Prior art keywords
solution
building
control unit
optimal solution
current measured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE102017206299.1A
Other languages
German (de)
Inventor
Thomas Lehmann
Arvid Amthor
Agnes Baumgärtner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens Schweiz AG
Original Assignee
Siemens Schweiz AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Schweiz AG filed Critical Siemens Schweiz AG
Priority to DE102017206299.1A priority Critical patent/DE102017206299A1/en
Publication of DE102017206299A1 publication Critical patent/DE102017206299A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2642Domotique, domestic, home control, automation, smart house
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

Die Erfindung betrifft ein Verfahren (14) zum Steuern (S7) mindestens einer Betriebseinrichtung (7) eines Gebäudes (1) sowie ein entsprechendes Gebäudeautomationssystem (2). Bei dem Verfahren (14) wird eine optimale Lösung eines mindestens einen Betriebsprozess der Betriebseinrichtung (7) beschreibenden Modell prädiktiven Regelungsproblems in Abhängigkeit von vorgegebenen Parametern mittels einer Recheneinrichtung (5) berechnet (S2). Wenigstens ein Teil der vorgegebenen Parameter und von die optimale Lösung beschreibenden Lösungsdaten werden von der Recheneinrichtung (5) zu einer lokalen Steuereinheit (13) des Gebäudes übertragen (S3). Weiterhin wird wenigstens ein aktueller Messwert wenigstens eines der Parameter erfasst (S4), dessen beim Berechnen (S2) der optimalen Lösung verwendeter Wert von dem aktuellen Messwert abweicht. Anschließend wird eine approximative Lösung des modellprädiktiven Regelungsproblems mittels der Steuereinheit (13) anhand der übertragenen Lösungsdaten und des aktuellen Messwertes berechnet (S6). Schließlich wird die Betriebseinrichtung (7) gemäß der approximativen Lösung gesteuert (S7).The invention relates to a method (14) for controlling (S7) at least one operating device (7) of a building (1) and to a corresponding building automation system (2). In the method (14), an optimal solution of a model of a predictive control problem describing at least one operating process of the operating device (7) is calculated by means of a computing device (5) as a function of predetermined parameters (S2). At least a portion of the predetermined parameters and solution data describing the optimal solution are transmitted from the computing device (5) to a local control unit (13) of the building (S3). Furthermore, at least one current measured value of at least one of the parameters is detected (S4) whose value used in calculating (S2) of the optimal solution deviates from the current measured value. Subsequently, an approximate solution of the model-predictive control problem is calculated by means of the control unit (13) on the basis of the transmitted solution data and the current measured value (S6). Finally, the operating device (7) is controlled according to the approximate solution (S7).

Description

Die Erfindung betrifft ein Verfahren zum Steuern mindestens einer Betriebseinrichtung eines Gebäudes sowie ein Gebäudeautomationssystem.The invention relates to a method for controlling at least one operating device of a building and a building automation system.

Gebäude, insbesondere kommerzielle Großgebäude, verfügen heutzutage oftmals über ein Gebäudemanagement- oder ein Gebäudeautomationssystem. Ein derartiges System kann etwa eine einem Betrieb des Gebäudes zu Grunde liegende Infrastruktur umfassen, beispielsweise zur Verwaltung, Verteilung und Steuerung von Energie. Ein Aufbau oder eine Funktionsweise eines Gebäudeautomationssystems kann durch mehrere hierarchische Ebenen beschrieben werden. So können beispielsweise in einer Managementebene übergeordnete Funktionen, wie etwa eine Visualisierung der Gebäudeinfrastruktur, zusammengefasst und wahrgenommen werden. In einer hierarchisch darunter angeordneten Automationsebene können einzelne Feldgeräte, welche beispielsweise verteilt in dem Gebäude angeordnete Elemente der Infrastruktur sein können, zusammengeführt und beispielsweise nach ihrer Funktion und/oder ihrer Position gruppiert sein. Auch können in oder auf der Automationsebene derartige Gerätegruppen angesteuert werden. Hierarchisch darunter kann eine Feldebene vorgesehen sein, auf der die einzelnen Komponenten oder Elemente der Gebäudeinfrastruktur mit dem Gebäudeautomationssystem verbunden sind.Buildings, especially large commercial buildings, today often have a building management or building automation system. Such a system may include, for example, an infrastructure underlying an operation of the building, for example for the management, distribution and control of energy. A structure or operation of a building automation system can be described by multiple hierarchical levels. For example, higher-level functions, such as a visualization of the building infrastructure, can be summarized and perceived at a management level. In an automation level arranged hierarchically thereunder, individual field devices, which can be elements of the infrastructure arranged, for example, distributed in the building, can be brought together and, for example, grouped according to their function and / or their position. Also, such device groups can be controlled in or on the automation level. Below this hierarchically, a field level can be provided, on which the individual components or elements of the building infrastructure are connected to the building automation system.

Ein Teilsystem eines derartigen Gebäudeautomationssystems kann ein Energie-Management-System (BEMS, englisch „Building Energy Management System“) sein. Zu den Kernfunktionen des Energie-Management-Systems kann beispielsweise eine energieeffiziente Steuerung der angeschlossenen Infrastrukturkomponenten, ein Schutz der Infrastruktur vor Überlastung und eine Bereitstellung von Komfort oder Komfortfunktionen, wie beispielsweise einer bestimmten Innentemperatur in einzelnen Bereichen des Gebäudes, gehören.A subsystem of such a building automation system may be a Building Energy Management System (BEMS). The core functions of the energy management system may include, for example, energy efficient control of the connected infrastructure components, protection of the infrastructure from congestion, and provision of comfort or convenience features, such as a particular indoor temperature in individual areas of the building.

Insbesondere vor dem Hintergrund von Nachhaltigkeitszertifizierungen und einer angestrebten Reduktion von Emissionen soll das Energie-Management-System zukünftig auch eine Koordination von Energieverbrauch des Gebäudes beziehungsweise der Gebäudeinfrastruktur und gebäudeeigener Energieerzeugung übernehmen. Dies kann beispielsweise ein Management von erneuerbaren Energiequellen, wie zum Beispiel Photovoltaikanlagen, von elektrischen Speichern und von steuerbaren Lasten, wie etwa Ladestationen für Elektroautos, umfassen. Dazu kann es vorgesehen sein, dass das Energie-Management-System auch elektrische Messungen, eine Überwachung der Infrastruktur, eine Datenanalyse sowie eine Erstellung von Prognosen durchführt.In particular against the background of sustainability certifications and a targeted reduction of emissions, the energy management system should in future also be responsible for coordinating the energy consumption of the building or the building infrastructure and the building's own energy generation. This may include, for example, management of renewable energy sources, such as photovoltaic systems, electrical storage, and controllable loads, such as electric vehicle charging stations. For this purpose, it may be provided that the energy management system also performs electrical measurements, infrastructure monitoring, data analysis and forecasting.

In einem derartigen, sich gegebenenfalls zukünftig ergebenden Umfeld können die Aufgabenstellungen oder Anforderungen für Energie-Management-Systeme wie folgt neu oder ergänzend formuliert werden. Erstens: Vorhersage der maximal möglichen Eigenenergieerzeugung des Gebäudes sowie des Eigenverbrauchs nicht steuerbarer Lasten (Grundlast). Zweitens: optimierter Energieeinkauf durch kostenoptimale Planung eines Betriebs von steuerbaren Lasten, von, insbesondere elektrischen und thermischen, Speichern, der Energieerzeugung und eines Energiebezugs aus einem Versorgungsnetz. Drittens: online-Energie-Management zur Einhaltung eines nominalen Lastgangs, insbesondere trotz Störungen oder unvorhergesehener Ereignisse. Viertens: automatisierte Teilnahme an einem Energiemarkt durch Vermarktung verfügbarer Flexibilität im Energiebezug beziehungsweise in der Energieerzeugung. Fünftens: Optimierung eines Einkaufs unterschiedlicher Energieformen, wie beispielsweise Elektrizität, Gas, Fernwärme, Fernkälte und dergleichen mehr.In such an environment that may arise in the future, the tasks or requirements for energy management systems can be formulated as new or supplementary as follows. First: Prediction of the maximum possible self-generated energy of the building and self-consumption of non-controllable loads (base load). Second: Optimized energy purchasing through cost-optimal planning of an operation of controllable loads, in particular electrical and thermal, storage, energy production and energy supply from a supply network. Third, online energy management to maintain a nominal load profile, especially despite disruptions or unforeseen events. Fourth: Automated participation in an energy market by marketing available flexibility in energy procurement or in energy production. Fifth: Optimization of purchasing different forms of energy, such as electricity, gas, district heating, district cooling and the like.

Um diese Aufgaben oder Funktionalitäten erfüllen zu können, benötigt das Energie-Management-System umfangreiche Daten, beispielsweise technische Spezifikationen der einzelnen Infrastrukturelemente und Wettervorhersagen, sowie eine leistungsfähige Berechnungshardware, da dabei zu lösende Modellierungs- und Optimierungsrechnungen sehr aufwendig sind.In order to be able to fulfill these tasks or functionalities, the energy management system requires extensive data, for example technical specifications of the individual infrastructure elements and weather forecasts, as well as powerful calculation hardware, since modeling and optimization calculations to be solved are very expensive.

Aufgabe der vorliegenden Erfindung ist es, eine robuste Steuerung einer Gebäudeinfrastruktur mit reduziertem Hardwareaufwand zu ermöglichen.The object of the present invention is to enable a robust control of a building infrastructure with reduced hardware complexity.

Diese Aufgabe wird erfindungsgemäß durch die Gegenstände der unabhängigen Patentansprüche gelöst. Vorteilhafte Ausgestaltungen und Weiterbildungen der Erfindung sind in den abhängigen Patentansprüchen sowie in der Beschreibung und in den Zeichnungen angegeben.This object is achieved by the subject matters of the independent claims. Advantageous embodiments and further developments of the invention are specified in the dependent claims as well as in the description and in the drawings.

Bei dem erfindungsgemäßen Verfahren zum Steuern mindestens einer Betriebseinrichtung eines Gebäudes beziehungsweise eines Bauwerks wird mittels einer Recheneinrichtung eine optimale Lösung eines mindestens einen Betriebsprozess der Betriebseinrichtung beschreibenden modellprädiktiven Regelungsproblems beziehungsweise Optimierungsproblems in Abhängigkeit von vorgegebenen Parametern berechnet (MPC, englisch „Modell Predictive Control“). Wenigstens ein Teil der vorgegebenen Parameter und wenigstens ein Teil von die optimale Lösung beschreibenden Lösungsdaten wird von der Recheneinrichtung zu einer lokalen Steuereinheit des Gebäudes, beispielsweise einem lokalen Controller der Betriebseinrichtung, übertragen. Diese lokale Steuereinheit kann dabei insbesondere - beispielsweise aufgrund ihrer Auslegung und/oder Rechenleistung - ungeeignet sein zum Berechnen der optimalen Lösung. Dies kann beispielsweise dann der Fall sein, wenn es sich bei der lokalen Steuereinheit um einen einfachen Controller handelt, welcher beispielsweise einen vorgegebenen, beispielsweise zur Steuerung der Betriebseinrichtung spezialisierten, Funktionsumfang aufweist. Auf dem Controller beziehungsweise der Steuereinheit können daher zum Berechnen der optimalen Lösung verwendete Softwareprogramme nicht ausführbar sein. Ein weiterer Verfahrensschritt des erfindungsgemäßen Verfahrens besteht im Erfassen wenigstens eines aktuellen Messwertes wenigstens eines der Parameter, dessen beim Berechnen der optimalen Lösung verwendeter Wert von dem aktuellen Messwert abweicht. Eine solche Abweichung kann sich beispielsweise ergeben, wenn jeweilige tatsächliche Wetterverhältnisse von einer angenommenen Wettervorhersage abweichen und somit beispielsweise eine als die Betriebseinrichtung dienende Photovoltaikanlage mehr oder weniger elektrische Energie bereitstellt als prognostiziert. Anhand der übertragenen Lösungsdaten und des aktuellen Messwertes wird dann mittels der lokalen Steuereinheit eine approximative Lösung des modellprädiktiven Regelungsproblems berechnet. Die mindestens eine Betriebseinrichtung wird dann gemäß der approximativen Lösung gesteuert. Hierzu können beispielsweise von der Steuereinheit entsprechende Steuersignale oder Steuerbefehle erzeugt und an die Betriebseinrichtung übermittelt werden.In the method according to the invention for controlling at least one operating device of a building or a construction, an optimal solution of a model-predictive control problem or optimization problem describing at least one operating process of the operating device is calculated by means of a computing device (MPC, English: "Model Predictive Control"). At least a portion of the predetermined parameters and at least a portion of solution data describing the optimal solution is transmitted by the computing device to a local control unit of the building, such as a local controller of the facility. This local control unit can in particular - for example, due to their design and / or Computing power - unsuitable for calculating the optimal solution. This can be the case, for example, if the local control unit is a simple controller which, for example, has a predetermined range of functions, which is specialized, for example, for controlling the operating device. Therefore, software programs used to calculate the optimal solution can not be executed on the controller or the control unit. A further method step of the method according to the invention consists in detecting at least one current measured value of at least one of the parameters whose value used in calculating the optimum solution deviates from the current measured value. Such a deviation may arise, for example, if respective actual weather conditions deviate from an assumed weather forecast and thus, for example, provides a photovoltaic system serving as the operating device more or less electrical energy than predicted. On the basis of the transmitted solution data and the current measured value, an approximate solution of the model-predictive control problem is then calculated by means of the local control unit. The at least one operating device is then controlled according to the approximate solution. For this purpose, for example by the control unit corresponding control signals or commands can be generated and transmitted to the operating device.

Bei der Betriebseinrichtung kann es sich um ein, insbesondere steuerbares, Element oder Bauteil einer Infrastruktur, insbesondere einer Energieinfrastruktur, des Gebäudes handeln. So kann die Betriebseinrichtung beispielsweise eine energetische Last, ein Energieerzeuger, ein Energiespeicher oder ein Schaltelement oder dergleichen sein. Konkret kann es sich bei der Betriebseinrichtung also beispielsweise um eine klimatechnische Einrichtung oder Anlage, um eine Photovoltaik- oder Windkraftanlage, ein Blockheizkraftwerk des Gebäudes, eine Batterie beziehungsweise einen Akkumulator, einen thermischen Speicher oder dergleichen handeln. Es können mehrere beziehungsweise eine Vielzahl von Betriebseinrichtungen in oder an dem Gebäude, also als Teil der Gebäudeinfrastruktur, vorgesehen sein, welche direkt oder indirekt miteinander verbunden sein können. Das erfindungsgemäße Verfahren kann dann zum Steuern auch mehrerer oder aller der Betriebseinrichtungen vorgesehen sein beziehungsweise verwendet werden. Dabei können die mehreren Betriebseinrichtungen mittels einer einzigen oder mehreren Steuereinheiten gesteuert werden. Sind mehrere Steuereinheiten vorgesehen, so können diese beispielsweise jeweils einer Betriebseinrichtung oder einer Gruppe oder Art von Betriebseinrichtungen zu deren Steuerung zugeordnet sein. Die Steuereinheit beziehungsweise die Steuereinheiten sind dabei wie die Betriebseinrichtungen ebenfalls Teil der Gebäudeinfrastruktur und können somit direkt oder indirekt miteinander verbunden beziehungsweise miteinander vernetzt sein. Teil dieser Infrastruktur beziehungsweise dieses Verbundes oder Netzwerks kann auch zumindest eine, bevorzugt eine Vielzahl, von Messeinrichtungen zum Erfassen des wenigstens einen aktuellen Messwertes sein. Diese Messeinrichtungen können beispielsweise entsprechende Sensoren oder Sensoriken sein oder umfassen, welche sich je nach zu bestimmendem Messwert oder Parameter in ihrer Art oder Auslegung unterscheiden können.The operating device may be a, in particular controllable, element or component of an infrastructure, in particular an energy infrastructure, of the building. For example, the operating device may be an energetic load, a power generator, an energy store or a switching element or the like. In concrete terms, the operating device can therefore be, for example, an air-conditioning device or installation, a photovoltaic or wind power plant, a cogeneration plant of the building, a battery or a rechargeable battery, a thermal storage or the like. Several or a plurality of operating devices may be provided in or on the building, ie as part of the building infrastructure, which may be directly or indirectly connected to one another. The method according to the invention can then be provided or used for controlling also several or all of the operating devices. In this case, the plurality of operating devices can be controlled by means of a single or multiple control units. If a plurality of control units are provided, they may be assigned to an operating device or a group or type of operating devices for their control, for example. The control unit or the control units are like the operating facilities also part of the building infrastructure and can thus be directly or indirectly connected or networked with each other. Part of this infrastructure or this network or network can also be at least one, preferably a plurality, of measuring devices for detecting the at least one current measured value. By way of example, these measuring devices may be or include corresponding sensors or sensor systems, which may differ in their type or design depending on the measured value or parameters to be determined.

Die Recheneinrichtung zum Berechnen der optimalen Lösung kann prinzipiell ebenfalls Teil des Gebäudes oder Teil der Infrastruktur sein. Bevorzugt kann es sich bei der Recheneinrichtung jedoch um eine entfernte, also von dem Gebäude separate, Recheneinrichtung, beispielsweise ein externes Rechenzentrum oder einen Cloud-Server, handeln. In diesem Fall kann die Recheneinrichtung über eine Datenverbindung mit der Gebäudeinfrastruktur, insbesondere mit der Steuereinheit zumindest zeitweise verbunden sein, um das Übertragen von Daten zu ermöglichen. Durch die Verwendung einer derartigen entfernten Recheneinrichtung kann in Verbindung mit dem erfindungsgemäßen Verfahren vorteilhaft ein jeweiliger Hardware-, Betriebs- und Kostenaufwand für einen Betrieb des einzelnen Gebäudes minimiert werden. Vorteilhaft kann die Recheneinrichtung beispielsweise durch die Berechnung der optimalen Lösung nur zeitweise beansprucht oder ausgelastet sein, sodass sie auch für andere Aufgaben oder Einsatzzwecke verfügbar ist, beispielsweise also jeweilige individuelle optimale Lösungen für eine Vielzahl von verschiedenen Gebäuden berechnen kann. Hierdurch kann vorteilhaft eine unnötige Redundanz verringert und eine verbesserte Effizienz erreicht werden.The computing device for calculating the optimal solution can in principle also be part of the building or part of the infrastructure. Preferably, however, the computing device may be a remote, that is to say separate from the building, computing device, for example an external data center or a cloud server. In this case, the computing device can be connected via a data connection with the building infrastructure, in particular with the control unit at least temporarily, in order to enable the transmission of data. By using such a remote computing device can be minimized in conjunction with the inventive method advantageously a respective hardware, operating and cost of operation of the individual building. Advantageously, the computing device, for example, by the calculation of the optimal solution only temporarily claimed or busy so that it is also available for other tasks or purposes, so for example, each individual optimal solutions for a variety of different buildings can calculate. This advantageously reduces unnecessary redundancy and improves efficiency.

Die optimale Lösung verwendet als Input, das heißt als Eingangsgrößen oder als Eingangsdaten, sämtliche notwendigen und verfügbaren Informationen, beispielsweise zu den technischen Eigenschaften der Infrastruktur beziehungsweise der Betriebseinrichtungen, zu einem Lastprofil beziehungsweise zu Vorhersagen über einen Lastgang des Gebäudes, zu Umgebungsbedingungen, wie beispielsweise die gebäudeeigene Energieerzeugung beeinflussenden Wetterbedingungen, und einem umfassenderen System oder Netz, in welches das Gebäude eingebunden sein kann, zu durch die entsprechende Steuerung der Infrastruktur beziehungsweise der Betriebseinrichtungen zu erreichenden oder zu realisierenden Zielsetzungen und dergleichen mehr. Mögliche Zielsetzungen können dabei beispielsweise eine Minimierung von zum Betrieb des Gebäudes erzeugten Emissionen, eine bestimmte Be- oder Auslastung der Infrastruktur oder einzelner Betriebseinrichtungen, eine Minimierung eines Kostenaufwandes zum Betrieb des Gebäudes und/oder dergleichen mehr umfassen. Gerade bei komplexen Gebäuden beziehungsweise Gebäudeinfrastrukturen, insbesondere mit mehreren Steuereinheiten, ist es vorteilhaft, wenn diese umfangreichen und komplexen für die Berechnung der optimalen Lösung zu verwendenden Daten nur gebündelt der Recheneinrichtung, insbesondere also beispielsweise nicht jeder individuellen Steuereinheit, bereitgestellt beziehungsweise auf unterschiedliche Steuereinheiten aufgeteilt werden müssen.The optimal solution uses as input, that is, as input variables or as input data, all necessary and available information, for example, the technical characteristics of the infrastructure or the operating equipment, a load profile or forecasts of a load profile of the building, to environmental conditions, such as building-specific power generation influencing weather conditions, and a more comprehensive system or network in which the building can be integrated into, by the appropriate control of infrastructure or facilities to be reached or realized objectives and the like. Possible objectives may be, for example, a minimization of emissions generated for the operation of the building, a certain occupancy or utilization of the infrastructure or individual operating facilities, a minimization of a cost to operate the building and / or the like more. Especially in the case of complex buildings or building infrastructures, in particular with multiple control units, it is advantageous if these extensive and complex data to be used for the calculation of the optimal solution are bundled only to the computing device, in particular thus not for each individual control unit, or distributed to different control units have to.

Da für die optimale Lösung also diese umfangreichen Daten und mit der Recheneirichtung eine ausreichend leistungsfähige Hardware verwendet werden, kann durch sie eine bestmögliche Steuerstrategie für die Betriebseinrichtung beziehungsweise die Betriebseinrichtungen unter den angenommenen Bedingungen angegeben werden. Insbesondere da die verwendeten Vorhersagen mit einer Unsicherheit behaftet sind und sich nach Abschluss dem Berechnen der optimalen Lösung, was eine signifikante Zeit in Anspruch nehmen kann, veränderte und insbesondere von der entsprechenden Vorhersage abweichende Bedingungen einstellen können, wäre für eine optimale Steuerung eine Neuberechnung oder Aktualisierung der optimalen Lösung notwendig. Ein zeitlicher Verzug ist aufgrund der Berechnungsdauer der optimalen Lösung dabei allerdings unvermeidbar. Zusätzlich kann oftmals die Problematik bestehen, dass die Recheneinrichtung beziehungsweise die Verbindung zu der Recheneinrichtung nicht dauerhaft und/oder nicht stabil verfügbar ist. Beispielsweise kann eine Verfügbarkeit nur einmal am Tag für einen begrenzten Zeitraum und/oder unregelmäßig gegeben sein. Eine bisher oftmals verwendete individuelle, einfache Regelung für jede Betriebseinrichtung kann weder die eingangs skizzierten Aufgaben oder Anforderungen des Energie-Managementsystems erfüllen noch eine - auch nur näherungsweise - optimale Realisierung der vorgegebenen Zielsetzung sicherstellen. Beispielsweise kann bei einer auftretenden Störung, das heißt einer Abweichung zwischen einem aktuellen Messwert - beispielsweise einer Energieerzeugung durch die Photovoltaikanlage - von der entsprechenden Prognose eine einfache Regelung diese Störung oder Abweichung vollständig über ein öffentliches Energieversorgungsnetz, an welches das Gebäude angeschlossen ist, oder alternativ vollständig über eine Batterie, also einen Energiespeicher, des Gebäudes abfangen oder ausgleichen, solange entsprechende Kapazität oder Flexibilität verfügbar ist. Dies ist jedoch im Sinne der angestrebten Funktionalität des Energie-Management-Systems nicht zielführend, da in der Regel eine Kombination mehrerer Ausgleichsmechanismen eine verbesserte Erfüllung der Zielsetzung ermöglicht.Since for the optimal solution, therefore, this extensive data and with the Recheneirichtung a sufficiently powerful hardware are used, it can be specified by them a best possible control strategy for the operating equipment or the operating equipment under the assumed conditions. In particular, since the predictions used are subject to uncertainty and may change after completion of calculating the optimal solution, which may take a significant amount of time, and in particular deviate from the corresponding prediction, a recalculation or update would be for optimal control the optimal solution necessary. However, a time delay is unavoidable due to the calculation time of the optimal solution. In addition, there can often be the problem that the computing device or the connection to the computing device is not permanently and / or not stably available. For example, availability may be given only once a day for a limited period of time and / or infrequently. A hitherto often used individual, simple control for each operating device can fulfill neither the initially outlined tasks or requirements of the energy management system nor one - even only approximately - ensure optimal realization of the specified objective. For example, in the case of an occurring disturbance, that is to say a deviation between a current measured value-for example a power generation by the photovoltaic system-from the corresponding prognosis, a simple control can completely or completely eliminate this disturbance or deviation via a public power supply network to which the building is connected via a battery, so an energy storage, intercept or compensate the building, as long as appropriate capacity or flexibility is available. However, this is not expedient in terms of the desired functionality of the energy management system, since usually a combination of several compensation mechanisms allows an improved fulfillment of the objective.

Durch die Berechnung der approximativen Lösung auf Basis der optimalen Lösung kann gegenüber der einfachen Regelung immer eine hinsichtlich der Zielsetzung zumindest gleichwertige, im Durchschnitt jedoch signifikant bessere, das heißt näher an der optimalen Lösung liegende, Steuerung der Betriebseinrichtung beziehungsweise der Gebäudeinfrastruktur erreicht werden. Da für die Berechnung der approximativen Lösung die bereits vorab berechneten Lösungsdaten der optimalen Lösung verwendet werden, ist vorteilhaft eine vollständige Neuberechnung oder Lösung des modellprädiktiven Regelungsproblems zum Berechnen der approximativen Lösung nicht notwendig. Dadurch wird es vorteilhaft ermöglicht, durch relativ zu der Berechnung der optimalen Lösung sehr viel einfachere und weniger umfangreiche Berechnungen eine gegenüber herkömmlichen Methoden verbesserte, beispielsweise effizientere, emissionsärmere und/oder kostengünstigere, Steuerungen der Betriebseinrichtung beziehungsweise der Gebäudeinfrastruktur zu realisieren. Insbesondere können diese einfachen Berechnungen mittels der mit geringem Kosten- und Betriebsaufwand betreibbaren Steuereinheit durchgeführt werden, da hierfür beispielsweise lediglich grundlegende Standardoperationen wie etwa einfache Additionen und Modifikationen oder höchstens Matrix-Vektor-Modifikationen erforderlich sein können und keine komplexe Modellierungs- oder Optimierungssoftware ausgeführt werden muss.By calculating the approximate solution on the basis of the optimal solution can be compared to the simple control always at least equivalent in terms of the objective, but on average significantly better, that is closer to the optimal solution, control of the facility or the building infrastructure. Since the solution data already calculated in advance of the optimal solution are used for the calculation of the approximate solution, advantageously a complete recalculation or solution of the model-predictive control problem for calculating the approximate solution is not necessary. As a result, it is advantageously possible to realize much simpler and less extensive calculations relative to the calculation of the optimal solution, compared to conventional methods, for example more efficient, emission-poorer and / or more cost-effective, control of the operating device or of the building infrastructure. In particular, these simple calculations can be carried out by means of the control unit which can be operated at low cost and operating costs since, for example, only basic standard operations such as simple additions and modifications or at most matrix-vector modifications may be required and no complex modeling or optimization software needs to be executed ,

Sowohl die optimale als auch die approximative Lösung können als Output, also als Ausgabedaten oder Ergebnis, insbesondere einen oder mehrere Sollwerte oder zu erreichende beziehungsweise einzustellende Zustände der Betriebseinrichtungen liefern. Die Lösungsdaten der optimalen Lösung, welche zum Berechnen der approximativen Lösung verwendet werden, können beispielsweise eine Funktion oder Matrix umfassen, welche einen jeweiligen Input in diesen Output überführt. Die Komplexität und der damit einhergehende notwendige Berechnungsaufwand der optimalen Lösung beziehungsweise des modellprädiktiven Regelungsproblems lässt sich daran erkennen, dass für ein kommerzielles Großgebäude beispielsweise zwischen 10000 und 20000 Sollwerte und/oder Zustände berechnet werden müssen, wobei die jeweiligen Betriebseinrichtungen beziehungsweise deren Betriebsprozesse sich untereinander beeinflussen beziehungsweise voneinander abhängig sein können.Both the optimal and the approximate solution can deliver as output, ie as output data or result, in particular one or more setpoint values or states of the operating devices to be reached or set. The optimal solution solution data used to calculate the approximate solution may include, for example, a function or matrix that translates a respective input into that output. The complexity and the associated necessary calculation effort of the optimal solution or the model-predictive control problem can be recognized from the fact that, for example, between 10,000 and 20,000 setpoints and / or states must be calculated for a large commercial building, with the respective operating facilities or their operating processes influencing each other or can be dependent on each other.

Eine Differenz zwischen der approximativen Lösung und der optimalen Lösung kann von einem betrachteten Zeithorizont abhängen. Beispielsweise kann jedoch bei einer Verfügbarkeit der Recheneinrichtung und einer Berechnung einer neuen beziehungsweise aktualisierten optimalen Lösung einmal am Tag eine Steuerung der Betriebseinrichtungen gemäß der approximativen Lösung näher an der optimalen Lösung liegen als eine herkömmliche einfache Regelung, sodass sich insgesamt - trotz der Einschränkungen der Steuereinheit bezüglich der verfügbaren Daten, der verfügbaren Rechenkapazität beziehungsweise Rechenleistung und des verfügbaren Funktionsumfangs - durch das erfindungsgemäße Verfahren eine signifikante Verbesserung bei der Steuerung der Betriebseinrichtung beziehungsweise mehrerer Betriebseinrichtungen des Gebäudes erreicht werden kann.A difference between the approximate solution and the optimal solution may depend on a considered time horizon. However, for example, with availability of the computing device and calculation of a new or updated optimal solution once a day, control of the operating devices according to the approximate solution may be closer to the optimal solution than a conventional simple control, so that overall Limitations of the control unit with respect to the available data, the available computing capacity or computing power and the available range of functions - can be achieved by the inventive method, a significant improvement in the control of the operating device or more operating equipment of the building.

In vorteilhafter Ausgestaltung der vorliegenden Erfindung umfassen die vorgegebenen Parameter einen Zustand der Betriebseinrichtung, ein durch die optimale Lösung zu realisierendes Ziel sowie eine Prognose für ein Lastprofil und/oder eine Energieerzeugung des Gebäudes. Der Zustand kann beispielsweise ein Ladezustand (SOC, englisch „State of Charge“) oder ein durch einen entsprechenden Messwert angegebener tatsächlicher Energieverbrauch oder Energieausstoß der Betriebseinrichtung sein. Anhand dieser Parameter kann bereits eine gegenüber herkömmlichen einfachen Regelungen signifikant verbesserte optimale Lösung berechnet werden. Die Optimalität der Lösung kann dabei bezogen sein auf die Genauigkeit, Aktualität, Verfügbarkeit und/oder den Umfang der als Input verwendeten Daten und/oder Vorgaben, beispielsweise bezüglich des Ziels, und/oder weiterer Einschränkungen oder Randbedingungen, beispielsweise durch technische Gegebenheiten und Möglichkeiten. So kann beispielsweise eine Belastbarkeit der Betriebseinrichtung oder der Gebäudeinfrastruktur, eine Schalt- und/oder Einstellgeschwindigkeit eines Zustands oder der gleichen beschränkt oder in vorgegebener Weise begrenzt sein, sodass hierdurch auch mögliche Steuerprozesse und somit ein Wertebereich der optimalen Lösung limitiert sein kann.In an advantageous embodiment of the present invention, the predetermined parameters include a state of the operating device, a goal to be realized by the optimal solution and a prognosis for a load profile and / or an energy generation of the building. The state may be, for example, a state of charge (SOC) or an actual energy consumption or energy output of the operating device indicated by a corresponding measured value. These parameters can already be used to calculate a significantly improved optimal solution compared to conventional simple rules. The optimality of the solution can be based on the accuracy, timeliness, availability and / or the extent of the data and / or specifications used as input, for example with respect to the target, and / or further restrictions or boundary conditions, for example due to technical circumstances and possibilities. For example, a load capacity of the operating device or the building infrastructure, a switching and / or setting speed of a state or the same may be limited or limited in a predetermined manner, so that thereby possible control processes and thus a range of values of the optimal solution may be limited.

In weiterer bevorzugter Ausgestaltung der vorliegenden Erfindung werden von der Recheneinrichtung zu der Steuereinheit wenigstens ein beim Berechnen der optimalen Lösung verwendeter Zustand der Betriebseinrichtung und wenigstens ein dazu korrespondierender, beim Berechnen der optimalen Lösung ermittelter Sollwert übertragen. Dies ermöglicht es vorteilhaft, die Abweichung, das heißt also eine Störung gegenüber der für die optimale Lösung verwendeten Daten beziehungsweise Vorhersagen, beispielsweise durch einen einfachen Vergleich des übertragenen Zustandes mit dem aktuellen Messwert zu ermitteln. Ebenso kann es beispielsweise vorteilhaft sein, einen beim Berechnen der approximativen Lösung ermittelten Sollwert mit dem Sollwert der optimalen Lösung zu vergleichen, da hierdurch beispielsweise auf einfache Art und Weise eine Bewertung der approximativen Lösung ermöglicht werden kann.In a further preferred refinement of the present invention, at least one desired value of the operating device used in calculating the optimal solution and at least one nominal value determined during calculation of the optimal solution are transmitted by the computing device to the control unit. This advantageously makes it possible to determine the deviation, that is to say an interference with the data or predictions used for the optimal solution, for example by a simple comparison of the transmitted state with the current measured value. Likewise, it may be advantageous, for example, to compare a desired value determined during the calculation of the approximate solution with the desired value of the optimal solution, since this allows, for example, a simple evaluation of the approximate solution.

In weiterer vorteilhafter Ausgestaltung der vorliegenden Erfindung ist es vorgesehen, dass die optimale Lösung darstellbar ist beziehungsweise dargestellt wird als x = A B 1 b .

Figure DE102017206299A1_0001
Dabei enthält der Vektor x
Figure DE102017206299A1_0002
wenigstens einen beim Berechnen der optimalen Lösung ermittelten Sollwert, also beispielsweise einen idealerweise zu erreichenden oder einzustellenden Zustand, Energieverbrauch oder dergleichen. Der Vektor b
Figure DE102017206299A1_0003
enthält die als Input für die optimale Lösung verwendeten beziehungsweise vorgegebenen Parameter beziehungsweise Vorhersagen. A B 1
Figure DE102017206299A1_0004
ist eine Matrix, welche im Folgenden auch als inverse Basismatrix bezeichnet wird und die Lösungsdaten der optimalen Lösung enthält. In der Matrix A B 1
Figure DE102017206299A1_0005
können beispielsweise einzelne Spalten jeweils einer Betriebseinrichtung, also beispielsweise einem Gerät oder Aggregat der Gebäudeinfrastruktur, zugeordnet sein. Beispielsweise kann eine Spalte einem elektrischen Energiespeicher, also einer Batterie, des Gebäudes oder der Gebäudeinfrastruktur zugeordnet sein und dann gegebenenfalls zur Berechnung des Ladungszustandes beziehungsweise der Sollwerte für den Ladungszustand der Batterie beitragen. Durch die Zeilennummern der Matrix A B 1
Figure DE102017206299A1_0006
beispielsweise zeitliche Verläufe der Sollwerte innerhalb jeweils einer Spalte beschreiben werden, sodass also die Einträge jeweils einer Spalte zu einem jeweiligen zeitlichen Verlauf eine entsprechenden Größe korrespondieren können. So kann beispielsweise ein Element einer Spalte mit einer bestimmten ersten Zeilennummer zur Berechnung eines für einen ersten Zeitpunkt vorgesehenen Sollwertes und ein anderes Element derselben Spalte mit einer anderen Zeilennummer zur Berechnung eines für einen zweiten Zeitpunkt vorgesehenen Sollwertes beitragen. Das Produkt der inversen Basismatrix A B 1
Figure DE102017206299A1_0007
mit dem Vektor b
Figure DE102017206299A1_0008
kann als Basislösung bezeichnet werden und insgesamt unter anderem technische Randbedingungen der zu steuernden Betriebseinrichtungen umfassen oder berücksichtigen.In a further advantageous embodiment of the present invention, it is provided that the optimal solution can be displayed or is shown as x = A B - 1 b ,
Figure DE102017206299A1_0001
The vector contains x
Figure DE102017206299A1_0002
at least one setpoint determined during calculation of the optimal solution, that is to say, for example, a state that can be ideally reached or set, energy consumption or the like. The vector b
Figure DE102017206299A1_0003
contains the parameters or predictions used or given as input for the optimal solution. A B - 1
Figure DE102017206299A1_0004
is a matrix, which is also referred to below as the inverse base matrix and contains the solution data of the optimal solution. In the matrix A B - 1
Figure DE102017206299A1_0005
For example, individual columns can each be assigned to an operating device, that is to say for example a device or aggregate of the building infrastructure. For example, a column can be assigned to an electrical energy store, that is to say a battery, of the building or of the building infrastructure and then optionally contribute to the calculation of the charge state or the setpoint values for the charge state of the battery. By the line numbers of the matrix A B - 1
Figure DE102017206299A1_0006
For example, temporal courses of the setpoint values within each one column will be described, so that therefore the entries in each case of a column can correspond to a respective time course of a corresponding size. For example, one element of a column with a particular first row number may contribute to the calculation of a setpoint provided for a first time and another element of the same column may have a different row number for the calculation of a setpoint provided for a second time. The product of the inverse base matrix A B - 1
Figure DE102017206299A1_0007
with the vector b
Figure DE102017206299A1_0008
may be referred to as a basic solution and include or take into account, inter alia, technical boundary conditions of the operating equipment to be controlled.

Sowohl die Einträge der Vektoren x  und  b

Figure DE102017206299A1_0009
und als auch die Einträge der Matrix A B 1
Figure DE102017206299A1_0010
können im einfachsten Fall Zahlen beziehungsweise Werte oder Variablen sein. Die jeweiligen Bedeutungen der einzelnen Einträge, das heißt also beispielsweise an welcher Stelle einer bestimmten Betriebseinrichtung oder einem bestimmten diskreten Zeitpunkt zugeordnete Einträge oder Angaben stehen, kann beispielsweise durch die Matrix A B 1
Figure DE102017206299A1_0011
selbst kodiert sein oder durch entsprechende Metadaten oder in einer separaten Datei angegeben sein. Diese Bedeutungen oder Zuordnungsdaten können ganz oder teilweise zusammen mit den Lösungsdaten und/oder den Parametern von der Recheneinrichtung zu der Steuereinheit übertragen werden. Ebenso kann es vorgesehen sein, dass diese Zuordnungsdaten bereits in einer Speichereinrichtung der Steuereinheit gespeichert beziehungsweise hinterlegt sind.Both the entries of the vectors x and b
Figure DE102017206299A1_0009
and the entries of the matrix A B - 1
Figure DE102017206299A1_0010
In the simplest case, they can be numbers or values or variables. The respective meanings of the individual entries, that is to say, for example, at which point of a particular operating device or a specific discrete point of time are associated entries or indications, can be determined, for example, by the matrix A B - 1
Figure DE102017206299A1_0011
self-coded or be specified by appropriate metadata or in a separate file. These meanings or assignment data can be transferred in whole or in part together with the solution data and / or the parameters from the computing device to the control unit. Likewise it can be provided that these assignment data are already stored or stored in a memory device of the control unit.

In weiterer vorteilhafter Ausgestaltung der vorliegenden Erfindung ist es vorgesehen, dass von der Recheneinrichtung zu der Steuereinheit als Lösungsdaten die inverse Basismatrix A B 1

Figure DE102017206299A1_0012
übertragen wird. Die approximative Lösung wird dann berechnet durch eine Matrix-Vektor-Multiplikation der inversen Basismatrix A B 1
Figure DE102017206299A1_0013
mit einem Vektor b ˜ ,
Figure DE102017206299A1_0014
welcher gebildet ist aus dem gemäß dem aktuellen Messwert modifizierten Vektor b .
Figure DE102017206299A1_0015
Der aktuelle Messwert beschreibt also eine von den für die optimale Lösung angenommenen Bedingungen abweichende Situation. Der Vektor b
Figure DE102017206299A1_0016
kann beispielsweise durch Addition der Abweichung zu dem entsprechenden Eintrag des Vektors b
Figure DE102017206299A1_0017
an diese neue Situation angepasst, also zu dem Vektor b ˜ ,
Figure DE102017206299A1_0018
modifiziert werden. Bei diesem Vorgehen muss vorteilhaft also die inverse Basismatrix A B 1
Figure DE102017206299A1_0019
nicht modifiziert oder neu berechnet werden, sodass das zu berechnende Matrix-Vektor-Produkt A B 1 b ˜
Figure DE102017206299A1_0020
problemlos durch die Steuereinheit berechnet werden kann. Als Ergebnis ergibt sich die approximative und nicht die optimale Lösung, da wechselseitige Einflüsse oder Rückkopplungen, die mit der Abweichung beziehungsweise der Modifikation des Vektors b
Figure DE102017206299A1_0021
einhergehen - beziehungsweise in der entsprechenden optimalen Lösung für die abweichende Situation einhergehen würden - und bei einer Berechnung einer neuen optimalen Lösung zu Veränderungen auch in anderen Einträgen führen können, unberücksichtigt bleiben. Da jedoch nur der Wert des durch den aktuellen Messwert beschriebenen Parameters modifiziert wird, ist auch die Differenz zwischen der dieserart berechneten approximativen Lösung und der optimalen Lösung beziehungsweise einer unter Berücksichtigung des aktuellen Messwertes neu berechneten optimalen Lösung begrenzt. Es kann also beispielsweise nur ein Wert in dem Vektor b
Figure DE102017206299A1_0022
geändert werden, um den modifizierten Vektor b ˜ ,
Figure DE102017206299A1_0023
zu erhalten. Basierend hierauf wird dann durch die Multiplikation mit der inversen Basismatrix A B 1
Figure DE102017206299A1_0024
dennoch eine approximative Lösung für das Gesamtsystem, also beispielsweise die gesamte Gebäudeinfrastruktur oder mehrere Betriebseinrichtungen, berechnet beziehungsweise ermittelt.In a further advantageous embodiment of the present invention, it is provided that from the computing device to the control unit as solution data, the inverse base matrix A B - 1
Figure DE102017206299A1_0012
is transmitted. The approximate solution is then calculated by a matrix-vector multiplication of the inverse base matrix A B - 1
Figure DE102017206299A1_0013
with a vector b ~ .
Figure DE102017206299A1_0014
which is formed from the vector modified according to the current measured value b ,
Figure DE102017206299A1_0015
The current measured value thus describes a situation deviating from the conditions assumed for the optimal solution. The vector b
Figure DE102017206299A1_0016
For example, by adding the deviation to the corresponding entry of the vector b
Figure DE102017206299A1_0017
adapted to this new situation, ie to the vector b ~ .
Figure DE102017206299A1_0018
be modified. In this procedure, therefore, the inverse base matrix must be advantageous A B - 1
Figure DE102017206299A1_0019
can not be modified or recalculated so that the matrix-vector product to be calculated A B - 1 b ~
Figure DE102017206299A1_0020
can be easily calculated by the control unit. The result is the approximate and not the optimal solution, because of mutual influences or feedbacks associated with the deviation or modification of the vector b
Figure DE102017206299A1_0021
go hand in hand - or would be in the appropriate optimal solution for the deviant situation - and can lead to changes in other entries when calculating a new optimal solution. However, since only the value of the parameter described by the current measured value is modified, the difference between the approximate solution calculated this way and the optimal solution or a newly calculated optimal solution taking into account the current measured value is also limited. For example, it can only have one value in the vector b
Figure DE102017206299A1_0022
be changed to the modified vector b ~ .
Figure DE102017206299A1_0023
to obtain. This is then based on multiplication by the inverse base matrix A B - 1
Figure DE102017206299A1_0024
Nevertheless, an approximate solution for the entire system, so for example, the entire building infrastructure or multiple operating equipment, calculated or determined.

Besonders vorteilhaft kann durch diese Vorgehensweise zudem die approximative Lösung besonders schnell, insbesondere schneller als eine aktualisierte optimale Lösung, berechnet werden, sodass auf die anhand des aktuellen Messwertes ermittelte Abweichung besonders schnell durch entsprechende Steuerungsmaßnahmen reagiert werden kann. Dies ist vorteilhaft insbesondere unabhängig von der Verbindung zu der Recheneinrichtung beziehungsweise deren Verfügbarkeit jederzeit möglich. Während also die Basislösung A B 1 b

Figure DE102017206299A1_0025
das ursprüngliche modellprädiktiven Regelungsproblems (MPC-Problem) unter Verwendung der Recheneinrichtung optimal löst, wird durch die Multiplikation A B 1 b ˜
Figure DE102017206299A1_0026
ein durch die Abweichung des aktuellen Messwerts gegebenes modifiziertes MPC-Problem approximativ gelöst. Somit kann durch eine einfache Matrix-Vektor-Multiplikation eine Approximation einer optimalen Reaktion auf die Abweichung, also die Störung, berechnet und die Betriebseinrichtung beziehungsweise die Gebäudeinfrastruktur entsprechend gesteuert werden.Particularly advantageously, the approximate solution can also be calculated particularly quickly, in particular faster than an updated optimal solution, by means of this procedure, so that it is possible to react to the deviation determined on the basis of the current measured value very quickly by appropriate control measures. This is advantageous in particular regardless of the connection to the computing device or its availability at any time possible. So while the basic solution A B - 1 b
Figure DE102017206299A1_0025
optimally solves the original model predictive control problem (MPC problem) using the calculator is multiplied A B - 1 b ~
Figure DE102017206299A1_0026
an approximately solved by the deviation of the current measured value modified MPC problem solved. Thus, by means of a simple matrix-vector multiplication, an approximation of an optimal response to the deviation, that is to say the disturbance, can be calculated and the operating device or the building infrastructure can be correspondingly controlled.

In weiterer vorteilhafter Ausgestaltung der vorliegenden Erfindung werden von der Recheneinrichtung zu der Steuereinheit als Lösungsdaten nur zu dem durch den aktuellen Messwert beschriebenen Parameter korrespondierende Spalten der inversen Basismatrix A B 1

Figure DE102017206299A1_0027
übertragen. Das bedeutet mit anderen Worten, dass nicht die vollständige inverse Basismatrix A B 1
Figure DE102017206299A1_0028
übertragen wird, sondern lediglich eine Teilmenge der Spalten der inversen Basismatrix A B 1 .
Figure DE102017206299A1_0029
Die übertragenen Spalten sind dabei diejenigen Spalten der inversen Basismatrix A B 1 ,
Figure DE102017206299A1_0030
welche Einträge enthalten, die bei der Berechnung des Matrix-Vektor-Produkts A B 1 b ˜
Figure DE102017206299A1_0031
mit einem durch den aktuellen Messwert beziehungsweise dessen Abweichung modifizierten Eintrag oder Element des Vektors b ˜
Figure DE102017206299A1_0032
multipliziert werden. Hierdurch kann vorteilhaft eine von der Recheneinrichtung zu der Steuereinheit zu übertragende Datenmenge reduziert werden. Dadurch kann vorteilhaft eine Zeitersparnis, eine schnellere Reaktionsfähigkeit der Steuereinheit und eine geringere Belastung einer verwendeten Datenverbindung erreicht werden. Mit diesen übermittelten Spalten und dem aktuellen Messwert beziehungsweise der Abweichung des aktuellen Messwerts von dem entsprechenden für die optimale Lösung angenommenen Wert kann durch die Steuereinheit so beispielsweise durch Addition der um die Abweichung beziehungsweise Störung modifizierten Spalten eine Approximation der optimalen Reaktion auf die Störung berechnet und die Infrastruktur entsprechend gesteuert werden.In a further advantageous embodiment of the present invention are of the Computing device to the control unit as solution data only to the corresponding parameters described by the current parameter columns of the inverse base matrix A B - 1
Figure DE102017206299A1_0027
transfer. In other words, that means not the complete inverse base matrix A B - 1
Figure DE102017206299A1_0028
but only a subset of the columns of the inverse base matrix A B - 1 ,
Figure DE102017206299A1_0029
The transferred columns are those columns of the inverse base matrix A B - 1 .
Figure DE102017206299A1_0030
which contain entries in the calculation of the matrix vector product A B - 1 b ~
Figure DE102017206299A1_0031
with an entry or element of the vector modified by the current measured value or its deviation b ~
Figure DE102017206299A1_0032
be multiplied. As a result, an amount of data to be transmitted from the computing device to the control unit can advantageously be reduced. As a result, a time saving, a faster response capability of the control unit and a lower load of a data connection used can advantageously be achieved. With these transmitted columns and the current measured value or the deviation of the current measured value from the corresponding value assumed for the optimum solution, the control unit can calculate an approximation of the optimal response to the disturbance and, for example, add the columns modified by the deviation or disturbance Infrastructure are controlled accordingly.

In weiterer vorteilhafter Ausgestaltung der vorliegenden Erfindung werden von der Recheneinrichtung zu der Steuereinheit als Lösungsdaten nur solche Einträge der inversen Basismatrix A B 1

Figure DE102017206299A1_0033
übertragen, die aufgrund ihrer jeweiligen Zeilennummer zu einem durch das Steuern zu erreichenden Sollwert und durch ihre jeweilige Spaltennummer zu dem durch den aktuellen Messwert beschriebenen Parameter, insbesondere also zu der Störung oder Abweichung, korrespondieren. Mit anderen Worten wird also nicht notwendigerweise die gesamte inverse Basismatrix A B 1
Figure DE102017206299A1_0034
übertragen, sondern lediglich ein einzelner Eintrag oder eine Teilmenge von einzelnen Einträgen. Der zu erreichenden Sollwert kann dabei der zuvor genannte durch das Berechnen der optimalen Lösung ermittelte Sollwert sein. Mit den so übertragenen Einträgen der inversen Basismatrix A B 1
Figure DE102017206299A1_0035
und dem aktuellen Messwert beziehungsweise dessen Abweichung gegenüber dem für die optimale Lösung angenommenen entsprechenden Wert kann dann durch die Steuereinheit durch jeweils eine Multiplikation pro entsprechendem Sollwert eine Approximation der optimalen Reaktion auf die Abweichung beziehungsweise Störung berechnet und die Betriebseinrichtung entsprechend, das heißt gemäß der derart ermittelten approximativen Lösung, gesteuert werden.In a further advantageous embodiment of the present invention are from the computing device to the control unit as solution data only such entries of the inverse base matrix A B - 1
Figure DE102017206299A1_0033
transmit, due to their respective line number to a setpoint to be achieved by the control and by their respective column number to the parameter described by the current measured value, in particular to the disturbance or deviation corresponding. In other words, it does not necessarily mean the entire inverse base matrix A B - 1
Figure DE102017206299A1_0034
but only a single entry or a subset of individual entries. The target value to be achieved can be the aforementioned desired value determined by calculating the optimum solution. With the so transferred entries of the inverse base matrix A B - 1
Figure DE102017206299A1_0035
and the current measured value or its deviation from the corresponding value assumed for the optimal solution can then be calculated by the control unit by one multiplication per corresponding setpoint an approximation of the optimal response to the deviation or disturbance and the operating device accordingly, that is according to the thus determined approximate solution, to be controlled.

Durch diese Vorgehensweise können vorteilhaft die von der Recheneinrichtung zu der Steuereinheit zu übertragende Datenmenge und gegebenenfalls ein Berechnungsaufwand zum Berechnen der approximativen Lösung reduziert werden. Vorteilhaft werden so also lediglich diejenigen Einträge übertragen und diejenigen einzelnen Berechnungen durchgeführt, welche bei der Berechnung des Produkts A B 1 b ˜

Figure DE102017206299A1_0036
durch die Störung beeinflusst oder verändert werden beziehungsweise zur Berücksichtigung der Störung relevant sind. Dabei kann beispielsweise ein bestimmter Zeitpunkt oder Zeithorizont vorgegeben sein, für den die approximative Lösung beziehungsweise entsprechende Sollwerte approximativ berechnet werden sollen.By virtue of this procedure, it is advantageously possible to reduce the amount of data to be transmitted from the computing device to the control unit and, if necessary, a calculation effort for calculating the approximate solution. Advantageously so only those entries are transmitted and those individual calculations performed, which in the calculation of the product A B - 1 b ~
Figure DE102017206299A1_0036
are influenced or changed by the disturbance or are relevant for the consideration of the disturbance. In this case, for example, a specific point in time or time horizon can be predetermined, for which the approximate solution or corresponding setpoint values are to be calculated approximately.

Mit anderen Worten ist es also beispielsweise nicht notwendig, die gesamte inverse Basismatrix A B 1

Figure DE102017206299A1_0037
zu übertragen, da beispielsweise zum Zeitpunkt der Berechnung der approximativen Lösung bereits in der Vergangenheit zu erreichenden beziehungsweise für einen in der Vergangenheit liegenden Zeitpunkt vorgesehene Sollwerte beziehungsweise die entsprechenden korrespondierenden Matrixeinträge nicht benötigt werden, da sie für die zukünftige Steuerung nicht länger relevant sind. Ebenso kann beispielsweise eine im Rahmen der optimalen Lösung, etwa für Planungszwecke, berechnete Steuerungsstrategie für weiter als der vorgegebene Zeitpunkt oder Zeithorizont in der Zukunft liegende Zeitpunkte oder Zeiträume für die Berechnung der approximativen Lösung ignoriert werden. Wird ein solcher in der Zukunft liegender Zeitpunkt oder Zeitraum erreicht, so kann dann beispielsweise vorteilhaft mit einem dann neu erfassten neuen aktuellen Messwert eine neue approximative Lösung berechnet werden. Ebenso kann es beispielsweise unnötig sein, konstante Einträge beziehungsweise Spalten, welche nicht von dem aktuellen Messwert abhängen oder zu diesem korrespondieren, zum Berechnen der approximativen Lösung zu übertragen. Beispielsweise kann eine Spalte der inversen Basismatrix A B 1
Figure DE102017206299A1_0038
eine maximale Batteriekapazität enthalten, welche - zumindest über den vorgegebenen Zeithorizont - konstant, also unverändert bleibt, da sie beispielsweise nicht von dem aktuellen Ladezustand der Batterie abhängt.In other words, it is not necessary, for example, the entire inverse base matrix A B - 1
Figure DE102017206299A1_0037
since, for example, at the time of the calculation of the approximate solution, target values to be reached or intended for a past time point are not required, since they are no longer relevant for future control. Likewise, for example, a control strategy calculated within the framework of the optimal solution, for example for planning purposes, can be ignored for time points or time periods for the calculation of the approximate solution that lie ahead of the predefined time or time horizon in the future. If such a time or period lying in the future is reached, it is then advantageously possible, for example, to calculate a new approximate solution with a newly acquired, new measured value. Likewise, it may be unnecessary, for example, to transmit constant entries or columns, which do not depend on or correspond to the current measured value, for calculating the approximate solution. For example, a column may be the inverse base matrix A B - 1
Figure DE102017206299A1_0038
contain a maximum battery capacity, which - at least over the predetermined time horizon - constant, ie unchanged, since it does not depend, for example, on the current state of charge of the battery.

In weiterer vorteilhafter Ausgestaltung der vorliegenden Erfindung wird zunächst mittels der Recheneinrichtung eine jeweilige optimale Lösung für mehrere Szenarien mit jeweils unterschiedlichen Prognosen, beispielsweise für eine Umgebung, oder Wetterbedingungen, für ein Lastprofil und/oder für eine Energieerzeugung der Betriebseinrichtung und/oder des Gebäudes, berechnet. Mit anderen Worten werden also mehrere optimale Lösungen berechnet, welche optimal sind für unterschiedliche mögliche Bedingungen oder Situationen beziehungsweise Entwicklungen. Dies trägt der unvermeidlichen Unsicherheit von Prognosen Rechnung. Von der Recheneinrichtung zu der Steuereinheit werden dann zu mehreren der Szenarien korrespondierende Parameter und Lösungsdaten übertragen. Anhand dieser übertragenen Daten wird durch die Steuereinheit dann durch einen Vergleich mit dem aktuellen Messwert das diesem nächstliegende Szenario ermittelt. Die approximative Lösung wird dann auf Basis dieses ermittelten nächstliegenden Szenarios berechnet. Das nächstliegende Szenario kann dabei dasjenige der mehreren berechneten Szenarien sein, bei dem ein für den durch den aktuellen Messwert beschriebenen Parameter verwendeter Wert die geringste Differenz zu dem aktuellen Messwert aufweist. Liegen mehrere verschiedene aktuelle Messwerte, beispielsweise unterschiedlicher Parameter, vor, so kann beispielsweise das Szenario ausgewählt werden, welches über alle diese mehreren Messwerte beziehungsweise Parameter die insgesamt geringste Gesamtabweichung oder die geringste durchschnittliche Abweichung aufweist. Dabei können zusätzliche Bedingungen, wie etwa eine maximale Abweichung ausgewertet beziehungsweise bei der Ermittlung des nächstliegenden Szenarios berücksichtigt werden.In a further advantageous embodiment of the present invention, a respective optimal solution for several scenarios, each with different forecasts, for example, for an environment, or weather conditions, for a load profile and / or for an energy production of the operating device and / or the building, first calculated by the computing device , In other words, several optimal solutions are calculated, which are optimal for different possible conditions or situations or developments. This takes into account the inevitable uncertainty of forecasts. From the computing device to the control unit, corresponding parameters and solution data are then transmitted to a plurality of the scenarios. Based on this transmitted data is then determined by the control unit by comparing it with the current measured value of this closest scenario. The approximate solution is then calculated on the basis of this determined closest scenario. In this case, the closest scenario may be that of the several calculated scenarios in which a value used for the parameter described by the current measured value has the smallest difference to the current measured value. If there are several different current measured values, for example different parameters, then, for example, the scenario can be selected which has the overall lowest total deviation or the lowest average deviation over all of these several measured values or parameters. In this case, additional conditions, such as a maximum deviation can be evaluated or taken into account when determining the closest scenario.

Der zum Ermitteln des nächstliegenden Szenarios notwendige Berechnungsaufwand ist vernachlässigbar und beispielsweise durch standardmäßig heutzutage verfügbare Controller, welche als Steuereinheit im Sinne der vorliegenden Erfindung dienen können, bewältigbar, da hierzu beispielsweise lediglich Vergleichsoperationen notwendig sein können. Durch die mehreren berechneten Szenarien können mehrere unterschiedliche Entwicklungen beschrieben oder modelliert werden, sodass sich durch die Ermittlung oder Auswahl eine Differenz zwischen der approximativen Lösung und der optimalen Lösung minimieren lässt. Hierdurch kann also, insbesondere ohne zusätzlichen Hardwareaufwand in der Steuereinheit, das vorgegebene durch das Steuern der Betriebseinrichtung beziehungsweise der Gebäudeinfrastruktur zu erreichende Ziel besser, also mit geringerer Differenz zu dem jeweiligen Optimum, realisiert werden. Je nach vorgegebenem Ziel kann somit beispielsweise eine höhere Energieeffizienz, eine geringere Kostenbelastung, eine verbesserte Umweltbilanz oder dergleichen erzielt werden. Konkret werden bei diesem Vorgehen also für jedes der durch die Recheneinrichtung berechneten Szenarien beispielsweise die entsprechenden Basismatrizen A B 1

Figure DE102017206299A1_0039
oder deren relevante Spalten oder Einträge sowie die jeweiligen ermittelten Sollwerte und Zustände und die oder einige der verwendeten Annahmen beziehungsweise Eingangsgrößen an die Steuereinheit übertragen.The computational effort required to determine the closest scenario is negligible and, for example, by default Nowadays available controllers, which can serve as a control unit in the context of the present invention, manageable, since this example, only comparison operations may be necessary. The multiple calculated scenarios may describe or model several different developments so that the determination or selection minimizes a difference between the approximate solution and the optimal solution. As a result, in particular, without any additional expenditure on hardware in the control unit, the predetermined target to be achieved by controlling the operating device or the building infrastructure can be realized better, ie with a smaller difference to the respective optimum. Depending on the given target, for example, a higher energy efficiency, a lower cost burden, an improved environmental balance or the like can be achieved. Specifically, in this procedure, for example, for each of the scenarios calculated by the computing device, the corresponding base matrices are used A B - 1
Figure DE102017206299A1_0039
or the relevant columns or entries as well as the respective determined setpoint values and states and the or some of the assumptions or input variables used are transmitted to the control unit.

In weiterer vorteilhafter Ausgestaltung der vorliegenden Erfindung werden in einem zeitlichen Abstand zueinander wenigstens zwei jeweils aktuelle Messwerte, insbesondere desselben Parameters, erfasst, welche jeweils unterschiedlichen Szenarien am nächsten liegen. Diese unterschiedlichen Szenarien werden durch die Steuereinheit dann zu einem kombinierten Szenario kombiniert und die approximative Lösung wird durch die Steuereinheit anhand des kombinierten Szenarios berechnet. Das Kombinieren der Szenarien kann hier beispielsweise bedeuten, dass die Störung und die zugehörigen Zustände, angenommenen Werte oder Prognosen der Szenarien miteinander in Einklang gebracht werden. Beispielsweise durch eine Mittelung oder eine stetige Fortsetzung.In a further advantageous embodiment of the present invention, at least two respectively current measured values, in particular of the same parameter, are detected at a time interval from one another, which respectively lie closest to different scenarios. These different scenarios are then combined by the control unit into a combined scenario and the approximate solution is calculated by the control unit based on the combined scenario. Combining the scenarios here can mean, for example, that the disruption and the associated states, assumed values or forecasts of the scenarios are reconciled with one another. For example, by an averaging or a steady continuation.

Beispielsweise können mittels der Recheneinrichtung zwei verschiedene optimale Lösungen berechnet werden, wobei für die eine optimale Lösung eine Energieerzeugung der Photovoltaikanlage des Gebäudes auf Basis eines während des gesamten Tages wolkenfreien Himmels und für die zweite optimale Lösung eine davon abweichende Energieerzeugung der Photovoltaikanlage auf Basis eines den gesamten Tag über bewölkten Himmels verwendet wird. Von beiden Szenarien abweichend kann in der Realität der Himmel beispielsweise am Vormittag des entsprechenden Tages wolkenfrei und am Nachmittag des entsprechenden Tages bewölkt sein. Ein während des Vormittags erfasster aktueller Messwert würde also dazu führen, dass das auf dem wolkenlosen Himmel basierende Szenario als nächstliegendes Szenario ermittelt wird. In entsprechender Weise würde ein am Nachmittag erfasster zweiter aktueller Messwert zur Ermittlung des zweiten Szenarios als nächstliegend führen. Über den gesamten Tag betrachtet ist also keines der beiden berechneten Szenarien optimal zur Abbildung der Realität geeignet. Mit der Erfassung des zweiten Messwertes würde es also zu einem Szenarienwechsel kommen. Da das zweite Szenario jedoch nicht die während des Vormittags erhöhte Energieerzeugung der Photovoltaikanlage aufgrund des abweichend von der Annahme des zweiten Szenarios wolkenfreien Himmels berücksichtigt, ergibt sich dann bei der Steuerung eine Abweichung von einer auf der tatsächlichen Realität basierenden, jedoch nicht zuvor berechneten optimalen Lösung. Um auch in solchen Fällen eine verbesserte approximative Lösung zu erhalten, können die beiden beziehungsweise mehreren unterschiedlichen, zu unterschiedlichen Zeitpunkten als nächstliegend ermittelten Szenarien miteinander in Einklang gebracht werden. Dazu kann das jeweils nächstliegende Szenario bestimmt werden, beispielsweise indem die Störung und die zugehörigen Zustände, beispielsweise ein zugehöriger Ladezustand eines Energiespeichers der Gebäudeinfrastruktur, verglichen und mithilfe der inversen Basismatrizen der Szenarien durch die Steuereinheit miteinander in Einklang gebracht beziehungsweise aneinander angeglichen werden. Hierfür können vorteilhaft bereits einfache mathematische Operationen ausreichen, welche in ihrer Komplexität oder ihrem Anspruch nicht über Matrix-Vektor-Multiplikationen hinausgehen und dementsprechend durch die Steuereinheit ausführbar sind. Mit anderen Worten kann also der zuvor im Zusammenhang mit anderen Ausgestaltungen der Erfindung beschriebene Mechanismus nicht nur auf die Sollwerte, sondern auch auf die Zustände beziehungsweise den Input angewendet werden. So kann vorteilhaft trotz der Verwendung einer approximativen Lösung in mehr unterschiedlichen Situationen das jeweils vorgegebene Ziel verbessert, das heißt mit geringerer Abweichung, realisiert oder erreicht werden.For example, by means of the computing device, two different optimal solutions can be calculated, for the optimal solution, an energy production of the photovoltaic system of the building based on a cloud-free sky throughout the day and for the second optimal solution deviating energy production of the photovoltaic system based on the entire Day is used over cloudy sky. Deviating from both scenarios, in reality, for example, the sky may be cloudless in the morning of the corresponding day and cloudy in the afternoon of the corresponding day. A current measured value recorded during the morning would therefore lead to the scenario based on the cloudless sky being determined as the closest scenario. Similarly, a second current reading taken in the afternoon would result in determining the second scenario as closest. Thus, over the entire day, neither of the two calculated scenarios is optimally suited for mapping reality. With the acquisition of the second measured value, it would therefore come to a scenario change. However, since the second scenario does not take into account the increased power generation of the photovoltaic system during the morning due to the sky devoid of the assumption of the second scenario, the control will deviate from an optimal solution based on the actual reality but not previously calculated. In order to obtain an improved approximate solution even in such cases, the two or more different scenarios, which are determined as being closest at different points in time, can be reconciled with one another. For this purpose, the respectively closest scenario can be determined, for example by comparing the disturbance and the associated states, for example an associated state of charge of an energy store of the building infrastructure, and by means of the inverse base matrix of the scenarios being reconciled by the control unit or aligned with one another. For this purpose, already simple mathematical operations can advantageously be sufficient, which in their complexity or their claim do not go beyond matrix-vector multiplications and are accordingly executable by the control unit. In other words, the mechanism described above in connection with other embodiments of the invention can be applied not only to the set values, but also to the states or the input. Thus, in spite of the use of an approximate solution in more different situations, the respectively predetermined target can advantageously be improved, that is to say with less deviation, realized or achieved.

Neben dem erfindungsgemäßen Verfahren betrifft ein weiterer Aspekt der vorliegenden Erfindung ein Gebäudeautomationssystem. Das erfindungsgemäße Gebäudeautomationssystem umfasst dabei jeweils mindestens eine steuerbare Betriebseinrichtung, eine lokale Steuereinheit und eine Messeinrichtung. Die Steuereinheit ist dabei dazu eingerichtet, eine approximative Lösung eines wenigstens einen Betriebsprozess der Betriebseinrichtung beschreibenden modellprädiktiven Regelungsproblems zu berechnen. Diese approximative Lösung wird dabei berechnet in Abhängigkeit von bereitgestellten, eine optimale Lösung des modellprädiktiven Regelungsproblems beschreibenden Lösungsdaten, in Abhängigkeit von bereitgestellten, für die optimale Lösung verwendeten Parametern und in Abhängigkeit von einem mittels der Messeinrichtung erfassten aktuellen Messwert zumindest eines dieser Parameter, dessen für die optimale Lösung verwendeter Wert von dem aktuellen Messwert abweicht. Die Steuereinheit ist zudem dazu eingerichtet, die mindestens eine Betriebseinrichtung gemäß der derart berechneten approximativen Lösung zu steuern. Die Lösungsdaten und gegebenenfalls die verwendeten Parameter können insbesondere von einer Recheneinrichtung bereitgestellt werden, welche Teil des Gebäudeautomationssystem oder von diesem separat sein kann. Ebenso kann die Steuereinheit alternativ oder zusätzlich zum Steuern einer anderen Betriebseinrichtung des Gebäudeautomationssystems beziehungsweise des Gebäudes eingerichtet sein.In addition to the method according to the invention, another aspect of the present invention relates to a building automation system. In each case, the building automation system according to the invention comprises at least one controllable operating device, a local control unit and a measuring device. In this case, the control unit is set up to calculate an approximate solution of a model-predictive control problem describing at least one operating process of the operating device. This approximate solution is calculated as a function of provided solution data describing an optimal solution of the model predictive control problem Depending on provided parameters used for the optimal solution and depending on a detected by the measuring device current measurement at least one of these parameters, the value used for the optimal solution deviates from the current measurement. The control unit is additionally configured to control the at least one operating device in accordance with the approximate solution calculated in this way. The solution data and optionally the parameters used can be provided, in particular, by a computing device which may be part of or separate from the building automation system. Likewise, the control unit may alternatively or additionally be arranged for controlling another operating device of the building automation system or of the building.

Die bisher und im Folgenden beschriebenen Ausgestaltungen und die jeweiligen Vorteile des erfindungsgemäßen Verfahrens und des erfindungsgemäßen Gebäudeautomationssystems sind jeweils wechselseitig sinngemäß zwischen dem Verfahren und dem Gebäudeautomationssystem übertragbar beziehungsweise austauschbar. Dies gilt insbesondere auch für zum Durchführen des erfindungsgemäßen Verfahrens verwendete oder verwendbare Bauteile und Einrichtungen. Zu der Erfindung gehören also auch Weiterbildungen aller Aspekte der Erfindung, die Merkmale und Vorteile aufweisen, wie sie im Zusammenhang mit nur einem oder einigen der Aspekte beschrieben worden sind. Aus diesem Grund sind nicht alle entsprechenden Weiterbildungen aller Aspekte der vorliegenden Erfindung in allen Kombinationen explizit beschrieben.The embodiments described above and below and the respective advantages of the method according to the invention and of the building automation system according to the invention are each mutually mutually transferable or exchangeable between the method and the building automation system. This applies in particular also to components or devices used or to be used for carrying out the method according to the invention. Thus, the invention also includes developments of all aspects of the invention having features and advantages as described in connection with only one or some of the aspects. For this reason, not all corresponding developments of all aspects of the present invention are explicitly described in all combinations.

Weitere Vorteile, Merkmale und Einzelheiten der Erfindung ergeben sich aus der nachfolgenden Beschreibung bevorzugter Ausführungsbeispiele der Erfindung sowie anhand der Zeichnungen. Die vorstehend in der Beschreibung genannten Merkmale und Merkmalskombinationen sowie die nachfolgend in der Figurenbeschreibung genannten und/oder in den FIG alleine gezeigten Merkmale und Merkmalskombinationen sind nicht nur in der jeweils angegebenen Kombination, sondern auch in anderen Kombinationen oder in Alleinstellung verwendbar, ohne den Rahmen der Erfindung zu verlassen.Further advantages, features and details of the invention will become apparent from the following description of preferred embodiments of the invention and from the drawings. The features and combinations of features mentioned above in the description as well as the features and feature combinations mentioned below in the description of the figures and / or shown alone in the figures can be used not only in the respectively indicated combination but also in other combinations or in isolation, without the scope of To leave invention.

Ausführungsbeispiele der Erfindung werden nachfolgend anhand schematischer Zeichnungen erläutert. Es zeigen:

  • 1 eine schematische Darstellung eines Gebäudes mit einem Gebäudeautomationssystem sowie einer separaten Recheneinrichtung; und
  • 2 einen schematischen Ablaufplan eines Verfahrens zum Steuern mindestens einer Betriebseinrichtung eines Gebäudes.
Embodiments of the invention are explained below with reference to schematic drawings. Show it:
  • 1 a schematic representation of a building with a building automation system and a separate computing device; and
  • 2 a schematic flowchart of a method for controlling at least one operating device of a building.

Bei den im Folgenden erläuterten Ausführungsbeispielen handelt es sich um bevorzugte Ausführungsformen der Erfindung. Bei den Ausführungsbeispielen stellen die beschriebenen Komponenten der Ausführungsformen jeweils einzelne, unabhängig voneinander zu betrachtende Merkmale der Erfindung dar, welche die Erfindung jeweils auch unabhängig voneinander weiterbilden und damit auch einzeln oder in einer anderen als der gezeigten Kombination als Bestandteil der Erfindung anzusehen sind. Des Weiteren sind die beschriebenen Ausführungsformen auch durch weitere der bereits beschriebenen Merkmale der Erfindung ergänzbar.The exemplary embodiments explained below are preferred embodiments of the invention. In the exemplary embodiments, the described components of the embodiments each represent individual features of the invention, which are to be considered independently of one another, which each further develop the invention independently of one another and thus also individually or in a different combination than the one shown as part of the invention. Furthermore, the described embodiments can also be supplemented by further features of the invention already described.

1 zeigt eine schematische Darstellung eines Gebäudes 1 mit einem gebäudeeigenen Gebäudeautomationssystem 2. Das Gebäude 1 ist über einen Netzanschluss 3 an ein externes Versorgungsnetz 4, beispielsweise an ein öffentliches Elektrizitätsnetz, angeschlossen. Weiterhin dargestellt ist eine von dem Gebäude 1 separate Servereinrichtung, bei der es sich vorliegend um einen Cloud-Server 5 handelt. Das Gebäude 1 beziehungsweise das Gebäudeautomationssystem 2 und der Cloud-Server 5 sind zumindest zeitweise über eine kabelgebundene oder kabellose Datenverbindung 6 miteinander verbunden. 1 shows a schematic representation of a building 1 with a building's own building automation system 2 , The building 1 is via a network connection 3 to an external supply network 4 , for example to a public electricity network. Also shown is one of the building 1 separate server device, which in the present case is a cloud server 5 is. The building 1 or the building automation system 2 and the cloud server 5 are at least temporarily via a wired or wireless data connection 6 connected with each other.

Das Gebäudeautomationssystem 2 umfasst vorliegend mehrere Betriebseinrichtungen 7, welche also auch Teil des Gebäudes 1 sind. Zu diesen Betriebseinrichtungen 7 zählen ein, insbesondere elektrischer, Verbraucher 8, welcher hier eine Grundlast des Gebäudes 1 repräsentiert, eine Ladestation 9 für Elektrofahrzeuge, eine Photovoltaikanlage 10 und eine Batterie 11. Diese Betriebseinrichtungen 7 sind hier beispielhaft an ein Leitungssystem 12 angeschlossen und so letztlich auch miteinander verbunden. Das Leitungssystem 12 kann dabei sowohl zur Übertragung oder Weiterleitung von Energie als auch zur Übermittlung von Daten dienen. Solche über das Leitungssystem 12 übermittelten Daten können beispielsweise Steuersignale, Zustandsmeldungen, Messwerte oder dergleichen umfassen.The building automation system 2 in the present case comprises a plurality of operating devices 7 which also forms part of the building 1 are. To these operating facilities 7 include, in particular electrical, consumer 8th , which is a basic load of the building 1 represents a charging station 9 for electric vehicles, a photovoltaic system 10 and a battery 11 , These operating facilities 7 Here are an example of a line system 12 connected and so ultimately connected. The pipe system 12 can serve both for the transmission or transmission of energy as well as for the transmission of data. Such over the pipe system 12 transmitted data may include, for example, control signals, status messages, measured values or the like.

Die Ladestation 9 kann beispielhaft eine steuerbare Last repräsentieren, die Photovoltaikanlage 10 kann beispielhaft eine gebäudeeigene Energieerzeugung repräsentieren und die Batterie 11 kann beispielhaft einen auf- und entladbaren Energiespeicher repräsentieren.The charging station 9 may exemplify a controllable load, the photovoltaic system 10 can exemplify a building's own power generation and the battery 11 may exemplify a charge and discharge energy storage.

Vorliegend weist jede der Betriebseinrichtungen 7 eine jeweilige Steuereinheit 13 auf, bei der es sich beispielsweise um einen einfachen Controller zur Steuerung einer jeweiligen Funktionalität beziehungsweise eines jeweiligen Betriebs oder Betriebsprozesses der jeweiligen Betriebseinrichtung 7 handeln kann. Die Steuereinheiten 13 können dabei insbesondere gegenüber dem Cloud-Server 5 geringere Rechenkapazitäten und/oder Fähigkeiten, also Funktionsumfänge, aufweisen. So können die Steuereinheiten 13 beispielsweise zur Verarbeitung eines spezialisierten Controllercodes ausgelegt und nicht in der Lage sein, beispielsweise beliebige, in einer höheren Programmiersprache wie etwa C oder C++ geschriebene Softwareprogramme auszuführen. Jede der Steuereinheiten 13 kann zum Steuern der jeweiligen Betriebseinrichtung 7 eingerichtet sein, an oder in welcher sie angeordnet ist. Ebenso kann wenigstens eine der Steuereinheiten 13 zum Steuern mehrerer der Betriebseinrichtungen 7 eingerichtet sein. Anders als hier dargestellt kann das Gebäudeautomationssystem 2 also beispielsweise nur eine Steuereinheit 13 oder weniger Steuereinheiten 13 als Betriebseinrichtungen 7 aufweisen.In the present case, each of the operating equipment points 7 a respective control unit 13 This is, for example, a simple controller for controlling a respective functionality or a respective operation or operating process of the respective operating device 7 can act. The control units 13 can do this especially against the cloud server 5 lower Computing capacities and / or capabilities, ie functional scopes have. So can the control units 13 For example, it may be configured to process a specialized controller code and may not be capable of executing, for example, any software programs written in a high-level programming language such as C or C ++. Each of the control units 13 can for controlling the respective operating device 7 be set up, at or in which it is arranged. Likewise, at least one of the control units 13 for controlling several of the operating devices 7 be furnished. Other than shown here, the building automation system 2 So for example only one control unit 13 or fewer control units 13 as operating equipment 7 exhibit.

Das Gebäudeautomationssystem 2, die Betriebseinrichtungen 7, das Leitungssystem 12 und weitere Elemente, wie etwa hier nicht dargestellte Messeinrichtungen, können gemeinsam als Infrastruktur des Gebäudes 1 bezeichnet werden.The building automation system 2 , the operating equipment 7 , the pipe system 12 and other elements, such as measuring devices, not shown here, can together as the infrastructure of the building 1 be designated.

2 zeigt einen schematischen Ablaufplan 14 eines Verfahrens zum Steuern der Betriebseinrichtungen 7 des Gebäudes 1. 2 shows a schematic flowchart 14 a method for controlling the operating equipment 7 of the building 1 ,

Im Folgenden werden 1 und 2 gemeinsam näher erläutert.The following will be 1 and 2 explained in more detail together.

In einem Verfahrensschritt S1 wird das Verfahren gestartet. Dazu kann beispielsweise eine Installation des Gebäudeautomationssystems 2 in dem Gebäude 1 vorgenommen beziehungsweise abgeschlossen und das Gebäudeautomationssystem 2 in Betrieb genommen werden. Ebenso kann beispielsweise ein Satz von Parametern vorgegeben werden, welche bei dem Steuern der Betriebseinrichtungen 7 berücksichtigt werden sollen. Derartige Parameter können beispielsweise technische Eigenschaften der Betriebseinrichtungen 7, jeweilige Messwerte beziehungsweise Zustände, einen prognostizierten Lastverlauf des Gebäudeautomationssystems 2 beziehungsweise des Gebäudes 1, eine Wettervorhersage und/oder dergleichen mehr umfassen. Ebenso kann eine Zielsetzung vorgegeben werden, hinsichtlich welcher der Betrieb des Gebäudeautomationssystems 2 durch entsprechende Steuerung der Betriebseinrichtungen 7 optimiert werden soll.In one process step S1 the procedure is started. For example, an installation of the building automation system 2 in the building 1 completed or completed and the building automation system 2 be put into operation. Likewise, for example, a set of parameters can be specified, which in the control of the operating equipment 7 should be taken into account. Such parameters may, for example, technical characteristics of the operating equipment 7 , respective measured values or states, a predicted load curve of the building automation system 2 or the building 1 , a weather forecast and / or the like more. Likewise, an objective can be specified with regard to which the operation of the building automation system 2 by appropriate control of the operating equipment 7 to be optimized.

Um einen derartigen optimierten beziehungsweise optimalen Betrieb zu ermöglichen, ist also ein komplexes Optimierungsproblem, insbesondere ein modellprädiktives Regelungsproblem (MPC-Problem), zu lösen. Da die Berechnung einer optimalen Lösung dieses MPC-Problems rechenaufwendig ist, wird die optimale Lösung in einem Verfahrensschritts S2 unter Berücksichtigung der vorgegebenen Parameter mittels des Cloud-Servers 5 berechnet. Dabei beziehungsweise davor können mittels des Cloud-Servers 5 auch eine oder mehrere bei der Berechnung der optimalen Lösung zu verwendende Vorhersagen berechnet werden. Dazu können beispielsweise einen historischen oder bisherigen Lastgang des Gebäudes 1 beschreibende Daten bereitgestellt werden.In order to enable such optimized or optimal operation, therefore, a complex optimization problem, in particular a model-predictive control problem (MPC problem), is to be solved. Since the calculation of an optimal solution to this MPC problem is computation-intensive, the optimal solution becomes in one process step S2 taking into account the specified parameters by means of the cloud server 5 calculated. In the process, or before, by means of the cloud server 5 also calculate one or more predictions to be used in the calculation of the optimal solution. This can be, for example, a historical or previous load profile of the building 1 descriptive data are provided.

Als Ergebnis der Berechnung der optimalen Lösung des MPC-Problems ergeben sich Sollwerte für die einzelnen Betriebseinrichtungen 7 und eine Lösungs- beziehungsweise Basismatrix, welche Lösungsdaten enthält, die die optimale Lösung beschreiben beziehungsweise charakterisieren. Durch die Basismatrix können Eingangswerte, also ein Input, überführt werden in die für den optimalen Betrieb des Gebäudeautomationssystems 2 vorgesehene beziehungsweise zu erreichende oder einzustellende Sollwerte. Aufgrund ihres begrenzten Funktionsumfangs und ihrer begrenzten Rechenkapazitäten können die Steuereinheiten 13 dieses MPC-Problem nicht lösen und somit die optimale Lösung nicht berechnen.As a result of calculating the optimal solution of the MPC problem, setpoints for the individual operating devices result 7 and a solution or base matrix containing solution data describing or characterizing the optimal solution. The basic matrix allows input values, ie an input, to be converted into those for optimum operation of the building automation system 2 provided or to be reached or set target values. Due to their limited functionality and their limited computing capacity, the control units 13 do not solve this MPC problem and therefore do not calculate the optimal solution.

Ebenso können mittels des Cloud-Servers 5 beispielsweise mehrere optimale Lösungen für verschiedene Werte der Eingangsgrößen, beispielsweise für unterschiedliche Wetterentwicklungen, berechnet werden.Likewise, by means of the cloud server 5 For example, several optimal solutions for different values of the input variables, for example for different weather developments, are calculated.

Problematisch ist, dass für die optimale Lösung Zukunftsprognosen verwendet werden, welche stets mit einer Unsicherheit behaftet sind. Ein weiteres Problem kann sein, dass der Cloud-Server 5 und/oder die Datenverbindung 6 nicht permanent für Neuberechnungen oder Aktualisierungen der optimalen Lösung beziehungsweise zum Übertragen von Daten verfügbar sind.The problem is that future forecasts are used for the optimal solution, which are always subject to uncertainty. Another problem may be that the cloud server 5 and / or the data connection 6 are not permanently available for recalculations or updates of the optimal solution or for transferring data.

Um dennoch einen relativ nahe an dem durch die optimale Lösung beschriebenen Optimum liegenden Betrieb des Gebäudeautomationssystems 2 unter diesen Bedingungen zu ermöglichen, sollen vorliegend die Betriebseinrichtungen 7 derart gesteuert werden, dass der optimale Betrieb zumindest approximiert wird.Nevertheless, a relatively close to the optimum described by the optimum solution operation of the building automation system 2 In this case, the operating equipment should be provided under these conditions 7 be controlled so that the optimal operation is at least approximated.

Dazu ist es vorgesehen, dass in einem Verfahrensschritts S3 wenigstens ein Teil der vorgegebenen Parameter und wenigstens ein Teil der die optimale Lösung beziehungsweise die optimalen Lösungen beschreibenden Lösungsdaten, das heißt also die jeweilige Basismatrix oder ein Teil der jeweiligen Basismatrix, von dem Cloud-Server 5 zu den Steuereinheiten 13 übertragen werden.For this it is envisaged that in a procedural step S3 at least a part of the predetermined parameters and at least a part of the solution data describing the optimal solution or the optimal solutions, that is to say the respective base matrix or a part of the respective base matrix, from the cloud server 5 to the control units 13 be transmitted.

In einem Verfahrensschritt S4 wird mittels einer hier nicht dargestellten Messeinrichtung, beispielsweise eines Sensors, der ebenfalls Teil des Gebäudeautomationssystems 2 sein kann, ein aktueller Messwert eines der Parameter erfasst. Beispielsweise kann als aktueller Messwert eine aktuelle Leistungsabgabe der Photovoltaikanlage 10 gemessen werden, wobei der aktuelle Messwert von dem bei der Berechnung der optimalen Lösung angenommenen Wert für die Energieerzeugung der Photovoltaikanlage 10 zum Zeitpunkt der Erfassung des aktuellen Messwerts abweichen kann. Da beispielsweise kontinuierlich oder in vorgegebenen Zeitabständen wiederholt derartige Messwerte erfasst werden können, kann der Verfahrensschritt S4 beispielsweise vor oder nach oder parallel zu dem Verfahrensschritt S3 durchgeführt werden.In one process step S4 is by means of a measuring device, not shown here, for example, a sensor, which is also part of the building automation system 2 may be a current reading of one of the parameters detected. For example, as the current measured value, a current power output of the photovoltaic system 10 measured, the current measured value of the assumed for the calculation of the optimal solution value for the power generation of the photovoltaic system 10 may deviate at the time of acquisition of the current measured value. For example, since such measured values can be recorded repeatedly continuously or at predetermined time intervals, the method step can be detected S4 for example, before or after or parallel to the method step S3 be performed.

Im einfachsten Fall könnten die Steuereinheiten 13 nun die Betriebseinrichtungen 7 gemäß der auf dem Cloud-Server 5 berechneten optimalen Lösung steuern. Dabei kann jedoch nicht auf Störungen, wie sie im vorliegenden Beispiel durch die Abweichung zwischen dem aktuellen Messwert und dem unterdessen angenommenen Wert gegeben ist, durch die Steuereinheiten 13 reagiert werden. Ist beispielsweise die gemessene Energieerzeugung durch die Photovoltaikanlage 10 geringer als der angenommene oder vorhergesagte Wert, so könnte eine optimale Reaktion auf diese Störung darin liegen, den sich daraus ergebenden Energiemangel zum Teil durch einen erhöhten Energiebezug aus dem Versorgungsnetz 4 und zum Teil durch einen angepassten Betrieb der Batterie 11 auszugleichen. So könnte beispielsweise die Batterie 11 zunächst für eine gewisse Zeit stärker belastet beziehungsweise entladen und während eines späteren Zeitraums zum Ausgleich wieder aufgeladen werden. Eine optimale Steuerung kann hierbei beispielsweise bei dynamischen, beispielsweise über einen Tagesverlauf variierenden Energiepreisen und bei Vorgabe einer Energiekosten Minimierung als Ziel eine Kosten optimale Steuerung des Gebäudeautomationssystems 2 ermöglichen beziehungsweise angeben.In the simplest case, the control units could 13 now the operating equipment 7 according to the on the cloud server 5 control calculated optimal solution. However, it is not possible for the control units to respond to disturbances, as in the present example by the deviation between the current measured value and the value assumed in the meantime 13 be reacted. For example, is the measured energy production by the photovoltaic system 10 less than the assumed or predicted value, an optimal response to this disturbance could lie therein, the resulting lack of energy in part due to an increased energy supply from the supply network 4 and partly by a customized operation of the battery 11 compensate. For example, the battery could 11 initially charged or discharged for a certain period of time and recharged during a later period to compensate. In this case, optimal control can be achieved, for example, in the case of dynamic, for example energy prices varying over a course of the day, and if energy cost minimization is specified as the goal, a cost optimal control of the building automation system 2 allow or specify.

In einem Verfahrensschritt S5 wird - sofern mehrere unterschiedliche optimale Lösungen für unterschiedliche Situationen oder Szenarien berechnet wurden - durch Vergleich des aktuellen Messwert mit den übertragenen Daten durch zumindest eine der Steuereinheiten 13 ermittelt, welches der berechneten Szenarien, das heißt welche der berechneten optimalen Lösungen, der durch den aktuellen Messwert beschriebenen tatsächlichen Situation am nächsten kommt. Dieses Szenario wird dann zur weiteren Verwendung ausgewählt.In one process step S5 If several different optimal solutions have been calculated for different situations or scenarios, this is done by comparing the current measured value with the transmitted data through at least one of the control units 13 Determines which of the calculated scenarios, that is, which of the calculated optimal solutions, comes closest to the actual situation described by the current measurement. This scenario is then selected for further use.

In einem Verfahrensschritt S6 wird dann durch zumindest eine der Steuereinheiten 13 auf Basis der übertragenen Lösungsdaten und des aktuellen Messwertes eine approximative Lösung des MPC-Problems berechnet. Dazu kann beispielsweise die Basismatrix der ausgewählten optimalen Lösung auf gemäß dem aktuellen Messwert modifizierte Eingangsdaten angewendet werden, sodass die sich daraus ergebende approximative Lösung beziehungsweise ein Satz entsprechender approximativer Sollwerte durch eine gegenüber der vollständigen optimalen Lösung des MPC-Problems deutlich einfachere Matrix-Vektor-Multiplikation berechnet werden kann.In one process step S6 is then through at least one of the control units 13 calculated on the basis of the transmitted solution data and the current measured value an approximate solution of the MPC problem. For this purpose, for example, the base matrix of the selected optimal solution can be applied to input data modified according to the current measured value, so that the resulting approximate solution or a set of corresponding approximate nominal values is significantly simpler than matrix-vector multiplication compared to the complete optimal solution of the MPC problem can be calculated.

In einem Verfahrensschritt S7 werden dann einige oder alle der Betriebseinrichtungen 7 gemäß der approximativen Lösung gesteuert. Dabei wird also von der optimalen Lösung und den dafür verwendeten Annahmen oder Eingangsdaten ausgegangen und eine Abweichung oder Störung gegenüber diesen Annahmen durch eine entsprechende Modifikation berücksichtigt. Somit kann sich insbesondere bei geringfügigen Abweichungen zwischen dem aktuellen Messwert und dem stattdessen bei der Berechnung der optimalen Lösung angenommenen Wert ein approximativ optimaler Betrieb des Gebäudeautomationssystems 2 ergeben beziehungsweise einstellen. Dieser ermöglicht insbesondere eine gegenüber einer herkömmlichen einfachen Regelung signifikant bessere Ergebnisse im Sinne des jeweils vorgegebenen Ziels.In one process step S7 then some or all of the operating equipment 7 controlled according to the approximate solution. In this case, the optimum solution and the assumptions or input data used for this purpose are assumed and a deviation or disturbance from these assumptions is taken into account by a corresponding modification. Thus, in particular with slight deviations between the current measured value and the value assumed instead in the calculation of the optimal solution, an approximately optimal operation of the building automation system can be achieved 2 surrender or discontinue. In particular, this allows significantly better results in the sense of the respectively specified objective compared to a conventional simple control.

Bei einer herkömmlichen einfachen Regelung werden beispielsweise keine wechselseitigen Abhängigkeiten oder Beeinflussungen zwischen den einzelnen Betriebseinrichtungen 7 und auch gegebenenfalls keine externen Faktoren, wie beispielsweise dynamische Energiepreise, berücksichtigt. Stattdessen kann bei den herkömmlich oftmals verwendeten einfachen Regelungen beispielsweise jede der Steuereinheiten 13 die ihr zugeordnete Betriebseinrichtung 7 unabhängig, etwa mittels eines PI-Reglers, nach einem einzigen Kriterium steuern. Im Gegensatz dazu werden durch die vorliegend verwendete approximative Lösung weiterhin die komplexen Abhängigkeiten innerhalb des Gebäudeautomationssystems 2 sowie die externen Einflussgrößen wie beispielsweise die dynamischen Energiepreise und eine für das gesamte Gebäude 1 beziehungsweise das gesamte Gebäudeautomationssystem 2 geltende Zielsetzung - zumindest approximativ - berücksichtigt.In a conventional simple control, for example, no interdependencies or influences between the individual operating equipment 7 and may also not take into account external factors, such as dynamic energy prices. Instead, in the conventional often used simple regulations, for example, each of the control units 13 the operating equipment assigned to it 7 independently, for example by means of a PI controller, according to a single criterion. In contrast, the approximate solution used herein continues to make the complex dependencies within the building automation system 2 as well as the external factors such as the dynamic energy prices and one for the entire building 1 or the entire building automation system 2 valid objective - at least approximately - taken into account.

Zumindest einige der beschriebenen Verfahrensschritte können in einer Schleife beziehungsweise kontinuierlich oder regelmäßig wiederholt durchlaufen werden, was hier durch einen Verfahrensschritt S8 angedeutet ist. So kann beispielsweise der Verfahrensschritt S2 einmal pro Tag durchgeführt werden. Insbesondere die Verfahrensschritte S4 bis S7 können beispielsweise jedoch auch untertägig mehrfach oder vielfach wiederholt durchlaufen werden, um beispielsweise auf Veränderungen eines oder mehrerer Messwerte beziehungsweise anhand jeweils aktueller Messwerte ermittelte Abweichungen gegenüber den für die optimale Lösung angenommenen Werten besonders zeitnah zu reagieren.At least some of the method steps described can be repeated in a loop or continuously or regularly, which here by a method step S8 is indicated. For example, the process step S2 be done once a day. In particular, the process steps S4 to S7 However, for example, they can also be repeated several times or multiple times during the day in order, for example, to respond to changes in one or more measured values or deviations from the values assumed for the optimum solution in a particularly timely manner on the basis of current measured values.

Durch das beschriebene Verfahren kann, insbesondere nachdem zumindest einmalig die Übertragung von dem Cloud-Server 5 zu mindestens einer der Steuereinheiten 13 erfolgt ist, beispielsweise auch bei einem Abbruch oder einer Unterbrechung der Kommunikations- beziehungsweise Datenverbindung 6 das Gebäudeautomationssystem 2 beziehungsweise die Gebäudeinfrastruktur mit gebäudeeigenen Mitteln weiter im Sinne der vorgegebenen Zielsetzung, beispielsweise approximativ kostenoptimal, gesteuert beziehungsweise betrieben werden. Somit wird also eine verbesserte Robustheit des Gebäudeautomationssystems 2 erreicht beziehungsweise ein robusterer Betrieb des Gebäudeautomationssystems 2 beziehungsweise des Gebäudes 1 ermöglicht. So kann beispielsweise eine sehr kostengünstige Energiemanagement-Lösung realisiert werden, welche lediglich einen einfachen Controller und eine gelegentliche Verbindung zu einem Cloud-Rechenservice benötigt.The method described may, in particular after at least one-time transmission from the cloud server 5 to at least one of the control units 13 takes place, for example, in the case of an abort or interruption of the communication or data connection 6 the building automation system 2 or the building infrastructure with building's own funds further in terms of the specified objective, for example, approximately cost optimal, controlled or operated. Thus, therefore, an improved robustness of the building automation system 2 achieved or a more robust operation of the building automation system 2 or the building 1 allows. For example, a very cost-effective energy management solution can be realized, which only requires a simple controller and an occasional connection to a cloud computing service.

Claims (10)

Verfahren (14) zum Steuern mindestens einer Betriebseinrichtung (7) eines Gebäudes (1) mit den Verfahrensschritten - Berechnen (S2) einer optimalen Lösung eines mindestens einen Betriebsprozess der Betriebseinrichtung (7) beschreibenden modellprädiktiven Regelungsproblems in Abhängigkeit von vorgegebenen Parametern mittels einer Recheneinrichtung (5), - Übertragen (S3) wenigstens eines Teils der vorgegebenen Parameter und wenigstens eines Teils von die optimale Lösung beschreibenden Lösungsdaten von der Recheneinrichtung (5) zu einer lokalen Steuereinheit (13) des Gebäudes (1), - Erfassen wenigstens eines aktuellen Messwertes wenigstens eines der Parameter, dessen beim Berechnen (S2) der optimalen Lösung verwendeter Wert von dem aktuellen Messwert abweicht, - Berechnen (S6) einer approximativen Lösung des modellprädiktiven Regelungsproblems mittels der Steuereinheit (13) anhand der übertragenen Lösungsdaten und des aktuellen Messwertes, und - Steuern (S7) der Betriebseinrichtung (7) gemäß der approximativen Lösung.Method (14) for controlling at least one operating device (7) of a building (1) with the method steps Calculating (S2) an optimal solution of a model-predictive control problem describing at least one operating process of the operating device (7) as a function of predetermined parameters by means of a computing device (5), Transferring (S3) at least part of the predetermined parameters and at least part of solution data describing the optimal solution from the computing device (5) to a local control unit (13) of the building (1), Detecting at least one of the current measured values of at least one of the parameters whose value used in calculating (S2) of the optimal solution deviates from the current measured value, Calculating (S6) an approximate solution of the model-predictive control problem by means of the control unit (13) on the basis of the transmitted solution data and the current measured value, and - Controlling (S7) of the operating device (7) according to the approximate solution. Verfahren (14) nach Anspruch 1, dadurch gekennzeichnet, dass die vorgegebenen Parameter einen Zustand der Betriebseinrichtung (7), ein durch die optimale Lösung zu realisierendes Ziel sowie eine Prognose für ein Lastprofil und/oder eine Energieerzeugung des Gebäudes (1) umfassen.Method (14) according to Claim 1 , characterized in that the predetermined parameters comprise a state of the operating device (7), a target to be realized by the optimal solution and a prognosis for a load profile and / or an energy generation of the building (1). Verfahren (14) nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass von der Recheneinrichtung (5) zu der Steuereinheit (13) wenigstens ein beim Berechnen (S2) der optimalen Lösung verwendeter Zustand der Betriebseinrichtung (7) und wenigstens ein dazu korrespondierender, beim Berechnen (S2) der optimalen Lösung ermittelter Sollwert übertragen werden.Method (14) according to one of the preceding claims, characterized in that from the computing device (5) to the control unit (13) at least one state of the operating device (7) used in the calculation (S2) of the optimal solution and at least one corresponding thereto Calculate (S2) of the optimum solution determined setpoint. Verfahren (14) nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die optimale Lösung darstellbar ist als x = A B 1 b
Figure DE102017206299A1_0040
wobei der Vektor x
Figure DE102017206299A1_0041
wenigstens einen beim Berechnen (S2) der optimalen Lösung ermittelten Sollwert enthält, der Vektor b
Figure DE102017206299A1_0042
die vorgegebenen Parameter enthält und A B 1
Figure DE102017206299A1_0043
eine als inverse Basismatrix bezeichnete Matrix ist, welche die Lösungsdaten enthält.
Method (14) according to one of the preceding claims, characterized in that the optimal solution can be represented as x = A B - 1 b
Figure DE102017206299A1_0040
being the vector x
Figure DE102017206299A1_0041
contains at least one setpoint determined during the calculation (S2) of the optimal solution, the vector b
Figure DE102017206299A1_0042
contains the given parameters and A B - 1
Figure DE102017206299A1_0043
is a matrix called inverse base matrix containing the solution data.
Verfahren (14) nach Anspruch 4, dadurch gekennzeichnet, dass - von der Recheneinrichtung (5) zu der Steuereinheit (13) als Lösungsdaten die inverse Basismatrix A B 1
Figure DE102017206299A1_0044
übertragen wird, und - die approximative Lösung berechnet wird durch Matrix-Vektor-Multiplikation der inversen Basismatrix A B 1
Figure DE102017206299A1_0045
mit einem Vektor b ˜ ,
Figure DE102017206299A1_0046
welcher gebildet ist aus dem gemäß dem aktuellen Messwert modifizierten Vektor b .
Figure DE102017206299A1_0047
Method (14) according to Claim 4 , characterized in that - from the computing device (5) to the control unit (13) as solution data, the inverse base matrix A B - 1
Figure DE102017206299A1_0044
and the approximate solution is calculated by matrix-vector multiplication of the inverse base matrix A B - 1
Figure DE102017206299A1_0045
with a vector b ~ .
Figure DE102017206299A1_0046
which is formed from the vector modified according to the current measured value b ,
Figure DE102017206299A1_0047
Verfahren (14) nach Anspruch 4, dadurch gekennzeichnet, dass von der Recheneinrichtung (5) zu der (13) Steuereinheit als Lösungsdaten nur zu dem durch den aktuellen Messwert beschriebenen Parameter korrespondierende Spalten der inversen Basismatrix A B 1
Figure DE102017206299A1_0048
übertragen werden.
Method (14) according to Claim 4 , characterized in that from the computing device (5) to the (13) control unit as solution data only columns of the inverse base matrix corresponding to the parameter described by the current measured value A B - 1
Figure DE102017206299A1_0048
be transmitted.
Verfahren (14) nach Anspruch 4, dadurch gekennzeichnet, dass von der Recheneinrichtung (5) zu der Steuereinheit (13) als Lösungsdaten nur solche Einträge der inversen Basismatrix A B 1
Figure DE102017206299A1_0049
übertragen werden, die aufgrund ihrer Zeilennummer zu einem durch das Steuern zu erreichenden Sollwert und durch ihre Spaltennummer zu dem durch den aktuellen Messwert beschriebenen Parameter korrespondieren.
Method (14) according to Claim 4 , characterized in that from the computing device (5) to the control unit (13) as solution data only those entries of the inverse base matrix A B - 1
Figure DE102017206299A1_0049
are transmitted, which correspond due to their line number to a setpoint to be achieved by the control and by their column number to the parameter described by the current measured value.
Verfahren (13) nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass - durch die Recheneinrichtung (5) eine jeweilige optimale Lösung für mehrere Szenarien mit jeweils unterschiedlichen Prognosen, insbesondere für ein Lastprofil und/oder für eine Energieerzeugung der Betriebseinrichtung und/oder des Gebäudes (1), berechnet werden, - von der Recheneinrichtung (5) zu der Steuereinheit (13) zu mehreren der Szenarien korrespondierende Parameter und Lösungsdaten übertragen werden, und - durch die Steuereinheit (13) durch Vergleich mit dem aktuellen Messwert das diesem nächstliegende Szenario ermittelt und die approximative Lösung auf Basis dieses Szenarios berechnet wird.Method (13) according to one of the preceding claims, characterized in that - by the computing device (5) a respective optimal solution for several scenarios, each with different forecasts, in particular for a load profile and / or for power generation of the operating device and / or the building (1), - from the computing device (5) to the control unit (13) to a plurality of the scenarios corresponding parameters and solution data are transmitted, and - determined by the control unit (13) by comparison with the current measured value, the closest this scenario and the approximate solution is calculated on the basis of this scenario. Verfahren (14) nach Anspruch 8, dadurch gekennzeichnet, dass - in einem zeitlichen Abstand zueinander wenigstens zwei jeweils aktuelle Messwerte erfasst werden, welche jeweils unterschiedlichen Szenarien am nächsten liegen, - diese Szenarien durch die Steuereinheit (13) zu einem kombinierten Szenario kombiniert werden, und - die approximative Lösung durch die Steuereinheit (13) anhand des kombinierten Szenarios berechnet wird.Method (14) according to Claim 8 , characterized in that - at least two respectively current measured values are detected at a time interval from each other, each of which is closest to different scenarios, - these scenarios are combined by the control unit (13) into a combined scenario, and - the approximate solution by the Control unit (13) is calculated based on the combined scenario. Gebäudeautomationssystem (2) mit jeweils mindestens einer steuerbaren Betriebseinrichtung (7), einer lokalen Steuereinheit (13) und einer Messeinrichtung, wobei die Steuereinheit (13) dazu eingerichtet ist - eine approximative Lösung eines wenigstens einen Betriebsprozess der Betriebseinrichtung (7) beschreibenden modellprädiktiven Regelungsproblems zu berechnen in Abhängigkeit von bereitgestellten eine optimale Lösung des modellprädiktiven Regelungsproblems beschreibenden Lösungsdaten, bereitgestellten für die optimale Lösung verwendeten Parametern und einem mittels der Messeinrichtung erfassten aktuellen Messwert eines der Parameter, dessen für die optimale Lösung verwendeter Wert von dem aktuellen Messwert abweicht, und - die mindestens eine Betriebseinrichtung (7) gemäß der approximativen Lösung zu steuern (S7).Building automation system (2) each having at least one controllable operating device (7), a local control unit (13) and a measuring device, wherein the control unit (13) is set up for this purpose to calculate an approximate solution of a model-predictive control problem describing at least one operating process of the operating device as a function of provided solution data describing an optimal solution of the model-predictive control problem, provided parameters used for the optimal solution and a current measured value of one of the parameters acquired by the measuring device, whose value used for the optimal solution deviates from the current measured value, and - To control the at least one operating device (7) according to the approximate solution (S7).
DE102017206299.1A 2017-04-12 2017-04-12 Method for controlling an operating device of a building and building automation system Pending DE102017206299A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102017206299.1A DE102017206299A1 (en) 2017-04-12 2017-04-12 Method for controlling an operating device of a building and building automation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102017206299.1A DE102017206299A1 (en) 2017-04-12 2017-04-12 Method for controlling an operating device of a building and building automation system

Publications (1)

Publication Number Publication Date
DE102017206299A1 true DE102017206299A1 (en) 2018-10-18

Family

ID=63678777

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102017206299.1A Pending DE102017206299A1 (en) 2017-04-12 2017-04-12 Method for controlling an operating device of a building and building automation system

Country Status (1)

Country Link
DE (1) DE102017206299A1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10341762A1 (en) * 2002-09-11 2004-04-15 Fisher-Rosemount Systems, Inc., Austin Handling the feasibility of restrictions and limits in an optimizer for process control systems
US20070233285A1 (en) * 2004-09-14 2007-10-04 Kakuya Yamamoto Apparatus Control System and Apparatus Control Method
US20140128998A1 (en) * 2012-11-05 2014-05-08 Rockwell Automation Technologies, Inc. Online integration of model-based optimization and model-less control

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10341762A1 (en) * 2002-09-11 2004-04-15 Fisher-Rosemount Systems, Inc., Austin Handling the feasibility of restrictions and limits in an optimizer for process control systems
US20070233285A1 (en) * 2004-09-14 2007-10-04 Kakuya Yamamoto Apparatus Control System and Apparatus Control Method
US20140128998A1 (en) * 2012-11-05 2014-05-08 Rockwell Automation Technologies, Inc. Online integration of model-based optimization and model-less control

Similar Documents

Publication Publication Date Title
EP3214718B1 (en) Method and system for operating a self-sufficient energy supply network
EP1074900B1 (en) Predictive device for controlling or regulating supply variables
DE102012212878A1 (en) Power system
EP3602229B1 (en) Method and device for internet-supported optimization of the parameters of heating control
EP2834573B1 (en) System for providing heat and operating method for such a system
DE112014002012T5 (en) Electric Vehicle Management System
DE102015206510A1 (en) Coordination of a power exchange between a consumer and a utility grid using energy demand / energy production forecasts
EP3161928B1 (en) Energy management system for controlling a device, computer software product, and method for controlling a device
WO2011092012A2 (en) Arrangement and method for optimizing the operation of a supply network
DE202008015537U1 (en) Decentralized energy efficiency through autonomous, self-organizing systems taking into account heterogeneous energy sources
EP4005861A1 (en) Method for planning a power exchange between a charge infrastructure and an electrical supply network
WO2007096377A1 (en) Model-based predictive regulation of a building energy system
EP3284152B1 (en) Energy transmission control between an energy supply network and end-user facilities on the basis of energy flow and network quality
WO2020043522A1 (en) Method for controlling an exchange of energy between energy sub-systems in adjusted harmonised conditions; control centre; energy system; computer program; and storage medium
DE102016225787A1 (en) Method of operating a building energy management system and energy management system
EP2577829B1 (en) Method and system for adapting a production flow schedule for a production process
DE102017206299A1 (en) Method for controlling an operating device of a building and building automation system
EP3719737A1 (en) Computer-based method for managing energy and energy management system
EP3664243B1 (en) Predictive planning in a micronetwork using high load time windows of a main power network
WO2023001531A1 (en) Method and device for estimating a departure time for use in an intelligent charging process of electric vehicles
EP3521947A1 (en) Energy management method
WO2020200569A1 (en) Coordination module, intelligent electricity meter, local energy market, energy system and method for operating an energy system
DE102008057751A1 (en) Device for controlling load bearing capacity of consumer in production system, has central computer for producing control signals for actuator and transmitting signals to actuator depending on measured values in secondary hierarchy region
WO2019096424A1 (en) Controlling microgrids
DE102023124038A1 (en) Method for operating an energy management system for buildings

Legal Events

Date Code Title Description
R163 Identified publications notified
R082 Change of representative

Representative=s name: MAIER, DANIEL OLIVER, DIPL.-ING. UNIV., DE

R012 Request for examination validly filed