing machine comprises the at least one delivery. The sheet processing machine preferably comprises at least one sheet diverter for discharging at least one sheet. Sheets can then preferably be sorted out and / or removed for test purposes, preferably without influencing a delivery stack and / or further treatment and / or processing of the sheets along the transport path.

In einer bevorzugten Ausführung können Daten über die jeweiligen transportierten Bogen gespeichert werden und beispielsweise ein Bericht über die Qualität der Bogen erstellt werden und beispielsweise ausgewertet werden. Beispielsweise ist es somit möglich, eine gewünschte und/oder geforderte Qualität der durch die Formgebungsmaschine bearbeiteten Bogen beispielsweise in einem Auslagestapel der Auslage exakt einzustellen und bevorzugt zu garantieren.In a preferred embodiment, data about the respective transported sheets can be stored and, for example, a report about the quality of the sheets can be created and, for example, evaluated. For example, it is thus possible to precisely set a desired and / or required quality of the sheets processed by the shaping machine, for example in a delivery stack of the delivery, and preferably to guarantee it.

Eine bevorzugte Ausführung der Bogenbearbeitungsmaschine ermöglicht eine besonders schonende und/oder genaue Führung von Bogen entlang des Transportwegs. Bevorzugt können die Bogen flach transportiert und dabei geschont werden. In einer bevorzugten Ausführung ist der Transport von Bogen in der Bogenbearbeitungsmaschine zumindest teilweise hängend. Bevorzugt ist entlang des Transportweges von Bogen an das zumindest eine Separationstransportmittel anschließend zumindest ein als Selektivtransportmittel ausgebildetes Transportmittel angeordnet, das vorzugsweise für den hängenden Transport von Bogen ausgebildet ist. In vorteilhafter Weise wird durch eine bevorzugte Ausführung der Bogenbearbeitungsmaschine zumindest ein auf den Bogen aufgebrachtes Druckbild, welches bevorzugt von unten auf den betreffenden Bogen aufgebracht ist, bei dem Transport des jeweiligen Bogens geschont. Ein weiterer Vorteil besteht bevorzugt darin, dass eine Wartung des Selektivtransportmittels und/oder des Separationstransportmittels bei einer hängenden Führung von Bogen auch bei großen Arbeitsbreiten von unten einfach möglich ist. Ein schonender Umgang mit Bogen ist insbesondere im Zusammenhang mit Wellpappe von Vorteil.A preferred embodiment of the sheet processing machine enables sheets to be guided particularly gently and / or precisely along the transport path. The sheets can preferably be transported flat and thereby protected. In a preferred embodiment, the transport of sheets in the sheet processing machine is at least partially suspended. At least one transport means configured as a selective transport means, which is preferably configured for the hanging transport of sheets, is preferably arranged along the transport path of sheets to the at least one separation transport means. In an advantageous manner, a preferred embodiment of the sheet processing machine protects at least one print image applied to the sheet, which is preferably applied from below to the relevant sheet, during the transport of the respective sheet. Another advantage is preferably that maintenance of the selective transport means and / or the separation transport means is easily possible from below when the sheets are guided in a hanging manner, even with large working widths. Careful handling of sheets is particularly advantageous in connection with corrugated cardboard.

In einer vorteilhaften Ausführung ist entlang des für den Transport von Bogen vorgesehenen Transportwegs zwischen dem zumindest einen Selektivtransportmittel und/oder der zumindest einen Bogenweiche einerseits und dem zumindest einen Bogenabbremsmittel andererseits zumindest eine Überschuppungseinrichtung angeordnet ist, die zumindest ein als oberes Saugtransportmittel und/oder als Bogeneinlaufmittel ausgebildetes Transportmittel aufweist. Dann können Bogen mit besonders großen Abmessungen und/oder in besonders schneller Folge auf den Auslagestapel abgelegt werden. Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine bevorzugt dadurch aus, dass das zumindest eine obere Saugtransportmittel der zumindest einen Überschuppungseinrichtung als passiv angetriebenes Saugtransportmittel ausgebildet ist. Dies erleichtert die Überschuppung und schont die Bogen. Ein weiterer Vorteil einer Überschuppungseinrichtung besteht insbesondere darin, dass keine zu großen Beschleunigungen von trägen Bauteilen notwendig sind. Dadurch kann Energie eingespart und Verschleiß reduziert werden. Ein weiterer Vorteil besteht darin, dass ein nachfolgender Bogen einen vorderen Bogen zumindest teilweise überholen kann und damit relativ sanfte Bewegungen der Bogen ermöglicht werden.In an advantageous embodiment, along the transport path provided for transporting sheets between the at least one selective transport means and / or the at least one sheet diverter on the one hand and the at least one Sheet braking means on the other hand at least one overlapping device is arranged, which has at least one transport means designed as an upper suction transport means and / or as a sheet inlet means. Then sheets with particularly large dimensions and / or in particularly rapid succession can be deposited on the delivery stack. Alternatively or additionally, the sheet processing machine is preferably characterized in that the at least one upper suction transport means of the at least one overlapping device is designed as a passively driven suction transport means. This facilitates the scaling and protects the arches. Another advantage of an overlapping device is in particular that no excessive accelerations of inert components are necessary. This saves energy and reduces wear. Another advantage is that a subsequent arch can at least partially overtake a leading arch and thus relatively smooth movements of the arches are made possible.

Bevorzugt wird, insbesondere aus dem Vergleich des Ist-Zustands des Bogens mit dem Soll-Zustand des betreffenden Bogens, ein Maß für einen Werkzeugverschleiß zumindest eines Werkzeugs der zumindest einen Formgebungseinrichtung ermittelt. Somit ist bevorzugt eine frühzeitige Erkennung einer Abnutzung und/oder des Verschleißes des Werkzeugs möglich. Bevorzugt ist ein Austauschen des Werkzeugs vor dem Zeitpunkt einer vollständigen Abnutzung und/oder eines vollständigen Verschleißes und/oder eines Bruchs des Werkzeugs möglich. Alternativ kann somit bevorzugt ein vorzeitiges Austauschen des Werkzeugs, beispielsweise bei geringerer Abnutzung und/oder Verschleiß als erwartet, verhindert werden.A measure of tool wear of at least one tool of the at least one shaping device is preferably determined, in particular from the comparison of the actual state of the sheet with the target state of the sheet in question. Early detection of wear and / or wear of the tool is thus preferably possible. An exchange of the tool is preferably possible before the point in time of complete wear and / or complete wear and / or breakage of the tool. Alternatively, premature replacement of the tool, for example when there is less wear and / or wear than expected, can thus preferably be prevented.

Bevorzugt wird, insbesondere aus dem Vergleich des Ist-Zustands des Bogens mit dem Soll-Zustand des betreffenden Bogens, ein Maß für einen Verschleiß zumindest einer Oberfläche zumindest eines Gegendruckzylinders der zumindest einen Formgebungseinrichtung ermittelt. Somit ist bevorzugt eine frühzeitige Erkennung einer Abnutzung und/oder eines Verschleißes der Oberfläche des Gegendruckzylinders möglich. Bevorzugt ist ein Austauschen der Oberfläche des Gegendruckzylinders vor dem Zeitpunkt einer vollständigen Abnutzung und/oder eines vollständigen Verschleißes möglich. Alternativ kann somit bevorzugt ein vorzeitiges Austauschen der Oberfläche des Gegendruckzylinders, beispielsweise bei geringerer Abnutzung und/oder Verschleiß als erwartet, verhindert werden.A measure of wear of at least one surface of at least one impression cylinder of the at least one shaping device is preferably determined, in particular from the comparison of the actual state of the sheet with the target state of the sheet in question. Early detection of wear and / or wear of the surface of the impression cylinder is thus preferably possible. An exchange of the surface of the impression cylinder is preferably possible before the point in time of complete wear and / or complete wear. Alternatively, premature replacement of the surface of the impression cylinder, for example when there is less wear and / or wear than expected, can thus preferably be prevented.

In einer bevorzugten Ausführung umfasst die Bogenbearbeitungsmaschine zumindest ein Auftragwerk zum Auftragen von zumindest einem Druckbild auf den zumindest einen Bogen. Bevorzugt ist durch die Inspektionseinrichtung, insbesondere durch ein Auswertemittel, ein Auswerten zumindest eines Passers des zumindest einen Druckbildes des zumindest einen Bogens und/oder zumindest ein Vergleich des zumindest einen Druckbildes des zumindest einen Bogens mit zumindest einer Bogenöffnung und/oder zumindest einer inneren Kontur und/oder zumindest einer äußeren Kontur des jeweiligen Bogens möglich.In a preferred embodiment, the sheet processing machine comprises at least one applicator for applying at least one print image to the at least one sheet. The inspection device, in particular an evaluation means, is preferably used to evaluate at least one register of the at least one print image of the at least one sheet and / or at least a comparison of the at least one print image of the at least one sheet with at least one sheet opening and / or at least one inner contour and / or at least one outer contour of the respective arch is possible.

Bevorzugt erfolgt die Inspektion des Bogens hinsichtlich der Bearbeitung des jeweiligen Bogens durch die Formgebungseinrichtung und zusätzlich oder alternativ des zumindest einen auf den jeweiligen Bogen aufgetragenen Druckbildes und zusätzlich oder alternativ des zumindest einen auf den jeweiligen Bogen aufgetragenen Druckbildes relativ zu der zumindest einen Bogenöffnung und/oder der zumindest einen inneren Kontur und/oder der zumindest einen äußeren Kontur des jeweiligen Bogens.The inspection of the sheet is preferably carried out with regard to the processing of the respective sheet by the shaping device and additionally or alternatively the at least one print image applied to the respective sheet and additionally or alternatively the at least one print image applied to the respective sheet relative to the at least one sheet opening and / or the at least one inner contour and / or the at least one outer contour of the respective arch.

Ausführungsbeispiele der Erfindung sind in den Zeichnungen dargestellt und werden im Folgenden näher beschrieben.Embodiments of the invention are shown in the drawings and are described in more detail below.

Es zeigen:

  • 1 eine schematische Darstellung einer Bogenbearbeitungsmaschine;
  • 2 eine schematische Darstellung einer Formgebungseinrichtung und einer Bogenauslage;
  • 3 eine schematische Darstellung eines Teilbereichs einer Bogenauslage;
  • 4a eine schematische Darstellung eines Teilbereichs einer Bogenauslage;
  • 4b eine schematische Darstellung eines Ausschnitts aus 4a;
  • 5 eine schematische Darstellung des Teilbereichs der Bogenauslage gemäß 3 in einer perspektivischen Ansicht;
  • 6 eine schematische Darstellung des Teilbereichs der Bogenauslage gemäß 3 in einer Ansicht von unten;
  • 7 eine schematische Darstellung des Teilbereichs der Bogenauslage gemäß 3 in einer Ansicht entgegen einer Transportrichtung;
  • 8a eine schematische Darstellung zur Erläuterung eines jeweiligen Kontaktbereichs und einer Kontaktfläche eines Bogeneinlaufmittels;
  • 8b eine schematische Darstellung zur Erläuterung eines jeweiligen Kontaktbereichs und einer Kontaktfläche eines Bogeneinlaufmittels;
  • 9 eine schematische Darstellung einer Formgebungseinrichtung und einer Bogenauslage mit mindestens einer Inspektionseinrichtung von unten;
  • 10 eine schematische Darstellung der mindestens einen Inspektionseinrichtung in einer Transportrichtung;
  • 11 eine beispielhafte Darstellung eines Bogens mit Nutzen und Abfallstücken;
  • 12 eine beispielhafte Darstellung eines Bogens mit Nutzen und Bogenöffnungen und/oder Bogenlücken.
Show it:
  • 1 a schematic representation of a sheet processing machine;
  • 2 a schematic representation of a shaping device and a sheet delivery;
  • 3 a schematic representation of a portion of a sheet delivery;
  • 4a a schematic representation of a portion of a sheet delivery;
  • 4b a schematic representation of a section from 4a ;
  • 5 a schematic representation of the portion of the sheet delivery according to 3 in a perspective view;
  • 6 a schematic representation of the portion of the sheet delivery according to 3 in a view from below;
  • 7th a schematic representation of the portion of the sheet delivery according to 3 in a view against a transport direction;
  • 8a a schematic illustration to explain a respective contact area and a contact surface of a sheet inlet means;
  • 8b a schematic illustration to explain a respective contact area and a contact surface of a sheet inlet means;
  • 9 a schematic representation of a shaping device and a sheet delivery with at least one inspection device from below;
  • 10 a schematic representation of the at least one inspection device in a transport direction;
  • 11 an exemplary representation of a sheet with use and waste pieces;
  • 12 an exemplary representation of a sheet with panels and sheet openings and / or sheet gaps.

Unter dem Begriff eines Auftragfluids sind im Vorangegangenen und im Folgenden Tinten und Druckfarben, aber auch Grundierungen, Lacke und pastöse Materialien zusammengefasst. Bevorzugt sind Auftragfluide Materialien, die durch eine Bearbeitungsmaschine 01, insbesondere Druckmaschine 01, oder zumindest ein Auftragwerk 614 oder ein als Auftragaggregat 600 ausgebildetes Aggregat 600 der Bearbeitungsmaschine 01, insbesondere zumindest ein Druckwerk 614 oder Druckaggregat 600 der Druckmaschine 01, auf ein Substrat 02, insbesondere einen Bedruckstoff 02, beispielweise auf zumindest einen Bogen 02, übertragen werden und/oder übertragbar sind und dabei bevorzugt in fein strukturierter Form und/oder nicht lediglich großflächig eine bevorzugt sichtbare und/oder durch Sinneseindrücke spürbare und/oder maschinell detektierbare Textur auf dem Substrat 02, insbesondere Bedruckstoff 02, begründen. Tinten und Druckfarben sind bevorzugt Lösungen oder Dispersionen zumindest eines Farbmittels in zumindest einem Lösungsmittel, beispielsweise Wasser und/oder organische Lösungsmittel. Alternativ oder zusätzlich kann das Auftragfluid als unter UV-Licht vernetzendes Auftragfluid ausgebildet sein. Tinten sind relativ niedrigviskose Auftragfluide und Druckfarben sind relativ hochviskose Auftragfluide. Tinten weisen dabei bevorzugt kein Bindemittel oder relativ wenig Bindemittel auf, während Druckfarben bevorzugt relativ viel Bindemittel und weiter bevorzugt weitere Hilfsstoffe enthalten. Im Vorangegangenen und im Folgenden sind insbesondere auch farblose Lacke gemeint, wenn von Auftragfluiden und/oder Tinten und/oder Druckfarben die Rede ist. Bevorzugt sind im Vorangegangenen und im Folgenden insbesondere auch Mittel für eine Vorbehandlung sogenanntes Grundieren oder precoating des Bedruckstoffs 02 gemeint, wenn von Auftragfluiden und/oder Tinten und/oder Druckfarben die Rede ist. Alternativ zu dem Begriff des Auftragfluids sind der Begriff des Druckfluids und der Begriff des Beschichtungsmittels synonym zu verstehen. Ein jeweiliges Auftragfluid ist bevorzugt nicht gasförmig. Ein jeweiliges Auftragfluid ist bevorzugt flüssig und/oder pulverförmig.In the foregoing and in the following, inks and printing inks, but also primers, lacquers and pasty materials are summarized under the term application fluid. Application fluids are preferred materials that are processed by a processing machine 01 , especially printing press 01 , or at least a commissioned work 614 or one as application unit 600 trained unit 600 the processing machine 01 , in particular at least one printing unit 614 or printing unit 600 the printing press 01 , on a substrate 02 , especially a substrate 02 , for example on at least one sheet 02 , are transmitted and / or are transferable and thereby preferably in a finely structured form and / or not only over a large area a preferably visible and / or perceptible and / or machine detectable texture on the substrate 02 , especially printing material 02 , justify. Inks and printing inks are preferably solutions or dispersions of at least one colorant in at least one solvent, for example water and / or organic solvents. Alternatively or additionally, the application fluid can be designed as an application fluid which cross-links under UV light. Inks are relatively low viscosity application fluids and printing inks are relatively high viscosity application fluids. Inks here preferably have no binder or relatively little binder, while printing inks preferably contain a relatively large amount of binder and more preferably further auxiliaries. In the foregoing and in the following, colorless lacquers are also meant in particular when application fluids and / or inks and / or printing inks are mentioned. Preference is given above and below in particular to means for pretreatment, so-called priming or precoating of the printing material 02 This is meant when speaking of application fluids and / or inks and / or printing inks. As an alternative to the term application fluid, the term pressure fluid and the term coating agent are to be understood synonymously. A respective application fluid is preferably not gaseous. A respective application fluid is preferably liquid and / or powdery.

Eine Bearbeitungsmaschine 01 ist bevorzugt als Druckmaschine 01 und/oder als Formgebungsmaschine 01, insbesondere Stanzmaschine 01 ausgebildet. Die Druckmaschine 01 ist beispielsweise als Flexo-Druckmaschine 01 ausgebildet.A processing machine 01 is preferred as a printing machine 01 and / or as a molding machine 01 , especially punching machine 01 educated. The printing press 01 is for example as a flexographic printing machine 01 educated.

Bevorzugt wird die Bearbeitungsmaschine 01 als Druckmaschine 01 bezeichnet, wenn sie zumindest ein Druckwerk 614 und/oder zumindest ein Druckaggregat 600 aufweist, insbesondere unabhängig davon, ob sie weitere Aggregate zur Bearbeitung von Substrat 02 aufweist. Beispielsweise weist eine als Druckmaschine 01 ausgebildete Bearbeitungsmaschine 01 zusätzlich zumindest ein weiteres solches Aggregat 900 auf, beispielsweise zumindest ein Formgebungsaggregat 900, das bevorzugt als Stanzaggregat 900, weiter bevorzugt als Stanzeinrichtung 900, ausgebildet ist. Bevorzugt wird die Bearbeitungsmaschine 01 als Formgebungsmaschine 01 bezeichnet, wenn sie zumindest ein Formgebungswerk 914 und/oder zumindest ein Formgebungsaggregat 900 aufweist, insbesondere unabhängig davon, ob sie weitere Aggregate 600 zur Bearbeitung von Substrat 02 aufweist. Bevorzugt wird die Bearbeitungsmaschine 01 als Stanzmaschine 01 bezeichnet, wenn sie zumindest ein Stanzwerk 914 und/oder zumindest ein Stanzaggregat 900 und/oder zumindest eine Stanzeinrichtung 900 aufweist, insbesondere unabhängig davon, ob sie weitere Aggregate 600 zur Bearbeitung von Substrat 02 aufweist. Beispielsweise weist eine als Formgebungsmaschine 01 oder Stanzmaschine 01 ausgebildete Bearbeitungsmaschine 01 zusätzlich zumindest ein weiteres Aggregat 600 zur Bearbeitung von Substrat 02 auf, beispielsweise zumindest ein Druckaggregat 600 und/oder zumindest ein Druckwerk 614.The processing machine is preferred 01 as a printing press 01 referred to when they have at least one printing unit 614 and / or at least one printing unit 600 has, in particular regardless of whether they have further units for processing substrate 02 having. For example, one has a printing press 01 trained processing machine 01 additionally at least one other such unit 900 on, for example, at least one shaping unit 900 , which is preferred as a punching unit 900 , more preferably as a punching device 900 , is trained. The processing machine is preferred 01 as a molding machine 01 referred to when they have at least one shaping plant 914 and / or at least one shaping unit 900 has, in particular regardless of whether they have other aggregates 600 for processing substrate 02 having. The processing machine is preferred 01 as a punching machine 01 referred to when they have at least one punching plant 914 and / or at least one punching unit 900 and / or at least one punching device 900 has, in particular regardless of whether they have other aggregates 600 for processing substrate 02 having. For example, one has a molding machine 01 or punching machine 01 trained processing machine 01 additionally at least one further unit 600 for processing substrate 02 on, for example, at least one printing unit 600 and / or at least one printing unit 614 .

In einer bevorzugten Ausführung umfasst die Bearbeitungsmaschine 01, insbesondere eine Bogenbearbeitungsmaschine 01, vorzugsweise ein als Bogenanleger 100 ausgebildetes Aggregat 100 und/oder zumindest ein Auftragwerk 614 zum Auftragen zumindest eines Druckbildes auf Substrat 02. Sofern die Bearbeitungsmaschine 01 zumindest ein Druckwerk 614 und/oder zumindest ein Druckaggregat 600 einerseits und zumindest ein Formgebungswerk 914 und/oder zumindest ein Formgebungsaggregat 900 andererseits aufweist, ist sie demnach sowohl als Druckmaschine 01 als auch als Formgebungsmaschine 01 ausgebildet. Sofern die Bearbeitungsmaschine 01 zumindest ein Druckwerk 614 und/oder zumindest ein Druckaggregat 600 einerseits und zumindest ein Stanzwerk 914 und/oder zumindest Stanzaggregat 900 und/oder zumindest eine Stanzeinrichtung 900 andererseits aufweist, ist sie demnach sowohl als Druckmaschine 01 als auch als Formgebungsmaschine 01, insbesondere Stanzmaschine 01 ausgebildet.In a preferred embodiment, the processing machine comprises 01 , in particular a sheet processing machine 01 , preferably one as a sheet feeder 100 trained unit 100 and / or at least one commissioned work 614 for applying at least one print image to the substrate 02 . Unless the processing machine 01 at least one printing unit 614 and / or at least one printing unit 600 on the one hand and at least one shaping unit 914 and / or at least one shaping unit 900 on the other hand, it is therefore both a printing machine 01 as well as a molding machine 01 educated. Unless the processing machine 01 at least one printing unit 614 and / or at least one printing unit 600 on the one hand and at least one punching plant 914 and / or at least a punching unit 900 and / or at least one punching device 900 on the other hand, it is therefore both a printing machine 01 as well as a molding machine 01 , especially punching machine 01 educated.

Bevorzugt ist die Bearbeitungsmaschine 01 als Bogenbearbeitungsmaschine 01 ausgebildet, also als Bearbeitungsmaschine 01 für eine Bearbeitung von bogenförmigem Substrat 02 oder Bogen 02, insbesondere bogenförmigem Bedruckstoff 02. Beispielsweise ist die Bogenbearbeitungsmaschine 01 als Bogendruckmaschine 01 und/oder als Bogenformgebungsmaschine 01 und/oder als Bogenstanzmaschine 01 ausgebildet. Die Bearbeitungsmaschine 01 ist weiter bevorzugt als Wellpappbogenbearbeitungsmaschine 01 ausgebildet, also als Bearbeitungsmaschine 01 für eine Bearbeitung von bogenförmigem Substrat 02 oder Bogen 02 aus Wellpappe 02, insbesondere bogenförmigem Bedruckstoff 02 aus Wellpappe 02. Weiter bevorzugt ist die Bearbeitungsmaschine 01 als Bogendruckmaschine 01 ausgebildet, insbesondere als Wellpappbogendruckmaschine 01, also als Druckmaschine 01 für ein Beschichten und/oder Bedrucken von bogenförmigem Substrat 02 oder Bogen 02 aus Wellpappe 02, insbesondere bogenförmigem Bedruckstoff 02 aus Wellpappe 02. Beispielsweise ist die Druckmaschine 01 als eine nach einem druckformgebundenen Druckverfahren arbeitende Druckmaschine 01 ausgebildet.The processing machine is preferred 01 as a sheet processing machine 01 trained, so as a processing machine 01 for processing of sheet-shaped substrates 02 or bow 02 , especially sheet-like printing material 02 . For example, the sheet processing machine 01 as a sheet-fed printing machine 01 and / or as Sheet forming machine 01 and / or as a sheet punching machine 01 educated. The processing machine 01 is further preferred as a corrugated cardboard sheet processing machine 01 trained, so as a processing machine 01 for processing of sheet-shaped substrates 02 or bow 02 made of corrugated cardboard 02 , especially sheet-like printing material 02 made of corrugated cardboard 02 . The processing machine is also preferred 01 as a sheet-fed printing machine 01 designed, in particular as a corrugated sheet printing machine 01 , so as a printing press 01 for coating and / or printing on sheet-shaped substrates 02 or bow 02 made of corrugated cardboard 02 , especially sheet-like printing material 02 made of corrugated cardboard 02 . For example, the printing press 01 as a printing machine operating according to a printing forme-bound printing process 01 educated.

Sofern nicht explizit unterschieden wird, soll hier vom Begriff des bogenförmigen Substrates 02, insbesondere eines Bedruckstoffes 02, speziell des Bogens 02 grundsätzlich jedes flächig und in Abschnitten vorliegendes Substrat 02, also auch tafelförmig oder plattenförmig vorliegende Substrate 02, also auch Tafeln bzw. Platten, umfasst sein. Das so definierte bogenförmige Substrat 02 bzw. der Bogen 02 ist beispielsweise aus Papier oder Karton, d. h. als Papier- oder Kartonbogen, oder durch Bogen 02, Tafeln oder ggf. Platten aus Kunststoff, Pappe, Glas oder Metall gebildet. Weiter bevorzugt handelt es sich bei dem Substrat 02 um Wellpappe 02, insbesondere Wellpappbogen 02. Vorzugsweise ist der zumindest eine Bogen 02 als Wellpappe 02 ausgebildet. Unter einer Dicke eines Bogens 02 ist bevorzugt eine Abmessung orthogonal zu einer größten Fläche des Bogens 02 zu verstehen. Diese größte Fläche wird auch als Hauptfläche bezeichnet. Die Dicke der Bogen 02 beträgt beispielsweise zumindest 0,1 mm, weiter bevorzugt zumindest 0,3 mm und noch weiter bevorzugt zumindest 0,5 mm. Gerade bei Wellpappbogen 02 sind auch deutlich größere Dicken üblich, beispielsweise zumindest 4 mm oder auch 10 mm und mehr. Wellpappbogen 02 sind vergleichsweise stabil und daher wenig biegbar. Entsprechende Anpassungen der Bearbeitungsmaschine 01 erleichtern deshalb die Bearbeitung von Bogen 02 großer Dicke.Unless explicitly differentiated, the term sheet-shaped substrate is used here 02 , in particular a printing material 02 , especially the bow 02 basically any substrate that is flat and in sections 02 , thus also substrates present in tabular or plate form 02 , so also panels or plates, be included. The so defined arcuate substrate 02 or the bow 02 is for example made of paper or cardboard, ie as a sheet of paper or cardboard, or by sheets 02 , Panels or possibly plates made of plastic, cardboard, glass or metal. It is more preferably the substrate 02 about corrugated cardboard 02 , especially sheets of corrugated cardboard 02 . The at least one is preferably an arch 02 than corrugated cardboard 02 educated. Under the thickness of an arch 02 is preferably a dimension orthogonal to a largest area of the arc 02 to understand. This largest area is also known as the main area. The thickness of the arch 02 is for example at least 0.1 mm, more preferably at least 0.3 mm and even more preferably at least 0.5 mm. Especially with corrugated cardboard sheets 02 Significantly greater thicknesses are also common, for example at least 4 mm or even 10 mm and more. Corrugated cardboard sheet 02 are comparatively stable and therefore not very flexible. Corresponding adjustments to the processing machine 01 therefore facilitate the processing of sheets 02 great thickness.

Bevorzugt ist der jeweilige Bogen 02 aus Papier oder Pappe oder Karton gebildet. Nach DIN 6730 ist Papier ein flächiger, im Wesentlichen aus Fasern meist pflanzlicher Herkunft bestehender Werkstoff, der durch Entwässerung einer Faserstoffaufschwemmung auf einem Sieb gebildet wird. Dabei entsteht ein Faserfilz, der anschließend getrocknet wird. Die flächenbezogene Masse von Papier beträgt bevorzugt maximal 225 g/m2. Nach DIN 6730 ist Pappe ein flächiger, im wesentlicher aus Fasern pflanzlicher Herkunft bestehender Werkstoff, der durch Entwässerung einer Faserstoffaufschwemmung auf einem oder zwischen zwei Sieben gebildet wird. Das Fasergefüge wird verdichtet und getrocknet. Bevorzugt wird Pappe durch Zusammenkleben oder Zusammenpressen aus Zellstoff und/oder gefertigt. Bevorzugt ist Pappe als Vollpappe oder Wellpappe 02 ausgebildet. Wellpappe 02 ist im Vorangegangenen und im Folgenden Pappe aus einer oder mehrerer Lagen eines gewellten Papiers, das auf eine Lage oder zwischen mehreren Lagen eines anderen bevorzugt glatten Papiers oder Pappe geklebt ist. Bevorzugt beträgt die flächenbezogene Masse von Pappe von über 225 g/m2. Der Begriff Karton bezeichnet im Vorangegangenen und im Folgenden ein bevorzugt einseitig gestrichenes papiernes Flächengebilde bevorzugt mit einer flächenbezogenen Masse von mindestens 150 g/m2 und maximal 600 g/m2. Bevorzugt weist ein Karton eine hohe Festigkeit relativ zu Papier auf.The respective arch is preferred 02 formed from paper or cardboard or cardboard. According to DIN 6730, paper is a flat material consisting essentially of fibers, mostly of vegetable origin, which is formed by dewatering a fiber suspension on a sieve. This creates a fiber felt that is then dried. The weight per unit area of paper is preferably a maximum of 225 g / m 2 . According to DIN 6730, cardboard is a flat material consisting essentially of fibers of plant origin, which is formed by dewatering a fiber suspension on one or between two sieves. The fiber structure is compressed and dried. Cardboard is preferably manufactured from cellulose and / or by gluing or pressing it together. Cardboard as solid cardboard or corrugated cardboard is preferred 02 educated. Corrugated cardboard 02 In the foregoing and in the following, cardboard is made up of one or more layers of corrugated paper, which is glued onto one layer or between several layers of another preferably smooth paper or cardboard. The mass per unit area of cardboard is preferably over 225 g / m 2 . In the foregoing and in the following, the term cardboard denotes a sheet of paper, preferably coated on one side, preferably with a mass per unit area of at least 150 g / m 2 and a maximum of 600 g / m 2 . A cardboard box preferably has a high strength relative to paper.

Die Bearbeitungsmaschine 01 weist bevorzugt mehrere Aggregate 100; 300; 600; 700; 900; 1000 auf. Unter einem Aggregat ist dabei bevorzugt jeweils eine Gruppe von Einrichtungen zu verstehen, die funktionell zusammenwirken, insbesondere um einen bevorzugt in sich geschlossenen Bearbeitungsvorgang von Bogen 02 durchführen zu können. Beispielsweise sind zumindest zwei und bevorzugt zumindest drei und weiter bevorzugt sämtliche der Aggregate 100; 300; 600; 700; 900; 1000 als Module 100; 300; 600; 700; 900; 1000 ausgebildet oder zumindest jeweils einem solchen zugeordnet. Unter einem Modul ist dabei insbesondere ein jeweiliges Aggregat oder ein Gebilde aus mehreren Aggregaten zu verstehen, das bevorzugt zumindest ein Transportmittel und/oder zumindest einen eigenen steuerbaren und/oder regelbaren Antrieb aufweist und/oder als eigenständig funktionsfähiges Modul und/oder jeweils für sich hergestellte und/oder jeweils für sich montierte Maschineneinheit oder funktionelle Baugruppe ausgebildet ist. Unter einem eigenen steuerbaren und/oder regelbaren Antrieb eines Aggregats oder Moduls ist insbesondere ein Antrieb zu verstehen, der dazu dient, Bewegungen von Bauteilen dieses Aggregats oder Moduls anzutreiben und/oder der dazu dient, einen Transport von Substrat 02, insbesondere Bogen 02 durch dieses jeweilige Aggregat oder Modul und/oder durch zumindest einen Einwirkbereich dieses jeweiligen Aggregats oder Moduls zu bewirken und/oder der dazu dient, zumindest ein für einen Kontakt mit Bogen 02 vorgesehenes Bauteil des jeweiligen Aggregats oder Moduls direkt oder indirekt anzutreiben. Diese Antriebe der Aggregate 100; 300; 600; 700; 900; 1000 der Bearbeitungsmaschine 01 sind bevorzugt als insbesondere lagegeregelte Elektromotoren ausgebildet.The processing machine 01 preferably has several aggregates 100 ; 300 ; 600 ; 700 ; 900 ; 1000 on. An aggregate is preferably to be understood as a group of devices which functionally interact, in particular around a preferably self-contained processing operation of sheets 02 to be able to perform. For example, there are at least two and preferably at least three and more preferably all of the aggregates 100 ; 300 ; 600 ; 700 ; 900 ; 1000 as modules 100 ; 300 ; 600 ; 700 ; 900 ; 1000 formed or at least assigned to one such. A module is to be understood as meaning in particular a respective unit or a structure made up of several units, which preferably has at least one means of transport and / or at least its own controllable and / or regulatable drive and / or as an independently functioning module and / or each manufactured individually and / or is designed in each case assembled machine unit or functional assembly. A separate controllable and / or regulatable drive of a unit or module is to be understood in particular as a drive which is used to drive the movements of components of this unit or module and / or which is used to transport the substrate 02 , especially bow 02 through this respective unit or module and / or through at least one area of action of this respective unit or module and / or which serves to provide at least one area for contact with the sheet 02 directly or indirectly to drive the intended component of the respective unit or module. These drives the aggregates 100 ; 300 ; 600 ; 700 ; 900 ; 1000 the processing machine 01 are preferably designed as, in particular, position-regulated electric motors.

Bevorzugt weist jedes Aggregat 100; 300; 600; 700; 900; 1000 zumindest eine Antriebssteuerung und/oder zumindest einen Antriebsregler auf, die dem jeweiligen zumindest einen Antrieb des jeweiligen Aggregats 100; 300; 600; 700; 900; 1000 zugeordnet ist. Die Antriebssteuerungen und/oder Antriebsregler der einzelnen Aggregate 100; 300; 600; 700; 900; 1000 sind bevorzugt einzeln und unabhängig voneinander betreibbar. Weiter bevorzugt sind die Antriebssteuerungen und/oder Antriebsregler der einzelnen Aggregate 100; 300; 600; 700; 900; 1000 schaltungstechnisch, insbesondere mittels zumindest eines BUS-Systems, miteinander und/oder mit einer Maschinensteuerung der Bearbeitungsmaschine 01 derart verknüpft und/oder verknüpfbar, dass eine aufeinander abgestimmte Steuerung und/oder Regelung der Antriebe mehrerer oder aller Aggregate 100; 300; 600; 700; 900; 1000 der Bearbeitungsmaschine 01 vorgenommen wird und/oder werden kann. Die einzelnen Aggregate 100; 300; 600; 700; 900; 1000 und/oder insbesondere Module 100; 300; 600; 700; 900; 1000 der Bearbeitungsmaschine 01 sind demnach zumindest bezüglich ihrer Antriebe bevorzugt elektronisch aufeinander abgestimmt betreibbar und/oder betrieben, insbesondere mittels zumindest einer elektronischen Leitachse. Bevorzugt wird dafür eine elektronische Leitachse vorgegeben, beispielsweise von einer übergeordneten Maschinensteuerung der Bearbeitungsmaschine 01. Alternativ oder zusätzlich sind die einzelnen Aggregate 100; 300; 600; 700; 900; 1000 der Bearbeitungsmaschine 01 zumindest bezüglich ihrer Antriebe beispielsweise mechanisch miteinander synchronisiert und/oder synchronisierbar. Bevorzugt sind die die einzelnen Aggregate 100; 300; 600; 700; 900; 1000 der Bearbeitungsmaschine 01 jedoch zumindest bezüglich ihrer Antriebe mechanisch voneinander entkoppelt.Each unit preferably has 100 ; 300 ; 600 ; 700 ; 900 ; 1000 at least one drive control and / or at least one drive controller, which the respective at least one drive of the respective unit 100 ; 300 ; 600 ; 700 ; 900 ; 1000 assigned. The drive controls and / or drive controllers of the individual units 100 ; 300 ; 600 ; 700 ; 900 ; 1000 are preferably operated individually and independently of one another. The drive controls and / or drive regulators of the individual units are also preferred 100 ; 300 ; 600 ; 700 ; 900 ; 1000 in terms of circuitry, in particular by means of at least one BUS system, with one another and / or with a machine control of the processing machine 01 linked and / or linkable in such a way that a coordinated control and / or regulation of the drives of several or all units 100 ; 300 ; 600 ; 700 ; 900 ; 1000 the processing machine 01 is and / or can be made. The individual aggregates 100 ; 300 ; 600 ; 700 ; 900 ; 1000 and / or in particular modules 100 ; 300 ; 600 ; 700 ; 900 ; 1000 the processing machine 01 are therefore preferably electronically coordinated and / or operated, at least with regard to their drives, in particular by means of at least one electronic master axis. An electronic master axis is preferably specified for this, for example from a higher-level machine control of the processing machine 01 . The individual units are alternatively or additionally 100 ; 300 ; 600 ; 700 ; 900 ; 1000 the processing machine 01 at least with respect to their drives, for example, mechanically synchronized and / or synchronizable with one another. The individual units are preferred 100 ; 300 ; 600 ; 700 ; 900 ; 1000 the processing machine 01 but at least mechanically decoupled from one another with regard to their drives.

Der für den Transport von Substrat 02 vorgesehene Raumbereich, den das Substrat 02 im Falle dessen Anwesenheit zumindest zeitweise einnimmt, ist der Transportweg. Vorzugsweise wird der Transportweg durch zumindest eine Einrichtung zum Führen des Substrates 02 in einem Betriebszustand der Bearbeitungsmaschine 01 festgelegt. Soweit nicht anders beschrieben zeichnen sich die Aggregate 100; 300; 600; 700; 900; 1000 der Bearbeitungsmaschine 01 bevorzugt jeweils dadurch aus, dass der durch das jeweilige Aggregat 100; 300; 600; 700; 900; 1000 festgelegte Abschnitt eines für einen Transport von Bogen 02 vorgesehenen Transportwegs zumindest im Wesentlichen flach und weiter bevorzugt vollständig flach ist. Unter einem im Wesentlichen flachen Abschnitt des für den Transport von Bogen 02 vorgesehenen Transportwegs ist dabei ein Abschnitt zu verstehen, der einen minimalen Krümmungsradius aufweist, der zumindest 2 Meter beträgt, weiter bevorzugt zumindest 5 Meter und noch weiter bevorzugt zumindest 10 Meter und noch weiter bevorzugt zumindest 50 Meter. Ein vollständig flacher Abschnitt weist einen unendlich großen Krümmungsradius auf und ist somit ebenfalls im Wesentlichen flach und weist somit ebenfalls einen minimalen Krümmungsradius auf, der zumindest 2 Meter beträgt. Soweit nicht anders beschrieben zeichnen sich die Aggregate 100; 300; 600; 700; 900; 1000 der Bearbeitungsmaschine 01 bevorzugt jeweils dadurch aus, dass der durch das jeweilige Aggregat 100; 300; 600; 700; 900; 1000 festgelegte Abschnitt des für den Transport von Bogen 02 vorgesehenen Transportwegs zumindest im Wesentlichen horizontal und weiter bevorzugt ausschließlich horizontal verläuft. Dieser Transportweg erstreckt sich bevorzugt in einer Richtung T, insbesondere Transportrichtung T. Ein im Wesentlichen horizontal verlaufender für den Transport von Bogen 02 vorgesehener Transportweg bedeutet insbesondere, dass der vorgesehene Transportweg im gesamten Bereich des jeweiligen Aggregats 100; 300; 600; 700; 900; 1000 ausschließlich eine oder mehrere Richtungen aufweist, die höchstens um 30°, bevorzugt höchstens um 15° und weiter bevorzugt höchstens um 5° von zumindest einer horizontalen Richtung abweicht. Die Richtung des Transportwegs, insbesondere die Transportrichtung T, ist dabei insbesondere diejenige Richtung, in der die Bogen 02 an der Stelle transportiert werden, an der die Richtung gemessen wird. Der für den Transport von Bogen 02 vorgesehene Transportweg beginnt bevorzugt an einer Stelle einer Entnahme der Bogen 02 von einem Anlegerstapel 104.The one for the transport of substrate 02 designated space area the substrate 02 in the case of its presence at least temporarily, is the transport route. The transport path is preferably through at least one device for guiding the substrate 02 in an operating state of the processing machine 01 set. Unless otherwise described, the units are characterized 100 ; 300 ; 600 ; 700 ; 900 ; 1000 the processing machine 01 preferably in each case that the through the respective unit 100 ; 300 ; 600 ; 700 ; 900 ; 1000 fixed section of a sheet for a transport 02 provided transport path is at least substantially flat and more preferably completely flat. Under a substantially flat section of the sheet for transportation 02 The intended transport path is to be understood as meaning a section that has a minimum radius of curvature that is at least 2 meters, more preferably at least 5 meters and even more preferably at least 10 meters and even more preferably at least 50 meters. A completely flat section has an infinitely large radius of curvature and is thus also essentially flat and thus also has a minimum radius of curvature which is at least 2 meters. Unless otherwise described, the units are characterized 100 ; 300 ; 600 ; 700 ; 900 ; 1000 the processing machine 01 preferably in each case that the through the respective unit 100 ; 300 ; 600 ; 700 ; 900 ; 1000 specified section of the sheet for transporting 02 provided transport path runs at least substantially horizontally and more preferably exclusively horizontally. This transport path preferably extends in one direction T , especially transport direction T . An essentially horizontal one for the transport of sheets 02 The intended transport route means in particular that the intended transport route covers the entire area of the respective unit 100 ; 300 ; 600 ; 700 ; 900 ; 1000 has exclusively one or more directions which deviate from at least one horizontal direction by at most 30 °, preferably at most 15 ° and more preferably at most 5 °. The direction of the transport route, especially the transport direction T , is in particular the direction in which the arc 02 transported at the point where the direction is measured. The one for transporting sheets 02 The intended transport path preferably begins at a point where the sheets are removed 02 from a feeder pile 104 .

Die Bearbeitungsmaschine 01 weist bevorzugt zumindest eine Substratzufuhreinrichtung 100 auf, die weiter bevorzugt als Aggregat 100, insbesondere Substratzufuhraggregat 100 und/oder als Modul 100, insbesondere Substratzufuhrmodul 100 ausgebildet ist. Insbesondere im Fall einer Bogenbearbeitungsmaschine 01 ist die zumindest eine Substratzufuhreinrichtung 100 bevorzugt als Bogenanleger 100 und/oder Bogenanlegeraggregat 100 und/oder Bogenanlegermodul 100 ausgebildet.The processing machine 01 preferably has at least one substrate supply device 100 on, which is more preferred as an aggregate 100 , in particular substrate supply unit 100 and / or as a module 100 , especially substrate supply module 100 is trained. Especially in the case of a sheet processing machine 01 is the at least one substrate supply device 100 preferably as a sheet feeder 100 and / or sheet feeder unit 100 and / or sheet feeder module 100 educated.

Die Bearbeitungsmaschine 01 weist beispielsweise zumindest ein als Konditionierungseinrichtung ausgebildetes Aggregat, insbesondere Konditionierungsaggregat auf, das weiter bevorzugt als Modul, insbesondere als Konditionierungsmodul ausgebildet ist. Eine solche Konditionierungseinrichtung ist beispielsweise als Vorbereitungseinrichtung oder als Nachbehandlungseinrichtung ausgebildet. Die Bearbeitungsmaschine 01 weist bevorzugt zumindest ein als Vorbereitungseinrichtung ausgebildetes Aggregat, insbesondere Vorbereitungsaggregat auf, das weiter bevorzugt als Modul, insbesondere als Vorbereitungsmodul ausgebildet ist und eine Konditionierungseinrichtung darstellt. Die Bearbeitungsmaschine 01 weist bevorzugt zumindest eine Nachbehandlungseinrichtung auf. Die Bearbeitungsmaschine 01 weist bevorzugt zumindest ein Aggregat 300, bevorzugt eine Anlageeinrichtung 300 auf, die weiter bevorzugt als Anlageaggregat 300 und/oder Anlagemodul 300 ausgebildet ist. Die zumindest eine Anlageeinrichtung 300 ist alternativ als Bestandteil der Substratzufuhreinrichtung 100 oder eines anderen Aggregats ausgebildet.The processing machine 01 For example, has at least one unit designed as a conditioning device, in particular a conditioning unit, which is more preferably designed as a module, in particular as a conditioning module. Such a conditioning device is designed, for example, as a preparation device or as an aftertreatment device. The processing machine 01 preferably has at least one unit designed as a preparation device, in particular a preparation unit, which is more preferably designed as a module, in particular as a preparation module and represents a conditioning device. The processing machine 01 preferably has at least one aftertreatment device. The processing machine 01 preferably has at least one aggregate 300 , preferably a facility 300 on, which is further preferred as a plant unit 300 and / or system module 300 is trained. The at least one investment facility 300 is alternatively as Part of the substrate feeding device 100 or another unit.

Die Bearbeitungsmaschine 01 weist beispielsweise zumindest ein Aggregat 600, z. B. Auftragaggregat 600 auf, das bevorzugt als Modul 600, insbesondere Auftragmodul 600 ausgebildet ist. Das zumindest eine Auftragaggregat 600 ist vorzugsweise je nach Funktion und/oder Auftragverfahren angeordnet und/oder aufgebaut. Das zumindest eine Auftragaggregat 600 dient bevorzugt dazu, zumindest ein jeweiliges Auftragfluid oder Beschichtungsmittel vollflächig und/oder teilflächig auf die Bogen 02 aufzutragen. Ein Beispiel eines Auftragaggregats 600 ist ein Druckaggregat 600 oder Druckmodul 600, das insbesondere einem Auftragen von Druckfarbe und/oder Tinte auf Substrat 02, insbesondere Bogen 02, dient. Im Vorangegangenen und im Nachfolgenden gelten auch ein gegebenenfalls angeordnetes Grundierungsaggregat und/oder ein gegebenenfalls Lackierungsaggregat als solches Auftragaggregat 600 oder Druckaggregat 600.The processing machine 01 has, for example, at least one unit 600 , e.g. B. Application unit 600 on, preferably as a module 600 , especially order module 600 is trained. At least one application unit 600 is preferably arranged and / or constructed depending on the function and / or application method. At least one application unit 600 preferably serves to apply at least one respective application fluid or coating agent to the sheet over the entire area and / or over part of the area 02 to apply. An example of an application unit 600 is a printing unit 600 or print module 600 , in particular an application of printing ink and / or ink to the substrate 02 , especially bow 02 , serves. In the foregoing and in the following, an optionally arranged priming unit and / or an optionally painting unit also apply as such an application unit 600 or printing unit 600 .

Insbesondere unabhängig von der Funktion des damit auftragbaren Auftragfluids lassen sich Auftragaggregate 600 bevorzugt hinsichtlich ihrer Auftragverfahren unterscheiden. Ein Beispiel eines Auftragaggregats 600 ist ein formbasiertes Auftragaggregat 600, das insbesondere zumindest eine feste, körperliche und bevorzugt auswechselbare Druckform aufweist. Formbasierte Auftragaggregate 600 arbeiten bevorzugt nach einem Flachdruckverfahren, insbesondere Offset-Flachdruckverfahren und/oder nach einem Tiefdruckverfahren und/oder nach einem Hochdruckverfahren, insbesondere bevorzugt nach einem Flexo-Druckverfahren. Das entsprechende Auftragaggregat 600 ist dann beispielsweise ein Flexo-Auftragaggregat 600 oder Flexo-Druckaggregat 600, insbesondere Flexo-Auftragmodul 600 oder Flexo-Druckmodul 600.In particular, application units can be used independently of the function of the application fluid that can be applied therewith 600 preferably differ with regard to their application method. An example of an application unit 600 is a shape-based application unit 600 , which in particular has at least one solid, physical and preferably exchangeable printing form. Shape-based application units 600 preferably work according to a planographic printing process, in particular an offset planographic printing process and / or a gravure printing process and / or a letterpress printing process, particularly preferably a flexographic printing process. The corresponding application unit 600 is then, for example, a flexographic application unit 600 or flexographic printing unit 600 , especially flexo application module 600 or flexo printing module 600 .

Die Bearbeitungsmaschine 01 weist beispielsweise zumindest ein als Trocknungseinrichtung ausgebildetes Aggregat, insbesondere Trocknungsaggregat auf, das weiter bevorzugt als Modul, insbesondere als Trocknungsmodul ausgebildet ist. Alternativ oder zusätzlich ist beispielsweise zumindest eine Trocknungsvorrichtung 506 und/oder zumindest eine Nachtrocknungseinrichtung Bestandteil zumindest eines bevorzugt als Modul 100; 300; 600; 700; 900; 1000 ausgebildeten Aggregats 100; 300; 600; 700; 900; 1000. Beispielsweise weist zumindest ein Auftragaggregat 600 zumindest eine Trocknungsvorrichtung 506 auf und/oder weist zumindest ein als Transporteinrichtung 700 und/oder zumindest ein Transportaggregat 700 ausgebildetes Aggregat 700 auf.The processing machine 01 has for example at least one unit designed as a drying device, in particular a drying unit, which is more preferably designed as a module, in particular as a drying module. Alternatively or additionally, for example, there is at least one drying device 506 and / or at least one post-drying device component of at least one, preferably as a module 100 ; 300 ; 600 ; 700 ; 900 ; 1000 trained unit 100 ; 300 ; 600 ; 700 ; 900 ; 1000 . For example, at least one application unit 600 at least one drying device 506 and / or has at least one as a transport device 700 and / or at least one transport unit 700 trained unit 700 on.

Die Bearbeitungsmaschine 01 weist bevorzugt zumindest eine Transporteinrichtung 700 auf, die weiter bevorzugt als Aggregat 700, insbesondere Transportaggregat 700, und/oder als Modul 700, insbesondere als Transportmodul 700 ausgebildet ist. Die Transporteinrichtung 700 wird auch als Transportmittel 700 bezeichnet. Zusätzlich oder alternativ weist die Bearbeitungsmaschine 01 bevorzugt Transporteinrichtungen 700 beispielsweise als Bestandteile anderer Aggregate und/oder Module auf.The processing machine 01 preferably has at least one transport device 700 on, which is more preferred as an aggregate 700 , especially transport unit 700 , and / or as a module 700 , especially as a transport module 700 is trained. The transport device 700 is also used as a means of transport 700 designated. Additionally or alternatively, the processing machine 01 prefers transport facilities 700 for example, as components of other units and / or modules.

Die Bearbeitungsmaschine 01 weist bevorzugt zumindest eine Formgebungseinrichtung 900 auf, die weiter bevorzugt als Aggregat 900, insbesondere Formgebungsaggregat 900 oder Stanzaggregat 900, und/oder als Modul 900, insbesondere als Formgebungsmodul 900 oder Stanzmodul 900 und/oder als Stanzeinrichtung 900 ausgebildet ist. Bevorzugt weist die Bearbeitungsmaschine 01 zumindest ein als Stanzaggregat 900 ausgebildetes Formgebungsaggregat 900 auf. Die zumindest eine Formgebungseinrichtung 900 ist bevorzugt als Rotationsstanzeinrichtung 900 ausgebildet und/oder weist bevorzugt zumindest ein Formgebungswerk 914 oder Stanzwerk 914 auf. Unter einer Formgebungseinrichtung 900 soll auch eine Prägeeinrichtung und/oder eine Rilleinrichtung zu verstehen sein. Bevorzugt ist eine Perforiereinrichtung ebenfalls eine Form einer Stanzeinrichtung 900.The processing machine 01 preferably has at least one shaping device 900 on, which is more preferred as an aggregate 900 , in particular shaping unit 900 or punching unit 900 , and / or as a module 900 , especially as a shaping module 900 or punching module 900 and / or as a punching device 900 is trained. The processing machine preferably has 01 at least one as a punching unit 900 trained shaping unit 900 on. The at least one shaping device 900 is preferred as a rotary punching device 900 formed and / or preferably has at least one shaping mechanism 914 or punching machine 914 on. Under a shaping device 900 should also be understood to mean an embossing device and / or a grooving device. Preferably, a perforating device is also a form of a punching device 900 .

Die Bearbeitungsmaschine 01 weist bevorzugt zumindest ein als Substratabgabeeinrichtung 1000 ausgebildetes, insbesondere als Auslage 1000 ausgebildetes Aggregat 1000, insbesondere als Bogenauslage 1000 ausgebildetes Aggregat 1000, insbesondere Auslageaggregat 1000 auf, das weiter bevorzugt als Modul 1000, insbesondere als Auslagemodul 1000 ausgebildet ist.The processing machine 01 preferably has at least one as a substrate dispensing device 1000 trained, especially as a display 1000 trained unit 1000 , especially as a sheet delivery 1000 trained unit 1000 , especially delivery unit 1000 on, which is further preferred as a module 1000 , especially as a display module 1000 is trained.

Die Bearbeitungsmaschine 01 weist beispielsweise zumindest ein als Weiterverarbeitungseinrichtung ausgebildetes Aggregat, insbesondere Weiterverarbeitungsaggregat auf, das weiter bevorzugt als Modul, insbesondere als Weiterverarbeitungsmodul ausgebildet ist. Bevorzugt ist die zumindest eine Weiterverarbeitungseinrichtung in Transportrichtung T nach einer Separationseinrichtung 903 angeordnet. Bevorzugt ist die zumindest eine Weiterverarbeitungseinrichtung in Transportrichtung T vor der Substratabgabeeinrichtung 1000 angeordnet. Beispielsweise ist die zumindest eine Weiterverarbeitungseinrichtung jeweils als Klebeeinrichtung und/oder Falteinrichtung ausgebildet.The processing machine 01 has for example at least one unit designed as a further processing device, in particular a further processing unit, which is more preferably designed as a module, in particular as a further processing module. The at least one further processing device is preferred in the transport direction T after a separation device 903 arranged. The at least one further processing device is preferred in the transport direction T in front of the substrate delivery device 1000 arranged. For example, the at least one further processing device is designed as an adhesive device and / or a folding device.

Die insbesondere für einen Transport von Bogen 02 vorgesehene Transportrichtung T ist die Richtung T, die bevorzugt zumindest im Wesentlichen und weiter bevorzugt vollständig horizontal orientiert ist und/oder die bevorzugt von einem ersten Aggregat 100; 300; 600; 700; 900; 1000 der Bearbeitungsmaschine 01 zu einem letzten Aggregat 100; 300; 600; 700; 900; 1000 der Bearbeitungsmaschine 01 weist, insbesondere von einem Bogenanlegeraggregat 100 bzw. einer Substratzufuhreinrichtung 100 einerseits zu einem Auslageaggregat 1000 bzw. einer Substratabgabeeinrichtung 1000 andererseits, und/oder die bevorzugt in eine Richtung weist, in der die Bogen 02 abgesehen von vertikalen Bewegungen oder vertikalen Komponenten von Bewegungen transportiert werden, insbesondere von einem ersten Kontakt mit einem der Substratzufuhreinrichtung 100 nachgeordneten Aggregat 300; 600; 700; 900; 1000 der Bearbeitungsmaschine 01 oder ersten Kontakt mit der Bearbeitungsmaschine 01 bis zu einem letzten Kontakt mit der Bearbeitungsmaschine 01. Unabhängig davon, ob die Anlageeinrichtung 300 ein eigenständiges Aggregat 300 oder Modul 300 ist oder Bestandteil der Substratzufuhreinrichtung 100 ist, ist die Transportrichtung T bevorzugt diejenige Richtung T, in der eine horizontale Komponente einer Richtung weist, die von der Anlageeinrichtung 300 zu der Substratabgabeeinrichtung 1000 orientiert ist.The particular for a transport of sheets 02 intended transport direction T is the direction T , which is preferably at least substantially and more preferably completely horizontally oriented and / or which is preferably from a first unit 100 ; 300 ; 600 ; 700 ; 900 ; 1000 the processing machine 01 to a final aggregate 100 ; 300 ; 600 ; 700 ; 900 ; 1000 the processing machine 01 knows in particular from a sheet feeder unit 100 or a substrate supply device 100 on the one hand to a delivery unit 1000 or a substrate dispenser 1000 on the other hand, and / or which preferably points in a direction in which the arc 02 apart from vertical movements or vertical components of movements are transported, in particular from a first contact with one of the substrate supply device 100 downstream aggregate 300 ; 600 ; 700 ; 900 ; 1000 the processing machine 01 or first contact with the processing machine 01 up to a last contact with the processing machine 01 . Regardless of whether the investment facility 300 a stand-alone unit 300 or module 300 is or part of the substrate feed device 100 is the direction of transport T prefers that direction T , in which a horizontal component faces a direction taken from the facility 300 to the substrate dispenser 1000 is oriented.

Eine Richtung A, bevorzugt eine Querrichtung A, ist bevorzugt eine orthogonal zu der Transportrichtung T der Bogen 02 und/oder orthogonal zu dem vorgesehenen Transportweg der Bogen 02 durch das zumindest eine Auftragaggregat 600 und/oder durch das zumindest eine Formgebungsaggregat 900 und/oder durch die zumindest eine Bogenauslage 1000 orientierte Richtung A. Die Querrichtung A ist bevorzugt eine horizontal orientierte Richtung A. Eine Arbeitsbreite der Bearbeitungsmaschine 01 und/oder des zumindest einen Auftragaggregats 600 und/oder des zumindest einen Formgebungsaggregats 900 und/oder der zumindest einen Bogenauslage 1000 ist bevorzugt eine Abmessung, die sich bevorzugt orthogonal zu dem vorgesehenen Transportweg der Bogen 02 durch das zumindest eine Auftragaggregat 600 und/oder das zumindest eine Formgebungsaggregat 900 und/oder die zumindest eine Bogenauslage 1000 erstreckt, weiter bevorzugt in der Querrichtung A. Die Arbeitsbreite der Bearbeitungsmaschine 01 entspricht bevorzugt einer maximalen Breite, die ein Bogen 02 aufweisen darf, um noch mit der Bearbeitungsmaschine 01 bearbeitet werden zu können, also insbesondere einer maximalen mit der Bearbeitungsmaschine 01 verarbeitbaren Bogenbreite. Unter der Breite eines Bogens 02 ist dabei insbesondere dessen Abmessung in der Querrichtung A zu verstehen. Dies ist bevorzugt unabhängig davon, ob diese Breite des Bogens 02 größer oder kleiner ist als eine dazu orthogonale horizontale Abmessung des Bogens 02, die weiter bevorzugt die Länge dieses Bogens 02 darstellt. Die Arbeitsbreite der Bearbeitungsmaschine 01 entspricht bevorzugt der Arbeitsbreite des zumindest einen Auftragaggregat 600 und/oder des zumindest einen Formgebungsaggregats 900 und/oder der zumindest einen Bogenauslage 1000. Die Arbeitsbreite der Bearbeitungsmaschine 01, insbesondere Bogenbearbeitungsmaschine 01 beträgt bevorzugt zumindest 100 cm, weiter bevorzugt zumindest 150 cm, noch weiter bevorzugt zumindest 160 cm, noch weiter bevorzugt zumindest 200 cm und noch weiter bevorzugt zumindest 250 cm.A direction A. , preferably a transverse direction A. , is preferably one orthogonal to the transport direction T the arc 02 and / or orthogonal to the intended transport path of the sheets 02 through the at least one application unit 600 and / or by the at least one shaping unit 900 and / or through the at least one sheet delivery 1000 oriented direction A. . The cross direction A. is preferably a horizontally oriented direction A. . A working width of the processing machine 01 and / or the at least one application unit 600 and / or the at least one shaping unit 900 and / or the at least one sheet delivery 1000 is preferably a dimension that is preferably orthogonal to the intended transport path of the sheet 02 through the at least one application unit 600 and / or the at least one shaping unit 900 and / or the at least one sheet delivery 1000 extends, more preferably in the transverse direction A. . The working width of the processing machine 01 preferably corresponds to a maximum width that an arc 02 may have to still use the processing machine 01 to be processed, so in particular a maximum with the processing machine 01 processable sheet width. Under the width of an arch 02 is in particular its dimension in the transverse direction A. to understand. This is preferred regardless of whether this width of the sheet 02 is larger or smaller than a horizontal dimension of the arch orthogonal thereto 02 who further prefers the length of this arc 02 represents. The working width of the processing machine 01 preferably corresponds to the working width of the at least one application unit 600 and / or the at least one shaping unit 900 and / or the at least one sheet delivery 1000 . The working width of the processing machine 01 , especially sheet processing machine 01 is preferably at least 100 cm, more preferably at least 150 cm, even more preferably at least 160 cm, even more preferably at least 200 cm and even more preferably at least 250 cm.

Eine vertikale Richtung V bezeichnet vorzugsweise eine Richtung, die parallel zu dem Normalenvektor einer Ebene aufgespannt durch die Transportrichtung T und die Querrichtung A angeordnet ist. Beispielsweise im Bereich der Formgebungseinrichtung 900 ist die vertikale Richtung V bevorzugt so orientiert, dass sie von dem Bedruckstoff 02 hin zu einem Formzylinder 901 der Formgebungseinrichtung 900 zeigt.A vertical direction V preferably denotes a direction that is parallel to the normal vector of a plane spanned by the transport direction T and the transverse direction A. is arranged. For example in the area of the shaping device 900 is the vertical direction V preferably oriented so that they are from the substrate 02 towards a forme cylinder 901 the shaping device 900 shows.

Die Bearbeitungsmaschine 01 weist bevorzugt an einer oder mehreren Stellen Transportmittel 07; 08; 09; 904 auf. Zumindest eines dieser Transportmittel 07; 08; 09 ist bevorzugt als Saugtransportmittel 07; 08; 09 ausgebildet, insbesondere als Saugband 07; 09 und/oder als Saugkastenband und/oder als Rollensaugsystem 08 und/oder als Saugrolle. Solche Saugtransportmittel 07; 08; 09 dienen bevorzugt dazu, Bogen 02 kontrolliert vorwärts zu bewegen und/oder Bewegungen zu ermöglichen, während Bogen 02 gegen zumindest eine Gegendruckfläche des entsprechenden Saugtransportmittels 07; 08; 09 gehalten werden. Dabei wird bevorzugt ein relativer Unterdruck genutzt, um die Bogen 02 gegen zumindest eine Transportfläche 22; 23; 24 zu ziehen und/oder zu drücken. Bevorzugt wird eine Transportbewegung der Bogen 02 durch eine entsprechende insbesondere umlaufende Bewegung der zumindest einen Transportfläche 22; 23; 24 erzeugt. Alternativ oder zusätzlich wird der Bogen 02 durch das zumindest eine Saugtransportmittel 07; 08; 09 in seiner Bahn beispielsweise entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs gehalten und dabei eine Transportbewegung des Bogens 02 durch eine von einem anderen, beispielsweise vorgeordneten und/oder nachgeordneten Transportmittel vorgegebene Kraft erzeugt. Der Unterdruck ist dabei insbesondere ein Unterdruck relativ zu einem Umgebungsdruck, insbesondere relativ zu einem Atmosphärendruck.The processing machine 01 preferably has means of transport at one or more points 07 ; 08 ; 09 ; 904 on. At least one of these modes of transport 07 ; 08 ; 09 is preferred as a suction transport means 07 ; 08 ; 09 designed, in particular as a suction belt 07 ; 09 and / or as a suction box belt and / or as a roller suction system 08 and / or as a suction roll. Such suction transport means 07 ; 08 ; 09 are preferably used to arch 02 Moving forward in a controlled manner and / or allowing movements while arching 02 against at least one counter-pressure surface of the corresponding suction transport means 07 ; 08 ; 09 being held. A relative negative pressure is preferably used here to feed the sheets 02 against at least one transport surface 22nd ; 23 ; 24 to pull and / or push. A transport movement of the sheets is preferred 02 by a corresponding, in particular circumferential, movement of the at least one transport surface 22nd ; 23 ; 24 generated. Alternatively or in addition, the arch 02 by the at least one suction transport means 07 ; 08 ; 09 in its path for example along the for the transport of sheets 02 provided transport path held while a transport movement of the sheet 02 generated by a force predetermined by another, for example upstream and / or downstream transport means. The negative pressure is in particular a negative pressure relative to an ambient pressure, in particular relative to an atmospheric pressure.

Unter dem Saugtransportmittel 07; 08; 09 ist also bevorzugt eine Einrichtung zu verstehen, die zumindest eine Gegendruckfläche 22; 23; 24 aufweist, die weiter bevorzugt als Gleitfläche und/oder als insbesondere bewegbare Transportfläche 22; 23; 24 ausgebildet ist und die beispielsweise zumindest teilweise zumindest in der Transportrichtung T bewegbar ist. Weiterhin weist das jeweilige Saugtransportmittel 07; 08; 09 bevorzugt zumindest eine Unterdruckkammer auf, die weiter bevorzugt mittels einer Saugleitung mit zumindest einer Unterdruckquelle verbunden ist. Die Unterdruckquelle weist beispielsweise ein Gebläse auf. Die zumindest eine Unterdruckkammer weist zumindest eine Saugöffnung auf, die einem Ansaugen der Bogen 02 dient. Je nach Ausführungsform des Saugtransportmittels 07; 08; 09 und Größe der Bogen 02 werden die Bogen 02 dabei in eine die zumindest eine Saugöffnung verschließende Lage gesaugt oder lediglich derart gegen eine Gegendruckfläche 22; 23; 24 gesaugt, dass dennoch Umgebungsluft an den Bogen 02 vorbei in die Saugöffnung gelangen kann. Beispielsweise weist die Transportfläche 22; 23; 24 eine oder mehrere Ansaugöffnungen 36 auf. Die Ansaugöffnungen 36 dienen bevorzugt dazu, einen Unterdruck von der Saugöffnung der Unterdruckkammer bis zu der Transportfläche 22; 23; 24 weiter zu vermitteln, insbesondere ohne Druckverluste oder mit sehr geringen Druckverlusten. Alternativ oder zusätzlich wirkt die Saugöffnung derart auf die Bogen 02, dass diese gegen die Transportfläche 22; 23; 24 gesaugt wird, ohne dass die Transportfläche 22; 23; 24 Ansaugöffnungen 36 aufweisen würde. Beispielsweise ist zumindest ein Umlenkmittel 47 angeordnet, das direkt oder indirekt für eine umlaufende Bewegung der zumindest einen Transportfläche 22; 23; 24 sorgt. Bevorzugt ist das zumindest eine Umlenkmittel 47 und/oder die Transportfläche 22; 23; 24 selbst angetrieben und/oder antreibbar, insbesondere um für eine Bewegung der Bogen 02 zu sorgen. Alternativ erlaubt die Transportfläche 22; 23; 24 ein Gleiten von Bogen 02 entlang der Transportfläche 22; 23; 24.Under the suction conveyor 07 ; 08 ; 09 is therefore preferably to be understood as a device that has at least one counterpressure surface 22nd ; 23 ; 24 has, which is more preferably as a sliding surface and / or as a particularly movable transport surface 22nd ; 23 ; 24 is formed and which, for example, at least partially at least in the transport direction T is movable. Furthermore, the respective suction transport means 07 ; 08 ; 09 preferably at least one vacuum chamber, which is further preferably connected to at least one vacuum source by means of a suction line. The vacuum source has a fan, for example. The at least one vacuum chamber has at least one suction opening, the one sucking the bow 02 serves. Depending on the embodiment of the suction transport means 07 ; 08 ; 09 and size of the arch 02 become the arch 02 sucked into a position that closes the at least one suction opening or merely in this way against a counterpressure surface 22nd ; 23 ; 24 sucked that still ambient air to the arch 02 can get past into the suction opening. For example, the transport surface 22nd ; 23 ; 24 one or more suction openings 36 on. The suction openings 36 are preferably used to create a negative pressure from the suction opening of the negative pressure chamber to the transport surface 22nd ; 23 ; 24 to convey further, especially without pressure loss or with very low pressure loss. Alternatively or additionally, the suction opening acts on the sheet in this way 02 that these against the transport surface 22nd ; 23 ; 24 is vacuumed without affecting the transport surface 22nd ; 23 ; 24 Suction openings 36 would exhibit. For example, there is at least one deflection means 47 arranged, directly or indirectly for a circumferential movement of the at least one transport surface 22nd ; 23 ; 24 cares. This is preferably at least one deflection means 47 and / or the transport surface 22nd ; 23 ; 24 self-driven and / or drivable, in particular in order to move the sheet 02 to care. Alternatively, the transport area allows 22nd ; 23 ; 24 a slip of arch 02 along the transport surface 22nd ; 23 ; 24 .

Eine erste Ausführungsform eines Saugtransportmittels 07; 09 ist ein Saugband 07; 09. Unter einem Saugband 07; 09 ist dabei eine Einrichtung zu verstehen, die zumindest ein flexibles Transportband 37; 38 aufweist, dessen Oberfläche als Transportfläche 22; 24 dient. Das zumindest eine Transportband 37; 38 wird bevorzugt durch als Umlenkrollen 47 und/oder Umlenkwalzen 47 ausgebildete Umlenkmittel 47 umgelenkt und/oder ist bevorzugt in sich geschlossen, insbesondere derart, dass ein endloser Umlauf ermöglicht ist. Das zumindest ein Transportband 37; 38 weist bevorzugt eine Vielzahl von Ansaugöffnungen 36 auf. Das zumindest eine Transportband 37; 38 bedeckt bevorzugt in zumindest einem Abschnitt seines Umlaufwegs die zumindest eine Saugöffnung 36 der zumindest einen Unterdruckkammer. Weiter bevorzugt ist die Unterdruckkammer dann nur durch die Ansaugöffnungen 36 des zumindest einen Transportbands 37; 38 mit einer Umgebung und/oder mit Bogen 02 verbunden. Bevorzugt sind Stützmittel angeordnet, die verhindern, dass das zumindest eine Transportband 37; 38 zu weit oder überhaupt in die Unterdruckkammer gezogen wird und/oder die dafür sorgen, dass die Transportfläche 22; 24 eine gewünschte Form annimmt, beispielsweise derart, dass sie zumindest in dem Bereich, in dem ihre Ansaugöffnungen 36 mit der Unterdruckkammer verbunden sind, eine ebene Fläche bildet. Durch eine umlaufende Bewegung des zumindest einen Transportbands 37; 38 ergibt sich dann eine Vorwärtsbewegung der Transportfläche 22; 24, wobei Bogen 02 genau in dem Bereich sicher auf der Transportfläche 22; 24 gehalten werden, in dem sie der durch das zumindest eine Transportband 37; 38 mit Ausnahme der Ansaugöffnungen 36 abgedeckten Saugöffnung gegenüberliegen.A first embodiment of a suction transport means 07 ; 09 is a suction belt 07 ; 09 . Under a suction belt 07 ; 09 is to be understood as a device that has at least one flexible conveyor belt 37 ; 38 has, its surface as a transport surface 22nd ; 24 serves. At least one conveyor belt 37 ; 38 is preferred by as pulleys 47 and / or deflection rollers 47 trained deflection means 47 deflected and / or is preferably self-contained, in particular in such a way that endless circulation is made possible. At least one conveyor belt 37 ; 38 preferably has a plurality of suction openings 36 on. At least one conveyor belt 37 ; 38 preferably covers the at least one suction opening in at least a section of its circulation path 36 the at least one vacuum chamber. The vacuum chamber is then further preferred only through the suction openings 36 of the at least one conveyor belt 37 ; 38 with an environment and / or with arch 02 connected. Support means are preferably arranged which prevent the at least one conveyor belt from being 37 ; 38 is pulled too far or at all into the vacuum chamber and / or which ensure that the transport surface 22nd ; 24 assumes a desired shape, for example such that it at least in the area in which its suction openings 36 are connected to the vacuum chamber, forms a flat surface. Through a rotating movement of the at least one conveyor belt 37 ; 38 This then results in a forward movement of the transport surface 22nd ; 24 , being arch 02 exactly in the area safely on the transport surface 22nd ; 24 be held by the at least one conveyor belt 37 ; 38 with the exception of the suction openings 36 opposite covered suction opening.

Eine zweite Ausführungsform eines Saugtransportmittels 08 ist ein Rollensaugsystem 08. Unter einem Rollensaugsystem 08 ist dabei eine Einrichtung zu verstehen, bei der die zumindest eine Transportfläche 23 aus zumindest Abschnitten von Mantelflächen einer Vielzahl von Transportrollen 26 und/oder Transportwalzen 26 gebildet wird. Die Transportrollen 26 und/oder Transportwalzen 26 bilden damit jeweils beispielsweise geschlossene und/oder durch Rotation umlaufenden Teile der Transportfläche 23. Das Rollensaugsystem 08 weist bevorzugt eine Vielzahl von Saugöffnungen auf. Diese Saugöffnungen sind bevorzugt zumindest zwischen benachbarten Transportrollen 26 und/oder Transportwalzen 26 angeordnet. Beispielsweise ist zumindest eine Abdeckmaske angeordnet, die bevorzugt eine Begrenzung der Unterdruckkammer darstellt. Die Abdeckmaske weist bevorzugt die Vielzahl von Saugöffnungen auf. Die Abdeckmaske bildet bevorzugt eine im Wesentlichen ebene Fläche. Bevorzugt sind die Transportrollen 26 und/oder Transportwalzen 26 derart angeordnet, dass sie von dieser ebenen Fläche geschnitten werden und weiter bevorzugt nur zu einem geringen Teil, beispielsweise nur wenige Millimeter über diese ebene Fläche hinausragen, insbesondere in einer von der Unterdruckkammer abgewandten Richtung. Die Saugöffnungen sind dann bevorzugt rahmenförmig ausgebildet und umgeben jeweils zumindest eine der Transportrollen 26 und/oder Transportwalzen 26. Durch eine umlaufende Bewegung der Transportrollen 26 und/oder Transportwalzen 26 ergibt sich dann eine Vorwärtsbewegung der entsprechenden Teile der Transportfläche 23, wobei Bogen 02 genau in dem Bereich sicher auf der Transportfläche 23 gehalten werden, in welchem sie den Saugöffnung gegenüberliegen.A second embodiment of a suction transport means 08 is a roller suction system 08 . Under a roller suction system 08 is to be understood as a device in which the at least one transport surface 23 from at least sections of lateral surfaces of a large number of transport rollers 26th and / or transport rollers 26th is formed. The transport rollers 26th and / or transport rollers 26th thus each form, for example, closed and / or rotating parts of the transport surface 23 . The roller suction system 08 preferably has a plurality of suction openings. These suction openings are preferably at least between adjacent transport rollers 26th and / or transport rollers 26th arranged. For example, at least one cover mask is arranged, which preferably represents a limitation of the vacuum chamber. The cover mask preferably has the plurality of suction openings. The cover mask preferably forms an essentially flat surface. The transport rollers are preferred 26th and / or transport rollers 26th arranged in such a way that they are cut from this flat surface and more preferably only protrude to a small extent, for example only a few millimeters, beyond this flat surface, in particular in a direction facing away from the vacuum chamber. The suction openings are then preferably designed in the form of a frame and each surround at least one of the transport rollers 26th and / or transport rollers 26th . By rotating the transport rollers 26th and / or transport rollers 26th This then results in a forward movement of the corresponding parts of the transport surface 23 , being arch 02 exactly in the area safely on the transport surface 23 are held in which they face the suction opening.

Eine dritte Ausführungsform eines Saugtransportmittels ist ein Saugkastenband. Unter einem Saugkastenband ist dabei eine Einrichtung zu verstehen, die eine Mehrzahl von insbesondere umlaufend bewegbaren Saugkästen aufweist, die jeweils eine als Transportfläche dienende Außenfläche aufweisen.A third embodiment of a suction transport means is a suction box belt. In this context, a suction box belt is to be understood as a device which has a plurality of suction boxes, in particular which can be moved in a circumferential manner, each of which has an outer surface serving as a transport surface.

Eine vierte Ausführungsform eines Saugtransportmittels ist zumindest eine Saugrolle. Unter einer Saugrolle ist dabei eine Rolle zu verstehen, deren Mantelfläche als Transportfläche dient und eine Vielzahl von Ansaugöffnungen aufweist und die in ihrem Inneren zumindest eine Unterdruckkammer aufweist, die beispielsweise mittels einer Saugleitung mit zumindest einer Unterdruckquelle verbunden ist.A fourth embodiment of a suction transport means is at least one suction roller. A suction roller is to be understood as a roller whose outer surface serves as a transport surface and has a plurality of suction openings and which has at least one vacuum chamber in its interior, which is connected to at least one vacuum source by means of a suction line, for example.

Eine fünfte Ausführungsform eines Saugtransportmittels ist zumindest eine Gleitsaugvorrichtung. Die Gleitsaugvorrichtung ist bevorzugt als passives Transportmittel ausgebildet und dient insbesondere dazu, Randbedingungen bezüglich einer Lage eines jeweiligen Bogens 02 vorzugeben, ohne den Bogen 02 selbst in Bewegung zu versetzen. Die jeweilige Gleitsaugvorrichtung weist bevorzugt zumindest eine Gleitfläche und zumindest eine Unterdruckkammer und zumindest eine Saugöffnung auf. Dies zumindest eine Gleitfläche dient dann als Gegendruckfläche und dient als Transportfläche. Im Fall der Gleitsaugvorrichtung wird die als Gleitfläche ausgebildete Transportfläche bevorzugt nicht bewegt. Die Gleitfläche dient als Gegendruckfläche, gegen die entsprechende Bogen 02 gepresst werden. Die Bogen 02 können dabei dennoch entlang der Gleitfläche bewegt werden, insbesondere sofern sie anderweitig mit einer zumindest auch parallel zu der Gleitfläche orientierten Kraft beaufschlagt werden. Beispielsweise kann mittels einer Gleitsaugvorrichtung ein Bereich zwischen zwei angetriebenen Saugtarnsportmitteln überbrückt werden.A fifth embodiment of a suction transport means is at least one sliding suction device. The sliding suction device is preferably designed as a passive transport means and is used in particular to establish boundary conditions with regard to a position of a respective sheet 02 pretend without the bow 02 to set yourself in motion. The respective sliding suction device preferably has at least one sliding surface and at least one vacuum chamber and at least one suction opening. This at least one sliding surface then serves as a counter-pressure surface and serves as a transport surface. In the case of the sliding suction device, the transport surface designed as a sliding surface is preferably not moved. The sliding surface serves as a counter pressure surface against the corresponding arch 02 be pressed. The arch 02 can nevertheless be moved along the sliding surface, in particular if they are otherwise acted upon by a force that is at least also oriented parallel to the sliding surface. For example, an area between two powered suction camouflage means can be bridged by means of a sliding suction device.

Es ist möglich, unterschiedliche Ausführungsformen von Saugtransportmitteln zu kombinieren. Diese können beispielsweise zumindest eine gemeinsame Unterdruckquelle und/oder zumindest eine gemeinsame Unterdruckkammer und/oder zumindest aufweisen und/oder als ein Saugtransportmittel zusammenwirken und/oder hintereinander und/oder nebeneinander angeordnet sein. Solche Kombinationen sind dann bevorzugt jeweils zumindest zweien der Ausführungsformen von Saugtransportmitteln zuzuordnen.It is possible to combine different embodiments of suction transport means. These can for example have at least one common negative pressure source and / or at least one common negative pressure chamber and / or at least and / or interact as a suction transport means and / or be arranged one behind the other and / or next to one another. Such combinations are then preferably to be assigned to at least two of the embodiments of suction transport means.

Unabhängig von der Ausführungsform des jeweiligen Saugtransportmittels 07; 08; 09 sind zumindest zwei im Folgenden beschriebene Anordnungen des jeweiligen Saugtransportmittels 07; 08; 09 möglich.Regardless of the embodiment of the respective suction transport means 07 ; 08 ; 09 are at least two arrangements of the respective suction transport means described below 07 ; 08 ; 09 possible.

In einer ersten Anordnung befindet sich ein von dem jeweiligen Saugtransportmittel 07; 08; 09 festgelegter Abschnitt des für den Transport von Bogen 02 vorgesehenen Transportwegs unterhalb der insbesondere bewegbaren Transportfläche 22; 23; 24, die insbesondere als Gegendruckfläche 22; 23; 24 dient und beispielsweise zumindest teilweise zumindest in der Transportrichtung T bewegbar ist. Beispielsweise ist das jeweilige Saugtransportmittel 07; 08; 09 dann als oberes Saugtransportmittel 07; 08; 09 ausgebildet, wobei weiter bevorzugt dessen Saugöffnungen oder Ansaugöffnungen 36 zumindest während ihrer Verbindung mit der zumindest einen Unterdruckkammer bevorzugt zumindest auch oder nur nach unten weisen und/oder dessen Saugwirkung bevorzugt zumindest auch oder nur nach oben gerichtet ist. Die Bogen 02 werden dann von dem Saugtransportmittel 07; 08; 09 bevorzugt hängend transportiert.In a first arrangement there is one of the respective suction transport means 07 ; 08 ; 09 defined section of the sheet for the transport of sheets 02 provided transport path below the particularly movable transport surface 22nd ; 23 ; 24 in particular as a counter pressure surface 22nd ; 23 ; 24 serves and for example at least partially at least in the transport direction T is movable. For example, is the respective suction transport means 07 ; 08 ; 09 then as an upper suction transport 07 ; 08 ; 09 formed, further preferably its suction openings or suction openings 36 at least during their connection with the at least one vacuum chamber, preferably at least also or only point downwards and / or whose suction effect is preferably at least also or only upwards. The arch 02 are then by the suction transport means 07 ; 08 ; 09 preferably transported hanging.

In einer zweiten Anordnung befindet sich ein von dem jeweiligen Saugtransportmittel festgelegter Abschnitt des für den Transport von Bogen 02 vorgesehenen Transportwegs oberhalb der insbesondere bewegbaren Transportfläche, die insbesondere als Gegendruckfläche dient und beispielsweise zumindest teilweise zumindest in der Transportrichtung T bewegbar ist. Beispielsweise ist das jeweilige Saugtransportmittel dann als unteres Saugtransportmittel ausgebildet, wobei weiter bevorzugt dessen Saugöffnungen oder Ansaugöffnungen zumindest während ihrer Verbindung mit der zumindest einen Unterdruckkammer bevorzugt zumindest auch oder nur nach oben weisen und/oder dessen Saugwirkung bevorzugt zumindest auch oder nur nach unten gerichtet ist. Die Bogen 02 werden dann von dem Saugtransportmittel bevorzugt liegend transportiert.In a second arrangement there is a section of the for the transport of sheets which is fixed by the respective suction transport means 02 provided transport path above the particularly movable transport surface, which serves in particular as a counter-pressure surface and, for example, at least partially at least in the transport direction T is movable. For example, the respective suction transport means is then designed as a lower suction transport means, furthermore preferably its suction openings or suction openings at least during their connection with the at least one vacuum chamber preferably at least also or only point upwards and / or its suction effect preferably at least also or only downwards. The arch 02 are then preferably transported horizontally by the suction transport means.

Die Bogenbearbeitungsmaschine 01 ist bevorzugt eine Bogenbearbeitungsmaschine 01 mit zumindest einer Formgebungseinrichtung 900 und zumindest einer entlang eines für einen Transport von Bogen 02 vorgesehenen Transportwegs nach der zumindest einen Formgebungseinrichtung 900 angeordneten Auslage 1000. Die zumindest eine Formgebungseinrichtung 900 ist bevorzugt als Stanzeinrichtung 900 und/oder als Rotationsstanzeinrichtung 900 ausgebildet. Beispielsweise ist genau eine Formgebungseinrichtung 900, insbesondere Stanzeinrichtung 900 und/oder Rotationsstanzeinrichtung 900, angeordnet. Die zumindest eine Formgebungseinrichtung 900 weist bevorzugt zumindest eine und weiter bevorzugt genau eine Formgebungsstelle 909 auf, die durch zumindest und weiter bevorzugt genau einen insbesondere als Stanzformzylinder 901 ausgebildeten Formzylinder 901 einerseits und zumindest einen Gegendruckzylinder 902 andererseits gebildet wird. Die Formgebungsstelle 909 ist bevorzugt derjenige Bereich, in dem sich der jeweilige Formzylinder 901 einerseits und der jeweilige Gegendruckzylinder 902 andererseits am nächsten sind. Die zumindest eine Formgebungsstelle 909 ist bevorzugt als zumindest eine Stanzstelle 909 und/oder als zumindest ein Transportmittel 909 und/oder als zumindest ein Formgebungstransportmittel 909 und/oder als zumindest ein Stanztransportmittel 909 ausgebildet. Bevorzugt umfasst die Formgebungseinrichtung 900, insbesondere das Formgebungswerk 914, zumindest ein Werkzeug, weiter bevorzugt umfasst der zumindest eine Formzylinder 901 zumindest ein Werkzeug. In einer bevorzugten Ausführung steht das Werkzeug der Formgebungseinrichtung 900, insbesondere des Formgebungswerks 914, bevorzugt das Werkzeug des Formzylinders 901, in direktem Kontakt zu dem Gegendruckzylinder 902, insbesondere in dem Bereich der Formgebungsstelle 909.The sheet processing machine 01 is preferably a sheet processing machine 01 with at least one shaping device 900 and at least one along one for transporting sheets 02 provided transport path after the at least one shaping device 900 arranged delivery 1000 . The at least one shaping device 900 is preferred as a punching device 900 and / or as a rotary punching device 900 educated. For example, there is exactly one shaping device 900 , especially punching device 900 and / or rotary punching device 900 , arranged. The at least one shaping device 900 preferably has at least one and more preferably exactly one shaping point 909 on, by at least and more preferably exactly one, in particular as a die cylinder 901 trained forme cylinder 901 on the one hand and at least one impression cylinder 902 on the other hand is formed. The shaping point 909 is preferably the area in which the respective forme cylinder is located 901 on the one hand and the respective impression cylinder 902 on the other hand are closest. The at least one shaping point 909 is preferred as at least one punching point 909 and / or as at least one means of transport 909 and / or as at least one shaping transport means 909 and / or as at least one punch transport means 909 educated. The shaping device preferably comprises 900 , especially the shaping unit 914 , at least one tool, further preferably comprises the at least one forme cylinder 901 at least one tool. In a preferred embodiment, the tool is at the forming device 900 , in particular the shaping unit 914 , preferably the tool of the forme cylinder 901 , in direct contact with the impression cylinder 902 , especially in the area of the shaping point 909 .

Der Begriff Nutzen 1101 bezeichnet im Vorangegangenen und im Folgenden nach DIN 16500-2 vorzugsweise die Anzahl gleicher Objekte, die aus dem gleichen Werkstoffstück gefertigt werden und/oder auf einem gemeinsamen Trägermaterial, beispielsweise einem gemeinsamen Bogen 02, angeordnet sind. Ein Nutzen 1101 ist vorzugsweise jener Bereich eines Bogens 02, welcher als ein Produkt der Bogenbearbeitungsmaschine 01, insbesondere als ein Zwischenprodukt zur Herstellung eines Endproduktes, beispielsweise als ein Rohling, ausgebildet ist und/oder beispielsweise zu dem gewünschten oder geforderten Endprodukt weiterverarbeitet wird und/oder weiterverarbeitbar ausgebildet ist. Bevorzugt weist der zumindest eine Nutzen 1101 des jeweiligen Bogens 02 jeweils mindestens ein Druckbild auf. Bevorzugt ist hier das gewünschte oder geforderte Endprodukt, welches durch den jeweiligen Nutzen 1101 oder bevorzugt durch Weiterverarbeitung des jeweiligen Nutzens 1101 erzeugt wurde, eine Faltschachtel und/oder eine Deckelschachtel und/oder eine Falthülle und/oder eine formfeste Schachtel.The term benefit 1101 In the foregoing and in the following, according to DIN 16500-2, preferably denotes the number of identical objects that are manufactured from the same piece of material and / or on a common carrier material, for example a common sheet 02 , are arranged. A benefit 1101 is preferably that area of an arc 02 , which as a product of the sheet processing machine 01 , in particular as an intermediate product for producing an end product, for example as a blank, and / or, for example, is further processed to the desired or required end product and / or is designed to be further processable. The at least one preferably has benefits 1101 of the respective arch 02 at least one print image each. The desired or required end product is preferred here, which is determined by the respective benefit 1101 or preferably by further processing the respective benefit 1101 was produced, a folding box and / or a lid box and / or a folding sleeve and / or a dimensionally stable box.

Ein Reststück 1102A, bevorzugt ein Abfallstück 1102A, ist im Vorangegangenen und im Folgenden jener Bereich eines Bogens 02, welcher keinem Nutzen 1101 entspricht. Ein Reststück 1102A ist vorzugsweise als Abfallstück 1102A und/oder Beschnitt 1102A und/oder Ausbruch 1102A ausgebildet und ist bevorzugt entfernbar ausgebildet. Bevorzugt während dem Betrieb der Bogenbearbeitungsmaschine 01 wird das zumindest eine Abfallstück 1102A an zumindest einer Formgebungsstelle 909 der Formgebungseinrichtung 900 erzeugt, beispielsweise in zumindest einem Stanzvorgang, und bevorzugt während dem Betrieb der Bogenbearbeitungsmaschine 01 von dem jeweiligen Bogen 02 zumindest teilweise, bevorzugt vollständig, entfernt.A leftover piece 1102A , preferably a scrap piece 1102A , is that area of an arc in the foregoing and in the following 02 which is of no use 1101 corresponds. A leftover piece 1102A is preferably a scrap piece 1102A and / or trim 1102A and / or outbreak 1102A and is preferably designed to be removable. Preferably during operation of the sheet processing machine 01 will be at least a piece of waste 1102A at at least one shaping point 909 the shaping device 900 generated, for example in at least one punching process, and preferably during the operation of the sheet processing machine 01 of the respective arch 02 at least partially, preferably completely, removed.

Ein Bogen 02, welcher durch die Formgebungseinrichtung 900 bearbeitet ist, also welcher auf dem Transportweg in Transportrichtung T nach der zumindest einen Formgebungsstelle 909 angeordnet ist, weist bevorzugt mindestens einen Stanzeindruck 1103 auf. Der zumindest eine Stanzeindruck 1103 ist beispielsweise als Rille und/oder Riefe und/oder Prägung und/oder Schnitt und/oder Perforierung ausgebildet. Bevorzugt ist der zumindest eine Stanzeindruck 1103, insbesondere wenn dieser als Perforierung und/oder Schnitt ausgebildet ist, zumindest teilweise mindestens ein Nutzen 1101 von mindestens einem Abfallstück 1102A und/oder von mindestens einem weiteren Nutzen 1101 trennend ausgebildet. Vorzugsweise weist ein Bogen 02, welcher durch die Formgebungseinrichtung 900 bearbeitet ist, also welcher auf dem Transportweg in Transportrichtung T nach der zumindest einen Formgebungsstelle 909 angeordnet ist, zumindest ein Nutzen 1101, bevorzugt mindestens zwei Nutzen 1101, und mindestens ein Abfallstück 1102A auf.A bow 02 , which by the shaping device 900 is processed, so which on the transport route in the transport direction T after the at least one shaping point 909 is arranged, preferably has at least one punch impression 1103 on. The at least one die-cut impression 1103 is designed, for example, as a groove and / or groove and / or embossing and / or cut and / or perforation. The at least one punching impression is preferred 1103 , in particular if this is designed as a perforation and / or cut, at least partially at least one panel 1101 of at least one scrap piece 1102A and / or of at least one other benefit 1101 trained separating. Preferably has an arch 02 , which by the shaping device 900 is processed, so which on the transport route in the transport direction T after the at least one shaping point 909 is arranged, at least one benefit 1101 , preferably at least two uses 1101 , and at least one scrap piece 1102A on.

Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs nach der zumindest einen Formgebungsstelle 909 die zumindest eine Separationseinrichtung 903 zum Entfernen von zumindest einem Abfallstück 1102A von zumindest einem Bogen 02 angeordnet ist. Die Separationseinrichtung 903 ist bevorzugt zum vollständigen Entfernen von Abfallstücken 1102A aus dem jeweiligen Bogen 02 ausgebildet. Die zumindest eine Separationseinrichtung 903 dient also insbesondere einer Separation der Reststücke 1102A, insbesondere der ehemaligen Teile des Bogens 02, die von dem Bogen 02 bereits ganz oder teilweise abgetrennt wurden und von dem Bogen 02 entfernt werden sollen, von Nutzen 1101, insbesondere denjenigen Teilen des Bogens 02, die weiterhin als Bogen 02 behandelt und gegebenenfalls weiter verarbeitet werden sollen. Die zumindest eine Separationseinrichtung 903 ist beispielsweise als Separationsaggregat 903 und/oder als Separationsmodul 903 ausgebildet. Alternativ ist die zumindest eine Separationseinrichtung 903 Bestandteil eines anderen Aggregats 900 oder Moduls 900, insbesondere des zumindest einen Formgebungsaggregats 900 oder Formgebungsmoduls 900.As an alternative or in addition, the sheet processing machine stands out 01 preferably in that along the for the transport of sheets 02 provided transport path after the at least one shaping point 909 the at least one separation device 903 for removing at least one scrap piece 1102A of at least one arch 02 is arranged. The separation device 903 is preferred to completely remove debris 1102A from the respective sheet 02 educated. The at least one separation device 903 thus serves in particular to separate the remaining pieces 1102A , especially the former parts of the arch 02 that from the arch 02 have already been completely or partially separated and from the arch 02 to be removed is of use 1101 , especially those parts of the arch 02 that continue as a bow 02 treated and, if necessary, processed further. The at least one separation device 903 is for example as a separation unit 903 and / or as a separation module 903 educated. Alternatively, there is at least one separation device 903 Part of another unit 900 or module 900 , in particular of the at least one shaping unit 900 or shaping module 900 .

Die zumindest eine Separationseinrichtung 903 weist bevorzugt zumindest ein als Separationstransportmittel 904 ausgebildetes Transportmittel 904 auf, insbesondere zum Transport von Bogen 02. Das zumindest eine Separationstransportmittel 904 dient bevorzugt dazu, jeweilige Bogen 02 entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs und/oder in der Transportrichtung T zu transportieren, während Abfallstücke 1102A von den jeweiligen Bogen 02 entfernt werden. Die Abfallstücke 1102A werden dabei bevorzugt in einer jeweiligen Richtung transportiert, die zumindest eine Komponente aufweist, die orthogonal zu der Transportrichtung T orientiert ist, bevorzugt entgegen einer vertikalen Richtung V, beispielsweise vertikal nach unten. Bevorzugt wird zumindest auch die Schwerkraft genutzt, um solche Abfallstücke 1102A von den jeweiligen Bogen 02 zu entfernen. So muss bevorzugt nur eine Kraft aufgebracht werden, die das jeweilige Abfallstück 1102A vom jeweiligen Bogen 02 trennt und durch die Schwerkraft wird dann das jeweilige Abfallstück 1102A in eine Richtung abgeführt, die zumindest eine Komponente aufweist, die orthogonal zu der Transportrichtung T orientiert ist, bevorzugt nach unten.The at least one separation device 903 preferably has at least one as a separation transport means 904 trained means of transport 904 on, especially for transporting sheets 02 . The at least one separation transport 904 serves preferably to the respective bow 02 along the for the transport of bow 02 intended transport route and / or in the transport direction T to transport while scrap pieces 1102A of the respective arch 02 removed. The scraps 1102A are preferably transported in a respective direction which has at least one component that is orthogonal to the transport direction T is oriented, preferably against a vertical direction V , for example vertically downwards. At least gravity is also preferably used to remove such waste pieces 1102A of the respective arch 02 to remove. So preferably only one force has to be applied that the respective piece of waste 1102A from the respective bow 02 separates and gravity then turns the respective piece of waste 1102A discharged in a direction which has at least one component that is orthogonal to the transport direction T is oriented, preferably downwards.

Bevorzugt ist längs des für den Transport von Bogen 02 vorgesehenen Transportwegs genau ein Separationstransportmittel 904 angeordnet. Alternativ sind längs des für den Transport von Bogen 02 vorgesehenen Transportwegs mehrere Separationstransportmittel 904 angeordnet, die beispielsweise unterschiedlich ausgebildet sind. Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass das zumindest eine Separationstransportmittel 904 sowohl von oben als auch von unten auf Bogen 02 einwirkend und/oder einzuwirken fähig ausgebildet ist. Dann können Bogen 02 trotz des Einwirkens der zumindest einen Separationseinrichtung 903 mit hinreichender Genauigkeit entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs transportiert werden. Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass das zumindest eine Separationstransportmittel 904 mehrere auf eine Querrichtung A bezogen beabstandet nebeneinander angeordnete obere Separationstransportriemen 907 und/oder mehrere auf eine Querrichtung A bezogen beabstandet nebeneinander angeordnete untere Separationstransportriemen 908 aufweist. Separationstransportriemen 907; 908 sind beispielsweise als endlose und/oder umlaufende Riemen ausgebildet, die weiter bevorzugt in der Querrichtung A eine relativ geringe Abmessung aufweisen, beispielsweise weniger als 5 cm, bevorzugt weniger als 2 cm und weiter bevorzugt weniger als 1 cm. Bevorzugt sind auf die Querrichtung A bezogen relativ große Abstände zwischen jeweiligen benachbarten Separationstransportriemen 907; 908, beispielsweise zumindest 2 cm, weiter bevorzugt zumindest 5 cm, noch weiter bevorzugt zumindest 10 cm und noch weiter bevorzugt zumindest 20 cm. Dadurch können Abfallstücke 1102A in eine Richtung mit zumindest einer Komponente, welche orthogonal zu der Transportrichtung T orientiert ist, bevorzugt in oder entgegen der vertikalen Richtung V, weiter bevorzugt nach unten und/oder nach oben, zwischen den Separationstransportriemen 907; 908 hindurch bewegt werden, insbesondere hindurchfallen.Is preferred along the for the transport of sheets 02 provided transport route exactly one separation transport 904 arranged. Alternatively, along the for the transport of sheets 02 provided transport route several separation transport means 904 arranged, for example, are designed differently. As an alternative or in addition, the sheet processing machine stands out 01 preferably in that the at least one separation transport means 904 both from above and below on arches 02 acting and / or capable of acting. Then you can bow 02 despite the action of the at least one separation device 903 with sufficient accuracy along the for the transport of sheets 02 intended transport route. As an alternative or in addition, the sheet processing machine stands out 01 preferably in that the at least one separation transport means 904 several in one transverse direction A. related spaced apart upper separation conveyor belts 907 and / or several in a transverse direction A. lower separation conveyor belts arranged at a distance from one another 908 having. Separation conveyor belt 907 ; 908 are designed, for example, as endless and / or circumferential belts, which are more preferably in the transverse direction A. have a relatively small dimension, for example less than 5 cm, preferably less than 2 cm and more preferably less than 1 cm. Preferred are the transverse direction A. related relatively large distances between respective adjacent separation conveyor belts 907 ; 908 , for example at least 2 cm, more preferably at least 5 cm, even more preferably at least 10 cm and even more preferably at least 20 cm. This can cause waste pieces 1102A in one direction with at least one component which is orthogonal to the transport direction T is oriented, preferably in or against the vertical direction V , more preferably downwards and / or upwards, between the separation conveyor belts 907 ; 908 be moved through, in particular fall through.

Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 beispielsweise dadurch aus, dass zumindest ein Walzenspalt als Separationstransportmittel 904 eingesetzt wird. Dann können Abfallstücke 1102A beispielsweise vor oder hinter dem jeweiligen Walzenspalt nach unten und/oder nach oben zwischen dem jeweiligen Walzenspalt und einem anderen Transportmittel hindurch bewegt werden, insbesondere hindurchfallen. Als solches weiteres Transportmittel kann beispielsweise zumindest ein weiterer Walzenspalt und/oder zumindest ein Separationstransportriemen 907; 908 angeordnet sein. Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass das zumindest eine Separationstransportmittel 904 von jeglichem Saugtransportmittel verschieden, also nicht als Saugtransportmittel ausgebildet ist.As an alternative or in addition, the sheet processing machine stands out 01 for example in that at least one roller gap as a separation transport means 904 is used. Then can waste pieces 1102A for example, in front of or behind the respective nip downward and / or upward between the respective nip and another transport means, in particular falling through. At least one further roller gap and / or at least one separation conveyor belt can be used as such a further transport means 907 ; 908 be arranged. As an alternative or in addition, the sheet processing machine stands out 01 preferably in that the at least one separation transport means 904 different from any suction transport means, i.e. not designed as a suction transport means.

Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass die zumindest Separationseinrichtung 903 als zumindest eine Rütteleinrichtung 903 ausgebildet ist und/oder dass die zumindest Separationseinrichtung 903 zumindest einen Rüttelantrieb 911 aufweist. Bevorzugt ist mittels des zumindest einen Rüttelantriebs 911 zumindest ein Separationstransportriemen 907; 908 orthogonal zu seiner lokalen Transferrichtung auslenkbar. Unter einer lokalen Transferrichtung ist dabei jeweils diejenige Richtung zu verstehen, in der ein jeweiliges Element des jeweiligen Separationstransportriemens 907; 908 auf Grund einer Umlaufbewegung des jeweiligen Separationstransportriemen 907; 908 beweget wird, insbesondere abgesehen von gegebenenfalls überlagerten Auslenkbewegungen. Der zumindest eine Rüttelantrieb 911 dient also bevorzugt dazu, den jeweiligen Bogen 02 zu rütteln, insbesondere durch Bewegungen in Richtungen orthogonal zu der Transportrichtung T. Solche Bewegungen sind beispielsweise nur mit geringer Auslenkung notwendig. Beispielsweise ist der zumindest eine Rüttelantrieb 911 auf das zumindest eine Separationstransportmittel 904 und/oder zumindest einen Separationstransportriemen 907; 908 direkt oder indirekt einwirkend und/oder einzuwirken fähig angeordnet, beispielsweise über zumindest eine Schlagwelle. Beispielsweise ist der zumindest eine Rüttelantrieb 911 auf zumindest ein Umlenkmittel und/oder zumindest ein Leitmittel zumindest eines Separationstransportriemens 907; 908 direkt oder indirekt einwirkend und/oder einzuwirken fähig angeordnet. Als Rüttelantrieb 911 ist beispielsweise zumindest ein elektrischer und/oder zumindest ein pneumatischer und/oder zumindest ein hydraulischer und/oder zumindest ein magnetischer Antrieb angeordnet. Alternativ oder zusätzlich weist die zumindest eine Separationseinrichtung 903 beispielsweise zumindest ein Separationsgebläse auf, das weiter bevorzugt dazu dient, Abfallstücke 1102A durch zumindest einen zumindest zeitweise aktivierten Gasstrom von den jeweiligen Bogen 02 zu entfernen.As an alternative or in addition, the sheet processing machine stands out 01 preferably in that the at least separation device 903 as at least one vibrating device 903 is formed and / or that the at least separation device 903 at least one vibration drive 911 having. The at least one vibrating drive is preferred 911 at least one separation conveyor belt 907 ; 908 deflectable orthogonally to its local transfer direction. A local transfer direction is to be understood in each case as that direction in which a respective element of the respective separation conveyor belt 907 ; 908 due to a revolving movement of the respective separation conveyor belt 907 ; 908 is moved, in particular apart from possibly superimposed deflection movements. The at least one vibration drive 911 is therefore preferably used for the respective bow 02 to shake, in particular by movements in directions orthogonal to the transport direction T . Such movements are only necessary with a slight deflection, for example. For example, there is at least one vibration drive 911 on the at least one separation transport means 904 and / or at least one separation conveyor belt 907 ; 908 arranged to act directly or indirectly and / or capable of acting, for example via at least one impact wave. For example, there is at least one vibration drive 911 to at least one deflection means and / or at least one guide means of at least one separation conveyor belt 907 ; 908 arranged to act directly or indirectly and / or able to act. As a vibration drive 911 For example, at least one electrical and / or at least one pneumatic and / or at least one hydraulic and / or at least one magnetic drive is arranged. Alternatively or additionally, the at least one separation device has 903 for example at least one separation fan, which is more preferably used to remove waste pieces 1102A by at least one at least temporarily activated gas flow from the respective sheets 02 to remove.

Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass das zumindest eine Separationstransportmittel 904 zumindest einen Transportantrieb 912 aufweist, mittels dem zumindest ein Bestandteil des zumindest einen Separationstransportmittels 904 umlaufend antreibbar ist, insbesondere in zumindest einer jeweiligen lokalen Transferrichtung. Der zumindest eine Transportantrieb 912 des zumindest einen Separationstransportmittels 904 und insbesondere dessen Antriebsregler ist bevorzugt mit der Maschinensteuerung der Bearbeitungsmaschine 01 und/oder mit der elektronischen Leitachse verbunden, insbesondere über das BUSSystem.As an alternative or in addition, the sheet processing machine stands out 01 preferably in that the at least one separation transport means 904 at least one transport drive 912 has, by means of which at least one component of the at least one separation transport means 904 Can be driven circumferentially, in particular in at least one respective local transfer direction. The at least one transport drive 912 of the at least one separation transport means 904 and in particular its drive controller is preferred with the machine control of the processing machine 01 and / or connected to the electronic master axis, in particular via the BUS system.

Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass die zumindest Separationseinrichtung 903 zumindest eine Auffangeinrichtung 917; 918 für Abfallstücke 1102A aufweist, welche bevorzugt in zumindest einer vertikal verschobenen Ebene parallel zu einer Transportebene angeordnet ist, welche weiter bevorzugt unterhalb des für den Transport von Bogen 02 vorgesehenen Transportwegs angeordnet ist. Die Auffangeinrichtung 917 ist beispielsweise als angetriebene Abfuhrvorrichtung 917, beispielsweise als Transportband, ausgebildet. Die Auffangeinrichtung 918 ist beispielsweise als Behälter 918 und/oder als Zerkleinerungseinrichtung 918 ausgebildet. Bevorzugt weist die Formgebungseinrichtung 900 zumindest einen Teil der zumindest einen Auffangeinrichtung 917; 918, insbesondere der Abfuhrvorrichtung 917, auf. Beispielsweise sind in der Auffangeinrichtung 917; 918 befindliche Abfallstücke 1102A einer Wiederaufbereitungseinrichtung und/oder Weiterverarbeitungseinrichtung zuführbar ausgebildet, welche beispielsweise zu der Erzeugung weiterer Bogen 02 ausgebildet ist.As an alternative or in addition, the sheet processing machine stands out 01 preferably in that the at least separation device 903 at least one collection facility 917 ; 918 For Waste pieces 1102A has, which is preferably arranged in at least one vertically displaced plane parallel to a transport plane, which is more preferably below that for the transport of sheets 02 provided transport route is arranged. The reception facility 917 is for example as a powered discharge device 917 , for example as a conveyor belt. The reception facility 918 is for example as a container 918 and / or as a shredding device 918 educated. The shaping device preferably has 900 at least part of the at least one collecting device 917 ; 918 , especially the discharge device 917 , on. For example, are in the collection facility 917 ; 918 waste pieces located 1102A designed to be fed to a reprocessing device and / or further processing device, which, for example, can be used to generate further sheets 02 is trained.

Ein Bogen 02, welcher auf dem Transportweg in Transportrichtung T nach der zumindest einen Formgebungsstelle 909 und nach der zumindest einen Separationseinrichtung 903 angeordnet ist, weist bevorzugt zumindest ein Nutzen 1101, bevorzugt zumindest zwei Nutzen 1101, und zumindest eine Bogenöffnung 1102L, bevorzugt zumindest zwei Bogenöffnungen 1102L, auf. Bevorzugt weist der zumindest eine Nutzen 1101 des jeweiligen Bogens 02 jeweils mindestens ein Druckbild auf. Bevorzugt weist der Bogen 02 mindestens zwei Nutzen 1101 mit jeweils mindestens einem Druckbild auf. Bevorzugt weisen die mindestens zwei Nutzen 1101 des einen jeweiligen Bogens 02 jeweils zumindest ein bevorzugt identisches Druckbild auf.A bow 02 , which on the transport route in the transport direction T after the at least one shaping point 909 and after the at least one separation device 903 is arranged, preferably has at least one benefit 1101 , preferably at least two uses 1101 , and at least one arch opening 1102L , preferably at least two arch openings 1102L , on. The at least one preferably has benefits 1101 of the respective arch 02 at least one print image each. The bow preferably has 02 at least two benefits 1101 each with at least one print image. The at least two benefits preferably have 1101 of the respective arch 02 in each case at least one preferably identical print image.

Bevorzugt weist ein Bogen 02, welcher auf dem Transportweg in Transportrichtung T nach der zumindest einen Formgebungsstelle 909 und nach der zumindest einen Separationseinrichtung 903 angeordnet ist und zusätzlich oder alternativ nach Durchlaufen der Bogenbearbeitungsmaschine 01 außerhalb der Bogenbearbeitungsmaschine 01 angeordnet ist, mindestens einen Nutzen 1101, bevorzugt mindestens zwei Nutzen 1101, auf, wobei mindestens ein Reststück 1102A, bevorzugt mindestens zwei Reststücke 1102A, von dem Bogen 02 entfernt worden sind. Beispielsweise weist der Bogen 02 zusätzlich zumindest einen Stanzeindruck 1103, bevorzugt zumindest zwei Stanzeindrücke 1103, auf, insbesondere einen als Rille und/oder Riefe und/oder Prägung ausgebildeten Stanzeindruck 1103. Vorzugsweise weist der Bogen 02 in Transportrichtung T nach der Separationseinrichtung 903 oder nach Durchlaufen der Bogenbearbeitungsmaschine 01 keine Reststücke 1102A auf. Voneinander verschiedene Nutzen 1101 sind innerhalb eines Bogens 02 beispielsweise durch zumindest einen Stanzeindruck 1103, beispielsweise eine Perforierung und/oder einen zumindest teilweisen Schnitt und/oder eine Rille, voneinander trennbar ausgebildet und/oder getrennt ausgebildet.Preferably has a bow 02 , which on the transport route in the transport direction T after the at least one shaping point 909 and after the at least one separation device 903 is arranged and additionally or alternatively after passing through the sheet processing machine 01 outside of the sheet processing machine 01 is arranged, at least one benefit 1101 , preferably at least two uses 1101 , on, with at least one remnant 1102A , preferably at least two remnants 1102A , from the arch 02 have been removed. For example, the bow 02 additionally at least one punched impression 1103 , preferably at least two punch impressions 1103 , on, in particular a stamped impression formed as a groove and / or groove and / or embossing 1103 . Preferably the bow 02 in transport direction T after the separation device 903 or after passing through the sheet processing machine 01 no leftover pieces 1102A on. Different benefits 1101 are within an arc 02 for example by at least one punching impression 1103 , for example a perforation and / or an at least partial cut and / or a groove, formed separable from one another and / or formed separately.

Vorzugsweise weist ein Bogen 02 in Transportrichtung T nach der Separationseinrichtung 903 keine Abfallstücke 1102A auf. Bevorzugt weist ein Bogen 02 in Transportrichtung T nach der Separationseinrichtung 903 an jenen Positionen der Abfallstücke 1102A jeweils eine Bogenöffnung 1102L und/oder Bogenlücke 1102L auf, deren Abmessung und/oder deren Kontur der Abmessung und/oder Kontur des jeweiligen entfernten Abfallstücks 1102A entspricht. In einer alternativen oder zusätzlichen Ausführung entspricht beispielsweise die Abmessung und/oder Kontur einer Bogenöffnung 1102L der Abmessung und/oder Kontur von mehreren aneinander angrenzenden Abfallstücken 1102A. Bevorzugt entspricht die verbliebene Kontur des Bogens 02, insbesondere die verbliebene Kontur des mindestens einen Nutzens 1101, der Kontur des mindestens einen vor der Inspektionseinrichtung 916 entfernten Reststücks 1102A und/oder einer zusammengesetzten Kontur von mindestens zwei vor der Inspektionseinrichtung 916 entfernten Reststücken 1102A.Preferably has an arch 02 in transport direction T after the separation device 903 no scraps 1102A on. Preferably has a bow 02 in transport direction T after the separation device 903 at those positions of the scrap pieces 1102A one arch opening each 1102L and / or arc gap 1102L on, the dimension and / or the contour of the dimension and / or contour of the respective removed piece of waste 1102A corresponds. In an alternative or additional embodiment, for example, the dimension and / or contour corresponds to an arched opening 1102L the dimension and / or contour of several adjacent pieces of waste 1102A . The remaining contour preferably corresponds to the arch 02 , in particular the remaining contour of the at least one panel 1101 , the contour of the at least one in front of the inspection device 916 removed remnant 1102A and / or a composite contour of at least two in front of the inspection device 916 removed remnants 1102A .

Im Vorangegangenen und im Folgenden bezeichnet Bogenöffnung 1102L bevorzugt in einem Ist-Zustand des betreffenden Bogens 02 vorzugsweise einen Bereich von Bogen 02, an welchem nach dem zumindest einen Bearbeitungsvorgang in der Formgebungseinrichtung 900 und zusätzlich oder alternativ nach dem zumindest einen Bearbeitungsvorgang in der Separationseinrichtung 903 der betreffende Bogen 02 vorzugsweise keine Masse, bevorzugt eine Lücke, aufweist. Beispielsweise ist die Bogenöffnung als Bogenlücke 1102L ausgebildet. Bevorzugt ist einer jeweiligen Bogenöffnung 1102L zumindest ein Abfallstück 1102A des betreffenden Bogens 02 zuordenbar und/oder zugeordnet. Bevorzugt ist eine Bogenöffnung 1102L jener Bereich eines Bogens 02, aus welchem zumindest ein Abfallstück 1102A entfernt worden ist und/oder in welchem der Bogen 02 an Masse verloren hat und/oder keine verbliebene Masse aufweist verglichen mit einem Zeitpunkt vor dem zumindest einen Bearbeitungsvorgang in der Formgebungseinrichtung 900 und zusätzlich oder alternativ vor dem zumindest einen Bearbeitungsvorgang in der Separationseinrichtung 903. Bevorzugt sind zwei sich gegenüberliegende Begrenzungen der jeweiligen Bogenöffnung 1102L, insbesondere zwei sich gegenüberliegende Kanten des jeweiligen Bogens 02 zur Begrenzung der betreffenden Bogenöffnung 1102L, mit einem Abstand größer null, bevorzugt größer 5 mm (fünf Millimeter), weiter bevorzugt größer 10 mm, weiter bevorzugt größer 20 mm, weiter bevorzugt größer 30 mm, voneinander beabstandet. Beispielsweise ist die zumindest eine betreffende Bogenöffnung 1102L in dem gewünschten oder geforderten Endprodukt, welches durch den jeweiligen Nutzen 1101 oder dessen Weiterverarbeitung erzeugt wurde, als Handgriff ausgebildet.In the foregoing and in the following, denotes arch opening 1102L preferably in an actual state of the sheet in question 02 preferably a range of arches 02 on which after the at least one machining process in the shaping device 900 and additionally or alternatively after the at least one processing operation in the separation device 903 the bow in question 02 preferably no mass, preferably a gap. For example, the arch opening is an arch gap 1102L educated. A respective arch opening is preferred 1102L at least one scrap piece 1102A of the arch in question 02 assignable and / or assigned. An arch opening is preferred 1102L that area of an arch 02 , from which at least one piece of waste 1102A has been removed and / or in which the arch 02 has lost mass and / or has no remaining mass compared to a point in time before the at least one processing operation in the shaping device 900 and additionally or alternatively before the at least one processing operation in the separation device 903 . Two opposing boundaries of the respective arch opening are preferred 1102L , in particular two opposite edges of the respective sheet 02 to limit the relevant arch opening 1102L , at a distance greater than zero, preferably greater than 5 mm (five millimeters), more preferably greater than 10 mm, more preferably greater than 20 mm, further preferably greater than 30 mm, spaced from one another. For example, the at least one relevant arch opening is 1102L in the desired or required end product, which by the respective benefits 1101 or whose further processing was produced, designed as a handle.

Insbesondere werden im Vorangegangenen und im Folgenden mit dem Begriff des Bogens 02 sowohl solche Bogen 02 bezeichnet, die noch nicht mittels der zumindest einen Formgebungseinrichtung 900 bearbeitet wurden, als auch solche Bogen 02, die bereits mittels der zumindest einen Formgebungseinrichtung 900 und/oder mittels der zumindest einen Separationseinrichtung 903 bearbeitet wurden und dabei gegebenenfalls in ihrer Form und/oder ihrer Masse verändert wurden.In the foregoing and in the following, the term arc 02 both such arch 02 referred to, which not yet by means of the at least one shaping device 900 edited, as well as such arches 02 , which already by means of the at least one shaping device 900 and / or by means of the at least one separation device 903 have been edited and possibly changed in their shape and / or their mass.

Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs zumindest ein als Selektivtransportmittel 09; 906 ausgebildetes Transportmittel 09; 906 angeordnet ist, insbesondere entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs nach dem zumindest einen Separationstransportmittel 904. Das zumindest eine als Selektivtransportmittel 09; 906 ausgebildetes Transportmittel 09; 906 ist bevorzugt entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs an das zumindest eine Separationstransportmittel 904 anschließend angeordnet, insbesondere direkt an das zumindest eine Separationstransportmittel 904 anschließend. Unter einem Selektivtransportmittel 09; 906 ist dabei insbesondere ein Transportmittel 09; 906 zu verstehen, das nur ausgewählte Objekte transportiert und/oder zu transportieren fähig ausgebildet ist, beispielsweise ausschließlich Bogen 02 und/oder keine Reststücke 1102A. Als Unterscheidungskriterium dient beispielsweise zumindest eine Lage und/oder zumindest eine Abmessung des jeweiligen Objekts, insbesondere bezüglich der Querrichtung A. Bevorzugt ist das zumindest ein als Selektivtransportmittel 09; 906 als zumindest ein oberes Saugtransportmittel 09; 906 für einen hängenden Transport von Bogen 02 ausgebildet, weiter bevorzugt als zumindest ein ausschließlich oberes Saugtransportmittel 09; 906 und/oder für einen ausschließlich hängenden Transport von Bogen 02. Dann können etwaige Reststücke 1102A auch nach dem zumindest einen Separationstransportmittel 904 noch entgegen der vertikalen Richtung V, bevorzugt nach unten, weg fallen und sich von den Bogen 02 entfernen, ohne nachfolgende Prozesse zu stören.As an alternative or in addition, the sheet processing machine stands out 01 preferably in that along the for the transport of sheets 02 provided transport route at least one as a selective transport means 09 ; 906 trained means of transport 09 ; 906 is arranged, in particular along the for the transport of sheets 02 provided transport path after the at least one separation transport means 904 . At least one as a selective means of transport 09 ; 906 trained means of transport 09 ; 906 is preferred along the for the transport of sheets 02 provided transport path to the at least one separation transport means 904 subsequently arranged, in particular directly on the at least one separation transport means 904 subsequently. Under a selective means of transport 09 ; 906 is in particular a means of transport 09 ; 906 to understand that only selected objects are transported and / or designed to be able to transport, for example exclusively sheets 02 and / or no remnants 1102A . For example, at least one position and / or at least one dimension of the respective object, in particular with regard to the transverse direction, serves as a differentiation criterion A. . This is preferably at least one as a selective transport medium 09 ; 906 as at least one upper suction transport means 09 ; 906 for hanging bows 02 formed, more preferably as at least one exclusively upper suction transport means 09 ; 906 and / or for an exclusively hanging transport of sheets 02 . Any remaining pieces can then be used 1102A also after the at least one separation transport means 904 still against the vertical direction V , preferably down, fall away and get off the arch 02 without disrupting subsequent processes.

Bevorzugt zeichnet sich die Bogenbearbeitungsmaschine 01 dadurch aus, dass die Bogenbearbeitungsmaschine 01 entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs in Transportrichtung T nach der Separationseinrichtung 903 zumindest ein Transportmittel 09; 906, insbesondere ein oberes Saugtransportmittel 09; 906, aufweist, das für den hängenden Transport von Bogen 02, bevorzugt für den hängenden Transport des zumindest einen verbliebenen und von der Formgebungseinrichtung 900 bearbeiteten Teils des zumindest einen Bogens 02 mit dem mindestens einen Nutzen 1101, ausgebildet ist.The sheet processing machine is preferred 01 characterized in that the sheet processing machine 01 along the for the transport of bow 02 intended transport route in transport direction T after the separation device 903 at least one means of transport 09 ; 906 , particularly an upper suction transport 09 ; 906 , has, that for the hanging transport of sheets 02 , preferably for the hanging transport of the at least one remaining and from the shaping device 900 machined part of the at least one sheet 02 with at least one benefit 1101 , is trained.

Die Bogenbearbeitungsmaschine 01 zeichnet sich bevorzugt dadurch aus, dass entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs zumindest eine Inspektionseinrichtung 916 zu einer zumindest teilweisen Inspektion von Bogen 02, bevorzugt zu einer zumindest teilweisen Inspektion zumindest eines verbliebenen und von der Formgebungseinrichtung 900 bearbeiteten Teils des zumindest einen Bogens 02 mit mindestens einem Nutzen 1101, bevorzugt mindestens zwei Nutzen 1101, angeordnet ist.The sheet processing machine 01 is preferably characterized in that along the for the transport of sheets 02 provided transport path at least one inspection device 916 to an at least partial inspection of sheets 02 , preferably for an at least partial inspection of at least one remaining and of the shaping device 900 machined part of the at least one sheet 02 with at least one benefit 1101 , preferably at least two uses 1101 , is arranged.

Bevorzugt ist die Inspektionseinrichtung 916 zur zumindest teilweisen Inspektion der Kontur von mindestens einem auf dem Transportweg vor der Inspektionseinrichtung 916 entfernten Reststücks 1102A an dem verbliebenen Bogen 02, insbesondere an dem mindestens einen Nutzen 1101 und/oder der mindestens einen Bogenöffnung 1102L, ermittelnd ausgebildet. Bevorzugt ergibt sich die Kontur des verbliebenen Bogens 02 auf dem Transportweg nach der Separationseinrichtung 903, oder beispielsweise nachdem der Bogen 02 die Bogenbearbeitungsmaschine 01 durchlaufen hat, infolge der Entfernung des mindestens einen Reststücks 1102A von dem betreffenden Bogen 02.The inspection device is preferred 916 for at least partial inspection of the contour of at least one on the transport route in front of the inspection device 916 removed remnant 1102A on the remaining arch 02 , especially the at least one benefit 1101 and / or the at least one arch opening 1102L , educated to determine. The contour of the remaining arc is preferably obtained 02 on the transport route after the separation device 903 , or for example after the arch 02 the sheet processing machine 01 has passed through, as a result of the removal of the at least one remaining piece 1102A of the bow in question 02 .

Bevorzugt umfasst die Bogenbearbeitungsmaschine 01 mit einer Formgebungseinrichtung 900 zur Bearbeitung von Bogen 02 vorzugsweise die zumindest eine Separationseinrichtung 903 und die zumindest eine Auslage 1000, wobei die Separationseinrichtung 903 zum Entfernen von zumindest einem Reststück 1102A von dem zumindest einen Bogen 02 ausgebildet ist. Vorzugsweise ist in Transportrichtung T der Bogen 02 nach der zumindest einen Separationseinrichtung 903 die zumindest eine Inspektionseinrichtung 916 zu der zumindest teilweisen Inspektion zumindest eines verbliebenen und von der Formgebungseinrichtung 900 bearbeiteten Teils des zumindest einen Bogens 02 mit dem mindestens einen Nutzen 1101 angeordnet.The sheet processing machine preferably comprises 01 with a shaping device 900 for processing sheets 02 preferably the at least one separation device 903 and the at least one display 1000 , wherein the separation device 903 for removing at least one leftover piece 1102A of at least one bow 02 is trained. Preferably is in the direction of transport T the arc 02 after the at least one separation device 903 the at least one inspection facility 916 for the at least partial inspection of at least one remaining and of the shaping device 900 machined part of the at least one sheet 02 with at least one benefit 1101 arranged.

Bevorzugt wird eine Vorrichtung zur Inspektion zumindest eines Bogens 02. Bevorzugt weist der jeweilige Bogen 02 zumindest einen Nutzen 1101 mit mindestens einem Druckbild und mindestens eine Bogenöffnung 1102L auf. Bevorzugt weist der jeweilige Bogen 02 zumindest einen Nutzen 1101 und mindestens eine Bogenöffnung 1102L auf, wobei der jeweilige Bogen 02 aus Papier oder Pappe oder Karton gebildet ist. Bevorzugt ist die Inspektionseinrichtung 916 die mindestens eine Bogenöffnung 1102L zumindest teilweise erfassend ausgebildet. Bevorzugt ist die Inspektionseinrichtung 916, bevorzugt das Auswertemittel, zumindest die mindestens eine Bogenöffnung 1102L mit einer Referenz der mindestens einen Bogenöffnung 1102L vergleichend ausgebildet.A device for inspecting at least one sheet is preferred 02 . The respective arch preferably has 02 at least one benefit 1101 with at least one print image and at least one arch opening 1102L on. The respective arch preferably has 02 at least one benefit 1101 and at least one arch opening 1102L on, with the respective arch 02 is formed from paper or cardboard or cardboard. The inspection device is preferred 916 the at least one arch opening 1102L at least partially designed to capture. The inspection device is preferred 916 , prefers that Evaluation means, at least the at least one arch opening 1102L with a reference of the at least one arch opening 1102L comparatively trained.

Bevorzugt enthält die Referenz der mindestens einen Bogenöffnung 1102L zumindest einen Teil der Informationen, bevorzugt sämtliche Informationen, welche zu einer eindeutigen Bestimmung eines geforderten Soll-Zustandes der betreffenden Bogenöffnung 1102L notwendig sind. Bevorzugt ist die Referenz der mindestens einen Bogenöffnung 1102L als digitale und/oder angelernte Referenz ausgebildet. Die digitale Referenz ist bevorzugt als digitale Bildvorlage ausgebildet. Vorzugsweise weist die digitale Referenz ein pdf- oder tif- oder jpg-Dateiformat auf. Die angelernte Referenz ist bevorzugt ein Bogen 02, welcher als Musterbogen ausgebildet ist und mindestens eine Bogenöffnung 1102L aufweist, die der zu inspizierenden Bogenöffnung 1102L entspricht, und/oder beispielsweise durch die Inspektionseinrichtung 916 erfasst und/oder in dem Auswertemittel als Vergleichsgrundlage hinterlegt ist.The reference preferably contains the at least one arch opening 1102L at least some of the information, preferably all of the information necessary for a clear determination of a required target state of the relevant arch opening 1102L are necessary. The reference of the at least one arch opening is preferred 1102L designed as a digital and / or learned reference. The digital reference is preferably designed as a digital image template. The digital reference preferably has a pdf or tif or jpg file format. The learned reference is preferably a bow 02 , which is designed as a sample arch and at least one arch opening 1102L having that of the arch opening to be inspected 1102L corresponds, and / or for example by the inspection device 916 recorded and / or stored in the evaluation means as a basis for comparison.

Bevorzugt umfasst die Inspektionseinrichtung 916 mindestens eine Bilderfassungseinrichtung, bevorzugt mindestens eine optische Bilderfassungseinrichtung. Bevorzugt ist die mindestens eine Bilderfassungseinrichtung als Kamera, weiter bevorzugt als Farbkamera, weiter bevorzugt als Zeilenkamera, weiter bevorzugt als CMOS-Sensor und/oder CCD-Sensor, ausgebildet. Beispielsweise umfasst die Inspektionseinrichtung 916 zusätzlich zu der mindestens einen Bilderfassungseinrichtung zumindest eine Lichtquelle, beispielsweise eine LED-Lichtquelle. Vorzugsweise umfasst die Inspektionseinrichtung 916 zumindest eine Optik, welche bevorzugt zwischen der zumindest einen Bilderfassungseinrichtung und dem für den Transport von Bogen 02 vorgesehenen Transportweg angeordnet ist. Bevorzugt ist die Inspektionseinrichtung 916, insbesondere die zumindest eine Bilderfassungseinrichtung, zum Erfassen zumindest eines Teils der Arbeitsbreite, weiter bevorzugt der gesamten Arbeitsbreite, der Bogenbearbeitungsmaschine 01 ausgebildet. Beispielsweise erfasst eine Bilderfassungseinrichtung lediglich einen Teil der Arbeitsbreite, vorzugsweise umfasst die Inspektionseinrichtung 916 in diesem Fall mindestens zwei Bilderfassungseinrichtungen, welche jeweils zumindest teilweise voneinander verschiedene Bereiche der Arbeitsbreite erfassend ausgebildet sind. Bevorzugt sind die mindestens zwei Bilderfassungseinrichtungen der Inspektionseinrichtung 916 im Falle ihrer Anwesenheit in Transportrichtung T nebeneinander und/oder in Querrichtung A hintereinander angeordnet.The inspection device preferably comprises 916 at least one image acquisition device, preferably at least one optical image acquisition device. The at least one image capture device is preferably designed as a camera, more preferably as a color camera, more preferably as a line camera, more preferably as a CMOS sensor and / or CCD sensor. For example, the inspection device comprises 916 in addition to the at least one image acquisition device, at least one light source, for example an LED light source. The inspection device preferably comprises 916 at least one optic, which is preferably located between the at least one image capturing device and the one for transporting sheets 02 provided transport route is arranged. The inspection device is preferred 916 , in particular the at least one image acquisition device, for acquiring at least part of the working width, more preferably the entire working width, of the sheet processing machine 01 educated. For example, an image capturing device captures only part of the working width; the inspection device preferably comprises 916 in this case at least two image capturing devices which are each designed to capture at least partially different areas of the working width. The at least two image capturing devices of the inspection device are preferred 916 in the case of their presence in the direction of transport T side by side and / or in the transverse direction A. arranged one behind the other.

In einer bevorzugten Ausführung ist die Inspektionseinrichtung 916 in Transportrichtung T direkt im Anschluss an die Separationseinrichtung 903 angeordnet. Vorzugsweise ist die Inspektionseinrichtung 916 in Transportrichtung T direkt im Anschluss an die Separationseinrichtung 903 ohne jegliche mögliche weitere Bearbeitungseinrichtung dazwischen und/oder ohne jegliche mögliche weitere Bearbeitungsstufe, wie beispielsweise Kleben eines Nutzens 1101 und/oder Trennen einzelner Nutzen 1101 voneinander, dazwischen angeordnet. Weiter bevorzugt ist die Inspektionseinrichtung 916 vor jeglicher möglichen weiteren Bearbeitungseinrichtung, beispielsweise einer Klebeeinrichtung und/oder einer Nutzentrenneinrichtung, zu einer möglichen weiteren Bearbeitung des zumindest einen Bogens 02 direkt im Anschluss an die Separationseinrichtung 903 angeordnet. Vorzugsweise ist die Inspektionseinrichtung 916 in Transportrichtung T vor der Auslage 1000 und nach der Separationseinrichtung 903 angeordnet.In a preferred embodiment, the inspection device 916 in transport direction T directly after the separation device 903 arranged. The inspection device is preferably 916 in transport direction T directly after the separation device 903 without any possible further processing device in between and / or without any possible further processing stage, such as for example gluing a panel 1101 and / or separation of individual benefits 1101 from each other, arranged in between. The inspection device is also preferred 916 before any possible further processing device, for example a gluing device and / or a blanking device, for a possible further processing of the at least one sheet 02 directly after the separation device 903 arranged. The inspection device is preferably 916 in transport direction T in front of the display 1000 and after the separation device 903 arranged.

Zusätzlich oder alternativ zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass die zumindest eine Inspektionseinrichtung 916 vorzugsweise orthogonal zu dem für den Transport von Bogen 02 vorgesehenen Transportweg des zumindest einen Bogens 02 angeordnet und auf den Transportweg des zumindest einen Bogens 02 gerichtet ist. Vorzugsweise ist die zumindest eine Inspektionseinrichtung 916 orthogonal zu der Transportebene des zumindest einen Bogens 02 angeordnet und auf die Transportebene des zumindest einen Bogens 02 gerichtet. Die Transportebene bezeichnet im Vorangegangenen und im Folgenden vorzugsweise eine Ebene des Transportweges, welche durch die Transportrichtung T und die Querrichtung A aufgespannt ist, insbesondere an der Position entlang des Transportweges, auf welche Bezug genommen wird. Bevorzugt ist die Inspektionseinrichtung 916 außerhalb des Transportweges angeordnet und auf den Transportweg und/oder die Transportebene gerichtet. Bevorzugt ist die Inspektionseinrichtung 916 lotrecht auf den Transportweg und/oder die Transportebene gerichtet. Vorzugsweise ist die Inspektionseinrichtung 916 in vertikaler Richtung V vor und/oder nach dem Transportweg angeordnet. Bevorzugt ist die Inspektionseinrichtung 916 den Bogen 02 von der Seite der Hauptfläche des Bogens 02 inspizierend ausgebildet, auf welcher das zumindest eine Druckbild auf den Bogen 02 aufgebracht ist.Additionally or alternatively, the sheet processing machine stands out 01 preferably in that the at least one inspection device 916 preferably orthogonal to that for the transport of sheets 02 provided transport path of the at least one sheet 02 arranged and on the transport path of the at least one sheet 02 is directed. The at least one inspection device is preferably 916 orthogonal to the transport plane of the at least one sheet 02 arranged and on the transport plane of the at least one sheet 02 directed. In the foregoing and in the following, the transport plane preferably denotes a plane of the transport path which passes through the transport direction T and the transverse direction A. is stretched, in particular at the position along the transport path to which reference is made. The inspection device is preferred 916 arranged outside the transport route and directed to the transport route and / or the transport plane. The inspection device is preferred 916 directed perpendicular to the transport route and / or the transport plane. The inspection device is preferably 916 in the vertical direction V arranged before and / or after the transport route. The inspection device is preferred 916 the bow 02 from the side of the main face of the arch 02 designed to inspect on which the at least one print image on the sheet 02 is upset.

Beispielsweise bei einer liegenden Führung von Bogen 02 ist die Inspektionseinrichtung 916 bevorzugt oberhalb des Transportweges und/oder der Transportebene, insbesondere in vertikaler Richtung V nach dem Transportweg und/oder der Transportebene, angeordnet. Somit kann die Inspektionseinrichtung 916 den Bogen 02 von oben inspizieren. Bei der liegenden Führung von Bogen 02 ist das zumindest eine Druckbild bevorzugt auf der Hauptfläche des Bogens 02 nach oben zeigend angeordnet. Somit kann die Inspektionseinrichtung 916 in dieser Ausführung ebenfalls das zumindest eine Druckbild des Bogens 02 inspizieren.For example, with a horizontal guide of sheets 02 is the inspection facility 916 preferably above the transport path and / or the transport plane, in particular in the vertical direction V after the transport route and / or the transport level, arranged. Thus, the inspection device 916 the bow 02 inspect from above. In the horizontal guidance of arches 02 the at least one print image is preferably on the main surface of the sheet 02 arranged pointing upwards. Thus, the inspection device 916 in this Execution also the at least one print image of the sheet 02 inspect.

Vorzugsweise bei einer hängenden Führung von Bogen 02 ist die Inspektionseinrichtung 916 bevorzugt unterhalb des Transportweges und/oder der Transportebene, insbesondere in vertikaler Richtung V vor dem Transportweg und/oder vor der Transportebene, angeordnet. Somit ist die Inspektionseinrichtung 916 den Bogen 02 bevorzugt von unten inspizierend ausgebildet. Bei der hängenden Führung von Bogen 02 ist das zumindest eine Druckbild bevorzugt auf der Hauptfläche des Bogens 02 nach unten zeigend angeordnet. Somit ist die Inspektionseinrichtung 916 zumindest in dieser Ausführung bevorzugt zusätzlich oder alternativ das zumindest eine Druckbild des Bogens 02 von unten inspizierend ausgebildet, bevorzugt in vertikaler Richtung V von vor dem Transportweg und/oder von vor der Transportebene inspizierend ausgebildet.Preferably with a hanging guide of arches 02 is the inspection facility 916 preferably below the transport path and / or the transport plane, in particular in the vertical direction V in front of the transport route and / or in front of the transport level. Thus, the inspection facility 916 the bow 02 preferably designed to inspect from below. When hanging arches 02 the at least one print image is preferably on the main surface of the sheet 02 arranged pointing downwards. Thus, the inspection facility 916 at least in this embodiment, the at least one print image of the sheet preferably additionally or alternatively 02 Designed to inspect from below, preferably in the vertical direction V designed to inspect from in front of the transport route and / or from in front of the transport plane.

Zusätzlich oder alternativ ist vorzugsweise die Inspektionseinrichtung 916 zu der Inspektion des zumindest einen verbliebenen und von der Formgebungseinrichtung 900 bearbeiteten Teils des zumindest einen Bogens 02 während zumindest eines Formgebungsprozesses zumindest eines weiteren Bogens 02 ausgebildet. Somit ist die Inspektionseinrichtung 916 vorzugsweise jeweils jeden Bogen 02 erfassend ausgebildet, bevorzugt jeweils jeden Bogen 02 einzeln erfassend ausgebildet, welcher auf dem Transportweg in Transportrichtung T die Inspektionseinrichtung 916 passiert. Beispielsweise werden bereits weitere Bogen 02 in zumindest einem Formgebungsprozess der mindestens einen Formgebungseinrichtung 900 bearbeitet und/oder durchlaufen zumindest ein in Transportrichtung T vor der Inspektionseinrichtung 916 angeordnetes Aggregat 100; 300; 600; 700; 900 der Bogenbearbeitungsmaschine 01, während ein Bogen 02 durch die Inspektionseinrichtung 916 erfasst wird.In addition or as an alternative, the inspection device is preferred 916 for the inspection of the at least one remaining and of the shaping device 900 machined part of the at least one sheet 02 during at least one shaping process of at least one further sheet 02 educated. Thus, the inspection facility 916 preferably each sheet 02 designed to detect, preferably each sheet 02 individually designed to detect which on the transport route in the transport direction T the inspection facility 916 happens. For example, there are already more sheets 02 in at least one shaping process of the at least one shaping device 900 processed and / or run through at least one in the transport direction T in front of the inspection facility 916 arranged aggregate 100 ; 300 ; 600 ; 700 ; 900 the sheet processing machine 01 while an arch 02 through the inspection facility 916 is captured.

In einer bevorzugten Ausführung ist die Inspektionseinrichtung 916, insbesondere die Bilderfassungseinrichtung der Inspektionseinrichtung 916, zumindest zum zumindest teilweisen Erfassen zumindest einer Bogenöffnung 1102L, beispielsweise zumindest einer Bogenlücke 1102L, des zumindest einen Bogens 02 und/oder zumindest einer inneren Kontur des zumindest einen Bogens 02, bevorzugt festgelegt durch zumindest eine Bogenöffnung 1102L, und/oder zumindest einer äußeren Kontur des zumindest einen Bogens 02, bevorzugt festgelegt durch zumindest eine Außenkante des jeweiligen Bogens 02, ausgebildet. Alternativ ist die Inspektionseinrichtung 916, insbesondere die Bilderfassungseinrichtung der Inspektionseinrichtung 916, bevorzugt zumindest zum zumindest teilweisen Erfassen des zumindest einen Nutzens 1101 und/oder der Kontur, insbesondere dem Umriss, des jeweiligen Nutzens 1101 ausgebildet. Die Kontur eines Bogens 02 beschreibt im Vorangegangenen und im Folgenden vorzugsweise die Form des jeweiligen Bogens 02, insbesondere einen äußeren und/oder inneren Umriss des mindestens einen Nutzens 1101 des jeweiligen Bogens 02. Bevorzugt ist die äußere Kontur des Bogens 02 durch zumindest eine Außenkante des Bogens 02, insbesondere durch zumindest eine Außenkante des mindestens einen Nutzens 1101, festgelegt. Bevorzugt ist die innere Kontur des Bogens 02 durch zumindest eine Bogenöffnung 1102L und/oder Bogenlücke 1102L, bevorzugt innerhalb der äußeren Kontur des jeweiligen Bogens 02, weiter bevorzugt innerhalb der Hauptfläche im Bereich des zumindest einen Nutzens 1101 des jeweiligen Bogens 02, festgelegt. Die Inspektionseinrichtung 916, insbesondere die Bilderfassungseinrichtung der Inspektionseinrichtung 916, ist bevorzugt zum zumindest teilweisen Erfassen der Hauptfläche von Bogen 02 ausgebildet. Bevorzugt ist die Inspektionseinrichtung 916, insbesondere die Bilderfassungseinrichtung der Inspektionseinrichtung 916, zum zumindest teilweisen Erfassen des Bereichs des mindestens einen Reststücks 1102A und/oder der mindestens einen Bogenöffnung 1102L von Bogen 02 ausgebildet.In a preferred embodiment, the inspection device 916 , in particular the image capture device of the inspection device 916 , at least for at least partially detecting at least one arch opening 1102L , for example at least one arc gap 1102L , of at least one arc 02 and / or at least one inner contour of the at least one arch 02 , preferably defined by at least one arch opening 1102L , and / or at least one outer contour of the at least one arc 02 , preferably determined by at least one outer edge of the respective sheet 02 , educated. Alternatively, the inspection device 916 , in particular the image capture device of the inspection device 916 , preferably at least for at least partially recording the at least one benefit 1101 and / or the contour, in particular the outline, of the respective benefit 1101 educated. The contour of an arch 02 preferably describes the shape of the respective arch in the foregoing and in the following 02 , in particular an outer and / or inner outline of the at least one benefit 1101 of the respective arch 02 . The outer contour of the arch is preferred 02 through at least one outer edge of the sheet 02 , in particular by at least one outer edge of the at least one panel 1101 , set. The inner contour of the arch is preferred 02 through at least one arch opening 1102L and / or arc gap 1102L , preferably within the outer contour of the respective arch 02 , more preferably within the main area in the area of the at least one utility 1101 of the respective arch 02 , set. The inspection facility 916 , in particular the image capture device of the inspection device 916 , is preferred for at least partially capturing the main surface of sheets 02 educated. The inspection device is preferred 916 , in particular the image capture device of the inspection device 916 for at least partially detecting the area of the at least one remnant piece 1102A and / or the at least one arch opening 1102L of arch 02 educated.

Bevorzugt entspricht die innere Kontur des zumindest einen Bogens 02 einer Kontur des zumindest einen Reststückes 1102A des betreffenden Bogens 02, insbesondere nach der Entfernung des zumindest einen Reststückes 1102A von dem betreffenden Bogen 02.The inner contour of the at least one arc preferably corresponds 02 a contour of the at least one remaining piece 1102A of the arch in question 02 , especially after the removal of the at least one remaining piece 1102A of the bow in question 02 .

Bevorzugt umfasst die Inspektionseinrichtung 916 zumindest ein Auswertemittel oder ist mit einem Auswertemittel verbunden.The inspection device preferably comprises 916 at least one evaluation means or is connected to an evaluation means.

In einer bevorzugten Ausführung ist die Inspektionseinrichtung 916, insbesondere durch die Bilderfassungseinrichtung, einen Ist-Zustand des zumindest einen Bogens 02 ermittelnd ausgebildet. Der Ist-Zustand von Bogen 02 ist bevorzugt der Zustand, insbesondere in Bezug auf Form und/oder Masse und/oder Kontur, welchen der jeweilige Bogen 02 zum Zeitpunkt der Erfassung mit der Inspektionseinrichtung 916 aufweist.In a preferred embodiment, the inspection device 916 , in particular by the image acquisition device, an actual state of the at least one sheet 02 educated to determine. The current state of Bogen 02 is preferred the state, especially in terms of shape and / or mass and / or contour, which the respective arc 02 at the time of acquisition with the inspection facility 916 having.

Zusätzlich oder alternativ zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass die Inspektionseinrichtung 916 das Auswertemittel umfasst oder mit dem Auswertemittel verbunden ist und dass das Auswertemittel den Ist-Zustand des zumindest einen Bogens 02 mit einem Soll-Zustand des betreffenden Bogens 02 vergleichend ausgebildet ist. Bevorzugt ist das Auswertemittel so ausgebildet, Daten über den Ist-Zustand von Bogen 02 von der Bilderfassungseinrichtung der Inspektionseinrichtung 916 zu erhalten und auszuwerten. Der Soll-Zustand des betreffenden Bogens 02 ist bevorzugt der Zustand, insbesondere in Bezug auf Form und/oder Masse und/oder Kontur, welchen der Bogen 02, bevorzugt ein ideal gefertigter Bogen 02, insbesondere zum Zeitpunkt der Erfassung mit der Inspektionseinrichtung 916, aufweisen soll und/oder welcher durch zumindest eine Referenz und/oder durch zumindest einen Musterbogen insbesondere als Vergleichswert dem zumindest einen Bogen 02 vorgegeben ist. Beispielsweise ist der Soll-Zustand des betreffenden Bogens 02 der gewünschte und/oder geforderte Zustand, welchen ein aus entsprechenden Bogen 02 gefertigtes Produkt aufweisen soll. Ein ideal gefertigter Bogen 02 beschreibt bevorzugt einen Bogen 02 der jeweils nach dem vollendeten Bearbeitungsvorgang vorzugsweise innerhalb des dem jeweiligen Bearbeitungsvorgang zugeordneten Aggregats 100; 300; 600; 700; 900; 1000 vorzugsweise exakt mit der dem jeweiligen Bearbeitungsvorgang zugrundeliegenden Referenz für diesen Bogen 02 übereinstimmt.Additionally or alternatively, the sheet processing machine stands out 01 preferably in that the inspection device 916 the evaluation means comprises or is connected to the evaluation means and that the evaluation means the actual state of the at least one sheet 02 with a target state of the sheet in question 02 is comparatively trained. The evaluation means is preferably designed in such a way as to provide data on the actual condition of sheets 02 from the image capture device of the inspection device 916 to receive and evaluate. The target state of the sheet in question 02 is preferably the state, in particular with regard to shape and / or mass and / or contour, which the arc 02 , prefers an ideally made bow 02 , especially at the time of acquisition with the inspection device 916 , should have and / or which by at least one reference and / or by at least one sample sheet, in particular as a comparison value, the at least one sheet 02 is given. For example, the target state of the relevant sheet 02 the desired and / or required state, which a corresponding sheet 02 manufactured product should have. An ideally made bow 02 preferably describes a bow 02 each after the completed machining process, preferably within the assembly assigned to the respective machining process 100 ; 300 ; 600 ; 700 ; 900 ; 1000 preferably exactly with the reference for this sheet on which the respective processing operation is based 02 matches.

In einer bevorzugten Ausführung ist der Soll-Zustand des betreffenden Bogens 02 auf Grundlage einer digitalen Referenz und/oder einer angelernten Referenz bestimmt und/oder bestimmbar ausgebildet. Bevorzugt enthält die digitale Referenz zumindest einen Teil der Informationen, bevorzugt sämtliche Informationen, welche zu einer eindeutigen Bestimmung des geforderten Soll-Zustandes des betreffenden Bogens 02 notwendig sind. Die digitale Referenz ist bevorzugt als digitale Bildvorlage ausgebildet. Vorzugsweise weist die digitale Referenz ein pdf- oder tif- oder jpg-Dateiformat auf. Die angelernte Referenz ist bevorzugt ein Bogen 02, welcher als Musterbogen ausgebildet ist und/oder beispielsweise durch die Inspektionseinrichtung 916 erfasst und/oder in dem Auswertemittel als Vergleichsgrundlage hinterlegt ist.In a preferred embodiment, this is the target state of the sheet in question 02 determined and / or designed to be determinable based on a digital reference and / or a learned reference. The digital reference preferably contains at least part of the information, preferably all of the information, which is necessary for an unambiguous determination of the required target state of the relevant sheet 02 are necessary. The digital reference is preferably designed as a digital image template. The digital reference preferably has a pdf or tif or jpg file format. The learned reference is preferably a bow 02 , which is designed as a sample sheet and / or for example by the inspection device 916 recorded and / or stored in the evaluation means as a basis for comparison.

Vorzugsweise ist die Inspektionseinrichtung 916, insbesondere das Auswertemittel, ein Maß für eine Abweichung der zumindest einen Bogenöffnung 1102L und/oder der zumindest einen inneren Kontur und/oder der zumindest einen äußeren Kontur des Bogens 02 von dem Soll-Zustand des jeweiligen Bogens 02 ermittelnd ausgebildet. Je nach Ergebnis des ermittelten Maßes für die Abweichung der zumindest einen Bogenöffnung 1102L und/oder der zumindest einen inneren Kontur und/oder der zumindest einen äußeren Kontur des Bogens 02 von dem Soll-Zustand des jeweiligen Bogens 02 ist die Inspektionseinrichtung 916, insbesondere das Auswertemittel, vorzugsweise ein Signal, beispielsweise ein optisches Signal und/oder ein Steuerungssignal und/oder ein Regelungssignal, ausgebend ausgebildet. Liegt das Maß für die Abweichung im Rahmen der Toleranz des Soll-Zustands des betreffenden Bogens 02, so ist die Inspektionseinrichtung 916, insbesondere das Auswertemittel, vorzugsweise zumindest ein Gut-Signal ausgebend ausgebildet, d. h. der betreffende Bogen 02 wird als in Ordnung betrachtet. Liegt das Maß für die Abweichung außerhalb des Rahmens der Toleranz des Soll-Zustands des betreffenden Bogens 02, so ist die Inspektionseinrichtung 916, insbesondere das Auswertemittel, vorzugsweise zumindest ein Schlecht-Signal ausgebend ausgebildet, d. h. der betreffende Bogen 02 wird als in nicht Ordnung betrachtet. Beispielsweise zusätzlich oder alternativ zu dem zumindest einen Schlecht-Signal ist die Inspektionseinrichtung 916, insbesondere das Auswertemittel, bevorzugt zumindest ein Signal zur Regelung und/oder Steuerung an die Bogenweiche 49 übertragend ausgebildet.The inspection device is preferably 916 , in particular the evaluation means, a measure for a deviation of the at least one arch opening 1102L and / or the at least one inner contour and / or the at least one outer contour of the arch 02 of the target state of the respective sheet 02 educated to determine. Depending on the result of the determined measure for the deviation of the at least one arch opening 1102L and / or the at least one inner contour and / or the at least one outer contour of the arch 02 of the target state of the respective sheet 02 is the inspection facility 916 , in particular the evaluation means, preferably designed to output a signal, for example an optical signal and / or a control signal and / or a regulating signal. Is the measure for the deviation within the tolerance of the target state of the sheet in question 02 so is the inspection facility 916 , in particular the evaluation means, preferably designed to output at least one good signal, ie the sheet in question 02 is considered okay. If the measure for the deviation lies outside the framework of the tolerance of the target state of the sheet in question 02 so is the inspection facility 916 , in particular the evaluation means, preferably designed to output at least one bad signal, ie the sheet in question 02 is considered to be out of order. For example, in addition or as an alternative to the at least one bad signal, the inspection device is 916 , in particular the evaluation means, preferably at least one signal for regulation and / or control to the curved switch 49 trained transferring.

Beispielsweise weist eine Bogenöffnung 1102L zumindest einen verbliebenen Teil des zumindest einen Reststücks 1102A auf, so weicht der Ist-Zustand des betreffenden Bogens 02 von dem Soll-Zustand des betreffenden Bogens 02 ab. Weist der verbliebene Teil des Reststücks 1102A beispielsweise eine Fläche von kleiner 25 mm2 (fünfundzwanzig Quadratmillimeter), bevorzugt von kleiner 20 mm2, weiter bevorzugt von kleiner 15 mm2, auf, so liegt das Maß für die Abweichung bevorzugt im Rahmen der Toleranz des Soll-Zustands des jeweiligen Bogens 02 und das zumindest eine Gut-Signal wird ausgegeben. Beispielsweise bei einer Fläche von mindestens 25 mm2 (fünfundzwanzig Quadratmillimeter), bevorzugt mindestens 30 mm2, weiter bevorzugt 35 mm2, des zumindest einen verbliebenen Teils des Reststücks 1102A wird bevorzugt das zumindest eine Schlecht-Signal ausgegeben.For example, has an arch opening 1102L at least a remaining part of the at least one remnant piece 1102A on, the actual state of the sheet in question is softened 02 of the target state of the relevant sheet 02 from. Shows the remaining part of the remainder 1102A For example, an area of less than 25 mm 2 (twenty-five square millimeters), preferably less than 20 mm 2 , more preferably less than 15 mm 2 , the amount for the deviation is preferably within the tolerance of the target state of the respective sheet 02 and the at least one good signal is output. For example, with an area of at least 25 mm 2 (twenty-five square millimeters), preferably at least 30 mm 2 , more preferably 35 mm 2 , of the at least one remaining part of the remainder 1102A the at least one bad signal is preferably output.

Zusätzlich oder alternativ zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass die Bogenbearbeitungsmaschine 01 zumindest ein Auftragwerk 614 zum Auftragen zumindest eines Druckbildes auf Bogen 02 umfasst und dass die Inspektionseinrichtung 916 ein Auswertemittel umfasst oder mit einem Auswertemittel verbunden ist und dass die Inspektionseinrichtung 916 und/oder das Auswertemittel zumindest zum Auswerten zumindest eines Passers des zumindest einen Druckbildes des zumindest einen Bogens 02 und/oder zumindest zum Vergleich des zumindest einen Druckbildes des zumindest einen Bogens 02 mit der zumindest einen Bogenöffnung 1102L und/oder der zumindest einen inneren Kontur und/oder der zumindest einen äußeren Kontur des jeweiligen Bogens 02 ausgebildet ist. Bevorzugt ist die Inspektionseinrichtung 916 zum Auswerten des zumindest einen Passers des zumindest einen Druckbildes des zumindest einen Bogens 02 und/oder zumindest zum Vergleich des zumindest einen Druckbildes des zumindest einen Bogens 02 mit der zumindest einen Bogenöffnung 1102L und/oder der zumindest einen inneren Kontur und/oder der zumindest einen äußeren Kontur des jeweiligen Bogens 02 ausgebildet.Additionally or alternatively, the sheet processing machine stands out 01 preferably in that the sheet processing machine 01 at least one commissioned work 614 for applying at least one print image to sheets 02 includes and that the inspection facility 916 comprises an evaluation means or is connected to an evaluation means and that the inspection device 916 and / or the evaluation means at least for evaluating at least one register of the at least one print image of the at least one sheet 02 and / or at least to compare the at least one print image of the at least one sheet 02 with the at least one arch opening 1102L and / or the at least one inner contour and / or the at least one outer contour of the respective arc 02 is trained. The inspection device is preferred 916 for evaluating the at least one register of the at least one print image of the at least one sheet 02 and / or at least to compare the at least one print image of the at least one sheet 02 with the at least one arch opening 1102L and / or the at least one inner contour and / or the at least one outer contour of the respective arc 02 educated.

Ein Passer bezeichnet im Vorangegangenen und im Folgenden nach DIN 16500-2 beispielsweise im Mehrfarbendruck eine passgenaue Zusammenfügung einzelner Druckbilder zu einem Bild, wobei die einzelnen Druckbilder beispielsweise durch verschiedene Auftragwerke 614 und/oder beispielsweise durch zumindest zwei voneinander verschiedene Auftragsfluiden aufgetragen wurden.A register designates in the foregoing and in the following according to DIN 16500-2, for example In multi-color printing, a precisely fitting combination of individual print images to form an image, with the individual print images, for example, through different application units 614 and / or were applied, for example, by at least two different application fluids.

Umfasst die Bogenbearbeitungsmaschine 01 zusätzlich zu der Formgebungseinrichtung 900 zumindest ein Auftragaggregat 600 mit mindestens einem Auftragwerk 614, so ist vorzugsweise die Inspektionseinrichtung 916 zum zumindest teilweisen Erfassen und/oder Auswerten des zumindest einen Druckbildes auf Bogen 02, welches durch das mindestens eine Auftragwerk 614 aufgetragen wurde, ausgebildet. Bevorzugt ist die Inspektionseinrichtung 916 das zumindest eine Druckbild des betreffenden Bogens 02 als zumindest einen Informationsbestandteil des Ist-Zustands des jeweiligen Bogens 02 erfassend und diesen Ist-Zustand vorzugsweise mit dem Soll-Zustand betreffenden des Bogens 02, beispielsweise durch das Auswertemittel, vergleichend ausgebildet. Alternativ oder zusätzlich ist die Inspektionseinrichtung 916 bevorzugt zum zumindest teilweisen Erfassen des zumindest einen Druckbildes und zum zumindest teilweisen Erfassen der zumindest einen Bogenöffnung 1102L und/oder der zumindest einen inneren Kontur und/oder der zumindest einen äußeren Kontur von Bogen 02 ausgebildet. Vorzugsweise ist die Inspektionseinrichtung 916, insbesondere das Auswertemittel, das zumindest eine Druckbild des Bogens 02 zumindest mit der Kontur des jeweiligen Bogens 02 vergleichend ausgebildet, beispielsweise durch den Vergleich des Ist-Zustandes mit dem Soll-Zustand des jeweiligen Bogens 02.Includes the sheet processing machine 01 in addition to the shaping device 900 at least one application unit 600 with at least one commissioned work 614 so is preferably the inspection facility 916 for at least partial acquisition and / or evaluation of the at least one print image on sheets 02 , which by the at least one commissioned work 614 was applied, trained. The inspection device is preferred 916 the at least one print image of the sheet in question 02 as at least one information component of the actual state of the respective sheet 02 and this actual state preferably with the target state of the sheet 02 , for example by the evaluation means, formed comparatively. As an alternative or in addition, there is the inspection device 916 preferably for at least partially capturing the at least one print image and for at least partially capturing the at least one sheet opening 1102L and / or the at least one inner contour and / or the at least one outer contour of arches 02 educated. The inspection device is preferably 916 , in particular the evaluation means, the at least one print image of the sheet 02 at least with the contour of the respective arch 02 designed comparatively, for example by comparing the actual state with the target state of the respective sheet 02 .

Zusätzlich oder alternativ zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass die Inspektionseinrichtung 916 das Auswertemittel umfasst oder mit dem Auswertemittel verbunden ist und dass die Inspektionseinrichtung 916 und/oder das Auswertemittel ein Maß für einen Werkzeugverschleiß des zumindest einen Werkzeugs der zumindest einen Formgebungseinrichtung 900 ermittelnd ausgebildet ist. Bevorzugt weist die Formgebungseinrichtung 900, insbesondere das Formgebungswerk 914 und/oder der Formzylinder 901, das zumindest eine Werkzeug, vorzugsweise zumindest ein Schnittwerkzeug und/oder zumindest ein Rillwerkzeug und/oder zumindest ein Perforierwerkzeug und/oder zumindest ein Prägewerkzeug und/oder zumindest ein Stanzwerkzeug, zum Bearbeiten von Bogen 02 auf. Durch die Bearbeitung von Bogen 02 ist das Werkzeug Verschleiß unterliegend ausgebildet. Vorzugsweise ist die Inspektionseinrichtung 916 durch das Erfassen von Bogen 02, insbesondere der Inspektion des zumindest einen verbliebenen und von der Formgebungseinrichtung 900 bearbeiteten Teils des zumindest einen Bogens 02 mit mindestens einem Nutzen 1101, und/oder bevorzugt dem Vergleich des Ist-Zustands des jeweiligen Bogens 02 mit dem Soll-Zustand des betreffenden Bogens 02 zum Ermitteln des Maßes für den Verschleiß des zumindest einen Werkzeugs der Formgebungseinrichtung 900, insbesondere des Formgebungswerks 914, bevorzugt des Formzylinders 901, ausgebildet. Beispielsweise durch den direkten Kontakt des Werkzeugs der Formgebungseinrichtung 900, insbesondere des Formgebungswerks 914, bevorzugt des Formzylinders 901, mit dem Gegendruckzylinder 902 und/oder dem Bogen 02 wirkt zumindest eine äußere Kraft auf das Werkzeug und ruft beispielsweise Verschleiß des Werkzeugs und/oder Gegendruckzylinders 902 hervor.Additionally or alternatively, the sheet processing machine stands out 01 preferably in that the inspection device 916 the evaluation means comprises or is connected to the evaluation means and that the inspection device 916 and / or the evaluation means a measure of tool wear of the at least one tool of the at least one shaping device 900 is designed to determine. The shaping device preferably has 900 , especially the shaping unit 914 and / or the forme cylinder 901 , the at least one tool, preferably at least one cutting tool and / or at least one creasing tool and / or at least one perforating tool and / or at least one embossing tool and / or at least one punching tool for processing sheets 02 on. By machining arches 02 the tool is designed to be subject to wear. The inspection device is preferably 916 by capturing arches 02 , in particular the inspection of the at least one remaining and of the shaping device 900 machined part of the at least one sheet 02 with at least one benefit 1101 , and / or preferably the comparison of the actual state of the respective sheet 02 with the target state of the sheet concerned 02 for determining the degree of wear of the at least one tool of the shaping device 900 , in particular the shaping unit 914 , preferably the forme cylinder 901 , educated. For example, through direct contact with the tool of the shaping device 900 , in particular the shaping unit 914 , preferably the forme cylinder 901 , with the impression cylinder 902 and / or the arch 02 At least one external force acts on the tool and causes, for example, wear on the tool and / or the impression cylinder 902 emerged.

Zusätzlich oder alternativ zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass die Inspektionseinrichtung 916 das Auswertemittel umfasst oder mit dem Auswertemittel verbunden ist und dass die Inspektionseinrichtung 916 und/oder das Auswertemittel ein Maß für einen Verschleiß zumindest einer Oberfläche des zumindest einen Gegendruckzylinders 902 der zumindest einen Formgebungseinrichtung 900 ermittelnd ausgebildet ist. Bevorzugt weist der zumindest eine Gegendruckzylinder 902, beispielsweise im Falle einer Rotationsstanzeinrichtung 900, eine Oberfläche auf, welche vorzugsweise in direktem Kontakt zu dem Werkzeug der Formgebungseinrichtung 900, insbesondere dem Werkzeug des Formzylinders 901, steht. Beispielsweise durch den direkten Kontakt der Oberfläche des Gegendruckzylinders 902 und dem Werkzeug der Formgebungseinrichtung 900, bevorzugt des Formzylinders 901, wirkt zumindest eine äußere Kraft auf die Oberfläche des Gegendruckzylinders 902 und ruft beispielsweise Verschleiß des Gegendruckzylinders 902 und/oder des jeweiligen Werkzeugs hervor.Additionally or alternatively, the sheet processing machine stands out 01 preferably in that the inspection device 916 the evaluation means comprises or is connected to the evaluation means and that the inspection device 916 and / or the evaluation means a measure of wear of at least one surface of the at least one impression cylinder 902 the at least one shaping device 900 is designed to determine. The at least one impression cylinder preferably has 902 , for example in the case of a rotary die cutter 900 , a surface which is preferably in direct contact with the tool of the shaping device 900 , especially the tool of the forme cylinder 901 , stands. For example, through direct contact with the surface of the impression cylinder 902 and the tool of the forming device 900 , preferably the forme cylinder 901 , at least one external force acts on the surface of the impression cylinder 902 and calls for example wear of the impression cylinder 902 and / or the respective tool.

Bevorzugt ist die Inspektionseinrichtung 916, insbesondere das Auswertemittel, zum Speichern und Auswerten von Daten über die jeweiligen transportierten Bogen 02 und vorzugsweise zum Erstellen zumindest eines Berichts über die Qualität der Bogen 02 ausgebildet. Vorzugsweise umfasst der Bericht zumindest die Gesamtzahl der bearbeiteten Bogen 02 innerhalb zumindest einer Zeiteinheit und/oder eines gemeinsamen Auftrags und/oder die Anzahl und/oder prozentualen Anteil der bearbeiteten Bogen 02, welche jeweils zu dem Auslagestapelträger 48 und/oder welche jeweils zu der Ausleitauslage 51 geleitet wurden. Zusätzlich oder alternativ umfasst der Bericht vorzugsweise eine Gesamtzahl an Nutzen 1101 und/oder die Anzahl und/oder prozentualen Anteil an Nutzen 1101, welche jeweils zu dem Auslagestapelträger 48 und/oder welche jeweils zu der Ausleitauslage 51 geleitet wurden. Vorzugsweise umfasst der Bericht zusätzlich oder alternativ zumindest eine Information über die jeweilige Ursache der Ausleitung der betreffenden Bogen 02 und/oder Nutzen 1101 zu der Ausleitauslage 51. Ursächlich für die Ausleitung zu der Ausleitauslage 51 ist beispielsweise das Maß für die Abweichung der zumindest einen Bogenöffnung 1102L und/oder inneren Kontur und/oder äußeren Kontur des jeweiligen Bogens 02 von dem Soll-Zustand des betreffenden Bogens 02, zusätzlich oder alternativ die Auswertung des zumindest einen Passers des zumindest einen Druckbildes des betreffenden Bogens 02 und/oder der Vergleich des zumindest einen Druckbildes mit zumindest einer Bogenöffnung 1102L und/oder inneren Kontur und/oder äußeren Kontur des betreffenden Bogens 02. Zusätzlich oder alternativ umfasst der Bericht beispielsweise zumindest eine Information über das Maß des Werkzeugverschleißes des zumindest einen Werkzeugs der Formgebungseinrichtung 900. Zusätzlich oder alternativ umfasst der Bericht bevorzugt das Maß für die Position des mindestens einen Nutzens 1101 relativ zu einer Referenz der Position des mindestens einen Nutzens 1101 und zusätzlich oder alternativ das Maß für die Farbe des zumindest einen Druckbildes des jeweiligen Bogens 02 und/oder Nutzens 1101 und zusätzlich oder alternativ das Maß für zumindest einen Fehler der zumindest einen Verarbeitung des jeweiligen Bogens 02 und/oder Nutzens 1101 und/oder des mindestens einen Druckbildes des jeweiligen Bogens 02 und/oder Nutzens 1101. Beispielsweise umfasst der Bericht weitere Informationen, welche bevorzugt durch die zumindest eine Inspektionseinrichtung 916 oder auch durch weitere Bestandteile der Bogenbearbeitungsmaschine 01 erfasst werden und/oder erfassbar sind. Beispielsweise ist es somit möglich, eine gewünschte und/oder geforderte Qualität der vorzugsweise durch die Formgebungsmaschine 900 bearbeiteten Bogen 02 beispielsweise in dem Auslagestapel 28 der Auslage 1000 exakt einzustellen und bevorzugt zu garantieren.The inspection device is preferred 916 , in particular the evaluation means, for storing and evaluating data about the respective transported sheets 02 and preferably for producing at least one report on the quality of the sheets 02 educated. The report preferably includes at least the total number of sheets processed 02 within at least one time unit and / or a common order and / or the number and / or percentage of sheets processed 02 , which each to the delivery pile carrier 48 and / or which in each case to the diversion delivery 51 were directed. Additionally or alternatively, the report preferably includes a total number of benefits 1101 and / or the number and / or percentage of benefits 1101 , which each to the delivery pile carrier 48 and / or which in each case to the diversion delivery 51 were directed. The report preferably additionally or alternatively comprises at least one piece of information about the respective cause of the diversion of the relevant sheet 02 and / or benefits 1101 to the reject delivery 51 . The cause of the diversion to the reject delivery 51 is, for example, the measure of the deviation of the at least one arch opening 1102L and / or inner contour and / or outer contour of the respective arc 02 of the target state of the relevant sheet 02 , additionally or alternatively the evaluation of the at least one register of the at least one print image of the sheet in question 02 and / or the comparison of the at least one print image with at least one sheet opening 1102L and / or inner contour and / or outer contour of the relevant arc 02 . Additionally or alternatively, the report includes, for example, at least one piece of information about the degree of tool wear of the at least one tool of the shaping device 900 . Additionally or alternatively, the report preferably includes the measure of the position of the at least one benefit 1101 relative to a reference of the position of the at least one benefit 1101 and additionally or alternatively the measure of the color of the at least one print image of the respective sheet 02 and / or benefits 1101 and additionally or alternatively the measure for at least one error of the at least one processing of the respective sheet 02 and / or benefits 1101 and / or of the at least one print image of the respective sheet 02 and / or benefits 1101 . For example, the report includes further information, which is preferably provided by the at least one inspection device 916 or by other components of the sheet processing machine 01 are detected and / or are detectable. For example, it is thus possible to achieve a desired and / or required quality, preferably by the molding machine 900 processed arch 02 for example in the delivery pile 28 the display 1000 set exactly and preferably guaranteed.

Zusätzlich oder alternativ zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass die Inspektionseinrichtung 916 vorzugsweise aus dem Vergleich des Ist-Zustands des zumindest einen Bogens 02 mit dem Soll-Zustand des jeweiligen Bogens 02 ein Maß für eine Position des mindestens einen Nutzens 1101 relativ zu einer Referenz der Position des mindestens einen Nutzens 1101 und zusätzlich oder alternativ ein Maß für die Farbe zumindest eines Druckbildes des jeweiligen Bogens 02 und zusätzlich oder alternativ ein Maß für zumindest einen Fehler einer Verarbeitung des jeweiligen Bogens 02 und/oder eines Druckbildes des jeweiligen Bogens 02 durch fehlende Teile und/oder zusätzliche Teile ermittelnd ausgebildet ist.Additionally or alternatively, the sheet processing machine stands out 01 preferably in that the inspection device 916 preferably from the comparison of the actual state of the at least one sheet 02 with the target state of the respective sheet 02 a measure of a position of the at least one benefit 1101 relative to a reference of the position of the at least one benefit 1101 and additionally or alternatively a measure of the color of at least one print image of the respective sheet 02 and additionally or alternatively a measure for at least one error in processing the respective sheet 02 and / or a print image of the respective sheet 02 is designed to be determined by missing parts and / or additional parts.

Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs nach dem zumindest einen Selektivtransportmittel 906 zumindest ein als Bogenabbremsmittel 07 ausgebildetes Transportmittel 07 angeordnet ist, das weiter bevorzugt zumindest teilweise und weiter bevorzugt vollständig oberhalb eines Auslagestapelträgers 48 der Bogenauslage 1000 angeordnet ist. Das zumindest eine Bogenabbremsmittel 07 dient insbesondere dazu, Bogen 02 abzubremsen, bevor sie auf einen Auslagestapel 28 abgelegt werden.As an alternative or in addition, the sheet processing machine stands out 01 preferably in that along the for the transport of sheets 02 provided transport route after the at least one selective transport means 906 at least one as sheet braking means 07 trained means of transport 07 is arranged, which is more preferably at least partially and more preferably completely above a display pile carrier 48 the sheet delivery 1000 is arranged. The at least one sheet braking means 07 serves in particular to arch 02 slow down before putting them on a stack 28 be filed.

Zusätzlich oder alternativ zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass in Transportrichtung T nach der Inspektionseinrichtung 916 und vor der Auslage 1000, bevorzugt vor der Bogenauslage 1000, bevorzugt zumindest eine Änderung des für den Transport von Bogen 02 vorgesehenen Transportweges, insbesondere eine Bogenweiche 49, geregelt ist und/oder gesteuert ist und/oder steuerbar ausgebildet ist und/oder regelbar ausgebildet ist. Vorzugsweise ist die Änderung des Transportweges zum Ausschleusen und/oder Auslenken von Bogen 02 auf einen den eigentlichen Transportweg umgehenden Transportweg ausgebildet. Vorzugsweise ist die Änderung des Transportweges, insbesondere die Bogenweiche 49, zum Ausschleusen und/oder Auslenken von Bogen 02 auf einen das zumindest eine Bogenabbremsmittel 07 umgehenden Transportpfad ausgebildet. Die Änderung des Transportweges, insbesondere die zumindest eine Bogenweiche 49, dient beispielsweise zum Ausschleusen zumindest eines Bogens 02, insbesondere eines zu untersuchenden Probebogens und/oder zumindest eines Makulaturbogens. Weiter bevorzugt zeichnet sich die Bogenbearbeitungsmaschine 01 dadurch aus, dass entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs zwischen der zumindest einen Separationseinrichtung 903 einerseits und dem zumindest einen Bogenabbremsmittel 07 andererseits die Änderung des Transportweges, insbesondere die zumindest eine Bogenweiche 49, zum Ausschleusen von Bogen 02 auf einen das zumindest eine Bogenabbremsmittel 07 umgehenden Transportpfad angeordnet ist.Additionally or alternatively, the sheet processing machine stands out 01 preferably in that in the transport direction T after the inspection facility 916 and in front of the display 1000 , preferably in front of the sheet delivery 1000 , preferably at least one change for the transport of sheets 02 intended transport route, in particular a curved switch 49 is regulated and / or is controlled and / or is designed to be controllable and / or is designed to be controllable. The change in the transport path is preferably used to discharge and / or deflect sheets 02 formed on a transport route bypassing the actual transport route. The change in the transport path, in particular the curved switch, is preferred 49 , for discharging and / or deflecting sheets 02 to the at least one sheet braking means 07 immediate transport path formed. The change in the transport route, in particular the at least one curved switch 49 , is used, for example, to discharge at least one sheet 02 , in particular a sample sheet to be examined and / or at least one waste sheet. The sheet processing machine is further preferred 01 characterized in that along the for the transport of sheets 02 provided transport path between the at least one separation device 903 on the one hand and the at least one sheet braking means 07 on the other hand, the change in the transport route, in particular the at least one curved switch 49 , for ejecting sheets 02 to the at least one sheet braking means 07 bypassing transport path is arranged.

Die zumindest eine Bogenweiche 49 weist beispielsweise zumindest ein Auslenkelement auf, weiter bevorzugt mehrere Auslenkelemente, die auf die Querrichtung A bezogen nebeneinander angeordnet sind. Bevorzugt sind die Auslenkelemente derart angeordnet, dass sie insbesondere pneumatisch zwischen einer Passierposition und einer Auslenkposition umschaltbar sind. Bei in der Passierposition angeordnetem zumindest einem Auslenkelement wird bevorzugt zumindest ein jeweiliger Bogen 02 entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs zu dem zumindest einen Bogenabbremsmittel 07 und/oder dem Auslagestapelträger 48 weitergeleitet. Bei in der Auslenkposition angeordnetem zumindest einem Auslenkelement wird bevorzugt zumindest ein jeweiliger Bogen 02 auf den das zumindest eine Bogenabbremsmittel 07 umgehenden Transportpfad und/oder zu einer Ausleitauslage 51 weitergeleitet. Bevorzugt ist zumindest eine Führung 52, insbesondere zumindest ein Führungsblech 52 angeordnet, mittels dem weiter bevorzugt die Weiterleitung auf den das zumindest eine Bogenabbremsmittel 07 umgehenden Transportpfad und/oder zu der Ausleitauslage 51 erfolgt. Beispielsweise werden Bogen 02 mittels des zumindest einem Auslenkelements zwischen zwei Führungen 52 geleitet, die zunächst als obere und untere Führung 52 wirken und durch ihre Krümmung im weitere Verlauf des Transportpfads zu vorderen und hinteren Führungen 52 werden. Beispielsweise ist das zumindest eine Auslenkelement derart angeordnet, dass es in seiner Auslenkposition in Querrichtung zwischen zumindest zwei Transportbändern und/oder Transportriemen des zumindest einen Selektivtransportmittels 09; 906 angeordnet ist.The at least one curved turnout 49 has, for example, at least one deflection element, more preferably several deflection elements, which point to the transverse direction A. related to each other are arranged. The deflection elements are preferably arranged in such a way that they can be switched, in particular pneumatically, between a passing position and a deflection position. In the case of at least one deflecting element arranged in the passing position, at least one respective arc is preferred 02 along the for the transport of bow 02 provided transport path to the at least one sheet braking means 07 and / or the delivery pile carrier 48 forwarded. With at least one deflection element arranged in the deflection position, at least one respective arch is preferred 02 on the at least one sheet braking means 07 immediate transport path and / or to a diversion delivery 51 forwarded. At least one is preferred guide 52 , in particular at least one guide plate 52 arranged by means of which further preferably the forwarding to the at least one sheet braking means 07 immediate transport path and / or to the diversion delivery 51 he follows. For example, bows 02 by means of the at least one deflection element between two guides 52 directed initially as an upper and lower guide 52 act and due to their curvature in the further course of the transport path to front and rear guides 52 will. For example, the at least one deflection element is arranged in such a way that it is in its deflection position in the transverse direction between at least two conveyor belts and / or conveyor belts of the at least one selective conveyor 09 ; 906 is arranged.

Zusätzlich oder alternativ zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass die Inspektionseinrichtung 916 das Auswertemittel umfasst oder mit dem Auswertemittel verbunden ist und dass die Änderung des Transportweges eines betreffenden Bogens 02, insbesondere die Bogenweiche 49, aufgrund zumindest eines Signals des Auswertemittels geregelt ist und/oder gesteuert ist und/oder regelbar ausgebildet ist und/oder steuerbar ausgebildet ist. Die Änderung des Transportweges, insbesondere die Bogenweiche 49, ist vorzugsweise in Abhängigkeit von der Auswertung des erfassten Bogens 02 durch das Auswertemittel, bevorzugt durch das Auswertemittel der Inspektionseinrichtung 916, geregelt und/oder gesteuert und/oder regelbar ausgebildet und/oder steuerbar ausgebildet. Beispielsweise ist ein Signal von dem Auswertemittel, insbesondere von dem Auswertemittel der Inspektionseinrichtung 916, an eine Steuerungseinheit und/oder Regelungseinheit der Bogenweiche 49 übertragbar, welches eine Regelung der Bogenweiche 49 und/oder eine Änderung des Transportweges veranlasst und/oder veranlassend ausgebildet ist.Additionally or alternatively, the sheet processing machine stands out 01 preferably in that the inspection device 916 the evaluation means comprises or is connected to the evaluation means and that the change in the transport path of a sheet in question 02 , especially the curved turnout 49 , is regulated and / or is controlled and / or is designed to be adjustable and / or is designed to be controllable based on at least one signal of the evaluation means. The change in the transport route, especially the curved turnout 49 , is preferably a function of the evaluation of the recorded sheet 02 by the evaluation means, preferably by the evaluation means of the inspection device 916 , regulated and / or controlled and / or designed to be adjustable and / or designed to be controllable. For example, there is a signal from the evaluation means, in particular from the evaluation means of the inspection device 916 , to a control unit and / or regulation unit of the curved switch 49 transferable, which is a regulation of the curved turnout 49 and / or a change in the transport route is initiated and / or designed to be initiating.

Zusätzlich oder alternativ zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass der Transportweg zwischen der Inspektionseinrichtung 916 und der Position der Änderung des Transportweges des betreffenden Bogens 02, insbesondere der Bogenweiche 49, mindestens 30 cm (dreißig Zentimeter), bevorzugt mindestens 40 cm, weiter bevorzugt mindestens 50 cm beträgt. Bevorzugt weist der Transportweg zwischen der Inspektionseinrichtung 916 und der Bogenweiche 49 eine Länge auf, welche der jeweilige transportierte Bogen 02 in Abhängigkeit von der Geschwindigkeit der transportierten Bogen 02 vorzugsweise in mindestens 50 ms (fünfzig Millisekunden), bevorzugt in mindestens 80 ms, weiter bevorzugt in mindestens 100 ms, zurücklegend ausgebildet ist. Bevorzugt weist der Transportweg zwischen der Inspektionseinrichtung 916 und der Bogenweiche 49 eine Länge auf, welche der jeweilige transportierte Bogen 02 in Abhängigkeit von der Geschwindigkeit der transportierten Bogen 02 vorzugsweise in höchstens 1000 ms (tausend Millisekunden), bevorzugt in höchstens 800 ms, weiter bevorzugt in höchstens 300 ms, zurücklegend ausgebildet ist.Additionally or alternatively, the sheet processing machine stands out 01 preferably in that the transport path between the inspection device 916 and the position of the change in the transport path of the sheet in question 02 , especially the curved turnout 49 , at least 30 cm (thirty centimeters), preferably at least 40 cm, more preferably at least 50 cm. The transport path preferably has between the inspection device 916 and the curved turnout 49 a length which the respective transported sheet 02 depending on the speed of the sheet being transported 02 is preferably designed to cover in at least 50 ms (fifty milliseconds), preferably in at least 80 ms, more preferably in at least 100 ms. The transport path preferably has between the inspection device 916 and the curved turnout 49 a length which the respective transported sheet 02 depending on the speed of the sheet being transported 02 preferably in a maximum of 1000 ms (thousand milliseconds), preferably in a maximum of 800 ms, more preferably in a maximum of 300 ms.

Zusätzlich oder alternativ weist das jeweilige zumindest eine Selektivtransportmittel 09; 906 bevorzugt zumindest zwei und weiter bevorzugt zumindest fünf in der Querrichtung A nebeneinander und/oder in der Querrichtung A beabstandet angeordnete Transportbänder auf. Beispielsweise sind als das zumindest eine Selektivtransportmittel 09; 906 jeweils mehrere Saugbänder angeordnet. Diese Saugbänder weisen beispielweise jeweils eine Breite auf, die bevorzugt zumindest 10 mm, weiter bevorzugt zumindest 20 mm, noch weiter bevorzugt zumindest 50 mm beträgt und die bevorzugt höchstens 200 mm, weiter bevorzugt höchstens 100 mm und noch weiter bevorzugt höchstens 80 mm beträgt. Insgesamt decken diese Saugbänder bevorzugt zumindest 10%, weiter bevorzugt zumindest 20 % und noch weiter bevorzugt zumindest 25 % und unabhängig davon bevorzugt höchstens 50 %, weiter bevorzugt höchstens 40 % und noch weiter bevorzugt höchstens 35 % der Arbeitsbreite der Bogenbearbeitungsmaschine 01 ab.Additionally or alternatively, each has at least one selective transport means 09 ; 906 preferably at least two and more preferably at least five in the transverse direction A. side by side and / or in the transverse direction A. spaced apart conveyor belts. For example, there are at least one selective transport means 09 ; 906 each arranged several suction belts. These suction bands each have, for example, a width that is preferably at least 10 mm, more preferably at least 20 mm, even more preferably at least 50 mm and which is preferably at most 200 mm, more preferably at most 100 mm and even more preferably at most 80 mm. Overall, these suction belts preferably cover at least 10%, more preferably at least 20% and even more preferably at least 25% and regardless of this preferably at most 50%, further preferably at most 40% and even more preferably at most 35% of the working width of the sheet processing machine 01 from.

Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass zwei Selektivtransportmittel 09; 906 entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs und/oder in der Transportrichtung T hintereinander angeordnet sind. Beispielsweise ist ein insbesondere auf den für den Transport von Bogen 02 vorgesehenen Transportwegs und/oder auf die Transportrichtung T bezogen erstes dieser zumindest zwei Selektivtransportmittel 09; 906 als Ausgangstransportmittel 906 der zumindest einen Formgebungseinrichtung 900 ausgebildet. Das zumindest eine Ausgangstransportmittel 906 der zumindest einen Formgebungseinrichtung 900 dient beispielsweise dazu, sicherzustellen, dass ausschließlich Bogen 02 ohne Abfallstücke 1102A weitergegeben werden. Beispielsweise ist ein insbesondere auf den für den Transport von Bogen 02 vorgesehenen Transportwegs und/oder auf die Transportrichtung T bezogen zweites und/oder letztes dieser zumindest zwei Selektivtransportmittel 09; 906 als Bogenübergabemittel 09 ausgebildet. Das zumindest eine Bogenübergabemittel 09 dient beispielsweise dazu, für den Auslagestapel 28 bestimmte Bogen 02 weiterzuleiten. Das zumindest eine Bogenübergabemittel 09 ist beispielsweise der Bogenauslage 1000 zugeordnet. Beispielsweise ist ein Einwirkbereich der zumindest einen Bogenweiche 49 an einer Stelle entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs angeordnet, die in der Transportrichtung T gesehen sowohl von dem zumindest einen Ausgangstransportmittel 906 als auch von dem zumindest einen Bogenübergabemittel 09 höchstens 100 cm weit entfernt ist, weiter bevorzugt höchstens 50 cm und noch weiter bevorzugt höchstens 20 cm. Dann kann beispielsweise ein modularer Aufbau realisiert werden, bei dem das zumindest eine Ausgangstransportmittel 906 an jeweilige Maschinengegebenheiten anpassbar ist, während das zumindest eine Bogenübergabemittel 09 eine standardisierte Ausbildung aufweist. Bevorzugt ist die zumindest eine Ausleitauslage 51 und/oder die zumindest eine Führung 52 unterhalb des zumindest einen Bogenübergabemittels 09 angeordnet.As an alternative or in addition, the sheet processing machine stands out 01 preferably in that two selective transport means 09 ; 906 along the for the transport of bow 02 intended transport route and / or in the transport direction T are arranged one behind the other. For example, one is particularly useful for the transport of sheets 02 intended transport route and / or the transport direction T related to the first of these at least two selective transport means 09 ; 906 as an exit means of transport 906 the at least one shaping device 900 educated. The at least one exit means of transport 906 the at least one shaping device 900 serves, for example, to ensure that only sheets 02 without waste pieces 1102A be passed on. For example, one is particularly useful for the transport of sheets 02 intended transport route and / or the transport direction T obtained second and / or last of these at least two selective transport means 09 ; 906 as a sheet transfer means 09 educated. The at least one sheet transfer means 09 serves, for example, for the delivery pile 28 certain arch 02 forward. The at least one sheet transfer means 09 is for example the sheet delivery 1000 assigned. For example, an area of action is the at least one curved switch 49 at one point along the for the transport of bow 02 provided transport path arranged in the transport direction T seen both from the at least one exit transport means 906 as well as from the at least one sheet transfer means 09 at most 100 cm away, more preferably at most 50 cm and even more preferably at most 20 cm. Then, for example, a modular structure can be implemented in which the at least one output transport means 906 can be adapted to the respective machine conditions, while the at least one sheet transfer means 09 has standardized training. The at least one diversion delivery is preferred 51 and / or the at least one guide 52 below the at least one sheet transfer means 09 arranged.

Zusätzlich oder alternativ ist vorzugsweise jeder der zumindest zwei Selektivtransportmittel 09; 906 als jeweiliges Saugtransportmittel 09; 906 ausgebildet. Bevorzugt weist das zumindest eine Selektivtransportmittel 09; 906 zumindest einen eigenen einen Antrieb 21; 913 auf, der weiter bevorzugt als insbesondere lagegeregelter Elektromotor 21; 913 ausgebildet ist. Weiter bevorzugt weist jedes der zumindest zwei Selektivtransportmittel 09; 906 jeweils einen eigenen Antrieb 21; 913 auf, der weiter bevorzugt als insbesondere lagegeregelter Elektromotor 21; 913 ausgebildet ist. Insbesondere weist bevorzugt das zumindest eine Ausgangstransportmittel 906 zumindest einen Antrieb 913, z. B. einen Ausgangsantrieb 913, der weiter bevorzugt als insbesondere lagegeregelter Elektromotor 913 ausgebildet ist. Der zumindest eine Ausgangstransportmittel 906 und insbesondere dessen Antriebsregler ist bevorzugt mit der Maschinensteuerung der Bearbeitungsmaschine 01 und/oder mit der elektronischen Leitachse verbunden, insbesondere über das BUS-System.Additionally or alternatively, each of the at least two is preferably selective transport means 09 ; 906 as the respective suction transport means 09 ; 906 educated. It preferably has at least one selective transport means 09 ; 906 at least its own drive 21st ; 913 on, which is further preferred as a position-regulated electric motor in particular 21st ; 913 is trained. More preferably, each of the at least two selective transport means has 09 ; 906 each with its own drive 21st ; 913 on, which is further preferred as a position-regulated electric motor in particular 21st ; 913 is trained. In particular, it preferably has at least one exit transport means 906 at least one drive 913 , e.g. B. an output drive 913 , which is further preferred as a position-regulated electric motor in particular 913 is trained. The at least one exit transport means 906 and in particular its drive controller is preferred with the machine control of the processing machine 01 and / or connected to the electronic master axis, in particular via the BUS system.

Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs zwischen dem zumindest einen Selektivtransportmittel 906 einerseits und dem zumindest einen Bogenabbremsmittel 07 andererseits zumindest eine Überschuppungseinrichtung 46 angeordnet ist. Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass die zumindest eine Überschuppungseinrichtung 46 entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs zwischen der zumindest einen Bogenweiche 49 einerseits und dem zumindest einen Bogenabbremsmittel 07 andererseits angeordnet ist. Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass sie zumindest ein als oberes Saugtransportmittel 08 und/oder als Bogeneinlaufmittel 08 ausgebildetes Transportmittel 08 aufweist. Weiter bevorzugt ist das zumindest eine obere Saugtransportmittel 08 der zumindest einen Überschuppungseinrichtung 46 als passiv angetriebenes Saugtransportmittel 08 und/oder als Gleitsaugvorrichtung 08 ausgebildet.As an alternative or in addition, the sheet processing machine stands out 01 preferably in that along the for the transport of sheets 02 provided transport path between the at least one selective transport means 906 on the one hand and the at least one sheet braking means 07 on the other hand at least one overlapping device 46 is arranged. As an alternative or in addition, the sheet processing machine stands out 01 preferably characterized in that the at least one overlapping device 46 along the for the transport of bow 02 provided transport path between the at least one curved switch 49 on the one hand and the at least one sheet braking means 07 on the other hand is arranged. As an alternative or in addition, the sheet processing machine stands out 01 preferably in that they have at least one as an upper suction transport means 08 and / or as sheet entry means 08 trained means of transport 08 having. The at least one upper suction transport means is further preferred 08 the at least one overlapping device 46 as a passively driven suction transport means 08 and / or as a sliding suction device 08 educated.

Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass die Auslage 1000, bevorzugt die Bogenauslage 1000, zumindest einen vorderen Stapelbegrenzer 04 aufweist und/oder dass ein Auslagestapelbereich zumindest durch den zumindest einen hinteren Bogenanschlag 03 und den zumindest einen vorderen Stapelbegrenzer 04 begrenzt wird und/oder dass die Bogenauslage 1000 zumindest ein für einen hängenden Transport von Bogen 02 ausgebildetes oberes Bogentransportsystem 06 aufweist, das die zumindest eine Überschuppungseinrichtung 46 aufweist und/oder dass die zumindest eine Überschuppungseinrichtung 46 einer Überschuppung für einen geschuppten, hängenden Transport zumindest zweier Bogen 02 an zumindest einer in vertikaler Richtung V gesehen über dem Auslagestapelbereich angeordneten Stelle dient.As an alternative or in addition, the sheet processing machine stands out 01 preferred in that the display 1000 , prefers the sheet delivery 1000 , at least one front stack limiter 04 and / or that a delivery stack area at least through the at least one rear sheet stop 03 and the at least one front stack limiter 04 is limited and / or that the sheet delivery 1000 at least one for hanging bows 02 trained upper sheet transport system 06 having the at least one overlapping device 46 and / or that the at least one overlapping device 46 a shingling for a shingled, hanging transport of at least two sheets 02 at least one in the vertical direction V seen above the display stack area is used.

Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass das zumindest eine für einen hängenden Transport von Bogen 02 ausgebildete obere Bogentransportsystem 06 zumindest ein als oberes Saugtransportmittel 08 ausgebildetes Bogeneinlaufmittel 08 und zumindest ein als oberes Saugtransportmittel 07 ausgebildetes Bogenabbremsmittel 07 aufweist und/oder dass das zumindest eine Bogeneinlaufmittel 08 auf die Transportrichtung T bezogen zumindest teilweise vor dem zumindest einen Bogenabbremsmittel 07 angeordnet ist und/oder dass das zumindest eine Bogeneinlaufmittel 08 auf die Transportrichtung T bezogen zumindest teilweise vor dem zumindest einen vorderen Stapelbegrenzer 04 angeordnet ist und/oder sich über den zumindest einen vorderen Stapelbegrenzer 04 hinweg erstreckt und/oder dass zumindest ein nach unten wirkendes, aktivierbares Verdrängungselement 12 auf den für den Transport von Bogen 02 vorgesehenen Transportweg und/oder auf die Transportrichtung T bezogen im Bereich des zumindest einen Bogeneinlaufmittels 08 angeordnet ist und/oder dass zumindest ein nach unten wirkendes, aktivierbares Verdrängungselement 12 derart angeordnet ist, dass sein Verdrängungsbereich sich auf die Transportrichtung T bezogen zumindest teilweise mit einem durch das zumindest eine Bogeneinlaufmittel 08 bestimmten Transportabschnitt des für den Transport von Bogen 02 vorgesehenen Transportwegs überschneidet.As an alternative or in addition, the sheet processing machine stands out 01 preferably in that the at least one for a hanging transport of sheets 02 trained upper sheet transport system 06 at least one as an upper suction transport means 08 trained sheet inlet means 08 and at least one as an upper suction transport means 07 trained sheet braking means 07 and / or that the at least one sheet inlet means 08 on the transport direction T related at least partially in front of the at least one sheet braking means 07 is arranged and / or that the at least one sheet inlet means 08 on the transport direction T related at least partially in front of the at least one front stack limiter 04 is arranged and / or over the at least one front stack limiter 04 extends away and / or that at least one downwardly acting, activatable displacement element 12 on the one for transporting sheets 02 intended transport route and / or the transport direction T related in the area of the at least one sheet inlet means 08 is arranged and / or that at least one downwardly acting, activatable displacement element 12 is arranged such that its displacement area is in the direction of transport T related at least partially with one through the at least one sheet inlet means 08 specific transport section of the for the transport of sheets 02 intended transport route overlaps.

Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass das zumindest eine Bogenabbremsmittel 07 auf den für den Transport von Bogen 02 vorgesehenen Transportweg und/oder auf die Transportrichtung T bezogen vollständig nach dem zumindest einen vorderen Stapelbegrenzer 04 angeordnet ist. Dann ist bevorzugt sichergestellt, dass ein nachfolgender Bogen 02 nicht negativ von dem zumindest einen Borgenabbremsmittel 07 beeinflusst wird. Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass das zumindest eine Bogenabbremsmittel 07 auf den für den Transport von Bogen 02 vorgesehenen Transportweg und/oder auf die Transportrichtung T bezogen das nächste Transportmittel 07 nach dem zumindest einen Bogeneinlaufmittel 08 ist.As an alternative or in addition, the sheet processing machine stands out 01 preferably in that the at least one sheet braking means 07 on the one for transporting sheets 02 intended transport route and / or the transport direction T related completely to the at least one front stack limiter 04 is arranged. It is then preferably ensured that a subsequent arc 02 not negative from the at least one borrow deceleration means 07 being affected. As an alternative or in addition, the sheet processing machine stands out 01 preferably in that the at least one sheet braking means 07 on the one for transporting sheets 02 intended transport route and / or the transport direction T took the next means of transport 07 after the at least one sheet inlet means 08 is.

Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs nach dem zumindest einen Separationstransportmittel 904 bis oberhalb des Auslagestapelträgers 48 der Bogenauslage 1000 ausschließlich als obere Saugtransportmittel 906; 07; 08; 09 ausgebildete Transportmittel 906; 07; 08; 09 und/oder für einen hängenden Transport von Bogen 02 vorgesehene Transportmittel 906; 07; 08; 09 für Bogen 02 angeordnet sind.As an alternative or in addition, the sheet processing machine stands out 01 preferably in that along the for the transport of sheets 02 provided transport path after the at least one separation transport means 904 to above the delivery pile carrier 48 the sheet delivery 1000 exclusively as upper suction transport means 906 ; 07 ; 08 ; 09 trained means of transport 906 ; 07 ; 08 ; 09 and / or for a hanging transport of sheets 02 intended means of transport 906 ; 07 ; 08 ; 09 for bow 02 are arranged.

Beispielsweise ist entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs zumindest ein als Formgebungsstelle 909 ausgebildetes, von oben und unten auf Bogen 02 einwirkendes und/oder einzuwirken fähiges Transportmittel 909 angeordnet. Beispielsweise ist entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs nach der zumindest einen Formgebungsstelle 909 zumindest ein als Separationstransportmittel 904 ausgebildetes, bevorzugt von oben und unten auf Bogen 02 einwirkendes und/oder einzuwirken fähiges Transportmittel 904 angeordnet. Beispielsweise ist entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs nach dem zumindest einen Separationstransportmittel 904 zumindest ein als Ausgangstransportmittel 906 ausgebildetes, bevorzugt für einen hängenden Transport von Bogen 02 vorgesehenes und/oder nur von oben auf Bogen 02 einwirkendes und/oder einzuwirken fähiges Transportmittel 906 angeordnet. Bevorzugt befindet sich entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs am Ende des zumindest einen Ausgangstransportmittel 906 eine Übergabestelle zur hängenden Übergabe von Bogen 02 an ein nachfolgendes oberes Saugtransportmittel 09.For example, along the for the transport of sheets 02 provided transport path at least one as a shaping point 909 trained, from above and below on arch 02 Means of transport acting and / or capable of acting 909 arranged. For example, along the for the transport of sheets 02 provided transport path after the at least one shaping point 909 at least one as a separation transport 904 trained, preferably from above and below on arches 02 Means of transport acting and / or capable of acting 904 arranged. For example, along the for the transport of sheets 02 provided transport path after the at least one separation transport means 904 at least one as an exit means of transport 906 trained, preferably for a hanging transport of sheets 02 provided and / or only from above on sheet 02 Means of transport acting and / or capable of acting 906 arranged. It is preferably located along the for the transport of sheets 02 provided transport path at the end of the at least one output transport means 906 a transfer point for the hanging transfer of sheets 02 to a subsequent upper suction transport means 09 .

Beispielsweise ist entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs nach dem zumindest einen Ausgangstransportmittel 906 zumindest ein als Bogenübergabemittel 09 ausgebildetes, bevorzugt für einen hängenden Transport von Bogen 02 vorgesehenes und/oder nur von oben auf Bogen 02 einwirkendes und/oder einzuwirken fähiges Transportmittel 09 angeordnet. Beispielsweise ist entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs nach dem zumindest einen Bogenübergabemittel 09 zumindest ein als Bogeneinlaufmittel 08 ausgebildetes, bevorzugt für einen hängenden Transport von Bogen 02 vorgesehenes und/oder nur von oben auf Bogen 02 einwirkendes und/oder einzuwirken fähiges Transportmittel 08 angeordnet. Beispielsweise ist entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs nach dem zumindest einen Bogeneinlaufmittel 08 zumindest ein als Bogenabbremsmittel 07 ausgebildetes, bevorzugt für einen hängenden Transport von Bogen 02 vorgesehenes und/oder nur von oben auf Bogen 02 einwirkendes und/oder einzuwirken fähiges Transportmittel 07 angeordnet.For example, along the for the transport of sheets 02 provided transport path after the at least one output transport means 906 at least one as a sheet transfer means 09 trained, preferably for a hanging transport of sheets 02 provided and / or only from above on sheet 02 Means of transport acting and / or capable of acting 09 arranged. For example, along the for the transport of sheets 02 provided transport path after the at least one sheet transfer means 09 at least one as sheet inlet means 08 trained, preferably for a hanging transport of sheets 02 provided and / or only from above on sheet 02 Means of transport acting and / or capable of acting 08 arranged. For example, along the for the transport of sheets 02 provided transport path after the at least one sheet entry means 08 at least one as sheet braking means 07 trained, preferably for a hanging transport of sheets 02 provided and / or only from above on sheet 02 Means of transport acting and / or capable of acting 07 arranged.

Zusätzlich oder alternativ ist bevorzugt die Bogenauslage 1000 eine Bogenauslage 1000 einer Bogenbearbeitungsmaschine 01. Die Bogenauslage 1000 weist bevorzugt zumindest einen hinteren Bogenanschlag 03 auf, der auch als hinterer Stapelbegrenzer 03 bezeichnet wird. Die Bogenauslage 1000 weist bevorzugt zumindest einen vorderen Stapelbegrenzer 04 auf, der auch als vorderer Bogenanschlag 04 bezeichnet wird. Die Transportrichtung T ist bevorzugt eine horizontale Richtung T, die von dem vorderen Stapelbegrenzer 04 zu dem hinteren Bogenanschlag 03 orientiert ist.In addition or as an alternative, the sheet delivery is preferred 1000 a sheet delivery 1000 a sheet processing machine 01 . The sheet delivery 1000 preferably has at least one rear bow stop 03 on, which also acts as a rear stack limiter 03 referred to as. The sheet delivery 1000 preferably has at least one front stack limiter 04 on, which is also used as the front sheet stop 04 referred to as. The direction of transport T is preferably a horizontal direction T from the front stack limiter 04 to the rear sheet stop 03 is oriented.

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass die Bogenauslage 1000 zumindest ein insbesondere für einen hängenden Transport von Bogen 02 ausgebildetes Bogentransportsystem 06 aufweist, das weiter bevorzugt als oberes Bogentransportsystem 06 ausgebildet ist. Das insbesondere obere Bogentransportsystem 06 weist bevorzugt zumindest ein als oberes Saugtransportmittel 08 ausgebildetes Bogeneinlaufmittel 08 auf. Das insbesondere obere Bogentransportsystem 06 weist bevorzugt des zumindest eine als oberes Saugtransportmittel 07 ausgebildete Bogenabbremsmittel 07 auf. Das zumindest eine Bogeneinlaufmittel 08 ist auf die Transportrichtung T bezogen bevorzugt zumindest teilweise vor dem zumindest einen Bogenabbremsmittel 07 angeordnet. Insbesondere ist das zumindest eine Bogenabbremsmittel 07 auf die Transportrichtung T bezogen vorzugsweise zumindest teilweise nach dem zumindest einen Bogeneinlaufmittel 08 angeordnet.Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the sheet delivery 1000 at least one, in particular for hanging sheet transport 02 trained sheet transport system 06 has, which is further preferred as an upper sheet transport system 06 is trained. The particular upper sheet transport system 06 preferably has at least one as an upper suction transport means 08 trained sheet inlet means 08 on. The particular upper sheet transport system 06 preferably has the at least one as the upper suction transport means 07 trained sheet braking means 07 on. The at least one sheet inlet means 08 is on the direction of transport T preferably at least partially covered in front of the at least one sheet braking means 07 arranged. In particular, this is at least one sheet braking means 07 on the transport direction T preferably based at least partially after the at least one sheet inlet means 08 arranged.

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass das zumindest eine Bogeneinlaufmittel 08 und das zumindest eine Bogenabbremsmittel 07 derart angeordnet sind, dass sich das zumindest eine Bogeneinlaufmittel 08 einerseits und das zumindest eine Bogenabbremsmittel 07 auf die Transportrichtung T bezogen teilweise überlappen. Das bedeutet insbesondere, dass in diesem Fall bevorzugt zumindest ein Bestandteil des zumindest einen Bogeneinlaufmittels 08 und zumindest ein Bestandteil des zumindest einen Bogenabbremsmittels 07 in der Querrichtung A nebeneinander angeordnet sind. In einer möglichen Weiterbildung ist ein Bestandteil einer Transportfläche 22 des zumindest einen Bogenabbremsmittels 07 in der Querrichtung A neben einem Bestandteil einer Transportfläche 23 des zumindest einen Bogeneinlaufmittels 08 angeordnet.Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the at least one sheet inlet means 08 and the at least one sheet braking means 07 are arranged such that the at least one sheet inlet means 08 on the one hand and the at least one sheet braking means 07 on the transport direction T partially overlap. This means in particular that in this case at least one component of the at least one sheet inlet means is preferred 08 and at least part of the at least one sheet braking means 07 in the transverse direction A. are arranged side by side. In a possible further development, one component is a transport surface 22nd of the at least one sheet braking means 07 in the transverse direction A. next to a component a transport area 23 of the at least one sheet inlet means 08 arranged.

Zusätzlich oder alternativ ist bevorzugt zumindest ein Bogenübergabemittel 09 auf die Transportrichtung T bezogen und/oder entlang des für den Transport von Bogen 02 vorgesehenen Transportwegs zumindest teilweise vor dem zumindest einen Bogeneinlaufmittel 08 und weiter bevorzugt vollständig vor dem zumindest einen Bogenabbremsmittel 07 angeordnet. Das zumindest eine Bogenübergabemittel 09 dient bevorzugt dazu, Bogen 02 von einem weiter vorne angeordneten Bereich der Bearbeitungsmaschine 01 kommend der Bogenauslage 1000 und/oder dem zumindest einen Bogeneinlaufmittel 08 zuzuführen. Das zumindest eine Bogenübergabemittel 09 ist beispielsweise als Bestandteil der Bogenauslage 1000 oder als Bestandteil eines anderen Aggregats 600; 700; 900 ausgebildet, beispielsweise als Bestandteil des zumindest einen Formgebungsaggregats 900 oder Stanzaggregats 900 oder als Bestandteil eines Auftragsaggregats 600 oder als Bestandteil eines Transportaggregats 700.Additionally or alternatively, at least one sheet transfer means is preferred 09 on the transport direction T related and / or along the for the transport of sheets 02 provided transport path at least partially in front of the at least one sheet inlet means 08 and more preferably completely in front of the at least one sheet braking means 07 arranged. The at least one sheet transfer means 09 is preferably used to arch 02 from a further forward area of the processing machine 01 coming to the sheet delivery 1000 and / or the at least one sheet inlet means 08 feed. The at least one sheet transfer means 09 is for example part of the sheet delivery 1000 or as part of another unit 600 ; 700 ; 900 formed, for example as part of the at least one shaping unit 900 or punching unit 900 or as part of an application unit 600 or as part of a transport unit 700 .

Zusätzlich oder alternativ ist das zumindest eine Bogenübergabemittel 09 bevorzugt als zumindest ein oberes Saugtransportmittel 09 ausgebildet, weiter bevorzugt als zumindest ein Saugband 09. Bevorzugt weist das zumindest eine Bogenübergabemittel 09 eine Mehrzahl von in der Querrichtung A nebeneinander angeordneten Transportbändern 38 auf, die jeweils Ansaugöffnungen 36 aufweisen. Durch die Transportbänder 38 des zumindest einen Bogenübergabemittels 09 ist bevorzugt eine Transportfläche 24 des zumindest einen Bogenübergabemittels 09 festgelegt. Die einzelnen Transportbänder 38 des zumindest einen Bogenübergabemittels 09 sind bevorzugt zueinander beabstandet angeordnet. Die dazwischen angeordneten Zwischenräume bieten bevorzugt Platz dafür, das zumindest eine Bogenübergabemittel 09 und das zumindest eine Bogeneinlaufmittel 08 auf die Transportrichtung T bezogen teilweise überlappend anzuordnen.Additionally or alternatively, this is at least one sheet transfer means 09 preferably as at least one upper suction transport means 09 formed, more preferably as at least one suction belt 09 . This preferably has at least one sheet transfer means 09 a plurality of in the transverse direction A. conveyor belts arranged next to one another 38 on, the respective suction openings 36 exhibit. Through the conveyor belts 38 of the at least one sheet transfer means 09 is preferably a transport surface 24 of the at least one sheet transfer means 09 set. The individual conveyor belts 38 of the at least one sheet transfer means 09 are preferably arranged at a distance from one another. The intermediate spaces arranged between them preferably offer space for the at least one sheet transfer means 09 and the at least one sheet inlet means 08 on the transport direction T related partially overlapping.

In einer bevorzugten Ausführung ist zumindest ein als oberes Saugtransportmittel 09 ausgebildetes Bogenübergabemittel 09 auf die Transportrichtung T bezogen zumindest teilweise vor dem zumindest einen Bogeneinlaufmittel 08 angeordnet und weiter bevorzugt vollständig vor dem zumindest einen Bogenabbremsmittel 07. Insbesondere ist bevorzugt das zumindest eine Bogeneinlaufmittel 08 auf die Transportrichtung T bezogen zumindest teilweise nach dem zumindest einen Bogenübergabemittel 09 angeordnet.In a preferred embodiment, at least one is used as the upper suction transport means 09 trained sheet transfer means 09 on the transport direction T related at least partially in front of the at least one sheet inlet means 08 arranged and more preferably completely in front of the at least one sheet braking means 07 . In particular, the at least one sheet inlet means is preferred 08 on the transport direction T related at least partially to the at least one sheet transfer means 09 arranged.

Zusätzlich oder alternativ ist bevorzugt zumindest ein als Übergabemittelantrieb 21 ausgebildeter Antrieb 21 angeordnet, mittels dem das zumindest eine Bogenübergabemittel 09 antreibbar ausgebildet ist, insbesondere bezüglich Bewegungen der Transportfläche 24 des zumindest einen Bogenübergabemittels 09 zumindest in Transportrichtung T. Der zumindest eine Übergabemittelantrieb 21 ist bevorzugt als insbesondere lagegeregelter Elektromotor 21 ausgebildet. Der zumindest eine Übergabemittelantrieb 21 und insbesondere dessen Antriebsregler ist bevorzugt mit der Maschinensteuerung der Bearbeitungsmaschine 01 und/oder mit der elektronischen Leitachse verbunden, insbesondere über das BUS-System.Additionally or alternatively, at least one is preferred as a transfer device drive 21st trained drive 21st arranged by means of which the at least one sheet transfer means 09 is designed to be drivable, in particular with respect to movements of the transport surface 24 of the at least one sheet transfer means 09 at least in the direction of transport T . The at least one transfer device drive 21st is preferred as a position-regulated electric motor in particular 21st educated. The at least one transfer device drive 21st and in particular its drive controller is preferred with the machine control of the processing machine 01 and / or connected to the electronic master axis, in particular via the BUS system.

In einer bevorzugten Ausführung überlappen das zumindest eine Bogenübergabemittel 09 einerseits und das zumindest eine Bogeneinlaufmittel 08 auf die Transportrichtung T bezogen teilweise. Das bedeutet insbesondere, dass in diesem Fall bevorzugt zumindest ein Bestandteil des zumindest einen Bogenübergabemittels 09 und zumindest ein Bestandteil des zumindest einen Bogeneinlaufmittels 08 in der Querrichtung A nebeneinander angeordnet sind. In einer möglichen Weiterbildung ist ein Bestandteil der Transportfläche 24 des zumindest einen Bogenübergabemittels 09 in der Querrichtung A neben einem Bestandteil der Transportfläche 23 des zumindest einen Bogeneinlaufmittels 08 angeordnet.In a preferred embodiment, the at least one sheet transfer means overlap 09 on the one hand and the at least one sheet inlet means 08 on the transport direction T related partially. This means in particular that in this case at least one component of the at least one sheet transfer means is preferred 09 and at least one component of the at least one sheet inlet means 08 in the transverse direction A. are arranged side by side. In a possible further development, part of the transport area is 24 of the at least one sheet transfer means 09 in the transverse direction A. next to part of the transport area 23 of the at least one sheet inlet means 08 arranged.

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass das zumindest eine Bogeneinlaufmittel 08 vor dem zumindest einen vorderen Stapelbegrenzer 04 beginnt und auch dem zumindest einen vorderen Stapelbegrenzer 04 endet. Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass das zumindest eine Bogeneinlaufmittel 08 sich insbesondere auf die Transportrichtung T bezogen über den zumindest einen vorderen Stapelbegrenzer 04 hinweg erstreckt, also insbesondere vor dem zumindest einen vorderen Stapelbegrenzer 04 beginnt und nach dem zumindest einen vorderen Stapelbegrenzer 04 endet. Bevorzugt wird, dass die Bogen 02 zumindest zeitweise mittels des zumindest einen Bogeneinlaufmittels 08 in einem vertikal oberhalb des zumindest einen vorderen Stapelbegrenzers 04 angeordneten Bereich gehalten werden, insbesondere oben gehalten werden, insbesondere während sie transportiert werden. Das zumindest eine Bogeneinlaufmittel 08 ist bevorzugt als Rollensaugsystem 08 ausgebildet und weist weiter bevorzugt eine Mehrzahl von Transportrollen 26 auf. Beispielsweise weist das zumindest eine Rollensaugsystem 08 mehrere Wellen auf, die jeweils um eine jeweilige Achse rotierbar sind, wobei sich diese Achse jeweils in der Querrichtung A erstreckt. Beispielsweise sind an jeder dieser Wellen jeweils mehrere Transportrollen 26 insbesondere voneinander beabstandet in der Querrichtung A nebeneinander angeordnet. Bevorzugt weist das zumindest eine Bogeneinlaufmittel 08 jedoch mehrere einzelne Leitelemente 39 auf, die jeweils eine Mehrzahl von Transportrollen 26 aufweisen, die in der Transportrichtung T hintereinander angeordnet sind und weiter bevorzugt unabhängig voneinander drehbar und/oder rotierbar sind. Beispielsweise weist jedes derartige Leitelement 39 genau eine Reihe von solchen Transportrollen 26 auf. Die Transportrollen 26 sind bevorzugt in einem jeweiligen Gehäuse des jeweiligen Leitelements 39 gelagert, das weiter bevorzugt zugleich eine entsprechende Unterdruckkammer bildet. Beispielsweise sind die jeweiligen Leitelemente 39 voneinander in der Querrichtung A beabstandet angeordnet. Beispielsweise sind die Leitelemente 39 zumindest teilweise beispielsweise an einem ihrer Enden in einem jeweiligen Zwischenraum zwischen Transportbändern 38 des zumindest einen Bogenübergabemittels 09 angeordnete und an ihrem anderen Ende in einem jeweiligen Zwischenraum zwischen Transportbändern 37 der zumindest einen Bogenabbremsmittels 07 angeordnet.Alternatively or additionally, the sheet delivery stands out 1000 preferably characterized in that the sheet delivery is distinguished 1000 preferably in that the at least one sheet inlet means 08 in front of the at least one front stack limiter 04 begins and also the at least one front stack limiter 04 ends. Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the at least one sheet inlet means 08 in particular on the direction of transport T related to the at least one front stack limiter 04 extends away, so in particular in front of the at least one front stack limiter 04 begins and after at least one front stack limiter 04 ends. It is preferred that the arch 02 at least temporarily by means of the at least one sheet inlet means 08 in one vertically above the at least one front stack limiter 04 arranged area are held, in particular held above, in particular while they are being transported. The at least one sheet inlet means 08 is preferred as a roller suction system 08 formed and further preferably has a plurality of transport rollers 26th on. For example, it has at least one roller suction system 08 several shafts which are each rotatable about a respective axis, this axis each in the transverse direction A. extends. For example, there are several transport rollers on each of these shafts 26th in particular spaced from one another in the transverse direction A. arranged side by side. This preferably has at least one sheet inlet means 08 however several individual ones Guiding elements 39 on, each having a plurality of transport rollers 26th have in the direction of transport T are arranged one behind the other and are more preferably rotatable and / or rotatable independently of one another. For example, each such guide element 39 exactly a number of such transport rollers 26th on. The transport rollers 26th are preferably in a respective housing of the respective guide element 39 stored, which further preferably forms a corresponding vacuum chamber at the same time. For example, the respective guide elements 39 from each other in the transverse direction A. spaced apart. For example, the guide elements 39 at least partially, for example at one of their ends in a respective space between conveyor belts 38 of the at least one sheet transfer means 09 arranged and at their other end in a respective space between conveyor belts 37 the at least one sheet braking means 07 arranged.

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass das zumindest eine Bogeneinlaufmittel 08 als passiv angetriebenes Saugtransportmittel 08 ausgebildet ist, insbesondere auf einen Bogentransport in Transportrichtung T bezogen und/oder bezüglich seiner Transportfläche 23. Unter einem passiv angetriebenen Saugtransportmittel 08 ist dabei insbesondere ein Saugtransportmittel 08 zu verstehen, das keinen eigenen Antrieb zum vorwärts bewegen der Bogen 02 aufweist, sondern zumindest eine frei bewegbare, insbesondere frei drehbare Transportfläche 23 aufweist, die lediglich durch einen Kontakt mit einem Bogen 02 in Bewegung versetzt wird. Das passive angetriebene Saugtransportmittel 08 hält die Bogen 02 dennoch mittels Unterdruck an seiner Transportfläche 23, nimmt aber bevorzugt keinen aktiven Einfluss auf deren Bewegung in der Transportrichtung T.Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the at least one sheet inlet means 08 as a passively driven suction transport means 08 is designed, in particular on a sheet transport in the transport direction T related and / or with regard to its transport area 23 . Under a passively powered suction conveyor 08 is in particular a suction transport means 08 to understand that this does not have its own drive to move the bow forward 02 has, but at least one freely movable, in particular freely rotatable transport surface 23 having that only through contact with an arc 02 is set in motion. The passive powered suction transport 08 holds the bow 02 nevertheless by means of negative pressure on its transport surface 23 , but preferably has no active influence on their movement in the transport direction T .

In einer bevorzugten Ausführung bietet das als passiv angetriebenes Saugtransportmittel 08 und als Rollensaugsystem 08 ausgebildete zumindest eine Bogeneinlaufmittel 08 den Vorteil, dass Teile zumindest zweier Bogen 02 gleichzeitig damit mit unterschiedlichen Geschwindigkeiten transportiert werden können. Bevorzugt liegt im Bogeneinlaufmittel 08 während des Betriebs der Bogenbearbeitungsmaschine 01 durchgehend ein Unterdruck vor.In a preferred embodiment, this offers a passively driven suction transport means 08 and as a roller suction system 08 trained at least one sheet inlet means 08 the advantage that parts of at least two arches 02 can be transported at the same time at different speeds. Preferably lies in the sheet inlet means 08 during operation of the sheet processing machine 01 a negative pressure throughout.

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass zumindest ein Bremsmittelantrieb 19 angeordnet ist, mittels dem das zumindest eine Bogenabbremsmittel 07 antreibbar ausgebildet ist. Der zumindest eine Bremsmittelantrieb 19 ist bevorzugt als insbesondere lagegeregelter Elektromotor 19 ausgebildet. Der zumindest eine Bremsmittelantrieb 19 und insbesondere dessen Antriebsregler ist bevorzugt mit der Maschinensteuerung der Bearbeitungsmaschine 01 und/oder mit der elektronischen Leitachse verbunden, insbesondere über das BUS-System. Mittels des zumindest einen Bogenabbremsmittels 07 sind Bogen 02 abbremsbar, beispielsweise ausgehend von einer Übergabegeschwindigkeit und/oder auf eine Endgeschwindigkeit. Die Übergabegeschwindigkeit ist bevorzugt eine Geschwindigkeit, mit der Bogen 02 der Bogenauslage 1000 zugeführt werden. Die Endgeschwindigkeit ist bevorzugt eine auf den für den Transport von Bogen 02 vorgesehenen Transportweg und/oder auf die Transportrichtung T bezogene Geschwindigkeit, mit der Bogen 02 in dem Moment transportiert werden, in dem sie von dem zumindest einen Bogenabbremsmittel 07 abgelöst werden. Bevorzugt ist die Endgeschwindigkeit Null. Dabei soll eine nach unten gerichtete Bewegung zum Ablegen der jeweiligen Bogen 02 auf einem Auslagestapel 28 unberücksichtigt bleiben.Alternatively or additionally, the sheet delivery stands out 1000 preferably in that at least one brake means drive 19th is arranged by means of which the at least one sheet braking means 07 is designed to be drivable. The at least one braking device drive 19th is preferred as a position-regulated electric motor in particular 19th educated. The at least one braking device drive 19th and in particular its drive controller is preferred with the machine control of the processing machine 01 and / or connected to the electronic master axis, in particular via the BUS system. By means of the at least one sheet braking means 07 are arches 02 can be braked, for example based on a transfer speed and / or on a final speed. The transfer speed is preferably a speed at which sheets 02 the sheet delivery 1000 are fed. The top speed is preferably one for the transport of sheets 02 intended transport route and / or the transport direction T related speed with the bow 02 are transported at the moment in which they are at least one sheet braking means 07 be replaced. The final speed is preferably zero. A downward movement should be used to deposit the respective sheet 02 on a display pile 28 remain unconsidered.

In einer bevorzugten Ausführung ist das zumindest eine Bogenabbremsmittel 07 bevorzugt als zumindest ein Saugband 07 ausgebildet. Bevorzugt weist das zumindest eine Bogenabbremsmittel 07 eine Mehrzahl von in der Querrichtung A nebeneinander angeordneten Transportbändern 37 auf, die jeweils Ansaugöffnungen 36 aufweisen. Durch die Transportbänder 37 des zumindest einen Bogenabbremsmittels 07 ist bevorzugt die Transportfläche 22 des zumindest einen Bogenabbremsmittels 07 festgelegt. Die einzelnen Transportbänder 37 des zumindest einen Bogenabbremsmittels 07 sind bevorzugt zueinander beabstandet angeordnet. Die dazwischen angeordneten Zwischenräume bieten beispielsweise Platz für zumindest ein und bevorzugt jeweils ein Abwurfmittel 32. Die dazwischen angeordneten Zwischenräume bieten alternativ oder zusätzlich Platz dafür, das zumindest eine Bogenabbremsmittel 07 und das zumindest eine Bogeneinlaufmittel 08 auf die Transportrichtung T bezogen teilweise überlappend anzuordnen.In a preferred embodiment, this is at least one sheet braking means 07 preferably as at least one suction belt 07 educated. This preferably has at least one sheet braking means 07 a plurality of in the transverse direction A. conveyor belts arranged next to one another 37 on, the respective suction openings 36 exhibit. Through the conveyor belts 37 of the at least one sheet braking means 07 is preferably the transport surface 22nd of the at least one sheet braking means 07 set. The individual conveyor belts 37 of the at least one sheet braking means 07 are preferably arranged at a distance from one another. The intermediate spaces arranged in between offer, for example, space for at least one and preferably one release means in each case 32 . As an alternative or in addition, the spaces arranged in between offer space for the at least one sheet braking means 07 and the at least one sheet inlet means 08 on the transport direction T related partially overlapping.

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass die Bogenauslage 1000 zumindest ein Abwurfmittel 32 aufweist, das zwischen zumindest einer Bereitschaftslage und zumindest einer Abwurflage bewegbar ist und dass das zumindest eine Abwurfmittel 32 in seiner zumindest einen Bereitschaftslage vollständig oberhalb desjenigen Teils der Transportfläche 22 des zumindest einen Bogenabbremsmittels 07 angeordnet ist, die den für den Transport von Bogen 02 vorgesehenen Transportweg mit festlegt und dass das zumindest eine Abwurfmittel 32 in seiner zumindest einen Abwurflage zumindest teilweise nach unten bis unter diesen Teil der Transportfläche 22 des zumindest einen Bogenabbremsmittels 07 ragt. Das zumindest eine Abwurfmittel 32 dient insbesondere dazu, Bogen 02 gezielt, insbesondere gesteuert und/oder geregelt nach unten zu drücken und/oder von dem zumindest einen Bogenabbremsmittel 07 zu lösen, insbesondere damit der jeweilige Bogen 02 auf den Auslagestapel 28 abgelegt werden kann. Bevorzugt ist zumindest ein Abwurfantrieb 33; 34 angeordnet, mittels das zumindest eine Abwurfmittel 32 bewegbar ist. Der zumindest eine Abwurfantrieb 33; 34 ist bevorzugt als insbesondere lagegeregelter Elektromotor 33; 34 ausgebildet. Alternativ oder zusätzlich kann auch zumindest ein hydraulischer und/oder zumindest ein pneumatischer Abwurfantrieb angeordnet sein. Alternativ oder zusätzlich kann auch zumindest eine Blaseinrichtung angeordnet sein, um das Ablösen der Bogen 02 von dem zumindest einen Bogenabbremsmittel 07 zu bewirken und/oder zu unterstützen. Der zumindest eine Abwurfantrieb 33; 34 und insbesondere dessen Antriebsregler ist bevorzugt mit der Maschinensteuerung der Bearbeitungsmaschine 01 und/oder mit der elektronischen Leitachse verbunden, insbesondere über das BUS-System.Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the sheet delivery 1000 at least one release device 32 which is movable between at least one standby position and at least one throwing position and that the at least one throwing means 32 in its at least one ready position completely above that part of the transport surface 22nd of the at least one sheet braking means 07 is arranged for the transport of sheets 02 intended transport route and that the at least one dropping means 32 in its at least one drop position, at least partially down to below this part of the transport surface 22nd of the at least one sheet braking means 07 protrudes. At least one drop device 32 serves in particular to arch 02 specifically, in particular in a controlled and / or regulated manner, to press down and / or by the at least one sheet braking means 07 to solve, especially with it the respective bow 02 on the display pile 28 can be filed. At least one ejection drive is preferred 33 ; 34 arranged by means of the at least one dropping means 32 is movable. The at least one release drive 33 ; 34 is preferred as a position-regulated electric motor in particular 33 ; 34 educated. Alternatively or additionally, at least one hydraulic and / or at least one pneumatic discharge drive can also be arranged. As an alternative or in addition, at least one blowing device can also be arranged in order to detach the sheets 02 of the at least one sheet braking means 07 to effect and / or support. The at least one release drive 33 ; 34 and in particular its drive controller is preferred with the machine control of the processing machine 01 and / or connected to the electronic master axis, in particular via the BUS system.

Zusätzlich oder alternativ ist vorzugsweise das zumindest eine Abwurfmittel 32 an einer ersten Verbindungsstelle 41 mit einem ersten Abwurfantrieb 33 verbunden, insbesondere über zumindest ein erstes Abwurfgetriebe 43. Das erste Abwurfgetriebe 43 weist beispielsweise zumindest einen mit dem ersten Abwurfantrieb 33 verbundenen ersten Abwurfexzenter auf, der mit einem oberen Ende eines ersten Abwurfpleuels verbunden ist. An einem unteren Ende ist der erste Abwurfpleuel bevorzugt mit einem ersten Führungselement verbunden, beispielsweise einem ersten Führungshebel. Dadurch werden Freiheitsgrade von Bewegungen dieses unteren Endes des ersten Abwurfpleuels begrenzt. Dieses untere Ende des ersten Abwurfpleuels ist beispielsweise über zumindest ein erstes Aufhängungselement an der ersten Verbindungsstelle 41 mit dem jeweiligen Abwurfmittel 32 verbunden. Bevorzugt ist das zumindest eine Abwurfmittel 32 an einer zweiten Verbindungsstelle 42 mit einem zweiten Abwurfantrieb 34 verbunden, insbesondere über ein zweites Abwurfgetriebe 44. Das zweite Abwurfgetriebe 44 weist beispielsweise zumindest einen mit dem zweiten Abwurfantrieb 34 verbundenen zweiten Abwurfexzenter auf, der mit einem oberen Ende eines zweiten Abwurfpleuels verbunden ist. An einem unteren Ende ist der zweite Abwurfpleuel bevorzugt mit einem zweiten Führungselement verbunden, beispielsweise einem zweiten Führungshebel. Dadurch werden Freiheitsgrade von Bewegungen unteren zweiten Endes des zweiten Abwurfpleuels begrenzt. Dieses untere Ende des zweiten Abwurfpleuels ist beispielsweise über zumindest ein zweites Aufhängungselement an der zweiten Verbindungsstelle 42 mit dem jeweiligen Abwurfmittel 32 verbunden. Bevorzugt ist die erste Verbindungsstelle 41 auf die Transportrichtung T bezogen vor der zweiten Verbindungsstelle 42 angeordnet.Additionally or alternatively, the at least one release means is preferably 32 at a first connection point 41 with a first ejection drive 33 connected, in particular via at least a first ejection gear 43 . The first ejection gear 43 has, for example, at least one with the first ejection drive 33 connected first eccentric which is connected to an upper end of a first ejector rod. At a lower end, the first ejection connecting rod is preferably connected to a first guide element, for example a first guide lever. This limits the degrees of freedom of movements of this lower end of the first dropping rod. This lower end of the first dropping connecting rod is, for example, at the first connection point via at least one first suspension element 41 with the respective release device 32 connected. This is preferably at least one release means 32 at a second connection point 42 with a second ejection drive 34 connected, in particular via a second ejection gear 44 . The second ejection gear 44 has, for example, at least one with the second ejection drive 34 connected second eccentric eccentric, which is connected to an upper end of a second ejector rod. At a lower end, the second ejection connecting rod is preferably connected to a second guide element, for example a second guide lever. As a result, degrees of freedom of movements of the lower second end of the second dropping rod are limited. This lower end of the second drop connecting rod is, for example, at the second connection point via at least one second suspension element 42 with the respective release device 32 connected. The first connection point is preferred 41 on the transport direction T related to the second connection point 42 arranged.

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass die Bogenauslage 1000 zumindest ein für einen hängenden Transport von Bogen 02 ausgebildetes oberes Bogentransportsystem 06 mit zumindest einer Überschuppungseinrichtung 46 zum geschuppten, hängenden Transport zumindest zweier Bogen 02 aufweist, insbesondere zum geschuppten, hängenden Transport zumindest zweier Bogen 02 an zumindest einer in vertikaler Richtung V gesehen über zumindest einem Auslagestapelträger 48 und/oder über einem Auslagestapel 28 und/oder über einem Auslagestapelbereich angeordneten Stelle. Der Auslagestapelbereich ist bevorzugt derjenige Bereich, in dem im Betrieb der Bogenauslage 1000 und/oder der Bogenbearbeitungsmaschine 01 der jeweilige Auslagestapel 28 insbesondere auf dem zumindest einen Auslagestapelträger 48 gebildet wird. Der Auslagestapelbereich wird bevorzugt zumindest durch den zumindest einen hinteren Bogenanschlag 03 und den zumindest einen vorderen Stapelbegrenzer 04 begrenzt, insbesondere bezüglich der Transportrichtung T. Der zumindest eine Auslagestapelträger 48 ist beispielsweise eine Palette und/oder ein eine Palette tragender und/oder zu tragen fähiger Bestandteil der Bogenauslage 1000 und/oder der Bogenbearbeitungsmaschine 01.Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the sheet delivery 1000 at least one for hanging bows 02 trained upper sheet transport system 06 with at least one overlapping device 46 for shingled, hanging transport of at least two sheets 02 has, in particular for the shingled, hanging transport of at least two sheets 02 at least one in the vertical direction V seen over at least one delivery pile carrier 48 and / or above a delivery pile 28 and / or point arranged above a delivery stack area. The delivery stack area is preferably that area in which the sheet delivery is in operation 1000 and / or the sheet processing machine 01 the respective delivery pile 28 in particular on the at least one delivery pile carrier 48 is formed. The delivery stack area is preferably at least formed by the at least one rear sheet stop 03 and the at least one front stack limiter 04 limited, especially with regard to the direction of transport T . The at least one delivery pile carrier 48 is, for example, a pallet and / or a component of the sheet delivery which carries a pallet and / or which can be carried 1000 and / or the sheet processing machine 01 .

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass zumindest ein nach unten wirkendes, insbesondere nach unten auf Bogen 02 einzuwirken fähiges Verdrängungselement 12 angeordnet ist. Das zumindest eine Verdrängungselement 12 ist bevorzugt aktivierbar ausgebildet. Das zumindest eine Verdrängungselement 12 ist weiter bevorzugt auch deaktivierbar ausgebildet. Dann kann das zumindest eine Verdrängungselement 12 für jeden Bogen 02 aktiviert und danach wieder deaktiviert werden. Das zumindest eine Verdrängungselement 12 ist bevorzugt auf die Transportrichtung T bezogen bevorzugt im Bereich des zumindest einen Bogeneinlaufmittels 08 angeordnet. Das zumindest eine Verdrängungselement 12 ist bevorzugt derart angeordnet ist, dass sein Verdrängungsbereich sich auf die Transportrichtung T bezogen bevorzugt zumindest teilweise mit einem durch das zumindest eine Bogeneinlaufmittel 08 bestimmten Transportabschnitt des für den Transport von Bogen 02 vorgesehenen Transportwegs überschneidet. Insbesondere ist also das zumindest eine Verdrängungselement 12 auf die Transportrichtung T bezogen bevorzugt zumindest teilweise und weiter bevorzugt vollständig an zumindest einer Stelle angeordnet, an der auf die Transportrichtung T bezogen auch zumindest ein Teil der Transportfläche 23 des zumindest einen Bogeneinlaufmittels 08 angeordnet ist. Weiter bevorzugt ist das zumindest eine Verdrängungselement 12 auf die Transportrichtung T bezogen zumindest teilweise und weiter bevorzugt vollständig an zumindest einer Stelle angeordnet, die auf die Transportrichtung T bezogen von jeder Transportfläche 24 des zumindest einen Bogenübergabemittels 09 und/oder von jeder Transportfläche 22 des zumindest einen Bogenabbremsmittels 07 beabstandet angeordnet ist. Bevorzugt ist das eine Verdrängungselement 12 auf die Transportrichtung T bezogen zumindest teilweise und beispielsweise zumindest zeitweise vollständig vor dem zumindest einen vorderen Stapelbegrenzer 04 angeordnet.Alternatively or additionally, the sheet delivery stands out 1000 preferably characterized in that at least one downward-acting, in particular downward-acting arc 02 Displacement element capable of acting 12 is arranged. The at least one displacement element 12 is preferably designed to be activated. The at least one displacement element 12 is more preferably also designed to be deactivated. Then at least one displacement element can do this 12 for every bow 02 activated and then deactivated again. The at least one displacement element 12 is preferred to the transport direction T preferably based in the area of the at least one sheet inlet means 08 arranged. The at least one displacement element 12 is preferably arranged such that its displacement area is in the direction of transport T preferably covered at least partially with one through the at least one sheet inlet means 08 specific transport section of the for the transport of sheets 02 intended transport route overlaps. In particular, this is at least one displacement element 12 on the transport direction T preferably at least partially and more preferably completely arranged at at least one point in relation to the transport direction T also related at least part of the transport area 23 of the at least one sheet inlet means 08 is arranged. The at least one displacement element is further preferred 12 on the transport direction T based at least partially and more preferably completely arranged at at least one point that relates to the transport direction T related to each transport area 24 of at least one Sheet transfer device 09 and / or from any transport surface 22nd of the at least one sheet braking means 07 is arranged spaced. This is preferably a displacement element 12 on the transport direction T related at least partially and for example at least temporarily completely in front of the at least one front stack limiter 04 arranged.

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass das zumindest eine Verdrängungselement 12 bevorzugt dazu dient, einen Teil eines jeweiligen insbesondere vorderen Bogens 02 zu verdrängen, insbesondere dessen nachlaufendes Ende 29. Auf diese Weise wird ein Raumbereich frei, der von einem jeweiligen vorlaufender Anfang 31 eines jeweiligen dem jeweiligen vorderen Bogen 02 nachfolgenden Bogen 02 eingenommen werden kann. Die Bogen 02 werden also zumindest zeitweise überschuppt angeordnet und transportiert. Das zumindest eine Verdrängungselement 12 ist bevorzugt Bestandteil der Überschuppungseinrichtung 46. Dadurch kann der nachfolgende Bogen 02 auf die Transportrichtung T bezogen bereits in einen Teil des für den Transport von Bogen 02 vorgesehenen Transportwegs eindringen, in dem der vordere Bogen 02 auf die Transportrichtung T bezogen noch angeordnet ist, insbesondere weil sein Abbremsvorgang noch nicht vollständig beendet ist und/oder er noch mit dem zumindest einen Bogenabbremsmittel 07 verbunden angeordnet ist. Auf diese Weise kann beispielsweise ein sanfteres Abbremsen der Bogen 02 und/oder eine höhere Anzahl von abgebremsten Bogen 02 je Zeiteinheit realisiert werden.Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the at least one displacement element 12 preferably serves to part of a respective, in particular front, arch 02 to displace, especially its trailing end 29 . In this way an area of space becomes free, that of a respective leading beginning 31 each of the respective front arch 02 subsequent arch 02 can be taken. The arch 02 are thus at least temporarily arranged and transported overlaid. The at least one displacement element 12 is preferably part of the overlapping device 46 . This allows the following arch 02 on the transport direction T already related to part of the sheet transport 02 penetrate the intended transport path in which the front sheet 02 on the transport direction T related is still arranged, in particular because his braking process is not yet completely finished and / or he is still with the at least one sheet braking means 07 connected is arranged. In this way, for example, the sheet can be braked more gently 02 and / or a higher number of braked sheets 02 can be realized per time unit.

Zusätzlich oder alternativ ist bevorzugt das zumindest eine Verdrängungselement 12 als zumindest ein Verdrängungskörper 12 und/oder als zumindest eine Verdrängungsöffnung 12 ausgebildet. Ein jeweiliger Verdrängungskörper 12 wirkt insbesondere dadurch auf Bogen 02, dass er mit dem jeweiligen Bogen 02 in Kontakt gebracht wird und diesen zumindest teilweise aus seiner aktuellen Lage verdrängt, insbesondere mit zumindest einer Richtungskomponente, die orthogonal zu der Transportrichtung T orientiert ist. Eine jeweilige Verdrängungsöffnung 12 wirkt insbesondere dadurch auf Bogen 02, dass zumindest ein Verdrängungsfluid, insbesondere zumindest ein Gas oder Gasgemisch, bevorzugt Luft, aus der jeweiligen Verdrängungsöffnung 12 ausgestoßen wird und dieses zumindest eine Verdrängungsfluid den Bogen 02 zumindest teilweise aus seiner aktuellen Lage verdrängt, insbesondere mit zumindest einer Richtungskomponente, die orthogonal zu der Transportrichtung T orientiert ist. Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass das zumindest eine Verdrängungselement 12 als zumindest eine zum Ausstoßen eines Verdrängungsfluids ausgebildete Verdrängungsöffnung 12 ausgebildet ist und weiter bevorzugt dass dieses Verdrängungsfluid als Gas und/oder Gasgemisch und/oder Luft ausgebildet ist. Bevorzugt ist die zumindest eine Verdrängungsöffnung 12 mit zumindest einer Druckluftquelle verbunden und/oder verbindbar. Ein als zumindest eine Verdrängungsöffnung 12 ausgebildetes Verdrängungselement 12 ist beispielsweise geeignet, hinsichtlich ihres Materials und/oder ihrer Oberfläche besonders empfindliche Bogen 02 möglichst schonend zu verdrängen.Additionally or alternatively, the at least one displacement element is preferred 12 as at least one displacement body 12 and / or as at least one displacement opening 12 educated. A respective displacement body 12 acts in particular on arches 02 that he is with the respective bow 02 is brought into contact and displaced this at least partially from its current position, in particular with at least one directional component that is orthogonal to the transport direction T is oriented. A respective displacement opening 12 acts in particular on arches 02 that at least one displacement fluid, in particular at least one gas or gas mixture, preferably air, from the respective displacement opening 12 is ejected and this at least one displacement fluid the sheet 02 at least partially displaced from its current position, in particular with at least one directional component that is orthogonal to the transport direction T is oriented. Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the at least one displacement element 12 as at least one displacement opening designed to expel a displacement fluid 12 is designed and further preferred that this displacement fluid is designed as a gas and / or gas mixture and / or air. The at least one displacement opening is preferred 12 connected and / or connectable to at least one compressed air source. One as at least one displacement opening 12 designed displacement element 12 is, for example, suitable for sheets that are particularly sensitive with regard to their material and / or their surface 02 to displace as gently as possible.

Ein Verdrängungsbereich ist bevorzugt derjenige Bereich, in dem das zumindest eine Verdrängungselement 12 Einfluss auf eine Lage eines jeweiligen Bogens 02 nehmen kann und/oder nimmt. Im Fall eines als Verdrängungskörper 12 ausgebildeten Verdrängungselements 12 ist der Verdrängungsbereich beispielsweise derjenige Raumbereich, der insbesondere an jedem seiner Raumelemente sowohl zumindest zeitweise von dem zumindest einen Verdrängungselement 12 einnehmbar ist und/oder eingenommen wird als auch zumindest zeitweise, insbesondere zu anderen Zeitpunkten, von zumindest einem Bogen 02 einnehmbar ist und/oder eingenommen wird. Im Fall eines als Verdrängungsöffnung 12 ausgebildeten Verdrängungselements 12 ist der Verdrängungsbereich beispielsweise derjenige Raumbereich, in den zumindest zeitweise das Verdrängungsfluid eingeblasen wird und der zumindest zeitweise, insbesondere zu anderen Zeitpunkten, von zumindest einem Bogen 02 einnehmbar ist und/oder eingenommen wird.A displacement area is preferably that area in which the at least one displacement element 12 Influence on a position of a respective arch 02 can take and / or take. In the case of one as a displacement body 12 trained displacement element 12 the displacement area is, for example, that spatial area which, in particular at each of its spatial elements, is at least temporarily removed from the at least one displacement element 12 can be taken and / or is taken as well as at least temporarily, in particular at other times, by at least one sheet 02 is ingestible and / or ingested. In the case of one as a displacement opening 12 trained displacement element 12 the displacement area is, for example, that spatial area into which the displacement fluid is blown at least temporarily and which at least temporarily, in particular at other times, from at least one bend 02 is ingestible and / or ingested.

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass das zumindest eine Verdrängungselement 12 als zumindest ein Verdrängungskörper 12 ausgebildet ist, dessen Lage bevorzugt zumindest mittels zumindest eines Verdrängungsantriebs 27 zwischen zumindest einer Passierlage und zumindest einer Verdrängungslage wechselbar ist. Ein als zumindest ein Verdrängungskörper 12 ausgebildetes Verdrängungselement 12 ist beispielsweise geeignet, Bogen 02 möglichst präzise zu verdrängen und nachfolgende Bogen 02 möglichst wenig zu beeinflussen, insbesondere wenn ein Kontakt mit nachfolgenden Bogen 02 vermieden wird.Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the at least one displacement element 12 as at least one displacement body 12 is formed, the position of which is preferably at least by means of at least one displacement drive 27 can be changed between at least one passing position and at least one displacement position. One as at least one displacement body 12 designed displacement element 12 is suitable, for example, bow 02 to displace as precisely as possible and subsequent arches 02 To influence as little as possible, especially if there is contact with subsequent arches 02 is avoided.

Ein jeweiliger Kontaktbereich 13 des zumindest einen Bogeneinlaufmittels 08 ist bevorzugt derjenige jeweilige, insbesondere flächige Bereich 13, an dem ein Kontakt zwischen einem jeweiligen, insbesondere bewegbaren Bestandteil 14 des zumindest einen Bogeneinlaufmittels 08 einerseits und einem jeweiligen zu transportierenden Bogen 02 andererseits vorgesehen ist. Ein jeweiliger solcher Bestandteil 14 ist beispielsweise eine jeweilige Transportrolle 26 des zumindest einen Bogeneinlaufmittels 08. Unter einer Kontaktfläche 16 bevorzugt eine einfach zusammenhängende Fläche 16 zu verstehen ist, die sämtliche Kontaktbereiche 13 des zumindest einen Bogeneinlaufmittels 08 umfasst. Eine Fläche ist im mathematischen Sinn dann einfach zusammenhängend, wenn sich jeder ausschließlich innerhalb dieser Fläche angeordnete geschlossene Weg auf einen Punkt zusammenziehen lässt. Eine Referenzfläche 11 ist bevorzugt festgelegt als von allen Kontaktflächen 16 diejenige Kontaktfläche 16, die sowohl die kürzeste Umrandungslinie als auch den kleinsten Flächeninhalt aufweist. Eine Umrandungslinie ist dabei diejenige Linie, die diese Kontaktfläche 16 begrenzt. (Beispielhaft ist dies in den 8a und 8b schematisch dargestellt.) Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass der zumindest eine Verdrängungskörper 12 in seiner zumindest einen Verdrängungslage in einem Verdrängungsbereich nach unten durch die Referenzfläche 11 ragt und weiter bevorzugt dass der zumindest eine Verdrängungskörper 12 in seiner zumindest einen Passierlage vollständig oberhalb der Referenzfläche 11 angeordnet ist. Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass die Kontaktfläche 16 zumindest im Wesentlichen und weiter bevorzugt vollständig innerhalb einer Kontaktebene liegt und/oder dass die Referenzfläche 11 zumindest im Wesentlichen und weiter bevorzugt vollständig innerhalb einer Referenzebene liegt. Die Verdrängungsachse 17 ist bevorzugt oberhalb einer Referenzfläche 11 angeordnet.A respective contact area 13 of the at least one sheet inlet means 08 is preferably that particular, in particular flat area 13 , at which a contact between a respective, in particular movable, component 14th of the at least one sheet inlet means 08 on the one hand and a respective sheet to be transported 02 on the other hand is provided. A respective such component 14th is for example a respective transport roller 26th of the at least one sheet inlet means 08 . Under a contact surface 16 prefers a simply contiguous area 16 is to understand the all contact areas 13 at least that a sheet inlet means 08 includes. In the mathematical sense, an area is simply connected if every closed path arranged exclusively within this area can be drawn together to one point. A reference surface 11 is preferably set as of all contact surfaces 16 that contact area 16 that has both the shortest border line and the smallest area. A border line is the line that this contact area 16 limited. (This is exemplified in the 8a and 8b shown schematically.) Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the at least one displacement body 12 in its at least one displacement position in a displacement area downwards through the reference surface 11 protrudes and more preferably that the at least one displacement body 12 in its at least one passing position completely above the reference surface 11 is arranged. Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the contact surface 16 lies at least essentially and more preferably completely within a contact plane and / or that the reference surface 11 lies at least substantially and more preferably completely within a reference plane. The displacement axis 17th is preferably above a reference surface 11 arranged.

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass der zumindest eine Verdrängungskörper 12 in zumindest einer Verdrängungslage in einem Verdrängungsbereich um zumindest 1 mm, weiter bevorzugt zumindest 2 mm, noch weiter bevorzugt zumindest 5 mm, noch weiter bevorzugt zumindest 9 mm, noch weiter bevorzugt zumindest 11 mm und noch weiter bevorzugt zumindest 14 mm nach unten durch die Referenzfläche 11 ragt. Der Verdrängungsbereich ist bevorzugt derjenige Raumbereich, der unterhalb der Referenzfläche 11 liegt und von dem zumindest einen Verdrängungskörper 12 ausgefüllt wird. Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass der zumindest eine Verdrängungskörper 12 in zumindest einer Verdrängungslage in dem Verdrängungsbereich um zumindest 100 %, weiter bevorzugt zumindest 120 % und noch weiter bevorzugt zumindest 150 % einer maximalen mit der Bogenauslage 1000 verarbeitbaren Dicke der Bogen 02 nach unten durch die Referenzfläche 11 ragt.Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the at least one displacement body 12 in at least one displacement position in a displacement area by at least 1 mm, more preferably at least 2 mm, even more preferably at least 5 mm, even more preferably at least 9 mm, even more preferably at least 11 mm and even more preferably at least 14 mm down through the reference surface 11 protrudes. The displacement area is preferably that space area that is below the reference surface 11 is and of the at least one displacement body 12 is filled out. Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the at least one displacement body 12 in at least one displacement position in the displacement area by at least 100%, more preferably at least 120% and even more preferably at least 150% of a maximum with the sheet delivery 1000 workable thickness of the sheet 02 down through the reference surface 11 protrudes.

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass der zumindest eine Verdrängungskörper 12 zumindest in zumindest einer Verdrängungslage auf die Transportrichtung T bezogen zumindest teilweise vor dem zumindest einen vorderen Stapelbegrenzer 04 angeordnet ist, weiter bevorzugt zumindest 5 mm davor, noch weiter bevorzugt zumindest 10 mm davor und noch weiter bevorzugt zumindest 15 mm davor. Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass die zumindest eine Verdrängungsachse 17 auf die Transportrichtung T bezogen zumindest teilweise vor dem zumindest einen vorderen Stapelbegrenzer 04 angeordnet ist, weiter bevorzugt zumindest 5 mm davor, noch weiter bevorzugt zumindest 10 mm davor und noch weiter bevorzugt zumindest 15 mm davor. Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass der zumindest eine Verdrängungskörper 12 zumindest in zumindest einer Verdrängungslage auf die Transportrichtung T bezogen zumindest teilweise vor dem zumindest einen Bogenabbremsmittel 07 angeordnet ist, weiter bevorzugt zumindest 2 cm davor, noch weiter bevorzugt zumindest 3 cm davor, noch weiter bevorzugt zumindest 5 cm davor und noch weiter bevorzugt zumindest 10 cm davor und unabhängig davon bevorzugt höchstens 50 cm davor und weiter bevorzugt höchstens 25 cm davor. Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass die zumindest eine Verdrängungsachse 17 auf die Transportrichtung T bezogen zumindest teilweise vor dem zumindest einen Bogenabbremsmittel 07 angeordnet ist, weiter bevorzugt zumindest 2 cm davor, noch weiter bevorzugt zumindest 3 cm davor, noch weiter bevorzugt zumindest 5 cm davor und noch weiter bevorzugt zumindest 10 cm davor und unabhängig davon bevorzugt höchstens 50 cm davor und weiter bevorzugt höchstens 25 cm davor. Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass eine auf die Transportrichtung T bezogene Lage des zumindest einen Verdrängungselements 12 und/oder der zumindest einen Verdrängungsachse 17 veränderbar ist. Dann kann eine Anpassung an unterschiedliche Bogenlängen vorgenommen werden.Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the at least one displacement body 12 at least in at least one displacement position in the direction of transport T related at least partially in front of the at least one front stack limiter 04 is arranged, more preferably at least 5 mm in front of it, even more preferably at least 10 mm in front of it and even more preferably at least 15 mm in front of it. Alternatively or additionally, the sheet delivery stands out 1000 preferably characterized in that the at least one displacement axis 17th on the transport direction T related at least partially in front of the at least one front stack limiter 04 is arranged, more preferably at least 5 mm in front of it, even more preferably at least 10 mm in front of it and even more preferably at least 15 mm in front of it. Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the at least one displacement body 12 at least in at least one displacement position in the direction of transport T related at least partially in front of the at least one sheet braking means 07 is arranged, more preferably at least 2 cm in front of it, even more preferably at least 3 cm in front of it, even more preferably at least 5 cm in front of it and even more preferably at least 10 cm in front of it and regardless of this, preferably at most 50 cm in front of it and more preferably at most 25 cm in front of it. Alternatively or additionally, the sheet delivery stands out 1000 preferably characterized in that the at least one displacement axis 17th on the transport direction T related at least partially in front of the at least one sheet braking means 07 is arranged, more preferably at least 2 cm in front of it, even more preferably at least 3 cm in front of it, even more preferably at least 5 cm in front of it and even more preferably at least 10 cm in front of it and regardless of this, preferably at most 50 cm in front of it and more preferably at most 25 cm in front of it. Alternatively or additionally, the sheet delivery stands out 1000 preferably in that one on the transport direction T related position of the at least one displacement element 12 and / or the at least one displacement axis 17th is changeable. Then an adjustment to different arc lengths can be made.

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass das zumindest eine Verdrängungselement 12 zumindest eine Kontaktrolle 18 und weiter bevorzugt zumindest eine in sich gedämpfte Kontaktrolle 18 aufweist. Die in sich gedämpfte Kontaktrolle 18 weist bevorzugt einen Innenring, einen Außenring und eine Anzahl von Speichen auf, wobei sich die Speichen weiter bevorzugt jeweils spiralförmig von dem Innenring zu dem Außenring erstrecken. Die zumindest eine Kontaktroll18 ist bevorzugt als frei drehbare Kontaktrolle 18 ausgebildet. Die zumindest eine Kontaktrolle 18 dient bevorzugt dazu, einen rollenden Kontakt zwischen einem jeweiligen Bogen 02 einerseits und dem zumindest einen Verdrängungskörper 12 andererseits zu ermöglichen.Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the at least one displacement element 12 at least one contact role 18th and more preferably at least one self-damped contact role 18th having. The subdued contact role 18th preferably has an inner ring, an outer ring and a number of spokes, the spokes more preferably each extending in a spiral shape from the inner ring to the outer ring. The at least one contact roll 18 is preferably a freely rotatable contact roll 18th educated. The at least one contact role 18th preferably serves to ensure rolling contact between a respective sheet 02 on the one hand and the at least one displacement body 12 on the other hand to enable.

In einer bevorzugten Ausführung zeichnet sich die Bogenbearbeitungsmaschine 01 dadurch aus, dass die zumindest eine Überschuppungseinrichtung 46 bevorzugt das zumindest eine Verdrängungselement 12 aufweist. Weiter bevorzugt weist die zumindest eine Überschuppungseinrichtung 46 zusätzlich den zumindest einen Verdrängungsantrieb 27 und/oder die zumindest eine Kontaktrolle 18 und/oder das zumindest eine Bogeneinlaufmittel 08 auf.In a preferred embodiment, the sheet processing machine stands out 01 in that the at least one Overlapping device 46 preferably the at least one displacement element 12 having. The at least one overlapping device preferably has 46 additionally the at least one displacement drive 27 and / or the at least one contact role 18th and / or the at least one sheet inlet means 08 on.

Zusätzlich oder alternativ ist bevorzugt das zumindest eine Verdrängungselement 12 als zumindest ein Verdrängungshebel 12 ausgebildet, der um eine Verdrängungsachse 17 drehbar, insbesondere schwenkbar oder weiter bevorzugt rotierbar angeordnet ist, insbesondere mittels des zumindest einen Verdrängungsantriebs 27. Bevorzugt ist der zumindest eine Verdrängungsantrieb 27 als insbesondere lagegeregelter Elektromotor 27 ausgebildet. Der zumindest eine Verdrängungsantrieb 27 und insbesondere dessen Antriebsregler ist bevorzugt mit der Maschinensteuerung der Bearbeitungsmaschine 01 und/oder mit der elektronischen Leitachse verbunden, insbesondere über das BUS-System. Dadurch lassen sich besonders präzise und/oder auf Bewegungen der Bogen 02 abgestimmte Bewegungsprofile des zumindest einen Verdrängungskörpers 12 realisieren.Additionally or alternatively, the at least one displacement element is preferred 12 as at least one displacement lever 12 formed around a displacement axis 17th is arranged rotatable, in particular pivotable or more preferably rotatable, in particular by means of the at least one displacement drive 27 . The at least one displacement drive is preferred 27 as a position-regulated electric motor in particular 27 educated. The at least one displacement drive 27 and in particular its drive controller is preferred with the machine control of the processing machine 01 and / or connected to the electronic master axis, in particular via the BUS system. This allows particularly precise and / or movements of the sheet 02 coordinated movement profiles of the at least one displacement body 12 realize.

Zusätzlich oder alternativ ist bevorzugt die Verdrängungsachse 17 parallel zu der Querrichtung A orientiert. Jeweilige Drehbewegungen des zumindest einen Verdrängungskörpers 12 um die Verdrängungsachse 17 erfolgen bevorzugt in einer Drehrichtung D. Die Drehrichtung D zeichnet sich bevorzugt dadurch aus, dass Drehbewegungen von Bestandteilen des zumindest einen Verdrängungskörpers 12, die sich in der Drehrichtung D drehen und die sich auf die vertikale Richtung V bezogen unterhalb der Verdrängungsachse 17 befinden, eine Richtungskomponente aufweisen, die parallel zu der Transportrichtung T orientiert ist. Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass die Verdrängungsachse 17 vor dem zumindest einen vorderen Stapelbegrenzer 04 und/oder vor dem zumindest einen Bogenabbremsmittel 07 angeordnet ist.Additionally or alternatively, the displacement axis is preferred 17th parallel to the transverse direction A. oriented. Respective rotary movements of the at least one displacement body 12 around the displacement axis 17th preferably take place in one direction of rotation D. . The direction of rotation D. is preferably characterized in that rotational movements of components of the at least one displacement body 12 that are in the direction of rotation D. rotate and face the vertical direction V related below the displacement axis 17th have a directional component that is parallel to the transport direction T is oriented. Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the displacement axis 17th in front of the at least one front stack limiter 04 and / or in front of the at least one sheet braking means 07 is arranged.

Alternativ oder zusätzlich zeichnet sich die Bogenauslage 1000 bevorzugt dadurch aus, dass der zumindest eine Verdrängungskörper 12 in zumindest einer und weiter bevorzugt in jeder Verdrängungslage zumindest teilweise weiter unten angeordnet ist, das das zumindest eine Bogenabbremsmittel 07 und das zumindest eine Bogeneinlaufmittel 08 und weiter bevorzugt auch als das zumindest eine Bogenübergabemittel 09 und noch weiter bevorzugt als jeder den Bogen 02 auf seinem Transportweg bis zum Abwurf transportierende und/oder in der Transportrichtung T antreibende oder abbremsende Bestandteil der Bogenauslage 1000.Alternatively or additionally, the sheet delivery stands out 1000 preferably in that the at least one displacement body 12 is arranged at least partially further down in at least one and more preferably in each displacement position, the at least one sheet braking means 07 and the at least one sheet inlet means 08 and more preferably also as the at least one sheet transfer means 09 and even more than anyone prefers the bow 02 on its transport route to the dropping point and / or in the transport direction T driving or decelerating component of the sheet delivery 1000 .

Zusätzlich oder alternativ zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass sie zumindest ein Formgebungsaggregat 900 oder Stanzaggregat 900 und/oder zumindest ein Auftragaggregat 600 aufweist und dass die Bogenbearbeitungsmaschine 01 zumindest eine Bogenauslage 1000 aufweist, die wie im Vorangegangenen und/oder im Folgenden beschrieben ausgebildet ist. Alternativ oder zusätzlich zeichnet sich die Bogenbearbeitungsmaschine 01 bevorzugt dadurch aus, dass das zumindest eine Auftragaggregat 600 als Flexo-Auftragaggregat 600 und/oder als Flexo-Druckaggregat 600 ausgebildet ist und/oder dass die Bogenbearbeitungsmaschine 01 zumindest eine als Bogenanleger 100 ausgebildete Substratzufuhreinrichtung 100 aufweist.Additionally or alternatively, the sheet processing machine stands out 01 preferably in that they have at least one shaping unit 900 or punching unit 900 and / or at least one application unit 600 and that the sheet processing machine 01 at least one sheet delivery 1000 has, which is designed as described above and / or below. As an alternative or in addition, the sheet processing machine stands out 01 preferably in that the at least one application unit 600 as a flexo application unit 600 and / or as a flexographic printing unit 600 is formed and / or that the sheet processing machine 01 at least one as a sheet feeder 100 trained substrate feeder 100 having.

Bevorzugt wird ein Verfahren zur Inspektion des zumindest einen verbliebenen und von einer Formgebungseinrichtung 900 bearbeiteten Teils des zumindest einen Bogens 02 der Bogenbearbeitungsmaschine 01 beschrieben. Bevorzugt umfasst der jeweilige Bogen 02 mindestens einen Nutzen 1101, bevorzugt mindestens zwei Nutzen 1101. Bevorzugt wird der jeweilige Bogen 02 in der zumindest einen Formgebungseinrichtung 900 bearbeitet. Bevorzugt werden jeweilige Bogen 02 in zumindest einem jeweiligen Bearbeitungsvorgang mittels zumindest einer Einrichtung der Bogenbearbeitungsmaschine 01 bearbeitet, beispielsweise mit zumindest einem Auftragfluid versehen und/oder mechanisch bearbeitet und/oder bezüglich ihrer Form verändert und/oder gestanzt. Bevorzugt werden die Bogen 02 während ihres jeweiligen Bearbeitungsvorgangs mit einer Bearbeitungsgeschwindigkeit transportiert, insbesondere längs des für den Transport von Bogen 02 vorgesehenen Transportwegs. Bevorzugt wird in Transportrichtung T der Bogen 02 nach der Formgebungseinrichtung 900, bevorzugt der Stanzeinrichtung 900 und/oder Rotationsstanzeinrichtung 900, zumindest ein Reststück 1102A von dem jeweiligen Bogen 02 entfernt. Vorzugsweise wird das zumindest eine Reststück 1102A bereits während des zumindest einen Bearbeitungsvorgangs und/oder während des Transports des jeweiligen Bogens 02 entlang des Transportweges, bevorzugt entlang des Transportweges zwischen der zumindest einen Formgebungseinrichtung 900 und der zumindest einen Separationseinrichtung 903, und/oder durch die zumindest eine Separationseinrichtung 903 von dem jeweiligen Bogen 02 entfernt. Bevorzugt ist die Separationseinrichtung 903 zum Entfernen von dem zumindest einen Reststück 1102A ausgebildet. Weiter bevorzugt ist die Separationseinrichtung 903 zum vollständigen Entfernen von dem zumindest einen Reststück 1102A von dem jeweiligen Bogen 02 ausgebildet.A method for inspecting the at least one remaining and of a shaping device is preferred 900 machined part of the at least one sheet 02 the sheet processing machine 01 described. The respective arch preferably comprises 02 at least one benefit 1101 , preferably at least two uses 1101 . The respective bow is preferred 02 in the at least one shaping device 900 processed. The respective sheets are preferred 02 in at least one respective processing operation by means of at least one device of the sheet processing machine 01 processed, for example provided with at least one application fluid and / or mechanically processed and / or changed with regard to their shape and / or punched. The bows are preferred 02 transported during their respective processing operation at a processing speed, in particular along that for the transport of sheets 02 intended transport route. It is preferred in the transport direction T the arc 02 after the shaping device 900 , preferably the punching device 900 and / or rotary punching device 900 , at least a leftover piece 1102A of the respective arch 02 away. This is preferably at least one leftover piece 1102A already during the at least one processing operation and / or during the transport of the respective sheet 02 along the transport path, preferably along the transport path between the at least one shaping device 900 and the at least one separation device 903 , and / or by the at least one separation device 903 of the respective arch 02 away. The separation device is preferred 903 for removing the at least one remaining piece 1102A educated. The separation device is further preferred 903 for the complete removal of the at least one remaining piece 1102A of the respective arch 02 educated.

Bevorzugt ermittelt die zumindest eine Inspektionseinrichtung 916 den Ist-Zustand des jeweiligen Bogens 02. Bevorzugt ermittelt nach der Separationseinrichtung 903 zum Entfernen von zumindest einem Reststück 1102A von dem zumindest einen Bogen 02 die zumindest eine Inspektionseinrichtung 916 den Ist-Zustand des jeweiligen Bogens 02. Vorzugsweise ermittelt die Inspektionseinrichtung 916 den Ist-Zustand des jeweiligen Bogens 02, welcher bevorzugt der Zustand des Bogens 02 ist, insbesondere in Bezug auf Form und/oder Masse und/oder Kontur, welchen der jeweilige Bogen 02 zum Zeitpunkt der Erfassung mit der Inspektionseinrichtung 916 aufweist. Bevorzugt ermittelt die Inspektionseinrichtung 916 den Ist-Zustand des zumindest einen verbliebenen und von einer Formgebungseinrichtung 900 bearbeiteten Teils des zumindest einen Bogens 02. The at least one inspection device preferably determines 916 the current state of the respective arc 02 . Preferably determined after the separation device 903 for removing at least one leftover piece 1102A of at least one bow 02 the at least one inspection facility 916 the current state of the respective sheet 02 . The inspection device preferably determines 916 the current state of the respective sheet 02 which prefers the state of the bow 02 is, in particular with regard to shape and / or mass and / or contour, which the respective arc 02 at the time of acquisition with the inspection facility 916 having. The inspection device preferably determines 916 the actual state of the at least one remaining and of a shaping device 900 machined part of the at least one sheet 02 .

Bevorzugt wird der Ist-Zustand des jeweiligen Bogens 02 mit dem Soll-Zustand des jeweiligen Bogens 02 verglichen. Bevorzugt vergleicht die Inspektionseinrichtung 916 und/oder das Auswertemittel den Ist-Zustand des jeweiligen Bogens 02 mit dem Soll-Zustand des jeweiligen Bogens 02. Weiter bevorzugt vergleicht das Auswertemittel der Inspektionseinrichtung 916 den Ist-Zustand des jeweiligen Bogens 02 mit dem Soll-Zustand des jeweiligen Bogens 02. Vorzugsweise wird der Ist-Zustand des jeweiligen Bogens 02 mit dem Soll-Zustand des jeweiligen Bogens 02 verglichen, wobei der Soll-Zustand des jeweiligen Bogens 02 vorzugsweise der Zustand des Bogens 02 ist, insbesondere in Bezug auf Form und/oder Masse und/oder Kontur, welchen ein ideal gefertigter Bogen 02, insbesondere zum Zeitpunkt der Erfassung mit der Inspektionseinrichtung 916, aufweisen soll und/oder aufweist.The actual state of the respective sheet is preferred 02 with the target state of the respective sheet 02 compared. The inspection device preferably compares 916 and / or the evaluation means the actual state of the respective sheet 02 with the target state of the respective sheet 02 . The evaluation means of the inspection device also preferably compares 916 the current state of the respective sheet 02 with the target state of the respective sheet 02 . The actual state of the respective sheet is preferably used 02 with the target state of the respective sheet 02 compared, the target state of the respective sheet 02 preferably the condition of the arch 02 is, in particular with regard to shape and / or mass and / or contour, which an ideally manufactured arch 02 , especially at the time of acquisition with the inspection device 916 , should have and / or has.

Zusätzlich oder alternativ ist das Verfahren bevorzugt dadurch ausgezeichnet, dass die Inspektionseinrichtung 916 vorzugsweise zumindest teilweise die zumindest eine Bogenöffnung 1102L des zumindest einen Bogens 02 und/oder die zumindest eine innere Kontur des zumindest einen Bogens 02, bevorzugt festgelegt durch zumindest eine Bogenöffnung 1102L, und/oder die zumindest eine äußere Kontur des zumindest einen Bogens 02, bevorzugt festgelegt durch zumindest eine Außenkante des jeweiligen Bogens 02, erfasst. Bevorzugt erfasst die Inspektionseinrichtung 916 die Form des Bogens 02 und/oder des mindestens einen Nutzens 1101, bevorzugt zumindest den inneren und/oder äußeren Umriss des mindestens einen Nutzens 1101 des jeweiligen Bogens 02. Bevorzugt erfasst die Inspektionseinrichtung 916 die zumindest eine Außenkante des Bogens 02 und zusätzlich oder alternativ die zumindest eine Bogenöffnung 11 02L des betreffenden Bogens 02. Bevorzugt erfasst die Inspektionseinrichtung 916 mindestens den Bereich des zumindest einen Reststücks 1102A und/oder mindestens den Bereich der zumindest einen Bogenöffnung 1102L. Bevorzug entspricht die innere Kontur des zumindest einen Bogens 02 der Kontur des zumindest einen Reststückes 1102A des betreffenden Bogens 02, welches bevorzugt von dem betreffenden Bogen 02 entfernt wurde.Additionally or alternatively, the method is preferably characterized in that the inspection device 916 preferably at least partially the at least one arch opening 1102L of at least one arc 02 and / or the at least one inner contour of the at least one arch 02 , preferably defined by at least one arch opening 1102L , and / or the at least one outer contour of the at least one arc 02 , preferably determined by at least one outer edge of the respective sheet 02 , detected. The inspection device preferably detects 916 the shape of the arch 02 and / or the at least one benefit 1101 , preferably at least the inner and / or outer contour of the at least one benefit 1101 of the respective arch 02 . The inspection device preferably detects 916 the at least one outer edge of the sheet 02 and additionally or alternatively the at least one arched opening 11 02L of the arch in question 02 . The inspection device preferably detects 916 at least the area of the at least one remnant piece 1102A and / or at least the area of the at least one arch opening 1102L . The inner contour of the at least one arc preferably corresponds 02 the contour of the at least one remaining piece 1102A of the arch in question 02 whichever is preferred by the bow in question 02 was removed.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass aus dem Vergleich des Ist-Zustands des zumindest einen Bogens 02 mit dem Soll-Zustand des betreffenden Bogens 02 das Maß für die Abweichung der zumindest einen Bogenöffnung 1102L und/oder der zumindest einen inneren Kontur und/oder der zumindest einen äußeren Kontur des Bogens 02 von dem Soll-Zustand des jeweiligen Bogens 02 ermittelt wird. Je nach Ergebnis des ermittelten Maßes für die Abweichung der zumindest einen Bogenöffnung 1102L und/oder der zumindest einen inneren Kontur und/oder der zumindest einen äußeren Kontur des Bogens 02 von dem Soll-Zustand des jeweiligen Bogens 02 gibt die Inspektionseinrichtung 916, insbesondere das Auswertemittel, vorzugsweise das zumindest eine Signal, beispielsweise das optische Signal und/oder das Steuerungssignal und/oder das Regelungssignal, aus. Liegt das Maß für die Abweichung im Rahmen der Toleranz des Soll-Zustands des betreffenden Bogens 02, so gibt die Inspektionseinrichtung 916, insbesondere das Auswertemittel, vorzugsweise das zumindest eine Gut-Signal aus. Liegt das Maß für die Abweichung außerhalb des Rahmens der Toleranz des Soll-Zustands des betreffenden Bogens 02, so gibt die Inspektionseinrichtung 916, insbesondere das Auswertemittel, vorzugsweise das zumindest eine Schlecht-Signal aus. Beispielsweise zusätzlich oder alternativ zu dem zumindest einen Schlecht-Signal gibt die Inspektionseinrichtung 916, insbesondere das Auswertemittel, bevorzugt das zumindest eine Signal zur Regelung und/oder Steuerung der Bogenweiche 49 aus.Alternatively or additionally, the method is preferably characterized in that the comparison of the actual state of the at least one sheet 02 with the target state of the sheet concerned 02 the measure of the deviation of the at least one arch opening 1102L and / or the at least one inner contour and / or the at least one outer contour of the arch 02 of the target state of the respective sheet 02 is determined. Depending on the result of the determined measure for the deviation of the at least one arch opening 1102L and / or the at least one inner contour and / or the at least one outer contour of the arch 02 of the target state of the respective sheet 02 gives the inspection facility 916 , in particular the evaluation means, preferably the at least one signal, for example the optical signal and / or the control signal and / or the regulation signal. Is the measure for the deviation within the tolerance of the target state of the sheet in question 02 so there the inspection facility 916 , in particular the evaluation means, preferably the at least one good signal. If the measure for the deviation lies outside the framework of the tolerance of the target state of the sheet in question 02 so there the inspection facility 916 , in particular the evaluation means, preferably the at least one bad signal. For example, in addition or as an alternative to the at least one bad signal, the inspection device emits 916 , in particular the evaluation means, preferably the at least one signal for regulating and / or controlling the curved switch 49 out.

Beispielsweise bei einer Fläche von kleiner 25 mm2 (fünfundzwanzig Quadratmillimeter), bevorzugt von kleiner 20 mm2, weiter bevorzugt von kleiner 15 mm2, des zumindest einen verbliebenen Reststücks 1102A, im Falle dass zumindest ein Teil des zumindest einen Reststücks 1102A in dem betreffenden Bogen 02 in Transportrichtung T nach der Separationseinrichtung 903 verblieben ist, liegt das Maß für die Abweichung bevorzugt im Rahmen der Toleranz des Soll-Zustands des jeweiligen Bogens 02 und beispielsweise wird das zumindest eine Gut-Signal ausgegeben. Beispielsweise bei einer Fläche von mindestens 25 mm2 (fünfundzwanzig Quadratmillimeter), bevorzugt mindestens 30 mm2, weiter bevorzugt 35 mm2, des zumindest einen verbliebenen Teils des Reststücks 1102A wird bevorzugt das zumindest eine Schlecht-Signal ausgegeben und zusätzlich oder alternativ das zumindest eine Signal zur Regelung und/oder Steuerung der Bogenweiche 49 ausgegeben.For example, with an area of less than 25 mm 2 (twenty-five square millimeters), preferably less than 20 mm 2 , more preferably less than 15 mm 2 , of the at least one remaining piece 1102A , in the event that at least a part of the at least one remaining piece 1102A in the arc concerned 02 in transport direction T after the separation device 903 remains, the measure for the deviation is preferably within the tolerance of the target state of the respective sheet 02 and for example the at least one good signal is output. For example, with an area of at least 25 mm 2 (twenty-five square millimeters), preferably at least 30 mm 2 , more preferably 35 mm 2 , of the at least one remaining part of the remainder 1102A the at least one bad signal is preferably output and, additionally or alternatively, the at least one signal for regulating and / or controlling the curved switch 49 issued.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass der Soll-Zustand des betreffenden Bogens 02 auf Grundlage der digitalen und/oder angelernten Referenz bestimmt wird.Additionally or alternatively, the method is preferably characterized in that the target state of the sheet in question 02 is determined on the basis of the digital and / or learned reference.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass in Transportrichtung T nach der Inspektionseinrichtung 916 und vor der Auslage 1000 in Abhängigkeit von dem Vergleich des Ist-Zustands des betreffenden Bogens 02 mit dem Soll-Zustand des betreffenden Bogens 02 eine Änderung des für den Transport von Bogen 02 vorgesehenen Transportweges des betreffenden Bogens 02, insbesondere die Bogenweiche 49, gesteuert und/oder geregelt wird. Bevorzugt wird in Abhängigkeit von dem Vergleich der mindestens einen Bogenöffnung 1102L mit der Referenz der mindestens einen Bogenöffnung 1102L und/oder in Abhängigkeit von dem Vergleich des Ist-Zustands des jeweiligen Bogens 02 mit dem Soll-Zustand des jeweiligen Bogens 02 die Änderung eines für den Transport von Bogen 02 vorgesehenen Transportweges, insbesondere die Bogenweiche 49, gesteuert und/oder geregelt. Bevorzugt wird der betreffende Bogen 02 in Abhängigkeit von dem Vergleich des Ist-Zustands des betreffenden Bogens 02 mit dem Soll-Zustand des betreffenden Bogens 02 auf dem vorgesehenen Transportweg belassen oder von dem vorgesehenen Transportweg auf einen alternativen Transportweg ausgelenkt.Additionally or alternatively, the method is preferably characterized in that in the transport direction T after the inspection facility 916 and in front of the display 1000 depending on the comparison of the actual state of the sheet in question 02 with the target state of the sheet concerned 02 a change in the transport of sheets 02 intended transport path of the sheet concerned 02 , especially the curved turnout 49 , controlled and / or regulated. The at least one arched opening is preferred depending on the comparison 1102L with the reference of the at least one arch opening 1102L and / or depending on the comparison of the actual state of the respective sheet 02 with the target state of the respective sheet 02 the change of one for the transport of sheets 02 intended transport route, in particular the curved switch 49 , controlled and / or regulated. The arch in question is preferred 02 depending on the comparison of the actual state of the sheet in question 02 with the target state of the sheet concerned 02 Leave on the intended transport route or diverted from the intended transport route to an alternative transport route.

Zur Steuerung und/oder Regelung der Änderung des Transportweges, insbesondere der Bogenweiche 49, gibt bevorzugt die Inspektionseinrichtung 916, insbesondere das Auswertemittel, das zumindest eine Signal aus. Bevorzugt umfasst die Inspektionseinrichtung 916 das Auswertemittel oder ist mit dem Auswertemittel verbunden und bevorzugt wird die Änderung des Transportweges, insbesondere die Bogenweiche 49, aufgrund des zumindest einen Signals des Auswertemittels geregelt und/oder gesteuert. Bevorzugt gibt die Inspektionseinrichtung 916, insbesondere das Auswertemittel, das zumindest eine Signal zur Steuerung und/oder Regelung der Änderung des Transportweges, insbesondere der Bogenweiche 49, insbesondere dann aus, wenn das Maß für die Abweichung außerhalb des Rahmens der Toleranz des Soll-Zustands des betreffende Bogen 02 liegt. Bevorzugt gibt die Inspektionseinrichtung 916, insbesondere das Auswertemittel, das zumindest eine Signal zur Steuerung und/oder Regelung der Änderung des Transportweges, insbesondere der Bogenweiche 49, unabhängig davon aus, ob das Maß für die Abweichung außerhalb des Rahmens der Toleranz des Soll-Zustands des betreffende Bogen 02 liegt. Dies heißt die Inspektionseinrichtung 916, insbesondere das Auswertemittel, gibt bevorzugt während und/oder nach der Inspektion des betreffenden Bogens 02 das zumindest eine Signal zur Steuerung und/oder Regelung der Änderung des Transportweges, insbesondere der Bogenweiche 49, beispielsweise zusätzlich oder alternativ zu dem zumindest einen Gut-Signal oder dem zumindest einen Schlecht-Signal, aus.To control and / or regulate the change in the transport path, in particular the curved switch 49 , gives preference to the inspection device 916 , in particular the evaluation means, the at least one signal from. The inspection device preferably comprises 916 the evaluation means or is connected to the evaluation means and the change in the transport route, in particular the curved switch, is preferred 49 , regulated and / or controlled based on the at least one signal of the evaluation means. The inspection device is preferably there 916 , in particular the evaluation means, the at least one signal for controlling and / or regulating the change in the transport path, in particular the curved switch 49 , especially when the measure of the deviation is outside the framework of the tolerance of the target state of the sheet in question 02 lies. The inspection device is preferably there 916 , in particular the evaluation means, the at least one signal for controlling and / or regulating the change in the transport path, in particular the curved switch 49 regardless of whether the measure for the deviation is outside the framework of the tolerance of the target state of the sheet in question 02 lies. This is called the inspection facility 916 , in particular the evaluation means, preferably gives during and / or after the inspection of the relevant sheet 02 the at least one signal for controlling and / or regulating the change in the transport path, in particular the curved switch 49 , for example in addition or as an alternative to the at least one good signal or the at least one bad signal.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Inspektionseinrichtung 916 das Auswertemittel umfasst oder mit dem Auswertemittel verbunden ist und dass die Änderung des Transportweges des jeweiligen Bogens 02, insbesondere der Bogenweiche 49, aufgrund des zumindest einen Signals des Auswertemittels geregelt und/oder gesteuert wird.Additionally or alternatively, the method is preferably characterized in that the inspection device 916 the evaluation means comprises or is connected to the evaluation means and that the change in the transport path of the respective sheet 02 , especially the curved turnout 49 is regulated and / or controlled based on the at least one signal of the evaluation means.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Reaktionszeit von dem Beginn der Ermittlung des Ist-Zustands des betreffenden Bogens 02 bis zu der Regelung und/oder Steuerung der Änderung des Transportweges für das Auslenken des jeweiligen Bogens 02, insbesondere der Bogenweiche 49, mindestens 50 ms (fünfzig Millisekunden), bevorzugt mindestens 80 ms, weiter bevorzugt mindestens 100 ms beträgt. Bevorzugt beginnt die Ermittlung des Ist-Zustands des betreffenden Bogens 02 an dem in Transportrichtung T vorlaufenden Anfang 31, weiter bevorzugt in Transportrichtung T einer vorderen Kante, des betreffenden Bogens 02 und/oder bevorzugt sobald die in Transportrichtung T vordere Kante des betreffenden Bogens 02 den von der Inspektionseinrichtung 916 erfassten Bereich des Transportwegs in Transportrichtung T erreicht. Bevorzugt legt der betreffende Bogen 02, insbesondere der in Transportrichtung T vorlaufende Anfang 31 des betreffenden Bogens 02, den Transportweg zwischen der Inspektionseinrichtung 916 und der Position zur Änderung des Transportweges, insbesondere der Bogenweiche 49, in Abhängigkeit von der Geschwindigkeit der transportierten Bogen 02 vorzugsweise in mindestens 50 ms (fünfzig Millisekunden), bevorzugt in mindestens 80 ms, weiter bevorzugt in mindestens 100 ms, zurück. Bevorzugt legt der betreffende Bogen 02, insbesondere der in Transportrichtung T vorlaufende Anfang 31 des betreffenden Bogens 02, bevorzugt die in Transportrichtung T vordere Kante des betreffenden Bogens 02, den Transportweg zwischen der Inspektionseinrichtung 916 und der Position zur Änderung des Transportweges, insbesondere der Bogenweiche 49, in Abhängigkeit von der Geschwindigkeit der transportierten Bogen 02 vorzugsweise in höchstens 1.000 ms (eintausend Millisekunden), bevorzugt in höchstens 800 ms, weiter bevorzugt in höchstens 300 ms, zurück.Additionally or alternatively, the method is preferably characterized in that the response time starts from the beginning of the determination of the actual state of the relevant sheet 02 up to the regulation and / or control of the change of the transport path for the deflection of the respective sheet 02 , especially the curved turnout 49 , at least 50 ms (fifty milliseconds), preferably at least 80 ms, more preferably at least 100 ms. The determination of the actual state of the sheet in question preferably begins 02 on the one in the direction of transport T leading beginning 31 , more preferably in the transport direction T a front edge of the sheet in question 02 and / or preferably as soon as the in the transport direction T leading edge of the sheet in question 02 the one from the inspection facility 916 recorded area of the transport path in the transport direction T reached. The sheet in question preferably places it 02 , especially in the transport direction T leading beginning 31 of the arch in question 02 , the transport route between the inspection facility 916 and the position to change the transport route, especially the curved switch 49 , depending on the speed of the sheet being transported 02 preferably in at least 50 ms (fifty milliseconds), preferably in at least 80 ms, more preferably in at least 100 ms. The sheet in question preferably places it 02 , especially in the transport direction T leading beginning 31 of the arch in question 02 , preferably in the transport direction T leading edge of the sheet in question 02 , the transport route between the inspection facility 916 and the position to change the transport route, especially the curved switch 49 , depending on the speed of the sheet being transported 02 preferably in at most 1,000 ms (one thousand milliseconds), preferably in at most 800 ms, more preferably in at most 300 ms.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Inspektionseinrichtung 916 orthogonal zu dem für den Transport von Bogen 02 vorgesehenem Transportweg des zumindest einen Bogens 02 angeordnet ist und auf den Transportweg des zumindest einen Bogens 02 gerichtet ist. Bevorzugt erfasst die Inspektionseinrichtung 916 den zumindest einen Teil des Transportwegs und/oder der Transportebene, auf welchen sie gerichtet ist. Bevorzugt ist die Inspektionseinrichtung 916 lotrecht auf den Transportweg und/oder die Transportebene gerichtet und erfasst vorzugsweise den zumindest einen Teil des Transportwegs lotrecht.Additionally or alternatively, the method is preferably characterized in that the inspection device 916 orthogonal to that for the transport of sheets 02 provided transport path of the at least one sheet 02 is arranged and on the transport path of the at least one sheet 02 is directed. The inspection device preferably detects 916 the at least part of the transport path and / or the transport plane on which it is directed. The inspection device is preferred 916 directed perpendicular to the transport path and / or the transport plane and preferably captures the at least part of the transport path vertically.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass das zumindest eine Druckbild, insbesondere das mindestens eine Druckbild des jeweiligen Nutzens 1101, durch das zumindest eine Auftragwerk 614 der Bogenbearbeitungsmaschine 01 in Transportrichtung T vor der Formgebungseinrichtung 900 auf den zumindest einen Bogen 02 aufgebracht wird. Beispielsweise wird das zumindest eine Druckbild durch zumindest ein Auftragwerk 614 auf den betreffenden Bogen 02 aufgetragen. Beispielsweise umfasst die Bogenbearbeitungsmaschine 01 zumindest zwei Auftragwerke 614, wodurch beispielsweise zwei in zumindest einer Eigenschaft, beispielsweise dem verwendeten Auftragsfluid und/oder der Position der Druckbilder auf dem Bogen 02, voneinander unterschiedliche Druckbilder auf den betreffenden Bogen 02 aufgetragen werden und/oder auftragbar sind.Additionally or alternatively, the method is preferably characterized in that the at least one print image, in particular the at least one print image of the respective panel 1101 , through at least one commissioned work 614 the sheet processing machine 01 in transport direction T in front of the shaping device 900 on at least one bow 02 is applied. For example, the at least one print image is produced by at least one application unit 614 on the sheet in question 02 applied. For example, the sheet processing machine includes 01 at least two commissioned works 614 whereby, for example, two in at least one property, for example the application fluid used and / or the position of the print images on the sheet 02 , different print images on the sheet in question 02 are applied and / or can be applied.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Inspektionseinrichtung 916 das Auswertemittel umfasst oder mit dem Auswertemittel verbunden ist und dass die Inspektionseinrichtung 916 und/oder das Auswertemittel den zumindest einen Passer des mindestens einen Druckbildes erfasst und/oder auswertet. Bevorzugt zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Inspektionseinrichtung 916 das Auswertemittel umfasst oder mit dem Auswertemittel verbunden ist und dass die Inspektionseinrichtung 916 und/oder das Auswertemittel den zumindest einen Passer des zumindest einen Druckbildes des zumindest einen Bogens 02 auswertet und/oder das zumindest eine Druckbild des zumindest einen Bogens 02 mit der zumindest einen Bogenöffnung 1102L und/oder der zumindest einen inneren Kontur und/oder der zumindest einen äußeren Kontur des jeweiligen Bogens 02 vergleicht. Bevorzugt vergleicht die Inspektionseinrichtung 916, insbesondere das Auswertemittel, den Ist-Zustand mit dem Soll-Zustand des betreffenden Bogens 02, wobei zur Ermittlung des Ist-Zustands des betreffenden Bogens 02 bevorzugt das zumindest eine Druckbild des betreffenden Bogens 02, insbesondere des jeweiligen Nutzens 1101, und/oder die zumindest eine Bogenöffnung 1102L und/oder die zumindest eine innere Kontur und/oder die zumindest eine äußere Kontur des betreffenden Bogens 02 ermittelt wird.Additionally or alternatively, the method is preferably characterized in that the inspection device 916 the evaluation means comprises or is connected to the evaluation means and that the inspection device 916 and / or the evaluation means detects and / or evaluates the at least one register of the at least one print image. The method is preferably characterized in that the inspection device 916 the evaluation means comprises or is connected to the evaluation means and that the inspection device 916 and / or the evaluation means the at least one register of the at least one print image of the at least one sheet 02 evaluates and / or the at least one print image of the at least one sheet 02 with the at least one arch opening 1102L and / or the at least one inner contour and / or the at least one outer contour of the respective arc 02 compares. The inspection device preferably compares 916 , in particular the evaluation means, the actual state with the target state of the sheet in question 02 , where to determine the actual state of the relevant sheet 02 preferably the at least one print image of the relevant sheet 02 , in particular the respective benefit 1101 , and / or the at least one arch opening 1102L and / or the at least one inner contour and / or the at least one outer contour of the relevant arc 02 is determined.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Inspektionseinrichtung 916 das Auswertemittel umfasst oder mit dem Auswertemittel verbunden ist und dass die Inspektionseinrichtung 916 und/oder das Auswertemittel die Position des mindestens einen Nutzens 1101 relativ zu der Referenz der Position des mindestens einen Nutzens 1101 erfasst und/oder auswertet. Bevorzugt ist zumindest ein weiterer Nutzen 1101 und/oder zumindest eine Marke auf dem jeweiligen Bogen 02 und/oder zumindest eine Kante des Bogens 02 und/oder zumindest eine Begrenzung des jeweiligen Bogens 02, insbesondere die äußere Kontur des jeweiligen Bogens 02, als die Referenz der Position des betreffenden Nutzens 1101 ausgebildet.Additionally or alternatively, the method is preferably characterized in that the inspection device 916 the evaluation means comprises or is connected to the evaluation means and that the inspection device 916 and / or the evaluation means the position of the at least one benefit 1101 relative to the reference of the position of the at least one benefit 1101 recorded and / or evaluated. At least one further benefit is preferred 1101 and / or at least one mark on the respective sheet 02 and / or at least one edge of the sheet 02 and / or at least a limitation of the respective arch 02 , especially the outer contour of the respective arch 02 , as the reference of the position of the benefit concerned 1101 educated.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Inspektionseinrichtung 916 das Auswertemittel umfasst oder mit dem Auswertemittel verbunden ist und dass die Inspektionseinrichtung 916 und/oder das Auswertemittel die zumindest eine Farbe des mindestens einen Druckbildes erfasst und/oder auswertet. Bevorzugt ist die jeweilige Farbe des Druckbildes durch das zumindest eine vorzugsweise zur Erzeugung des Druckbildes verwendete Auftragsfluid festgelegt und/oder vorzugsweise entspricht dem auf dem Bogen 02 bevorzugt getrockneten Auftragsfluid verwendet zur Erzeugung des jeweiligen Druckbildes.Additionally or alternatively, the method is preferably characterized in that the inspection device 916 the evaluation means comprises or is connected to the evaluation means and that the inspection device 916 and / or the evaluation means detects and / or evaluates the at least one color of the at least one print image. The respective color of the print image is preferably determined by the at least one application fluid that is preferably used to generate the print image and / or preferably corresponds to that on the sheet 02 preferably dried application fluid used to generate the respective print image.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Inspektionseinrichtung 916 das Auswertemittel umfasst oder mit dem Auswertemittel verbunden ist und dass die Inspektionseinrichtung 916 und/oder das Auswertemittel zumindest einen Fehler einer Verarbeitung des jeweiligen Bogens 02 und/oder zumindest einen Fehler des mindestens einen Druckbildes durch fehlende Teile und/oder zusätzliche Teile erfasst und/oder auswertet. Beispielsweise ist ein Fehler der Verarbeitung des jeweiligen Bogens 02 eine Störstelle in dem Material des jeweiligen Bogens 02. Beispielsweise ist ein Fehler des mindestens einen Druckbildes ein beispielsweise zusätzlich aufgebrachter Auftrag auf den Bogen 02, beispielsweise ein Fettfleck oder zusätzlich aufgebrachtes Auftragsfluid.Additionally or alternatively, the method is preferably characterized in that the inspection device 916 the evaluation means comprises or is connected to the evaluation means and that the inspection device 916 and / or the evaluation means at least one error in processing the respective sheet 02 and / or at least one error of the at least one print image due to missing parts and / or additional parts is detected and / or evaluated. For example, there is an error in the processing of the respective sheet 02 an imperfection in the material of the respective sheet 02 . For example, an error in the at least one print image is, for example, an additionally applied order to the sheet 02 , for example a grease stain or additionally applied application fluid.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass aus dem Vergleich des Ist-Zustands des zumindest einen Bogens 02 mit dem Soll-Zustand des jeweiligen Bogens 02 das Maß für den Werkzeugverschleiß des zumindest einen Werkzeugs der zumindest einen Formgebungseinrichtung 900, insbesondere des Formgebungswerks 914, bevorzugt des Formzylinders 901, der Bogenbearbeitungsmaschine 01 ermittelt wird. Bevorzugt umfasst die Inspektionseinrichtung 916 das Auswertemittel oder ist mit dem Auswertemittel verbunden und bevorzugt ermittelt die Inspektionseinrichtung 916 und/oder das Auswertemittel das Maß für den Werkzeugverschleiß des zumindest einen Werkzeugs der zumindest einen Formgebungseinrichtung 900 der Bogenbearbeitungsmaschine 01 zur Bearbeitung des jeweiligen Bogens 02 vor der Inspektion des betreffenden Bogens 02 mit der Inspektionseinrichtung 916.Additionally or alternatively, the method is preferably characterized in that the comparison of the actual state of the at least one sheet 02 with the target state of the respective sheet 02 the measure of the tool wear of the at least one tool of the at least one shaping device 900 , in particular the shaping unit 914 , preferably the forme cylinder 901 , the sheet processing machine 01 is determined. The inspection device preferably comprises 916 the evaluation means or is connected to the evaluation means and preferably determines the inspection device 916 and / or the evaluation means the measure for the tool wear of the at least one tool of the at least one Shaping device 900 the sheet processing machine 01 for processing the respective sheet 02 before inspecting the sheet in question 02 with the inspection device 916 .

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass aus dem Vergleich des Ist-Zustands des zumindest einen Bogens 02 mit dem Soll-Zustand des jeweiligen Bogens 02 das Maß für den Verschleiß der zumindest einen Oberfläche des zumindest einen Gegendruckzylinders 902 der zumindest einen Formgebungseinrichtung 900 der Bogenbearbeitungsmaschine 01 ermittelt wird.Additionally or alternatively, the method is preferably characterized in that the comparison of the actual state of the at least one sheet 02 with the target state of the respective sheet 02 the measure of the wear on the at least one surface of the at least one impression cylinder 902 the at least one shaping device 900 the sheet processing machine 01 is determined.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass der zumindest eine Bogen 02 hängend in Transportrichtung T transportiert wird und dass die Inspektionseinrichtung 916 unterhalb des für den Transport von Bogen 02 vorgesehenen Transportweges des zumindest einen Bogens 02 angeordnet ist und auf den Transportweg gerichtet ist. Bevorzugt inspiziert die Inspektionseinrichtung 916 den Bogen 02 von der Seite der Hauptfläche des Bogens 02, auf welcher das zumindest eine Druckbild auf den Bogen 02 aufgebracht ist. Bevorzugt bei der hängenden Führung von Bogen 02 ist die Inspektionseinrichtung 916 bevorzugt unterhalb des Transportweges und/oder der Transportebene, bevorzugt in vertikaler Richtung V vor dem Transportweg und/oder der Transportebene, angeordnet und auf den Transportweg und/oder die Transportebene gerichtet. Somit inspiziert die Inspektionseinrichtung 916 den Bogen 02 bevorzugt von unten. Somit erfasst die Inspektionseinrichtung 916 bevorzugt zumindest einen Teil des Transportwegs und/oder zumindest einen Teil der Transportebene und somit zumindest einen Teil des zumindest einen Bogens 02, welcher die Inspektionseinrichtung 916 auf dem Transportweg in Transportrichtung T passiert, an jener Position des Transportwegs und/oder der Transportebene, auf welche die Inspektionseinrichtung 916 gerichtet ist, von unten. Bevorzugt ist das zumindest eine Druckbild von unten, das heißt in vertikaler Richtung V vor dem Bogen 02, auf dem Bogen 02 aufgebracht. Somit inspiziert die Inspektionseinrichtung 916 zumindest in dieser Ausführung bevorzugt zusätzlich oder alternativ das zumindest eine Druckbild des Bogens 02 von unten, bevorzugt in vertikaler Richtung V von vor dem Transportweg und/oder von vor der Transportebene.Additionally or alternatively, the method is preferably characterized in that the at least one sheet 02 hanging in the direction of transport T is transported and that the inspection facility 916 below the for the transport of sheets 02 provided transport path of the at least one sheet 02 is arranged and is directed to the transport route. The inspection device preferably inspects 916 the bow 02 from the side of the main face of the arch 02 on which the at least one print image on the sheet 02 is upset. Preferred for hanging arches 02 is the inspection facility 916 preferably below the transport path and / or the transport plane, preferably in the vertical direction V in front of the transport route and / or the transport plane, arranged and directed to the transport route and / or the transport plane. Thus, the inspection device inspects 916 the bow 02 preferably from below. The inspection device thus detects 916 preferably at least part of the transport path and / or at least part of the transport plane and thus at least part of the at least one sheet 02 , which is the inspection facility 916 on the transport route in the transport direction T happens at that position of the transport route and / or the transport plane on which the inspection device 916 is directed from below. This is preferably at least one print image from below, that is to say in the vertical direction V in front of the arch 02 , on the arch 02 upset. Thus, the inspection device inspects 916 at least in this embodiment, the at least one print image of the sheet preferably additionally or alternatively 02 from below, preferably in a vertical direction V from in front of the transport route and / or from in front of the transport level.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass aus dem Vergleich des Ist-Zustands des zumindest einen Bogens 02 mit dem Soll-Zustand des jeweiligen Bogens 02 das Maß für die Position des mindestens einen Nutzens 1101 relativ zu einer Referenz der Position des mindestens einen Nutzens 1101 und zusätzlich oder alternativ das Maß für die Farbe zumindest eines Druckbildes des jeweiligen Bogens 02 und zusätzlich oder alternativ das Maß für zumindest einen Fehler einer Verarbeitung des jeweiligen Bogens 02 und/oder des mindestens einen Druckbildes des jeweiligen Bogens 02 durch fehlende Teile und/oder zusätzliche Teile ermittelt wird.Additionally or alternatively, the method is preferably characterized in that the comparison of the actual state of the at least one sheet 02 with the target state of the respective sheet 02 the measure of the position of the at least one benefit 1101 relative to a reference of the position of the at least one benefit 1101 and additionally or alternatively the measure of the color of at least one print image of the respective sheet 02 and additionally or alternatively the measure of at least one error in processing the respective sheet 02 and / or of the at least one print image of the respective sheet 02 is determined by missing parts and / or additional parts.

Bevorzugt wird ein Verfahren zur Inspektion zumindest eines Bogens 02. Der jeweilige Bogen 02 weist bevorzugt den zumindest einen Nutzen 1101 mit dem mindestens einen Druckbild und die mindestens eine Bogenöffnung 1102L, beispielsweise die mindestens eine Bogenlücke 1102L, auf. Bevorzugt erfasst die Inspektionseinrichtung 916 die mindestens eine Bogenöffnung 1102L zumindest teilweise. Bevorzugt vergleicht die Inspektionseinrichtung 916, insbesondere das Auswertemittel, zumindest die mindestens eine Bogenöffnung 1102L mit der Referenz der mindestens einen Bogenöffnung 1102L.A method for inspecting at least one sheet is preferred 02 . The respective arch 02 preferably has the at least one benefit 1101 with the at least one print image and the at least one sheet opening 1102L , for example the at least one arc gap 1102L , on. The inspection device preferably detects 916 the at least one arch opening 1102L at least partially. The inspection device preferably compares 916 , in particular the evaluation means, at least the at least one arch opening 1102L with the reference of the at least one arch opening 1102L .

Bevorzugt weist der jeweilige Bogen 02 den zumindest einen Nutzen 1101 und mindestens eine Bogenöffnung 1102L auf. Bevorzugt ist der jeweilige Bogen 02 aus Papier oder Pappe oder Karton gebildet ist. Bevorzugt erfasst die Inspektionseinrichtung 916 die mindestens eine Bogenöffnung 1102L zumindest teilweise.The respective arch preferably has 02 at least one benefit 1101 and at least one arch opening 1102L on. The respective arch is preferred 02 is formed from paper or cardboard or cardboard. The inspection device preferably detects 916 the at least one arch opening 1102L at least partially.

Bevorzugt entspricht die mindestens eine Bogenöffnung 1102L mindestens einem Teil eines von dem jeweiligen Bogen 02 entfernten Reststückes 1102A. Zusätzlich oder alternativ wurde bevorzugt die Bogenöffnung 1102L durch Entfernen des mindestens einen Teils des zumindest einen Reststücks 1102A von dem jeweiligen Bogen 02 erzeugt.The at least one arch opening preferably corresponds to 1102L at least part of one of the respective sheets 02 removed remnant 1102A . Additionally or alternatively, the arched opening was preferred 1102L by removing the at least part of the at least one remnant piece 1102A of the respective arch 02 generated.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Inspektionseinrichtung 916 die zumindest eine Kontur und/oder die zumindest eine Form und/oder die zumindest eine Masse und/oder die zumindest eine Fläche der mindestens einen Bogenöffnung 1102L zumindest teilweise erfasst.Additionally or alternatively, the method is preferably characterized in that the inspection device 916 the at least one contour and / or the at least one shape and / or the at least one mass and / or the at least one surface of the at least one arched opening 1102L at least partially recorded.

Zusätzlich oder alternativ zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Kontur und/oder Form und/oder Masse und/oder Fläche der zumindest einen Bogenöffnung 1102L der Kontur und/oder Form und/oder Masse und/oder Fläche des zumindest einen von dem jeweiligen Bogen 02 entfernten Reststückes 1102A entspricht.Additionally or alternatively, the method is preferably characterized in that the contour and / or shape and / or mass and / or surface of the at least one arched opening 1102L the contour and / or shape and / or mass and / or surface of the at least one of the respective arches 02 removed remnant 1102A corresponds.

Bevorzugt ist die Referenz der zumindest einen Bogenöffnung 1102L und/oder der Soll-Zustand des betreffenden Bogens 02 auf Grundlage der digitalen Referenz und/oder der angelernten Referenz bestimmt und/oder bestimmbar ausgebildet. Bevorzugt umfasst die Referenz des jeweiligen Bogens 02 die Referenz der zumindest einen Bogenöffnung 1102L des jeweiligen Bogens 02.The reference of the at least one arch opening is preferred 1102L and / or the target state of the sheet in question 02 determined and / or determined based on the digital reference and / or the learned reference. The reference preferably includes the respective arc 02 the reference of the at least one arch opening 1102L of the respective arch 02 .

Bevorzugt erfolgt die Inspektion des Bogens 02 hinsichtlich der Bearbeitung des jeweiligen Bogens 02 durch die Formgebungseinrichtung 900 und zusätzlich oder alternativ des zumindest einen auf den jeweiligen Bogen 02 aufgetragenen Druckbildes und zusätzlich oder alternativ des zumindest einen auf den jeweiligen Bogen 02 aufgetragenen Druckbildes relativ zu der zumindest einen Bogenöffnung 1102L und/oder der zumindest einen inneren Kontur und/oder der zumindest einen äußeren Kontur des jeweiligen Bogens 02.The sheet is preferably inspected 02 regarding the processing of the respective arch 02 by the shaping device 900 and additionally or alternatively the at least one on the respective sheet 02 applied print image and additionally or alternatively the at least one on the respective sheet 02 applied print image relative to the at least one sheet opening 1102L and / or the at least one inner contour and / or the at least one outer contour of the respective arc 02 .

Bevorzugt zeichnet sich das Verfahren dadurch aus, dass die Bogen 02 in einem jeweiligen Formgebungsvorgang in ihrer Form verändert werden. Bevorzugt ist der jeweilige Formgebungsvorgang ein jeweiliger Stanzvorgang, in dem der jeweilige Bogen 02 gestanzt wird, wobei insbesondere Teile des Bogens 02 entfernt werden.The method is preferably characterized in that the sheet 02 can be changed in shape in a respective shaping process. The respective shaping process is preferably a respective punching process in which the respective sheet 02 is punched, in particular parts of the sheet 02 removed.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Bogen 02 in einem jeweiligen Separationsvorgang von den Reststücken 1102A zumindest teilweise befreit werden, beispielsweise indem sie gerüttelt werden. Dabei werden die jeweiligen Bogen 02 bevorzugt mittels des zumindest einen Separationstransportmittels 904 transportiert.Alternatively or additionally, the method is preferably characterized in that the sheet 02 in a respective separation process from the remaining pieces 1102A be at least partially freed, for example by shaking them. The respective arches 02 preferably by means of the at least one separation transport means 904 transported.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Bogen 02 in einem jeweiligen insbesondere direkt an den jeweiligen Separationsvorgang anschließenden Transportvorgang entlang des für den Transport der Bogen 02 vorgesehenen Transportwegs zu der Auslage 1000, bevorzugt der Bogenauslage 1000, transportiert werden, insbesondere mittels des bevorzugt als oberes Saugtransportmittel 906 ausgebildeten Ausgangstransportmittels 906 und/oder hängend.Alternatively or additionally, the method is preferably characterized in that the sheet 02 in a respective transport process, in particular directly following the respective separation process, along the for transporting the sheets 02 intended transport route to the delivery 1000 , preferably the sheet delivery 1000 , are transported, in particular by means of the preferably as the upper suction transport means 906 trained output means of transport 906 and / or hanging.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass bevorzugt in einem jeweiligen Zuführungsvorgang insbesondere bearbeitetes Substrat 02 in Form einer Folge voneinander in der Transportrichtung T beabstandeter Bogen 02 in dieser Transportrichtung T insbesondere mit einer Übergabegeschwindigkeit der Bogenauslage 1000 der Bogenbearbeitungsmaschine 01 zugeführt werden. Die Übergabegeschwindigkeit ist bevorzugt gleich der Bearbeitungsgeschwindigkeit. Der Zuführungsvorgang ist bevorzugt der Vorgang, in dem die jeweiligen in dem Transportvorgang transportierten Bogen 02 von dem Ausgangstransportmittel 906 an das zumindest ein Bogenübergabemittels 09 übergeben werden, insbesondere hängend. Alternativ kann in dem Fall, in dem anstelle einer Aneinanderreihung von Ausgangstransportmittel 906 und Bogenübergabemittels 09 lediglich ein Selektivtransportmittel 09; 906 angeordnet ist, der entfallen und der Zuführungsvorgang erfolgt direkt im Anschluss an den jeweiligen Separationsvorgang.Alternatively or additionally, the method is preferably characterized in that the substrate, in particular, processed in a respective feeding process 02 in the form of a sequence from each other in the transport direction T spaced arc 02 in this transport direction T especially with a transfer speed of the sheet delivery 1000 the sheet processing machine 01 are fed. The transfer speed is preferably equal to the processing speed. The feeding process is preferably the process in which the respective sheets transported in the transport process 02 from the exit vehicle 906 to the at least one sheet transfer means 09 be handed over, especially hanging. Alternatively, in the case in which, instead of a stringing together of output transport means 906 and sheet transfer means 09 just a selective means of transport 09 ; 906 is arranged, which is omitted and the feeding process takes place directly after the respective separation process.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass zumindest während eines Bogenabbremsvorgangs und/oder während eines Überschuppungsvorgangs zumindest zeitweise zumindest zwei Bogen 02 mittels eines für einen hängenden Transport von Bogen 02 ausgebildeten oberen Bogentransportsystems 06 der Bogenauslage 1000 hängend geführt und überschuppt angeordnet zumindest auch in der Transportrichtung T transportiert werden.As an alternative or in addition, the method is preferably characterized in that at least at times at least two sheets during a sheet braking process and / or during a overlapping process 02 by means of a hanging transport of sheets 02 trained upper sheet transport system 06 the sheet delivery 1000 guided hanging and overlapping arranged at least also in the transport direction T be transported.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Bogen 02 jeweils insbesondere in einem jeweiligen Bremsübergabevorgang mittels des zumindest einen als oberes Saugtransportmittel 08 ausgebildeten Bogeneinlaufmittels 08 der Bogenauslage 1000 hängend transportiert und von diesem an das zumindest eine als oberes Saugtransportmittel 07 ausgebildete und weiter bevorzugt in der Transportrichtung T gesehen zumindest teilweise nach dem zumindest einen Bogeneinlaufmittel 08 angeordnete Bogenabbremsmittel 07 übergeben werden. Das zumindest eine Bogenabbremsmittel 07 dient bevorzugt dazu die Bogen 02 von der Bearbeitungsgeschwindigkeit und/oder Übergabegeschwindigkeit abzubremsen, damit diese auf dem Auslagestapel 28 abgelegt werden können.Alternatively or additionally, the method is preferably characterized in that the sheet 02 in each case in particular in a respective brake transfer process by means of the at least one as the upper suction transport means 08 trained sheet inlet means 08 the sheet delivery 1000 transported hanging and from this to the at least one as an upper suction transport 07 trained and more preferably in the transport direction T seen at least partially after the at least one sheet inlet means 08 arranged sheet braking means 07 be handed over. The at least one sheet braking means 07 the bow is preferably used for this 02 to decelerate from the processing speed and / or transfer speed so that they are on the delivery pile 28 can be filed.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass in einem insbesondere jeweiligen Verdrängungsvorgang ein jeweiliges nachlaufendes Ende 29 eines jeweiligen vorderen Bogens 02 mittels zumindest eines Verdrängungselements 12 nach unten von dem zumindest einen Bogeneinlaufmittel 08 weg gedrückt wird. Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass in dem Verdrängungsvorgang das jeweilige nachlaufende Ende 29 des jeweiligen vorderen Bogens 02 auf die Transportrichtung T bezogen zumindest auch vor dem zumindest einen vorderen Stapelbegrenzer 04 mittels des zumindest einen Verdrängungselements 12 nach unten von dem zumindest einen Bogeneinlaufmittel 08 weg gedrückt wird. Ein vorlaufender Anfang 31 des jeweiligen vorderen Bogens 02 steht währenddessen bevorzugt mit einer Transportfläche 22 des zumindest einen Bogenabbremsmittels 07 in Kontakt. Während des jeweiligen Verdrängungsvorgangs gerät bevorzugt zumindest ein hinterer Abschnitt des vorderen Bogens 02 außer Kontakt mit dem zumindest einen Bogeneinlaufmittel 08, obwohl dieser hintere Abschnitt des vorderen Bogens 02 sich noch immer in vertikaler Richtung V unter dem zumindest einen Bogeneinlaufmittel 08 befindet. Dadurch entsteht ein Überschuppungsspalt zwischen dem jeweiligen hinteren Abschnitt des vorderen Bogens 02 einerseits und dem zumindest einen Bogeneinlaufmittel 08, insbesondere dessen Kontaktfläche 16 andererseits.As an alternative or in addition, the method is preferably characterized in that there is a respective trailing end in a particular respective displacement process 29 of a respective front arch 02 by means of at least one displacement element 12 downward from the at least one sheet inlet means 08 is pushed away. Alternatively or additionally, the method is preferably characterized in that the respective trailing end in the displacement process 29 of the respective front arch 02 on the transport direction T related at least also in front of the at least one front stack limiter 04 by means of the at least one displacement element 12 downward from the at least one sheet inlet means 08 is pushed away. A preliminary beginning 31 of the respective front arch 02 stands meanwhile preferably with a transport surface 22nd of the at least one sheet braking means 07 in contact. During the respective displacement process, at least a rear section of the front arch preferably comes into play 02 out of contact with the at least one sheet inlet means 08 although this rear section of the front arch 02 still vertically V under the at least one sheet inlet means 08 is located. This creates an overlapping gap between each posterior portion of the anterior arch 02 on the one hand and the at least one sheet inlet means 08 , especially its contact area 16 on the other hand.

Beispielsweise durch Aktivierung des zumindest einen Verdrängungselements 12 wird bevorzugt zumindest für einen Teil des jeweiligen vorderen Bogens 02 auf die vertikale Richtung V bezogen ein Abstand zwischen dem zumindest einen Bogenabbremsmittel 07 einerseits und dem jeweiligen vorderen Bogen 02 andererseits erzeugt und/oder vergrößert.For example, by activating the at least one displacement element 12 is preferred for at least part of the respective front sheet 02 on the vertical direction V related to a distance between the at least one sheet braking means 07 one hand and the respective front arch 02 on the other hand generated and / or enlarged.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass in dem Bogenabbremsvorgang dieser jeweilige vordere Bogen 02 mittels des zumindest einen Bogenabbremsmittels 07 abgebremst wird, insbesondere bezüglich der Bewegung in der Transportrichtung T. Der jeweilige Bogen 02 wird bevorzugt dadurch abgebremst, dass der jeweilige Bogen 02 mittels Unterdruck gegen eine Transportfläche 22 des zumindest einen Bogenabbremsmittels 07 gezogen wird und diese Transportfläche 22 abgebremst wird. Das Abbremsen der Transportfläche 22 des zumindest einen Bogenabbremsmittels 07 erfolgt bevorzugt dadurch, dass ein das zumindest eine Bogenabbremsmittel 07 antreibender Bremsmittelantrieb 19 mit abnehmender Geschwindigkeit betrieben, insbesondere in Form eines zumindest teilweise vorgegebenen Bremsprofils. Bevorzugt wird der jeweilige Bogen 02 während seines Abbremsvorgangs lediglich auf seiner auf die vertikale Richtung V bezogen oberen Seite gehalten oder berührt.Alternatively or additionally, the method is preferably characterized in that this respective front sheet is used in the sheet braking process 02 by means of the at least one sheet braking means 07 is braked, especially with regard to the movement in the transport direction T . The respective arch 02 is preferably slowed down by the fact that the respective sheet 02 by means of negative pressure against a transport surface 22nd of the at least one sheet braking means 07 is pulled and this transport surface 22nd is braked. Braking the transport surface 22nd of the at least one sheet braking means 07 preferably takes place in that the at least one sheet braking means 07 driving brake means drive 19th operated at a decreasing speed, in particular in the form of an at least partially predetermined braking profile. The respective bow is preferred 02 during its deceleration process only in its vertical direction V related upper side held or touched.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass der jeweilige Bogenabbremsvorgang eines jeweiligen Bogens 02 bevorzugt beginnt, bevor der jeweilige Verdrängungsvorgang dieses Bogens 02 beginnt. Bevorzugt findet der jeweilige Verdrängungsvorgang eines jeweiligen Bogens 02 zumindest teilweise gleichzeitig mit dem jeweiligen Bogenabbremsvorgang des jeweiligen Bogens 02 statt. Bevorzugt endet der jeweilige Verdrängungsvorgang eines jeweiligen Bogens 02 bevor der jeweilige Bogenabbremsvorgang des jeweiligen Bogens 02 abgeschlossen ist. Das zumindest eine Verdrängungselement 12 wird zum Beenden des jeweiligen Verdrängungsvorgangs bevorzugt deaktiviert. Im Fall eines als Verdrängungsöffnung 12 ausgebildeten Verdrängungselements 12 wird dazu ein Ausstoßen des Verdrängungsfluids entsprechend verringert und/oder unterbrochen und/oder beendet. Im Fall eines als Verdrängungskörper 12 ausgebildeten Verdrängungselement 12 wird dieser Verdrängungskörper 12 dazu bevorzugt nach oben bewegt, bis er außer Kontakt mit dem jeweiligen vorderen Bogen 02 gerät. Beispielsweise bewegt sich das jeweilige nachlaufende Ende 29 des jeweiligen vorderen Bogens 02 beim Beenden und/oder nach dem Ende des jeweiligen Verdrängungsvorgang dieses Bogens 02 wieder nach oben. Wegen einer inzwischen stattgefundenen Überschuppung bleibt aber zumindest das jeweilige nachlaufende Ende 29 des jeweiligen vorderen Bogens 02 von der Transportfläche 23 des zumindest einen Bogeneinlaufmittels 08 und von der Transportfläche 22 des zumindest einen Bogenabbremsmittels 07 bezüglich der vertikalen Richtung V beabstandet.Alternatively or additionally, the method is preferably characterized in that the respective sheet braking process of a respective sheet 02 preferably begins before the respective displacement process of this arc 02 begins. The respective displacement process of a respective sheet preferably takes place 02 at least partially simultaneously with the respective sheet braking process of the respective sheet 02 instead of. The respective displacement process of a respective sheet preferably ends 02 before the respective sheet braking process of the respective sheet 02 is completed. The at least one displacement element 12 is preferably deactivated to end the respective displacement process. In the case of one as a displacement opening 12 trained displacement element 12 an ejection of the displacement fluid is correspondingly reduced and / or interrupted and / or terminated for this purpose. In the case of one as a displacement body 12 trained displacement element 12 becomes this sinker 12 this is preferably moved upwards until it is out of contact with the respective front sheet 02 device. For example, the respective trailing end moves 29 of the respective front arch 02 at the end of and / or after the end of the respective displacement process of this arc 02 back up. Because of a scaling that has taken place in the meantime, at least the respective trailing end remains 29 of the respective front arch 02 from the transport area 23 of the at least one sheet inlet means 08 and from the transport surface 22nd of the at least one sheet braking means 07 with respect to the vertical direction V spaced.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass die Überschuppung bevorzugt in einem jeweiligen Überschuppungsvorgang und/oder mittels der zumindest einen Überschuppungseinrichtung 46 stattfindet. Der Überschuppungsvorgang ist dabei bevorzugt zumindest zwei Bogen 02 zugeordnet, insbesondere dem vorderen Bogen 02 und dem nachfolgenden Bogen 02. Diese werden in dem Überschuppungsvorgang bevorzugt überschuppt zueinander angeordnet und dabei weiter in der Transportrichtung T transportiert. Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass in dem Überschuppungsvorgang insbesondere mittels des zumindest einen Bogenübergabemittels 09 ein jeweiliger vorlaufender Anfang 31 eines jeweiligen insbesondere dem jeweiligen vorderen Bogen 02 nachfolgenden Bogens 02 auf die vertikale Richtung V bezogen zwischen das nachlaufende Ende 29 des jeweiligen vorderen Bogens 02 einerseits und das zumindest eine Bogeneinlaufmittel 08 andererseits geschoben wird, während der jeweilige vordere Bogen 02 noch teilweise von dem zumindest einen Bogenabbremsmittel 07 gehalten wird. Dadurch muss der vordere Bogen 02 nicht bereits vollständig von dem zumindest einen Bogenabbremsmittel 07 abgelöst oder angehalten sein, wenn der nachfolgende Bogen 02 bereits weniger als seine Bogenlänge von dem hinteren Bogenanschlag 03 entfernt angeordnet ist.Alternatively or additionally, the method is preferably characterized in that the overlapping is preferably carried out in a respective overlapping process and / or by means of the at least one overlapping device 46 takes place. The overlapping process is preferably at least two sheets 02 assigned, especially the front arch 02 and the following arch 02 . In the overlapping process, these are preferably arranged overlapping one another and further in the direction of transport T transported. Alternatively or additionally, the method is preferably characterized in that in the overlapping process, in particular by means of the at least one sheet transfer means 09 a respective leading beginning 31 of a respective in particular the respective front arch 02 subsequent arc 02 on the vertical direction V related between the trailing end 29 of the respective front arch 02 on the one hand and the at least one sheet inlet means 08 on the other hand is pushed while the respective front arch 02 still partially from the at least one sheet braking means 07 is held. This must make the front arch 02 not already completely from the at least one sheet braking means 07 be relieved or stopped when the subsequent bow 02 already less than its arc length from the rear arc stop 03 is located away.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass Transportrollen 26 des zumindest einen Bogeneinlaufmittels 08 ausschließlich durch einen Kontakt dieser Transportrollen 26 mit dem jeweiligen bewegten Bogen 02 angetrieben rotiert werden und/oder dass Bogen 02 bei einem Transport entlang des zumindest einen Bogeneinlaufmittels 08 zumindest zweitweise entlang zumindest einer Gleitfläche des zumindest einen Bogeneinlaufmittels 08 gleiten. Wenn wie bevorzugt das zumindest eine Bogeneinlaufmittel 08 als Rollensaugsystem 08 ausgebildet ist und passiv drehbare Transportrollen 26 aufweist, können diejenigen Transportrollen 26 des zumindest einen Bogeneinlaufmittels 08, die noch mit dem vorderen Bogen 02 in Kontakt stehen, mit einer anderen Umfangsgeschwindigkeit rotieren, als diejenigen Transportrollen 26 des zumindest einen Bogeneinlaufmittels 08, die bereits mit dem nachfolgenden Bogen 02 Kontakt stehen. Dennoch werden beide Bogen 02 sicher transportiert, beispielsweise durch den Unterdruck des zumindest einen Bogeneinlaufmittels 08.Alternatively or additionally, the method is preferably characterized in that transport rollers 26th of the at least one sheet inlet means 08 exclusively through contact between these transport rollers 26th with the respective moving arc 02 be driven rotated and / or that arch 02 during a transport along the at least one sheet inlet means 08 at least in part along at least one sliding surface of the at least one sheet inlet means 08 slide. If we prefer at least one sheet inlet means 08 as a roller suction system 08 is formed and passively rotatable transport rollers 26th has, those transport rollers 26th of the at least one sheet inlet means 08 that are still with the front arch 02 are in contact, rotate at a different peripheral speed than those transport rollers 26th of the at least one sheet inlet means 08 that already started with the subsequent arch 02 Stay in contact. Still, both bows 02 for sure transported, for example by the negative pressure of the at least one sheet inlet means 08 .

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass eine Bewegung des zumindest einen Verdrängungskörpers 12 bevorzugt mittels eines vorgegebenen Bewegungsprofils erfolgt. Bevorzugt wird zumindest ein Teil des zumindest einen Verdrängungskörpers 12 von oben kommend unter die Referenzfläche 11 geführt und füllt dort den Verdrängungsbereich aus, der sich insbesondere mit dem zumindest einen Verdrängungskörper 12 mitbewegt. Dies geschieht bevorzugt derart abgestimmt, dass der zumindest eine Verdrängungskörper 12 möglichst lange mit einer annähernd selben Stelle des nachfolgenden Bogens 02 in Kontakt steht. Bei einer konstanten negativen Beschleunigung des vorderen Bogens 02 ergibt sich ein parabelförmiger Verlauf der auf die Transportrichtung T bezogenen Position des nachlaufenden Endes 29 des vorderen Bogens 02 über die Zeit. Bevorzugt weist die auf die Transportrichtung T bezogene Position des zumindest einen Verdrängungskörpers 12 gegenüber der Zeit aufgetragen einen parabelförmigen Verlauf auf, zumindest bis kurz bevor der jeweilige vorlaufende Anfang 31 des nachfolgenden Bogens 02 den zumindest einen Verdrängungskörper 12 einholen würde. Ab dann wird der zumindest eine Verdrängungskörper 12 bevorzugt mit einer auf die Transportrichtung T bezogen konstanten Geschwindigkeit bewegt, die der Geschwindigkeit des zweiten Bogens 02 entspricht und insbesondere gleich der Übergabegeschwindigkeit und/oder der Bearbeitungsgeschwindigkeit ist.Alternatively or additionally, the method is preferably characterized in that a movement of the at least one displacement body 12 preferably takes place by means of a predetermined movement profile. At least part of the at least one displacement body is preferred 12 coming from above under the reference surface 11 guided and there fills the displacement area, which is in particular with the at least one displacement body 12 moved along. This is preferably done in such a way that the at least one displacement body 12 as long as possible with an approximately the same position on the following sheet 02 is in contact. At a constant negative acceleration of the front arch 02 the result is a parabolic course in the direction of transport T related position of the trailing end 29 of the front arch 02 over time. It preferably points to the transport direction T related position of the at least one displacement body 12 plotted against time, a parabolic course, at least until shortly before the respective leading beginning 31 of the following arc 02 the at least one displacement body 12 would catch up. From then on, the at least one displacement body becomes 12 preferably with one on the transport direction T related constant speed moves that of the speed of the second sheet 02 corresponds and in particular is equal to the transfer speed and / or the processing speed.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass bevorzugt während des Verdrängungsvorgangs der Verdrängungsbereich durch eine Bewegung des zumindest einen Verdrängungsköpers 12 mit zumindest einem Sicherheitsabstand in der Transportrichtung T vor dem nachfolgenden Bogen 02 weg bewegt wird, insbesondere solange der zumindest Verdrängungskörper 12 sich zumindest teilweise unter die Referenzfläche 11 befindet und der nachfolgende Bogen 02 noch nicht in den Überschuppungsspalt eingetreten ist. Der Sicherheitsabstand beträgt bevorzugt zumindest 1 mm, weiter bevorzugt zumindest 2 mm, noch weiter bevorzugt zumindest 5 mm und noch weiter bevorzugt zumindest 8 mm. Unabhängig davon beträgt der Sicherheitsabstand bevorzugt höchstens 50 mm, weiter bevorzugt höchstens 20 mm und noch weiter bevorzugt höchstens 12 mm. Je geringer der Sicherheitsabstand ist, umso mehr Bogen 02 können je Zeiteinheit verarbeitet werden und/oder desto sanfter können die Bogen 02 abgebremst werden, insbesondere bei vorgegebener Lage des zumindest einen Verdrängungskörpers 12. Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass mittels der Bogenauslage 1000 zumindest ein Bogen pro Sekunde auf den Auslagestapel 28 ablegt wird, weiter bevorzugt zumindest zwei Bogen 02 pro Sekunde, noch weiter bevorzugt zumindest 2,5 Bogen 02 pro Sekunde, noch weiter bevorzugt zumindest drei Bogen 02 pro Sekunde und noch weiter bevorzugt zumindest 3,2 Bogen 02 pro Sekunde.Alternatively or additionally, the method is preferably characterized in that the displacement region is preferably caused by a movement of the at least one displacement body during the displacement process 12 with at least a safety margin in the direction of transport T before the next arch 02 is moved away, in particular as long as the at least displacement body 12 at least partially below the reference surface 11 and the subsequent arch 02 has not yet entered the overlapping gap. The safety distance is preferably at least 1 mm, more preferably at least 2 mm, even more preferably at least 5 mm and even more preferably at least 8 mm. Regardless of this, the safety distance is preferably at most 50 mm, more preferably at most 20 mm and even more preferably at most 12 mm. The smaller the safety distance, the more arches 02 can be processed per unit of time and / or the smoother the sheets can be 02 are braked, in particular with a predetermined position of the at least one displacement body 12 . Alternatively or additionally, the method is preferably characterized in that by means of the sheet delivery 1000 at least one sheet per second on the delivery pile 28 is deposited, more preferably at least two sheets 02 per second, more preferably at least 2.5 sheets 02 per second, more preferably at least three sheets 02 per second and more preferably at least 3.2 sheets 02 per second.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass der zumindest eine Verdrängungshebel 12 bevorzugt als der zumindest eine Verdrängungskörper 12 eingesetzt wird, der um die Verdrängungsachse 17 drehbar angeordnet ist. Die Drehbewegung des zumindest einen Verdrängungshebels 12 wird folgt bevorzugt derart einem vorgegebenen Profil, dass sich seine auf die Transportrichtung T bezogene Position mit der Zeit wie oben beschrieben verhält.Alternatively or in addition, the method is preferably characterized in that the at least one displacement lever 12 preferably as the at least one displacement body 12 is used around the displacement axis 17th is rotatably arranged. The rotary movement of the at least one displacement lever 12 is preferably follows a predetermined profile in such a way that its on the transport direction T related position behaves as described above over time.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass das zumindest eine Verdrängungselement 12 als Verdrängungskörper 12 ausgebildet ist und in dem Verdrängungsvorgang zumindest teilweise bis unter eine Transportfläche 23 des zumindest einen Bogeneinlaufmittels 08 bewegt wird. Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass das zumindest eine Verdrängungselement 12 als um eine Verdrängungsachse 17 drehbarer, insbesondere schwenkbarer und weiter bevorzugt rotierbarer Verdrängungshebel 12 ausgebildet ist und in dem Verdrängungsvorgang um die Verdrängungsachse 17 zumindest teilweise bis unter eine Transportfläche 23 des zumindest einen Bogeneinlaufmittels 08 gedreht, insbesondere geschwenkt und/oder rotiert wird, insbesondere in der Drehrichtung D. Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass das zumindest eine Verdrängungselement 12 während des Verdrängungsvorgangs zumindest teilweise unterhalb der Referenzfläche 11 des zumindest einen Bogeneinlaufmittels 08 angeordnet ist. Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass eine auf die Transportrichtung T bezogene Lage des zumindest einen Verdrängungselements 12 als Funktion der Zeit zumindest während des Verdrängungsvorgangs einem insbesondere vorgegebenen Bewegungsprofil folgt. Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass das Bewegungsprofil zumindest einen parabelförmigen Abschnitt und zumindest einen linearen Abschnitt aufweist.Alternatively or additionally, the method is preferably characterized in that the at least one displacement element 12 as a displacement body 12 is formed and in the displacement process at least partially up to below a transport surface 23 of the at least one sheet inlet means 08 is moved. Alternatively or additionally, the method is preferably characterized in that the at least one displacement element 12 than about a displacement axis 17th rotatable, in particular pivotable and more preferably rotatable displacement lever 12 is formed and in the displacement process about the displacement axis 17th at least partially to below a transport surface 23 of the at least one sheet inlet means 08 rotated, in particular pivoted and / or rotated, in particular in the direction of rotation D. . Alternatively or additionally, the method is preferably characterized in that the at least one displacement element 12 during the displacement process at least partially below the reference surface 11 of the at least one sheet inlet means 08 is arranged. Alternatively or additionally, the method is preferably characterized in that one on the transport direction T related position of the at least one displacement element 12 as a function of time, at least during the displacement process, a particular predetermined movement profile follows. Alternatively or additionally, the method is preferably characterized in that the movement profile has at least one parabolic section and at least one linear section.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass in einem Ablösevorgang der jeweilige vordere Bogen 02 insbesondere mittels des zumindest einen Abwurfmittels 32 von dem zumindest einen Bogenabbremsmittel 07 vollständig abgelöst wird. Der Ablösevorgang beginnt bevorzugt nachdem der Verdrängungsvorgang begonnen hat. Der Ablösevorgang kann bereits beginnen, wenn der Verdrängungsvorgang noch nicht abgeschlossen ist. Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass in dem Ablösevorgang zunächst an der ersten Verbindungsstelle 41 abgesenkt wird und danach an einer zweiter Verbindungsstelle 42 abgesenkt wird, die wie beschrieben auf die Transportrichtung T bezogen bevorzugt nach der ersten Verbindungsstelle 41 angeordnet ist. Insgesamt wird der vordere Bogen 02 bevorzugt dadurch von dem oberen Bogentransportsystem 06 abgelöst, dass zunächst sein nachlaufendes Ende 29 mittels des zumindest einen Verdrängungselements 12 von dem oberen Bogentransportsystem 06 und insbesondere von dem zumindest einen Bogeneinlaufmittel 08 abgelöst wird und dass danach ein weiter in der Transportrichtung T angeordneter Teil des vorderen Bogens 02 mittels des zumindest einen Abwurfmittels 32, insbesondere mittels eines mittels des zumindest einen ersten Abwurfantriebs 33 absenkbaren Teils des zumindest einen Abwurfmittels 32, von dem oberen Bogentransportsystem 06 und insbesondere von dem zumindest einen Bogenabbremsmittel 07 abgelöst wird und dass danach der noch weiter in der Transportrichtung T angeordnete vorlaufende Anfang 29 des vorderen Bogens 02 mittels des zumindest einen Abwurfmittels 32, insbesondere mittels eines mittels des zumindest einen zweiten Abwurfantriebs 34 absenkbaren Teils des zumindest einen Abwurfmittels 32, von dem oberen Bogentransportsystem 06 und insbesondere von dem zumindest einen Bogenabbremsmittel 07 abgelöst wird.Alternatively or additionally, the method is preferably characterized in that the respective front sheet is removed in a detachment process 02 in particular by means of the at least one ejection means 32 of the at least one sheet braking means 07 is completely replaced. The detachment process preferably begins after the displacement process has begun. The removal process can already start if the displacement process is not yet complete. Alternatively or additionally, the method is preferably characterized in that, in the detachment process, initially at the first connection point 41 is lowered and then at a second connection point 42 is lowered, as described on the transport direction T preferably based on the first connection point 41 is arranged. Overall becomes the front arch 02 thereby preferentially from the upper sheet transport system 06 that initially replaced its trailing end 29 by means of the at least one displacement element 12 from the upper sheet transport system 06 and in particular from the at least one sheet inlet means 08 is replaced and that afterwards a further in the transport direction T arranged part of the front arch 02 by means of the at least one ejection means 32 , in particular by means of a means of the at least one first ejection drive 33 lowerable part of the at least one dropping means 32 , from the upper sheet transport system 06 and in particular of the at least one sheet braking means 07 is detached and that then the still further in the transport direction T arranged leading beginning 29 of the front arch 02 by means of the at least one ejection means 32 , in particular by means of a means of the at least one second ejection drive 34 lowerable part of the at least one dropping means 32 , from the upper sheet transport system 06 and in particular of the at least one sheet braking means 07 is replaced.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass das zumindest eine Bogenabbremsmittel 07 nach dem Ablösevorgang wieder insbesondere auf die Übergabegeschwindigkeit und/oder die Bearbeitungsgeschwindigkeit beschleunigt wird und danach der jeweilige nachfolgende Bogen 02 mit dem zumindest einen Bogenabbremsmittel 07 in Kontakt gebracht wird. Dadurch wird der bisherige nachfolgende Bogen 02 zu einem neuen vorderen Bogen 02 und das Verfahren kann entsprechend wiederholt bzw. fortgesetzt werden.Alternatively or in addition, the method is preferably characterized in that the at least one sheet braking means 07 after the detachment process is accelerated again in particular to the transfer speed and / or the processing speed and then the respective subsequent sheet 02 with the at least one sheet braking means 07 is brought into contact. This will make the previous arch 02 to a new front arch 02 and the process can be repeated or continued accordingly.

Alternativ oder zusätzlich zeichnet sich das Verfahren bevorzugt dadurch aus, dass in einem Stapelvorgang der jeweilige gerade abgelöste Bogen 02 von dem zumindest einen Bogenabbremsmittel 07 aus nach unten auf einem Auslagestapel 28 abgelegt wird. Dabei wird der Auslagestapel 28 um diesen vorderen Bogen 02 ergänzt. Der Auslagestapel 28 wird bevorzugt zwischen dem zumindest einen vorderen Stapelbegrenzer 04 einerseits und dem zumindest einen hinteren Bogenanschlag 03 andererseits gebildet. Der zumindest eine hintere Bogenanschlag 03 ist bevorzugt in seiner auf die Transportrichtung T bezogenen Lage längs eines Formatanpassungswegs einstellbar angeordnet. Dadurch können Anpassungen an unterschiedliche Bogenlängen vorgenommen werden, insbesondere einmalig bei einem Formatwechsel. Durch den zumindest einen hinteren Bogenanschlag 03 wird eine hintere Grenzfläche des Auslagestapels 28 festgelegt. Eine vordere Grenzfläche des Auslagestapels 28 wird bevorzugt durch den zumindest einen vorderen Stapelbegrenzer 04 festgelegt. Der zumindest eine vordere Stapelbegrenzer 04 ist bevorzugt bezüglich der Transportrichtung T längs eines Stapelformwegs bewegbar, insbesondere periodisch bewegbar. Dadurch kann der Auslagestapel 28 in Form gebracht werden, insbesondere indem jeweilige Bogen 02 in der Transportrichtung T geschoben werden, damit sich eine gleichmäßige vordere und/oder hintere Grenzfläche des Auslagestapels 28 ergibt. Periodische Bewegungen des zumindest einen vorderen Stapelbegrenzers 04 werden im Betrieb der Bogenbearbeitungsmaschine 01 bevorzugt mehrfach vorgenommen, beispielsweise mehrmals pro Minute. Beispielsweise sind auch seitliche Stapelbegrenzer angeordnet. Die seitlichen Stapelbegrenzer sind bevorzugt in ihrer auf die Querrichtung A bezogenen Lage je nach Bogenformat einstellbar und/oder bezüglich der Querrichtung A insbesondere periodisch bewegbar, um zumindest eine seitliche Grenzfläche des Auslagestapels 28 in Form zu bringen.Alternatively or additionally, the method is preferably characterized in that the respective sheet that has just been detached is in a stacking process 02 of the at least one sheet braking means 07 from down on a display pile 28 is filed. The delivery pile becomes 28 around that front arch 02 added. The display pile 28 is preferred between the at least one front stack limiter 04 on the one hand and the at least one rear bow stop 03 on the other hand formed. The at least one rear arch stop 03 is preferred in its on the transport direction T related position along a format adjustment path adjustable. As a result, adjustments to different sheet lengths can be made, in particular once in the event of a format change. Through the at least one rear arch stop 03 becomes a rear interface of the delivery stack 28 set. A front interface of the delivery stack 28 is preferred by the at least one front stack limiter 04 set. The at least one front stack limiter 04 is preferred with regard to the transport direction T movable, in particular periodically movable, along a stack mold path. This allows the delivery pile 28 be brought into shape, in particular by adding respective arches 02 in the direction of transport T be pushed so that there is a uniform front and / or rear boundary surface of the delivery stack 28 results. Periodic movements of the at least one front stack limiter 04 are in operation of the sheet processing machine 01 preferably carried out several times, for example several times per minute. For example, lateral stack limiters are also arranged. The side stack limiters are preferably in the transverse direction A. related position can be adjusted depending on the sheet format and / or with respect to the transverse direction A. in particular periodically movable around at least one lateral boundary surface of the delivery stack 28 to get in shape.

BezugszeichenlisteList of reference symbols

0101
Bearbeitungsmaschine, Druckmaschine, Formgebungsmaschine, Stanzmaschine, Flexo-Druckmaschine, Bogenbearbeitungsmaschine, Bogendruckmaschine, Bogenformgebungsmaschine, Bogenstanzmaschine, Wellpappbogenbearbeitungsmaschine, WellpappbogendruckmaschineProcessing machine, printing machine, forming machine, punching machine, flexographic printing machine, sheet processing machine, sheet printing machine, sheet forming machine, sheet punching machine, corrugated cardboard sheet processing machine, corrugated cardboard sheet printing machine
0202
Substrat, Bedruckstoff, Bogen, Wellpappe, WellpappbogenSubstrate, printing material, sheets, corrugated cardboard, corrugated cardboard sheets
0303
Bogenanschlag, Stapelbegrenzer, hintererSheet stop, pile limiter, rear
0404
Stapelbegrenzer, Bogenanschlag, vordererStack limiter, bow stop, front
0505
--
0606
Bogentransportsystem, oberesSheet transport system, upper one
0707
Transportmittel, Saugtransportmittel, Saugband, Bogenabbremsmittel, oberesTransport means, suction transport means, suction belt, sheet braking means, upper
0808
Transportmittel, Saugtransportmittel, Rollensaugsystem, Bogeneinlaufmittel, Gleitsaugvorrichtung, oberesMeans of transport, suction means of transport, roller suction system, sheet infeed means, sliding suction device, upper
0909
Transportmittel, Saugtransportmittel, Saugband, Selektivtransportmittel Bogenübergabemittel, oberesTransport means, suction transport means, suction belt, selective transport means, sheet transfer means, upper
1010
--
1111
ReferenzflächeReference area
1212
Verdrängungselement, Verdrängungskörper, Verdrängungsöffnung, VerdrängungshebelDisplacement element, displacement body, displacement opening, displacement lever
1313th
Kontaktbereich, BereichContact area, area
1414th
Bestandteil (08)Component ( 08 )
1515th
--
1616
Fläche, KontaktflächeArea, contact area
1717th
VerdrängungsachseDisplacement axis
1818th
KontaktrolleContact role
1919th
Bremsmittelantrieb (07), Elektromotor, lagegeregeltBraking device drive ( 07 ), Electric motor, position-controlled
2020th
--
2121st
Antrieb, Elektromotor, lagegeregelt, Übergabemittelantrieb (09)Drive, electric motor, position-controlled, transfer device drive ( 09 )
2222nd
Transportfläche, Gegendruckfläche (07)Transport surface, counter pressure surface ( 07 )
2323
Transportfläche, Gegendruckfläche (08)Transport surface, counter pressure surface ( 08 )
2424
Transportfläche, Gegendruckfläche (09)Transport surface, counter pressure surface ( 09 )
2525th
--
2626th
Transportrolle, Transportwalze (08)Transport roller, transport roller ( 08 )
2727
Verdrängungsantrieb (12), Elektromotor, lagegeregeltDisplacement drive ( 12 ), Electric motor, position-controlled
2828
AuslagestapelDisplay pile
2929
Ende (02), nachlaufendThe End ( 02 ), trailing
3030th
--
3131
Anfang (02), vorlaufendBeginning ( 02 ), leading
3232
AbwurfmittelRelease means
3333
Abwurfantrieb, Elektromotor, lagegeregelt, ersterDrop drive, electric motor, position-controlled, first
3434
Abwurfantrieb, Elektromotor, lagegeregelt, zweiterDrop drive, electric motor, position-controlled, second
3535
--
3636
AnsaugöffnungSuction opening
3737
Transportband (07)Conveyor belt ( 07 )
3838
Transportband (09)Conveyor belt ( 09 )
3939
Leitelemente (08)Guiding elements ( 08 )
4040
--
4141
Verbindungsstelle, ersteJunction, first
4242
Verbindungsstelle, zweiteJunction, second
4343
Abwurfgetriebe, erstesEjection gear, first
4444
Abwurfgetriebe, zweitesEjection gear, second
4545
--
4646
ÜberschuppungseinrichtungOverlapping device
4747
Umlenkmittel, Umlenkrolle, UmlenkwalzeDeflection means, deflection roller, deflection roller
4848
AuslagestapelträgerDelivery pile carrier
4949
BogenweicheCurved turnout
5050
--
5151
AusleitauslageReject delivery
5252
Führung, Führungsblech Guide, guide plate
100100
Aggregat, Modul, Substratzufuhreinrichtung, Substratzufuhraggregat, Substratzufuhrmodul, Bogenanleger, Bogenanlegeraggregat, Bogenanlegermodul Unit, module, substrate feed device, substrate feed unit, substrate feed module, sheet feeder, sheet feeder unit, sheet feeder module
104104
Anlegerstapel Feeder pile
300300
Aggregat, Modul, Anlageeinrichtung, Anlageaggregat, Anlagemodul Unit, module, system equipment, system unit, system module
506506
Trocknungsvorrichtung Drying device
600600
Aggregat, Auftragaggregat, Modul, Auftragmodul, Druckaggregat, Druckmodul, Flexo-Auftragaggregat, Flexo-Druckaggregat, Flexo-Auftragmodul, Flexo-Druckmodul Unit, application unit, module, application module, printing unit, printing module, flexo application unit, flexo printing unit, flexo application module, flexo printing module
614614
Auftragwerk, Druckwerk Order work, printing work
700700
Aggregat, Modul, Transportaggregat, Transporteinrichtung, Transportmodul, Transportmittel Unit, module, transport unit, transport device, transport module, means of transport
900900
Aggregat, Modul, Formgebungseinrichtung, Formgebungsaggregat, Stanzaggregat, Formgebungsmodul, Stanzmodul, Stanzeinrichtung, RotationsstanzeinrichtungUnit, module, shaping device, shaping unit, punching unit, shaping module, punching module, punching device, rotary punching device
901901
Formzylinder, StanzformzylinderForm cylinder, die cylinder
902902
GegendruckzylinderImpression cylinder
903903
Separationseinrichtung, Separationsaggregat, Separationsmodul, Rütteleinrichtung,Separation device, separation aggregate, separation module, vibrating device,
904904
Transportmittel, SeparationstransportmittelMeans of transport, separation means of transport
905905
--
906906
Transportmittel, Selektivtransportmittel, Saugtransportmittel, Ausgangstransportmittel, oberesMeans of transport, selective means of transport, suction means of transport, exit means of transport, upper
907907
Separationstransportriemen, obererSeparation conveyor belt, upper
908908
Separationstransportriemen, untererSeparation conveyor belt, lower
909909
Formgebungsstelle, Stanzstelle, Transportmittel, Formgebungstransportmittel, StanztransportmittelShaping location, punching location, means of transport, shaping means of transport, punching means of transport
910910
--
911911
RüttelantriebVibration drive
912912
TransportantriebTransport drive
913913
Antrieb, Ausgangsantrieb (906), Elektromotor, lagegeregeltDrive, output drive ( 906 ), Electric motor, position-controlled
914914
Formgebungswerk, StanzwerkForming plant, stamping plant
915915
--
916916
InspektionseinrichtungInspection facility
917917
Auffangreinrichtung, Abfuhrvorrichtung,Collecting device, discharge device,
918918
Auffangreinrichtung, Abfuhrvorrichtung, Behälter, ZerkleinerungseinrichtungCollecting device, discharge device, container, shredding device
10001000
Aggregat, Modul, Substratabgabeeinrichtung, Auslage, Bogenauslage, Auslageaggregat, Auslagemodul Unit, module, substrate delivery device, delivery, sheet delivery, delivery unit, delivery module
11011101
NutzenUse
1102A1102A
Reststück, Abfallstück, Beschnitt, AusbruchRemnants, scraps, trimmings, breakouts
1102L1102L
Bogenöffnung, BogenlückeArch opening, arch gap
11031103
Stanzeindruck Die-cut impression
AA.
Richtung, Querrichtung, horizontalDirection, cross direction, horizontal
DD.
DrehrichtungDirection of rotation
TT
Richtung, TransportrichtungDirection, transport direction
VV
Richtung, vertikalDirection, vertical

ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDED IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant was generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturPatent literature cited

  • EP 3064327 A1 [0002]EP 3064327 A1 [0002]
  • EP 2589494 A1 [0003]EP 2589494 A1 [0003]
  • EP 1727679 B1 [0004]EP 1727679 B1 [0004]
  • EP 1759845 A2 [0005]EP 1759845 A2 [0005]
  • WO 2019/034289 A1 [0006]WO 2019/034289 A1 [0006]

Claims (37)

Verfahren zur Inspektion zumindest eines Bogens (02), wobei der jeweilige Bogen (02) zumindest einen Nutzen (1101) mit mindestens einem Druckbild und mindestens eine Bogenöffnung (1102L) aufweist, dadurch gekennzeichnet, dass zumindest eine Inspektionseinrichtung (916) die mindestens eine Bogenöffnung (1102L) zumindest teilweise erfasst und zumindest die mindestens eine Bogenöffnung (1102L) mit einer Referenz der mindestens einen Bogenöffnung (1102L) vergleicht.Method for inspecting at least one sheet (02), the respective sheet (02) having at least one use (1101) with at least one print image and at least one sheet opening (1102L), characterized in that at least one inspection device (916) has the at least one sheet opening (1102L) is at least partially detected and at least the at least one arch opening (1102L) is compared with a reference of the at least one arch opening (1102L). Verfahren zur Inspektion zumindest eines Bogens (02), wobei der jeweilige Bogen (02) zumindest einen Nutzen (1101) und mindestens eine Bogenöffnung (1102L) aufweist, wobei der jeweilige Bogen (02) aus Papier oder Pappe oder Karton gebildet ist, dadurch gekennzeichnet, dass zumindest eine Inspektionseinrichtung (916) die mindestens eine Bogenöffnung (1102L) zumindest teilweise erfasst und zumindest die mindestens eine Bogenöffnung (1102L) mit einer Referenz der mindestens einen Bogenöffnung (1102L) vergleicht.A method for inspecting at least one sheet (02), the respective sheet (02) having at least one use (1101) and at least one sheet opening (1102L), the respective sheet (02) being formed from paper or cardboard, characterized that at least one inspection device (916) at least partially detects the at least one arch opening (1102L) and compares at least one arch opening (1102L) with a reference of the at least one arch opening (1102L). Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass der jeweilige Bogen (02) aus Papier oder Pappe oder Karton gebildet ist.Procedure according to Claim 1 , characterized in that the respective sheet (02) is formed from paper or cardboard or cardboard. Verfahren nach Anspruch 2, dadurch gekennzeichnet, dass der zumindest eine Nutzen (1101) des jeweiligen Bogens (02) jeweils mindestens ein Druckbild aufweist.Procedure according to Claim 2 , characterized in that the at least one use (1101) of the respective sheet (02) each has at least one print image. Verfahren nach Anspruch 1 und/oder 2 und/oder 3 und/oder 4, dadurch gekennzeichnet, dass die mindestens eine Bogenöffnung (1102L) mindestens einem Teil eines von dem jeweiligen Bogen (02) entfernten Reststückes (1102A) entspricht und/oder die Bogenöffnung (1102L) durch Entfernen mindestens eines Teils des zumindest einen Reststücks (1102A) von dem jeweiligen Bogen (02) erzeugt wurde.Procedure according to Claim 1 and / or 2 and / or 3 and / or 4, characterized in that the at least one arch opening (1102L) corresponds to at least part of a remnant piece (1102A) removed from the respective arch (02) and / or the arch opening (1102L) through Removal of at least part of the at least one remnant piece (1102A) from the respective sheet (02) was generated. Verfahren nach Anspruch 1 und/oder 2 und/oder 3 und/oder 4 und/oder 5, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) zumindest eine Kontur und/oder zumindest eine Form und/oder zumindest eine Masse und/oder zumindest eine Fläche der mindestens einen Bogenöffnung (1102L) zumindest teilweise erfasst.Procedure according to Claim 1 and / or 2 and / or 3 and / or 4 and / or 5, characterized in that the inspection device (916) has at least one contour and / or at least one shape and / or at least one mass and / or at least one surface of the at least one Arch opening (1102L) at least partially captured. Verfahren nach Anspruch 6, dadurch gekennzeichnet, dass die Kontur und/oder Form und/oder Masse und/oder Fläche der zumindest einen Bogenöffnung (1102L) einer Kontur und/oder Form und/oder Masse und/oder Fläche des zumindest einen von dem jeweiligen Bogen (02) entfernten Reststückes (1102A) entspricht.Procedure according to Claim 6 , characterized in that the contour and / or shape and / or mass and / or surface of the at least one arch opening (1102L) of a contour and / or shape and / or mass and / or surface of the at least one of the respective arch (02) removed remnant (1102A) corresponds. Verfahren nach Anspruch 1 und/oder 2 und/oder 3 und/oder 4 und/oder 5 und/oder 6 und/oder 7, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) einen Ist-Zustand des jeweiligen Bogens (02) ermittelt und dass der Ist-Zustand des jeweiligen Bogens (02) mit einem Soll-Zustand des jeweiligen Bogens (02) verglichen wird.Procedure according to Claim 1 and / or 2 and / or 3 and / or 4 and / or 5 and / or 6 and / or 7, characterized in that the inspection device (916) determines an actual state of the respective sheet (02) and that the actual State of the respective sheet (02) is compared with a target state of the respective sheet (02). Verfahren nach Anspruch 1 und/oder 2 und/oder 3 und/oder 4 und/oder 5 und/oder 6 und/oder 7 und/oder 8, dadurch gekennzeichnet, dass die Referenz der zumindest einen Bogenöffnung (1102L) und/oder der Soll-Zustand des betreffenden Bogens (02) auf Grundlage einer digitalen Referenz und/oder einer angelernten Referenz bestimmt ist und/oder bestimmbar ausgebildet ist.Procedure according to Claim 1 and / or 2 and / or 3 and / or 4 and / or 5 and / or 6 and / or 7 and / or 8, characterized in that the reference of the at least one arch opening (1102L) and / or the target state of the relevant sheet (02) is determined on the basis of a digital reference and / or a learned reference and / or is designed to be determinable. Verfahren nach Anspruch 1 und/oder 2 und/oder 3 und/oder 4 und/oder 5 und/oder 6 und/oder 7 und/oder 8 und/oder 9, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) ein Auswertemittel umfasst oder mit einem Auswertemittel verbunden ist und dass die Inspektionseinrichtung (916) und/oder das Auswertemittel zumindest einen Passer des mindestens einen Druckbildes erfasst und/oder auswertet.Procedure according to Claim 1 and / or 2 and / or 3 and / or 4 and / or 5 and / or 6 and / or 7 and / or 8 and / or 9, characterized in that the inspection device (916) comprises an evaluation means or is connected to an evaluation means and that the inspection device (916) and / or the evaluation means detects and / or evaluates at least one register of the at least one print image. Verfahren nach Anspruch 1 und/oder 2 und/oder 3 und/oder 4 und/oder 5 und/oder 6 und/oder 7 und/oder 8 und/oder 9 und/oder 10, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) ein Auswertemittel umfasst oder mit einem Auswertemittel verbunden ist und dass die Inspektionseinrichtung (916) und/oder das Auswertemittel die Position des mindestens einen Nutzens (1101) relativ zu einer Referenz der Position des mindestens einen Nutzens (1101) erfasst und/oder auswertet.Procedure according to Claim 1 and / or 2 and / or 3 and / or 4 and / or 5 and / or 6 and / or 7 and / or 8 and / or 9 and / or 10, characterized in that the inspection device (916) comprises an evaluation means or is connected to an evaluation device and that the inspection device (916) and / or the evaluation device detects and / or evaluates the position of the at least one panel (1101) relative to a reference of the position of the at least one panel (1101). Verfahren nach Anspruch 1 und/oder 2 und/oder 3 und/oder 4 und/oder 5 und/oder 6 und/oder 7 und/oder 8 und/oder 9 und/oder 10 und/oder 11, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) ein Auswertemittel umfasst oder mit einem Auswertemittel verbunden ist und dass die Inspektionseinrichtung (916) und/oder das Auswertemittel die zumindest eine Farbe des mindestens einen Druckbildes erfasst und/oder auswertet.Procedure according to Claim 1 and / or 2 and / or 3 and / or 4 and / or 5 and / or 6 and / or 7 and / or 8 and / or 9 and / or 10 and / or 11, characterized in that the inspection device (916) comprises an evaluation means or is connected to an evaluation means and that the inspection device (916) and / or the evaluation means detects and / or evaluates the at least one color of the at least one print image. Verfahren nach Anspruch 1 und/oder 2 und/oder 3 und/oder 4 und/oder 5 und/oder 6 und/oder 7 und/oder 8 und/oder 9 und/oder 10 und/oder 11 und/oder 12, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) ein Auswertemittel umfasst oder mit einem Auswertemittel verbunden ist und dass die Inspektionseinrichtung (916) und/oder das Auswertemittel zumindest einen Fehler einer Verarbeitung des jeweiligen Bogens (02) und/oder zumindest einen Fehler des mindestens einen Druckbildes durch fehlende Teile und/oder zusätzliche Teile erfasst und/oder auswertet.Procedure according to Claim 1 and / or 2 and / or 3 and / or 4 and / or 5 and / or 6 and / or 7 and / or 8 and / or 9 and / or 10 and / or 11 and / or 12, characterized in that the Inspection device (916) comprises an evaluation means or is connected to an evaluation means and that the inspection device (916) and / or the evaluation means at least one error in processing the respective sheet (02) and / or at least one error in the at least one print image due to missing parts and / or additional parts recorded and / or evaluated. Verfahren nach Anspruch 1 und/oder 2 und/oder 3 und/oder 4 und/oder 5 und/oder 6 und/oder 7 und/oder 8 und/oder 9 und/oder 10 und/oder 11 und/oder 12 und/oder 13, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) ein Auswertemittel umfasst oder mit einem Auswertemittel verbunden ist und dass die Inspektionseinrichtung (916) und/oder das Auswertemittel ein Maß für einen Werkzeugverschleiß zumindest eines Werkzeugs zumindest einer Formgebungseinrichtung (900) einer Bogenbearbeitungsmaschine (01) zur Bearbeitung des jeweiligen Bogens (02) vor der Inspektion des betreffenden Bogens (02) mit der Inspektionseinrichtung (916) ermittelt.Procedure according to Claim 1 and / or 2 and / or 3 and / or 4 and / or 5 and / or 6 and / or 7 and / or 8 and / or 9 and / or 10 and / or 11 and / or 12 and / or 13, thereby characterized in that the inspection device (916) comprises an evaluation means or is connected to an evaluation means and that the inspection device (916) and / or the evaluation means a measure of tool wear of at least one tool of at least one shaping device (900) of a sheet processing machine (01) for processing of the respective sheet (02) is determined with the inspection device (916) before the inspection of the sheet (02) in question. Verfahren nach Anspruch 1 und/oder 2 und/oder 3 und/oder 4 und/oder 5 und/oder 6 und/oder 7 und/oder 8 und/oder 9 und/oder 10 und/oder 11 und/oder 12 und/oder 13 und/oder 14, dadurch gekennzeichnet, dass der Bogen (02) mindestens zwei Nutzen (1101) mit jeweils mindestens einem Druckbild aufweist.Procedure according to Claim 1 and / or 2 and / or 3 and / or 4 and / or 5 and / or 6 and / or 7 and / or 8 and / or 9 and / or 10 and / or 11 and / or 12 and / or 13 and / or 14, characterized in that the sheet (02) has at least two copies (1101) each with at least one print image. Verfahren nach Anspruch 15, dadurch gekennzeichnet, dass die mindestens zwei Nutzen (1101) des jeweiligen Bogens (02) jeweils zumindest ein identisches Druckbild aufweisen.Procedure according to Claim 15 , characterized in that the at least two copies (1101) of the respective sheet (02) each have at least one identical print image. Verfahren nach Anspruch 1 und/oder 2 und/oder 3 und/oder 4 und/oder 5 und/oder 6 und/oder 7 und/oder 8 und/oder 9 und/oder 10 und/oder 11 und/oder 12 und/oder 13 und/oder 14 und/oder 15 und/oder 16, dadurch gekennzeichnet, dass ein gewünschtes oder gefordertes Endprodukt, welches durch den jeweiligen Nutzen (1101) oder durch Weiterverarbeitung des jeweiligen Nutzens (1101) erzeugt wurde, eine Faltschachtel und/oder eine Deckelschachtel und/oder eine Falthülle und/oder eine formfeste Schachtel ist.Procedure according to Claim 1 and / or 2 and / or 3 and / or 4 and / or 5 and / or 6 and / or 7 and / or 8 and / or 9 and / or 10 and / or 11 and / or 12 and / or 13 and / or 14 and / or 15 and / or 16, characterized in that a desired or required end product, which was produced by the respective panel (1101) or by further processing of the respective panel (1101), a folding box and / or a lid box and / or a folding cover and / or a dimensionally stable box. Verfahren nach Anspruch 8 und/oder 9 und/oder 10 und/oder 11 und/oder 12 und/oder 13 und/oder 14 und/oder 15 und/oder 16 und/oder 17, dadurch gekennzeichnet, dass in Abhängigkeit von dem Vergleich der mindestens einen Bogenöffnung (1102L) mit der Referenz der mindestens einen Bogenöffnung (1102L) und/oder in Abhängigkeit von dem Vergleich des Ist-Zustands des jeweiligen Bogens (02) mit dem Soll-Zustand des jeweiligen Bogens (02) eine Änderung eines für den Transport von Bogen (02) vorgesehenen Transportweges, insbesondere die Bogenweiche (49), gesteuert und/oder geregelt wird.Procedure according to Claim 8 and / or 9 and / or 10 and / or 11 and / or 12 and / or 13 and / or 14 and / or 15 and / or 16 and / or 17, characterized in that depending on the comparison of the at least one arch opening (1102L) with the reference of the at least one sheet opening (1102L) and / or depending on the comparison of the actual state of the respective sheet (02) with the target state of the respective sheet (02), a change in one for the transport of sheets (02) provided transport path, in particular the curved switch (49), is controlled and / or regulated. Verfahren nach 18, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) ein Auswertemittel umfasst oder mit einem Auswertemittel verbunden ist und dass die Änderung des Transportweges, insbesondere die Bogenweiche (49), aufgrund zumindest eines Signals des Auswertemittels geregelt und/oder gesteuert wird.Method according to 18, characterized in that the inspection device (916) comprises an evaluation means or is connected to an evaluation means and that the change in the transport path, in particular the curved diverter (49), is regulated and / or controlled based on at least one signal from the evaluation means. Vorrichtung zur Inspektion zumindest eines Bogens (02), wobei der jeweilige Bogen (02) zumindest einen Nutzen (1101) mit mindestens einem Druckbild und mindestens eine Bogenöffnung (1102L) aufweist, dadurch gekennzeichnet, dass zumindest eine Inspektionseinrichtung (916) die mindestens eine Bogenöffnung (1102L) zumindest teilweise erfassend ausgebildet ist und zumindest die mindestens eine Bogenöffnung (1102L) mit einer Referenz der mindestens einen Bogenöffnung (1102L) vergleichend ausgebildet ist.Device for inspecting at least one sheet (02), wherein the respective sheet (02) has at least one use (1101) with at least one print image and at least one sheet opening (1102L), characterized in that at least one inspection device (916) the at least one sheet opening (1102L) is designed to be at least partially sensing and at least the at least one arched opening (1102L) is designed to compare with a reference of the at least one arched opening (1102L). Vorrichtung zur Inspektion zumindest eines Bogens (02), wobei der jeweilige Bogen (02) zumindest einen Nutzen (1101) und mindestens eine Bogenöffnung (1102L) aufweist, wobei der jeweilige Bogen (02) aus Papier oder Pappe oder Karton gebildet ist, dadurch gekennzeichnet, dass zumindest eine Inspektionseinrichtung (916) die mindestens eine Bogenöffnung (1102L) zumindest teilweise erfassend ausgebildet ist und zumindest die mindestens eine Bogenöffnung (1102L) mit einer Referenz der mindestens einen Bogenöffnung (1102L) vergleichend ausgebildet ist.Device for inspecting at least one sheet (02), the respective sheet (02) having at least one use (1101) and at least one sheet opening (1102L), the respective sheet (02) being formed from paper or cardboard, characterized that at least one inspection device (916) is designed to at least partially cover the at least one arch opening (1102L) and at least the at least one arch opening (1102L) is designed to compare with a reference of the at least one arch opening (1102L). Vorrichtung nach Anspruch 20, dadurch gekennzeichnet, dass der jeweilige Bogen (02) aus Papier oder Pappe oder Karton gebildet ist.Device according to Claim 20 , characterized in that the respective sheet (02) is formed from paper or cardboard or cardboard. Vorrichtung nach Anspruch 21, dadurch gekennzeichnet, dass der zumindest eine Nutzen (1101) des jeweiligen Bogens (02) jeweils mindestens ein Druckbild aufweist.Device according to Claim 21 , characterized in that the at least one use (1101) of the respective sheet (02) each has at least one print image. Vorrichtung nach Anspruch 20 und/oder 21 und/oder 22 und/oder 23, dadurch gekennzeichnet, dass die mindestens eine Bogenöffnung (1102L) mindestens einem Teil eines von dem jeweiligen Bogen (02) entfernten Reststückes (1102A) entspricht und/oder die Bogenöffnung (1102L) durch Entfernen mindestens eines Teils des zumindest einen Reststücks (1102A) von dem jeweiligen Bogen (02) erzeugbar ausgebildet ist.Device according to Claim 20 and / or 21 and / or 22 and / or 23, characterized in that the at least one arch opening (1102L) corresponds to at least part of a remnant piece (1102A) removed from the respective arch (02) and / or the arch opening (1102L) through Removing at least a part of the at least one remnant piece (1102A) from the respective sheet (02) is designed to be producible. Vorrichtung nach Anspruch 20 und/oder 21 und/oder 22 und/oder 23 und/oder 24, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) zumindest eine Kontur und/oder zumindest eine Form und/oder zumindest eine Masse und/oder zumindest eine Fläche der mindestens einen Bogenöffnung (1102L) zumindest teilweise erfassend ausgebildet ist.Device according to Claim 20 and / or 21 and / or 22 and / or 23 and / or 24, characterized in that the inspection device (916) has at least one contour and / or at least one shape and / or at least one mass and / or at least one surface of the at least one Arch opening (1102L) is formed at least partially gripping. Vorrichtung nach Anspruch 25, dadurch gekennzeichnet, dass die Kontur und/oder Form und/oder Masse und/oder Fläche der zumindest einen Bogenöffnung (1102L) einer Kontur und/oder Form und/oder Masse und/oder Fläche des zumindest einen von dem jeweiligen Bogen (02) entfernten Reststückes (1102A) entsprechend ausgebildet ist und/oder entspricht.Device according to Claim 25 , characterized in that the contour and / or shape and / or mass and / or surface of the at least one arcuate opening (1102L) of a contour and / or shape and / or the mass and / or area of the at least one remnant piece (1102A) removed from the respective sheet (02) is designed and / or corresponds accordingly. Vorrichtung nach Anspruch 20 und/oder 21 und/oder 22 und/oder 23 und/oder 24 und/oder 25 und/oder 26, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) einen Ist-Zustand des jeweiligen Bogens (02) ermittelnd ausgebildet ist und dass die Inspektionseinrichtung (916) ein Auswertemittel umfasst oder mit einem Auswertemittel verbunden ist und dass das Auswertemittel den Ist-Zustand des jeweiligen Bogens (02) mit einem Soll-Zustand des jeweiligen Bogens (02) vergleichend ausgebildet ist.Device according to Claim 20 and / or 21 and / or 22 and / or 23 and / or 24 and / or 25 and / or 26, characterized in that the inspection device (916) is designed to determine an actual state of the respective sheet (02) and that the Inspection device (916) comprises an evaluation means or is connected to an evaluation means and that the evaluation means is designed to compare the actual state of the respective sheet (02) with a target state of the respective sheet (02). Vorrichtung nach Anspruch 20 und/oder 21 und/oder 22 und/oder 23 und/oder 24 und/oder 25 und/oder 26 und/oder 27, dadurch gekennzeichnet, dass die Referenz der zumindest einen Bogenöffnung (1102L) und/oder der Soll-Zustand des betreffenden Bogens (02) auf Grundlage einer digitalen Referenz und/oder einer angelernten Referenz bestimmt ist und/oder bestimmbar ausgebildet ist.Device according to Claim 20 and / or 21 and / or 22 and / or 23 and / or 24 and / or 25 and / or 26 and / or 27, characterized in that the reference of the at least one arch opening (1102L) and / or the target state of the relevant sheet (02) is determined on the basis of a digital reference and / or a learned reference and / or is designed to be determinable. Vorrichtung nach Anspruch 20 und/oder 21 und/oder 22 und/oder 23 und/oder 24 und/oder 25 und/oder 26 und/oder 27 und/oder 28, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) ein Auswertemittel umfasst oder mit einem Auswertemittel verbunden ist und dass die Inspektionseinrichtung (916) und/oder das Auswertemittel zumindest einen Passer des mindestens einen Druckbildes erfassend und/oder auswertend ausgebildet ist.Device according to Claim 20 and / or 21 and / or 22 and / or 23 and / or 24 and / or 25 and / or 26 and / or 27 and / or 28, characterized in that the inspection device (916) comprises an evaluation means or is connected to an evaluation means and that the inspection device (916) and / or the evaluation means is designed to detect and / or evaluate at least one register of the at least one print image. Vorrichtung nach Anspruch 20 und/oder 21 und/oder 22 und/oder 23 und/oder 24 und/oder 25 und/oder 26 und/oder 27 und/oder 28 und/oder 29, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) ein Auswertemittel umfasst oder mit einem Auswertemittel verbunden ist und dass die Inspektionseinrichtung (916) und/oder das Auswertemittel die Position des mindestens einen Nutzens (1101) relativ zu einer Referenz der Position des mindestens einen Nutzens (1101) erfassend und/oder auswertend ausgebildet ist.Device according to Claim 20 and / or 21 and / or 22 and / or 23 and / or 24 and / or 25 and / or 26 and / or 27 and / or 28 and / or 29, characterized in that the inspection device (916) comprises an evaluation means or is connected to an evaluation device and that the inspection device (916) and / or the evaluation device is designed to detect and / or evaluate the position of the at least one panel (1101) relative to a reference of the position of the at least one panel (1101). Vorrichtung nach Anspruch 20 und/oder 21 und/oder 22 und/oder 23 und/oder 24 und/oder 25 und/oder 26 und/oder 27 und/oder 28 und/oder 29 und/oder 30, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) ein Auswertemittel umfasst oder mit einem Auswertemittel verbunden ist und dass die Inspektionseinrichtung (916) und/oder das Auswertemittel die zumindest eine Farbe des mindestens einen Druckbildes erfassend und/oder auswertend ausgebildet ist.Device according to Claim 20 and / or 21 and / or 22 and / or 23 and / or 24 and / or 25 and / or 26 and / or 27 and / or 28 and / or 29 and / or 30, characterized in that the inspection device (916) comprises an evaluation means or is connected to an evaluation means and that the inspection device (916) and / or the evaluation means is designed to detect and / or evaluate the at least one color of the at least one print image. Vorrichtung nach Anspruch 20 und/oder 21 und/oder 22 und/oder 23 und/oder 24 und/oder 25 und/oder 26 und/oder 27 und/oder 28 und/oder 29 und/oder 30 und/oder 31, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) ein Auswertemittel umfasst oder mit einem Auswertemittel verbunden ist und dass die Inspektionseinrichtung (916) und/oder das Auswertemittel zumindest einen Fehler einer Verarbeitung des jeweiligen Bogens (02) und/oder zumindest einen Fehler des mindestens einen Druckbildes durch fehlende Teile und/oder zusätzliche Teile erfassend und/oder auswertend ausgebildet ist.Device according to Claim 20 and / or 21 and / or 22 and / or 23 and / or 24 and / or 25 and / or 26 and / or 27 and / or 28 and / or 29 and / or 30 and / or 31, characterized in that the Inspection device (916) comprises an evaluation means or is connected to an evaluation means and that the inspection device (916) and / or the evaluation means at least one error in processing the respective sheet (02) and / or at least one error in the at least one print image due to missing parts and / or is designed to detect and / or evaluate additional parts. Vorrichtung nach Anspruch 20 und/oder 21 und/oder 22 und/oder 23 und/oder 24 und/oder 25 und/oder 26 und/oder 27 und/oder 28 und/oder 29 und/oder 30 und/oder 31 und/oder 32, dadurch gekennzeichnet, dass die Inspektionseinrichtung (916) ein Auswertemittel umfasst oder mit einem Auswertemittel verbunden ist und dass die Inspektionseinrichtung (916) und/oder das Auswertemittel ein Maß für einen Werkzeugverschleiß zumindest eines Werkzeugs zumindest einer Formgebungseinrichtung (900) einer Bogenbearbeitungsmaschine (01) zur Bearbeitung des jeweiligen Bogens (02) vor der Inspektion des betreffenden Bogens (02) mit der Inspektionseinrichtung (916) ermittelnd ausgebildet ist.Device according to Claim 20 and / or 21 and / or 22 and / or 23 and / or 24 and / or 25 and / or 26 and / or 27 and / or 28 and / or 29 and / or 30 and / or 31 and / or 32, thereby characterized in that the inspection device (916) comprises an evaluation means or is connected to an evaluation means and that the inspection device (916) and / or the evaluation means a measure of tool wear of at least one tool of at least one shaping device (900) of a sheet processing machine (01) for processing of the respective sheet (02) is designed to determine before the inspection of the relevant sheet (02) with the inspection device (916). Vorrichtung nach Anspruch 20 und/oder 21 und/oder 22 und/oder 23 und/oder 24 und/oder 25 und/oder 26 und/oder 27 und/oder 28 und/oder 29 und/oder 30 und/oder 31 und/oder 32 und/oder 33, dadurch gekennzeichnet, dass der Bogen (02) mindestens zwei Nutzen (1101) mit jeweils mindestens einem Druckbild aufweist.Device according to Claim 20 and / or 21 and / or 22 and / or 23 and / or 24 and / or 25 and / or 26 and / or 27 and / or 28 and / or 29 and / or 30 and / or 31 and / or 32 and / or 33, characterized in that the sheet (02) has at least two copies (1101) each with at least one print image. Vorrichtung nach Anspruch 34, dadurch gekennzeichnet, dass die mindestens zwei Nutzen (1101) des jeweiligen Bogens (02) jeweils zumindest ein identisches Druckbild aufweisen.Device according to Claim 34 , characterized in that the at least two copies (1101) of the respective sheet (02) each have at least one identical print image. Vorrichtung nach Anspruch 20 und/oder 21 und/oder 22 und/oder 23 und/oder 24 und/oder 25 und/oder 26 und/oder 27 und/oder 28 und/oder 29 und/oder 30 und/oder 31 und/oder 32 und/oder 33 und/oder 34 und/oder 35, dadurch gekennzeichnet, dass ein gewünschtes oder gefordertes Endprodukt, welches durch den jeweiligen Nutzen (1101) oder durch Weiterverarbeitung des jeweiligen Nutzens (1101) erzeugt wurde, eine Faltschachtel und/oder eine Deckelschachtel und/oder eine Falthülle und/oder eine formfeste Schachtel ist.Device according to Claim 20 and / or 21 and / or 22 and / or 23 and / or 24 and / or 25 and / or 26 and / or 27 and / or 28 and / or 29 and / or 30 and / or 31 and / or 32 and / or 33 and / or 34 and / or 35, characterized in that a desired or required end product, which was produced by the respective panel (1101) or by further processing the respective panel (1101), a folding box and / or a lid box and / or a folding cover and / or a dimensionally stable box. Vorrichtung nach Anspruch 20 und/oder 21 und/oder 22 und/oder 23 und/oder 24 und/oder 25 und/oder 26 und/oder 27 und/oder 28 und/oder 29 und/oder 30 und/oder 31 und/oder 32 und/oder 33 und/oder 34 und/oder 35 und/oder 36, dadurch gekennzeichnet, dass in Abhängigkeit von dem Vergleich der mindestens einen Bogenöffnung (1102L) mit der Referenz der mindestens einen Bogenöffnung (1102L) und/oder in Abhängigkeit von dem Vergleich des Ist-Zustands des jeweiligen Bogens (02) mit dem Soll-Zustand des jeweiligen Bogens (02) eine Änderung eines für den Transport von Bogen (02) vorgesehenen Transportweges, insbesondere die Bogenweiche (49), gesteuert und/oder geregelt ausgebildet ist.Device according to Claim 20 and / or 21 and / or 22 and / or 23 and / or 24 and / or 25 and / or 26 and / or 27 and / or 28 and / or 29 and / or 30 and / or 31 and / or 32 and / or 33 and / or 34 and / or 35 and / or 36, characterized in that depending on the Comparison of the at least one arch opening (1102L) with the reference of the at least one arch opening (1102L) and / or, depending on the comparison of the actual state of the respective arch (02) with the target state of the respective arch (02), a change in one the transport path provided for the transport of sheets (02), in particular the sheet deflector (49), is designed in a controlled and / or regulated manner.
DE102019110854.3A 2019-04-26 2019-04-26 Method for inspecting at least one sheet and devices for inspecting at least one sheet Pending DE102019110854A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102019110854.3A DE102019110854A1 (en) 2019-04-26 2019-04-26 Method for inspecting at least one sheet and devices for inspecting at least one sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102019110854.3A DE102019110854A1 (en) 2019-04-26 2019-04-26 Method for inspecting at least one sheet and devices for inspecting at least one sheet

Publications (1)

Publication Number Publication Date
DE102019110854A1 true DE102019110854A1 (en) 2020-10-29

Family

ID=72839507

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102019110854.3A Pending DE102019110854A1 (en) 2019-04-26 2019-04-26 Method for inspecting at least one sheet and devices for inspecting at least one sheet

Country Status (1)

Country Link
DE (1) DE102019110854A1 (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE69111122T2 (en) * 1990-04-18 1996-01-18 Bobst Sa Monitoring of print quality and cutting quality in a production facility for the production of packaging.
EP1759845A2 (en) * 2005-08-31 2007-03-07 MAN Roland Druckmaschinen AG Control process for printing methods
EP1844865A1 (en) * 2006-04-10 2007-10-17 BCS machine vision GmbH Electronic marking to sort single object which are produced and inspected in connected object units
EP1727679B1 (en) * 2004-03-23 2008-10-01 Koenig & Bauer AG Method for identifying a single panel comprising a printed image of defective quality on printed material comprising several panels
EP2098469A2 (en) * 2008-03-05 2009-09-09 Heidelberger Druckmaschinen Aktiengesellschaft Method for measuring the position of sheets and aligning sheets
EP2589494A1 (en) * 2010-06-29 2013-05-08 Mitsubishi Heavy Industries Printing & Packaging Machinery, Ltd. Carton former, inspection device, and print register control method for carton former
DE102012023391A1 (en) * 2012-11-30 2014-06-05 Heidelberger Druckmaschinen Ag Method for quality control of printed product e.g. paper, involves ejecting identification of bad print image and printing printed image and individual coding in front of paper/foil web for performing image inspection
EP3064327A1 (en) * 2015-03-05 2016-09-07 Heidelberger Druckmaschinen AG Method for register correction of a flat bed stamping machine
WO2019034289A1 (en) * 2017-08-17 2019-02-21 Bobst Mex Sa Method and a machine for checking the quality of a product

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE69111122T2 (en) * 1990-04-18 1996-01-18 Bobst Sa Monitoring of print quality and cutting quality in a production facility for the production of packaging.
EP1727679B1 (en) * 2004-03-23 2008-10-01 Koenig & Bauer AG Method for identifying a single panel comprising a printed image of defective quality on printed material comprising several panels
EP1759845A2 (en) * 2005-08-31 2007-03-07 MAN Roland Druckmaschinen AG Control process for printing methods
EP1844865A1 (en) * 2006-04-10 2007-10-17 BCS machine vision GmbH Electronic marking to sort single object which are produced and inspected in connected object units
EP2098469A2 (en) * 2008-03-05 2009-09-09 Heidelberger Druckmaschinen Aktiengesellschaft Method for measuring the position of sheets and aligning sheets
EP2589494A1 (en) * 2010-06-29 2013-05-08 Mitsubishi Heavy Industries Printing & Packaging Machinery, Ltd. Carton former, inspection device, and print register control method for carton former
DE102012023391A1 (en) * 2012-11-30 2014-06-05 Heidelberger Druckmaschinen Ag Method for quality control of printed product e.g. paper, involves ejecting identification of bad print image and printing printed image and individual coding in front of paper/foil web for performing image inspection
EP3064327A1 (en) * 2015-03-05 2016-09-07 Heidelberger Druckmaschinen AG Method for register correction of a flat bed stamping machine
WO2019034289A1 (en) * 2017-08-17 2019-02-21 Bobst Mex Sa Method and a machine for checking the quality of a product

Similar Documents

Publication Publication Date Title
EP3894225B1 (en) Processing machine for processing sheets, and method for processing sheets
EP3959078B1 (en) Sheet processing machine and method for inspection of a sheet
EP3921259B1 (en) Sheet processing machine with shaping device and upper suction transport means
WO2023148014A1 (en) Processing machines and method for the relative orientation of a substrate to a processing unit in a processing machine
EP0622320A1 (en) Method and device for cutting a material in sheets
DE102017212982B4 (en) sheet processing machine
EP3921258B1 (en) Sheet delivery unit, corresponding sheet processing machine, and method for operating a sheet processing machine
DE102019110854A1 (en) Method for inspecting at least one sheet and devices for inspecting at least one sheet
EP3817925B1 (en) Method for operating a printing press with a test printed image, and a printed product having a test printed image
DE102017222314B4 (en) substrate feeder
WO2021083675A1 (en) Sheet processing machine with at least one sheet storage device, and method for storing sheets
EP4110620B1 (en) Methods for monitoring at least one adhesive point using a monitoring system and monitoring systems for monitoring at least one adhesive point
DE102021131719B3 (en) System comprising a processing machine and at least one lifting device and method for changing at least one punching tool
EP4288291A1 (en) Processing machine, and method for adjusting a printing length and/or a processing length
EP4288290A1 (en) Processing machine, and method for adjusting a processing length of a shaping unit of a processing machine
DE102021006550A1 (en) Processing machine and method for setting a print length and/or processing length
WO2022028741A1 (en) Method for monitoring at least one adhesive point using a monitoring system, and monitoring system for monitoring at least one adhesive point
EP4377092A1 (en) Processing machine and method for aligning a substrate in a processing machine
DE102020120510A1 (en) Method for checking at least one cylinder winding of a processing machine and cylinder winding control system
DE102022115649A1 (en) Device for transporting sheets through a processing machine and method for transporting sheets
WO2021083676A1 (en) Sheet processing machine with at least one sheet storage device, and method for storing sheets

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R016 Response to examination communication
R016 Response to examination communication