DE102016203470B4 - Method for connecting a ball joint with a counterpart - Google Patents

Method for connecting a ball joint with a counterpart Download PDF

Info

Publication number
DE102016203470B4
DE102016203470B4 DE102016203470.7A DE102016203470A DE102016203470B4 DE 102016203470 B4 DE102016203470 B4 DE 102016203470B4 DE 102016203470 A DE102016203470 A DE 102016203470A DE 102016203470 B4 DE102016203470 B4 DE 102016203470B4
Authority
DE
Germany
Prior art keywords
joint
ball joint
ball
counterpart
bearing shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DE102016203470.7A
Other languages
German (de)
Other versions
DE102016203470A1 (en
Inventor
Christian Hoyer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZF Friedrichshafen AG
Original Assignee
ZF Friedrichshafen AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZF Friedrichshafen AG filed Critical ZF Friedrichshafen AG
Priority to DE102016203470.7A priority Critical patent/DE102016203470B4/en
Priority to PCT/EP2017/052208 priority patent/WO2017148644A1/en
Priority to EP17703711.6A priority patent/EP3423231A1/en
Publication of DE102016203470A1 publication Critical patent/DE102016203470A1/en
Application granted granted Critical
Publication of DE102016203470B4 publication Critical patent/DE102016203470B4/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P11/00Connecting or disconnecting metal parts or objects by metal-working techniques not otherwise provided for 
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60GVEHICLE SUSPENSION ARRANGEMENTS
    • B60G7/00Pivoted suspension arms; Accessories thereof
    • B60G7/005Ball joints
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C11/00Pivots; Pivotal connections
    • F16C11/04Pivotal connections
    • F16C11/06Ball-joints; Other joints having more than one degree of angular freedom, i.e. universal joints
    • F16C11/0614Ball-joints; Other joints having more than one degree of angular freedom, i.e. universal joints the female part of the joint being open on two sides
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P2700/00Indexing scheme relating to the articles being treated, e.g. manufactured, repaired, assembled, connected or other operations covered in the subgroups
    • B23P2700/11Joints, e.g. ball joints, universal joints
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60GVEHICLE SUSPENSION ARRANGEMENTS
    • B60G2204/00Indexing codes related to suspensions per se or to auxiliary parts
    • B60G2204/40Auxiliary suspension parts; Adjustment of suspensions
    • B60G2204/416Ball or spherical joints
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60GVEHICLE SUSPENSION ARRANGEMENTS
    • B60G2206/00Indexing codes related to the manufacturing of suspensions: constructional features, the materials used, procedures or tools
    • B60G2206/01Constructional features of suspension elements, e.g. arms, dampers, springs
    • B60G2206/10Constructional features of arms
    • B60G2206/11Constructional features of arms the arm being a radius or track or torque or steering rod or stabiliser end link
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B4/00Shrinkage connections, e.g. assembled with the parts at different temperature; Force fits; Non-releasable friction-grip fastenings
    • F16B4/006Shrinkage connections, e.g. assembled with the parts being at different temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C2226/00Joining parts; Fastening; Assembling or mounting parts
    • F16C2226/10Force connections, e.g. clamping
    • F16C2226/14Force connections, e.g. clamping by shrink fit, i.e. heating and shrinking part to allow assembly

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pivots And Pivotal Connections (AREA)

Abstract

Verfahren zum Verbinden eines Kugelgelenks (1) mit einem Gegenstück (19), das eine Gelenkaufnahme (20) zur Aufnahme des Kugelgelenks (1) aufweist, welches ein Gelenkgehäuse (2), eine in dem Gelenkgehäuse (2) angeordnete Lagerschale (5) und ein einen kugelförmigen Lagerbereich (3) aufweisendes Gelenkinnenteil (4) umfasst, das mit dem Lagerbereich (3) gelenkig in der Lagerschale (5) gelagert ist und sich aus dem Gelenkgehäuse (2) heraus erstreckt, mit den Verfahrensschritten:
- Bereitstellen des Gegenstücks (19) in einem Gegenstück-Bereitstellungsschritt (29),
- Bereitstellen des Kugelgelenks (1) in einem Gelenk-Bereitstellungsschritt (26),
- Einpressen des Kugelgelenks (1) in die Gelenkaufnahme (20) in einem den Bereitstellungsschritten (26, 29) nachfolgenden Einpressschritt (31) und
- Erwärmen des Kugelgelenks (1) oder zumindest der Lagerschale (5) des Kugelgelenks (1) in einem dem Gelenk-Bereitstellungsschritt (26) nachfolgenden und dem Einpressschritt (31) vorgelagerten Erwärmungsschritt (30).

Figure DE102016203470B4_0000
Method for connecting a ball joint (1) to a counterpart (19) which has a joint receptacle (20) for receiving the ball joint (1), which has a joint housing (2), a bearing shell (5) arranged in the joint housing (2) a joint inner part (4) having a spherical bearing region (3), which is mounted with the bearing region (3) in an articulated manner in the bearing shell (5) and extends out of the joint housing (2), with the process steps:
Providing the counterpart (19) in a counterpart providing step (29),
Providing the ball joint (1) in a joint providing step (26),
- Pressing the ball joint (1) in the joint receptacle (20) in a the deployment steps (26, 29) subsequent press-insertion (31) and
Heating the ball joint (1) or at least the bearing shell (5) of the ball joint (1) in a heating step (30) which follows the joint supply step (26) and which precedes the press-in step (31).
Figure DE102016203470B4_0000

Description

Die Erfindung betrifft ein Verfahren zum Verbinden eines Kugelgelenks mit einem Gegenstück, das eine Gelenkaufnahme zur Aufnahme des Kugelgelenks aufweist, welches ein Gelenkgehäuse, eine in dem Gelenkgehäuse angeordnete Lagerschale und ein einen kugelförmigen Lagerbereich aufweisendes Gelenkinnenteil umfasst, das mit dem Lagerbereich gelenkig in der Lagerschale gelagert ist und sich aus dem Gelenkgehäuse heraus erstreckt, mit den Verfahrensschritten: Bereitstellen des Gegenstücks in einem Gegenstück-Bereitstellungsschritt, Zusammenbauen des Kugelgelenks in einem Gelenk-Montageschritt, Bereitstellen des Kugelgelenks in einem Gelenk-Bereitstellungsschritt und Einpressen des Kugelgelenks mit seinem Gelenkgehäuse in die Gelenkaufnahme in einem den Bereitstellungsschritten nachfolgenden Einpressschritt.The invention relates to a method for connecting a ball joint with a counterpart, which has a joint receptacle for receiving the ball joint, which comprises a joint housing, a bearing shell arranged in the joint housing and a spherical bearing area exhibiting joint inner part which articulates with the storage area in the bearing shell and extending out of the joint housing, comprising the steps of: providing the counterpart in a counterpart provisioning step, assembling the ball joint in a joint mounting step, providing the ball joint in a joint providing step, and forcing the ball joint with its joint housing into the joint receiver an injection step following the provisioning steps.

Zum Reduzieren von Drehmomenten und/oder Reibmomenten zwischen dem Lagerbereich und der Lagerschale werden Kugelgelenke in der Regel bereits während oder nach ihrer Herstellung getempert.To reduce torques and / or friction moments between the bearing area and the bearing shell ball joints are usually already annealed during or after their preparation.

Ein derartiges Tempern ist beispielsweise aus der DE 10 2013 221 964 B3 bekannt. Hierbei kann das Erwärmen beispielsweise mittels Induktion erfolgen.Such annealing is for example from the DE 10 2013 221 964 B3 known. Here, the heating can be done for example by means of induction.

Auch aus der DE 11 2012 001 492 T5 ist ein induktives Erwärmen während des Zusammenbaus des Kugelgelenks bekannt.Also from the DE 11 2012 001 492 T5 Inductive heating during assembly of the ball joint is known.

Der US 4 439 909 A ist ein Zusammenbauen eines Kugelgelenks zu entnehmen, wobei für das Zusammenbauen des Kugelgelenks das Kugelgehäuse vorerwärmt ist.Of the US 4 439 909 A see assembling a ball joint where the ball housing is preheated to assemble the ball joint.

Jedoch kann sich das Reibmoment durch das Einpressen des Kugelgelenks in das Gegenstück wieder erhöhen.However, the friction torque can increase again by the press-fitting of the ball joint in the counterpart.

Ausgehend hiervon liegt der Erfindung die Aufgabe zugrunde, eine Möglichkeit zu schaffen, eine durch das Einpressen des Kugelgelenks in das Gegenstück hervorgerufene Erhöhung des Reibmoments zwischen dem Lagerbereich und der Lagerschale reduzieren oder vermeiden zu können.Based on this, the present invention seeks to provide a way to reduce or avoid a caused by the press-fitting of the ball joint in the counterpart increase the friction torque between the bearing area and the bearing shell.

Diese Aufgabe wird durch ein Verfahren nach Anspruch 1 gelöst. Bevorzugte Weiterbildungen des Verfahrens sind in den Unteransprüchen und in der nachfolgenden Beschreibung gegeben.This object is achieved by a method according to claim 1. Preferred developments of the method are given in the subclaims and in the following description.

Das Verfahren zum Verbinden eines Kugelgelenks mit einem Gegenstück, das eine Gelenkaufnahme zur Aufnahme des Kugelgelenks aufweist, welches ein Gelenkgehäuse, eine in dem Gelenkgehäuse angeordnete Lagerschale und ein einen kugelförmigen Lagerbereich aufweisendes Gelenkinnenteil umfasst, das mit dem Lagerbereich gelenkig in der Lagerschale gelagert ist und sich aus dem Gelenkgehäuse heraus erstreckt, umfasst die Verfahrensschritte:

  • - Bereitstellen des Gegenstücks in einem Gegenstück-Bereitstellungsschritt,
  • - Zusammenbauen des Kugelgelenks in einem Gelenk-Montageschritt,
  • - Bereitstellen des Kugelgelenks in einem Gelenk-Bereitstellungsschritt,
  • - Einpressen des Kugelgelenks mit seinem Gelenkgehäuse in die Gelenkaufnahme in einem den Bereitstellungsschritten nachfolgenden Einpressschritt und
  • - Erwärmen des Kugelgelenks oder zumindest der Lagerschale des Kugelgelenks in einem dem Gelenk-Bereitstellungsschritt nachfolgenden und dem Einpressschritt vorgelagerten Erwärmungsschritt, wobei das Einpressen des Kugelgelenks in die Gelenkaufnahme im erwärmten Zustand des Kugelgelenks und/oder der Lagerschale erfolgt.
The method for connecting a ball joint with a counterpart comprising a joint receptacle for receiving the ball joint, which comprises a joint housing, a bearing shell arranged in the joint housing and a spherical bearing area having inner joint part which is articulated with the bearing area in the bearing shell and extends out of the joint housing, comprises the method steps:
  • Providing the counterpart in a counterpart provisioning step,
  • Assembling the ball joint in a joint assembly step,
  • Providing the ball joint in a joint providing step,
  • - Pressing the ball joint with its joint housing in the joint receptacle in a deployment steps following the injection step and
  • Heating the ball joint or at least the bearing shell of the ball joint in a heating step subsequent to the joint provision step and the pressing step, the pressing in of the ball joint into the joint receptacle in the heated state of the ball joint and / or the bearing shell.

Durch den Erwärmungsschritt werden durch das Einpressen des Kugelgelenks in das Gegenstück hervorgerufene Spannungen in der Lagerschale abgebaut, sodass das Reibmoment und/oder Drehmoment zwischen dem Lagerbereich und der Lagerschale reduziert wird.As a result of the heating step, stresses in the bearing shell caused by the press-fitting of the ball joint into the counterpart are released, so that the frictional torque and / or torque between the bearing region and the bearing shell is reduced.

Durch den Erwärmungsschritt und/oder durch das Erwärmen des Kugelgelenks oder zumindest der Lagerschale des Kugelgelenks wird das Kugelgelenk oder zumindest die Lagerschale des Kugelgelenks in einen erwärmten Zustand überführt. Der Einpressschritt und/oder das Einpressen des Kugelgelenks in die Gelenkaufnahme erfolgt im erwärmten Zustand des Kugelgelenks und/oder der Lagerschale.By the heating step and / or by the heating of the ball joint or at least the bearing shell of the ball joint, the ball joint or at least the bearing shell of the ball joint is brought into a heated state. The press-in step and / or the press-fitting of the ball joint in the joint receptacle takes place in the heated state of the ball joint and / or the bearing shell.

Im Einpressschritt wird das Kugelgelenk mit seinem Gelenkgehäuse in die Gelenkaufnahme des Gegenstücks eingepresst. Insbesondere umfasst die Gelenkaufnahme eine in oder an dem Gegenstück vorgesehene Ausnehmung oder ein in oder an dem Gegenstück vorgesehenes Lagerauge. Vorzugsweise ist die Gelenkaufnahme durch die oder eine in oder an dem Gegenstück vorgesehene Ausnehmung oder durch das oder ein in oder an dem Gegenstück vorgesehenes Lagerauge gebildet.In Einpressschritt the ball joint is pressed with its joint housing in the joint seat of the counterpart. In particular, the joint receptacle comprises a recess provided in or on the counterpart or a bearing eye provided in or on the counterpart. Preferably, the joint receptacle is formed by the or in or on the counterpart provided recess or by or provided in or on the counterpart bearing eye.

Gemäß einer Weiterbildung werden das Kugelgelenk und das Gegenstück in einem Zusammenführungsschritt zusammengeführt. Bevorzugt folgt der Einpressschritt dem Zusammenführungsschritt nach und/oder der Zusammenführungsschritt ist dem Einpressschritt vorgelagert. Vorzugsweise folgt der Zusammenführungsschritt dem Erwärmungsschritt nach. Beispielsweise bildet oder umfasst der Zusammenführungsschritt den Gegenstück-Bereitstellungsschritt. Alternativ folgt der Zusammenführungsschritt z.B. dem Gegenstück-Bereitstellungsschritt nach.According to a development, the ball joint and the counterpart are brought together in a merge step. Preferably, the press-in step follows the merging step and / or the merging step is the Press-in step upstream. Preferably, the merging step follows the heating step. For example, the merging step forms or includes the counterpart providing step. Alternatively, the merge step follows the counterpart provision step, for example.

Der Einpressschritt und/oder das Einpressen des Kugelgelenks in die Gelenkaufnahme wird bevorzugt mittels eines Einpresswerkzeugs durchgeführt. Insbesondere werden das Kugelgelenk und das Gegenstück, vorzugsweise im Zusammenführungsschritt und/oder vor dem Einpressschritt, in dem Einpresswerkzeug zusammengeführt. Der Erwärmungsschritt und/oder das Erwärmen des Kugelgelenks oder zumindest der Lagerschale des Kugelgelenks wird beispielsweise im Einpresswerkzeug oder außerhalb des Einpresswerkzeugs durchgeführt.The press-in step and / or the press-fitting of the ball joint into the joint receptacle is preferably carried out by means of a press-fit tool. In particular, the ball joint and the counterpart, preferably in the merging step and / or before the press-in step, are brought together in the press-fit tool. The heating step and / or the heating of the ball joint or at least the bearing shell of the ball joint is performed, for example, in the press tool or outside of the press tool.

Bevorzugt wird das Kugelgelenk, insbesondere in einem Gelenk-Zuführungsschritt, dem Einpresswerkzeug und/oder dem Gegenstück zugeführt. Vorzugsweise folgt der Einpressschritt dem Gelenk-Zuführungsschritt nach und/oder der Gelenk-Zuführungsschritt ist dem Einpressschritt vorgelagert. Ferner wird bevorzugt das Gegenstück, insbesondere in einem Gegenstück-Zuführungsschritt, dem Einpresswerkzeug und/oder dem Kugelgelenk zugeführt. Vorzugsweise folgt der Einpressschritt dem Gegenstück-Zuführungsschritt nach und/oder der Gegenstück-Zuführungsschritt ist dem Einpressschritt vorgelagert. Beispielsweise bildet oder umfasst der Gelenk-Bereitstellungsschritt den Gelenk-Zuführungsschritt. Alternativ folgt der Gelenk-Zuführungsschritt z.B. dem Gelenk-Bereitstellungsschritt und/oder dem Erwärmungsschritt nach. Vorteilhaft umfasst der Gelenk-Zuführungsschritt den Erwärmungsschritt und/oder der Erwärmungsschritt wird insbesondere während des Zuführens des Kugelgelenks zu dem Einpresswerkzeug und/oder zu dem Gegenstück durchgeführt. Ferner bildet oder umfasst der Gegenstück-Bereitstellungsschritt beispielsweise den Gegenstück-Zuführungsschritt. Alternativ folgt der Gegenstück-Zuführungsschritt z.B. dem Gegenstück-Bereitstellungsschritt nach. Beispielsweise wird während des Gegenstück-Zuführungsschritts der Erwärmungsschritt durchgeführt.Preferably, the ball joint, in particular in a joint feed step, the press tool and / or the counterpart supplied. Preferably, the press-in step follows the hinge feed step and / or the hinge feed step precedes the press-fit step. Furthermore, the counterpart is preferably supplied to the pressfit tool and / or the ball joint, in particular in a counterpart feed step. Preferably, the press-in step follows the counterpart feed step and / or the counterpart feed step precedes the press-in step. For example, the hinge providing step forms or includes the hinge delivery step. Alternatively, the joint delivery step follows e.g. the joint providing step and / or the heating step. Advantageously, the joint feed step comprises the heating step and / or the heating step is performed in particular during the feeding of the ball joint to the press tool and / or to the counterpart. Further, the counterpart providing step forms or includes, for example, the counterpart feeding step. Alternatively, the counterpart feed step follows, e.g. to the counterpart provision step. For example, during the counterpart feed step, the heating step is performed.

Gemäß einer Ausgestaltung werden die Verfahrensschritte und/oder die Bereitstellungsschritte und/oder der Einpressschritt und/oder der Erwärmungsschritt und/oder der Zusammenführungsschritt und/oder die Zuführungsschritte innerhalb einer oder einer einzigen Montagelinie durchgeführt.According to one embodiment, the method steps and / or the provisioning steps and / or the press-fitting step and / or the heating step and / or the merging step and / or the feeding steps are carried out within one or a single assembly line.

Der Einpressschritt liegt insbesondere kurz hinter dem Erwärmungsschritt, sodass ein zu starkes Abkühlen des erwärmten Kugelgelenks und/oder der erwärmten Lagerschale vermieden werden kann. Gemäß einer Weiterbildung liegen zwischen dem Erwärmungsschritt und dem Einpressschritt maximal drei Minuten. Bevorzugt liegt zwischen dem Erwärmungsschritt und dem Einpressschritt aber maximal eine Minute.The press-in step is in particular shortly after the heating step, so that excessive cooling of the heated ball joint and / or the heated bearing shell can be avoided. According to a further development, there is a maximum of three minutes between the heating step and the pressing-in step. Preferably, however, there is a maximum of one minute between the heating step and the pressing-in step.

Gemäß einer Ausgestaltung besteht die Lagerschlage aus Kunststoff, vorzugsweise aus thermoplastischem Kunststoff. Bevorzugt wird die Lagerschale aus Kunststoff, vorzugsweise aus thermoplastischem Kunststoff hergestellt. Vorteilhaft wird das Kugelgelenk oder zumindest die Lagerschale des Kugelgelenks im Erwärmungsschritt auf 100℃ oder näherungsweise auf 100℃ erwärmt. Das Gelenkinnenteil ist mit seinem Lagerbereich vorzugsweise gleitfähig in der Lagerschale gelagert.According to one embodiment, the bearing lugs made of plastic, preferably of thermoplastic material. Preferably, the bearing shell made of plastic, preferably made of thermoplastic material. Advantageously, the ball joint or at least the bearing shell of the ball joint is heated in the heating step to 100 ℃ or approximately to 100 ℃. The inner joint part is preferably slidably mounted in the bearing shell with its storage area.

Gemäß einer Weiterbildung wird das Kugelgelenk in einem Gelenk-Montageschritt zusammengebaut. Dabei wird insbesondere die Lagerschale in das Gelenkgehäuse eingebracht und das Gelenkinnenteil in der Lagerschale gelagert. Der Gelenk-Montageschritt ist insbesondere dem Gelenk-Bereitstellungsschritt vorgelagert. Vorteilhaft sind die zum Zusammenbau des Kugelgelenks erforderlichen Komponenten vor oder zu Beginn des Gelenk-Montageschritts bereits vorgefertigt. Bevorzugt wird das Kugelgelenk oder zumindest die Lagerschale des Kugelgelenks in einem Temperschritt erwärmt, der vorzugsweise dem Gelenk-Bereitstellungsschritt und/oder dem Erwärmungsschritt und/oder der Montagelinie vorgelagert ist. Der Temperschritt folgt insbesondere dem Gelenk-Montageschritt nach. Verzugsweise erfolgt der Temperschritt zwischen dem Gelenk-Montageschritt und dem Gelenk-Bereitstellungsschritt. Der Gelenk-Montageschritt und/oder der Temperschritt erfolgen bevorzugt in einer, insbesondere der Montagelinie und/oder den Bereitstellungsschritten und/oder dem Gelenk-Bereitstellungsschritt, vorgelagerten Gelenk-Fertigung.According to a development, the ball joint is assembled in a joint assembly step. In particular, the bearing shell is introduced into the joint housing and the inner joint part is mounted in the bearing shell. The joint-mounting step is in particular preceded by the joint-providing step. Advantageously, the components required to assemble the ball joint are already prefabricated before or at the beginning of the joint assembly step. Preferably, the ball joint or at least the bearing shell of the ball joint is heated in an annealing step, which is preferably upstream of the joint-providing step and / or the heating step and / or the assembly line. The tempering step follows in particular the joint assembly step. Preferably, the annealing step is between the joint mounting step and the joint providing step. The joint assembly step and / or the annealing step are preferably carried out in one, in particular the assembly line and / or the provisioning steps and / or the joint-providing step, upstream joint manufacturing.

Gemäß einer Weiterbildung wird das Gegenstück in einem Gegenstück-Herstellungsschritt hergestellt, der insbesondere dem Gegenstück-Bereitstellungsschritt vorgelagert ist. Der Gegenstück-Herstellungsschritt umfasst bevorzugt das Vorsehen der Gelenkaufnahme in oder an dem Gegenstück. Der Gegenstück-Herstellungsschritt erfolgt bevorzugt in einer, insbesondere der Montagelinie und/oder den Bereitstellungsschritten und/oder dem Gegenstück-Bereitstellungsschritt, vorgelagerten Gegenstück-Fertigung.According to a further development, the counterpart is produced in a counterpart manufacturing step, which in particular precedes the counterpart provision step. The counterpart manufacturing step preferably comprises providing the hinge mount in or on the counterpart. The counterpart production step preferably takes place in a counterpart production, upstream of the assembly line and / or the provisioning steps and / or the counterpart provisioning step.

Gemäß einer Ausgestaltung besteht das Gegenstück aus Kunststoff und/oder aus Metall. Bevorzugt wird das Gegenstück aus Kunststoff und/oder aus Metall hergestellt. Der Kunststoff ist oder bildet z.B. einen Faser-Kunststoff-Verbund. Das Metall ist z.B. Aluminium, Magnesium oder ein Eisenwerkstoff, wie z.B. Stahl. According to one embodiment, the counterpart is made of plastic and / or metal. Preferably, the counterpart is made of plastic and / or metal. The plastic is or forms, for example, a fiber-plastic composite. The metal is for example aluminum, magnesium or an iron material, such as steel.

Gemäß einer Ausgestaltung besteht das Gelenkgehäuse aus Kunststoff oder aus Metall, vorzugsweise aus Aluminium, aus Magnesium oder aus einem Eisenwerkstoff, wie z.B. Stahl. Bevorzugt wird das Gelenkgehäuse aus Kunststoff oder aus Metall hergestellt, vorzugsweise aus Aluminium, aus Magnesium oder aus einem Eisenwerkstoff, wie z.B. Stahl.According to one embodiment, the joint housing is made of plastic or of metal, preferably of aluminum, of magnesium or of a ferrous material, such as e.g. Stole. Preferably, the joint housing is made of plastic or metal, preferably aluminum, magnesium or a ferrous material, such as aluminum. Stole.

Gemäß einer Weiterbildung besteht das Gelenkinnenteil aus Kunststoff oder aus Metall, vorzugsweise aus Aluminium, aus Magnesium oder aus einem Eisenwerkstoff, wie z.B. Stahl. Bevorzugt wird das Gelenkinnenteil aus Kunststoff oder aus Metall hergestellt, vorzugsweise aus Aluminium, aus Magnesium oder aus einem Eisenwerkstoff, wie z.B. Stahl.According to a further development, the inner joint part is made of plastic or of metal, preferably of aluminum, of magnesium or of a ferrous material, such as e.g. Stole. Preferably, the inner joint part is made of plastic or of metal, preferably of aluminum, of magnesium or of a ferrous material, such as e.g. Stole.

Das Gelenkinnenteil ist oder bildet z.B. einen Kugelzapfen. Bevorzugt ist oder bildet das Gelenkinnenteil aber eine Kugelhülse. Insbesondere erstreckt sich durch die Kugelhülse eine durchgehende Kugelhülsenausnehmung hindurch. Vorzugsweise ist oder bildet das Kugelgelenk ein Kugelhülsengelenk. Das Gelenkinnenteil und/oder der Kugelzapfen und/oder die Kugelhülse erstreckt sich insbesondere einseitig oder beidseitig aus dem Gelenkgehäuse heraus.The inner joint part is or forms e.g. a ball stud. Preferably, however, the inner joint part is or forms a ball sleeve. In particular, a continuous ball sleeve recess extends through the ball sleeve. Preferably, the ball joint is or forms a ball and socket joint. The inner joint part and / or the ball pin and / or the ball sleeve extends in particular on one side or on both sides out of the joint housing.

Die Lagerschale sitzt beispielsweise in einem in dem Gelenkgehäuse angeordneten Ringelement. Das Ringelement besteht bevorzugt aus Kunststoff oder aus Metall, vorzugsweise aus Aluminium, aus Magnesium oder aus einem Eisenwerkstoff, wie z.B. Stahl. Bevorzugt wird das Ringelement aus Kunststoff oder aus Metall hergestellt, vorzugsweise aus Aluminium, aus Magnesium oder aus einem Eisenwerkstoff, wie z.B. Stahl.The bearing shell is seated, for example, in a ring element arranged in the joint housing. The ring element is preferably made of plastic or of metal, preferably of aluminum, of magnesium or of a ferrous material, such as e.g. Stole. Preferably, the ring element is made of plastic or of metal, preferably of aluminum, of magnesium or of a ferrous material, such as e.g. Stole.

Der Erwärmungsschritt erfolgt z.B. in einem Ofen, sodass das Kugelgelenk oder zumindest die Lagerschale des Kugelgelenks im Erwärmungsschritt bevorzugt in dem oder einem Ofen erwärmt wird. Das Erwärmen in einem Ofen ist in der Regel jedoch mit dem Nachteil verbunden, dass das Kugelgelenk einer Fließförderung oder der Montagelinie vorübergehend entzogen wird. Bevorzugt wird das Kugelgelenk oder zumindest die Lagerschale des Kugelgelenks daher induktiv erwärmt. Vorzugsweise werden dabei das Gelenkgehäuse und/oder das Gelenkinnenteil induktiv erwärmt, wobei die Lagerschale durch das erwärmte Gelenkgehäuse und/oder das erwärmte Gelenkinnenteil erwärmt wird, vorzugsweise durch Wärmeleitung. Eine induktive Erwärmung des Kugelgelenks ist insbesondere gut in eine Fließförderung und/oder in die Montagelinie integrierbar.The heating step is e.g. in an oven so that the ball joint or at least the bearing shell of the ball joint is preferably heated in the or a furnace in the heating step. However, heating in an oven is usually associated with the disadvantage that the ball joint is temporarily removed from a flow conveyor or assembly line. Preferably, the ball joint or at least the bearing shell of the ball joint is therefore heated inductively. Preferably, the joint housing and / or the inner joint part are heated inductively, wherein the bearing shell is heated by the heated joint housing and / or the heated inner joint part, preferably by heat conduction. An inductive heating of the ball joint is particularly well integrated in a flow promotion and / or in the assembly line.

Das Gegenstück ist oder bildet bevorzugt ein Fahrwerkbauteil für das Fahrwerk eines Fahrzeugs, insbesondere Kraftfahrzeugs. Vorzugsweise ist oder bildet das Gegenstück einen Radträger oder einen Fahrwerklenker, wie z.B. einen Querlenker. Ferner ist oder bildet das Kugelgelenk bevorzugt ein Fahrwerkbauteil für das Fahrwerk des oder eines Fahrzeugs, insbesondere Kraftfahrzeugs. Vorzugsweise bildet das mit dem Kugelgelenk verbundene Gegenstück eine Fahrwerkkomponente für das Fahrwerk des oder eines Fahrzeugs, insbesondere Kraftfahrzeugs. Insbesondere ist das beschriebene Verfahren zur Herstellung der oder einer Fahrwerkkomponente für das Fahrwerk des oder eines Fahrzeugs, insbesondere Kraftfahrzeugs vorgesehen.The counterpart is or preferably forms a chassis component for the chassis of a vehicle, in particular a motor vehicle. Preferably, the counterpart is or forms a wheel carrier or a suspension arm, such as, for example. a wishbone. Furthermore, the ball joint is or is preferably a chassis component for the chassis of or a vehicle, in particular a motor vehicle. Preferably, the counterpart connected to the ball joint forms a chassis component for the chassis of or a vehicle, in particular a motor vehicle. In particular, the described method for producing the or a chassis component for the chassis of or of a vehicle, in particular motor vehicle is provided.

Bevorzugt erfolgt das Erwärmen des Kugelgelenks in oder während der Zuführung des Kugelgelenks zum finalen Einpressvorgang des Kugelgelenks in das Gegenstück (wie z.B. Radträger oder Querlenker). Insbesondere ist ein einfaches Nachrüsten vorhandener Montageanlagen und/oder Montagelinien möglich, sodass die erfindungsgemäße Lösung einfach und schnell adaptiert werden kann. Insbesondere ist keine Neuentwicklung des Kugelgelenks erforderlich.Preferably, the heating of the ball joint in or during the supply of the ball joint for the final Einpressvorgang of the ball joint in the counterpart (such as wheel or wishbone). In particular, a simple retrofitting of existing assembly systems and / or assembly lines is possible, so that the inventive solution can be easily and quickly adapted. In particular, no new development of the ball joint is required.

Die Erfindung wird nachfolgend anhand einer bevorzugten Ausführungsform unter Bezugnahme auf die Zeichnung beschrieben. In der Zeichnung zeigen:

  • 1 eine teilweise geschnittene Ansicht eines Kugelhülsengelenks,
  • 2 eine perspektivische Teilansicht eines Fahrwerklenkers mit einer Gelenkaufnahme,
  • 3 eine perspektivische Teilansicht des Fahrwerklenkers, wobei das Kugelgelenk in die Gelenkaufnahme eingepresst ist und
  • 4 ein schematisches Flussdiagramm zur Veranschaulichung eines Verfahrens gemäß einer Ausführungsform, wonach das Kugelgelenk mit dem Fahrwerklenker verbunden wird.
The invention will be described below with reference to a preferred embodiment with reference to the drawing. In the drawing show:
  • 1 a partially sectioned view of a ball and socket joint,
  • 2 3 is a partial perspective view of a suspension link with a joint mount,
  • 3 a partial perspective view of the suspension arm, wherein the ball joint is pressed into the joint receptacle and
  • 4 a schematic flow diagram illustrating a method according to an embodiment, according to which the ball joint is connected to the suspension arm.

Aus 1 ist ein Kugelgelenk 1, welches hier als Kugelhülsengelenk ausgebildet ist, in teilweise geschnittener Ansicht ersichtlich. Das Kugelgelenk 1 umfasst ein Gelenkgehäuse 2 sowie ein einen kugelförmigen Lagerbereich 3 aufweisendes Gelenkinnenteil 4 in Form einer Kugelhülse, welches mit seinem Lagerbereich 3 drehbar und kippbar in einer in dem Gelenkgehäuse 2 angeordneten Lagerschale 5 gelagert ist. Die Lagerschale 5 sitzt in einem Ringelement 6, welches in einer Außenhülse 7 angeordnet ist, die einen Grundkörper des Gelenkgehäuses 2 bildet. Dem Gelenkgehäuse 2 ist eine Gehäuselängsachse 8 zugeordnet, bezüglich welcher das Gelenkgehäuse 2 rotationssymmetrisch ist. Ferner ist dem Gelenkinnenteil 4 eine Gelenkinnenteillängsachse 9 zugeordnet, bezüglich welcher das Gelenkinnenteil 4 rotationssymmetrisch ist. Die Gehäuselängsachse 8 und die Gelenkinnenteillängsachse 9 schneiden sich in einem Mittelpunkt M des kugelförmigen Lagerbereichs 3. Das Ringelement 6 und die Lagerschale 5 sind in Richtung der Gehäuselängsachse 8 zwischen zwei in der Außenhülse 7 angeordneten Verschlussringen 10 und 11 festgelegt, die wiederum in Richtung der Gehäuselängsachse 8 zwischen zwei nach innen umgebogenen Randbereichen 12 und 13 der Außenhülse 7 festgelegt sind. Die Verschlussringe 10 und 11 werden dabei dem Gehäuse 2 zugerechnet und definieren jeweils eine Gehäuseöffnung 14 bzw. 15, wobei die Gehäuseöffnung 14 durch den Verschlussring 10 und die Gehäuseöffnung 15 durch den Verschlussring 11 definiert ist.Out 1 is a ball joint 1 , which is designed here as a ball and socket joint, seen in a partially sectioned view. The ball joint 1 includes a joint housing 2 as well as a spherical storage area 3 having inner joint part 4 in the form of a ball sleeve, which with its storage area 3 rotatable and tiltable in one in the joint housing 2 arranged bearing shell 5 is stored. The bearing shell 5 sits in a ring element 6 which is in an outer sleeve 7 is arranged, which is a main body of the joint housing 2 forms. The joint housing 2 is a housing longitudinal axis 8th associated with respect to which the joint housing 2 is rotationally symmetric. Furthermore, the inner joint part 4 a joint inner longitudinal axis 9 associated, with respect to which the inner joint part 4 is rotationally symmetric. The housing longitudinal axis 8th and the inner joint longitudinal axis 9 intersect at a center M of the spherical storage area 3 , The ring element 6 and the bearing shell 5 are in the direction of the housing longitudinal axis 8th between two in the outer sleeve 7 arranged locking rings 10 and 11 set, in turn, in the direction of the housing longitudinal axis 8th between two inwardly bent edge regions 12 and 13 the outer sleeve 7 are fixed. The lock rings 10 and 11 be doing the case 2 attributed and each define a housing opening 14 respectively. 15 , wherein the housing opening 14 through the lock ring 10 and the housing opening 15 through the lock ring 11 is defined.

In 1 trennt die Gehäuselängsachse 8 die Darstellung des Kugelgelenks 1 in zwei Darstellungsbereiche I und II, wobei im Darstellungsbereich I eine Außenansicht des Kugelgelenks 1 und im Darstellungsbereich II ein Längsschnitt des Kugelgelenks 1 entlang der Gehäuselängsachse 8 gezeigt ist.In 1 separates the housing longitudinal axis 8th the representation of the ball joint 1 in two presentation areas I and II , where in the presentation area I an outside view of the ball joint 1 and in the viewport II a longitudinal section of the ball joint 1 along the housing longitudinal axis 8th is shown.

Das Gelenkinnenteil 4 erstreckt sich durch beide Gehäuseöffnungen 14 und 15 hindurch aus dem Gelenkgehäuse 2 heraus und weist zwei sich an den Lagerbereich 3 anschließende Halsbereiche 16 und 17 auf, zwischen denen der Lagerbereich 3 angeordnet ist. Ferner ist in 2 das Gelenkinnenteil 4 gegenüber dem Gelenkgehäuse 2 um einen Kippwinkel α gekippt, der zwischen der Gehäuselängsachse 8 und der Gelenkinnenteillängsachse 9 eingeschlossen ist. In einem nicht gekippten Zustand beträgt der Kippwinkel α Null, sodass die Gehäuselängsachse 8 mit der Gelenkinnenteillängsachse 9 zusammenfällt. Ferner ist das Gelenkinnenteil 4 mit einer in Richtung der Gelenkinnenteillängsachse 9 durchgehenden Ausnehmung 18 versehen.The inner joint part 4 extends through both housing openings 14 and 15 through out of the joint housing 2 out and points two to the storage area 3 subsequent neck areas 16 and 17 on, between which the storage area 3 is arranged. Furthermore, in 2 the inner joint part 4 opposite the joint housing 2 tilted by a tilt angle α, between the housing longitudinal axis 8th and the inner joint longitudinal axis 9 is included. In a non-tilted state, the tilt angle α is zero, so that the housing longitudinal axis 8th with the inner joint longitudinal axis 9 coincides. Furthermore, the inner joint part 4 with one in the direction of the joint inner longitudinal axis 9 through recess 18 Mistake.

Aus 2 ist eine perspektivische Teilansicht eines Fahrwerklenkers 19 mit einer Gelenkaufnahme 20 ersichtlich, die eine durchgehende, zylindrische Ausnehmung 21 umfasst, die bezüglich einer Gelenkaufnahme-Mittellängsachse 22 rotationssymmetrisch ausgebildet ist. Das Kugelgelenk 1 wird in einer in Richtung der Gelenkaufnahme-Mittellängsachse 22 verlaufenden Einpressrichtung 23 mit seinem Gelenkgehäuse 2 in die Ausnehmung 21 der Gelenkaufnahme 20 eingepresst, sodass der Fahrwerklenker 19 bezüglich des Einpressvorgangs ein Gegenstück zu dem Kugelgelenk 1 bildet.Out 2 is a partial perspective view of a suspension handlebar 19 with a joint recording 20 it can be seen that a continuous, cylindrical recess 21 comprising, with respect to a joint receiving central longitudinal axis 22 is formed rotationally symmetrical. The ball joint 1 becomes in a direction of the joint receiving central longitudinal axis 22 extending press-fitting 23 with his joint housing 2 into the recess 21 the joint recording 20 pressed in, so the suspension handlebar 19 with respect to the press-fitting a counterpart to the ball joint 1 forms.

Eine perspektivische Teilansicht des Fahrwerklenkers 19 mit in die Gelenkaufnahme 20 eingepresstem Kugelgelenk 1 ist aus 3 ersichtlich, welches ferner mit einem sich zwischen dem Verschlussring 10 und dem Gelenkinnenteil 4 erstreckenden und sowohl den Verschlussring 10 als auch das Gelenkinnenteil 4 umringenden Dichtungsbalg 33 versehen ist, der sowohl an dem Verschlussring 10 als auch an dem Gelenkinnenteil 4 dichtend anliegt. Zwischen dem Verschlussring 11 und dem Gelenkinnenteil 4 erstreckt sich ein entsprechender Dichtungsbalg, der in 3 aber durch den Fahrwerklenker 19 verdeckt und somit nicht sichtbar ist. Die Gehäuselängsachse 8 fällt mit der Gelenkaufnahme-Mittellängsachse 22 zusammen. Ferner ist in 3 das Kugelgelenk 1 in einem nicht gekippten Zustand gezeigt, sodass auch die Gelenkinnenteillängsachse 9 mit der Gelenkaufnahme-Mittellängsachse 22 zusammenfällt.A partial perspective view of the suspension handlebar 19 with in the joint recording 20 pressed-in ball joint 1 is out 3 can be seen, which further with a between the locking ring 10 and the inner joint part 4 extending and both the locking ring 10 as well as the inner joint part 4 surrounding sealing bellows 33 is provided, both on the lock ring 10 as well as on the inner joint part 4 sealingly rests. Between the lock ring 11 and the inner joint part 4 extends a corresponding sealing bellows, which in 3 but by the suspension control 19 hidden and therefore not visible. The housing longitudinal axis 8th coincides with the hinge-receiving central longitudinal axis 22 together. Furthermore, in 3 the ball joint 1 shown in a non-tilted state, so that the joint inner longitudinal axis 9 with the joint receiving central longitudinal axis 22 coincides.

Aus 4 ist ein schematisches Flussdiagramm eines Verfahrens gemäß einer Ausführungsform ersichtlich, wobei in einem Gelenk-Montageschritt 24 das Kugelgelenk 1 aus bereits vorgefertigten Komponenten zusammengebaut wird. Out 4 FIG. 3 is a schematic flow diagram of a method according to an embodiment, wherein in a joint assembly step 24 the ball joint 1 is assembled from pre-fabricated components.

Anschließend wird in einem Temperschritt 25 das zusammengebaute Kugelgelenk 1 oder zumindest dessen Lagerschale 5 erwärmt. Nachfolgend wird in einem Gelenk-Bereitstellungsschritt 26 das getemperte Kugelgelenk 1 einer Montagelinie 27 bereitgestellt. Ferner wird in einem Gegenstück-Herstellungsschritt 28 der Fahrwerklenker 19 hergestellt und in einem nachfolgenden Gegenstück-Bereitstellungsschritt 29 der Montagelinie 27 bereitgestellt. Die Schritte 24, 25 und 28 sind der Montagelinie 27 vorgelagert und erfolgen separat von dieser, beispielsweise an einem anderen Ort.Subsequently, in a tempering step 25 the assembled ball joint 1 or at least its bearing shell 5 heated. The following is in a joint providing step 26 the tempered ball joint 1 an assembly line 27 provided. Further, in a counterpart manufacturing step 28 the suspension handlebar 19 and in a subsequent counterpart provision step 29 the assembly line 27 provided. The steps 24 . 25 and 28 are the assembly line 27 upstream and separate from this, for example, at another location.

Die beiden Schritte 26 und 29 können gleichzeitig oder nacheinander erfolgen. In einem dem Schritt 26 nachfolgenden Erwärmungsschritt 30 wird das Kugelgelenk 1 induktiv erwärmt. Dies erfolgt insbesondere dadurch, dass das Gelenkinnenteil 4 und/oder das Gelenkgehäuse 2 induktiv erwärmt werden, sodass auch die Lagerschale 5 durch das erwärmte Gelenkinnenteil 4 und/oder das erwärmte Gelenkgehäuse 2 erwärmt wird, vorzugsweise auf näherungsweise 100℃. In einem den Schritten 29 und 30 nachfolgendem Einpressschritt 31 wird das erwärmte Kugelgelenk 1 in die Gelenkaufnahme 20 des Fahrwerklenkers 19 eingepresst, wobei zwischen den Schritten 30 und 31 bevorzugt maximal 1 Minute vergeht.The two steps 26 and 29 can be done simultaneously or sequentially. In one step 26 subsequent heating step 30 becomes the ball joint 1 inductively heated. This is done in particular by the fact that the inner joint part 4 and / or the joint housing 2 are inductively heated, so that the bearing shell 5 through the heated inner joint part 4 and / or the heated joint housing 2 is heated, preferably to approximately 100 ℃. In one of the steps 29 and 30 subsequent press-in step 31 becomes the heated ball joint 1 in the joint recording 20 of the chassis driver 19 pressed in, taking in between the steps 30 and 31 preferably a maximum of 1 minute passes.

Das Einpressen des Kugelgelenks 1 in die Gelenkaufnahme 20 des Fahrwerklenkers 19 erfolgt dabei mittels eines schematisch dargestellten Einpresswerkzeugs 32, dem das Kugelgelenk 1 nach dem Erwärmungsschritt 30 zugeführt wird. Ferner wird der Fahrwerklenker 19 dem Einpresswerkzeug 32 zugeführt, was entweder nach dem Gegenstück-Bereitstellungsschritt 29 oder während dieses Schritts erfolgt.Pressing in the ball joint 1 in the joint recording 20 of the chassis driver 19 takes place by means of a press-fit tool shown schematically 32 to which the ball joint 1 after the heating step 30 is supplied. Furthermore, the suspension handlebar 19 the press tool 32 fed either after the counterpart provisioning step 29 or during this step.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

11
Kugelgelenkball joint
22
Gelenkgehäusejoint housing
33
Lagerbereich des GelenkinnenteilsBearing area of the inner joint part
44
GelenkinnenteilInner race
55
Lagerschalebearing shell
66
Ringelementring element
77
Außenhülseouter sleeve
88th
Gehäuselängsachsehousing longitudinal axis
99
GelenkinnenteillängsachseInner race longitudinal axis
1010
Verschlussringlock ring
1111
Verschlussringlock ring
1212
umgebogener Randbereich der Außenhülsebent edge region of the outer sleeve
1313
umgebogener Randbereich der Außenhülsebent edge region of the outer sleeve
1414
Gehäuseöffnunghousing opening
1515
Gehäuseöffnunghousing opening
1616
Halsbereichneck
1717
Halsbereichneck
1818
durchgehende Ausnehmung im Gelenkinnenteilcontinuous recess in the inner joint part
1919
Fahrwerklenker / GegenstückSuspension handlebar / counterpart
2020
Gelenkaufnahmejoint Taping
2121
Ausnehmung der GelenkaufnahmeRecess of the joint receptacle
2222
Gelenkaufnahme-MittellängsachseJoint Taping-center longitudinal axis
2323
Einpressrichtungpress-in
2424
Gelenk-MontageschrittJoint assembly step
2525
Temperschrittannealing
2626
Gelenk-BereitstellungsschrittJoint Deployment step
2727
Montagelinieassembly line
2828
Gegenstück-HerstellungsschrittCounterpart manufacturing step
2929
Gegenstück-BereitstellungsschrittCounterpart providing step
3030
Erwärmungsschrittheating step
3131
Einpressschrittforce-fitting
3232
Einpresswerkzeugpress tool
3333
Dichtungsbalgbellows

Claims (10)

Verfahren zum Verbinden eines Kugelgelenks (1) mit einem Gegenstück (19), das eine Gelenkaufnahme (20) zur Aufnahme des Kugelgelenks (1) aufweist, welches ein Gelenkgehäuse (2), eine in dem Gelenkgehäuse (2) angeordnete Lagerschale (5) und ein einen kugelförmigen Lagerbereich (3) aufweisendes Gelenkinnenteil (4) umfasst, das mit dem Lagerbereich (3) gelenkig in der Lagerschale (5) gelagert ist und sich aus dem Gelenkgehäuse (2) heraus erstreckt, mit den Verfahrensschritten: - Bereitstellen des Gegenstücks (19) in einem Gegenstück-Bereitstellungsschritt (29), - Zusammenbauen des Kugelgelenks (1) in einem Gelenk-Montageschritt (24), - Bereitstellen des Kugelgelenks (1) in einem Gelenk-Bereitstellungsschritt (26) und - Einpressen des Kugelgelenks (1) mit seinem Gelenkgehäuse (2) in die Gelenkaufnahme (20) in einem den Bereitstellungsschritten (26, 29) nachfolgenden Einpressschritt (31), dadurch gekennzeichnet, dass - das Kugelgelenk (1) oder zumindest die Lagerschale (5) des Kugelgelenks (1) in einem dem Gelenk-Bereitstellungsschritt (26) nachfolgenden und dem Einpressschritt (31) vorgelagerten Erwärmungsschritt (30) erwärmt wird, wobei das Einpressen des Kugelgelenks (1) in die Gelenkaufnahme (20) im erwärmten Zustand des Kugelgelenks (1) und/oder der Lagerschale (5) erfolgt.Method for connecting a ball joint (1) to a counterpart (19) which has a joint receptacle (20) for receiving the ball joint (1), which has a joint housing (2), a bearing shell (5) arranged in the joint housing (2) a joint inner part (4) having a spherical bearing region (3), which is mounted with the bearing region (3) in an articulated manner in the bearing shell (5) and extends out of the joint housing (2), comprising the steps of: - providing the counterpart ( 19) in a counterprovision providing step (29), - assembling the ball joint (1) in a joint mounting step (24), - providing the ball joint (1) in a joint providing step (26), and - press-fitting the ball joint (1) with its joint housing (2) into the joint receptacle (20) in a the delivery steps (26, 29) subsequent Einpressschritt (31), characterized in that - the ball joint (1) or at least the bearing shell (5) of the Kuge is heated in a joint providing step (26) subsequent to the press-in step (31) heating step (30), wherein the pressing of the ball joint (1) in the joint receptacle (20) in the heated state of the ball joint (1) and / or the bearing shell (5). Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass das Kugelgelenk (1) und das Gegenstück (19) einem Einpresswerkzeug (32) zugeführt werden, mittels welchem der Einpressschritt (31) durchgeführt wird, wobei der Erwärmungsschritt (3) während des Zuführens des Kugelgelenks (1) zu dem Einpresswerkzeug (32) durchgeführt wird.Method according to Claim 1 characterized in that the ball joint (1) and the counterpart (19) are fed to a press - in tool (32) by means of which the press - in step (31) is performed, the heating step (3) being performed during the feeding of the ball joint (1) Pressing tool (32) is performed. Verfahren nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass die Bereitstellungsschritte (26, 29), der Erwärmungsschritt (30) und der Einpressschritt (31) innerhalb einer Montagelinie (27) durchgeführt werden.Method according to one of the preceding claims, characterized in that the providing steps (26, 29), the heating step (30) and the press-fitting step (31) are performed within an assembly line (27). Verfahren nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass zwischen dem Erwärmungsschritt (30) und dem Einpressschritt (31) maximal drei Minuten liegen.Method according to one of the preceding claims, characterized in that a maximum of three minutes lie between the heating step (30) and the pressing step (31). Verfahren nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass die Lagerschale (5) aus Kunststoff besteht und das Kugelgelenk (1) oder zumindest die Lagerschale (5) des Kugelgelenks (1) im Erwärmungsschritt (30) auf 100℃ oder näherungsweise auf 100℃ erwärmt wird.Method according to one of the preceding claims, characterized in that the bearing shell (5) consists of plastic and the ball joint (1) or at least the bearing shell (5) of the ball joint (1) in the heating step (30) to 100 ℃ or approximately to 100 ℃ is heated. Verfahren nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass das Kugelgelenk (1) oder zumindest die Lagerschale (5) des Kugelgelenks (1) in einem dem Gelenk-Montageschritt (24) nachfolgenden und dem Gelenk-Bereitstellungsschritt (26) vorgelagerten Temperschritt (25) erwärmt wird.Method according to one of the preceding claims, characterized in that the ball joint (1) or at least the bearing shell (5) of the ball joint (1) in a the joint-mounting step (24) subsequent and the joint-providing step (26) upstream tempering step (25 ) is heated. Verfahren nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass das Kugelgelenk (1) oder zumindest die Lagerschale (5) des Kugelgelenks (1) im Erwärmungsschritt (3) induktiv erwärmt wird.Method according to one of the preceding claims, characterized in that the ball joint (1) or at least the bearing shell (5) of the ball joint (1) is heated inductively in the heating step (3). Verfahren nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass das Gegenstück (19) ein Fahrwerkbauteil für das Fahrwerk eines Fahrzeugs bildet.Method according to one of the preceding claims, characterized in that the Counterpart (19) forms a chassis component for the chassis of a vehicle. Verfahren nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass das Gegenstück (19) einen Radträger oder Fahrwerklenker bildet.Method according to one of the preceding claims, characterized in that the counterpart (19) forms a wheel carrier or suspension link. Verfahren nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass das Kugelgelenk (1) ein Kugelhülsengelenk ist, dessen Gelenkinnenteil (4) als Kugelhülse ausgebildet ist, die sich beidseitig aus dem Gelenkgehäuse (2) herauserstreckt.Method according to one of the preceding claims, characterized in that the ball joint (1) is a ball and socket joint whose inner joint part (4) is designed as a ball sleeve, which extends on both sides of the joint housing (2).
DE102016203470.7A 2016-03-03 2016-03-03 Method for connecting a ball joint with a counterpart Active DE102016203470B4 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DE102016203470.7A DE102016203470B4 (en) 2016-03-03 2016-03-03 Method for connecting a ball joint with a counterpart
PCT/EP2017/052208 WO2017148644A1 (en) 2016-03-03 2017-02-02 Method for connecting a ball joint to a counterpart
EP17703711.6A EP3423231A1 (en) 2016-03-03 2017-02-02 Method for connecting a ball joint to a counterpart

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102016203470.7A DE102016203470B4 (en) 2016-03-03 2016-03-03 Method for connecting a ball joint with a counterpart

Publications (2)

Publication Number Publication Date
DE102016203470A1 DE102016203470A1 (en) 2017-09-07
DE102016203470B4 true DE102016203470B4 (en) 2018-10-25

Family

ID=57984924

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102016203470.7A Active DE102016203470B4 (en) 2016-03-03 2016-03-03 Method for connecting a ball joint with a counterpart

Country Status (3)

Country Link
EP (1) EP3423231A1 (en)
DE (1) DE102016203470B4 (en)
WO (1) WO2017148644A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6768584B2 (en) * 2017-03-31 2020-10-14 日本発條株式会社 Ball joint manufacturing method and stabilizer link manufacturing method
DE102018103780A1 (en) 2018-02-20 2019-08-22 THK RHYTHM AUTOMOTIVE GmbH Ball joint, in particular for chassis parts of a motor vehicle

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4439909A (en) 1982-07-08 1984-04-03 General Motors Corporation Ball joint manufacture
DE112012001492T5 (en) 2011-03-31 2014-01-09 Musashi Seimitsu Industry Co., Ltd. Method for producing a ball joint
DE102013221964B3 (en) 2013-10-29 2015-03-12 Zf Friedrichshafen Ag Method and device for producing a ball joint

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19934218C2 (en) * 1999-07-21 2003-03-20 Brueninghaus Hydromatik Gmbh Method for producing a ball joint connection between a sliding block and a piston and axial piston machine with a ball joint connection
GB2400146B (en) * 2003-03-31 2005-03-02 Minebea Co Ltd A method of swaging a spherical bearing
GB2434844B (en) * 2006-02-03 2007-12-19 Minebea Co Ltd Improvements in or relating to spherical bearing arrangements
DE102006016060B4 (en) * 2006-04-04 2012-10-25 Zf Friedrichshafen Ag Radial joint and method for producing such a radial joint for a motor vehicle

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4439909A (en) 1982-07-08 1984-04-03 General Motors Corporation Ball joint manufacture
DE112012001492T5 (en) 2011-03-31 2014-01-09 Musashi Seimitsu Industry Co., Ltd. Method for producing a ball joint
DE102013221964B3 (en) 2013-10-29 2015-03-12 Zf Friedrichshafen Ag Method and device for producing a ball joint

Also Published As

Publication number Publication date
DE102016203470A1 (en) 2017-09-07
EP3423231A1 (en) 2019-01-09
WO2017148644A1 (en) 2017-09-08

Similar Documents

Publication Publication Date Title
DE69531225T2 (en) Manufacturing process for a drive shaft
DE10301057B4 (en) Rotator with bearing and process for its preparation
DE102014109825A1 (en) Dome-shaped elastic tube alignment system for providing precise four-way alignment of components
DE3636243A1 (en) WHEEL BEARING (NY) SMOOTH JOINT UNIT
DE102014118604A1 (en) Elastic averaged alignment systems and methods therefor
DE102016203470B4 (en) Method for connecting a ball joint with a counterpart
DE112017003156T5 (en) OVERPROOF WELDABLE DIFFERENTIAL RING
DE102013218764A1 (en) Two-piece piston for internal combustion engine twice joined
EP0922868A2 (en) Ball joint
DE112020004420T5 (en) Split lightweight composite connecting rod assembly and method of making same
DE10219195C1 (en) One-piece cam
EP2725659B1 (en) Coaxial cable socket
DE102005029539A1 (en) Axle journal for motor vehicle comprises base body and journal penetrating aperture in it and consisting of journal part and counter part
WO2018210489A1 (en) Method for producing a connection element, and connection element
EP0898090A2 (en) Method of making a ball element and ball element for a ball joint
WO2018050352A1 (en) Ball pin
DE102017203433A1 (en) Method for producing a piston
EP1219865A1 (en) A differential assembly and method for producing the same
DE102013216012A1 (en) Alignment system for aligning three components during joining process, has openings, which are distributed in coordinated relation to geometric distribution of elastic pipes such that each elastic pipe is accommodated in respective opening
DE19802283A1 (en) Link shaft with two rotary links
EP3512649B1 (en) Method for forming a rivet head from a brittle metallic material
DE10227816A1 (en) Method of making a universal joint for a universal joint
WO2017016773A1 (en) Connecting pipe, steering or track rod having a connecting pipe of said type, and method for producing a connecting pipe of said type
DE102015226124A1 (en) Twist-beam axle, method for producing a torsion-beam axle and vehicle with a torsion-beam axle
DE10152316B4 (en) Method for producing a piston

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R016 Response to examination communication
R016 Response to examination communication
R018 Grant decision by examination section/examining division
R020 Patent grant now final