DE102014200228B4 - Ground Clamp Arrangement - Google Patents

Ground Clamp Arrangement Download PDF

Info

Publication number
DE102014200228B4
DE102014200228B4 DE102014200228.1A DE102014200228A DE102014200228B4 DE 102014200228 B4 DE102014200228 B4 DE 102014200228B4 DE 102014200228 A DE102014200228 A DE 102014200228A DE 102014200228 B4 DE102014200228 B4 DE 102014200228B4
Authority
DE
Germany
Prior art keywords
reinforcement
holding
clamping device
grounding
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DE102014200228.1A
Other languages
German (de)
Other versions
DE102014200228A1 (en
Inventor
Johann Pröpster
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
J Proepster GmbH
Original Assignee
J Proepster GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by J Proepster GmbH filed Critical J Proepster GmbH
Priority to DE102014200228.1A priority Critical patent/DE102014200228B4/en
Publication of DE102014200228A1 publication Critical patent/DE102014200228A1/en
Application granted granted Critical
Publication of DE102014200228B4 publication Critical patent/DE102014200228B4/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R4/00Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
    • H01R4/58Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation characterised by the form or material of the contacting members
    • H01R4/64Connections between or with conductive parts having primarily a non-electric function, e.g. frame, casing, rail
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R4/00Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
    • H01R4/28Clamped connections, spring connections
    • H01R4/38Clamped connections, spring connections utilising a clamping member acted on by screw or nut

Abstract

Erdungsklemmen-Anordnung zum Anschluss mindestens einer Erdungsleitung (27, 34) an eine Bewehrung (3),a) mit einer Klemmeinrichtung (2a), die umfassti) einen Bewehrungs-Halte-Grundkörper (5a),ii) einen Bewehrungs-Halte-Gegenkörper (6a), der- mit dem Bewehrungs-Halte-Grundkörper (5a) in Verbindung steht, wobei der Bewehrungs-Halte-Grundkörper (5a) und der Bewehrungs-Halte-Gegenkörper (6a) relativ zueinander zum klemmenden Anordnen der Klemmeinrichtung (2a) an der Bewehrung (3) in eine Haltestellung verschwenkbar sind, undiii) mindestens einen Rückhaltevorsprung (18a) zum Rückhalten von mindestens einer Erdungsleitung (27) in der Klemmeinrichtung (2a),b) mit einer Spanneinrichtung (4) zum Halten der Klemmeinrichtung (2a) in der Haltestellung und Beaufschlagen der Klemmeinrichtung (2a) mit einer auf die Bewehrung (3) wirkenden Klemmkraft, undc) mit mindestens einem Erdungsleitungs-Aufnahmemittel (39, 40) zum Halten mindestens einer Erdungsleitung (27, 34) an der Klemmeinrichtung (2a) in, in Bezug auf die Bewehrung (3) verschiedenen Erdungsleitungs-Verlaufsrichtungen,d) wobei die Klemmeinrichtung (2a) und das mindestens eine Erdungsleitungs-Aufnahmemittel (39, 40) derart angeordnet und ausgebildet sind, dass eine kreuzende Anordnung der Bewehrung (3) und mindestens einer Erdungsleitung (27, 34) möglich ist, unde) wobei der Bewehrungs-Halte-Grundkörper (5a) und der Bewehrungs-Halte-Gegenkörper (6a) separate Teile sind und unter Bildung einer Schwenkachse miteinander in gelenkigem Eingriff stehen.Grounding clamp arrangement for connecting at least one grounding line (27, 34) to a reinforcement (3),a) with a clamping device (2a), which comprises i) a reinforcement-holding base body (5a),ii) a reinforcement-holding counterbody (6a), which is connected to the reinforcement-retaining base body (5a), the reinforcement-retaining base body (5a) and the reinforcement-retaining counter-body (6a) relative to one another for the clamping arrangement of the clamping device (2a) on the reinforcement (3) can be pivoted into a holding position, andiii) at least one retaining projection (18a) for retaining at least one grounding line (27) in the clamping device (2a), b) with a tensioning device (4) for holding the clamping device (2a ) in the holding position and subjecting the clamping device (2a) to a clamping force acting on the reinforcement (3), and c) having at least one grounding wire receiving means (39, 40) for holding at least one grounding wire (27, 34) on the clamping device (2a ) in, in relation to the reinforcement (3), different ground wire course directions, d) wherein the clamping device (2a) and the at least one ground wire receiving means (39, 40) are arranged and designed in such a way that a crossing arrangement of the reinforcement (3 ) and at least one grounding line (27, 34) is possible, ande) the reinforcement holding base body (5a) and the reinforcement holding counter body (6a) being separate parts and being in articulated engagement with one another to form a pivot axis.

Description

Die Erfindung betrifft eine Erdungsklemmen-Anordnung zum Anschluss mindestens einer Erdungsleitung an eine Bewehrung.The invention relates to a grounding clamp arrangement for connecting at least one grounding line to a reinforcement.

Aus dem Stand der Technik sind bereits gattungsgemäße Erdungsklemmen-Anordnungen bzw. Erdungsklemmen bekannt, die das Anschließen von mindestens einer Erdungsleitung an eine Bewehrung erlauben. Die Benutzerfreundlichkeit derartiger Erdungsklemmen-Anordnungen bestimmt in einem erheblichen Umfang den Zeitaufwand für deren Montage.Generic grounding clamp arrangements or grounding clamps are already known from the prior art, which allow the connection of at least one grounding line to a reinforcement. The user-friendliness of such grounding clamp arrangements determines to a considerable extent the time required for their installation.

In der DE 86 32 107 U1 wird eine Anschlussklemme zum Verbinden eines Erdungskabels mit Armierungseisen beschrieben. Die Anschlussklemme hat eine obere und eine untere Klemmplatte, die einander gegenüberliegend angeordnet sind. Die obere Klemmplatte hat ein Durchgangsloch und ein Gewindeloch. Die untere Klemmplatte weist ein zu dem Durchgangsloch der oberen Klemmplatte korrespondierendes Gewindeloch und eine Ausnehmung auf, die die beiden Klemmplatten in der Montagestellung gegen Verdrehen fixiert. Die beiden Klemmplatten werden gegenseitig mittels einer Schraube zusammengespannt und dabei auch an zwei sich kreuzende Armierungsstäbe angeklemmt, die beispielsweise Armierungseisen eines Fundamentes sind.In the DE 86 32 107 U1 describes a terminal for connecting a ground wire to armor iron. The terminal has an upper and a lower clamping plate, which are arranged opposite to each other. The upper clamping plate has a through hole and a threaded hole. The lower clamping plate has a threaded hole corresponding to the through-hole of the upper clamping plate and a recess which fixes the two clamping plates against twisting in the assembly position. The two clamping plates are mutually clamped together by means of a screw and are also clamped to two crossing reinforcing bars, which are, for example, reinforcing bars of a foundation.

In der DE 10 2006 044 991 A1 wird eine Klemme zum Verbinden von Runddrähten zur Erdung von Betonarmierungen beschrieben. Die Klemme hat zwei Klemmbackenpaare mit jeweils zwei Klemmbacken, die jeweils eine Grundplatte und einen Halteabschnitt aufweisen. Die Grundplatten haben eine quadratische Befestigungsausnehmung, welche in montiertem Zustand von einem im Querschnitt quadratischen Abschnitt einer Befestigungsschraube durchsetzt ist, sodass eine Verdrehsicherung gewährleistet ist. Die Fixierung der Befestigungsschraube an den Klemmbackenpaaren erfolgt mittels einer Mutter.In the DE 10 2006 044 991 A1 describes a clamp for connecting round wires for grounding concrete reinforcements. The clamp has two pairs of jaws, each with two jaws, each having a base plate and a holding portion. The base plates have a square fastening recess, which in the mounted state is penetrated by a section of a fastening screw with a square cross section, so that an anti-twist device is ensured. The fastening screw is fixed to the pairs of clamping jaws by means of a nut.

In der US 5,752,860 werden Klemmen zum klemmenden Verbinden einer Armierung mit einem Erdungsleiter beschrieben. Die Klemmen haben mindestens zwei Klemmelemente, wobei die beiden Klemmelemente in einer Ausgestaltung jeweils eine Durchgangsbohrung haben, durch die eine Schraube hindurchgesteckt ist. Die beiden Klemmelemente sind mittels einer auf die Schraube aufgedrehten Mutter, die außen an einem der Klemmelemente angreift, aneinander festgelegt. Alternativ hat eines der Klemmelemente anstelle der Durchgangsbohrung eine Gewindebohrung. Bei einer anderen Ausgestaltung ist zwischen zwei äußeren Klemmelementen ein Zwischen-Klemmelement mit sich kreuzenden Kanälen zur Aufnahme länglicher Elemente angeordnet.In the U.S. 5,752,860 describes clamps for clamping connection of an armor to a grounding conductor. The clamps have at least two clamping elements, with the two clamping elements in one embodiment each having a through hole through which a screw is inserted. The two clamping elements are fixed to one another by means of a nut which is screwed onto the screw and engages one of the clamping elements on the outside. Alternatively, one of the clamping elements has a threaded hole instead of the through hole. In another embodiment, an intermediate clamping element with intersecting channels for receiving elongated elements is arranged between two outer clamping elements.

In der US 8,007,293 B2 wird eine elektrische Verbindungseinrichtung beschrieben, die zwei Verbindungselemente hat. Ein U-förmiges Schraubelement umläuft eine Armierung und durchsetzt die Verbindungselemente. Auf das Schraubelement sind Muttern zur spannenden Befestigung aufgedreht.In the U.S. 8,007,293 B2 describes an electrical connection device having two connection elements. A U-shaped screw element runs around a reinforcement and penetrates the connecting elements. Nuts are screwed onto the screw element for tightening.

In der DE 20 2012 000 989 U1 wird eine Klemmvorrichtung beschrieben, welche ein jeweils U-förmiges Klemmenober- und Klemmenunterteil hat. Die beiden Klemmenteile sind mittels einer Verbindungsschraube miteinander verbunden. Dafür weist das Klemmoberteil in seinem oberen Steg eine Durchgangsöffnung und das Klemmunterteil in seinem oberen Steg eine Gewindebohrung für die Verbindungsschraube auf. Die Klemmvorrichtung dient beispielsweise zum Klemmen von einer Blitzableiter-Einrichtung mit einem Bewehrungsstab.In the DE 20 2012 000 989 U1 describes a clamping device which has a U-shaped terminal upper part and terminal lower part. The two clamp parts are connected to each other by means of a connecting screw. For this purpose, the upper clamp part has a through-opening in its upper web and the lower clamp part has a threaded hole for the connecting screw in its upper web. The clamping device is used, for example, to clamp a lightning conductor device with a reinforcing bar.

In der DE 100 35 795 B4 wird eine Klemmschuhanordnung zum Befestigen und Verbinden von Drähten von Blitzschutzanlagen beschrieben. Sie hat zwei übereinander angeordnete Klemmschuhe. Jeder Klemmschuh umfasst zwei Flanschteile, die über eine Umbiegung miteinander verbunden sind. Im Bereich der Umbiegung ist eine Ausnehmung für einen Draht ausgebildet. Jedes Flanschteil hat eine Ausnehmung für eine Befestigungsschraube, die die Klemmschuhe zusammenhält.In the DE 100 35 795 B4 describes a clamping shoe arrangement for fastening and connecting wires from lightning protection systems. It has two clamping shoes arranged one above the other. Each clamping shoe comprises two flange parts which are connected to one another via a bend. A recess for a wire is formed in the area of the bend. Each flange part has a recess for a fastening screw that holds the clamping shoes together.

In der DE 100 35 793 B4 wird eine weitere Verbindungsklemme zum Verbinden von Drähten von Blitzschutzanlagen beschrieben. Sie hat einstückig miteinander verbundene Metallformteile, die mittels einer einzigen Klemmschraube gegeneinander verspannbar sind. Zwischen den Metallformteilen sind zu verbindende sich kreuzende Drähte einspannbar.In the DE 100 35 793 B4 another connection clamp for connecting wires of lightning protection systems is described. It has metal molded parts that are connected to one another in one piece and can be braced against one another by means of a single clamping screw. Intersecting wires to be connected can be clamped between the shaped metal parts.

Die US 2 216 309 offenbart ein Erdungsteil zum elektrischen und mechanischen Verbinden eines Erdungsdrahts und einer Leitung mit einem Leiter. Das Erdungsteil hat ein Paar Backenelemente zum Greifen des Leiters und Kooperationsmittel zum verstellbaren und verschwenkbaren örtlichen Festlegen der Elemente aneinander sowie ein Schraubmittel zum Zuziehen der Backenelemente.The U.S. 2,216,309 discloses a grounding member for electrically and mechanically connecting a ground wire and a conduit to a conductor. The grounding member has a pair of jaw members for gripping the conductor and cooperating means for adjustably and pivotally locking the members in place, and screw means for tightening the jaw members.

Aus der US 3 118 720 sind elektrische Verbindungsmittel zum mechanischen und elektrischen örtlichen Festlegen eines elektrischen Leiters an einem Chassis bekannt. Das Verbindungsmittel umfasst einen Klemmblock und ein Riegelelement. Der Klemmblock hat einen Grundabschnitt und Zylinderabschnitt. Das Riegelelement wiederum weist einen Grundplattenabschnitt und eine Zylinderaufnahme auf. Eine Schraube durchsetzt den Grundabschnitt und den Grundplattenabschnitt. Auf die Schraube ist eine Mutter aufgedreht, die außen an dem Grundplattenabschnitt anliegt. Der elektrische Leiter durchsetzt die Zylinderaufnahme und den Zylinderabschnitt.From the U.S. 3,118,720 electrical connection means are known for mechanically and electrically locating an electrical conductor to a chassis. The connecting means comprises a clamping block and a locking element. The terminal block has a base section and barrel section. The locking element in turn has a base plate section and a cylinder receptacle. A screw penetrates the base cut and the base plate section. A nut is screwed onto the screw and rests on the outside of the base plate section. The electrical conductor passes through the cylinder receptacle and the cylinder section.

Ein in der US 6 347 967 B 1 offenbartes elektrisches Verbindungsmittel für Gewindeschäfte und Kabel umfasst eine Basis und ein zweites Verbindungselement sowie mindestens ein drittes Verbindungselement. Die Basis hat ein Endteil und einen vorstehenden Flansch, der ein Gelenkelement bildet. Das zweite Verbindungselement hat ein zweites Ende und ein zweites Gelenkelement. Die Verbindungselemente umgreifen beispielsweise einen Gewindeschaft und sind mittels eines Befestigungsmittels relativ zueinander festgelegt.An Indian U.S. 6,347,967 B 1 disclosed electrical connection means for threaded shafts and cables comprises a base and a second connection element and at least one third connection element. The base has an end portion and a projecting flange forming a hinge member. The second link has a second end and a second hinge member. The connecting elements encompass a threaded shank, for example, and are fixed relative to one another by means of a fastening means.

Der Erfindung liegt hiervon ausgehend die Aufgabe zugrunde, eine Erdungsklemmen-Anordnung bereitzustellen, die einerseits äußerst flexibel und vielseitig bei der Erdung einsetzbar ist und andererseits besonders montagefreundlich sowie kostengünstig herstellbar ist.Proceeding from this, the invention is based on the object of providing a grounding clamp arrangement which, on the one hand, can be used extremely flexibly and in a variety of ways for grounding and, on the other hand, is particularly easy to assemble and inexpensive to produce.

Diese Aufgabe wird erfindungsgemäß durch die in dem unabhängigen Anspruch 1 angegebenen Merkmale gelöst. Der Kern der Erfindung liegt darin, dass das mindestens eine Erdungsleitungs-Aufnahmemittel geeignet ist, mindestens eine Erdungsleitung an der Klemmeinrichtung in verschiedenen Erdungsleitungs-Verlaufsrichtungen in Bezug auf die Bewehrung anzuordnen bzw. zu halten. Vorzugsweise sind die verschiedenen Erdungsleitungs-Verlaufsrichtungen stufenlos einstellbar. Eine kreuzende Anordnung der Bewehrung und mindestens einer Erdungsleitung ist möglich. Die Erdungsklemmen-Anordnung erlaubt insbesondere eine mechanische und elektrische Verbindung von mindestens einer Erdungsleitung mit einer Bewehrung.According to the invention, this object is achieved by the features specified in independent claim 1 . The essence of the invention lies in the fact that the at least one grounding wire receiving means is suitable for arranging or holding at least one grounding wire on the clamping device in different directions of the grounding wire in relation to the reinforcement. Preferably, the different directions of the grounding line can be adjusted steplessly. A crossing arrangement of the reinforcement and at least one earthing wire is possible. In particular, the grounding clamp arrangement allows a mechanical and electrical connection of at least one grounding line to an armouring.

Die erfindungsgemäße Erdungsklemmen-Anordnung vereinfacht die Vorratshaltung, da für verschiedene Anschlussarten keine speziellen Erdungsklemmen-Anordnungen notwendig sind. Mit der erfindungsgemäßen Erdungsklemmen-Anordnung sind vorzugsweise Parallel-Verbindungen, T- und Kreuz-Verbindungen oder dergleichen einfach und sicher zwischen mindestens einer Erdungsleitung und der Bewehrung herstellbar.The grounding clamp arrangement according to the invention simplifies stock keeping, since no special grounding clamp arrangements are necessary for different connection types. With the grounding clamp arrangement according to the invention, parallel connections, T and cross connections or the like can preferably be produced simply and safely between at least one grounding line and the reinforcement.

Es ist von Vorteil, wenn die Erdungsklemmen-Anordnung imstande ist, mehrere Erdungsleitungen zu halten. Es ist zweckmäßig, wenn die Erdungsklemmen-Anordnung geeignet ist, sich voneinander unterscheidende Erdungsleitungen zu halten. Eine zu haltende Erdungsleitung kann beispielsweise als Rundleitung ausgeführt sein, während eine andere Erdungsleitung als Flachbandleiter ausgeführt ist.It is advantageous if the grounding clamp assembly is able to hold multiple grounding leads. It is convenient if the grounding clip arrangement is capable of holding differing grounding conductors. A grounding line to be held can be designed as a round line, for example, while another grounding line is designed as a ribbon conductor.

Die Bewehrung ist vorzugsweise aus Bewehrungsstahl bzw. Betonstahl gebildet. Sie ist beispielsweise stab- bzw. stangenförmig ausgeführt und hat dann insbesondere einen runden Querschnitt. Die Bewehrung ist insbesondere durch einen Stabstahl oder eine Vielzahl von Stabstahl-Elementen gebildet, die dann beispielsweise gitterartig angeordnet sind.The reinforcement is preferably formed from reinforcing steel or reinforcing steel. It is designed, for example, in the form of a bar or bar and then has a round cross section in particular. The reinforcement is formed in particular by a bar steel or a multiplicity of bar steel elements which are then arranged, for example, in a grid-like manner.

Die mindestens eine Erdungsleitung ist beispielsweise als Rundleitung und/oder als Flachbandleiter ausgeführt.The at least one grounding line is designed, for example, as a round line and/or as a ribbon conductor.

Es ist von Vorteil, wenn das mindestens eine Erdungsleitungs-Aufnahmemittel die mindestens eine Erdungsleitung oberhalb oder unterhalb der Bewehrung hält.It is advantageous if the at least one ground wire receiving means holds the at least one ground wire above or below the armor.

Es ist zweckmäßig, wenn die mindestens eine Erdungsleitung in ihrer gewählten Erdungsleitungs-Verlaufsrichtung, vorzugsweise klemmend, gegenüber der Klemmeinrichtung bzw. der Bewehrung örtlich festlegbar ist.It is expedient if the at least one grounding line can be fixed locally in its selected grounding line course direction, preferably in a clamping manner, relative to the clamping device or the reinforcement.

Es ist von Vorteil, wenn die Klemmeinrichtung zwischen einer geschlossenen Haltestellung und einer offenen Öffnungsstellung verschwenkbar ist. Günstigerweise ist die Klemmeinrichtung an die Querabmessung der Bewehrung anpassbar.It is advantageous if the clamping device can be pivoted between a closed holding position and an open, open position. Favorably, the clamping device can be adapted to the transverse dimensions of the reinforcement.

Die separate Ausgestaltung des Bewehrungs-Halte-Grundkörpers und des Bewehrungs-Halte-Gegenkörpers erlaubt einen Austausch des Bewehrungs-Halte-Grundkörpers oder des Bewehrungs-Halte-Gegenkörpers, was beispielsweise eine spezielle Anpassung an die Bewehrung bzw. an äußere Gegebenheiten ermöglicht.The separate configuration of the reinforcement holder base body and the reinforcement holder counter-body allows the reinforcement holder base body or the reinforcement holder counter-body to be exchanged, which, for example, enables a special adaptation to the reinforcement or to external conditions.

Weiterhin stehen der Bewehrungs-Halte-Grundkörper und der Bewehrungs-Halte-Gegenkörper unter Bildung einer Schwenkachse miteinander in gelenkigem Eingriff. Es ist von Vorteil, wenn der Bewehrungs-Halte-Grundkörper in den Bewehrungs-Halte-Gegenkörper unter Bildung der Schwenkachse gelenkig eingreift bzw. durch diesen greift.Furthermore, the reinforcement-retaining base body and the reinforcement-retaining counter-body are in articulated engagement with one another, forming a pivot axis. It is advantageous if the reinforcement-retaining base body engages in the reinforcement-retaining counter-body in an articulated manner, forming the pivot axis, or engages through it.

Die Klemmeinrichtung umfasst mindestens einen Rückhaltevorsprung zum Rückhalten einer Erdungsleitung in der Klemmeinrichtung. Es ist zweckmäßig, wenn der mindestens eine Rückhaltevorsprung einstückig mit der Klemmeinrichtung verbunden ist. Vorzugsweise ist der mindestens eine Rückhaltevorsprung an dem Bewehrungs-Halte-Gegenkörper angeordnet und springt in Richtung auf den Bewehrungs-Halte-Grundkörper vor.The clamp includes at least one retention tab for retaining a ground wire in the clamp. It is expedient if the at least one retaining projection is connected in one piece to the clamping device. The at least one retaining projection is preferably arranged on the reinforcement-retaining counter-body and projects in the direction of the reinforcement-retaining base body.

Weitere vorteilhafte Ausgestaltungen der Erfindung sind in den Unteransprüchen angegeben.Further advantageous refinements of the invention are specified in the dependent claims.

Die Ausgestaltung gemäß dem Unteranspruch 2 erlaubt eine besonders gute Übertragung der Spannkraft der Spanneinrichtung auf die Klemmeinrichtung.The configuration according to dependent claim 2 allows a particularly good transmission of the clamping force of the clamping device to the clamping device.

Die Erdungsklemmen-Anordnung gemäß dem Unteranspruch 3 ist äußerst montagefreundlich und besonders einfach zu handhaben. Es ist sehr vorteilhaft, wenn bei der Montage nur eine einzige Schraube anzuziehen ist. Außerdem ist diese Ausgestaltung der Erdungsklemmen-Anordnung insbesondere auch kostengünstig herstellbar. Es ist von Vorteil, wenn durch Drehen der Spannschraube die Spannkraft und so auch die Klemmkraft veränderbar ist. Beispielsweise ist in/an dem Bewehrungs-Halte-Grundkörper ein zu der Spannschraube komplementäres Gewinde vorgesehen, während ein Kopf der Spannschraube benachbart zu dem Bewehrungs-Halte-Gegenkörper angeordnet ist. Eine umgekehrte bzw. getauschte Anordnung ist alternativ möglich. Eine Ausgestaltung mit einer separaten Spannmutter anstelle des Gewindes ist alternativ möglich.The grounding terminal arrangement according to dependent claim 3 is extremely easy to install and easy to handle. It is very advantageous if only one screw has to be tightened during assembly. In addition, this configuration of the grounding terminal arrangement can also be produced in a particularly cost-effective manner. It is advantageous if the clamping force and thus also the clamping force can be changed by turning the clamping screw. For example, a thread complementary to the clamping screw is provided in/on the reinforcement-retaining base body, while a head of the clamping screw is arranged adjacent to the reinforcement-retaining counter-body. A reversed or swapped arrangement is alternatively possible. An embodiment with a separate clamping nut instead of the thread is alternatively possible.

Die Ausgestaltung gemäß dem Unteranspruch 4 erlaubt ein sicheres örtliches Festlegen der Klemmeinrichtung gegenüber der Bewehrung. Es ist von Vorteil, wenn die mindestens eine Halte-Aufnahme in Seitenstegen bzw. Haltewänden des Bewehrungs-Halte-Grundkörpers ausgebildet ist. Vorzugsweise erweitert sich die mindestens eine Halte-Aufnahme nach außen, so dass Bewehrungen mit unterschiedlicher Querabmessung bzw. mit unterschiedlichem Querschnitt sicher aufnehmbar sind.The configuration according to dependent claim 4 allows the clamping device to be fixed securely in place relative to the reinforcement. It is advantageous if the at least one holding receptacle is formed in side bars or holding walls of the reinforcement holding base body. The at least one holding receptacle preferably widens outwards, so that reinforcements with different transverse dimensions or with different cross sections can be securely accommodated.

Die in dem Unteranspruch 5 angegebene Erdungsleitungs-Halteeinrichtung ermöglicht das sichere Halten von mindestens einer Erdungsleitung an der Klemmeinrichtung. Es ist von Vorteil, wenn die Erdungsleitungs-Halteeinrichtung imstande ist, mindestens zwei Erdungsleitungen zu halten. Die Erdungsleitungen können identisch oder unterschiedlich ausgeführt sein. Es ist von Vorteil, wenn die Erdungsleitungs-Halteeinrichtung außen auf dem Bewehrungs-Halte-Grundkörper oder bevorzugter auf dem Bewehrungs-Halte-Gegenkörper sitzt.The ground wire holding device specified in dependent claim 5 enables at least one ground wire to be held securely on the clamping device. It is advantageous if the ground wire holding device is capable of holding at least two ground wires. The grounding wires can be identical or different. It is advantageous if the grounding line holding device sits on the outside of the armouring holding base body or, more preferably, on the armouring holding counterbody.

Die Ausgestaltung gemäß dem Unteranspruch 6 führt zu einer Erdungsklemmen-Anordnung, die einerseits äußerst einfach handhabbar und andererseits besonders kostengünstig herstellbar ist. Die Erdungsleitungs-Halteeinrichtung ist gegenüber der Klemmeinrichtung in der nicht-spannenden Stellung der Spanneinrichtung verschwenkbar, was die Einstellung verschiedener Erdungsleitungs-Verlaufsrichtungen gegenüber der Bewehrung bzw. der Klemmeinrichtung erlaubt. Es ist von Vorteil, wenn die Erdungsleitungs-Halteeinrichtung durch die Spanneinrichtung in der spannenden Stellung örtlich festgelegt ist. Vorzugsweise übt die Spanneinrichtung in ihrer spannenden Stellung eine Spannkraft auf die Klemmeinrichtung aus, sodass die Klemmeinrichtung beispielsweise klemmend an der Bewehrung gehalten ist. Günstigerweise ist die Klemmeinrichtung in der nicht-spannenden Stellung der Spanneinrichtung im Wesentlichen von der Spanneinrichtung unbeaufschlagt, sodass die Klemmeinrichtung gegenüber der Bewehrung beweglich ist und/oder die Erdungsleitungen verstellbar bzw. beweglich sind.The configuration according to dependent claim 6 leads to a grounding clamp arrangement which is extremely easy to handle on the one hand and particularly inexpensive to produce on the other hand. The grounding line holding device can be pivoted relative to the clamping device in the non-clamping position of the clamping device, which allows different grounding line run directions to be set relative to the reinforcement or the clamping device. It is advantageous if the ground wire holding means is fixed in the clamped position by the clamping means. In its tensioned position, the tensioning device preferably exerts a tensioning force on the clamping device, so that the clamping device is held, for example, in a clamping manner on the reinforcement. In the non-clamping position of the clamping device, the clamping device is favorably not acted upon by the clamping device, so that the clamping device can be moved relative to the reinforcement and/or the grounding lines can be adjusted or moved.

Die Ausgestaltungen gemäß den Unteransprüchen 8 und 9 führen zu äußerst sicheren Gelenkverbindungen zwischen dem Bewehrungs-Halte-Grundkörper und dem Bewehrungs-Halte-Gegenkörper. Es ist von Vorteil, wenn der Bewehrungs-Halte-Grundkörper und/oder der Bewehrungs-Halte-Gegenkörper mindestens zwei Gelenkmittel bzw. Gegen-Gelenkmittel umfasst und unterschiedliche Schwenkachsen zwischen dem Bewehrungs-Halte-Grundkörper und dem Bewehrungs-Halte-Gegenkörper einstellbar sind, was beispielsweise eine Anpassung an die Bewehrung ermöglicht.The configurations according to the subclaims 8 and 9 lead to extremely secure articulated connections between the reinforcement-retaining base body and the reinforcement-retaining counter-body. It is advantageous if the reinforcement holder base body and/or the reinforcement holder counter-body comprises at least two articulation means or counter-joint means and different pivot axes can be set between the reinforcement holder base body and the reinforcement holder counter-body, which allows, for example, an adjustment to the reinforcement.

Nachfolgend werden unter Bezugnahme auf die beigefügte Zeichnung zwei bevorzugte Ausführungsformen der Erfindung beschrieben. Dabei zeigen:

  • 1 eine perspektivische Ansicht einer nicht-erfindungsgemäßen Erdungsklemmen-Anordnung,
  • 2 bis 4 die in 1 dargestellte Erdungsklemmen-Anordnung, wobei die Erdungsleitungen unterschiedlich orientiert zu der Bewehrung sind,
  • 5 bis 7 perspektivische Ansichten der in den 1 bis 4 dargestellten Erdungsklemmen-Anordnungen, wobei außerdem noch Erdungsleitungs-Halteeinrichtungen dargestellt sind,
  • 8 eine Explosionsansicht einer erfindungsgemäßen Erdungsklemmen-Anordnung, und
  • 9 bis 15 perspektivische Ansichten der in 8 gezeigten Erdungsklemmen-Anordnung, wobei unterschiedliche Erdungsleitungen in verschiedenen Orientierungen mit dargestellt sind.
Two preferred embodiments of the invention are described below with reference to the attached drawing. show:
  • 1 a perspective view of a grounding clip arrangement not according to the invention,
  • 2 until 4 in the 1 earthing clamp arrangement shown, with the earthing lines being oriented differently to the reinforcement,
  • 5 until 7 perspective views of the in the 1 until 4 illustrated grounding clamp assemblies, wherein grounding wire holding devices are also shown,
  • 8th an exploded view of a grounding clamp assembly according to the invention, and
  • 9 until 15 perspective views of the in 8th shown ground clip arrangement, with different ground wires in different orientations being shown.

Zunächst wird die in den 1 bis 7 dargestellte Erdungsklemmen-Anordnung 1 näher beschrieben. Diese Erdungsklemmen-Anordnung 1 umfasst eine Klemmeinrichtung 2 zum klemmenden Anordnen der Erdungsklemmen-Anordnung 1 an einem Betonstabstahl 3 und eine einzige Spannschraube 4 zum Beaufschlagen der Klemmeinrichtung 2 mit einer auf den Betonstabstahl 3 wirkenden Klemmkraft, sodass die Klemmeinrichtung 2 gegenüber dem Betonstabstahl 3 klemmend örtlich festgelegt ist.First, the in the 1 until 7 shown grounding clamp assembly 1 described in more detail. This grounding clamp arrangement 1 comprises a clamping device 2 for the clamping arrangement of the grounding clamp arrangement 1 on a rebar 3 and a single clamping screw 4 for subjecting the clamping device 2 to a clamping force acting on the rebar 3, so that the clamping device 2 counteracts is fixed over the rebar 3 clamping.

Der Betonstabstahl 3 ist Bestandteil einer Bewehrung eines Betonbauteils (nicht dargestellt). Alternativ bildet der Betonstabstahl 3 alleine die Bewehrung des Betonbauteils. Der Betonstabstahl 3 ist im Querschnitt im Wesentlichen kreisförmig und hat in Abhängigkeit des Anwendungsfalls einen Durchmesser zwischen 6 mm und 40 mm. Er hat vorzugsweise zwei Rippenflächen mit äußeren Rippen.The rebar 3 is part of a reinforcement of a concrete component (not shown). Alternatively, the reinforcing steel bar 3 alone forms the reinforcement of the concrete component. The rebar 3 is essentially circular in cross-section and has a diameter of between 6 mm and 40 mm, depending on the application. It preferably has two rib faces with outer ribs.

Die Klemmeinrichtung 2 ist im Wesentlichen U-förmig ausgeführt. Sie umfasst einen Bewehrungs-Halte-Grundkörper 5 und einen Bewehrungs-Halte-Gegenkörper 6 sowie ein Verbindungsstück 7, das den Bewehrungs-Halte-Grundkörper 5 und den Bewehrungs-Halte-Gegenkörper 6 miteinander verbindet. Der Bewehrungs-Halte-Grundkörper 5 und der Bewehrungs-Halte-Gegenkörper 6 bilden jeweils einen U-Schenkel, während das Verbindungsstück 7 eine U-Basis bildet. Der Bewehrungs-Halte-Gegenkörper 6 und der Bewehrungs-Halte-Grundkörper 5 sind also einander gegenüberliegend angeordnet.The clamping device 2 is essentially U-shaped. It comprises a reinforcement support base body 5 and a reinforcement support counter body 6 and a connecting piece 7 which connects the reinforcement support base body 5 and the reinforcement support counter body 6 to one another. The reinforcement holding base body 5 and the reinforcement holding counter body 6 each form a U-leg, while the connecting piece 7 forms a U-base. The reinforcement-retaining counter-body 6 and the reinforcement-retaining base body 5 are thus arranged opposite one another.

Die Klemmeinrichtung 2 ist metallisch ausgeführt. Sie ist beispielsweise aus Stahl, Kupfer, Edelstahl, und/oder Aluminium gebildet.The clamping device 2 is made of metal. It is made of steel, copper, stainless steel and/or aluminum, for example.

Der Bewehrungs-Halte-Grundkörper 5, der Bewehrungs-Halte-Gegenkörper 6 und das Verbindungsstück 7 sind einteilig bzw. einstückig miteinander verbunden. Die Klemmeinrichtung 2 ist dafür als Biegestück ausgeführt, dessen Ausgangskörper vorzugsweise durch Stanzen hergestellt ist.The reinforcement holding base body 5, the reinforcement holding counter body 6 and the connecting piece 7 are connected to one another in one piece or in one piece. For this purpose, the clamping device 2 is designed as a bent piece, the starting body of which is preferably produced by stamping.

Der Bewehrungs-Halte-Grundkörper 5 hat eine längliche Grundplatte 8, die rechteckig ausgeführt ist und vorzugsweise durch mindestens eine Sicke (nicht dargestellt) versteift bzw. verstärkt ist. Die Grundplatte 8 schließt sich entlang einer ersten Biegelinie 9 an das Verbindungsstück 7 an, so dass die erste Biegelinie 9 auch eine erste Anschlusslinie bildet. Gegenüber zu der ersten Biegelinie 9 weist die Grundplatte 8 eine freie Abschlusskante 10 auf.The reinforcement-retaining base body 5 has an elongated base plate 8, which is rectangular and is preferably stiffened or reinforced by at least one bead (not shown). The base plate 8 follows the connecting piece 7 along a first bending line 9, so that the first bending line 9 also forms a first connecting line. Opposite the first bending line 9 , the base plate 8 has a free end edge 10 .

Zwischen der ersten Biegelinie 9 und der freien Abschlusskante 10 grenzen außen an die Grundplatte 8 zwei seitliche Haltewände 11 an, die mit der Grundplatte 8 jeweils einen rechten Winkel einschließen und in Richtung auf den Bewehrungs-Halte-Gegenkörper 6 vorspringen. Die Haltewände 11 sind Bestandteil des Bewehrungs-Halte-Grundkörpers 5 und durch Biegen gebildet.Between the first bending line 9 and the free end edge 10 , two lateral holding walls 11 adjoin the base plate 8 on the outside. The retaining walls 11 are part of the reinforcement-retaining base body 5 and are formed by bending.

Benachbart zu der freien Abschlusskante 10 ist in jeder Haltewand 11 eine Vertiefung 12 ausgebildet, die von einem der Grundplatte 8 abgewandten Rand 13 der jeweiligen Haltewand 11 ausgeht und sich in Richtung auf die Grundplatte 8 verjüngt. Die Vertiefungen 12 dienen zum örtlichen Festlegen der Klemmeinrichtung 2 bzw. der Erdungsklemmen-Anordnung 1 an dem Betonstabstahl 3, der dann zumindest teilweise in die Vertiefungen 12 eingreift.A depression 12 is formed in each retaining wall 11 adjacent to the free end edge 10 , which starts from an edge 13 of the respective retaining wall 11 facing away from the base plate 8 and tapers in the direction of the base plate 8 . The indentations 12 serve to fix the clamping device 2 or the grounding clamp arrangement 1 in place on the rebar 3 , which then at least partially engages in the indentations 12 .

In der Grundplatte 8 ist eine Spannschrauben-Aufnahme 14 vorhanden, die im Querschnitt kreisförmig ausgeführt ist und ein Innengewinde 15 trägt. Die Spannschrauben-Aufnahme 14 ist in der Grundplatte 8 mittig zwischen den Haltewänden 11 und ausgehend von der ersten Biegelinie 9 vor den Vertiefungen 12 angeordnet.In the base plate 8 there is a clamping screw receptacle 14 which is circular in cross section and has an internal thread 15 . The clamping screw receptacle 14 is arranged in the base plate 8 centrally between the retaining walls 11 and, starting from the first bending line 9, in front of the depressions 12.

Der Bewehrungs-Halte-Grundkörper 5 ist bezüglich einer Mittelebene (nicht dargestellt) symmetrisch ausgeführt, die sich senkrecht zu der ersten Biegelinie 9 mittig zwischen den Haltewänden 11 erstreckt.The reinforcement holding base body 5 is designed symmetrically with respect to a central plane (not shown), which extends centrally between the holding walls 11 perpendicularly to the first bending line 9 .

Der Bewehrungs-Halte-Gegenkörper 6 ist plattenartig ausgeführt und schließt sich entlang einer zweiten Biegelinie 16 an das Verbindungsstück 7 an, so dass die zweite Biegelinie 16 eine zweite Anschlusslinie bildet. Die Biegelinien 9, 16 verlaufen parallel, aber beabstandet zueinander.The reinforcement-retaining counter-body 6 is plate-like and connects to the connecting piece 7 along a second bending line 16, so that the second bending line 16 forms a second connecting line. The bending lines 9, 16 are parallel but spaced apart from one another.

Der Bewehrungs-Halte-Gegenkörper 6 erstreckt sich von dem Verbindungsstück 7 ausgehend über den Bewehrungs-Halte-Grundkörper 5 bzw. dessen freie Abschlusskante 10 vorne hinweg, sodass er gegenüber der freien Abschlusskante 10 übersteht. Er erstreckt sich außerdem seitlich über den Bewehrungs-Halte-Grundkörper 5 bzw. dessen Haltewände 11 hinweg, sodass er gegenüber den Haltewänden 11 seitlich übersteht.The reinforcement-retaining counter-body 6 extends from the connection piece 7 over the reinforcement-retaining base body 5 or its free end edge 10 at the front, so that it overhangs the free end edge 10 . It also extends laterally beyond the reinforcement-retaining base body 5 or its retaining walls 11 , so that it projects laterally beyond the retaining walls 11 .

Der Bewehrungs-Halte-Gegenkörper 6 hat eine erste und zweite Seitenkante 48 bzw. 49 und eine zwischen diesen verlaufende, freie Abschlusskante 50, die parallel und gegenüber liegend zu der zweiten Biegelinie 16 verläuft. Die Seitenkanten 48, 49 verlaufen parallel zueinander.The reinforcement-retaining counter-body 6 has a first and second side edge 48 and 49 and a free end edge 50 running between them, which runs parallel and opposite to the second bending line 16 . The side edges 48, 49 run parallel to one another.

Der Bewehrungs-Halte-Gegenkörper 6 ist vorzugsweise durch mindestens eine Sicke 17 versteift bzw. verstärkt.The reinforcement holding counter body 6 is preferably stiffened or reinforced by at least one bead 17 .

Gegenüberliegend zu der zweiten Biegelinie 16 hat der Bewehrungs-Halte-Gegenkörper 6 bei der freien Abschlusskante 50 einen im Wesentlichen in Richtung auf den Bewehrungs-Halte-Grundkörper 5 vorspringenden Rückhaltevorsprung 18, der aus dem eigentlichen Bewehrungs-Halte-Gegenkörper 6 herausgebogen worden ist. Der Rückhaltevorsprung 18 ist außermittig bei der freien Abschlusskante 50 und so seitlich versetzt in Richtung auf die erste Seitenkante 48 angeordnet.Opposite the second bending line 16, the reinforcement holding counter-body 6 has at the free end edge 50 a retaining projection 18 which protrudes essentially in the direction of the reinforcement-holding base body 5 and which has been bent out of the actual reinforcement-holding counter body 6. The retaining projection 18 is arranged eccentrically at the free end edge 50 and is thus laterally offset in the direction of the first side edge 48 .

Zwischen der zweiten Biegelinie 16 und dem Rückhaltevorsprung 18 ist in dem Bewehrungs-Halte-Gegenkörper 6 ein Durchführungsfenster 19 angeordnet. Das Durchführungsfenster 19 ist mittig zwischen den Seitenkanten 48, 49 angeordnet. Es ist vorzugsweise in der Fläche größer als die Spannschrauben-Aufnahme 14 und ist gegenüberliegend zu dieser platziert. Es ist von Vorteil, wenn das Durchführungsfenster 19 langlochartig ausgeführt ist und sich mit seiner Haupterstreckung zwischen der zweiten Biegelinie 16 und dem Rückhaltevorsprung 18 erstreckt.Between the second bending line 16 and the retaining projection 18 is in the reinforcement Holding counter-body 6 has a feed-through window 19 arranged. The feedthrough window 19 is arranged centrally between the side edges 48,49. It is preferably larger in area than the turnbuckle receptacle 14 and is placed opposite thereto. It is advantageous if the lead-through window 19 is in the form of a slot and extends with its main extent between the second bending line 16 and the retaining projection 18 .

Das Verbindungsstück 7 ist plattenartig ausgeführt. Es erweitert sich von der ersten Biegelinie 9 aus in Richtung auf die zweite Biegelinie 16. Nach seitlich außen ist das Verbindungsstück 7 durch Außenränder 20, 21 begrenzt, die sich zwischen dem Bewehrungs-Halte-Grundkörper 5 und dem Bewehrungs-Halte-Gegenkörper 6 erstrecken.The connector 7 is plate-like. It widens from the first bending line 9 in the direction of the second bending line 16 . The connecting piece 7 is delimited laterally outwards by outer edges 20 , 21 which extend between the reinforcement holding base body 5 and the reinforcement holding counter body 6 .

Benachbart zu dem Bewehrungs-Halte-Gegenkörper 6 erstreckt sich in dem Verbindungsstück 7 ein Schwenkschlitz 22. Der Schwenkschlitz 22 schließt sich im Wesentlichen an die zweite Biegelinie 16 an und verläuft entlang derselben. Er verläuft außerdem beabstandet zu der ersten Biegelinie 9. Der Schwenkschlitz 22 hat eine konstante Öffnungsweite W. Der Schwenkschlitz 22 geht dabei von dem Außenrand 20 aus und ist so dort offen. Der Außenrand 20 verläuft benachbart zu der ersten Seitenkante 48 bzw. geht er im Wesentlichen von dieser aus. Der Schwenkschlitz 22 endet vor dem Außenrand 21. Er endet außermittig zwischen den Außenrändern 20, 21 in etwa auf der Höhe des Rückhaltevorsprungs 18. Der Schwenkschlitz 22 ist nach innen durch ein Anschlagteil 30 des Verbindungsstücks 7 begrenzt.A pivoting slot 22 extends in the connecting piece 7 adjacent to the reinforcement holding counter-body 6. The pivoting slot 22 essentially follows the second bending line 16 and runs along the same. It also runs at a distance from the first bending line 9. The pivoting slot 22 has a constant opening width W. The pivoting slot 22 starts from the outer edge 20 and is therefore open there. The outer edge 20 extends adjacent to, or substantially extends from, the first side edge 48 . The pivoting slot 22 ends in front of the outer edge 21. It ends eccentrically between the outer edges 20, 21 approximately at the height of the retaining projection 18. The pivoting slot 22 is bounded on the inside by a stop part 30 of the connecting piece 7.

In dem Verbindungsstück 7 ist außerdem ein Schwächungsfenster 23 angeordnet, das umfangsseitig geschlossen ist und sich zwischen dem Außenrand 21 und dem Schwenkschlitz 22 entlang der zweiten Biegelinie 16 erstreckt.In addition, a weakening window 23 is arranged in the connecting piece 7 , which is closed on the peripheral side and extends between the outer edge 21 and the pivot slot 22 along the second bending line 16 .

Die Spannschraube 4 hat einen im Wesentlichen zylindrischen Kern 24, an dessen einem Ende ein Mehrkant-Kopf 25 angeordnet ist. Alternativ ist ein anderer Kopf vorhanden. Die Spannschraube 4 weist an dem Kern 24 ein Außengewinde 26 auf.The clamping screw 4 has an essentially cylindrical core 24, at one end of which a polygonal head 25 is arranged. Alternatively, another head is available. The clamping screw 4 has an external thread 26 on the core 24 .

Die Spannschraube 24 durchsetzt mit ihrem Kern 24 das Durchführungsfenster 19 und die Spannschrauben-Aufnahme 14 und somit die Klemmeinrichtung 2. Der Mehrkant-Kopf 25 liegt dabei gemäß 1 bis 4 außenseitig an dem Bewehrungs-Halte-Gegenkörper 6 an, während das Außengewinde 26 der Spannschraube 4 mit dem zu diesem komplementären Innengewinde 15 an dem Bewehrungs-Halte-Grundkörper 5 in Gewindeverbindung bzw. Eingriff steht. Durch Drehen der Spannschraube 4 um deren Längsmittelachse ändert sich die durch die Spannschraube 4 auf die Klemmeinrichtung 2 ausgeübte Spannkraft und die auf die Bewehrung 3 ausgeübte Klemmkraft.The clamping screw 24 penetrates with its core 24 the lead-through window 19 and the clamping screw receptacle 14 and thus the clamping device 2. The polygonal head 25 is in accordance with FIG 1 until 4 on the outside of the reinforcement-retaining counter-body 6, while the external thread 26 of the clamping screw 4 is in threaded connection or engagement with the internal thread 15 complementary to this on the reinforcement-retaining base body 5. By rotating the clamping screw 4 about its longitudinal central axis, the clamping force exerted by the clamping screw 4 on the clamping device 2 and the clamping force exerted on the reinforcement 3 change.

Nachfolgend wird auch unter Bezugnahme auf 2 ein erster möglicher Einsatz der in 1 dargestellten Erdungsklemmen-Anordnung 1 beschrieben. Wie aus 2 hervorgeht, ist in den Vertiefungen 12 der Betonstabstahl 3 sicher aufgenommen. Der Betonstabstahl 3 erstreckt sich parallel zu dem Verbindungsstück 7 bzw. zu den Biegelinien 9, 16. Er verläuft zwischen dem Bewehrungs-Halte-Grundkörper 5 und dem Bewehrungs-Halte-Gegenkörper 6. Der Betonstabstahl 3 verläuft außerdem zwischen der Spannschraube 4 und der Abschlusskante 10 des Bewehrungs-Halte-Grundkörpers 5 in der Klemmeinrichtung 2.In the following, also with reference to 2 a first possible use of the in 1 illustrated grounding clamp assembly 1 described. How out 2 shows, the rebar 3 is securely accommodated in the depressions 12 . The rebar 3 extends parallel to the connecting piece 7 or to the bending lines 9, 16. It runs between the reinforcement holding base body 5 and the reinforcement holding counter body 6. The rebar 3 also runs between the clamping screw 4 and the end edge 10 of the reinforcement holding base body 5 in the clamping device 2.

Zwischen dem Betonstabstahl 3 und dem Bewehrungs-Halte-Gegenkörper 6 erstreckt sich entlang des Betonstabstahls 3 und parallel zu diesem eine erste Erdungsleitung 27, die als Flachbandleiter ausgeführt ist und so eine dem Betonstabstahl 3 entsprechende Erdungsleitungs-Verlaufsrichtung hat. Die erste Erdungsleitung 27 liegt außen an dem Betonstabstahl 3 an. Sie liegt außerdem innen an dem Bewehrungs-Halte-Gegenkörper 6 an. Die erste Erdungsleitung 27 und der Betonstabstahl 3 sind elektrisch miteinander verbunden. Durch die Erdungsklemmen-Anordnung 1 sind der Betonstabstahl 3 und die erste Erdungsleitung 27 mechanisch und elektrisch miteinander verbunden.Between the rebar 3 and the reinforcement-holding counter-body 6 extends along the rebar 3 and parallel to it, a first grounding line 27, which is designed as a flat conductor and so has a grounding line course direction corresponding to the rebar 3. The first grounding line 27 rests on the outside of the reinforcing steel bar 3 . It also rests on the inside of the counter-body 6 for holding the reinforcement. The first ground wire 27 and the reinforcing bar 3 are electrically connected to each other. The earthing clamp arrangement 1 mechanically and electrically connects the rebar 3 and the first earthing line 27 to one another.

Der Rückhaltevorsprung 18 liegt an einem dem Verbindungsstück 7 abgewandten Außenrand 28 der ersten Erdungsleitung 27 an bzw. ist der Rückhaltevorsprung 18 benachbart, aber beabstandet zu dem Außenrand 28 angeordnet. Der Rückhaltevorsprung 18 hält die erste Erdungsleitung 27 so sicher in der Klemmeinrichtung 2.The retaining projection 18 rests against an outer edge 28 of the first grounding line 27 facing away from the connecting piece 7 or the retaining projection 18 is arranged adjacent to but at a distance from the outer edge 28 . The retaining projection 18 thus securely holds the first grounding line 27 in the clamping device 2.

Ein dem Außenrand 28 gegenüberliegender Innenrand 29 der ersten Erdungsleitung 27 ist dem Kern 24 zugewandt. Der Innenrand 29 der ersten Erdungsleitung 27 kann an dem Kern 24 außenseitig anliegen oder beabstandet zu diesem verlaufen.An inner edge 29 of the first ground line 27 opposite the outer edge 28 faces the core 24 . The inner edge 29 of the first grounding line 27 can rest on the outside of the core 24 or run at a distance from it.

Beim Anbringen der Klemmeinrichtung 2 an dem Betonstabstahl 3 befindet sich diese in ihrer Öffnungsstellung. Die Klemmeinrichtung 2 kann in der Öffnungsstellung ausgeliefert werden, was bevorzugt ist, oder in diese durch Auseinanderschwenken des Bewehrungs-Halte-Grundkörper 5 und des Bewehrungs-Halte-Gegenkörpers 6 um die zweite Biegelinie 16 gebracht werden. Das Auseinanderschwenken wird durch das Schwächungsfenster 23 ermöglicht bzw. vereinfacht.When attaching the clamping device 2 to the rebar 3, it is in its open position. The clamping device 2 can be delivered in the open position, which is preferred, or it can be brought into this position by pivoting the reinforcement-retaining base body 5 and the reinforcement-retaining counter-body 6 apart about the second bending line 16 . Pivoting apart is made possible or simplified by the weakening window 23 .

Der Bewehrungs-Halte-Grundkörper 5 und der Bewehrungs-Halte-Gegenkörper 6 werden dann in ihre Haltestellung um die zweite Biegelinie 16 verschwenkt. Das Zusammenschwenken wird durch das Schwächungsfenster 23 ermöglicht bzw. vereinfacht. Dies kann durch Anziehen der Spannschraube 4 oder händisch erfolgen. Zur sicheren örtlichen Festlegung der Klemmeinrichtung 2 an dem Betonstabstahl 3 wird die Spannschraube 4 weiter angezogen, sodass der Bewehrungs-Halte-Grundkörper 5 und der Bewehrungs-Halte-Gegenkörper 6 von außen gegen die erste Erdungsleitung 27 und den Betonstabstahl 3 drücken. Die Klemmeinrichtung 2 und die erste Erdungsleitung 27 sowie der Betonstabstahl 3 sind nun relativ zueinander unbeweglich.The reinforcement holding base body 5 and the reinforcement holding counter body 6 are then pivoted about the second bending line 16 in its holding position. Pivoting together is made possible or simplified by the weakening window 23 . This can be done by tightening the clamping screw 4 or by hand. To securely fix the clamping device 2 to the rebar 3 , the clamping screw 4 is tightened further so that the base body 5 for holding the reinforcement and the counter-body 6 for holding the reinforcement press from the outside against the first earthing line 27 and the reinforcing steel bar 3 . The clamping device 2 and the first grounding line 27 and the rebar 3 are now immovable relative to one another.

Insbesondere Bezug nehmend auf 3 wird nachfolgend ein weiterer möglicher Einsatz der Erdungsklemmen-Anordnung 1 gemäß 1 beschrieben. Hier sind der in den Vertiefungen 12 aufgenommene Betonstabstahl 3 und die erste Erdungsleitung 27 einander rechtwinklig kreuzend angeordnet, sodass die erste Erdungsleitung 27 eine zu dem Betonstabstahl 3 senkrecht orientierte Erdungsleitungs-Verlaufsrichtung hat. Dafür greift die erste Erdungsleitung 27 von seitlich außen in den Schwenkschlitz 22 vollständig ein. Die erste Erdungsleitung 27 ist dafür quasi über den Außenrand 20 in den Schwenkschlitz 22 eingeführt worden.Referring in particular to 3 Another possible use of the grounding clamp arrangement 1 is shown below 1 described. Here, the reinforcing steel bar 3 accommodated in the recesses 12 and the first grounding line 27 are arranged crossing one another at right angles, so that the first grounding line 27 has a grounding line course direction oriented perpendicularly to the reinforcing steel bar 3 . For this purpose, the first grounding line 27 fully engages in the pivoting slot 22 from the outside. For this purpose, the first grounding line 27 has been introduced into the pivoting slot 22 over the outer edge 20 .

Es ist von Vorteil, wenn dabei die erste Erdungsleitung 27 seitlich an dem Rückhaltevorsprung 18 und/oder an dem dem Schwenkschlitz 22 nach innen liegenden Anschlagteil 30 des Verbindungsstücks 7 anliegt bzw. beabstandet, benachbart zu diesem verläuft. Die erste Erdungsleitung 27 kann außerdem seitlich an dem Kern 24 anliegen oder beabstandet, benachbart zu diesem verlaufen. Die erste Erdungsleitung 27 liegt wieder innenseitig an dem Bewehrungs-Halte-Gegenkörper 6 an. Die Klemmeinrichtung 2 und die erste Erdungsleitung 27 sowie der Betonstabstahl 3 sind relativ zueinander unbeweglich, wenn sich die Spannschraube 4 in ihrer spannenden Stellung befindet. Durch die sich an den Bewehrungs-Halte-Gegenkörper 6 anschließenden Bereiche des Verbindungsstücks 7 ist dort der Bewehrungs-Halte-Gegenkörper 6 gegenüber dem Verbindungsstück 7 abgestützt.It is advantageous if the first grounding line 27 rests laterally on the retaining projection 18 and/or on the stop part 30 of the connecting piece 7 lying inwardly of the pivoting slot 22 or at a distance from it, runs adjacent thereto. The first ground line 27 may also abut the core 24 laterally or spaced adjacent thereto. The first grounding line 27 is again in contact with the counter-body 6 for holding the reinforcement. The clamping device 2 and the first grounding line 27 and the reinforcing steel bar 3 are immovable relative to one another when the clamping screw 4 is in its clamping position. The reinforcement holding counter body 6 is supported relative to the connecting piece 7 by the areas of the connecting piece 7 adjoining the reinforcement holding counter body 6 .

Das Anbringen und Fixieren der Klemmeinrichtung 2 erfolgt im Wesentlichen analog zu 2.The attachment and fixing of the clamping device 2 is essentially analogous to 2 .

Wie aus 4 gut hervorgeht, sind auch Zwischenorientierungen zwischen dem Betonstabstahl 3 und der ersten Erdungsleitung 27 möglich, sodass die erste Erdungsleitung 27 eine zu dem Betonstabstahl 3 schräg orientierte Erdungsleitungs-Verlaufsrichtung hat. Der Betonstabstahl 3 ist wieder in den Vertiefungen 12 aufgenommen. Die erste Erdungsleitung 27 ist nun beabstandet zu dem ersten Anschlagteil 30 angeordnet und greift nur teilweise in den Schwenkschlitz 22 ein. Sie kann an dem Rückhaltevorsprung 18 anliegen. Außerdem liegt sie innen an dem Bewehrungs-Halte-Gegenkörper 6 an. Sie kann außerdem seitlich an dem Kern 24 anliegen oder benachbart, beabstandet zu diesem verlaufen. Die Klemmeinrichtung 2 und die erste Erdungsleitung 27 sowie der Betonstabstahl 3 sind nun relativ zueinander unbeweglich, wenn sich die Spannschraube 4 in ihrer spannenden Stellung befindet.How out 4 It is clear that intermediate orientations between the reinforcing steel bar 3 and the first grounding line 27 are also possible, so that the first grounding line 27 has a grounding line course direction that is oriented obliquely to the reinforcing steel bar 3 . The rebar 3 is again accommodated in the recesses 12 . The first ground wire 27 is now spaced from the first stop member 30 and only partially engages the pivot slot 22 . It can lie against the retaining projection 18 . In addition, it lies on the inside of the counter-body 6 for holding the reinforcement. It can also lie laterally against the core 24 or run adjacent to, at a distance from, this. The clamping device 2 and the first grounding line 27 and the reinforcing steel bar 3 are now immovable relative to one another when the clamping screw 4 is in its clamping position.

Gemäß 5 ist außen an dem Bewehrungs-Halte-Gegenkörper 6 eine Erdungsleitungs-Halteeinrichtung 31 angeordnet, die ein separates Bauteil ist und Bestandteil der Erdungsklemmen-Anordnung 1 ist. Die Erdungsleitungs-Halteeinrichtung 31 hat eine Aufwölbung 32, deren kreisabschnittförmig gekrümmte Unterseite 33 einen Krümmungsradius aufweist, der dem Radius einer zu haltenden, als Rundleitung ausgeführten, zweiten Erdungsleitung 34 ähnelt bzw. entspricht. Seitlich neben der Aufwölbung 32 hat die Erdungsleitungs-Halteeinrichtung 31 eine Aussparung 35.According to 5 an earthing line holding device 31 is arranged on the outside of the reinforcement holding counter-body 6 , which is a separate component and is part of the earthing clamp arrangement 1 . The grounding line holding device 31 has a bulge 32, the underside 33 of which is curved in the shape of a segment of a circle and has a radius of curvature which is similar to or corresponds to the radius of a second grounding line 34 to be held and designed as a round line. On the side next to the bulge 32, the grounding line holding device 31 has a recess 35.

Die erste Erdungsleitung 27 und der Betonstabstahl 3 sind entsprechend 2 angeordnet. Die erste Erdungsleitung 27 kann auch anders orientiert sein oder sogar fehlen.The first ground wire 27 and the rebar 3 correspond 2 arranged. The first grounding line 27 can also be oriented differently or even absent.

Die Spannschraube 4 durchsetzt im montierten Zustand der Erdungsklemmen-Anordnung 1 mit ihrem Kern 24 zusätzlich zu der Klemmeinrichtung 2 - wie bereits erwähnt - nun auch die Aussparung 35. Die Erdungsleitungs-Halteeinrichtung 31 ist um die Spannschraube 4 bzw. deren Längsmittelachse 36 verschwenkbar, wenn die Spannschraube 4 noch nicht angezogen ist. Der Mehrkant-Kopf 25 liegt außen an der Erdungsleitungs-Halteeinrichtung 31 an und drückt diese und die in der Aufwölbung 32 aufgenommene zweite Erdungsleitung 34 außen gegen die Klemmeinrichtung 2 bzw. den Bewehrungs-Halte-Gegenkörper 6. Die Klemmeinrichtung 2, die erste und zweite Erdungsleitung 27, 34 sowie der Betonstabstahl 3 sind nun relativ zueinander unbeweglich, wenn sich die Spannschraube 4 in ihrer spannenden Stellung befindet.In the assembled state of the grounding terminal arrangement 1, the clamping screw 4 with its core 24 now also passes through the recess 35 in addition to the clamping device 2 - as already mentioned the clamping screw 4 has not yet been tightened. The polygonal head 25 rests on the outside of the grounding line holding device 31 and presses it and the second grounding line 34 accommodated in the bulge 32 on the outside against the clamping device 2 or the reinforcement-holding counter-body 6. The clamping device 2, the first and second Ground wire 27, 34 and the rebar 3 are now immovable relative to each other when the clamping screw 4 is in its exciting position.

Durch Anziehen der Spannschraube 4 ist die Klemmkraft auch auf die zweite Erdungsleitung 34 steigerbar.By tightening the clamping screw 4, the clamping force can also be increased on the second grounding line 34.

Gemäß 6 hat die Erdungsleitungs-Halteeinrichtung 31 seitlich neben der Aussparung 35 zwei Aufwölbungen 32. Die Aufwölbungen 32 verlaufen parallel zueinander und sind vorzugsweise identisch. In jeder Aufwölbung 32 ist eine zweite Erdungsleitung 34 aufnehmbar. Gemäß 6 wird nur eine zweite Erdungsleitung 34 gehalten. Ansonsten wird auf die Beschreibung zu 5 verwiesen.According to 6 the ground wire holding device 31 has two bulges 32 laterally next to the recess 35. The bulges 32 run parallel to one another and are preferably identical. A second grounding line 34 can be accommodated in each bulge 32 . According to 6 only a second ground line 34 is maintained. Otherwise, refer to the description 5 referred.

Gemäß 7 ist die separate Erdungsleitungs-Halteeinrichtung 31 im Querschnitt im Wesentlichen U-förmig ausgeführt. Diese ist symmetrisch ausgeführt und hat eine Basisplatte 37 sowie zwei einander gegenüberliegende Seitenwände 38. In jeder Seitenwand 38 ist eine im Wesentlichen kreissegment-, bevorzugter halbkreisförmige, erste Öffnung 39 und eine rechteckförmige, zweite Öffnung 40 angeordnet, die jeweils an dem freien Außenrand 41 der jeweiligen Seitenwand 38 und somit auch zu dem Bewehrungs-Halte-Gegenkörper 6 hin offen sind.According to 7 For example, the separate ground wire holder 31 is formed into a substantially U-shape in cross section. This is symmetrical and has a base plate 37 and two opposite side walls 38. In each side wall 38 there is a first opening 39, which is essentially in the shape of a segment of a circle, preferably semi-circular, and a rectangular, second opening 40, each of which is located on the free outer edge 41 of the respective side wall 38 and thus also to the reinforcement holding counter body 6 are open.

Durch die ersten Öffnungen 39 ist eine zweite Erdungsleitung 34 führbar (nicht dargestellt). Die zweite Erdungsleitung 34 ist dort durch Klemmen zwischen der Erdungsleitungs-Halteeinrichtung 31 und dem Bewehrungs-Halte-Gegenkörper 6 örtlich festlegbar. Durch die zweiten Öffnungen 40 ist eine erste Erdungsleitung 27 führbar (nicht dargestellt). Die erste Erdungsleitung 27 ist dort durch Klemmen zwischen der Erdungsleitungs-Halteeinrichtung 31 und dem Bewehrungs-Halte-Gegenkörper 6 örtlich festlegbar. Durch den durch die Basisplatte 37 und die Seitenwände 38 begrenzten Innenraum 51 ist zusätzlich oder alternativ eine zweite Erdungsleitung 34 führbar. Die zweite Erdungsleitung 34 ist dort durch Klemmen zwischen der Erdungsleitungs-Halteeinrichtung 31 und dem Bewehrungs-Halte-Gegenkörper 6 örtlich festlegbar. Ansonsten wird auf die Beschreibung zu 5 verwiesen.A second grounding line 34 can be routed through the first openings 39 (not shown). The second grounding line 34 can be fixed locally by clamping between the grounding line holding device 31 and the counter-body 6 for holding the reinforcement. A first grounding line 27 can be routed through the second openings 40 (not shown). The first grounding line 27 can be fixed locally by clamping between the grounding line holding device 31 and the counter-body 6 for holding the reinforcement. Additionally or alternatively, a second grounding line 34 can be routed through the interior space 51 delimited by the base plate 37 and the side walls 38 . The second grounding line 34 can be fixed locally by clamping between the grounding line holding device 31 and the counter-body 6 for holding the reinforcement. Otherwise, refer to the description 5 referred.

Nachfolgend wird unter Bezugnahme auf die 8 bis 16 eine erfindungsgemäße Ausführungsform der Erdungsklemmen-Anordnung beschrieben. Identische Bauteile erhalten dieselben Bezugszeichen wie bei der vorherigen Ausführungsform, auf die hiermit verwiesen wird. Konstruktiv unterschiedliche, jedoch funktionell gleichartige Bauteile erhalten dieselben Bezugszeichen mit einem nachgeordneten „a“.In the following, with reference to the 8th until 16 an embodiment of the grounding clamp arrangement according to the invention is described. Identical components are given the same reference numbers as in the previous embodiment to which reference is hereby made. Structurally different but functionally similar components are given the same reference numbers with an “a” after them.

Zunächst Bezug nehmend auf 8 sind bei der Erdungsklemmen-Anordnung 1a der Bewehrungs-Halte-Grundkörper 5a und der Bewehrungs-Halte-Gegenkörper 6a separat ausgeführt. Die Klemmeinrichtung 2a ist somit zweiteilig ausgeführt.Referring first to 8th the reinforcement-holding base body 5a and the reinforcement-holding counter-body 6a are designed separately in the grounding clamp arrangement 1a. The clamping device 2a is therefore designed in two parts.

Der Bewehrungs-Halte-Grundkörper 5a hat im Gegensatz zu der vorherigen Ausführungsform gegenüberliegend zu der freien Abschlusskante 10 einen Gelenkvorsprung 42, der sich an die Grundplatte 8 anschließt und eine äußere, gekrümmte Lagerfläche 43 hat. Die Lagerfläche 43 ist dem eigentlichen Bewehrungs-Halte-Gegenkörper 6a abgewandt. In der Grundplatte 8 verlaufen Sicken 44 parallel zu den Haltewänden 11.In contrast to the previous embodiment, the reinforcement holding base body 5a has a joint projection 42 opposite the free end edge 10, which is connected to the base plate 8 and has an outer, curved bearing surface 43. The bearing surface 43 faces away from the actual reinforcement holding counter-body 6a. Beads 44 run parallel to the retaining walls 11 in the base plate 8.

Das Verbindungsstück 7a ist nun Bestandteil des Bewehrungs-Halte-Gegenkörpers 6a. Der Bewehrungs-Halte-Gegenkörper 6a und das Verbindungsstück 7a sind einteilig als Biegestück ausgeführt. Zwischen dem Bewehrungs-Halte-Gegenkörper 6a und dem Verbindungsstück 7a verläuft somit wieder die zweite Biegelinie 16. Vorzugsweise sind der Bewehrungs-Halte-Gegenkörper 6a und das Verbindungsstück 7a starr bzw. ununbeweglich zueinander. Das Verbindungsstück 7a schließt mit dem eigentlichen Bewehrungs-Halte-Gegenkörper 6a im Wesentlichen einen rechten Winkel ein.The connecting piece 7a is now part of the reinforcement holding counter-body 6a. The reinforcement holding counter body 6a and the connecting piece 7a are designed in one piece as a bent piece. The second bending line 16 thus runs again between the reinforcement-holding counter-body 6a and the connecting piece 7a. The reinforcement-holding counter-body 6a and the connecting piece 7a are preferably rigid or immovable in relation to one another. The connecting piece 7a essentially encloses a right angle with the actual reinforcement holding counter-body 6a.

In dem Verbindungsstück 7a sind eine erste und zweite längliche Gelenkaussparung 45 bzw. 46 angeordnet, die parallel zueinander und zu der zweiten Biegelinie 16 verlaufen. Die beiden Gelenkaussparungen 45, 46 haben zur Grobeinstellung auf den Betonstabstahl 3 bzw. die Bewehrung einen unterschiedlichen Abstand zu der zweiten Biegelinie 16 und sind identisch, vorzugsweise schlitzartig, ausgeführt.A first and second elongate hinge recess 45 and 46 are arranged in the connecting piece 7a and run parallel to one another and to the second bending line 16. FIG. The two joint recesses 45, 46 have a different distance from the second bending line 16 for rough adjustment to the reinforcing steel bar 3 or the reinforcement and are identical, preferably slit-like.

Gegenüberliegend zu dem Verbindungsstück 7a sind an dem Bewehrungs-Halte-Gegenkörper 6a zwei Rückhaltevorsprünge 18a seitlich außen angeordnet, die einander gegenüberliegen.Opposite the connecting piece 7a, two retaining projections 18a are arranged laterally outside on the reinforcement holding counter-body 6a, which are opposite to one another.

Die Erdungsleitungs-Halteeinrichtung 31, die außen auf dem Bewehrungs-Halte-Gegenkörper 6a sitzt, ist entsprechend 7 ausgebildet. Sie kann auch anders ausgeführt sein.The ground wire holder 31, which sits on the outside of the armor-holder counter-body 6a, is similar 7 educated. It can also be designed differently.

Nachfolgend wird die in 8 dargestellte Erdungsklemmen-Anordnung 1a gemäß der zweiten Ausführungsform unter Bezugnahme auf die 9 bis 15 im Einsatz beschrieben, wobei dazu auch auf die Beschreibung zu der vorherigen Ausführungsform verwiesen wird.The in 8th illustrated grounding terminal assembly 1a according to the second embodiment with reference to FIG 9 until 15 described in use, reference being made to the description of the previous embodiment.

Der Bewehrungs-Halte-Grundkörper 5a durchsetzt gemäß 9 mit seinem Gelenkvorsprung 42 die zweite Gelenkaussparung 46, was dort zu einer Schwenkverbindung zwischen dem Bewehrungs-Halte-Grundkörper 5a und dem Verbindungsstück 7a bzw. dem Bewehrungs-Halte-Gegenkörper 6a führt.The reinforcement holding base body 5a penetrates according to 9 with its joint projection 42, the second joint recess 46, which there leads to a pivotal connection between the reinforcement-holder base body 5a and the connecting piece 7a or the reinforcement-holder counter-body 6a.

Der Betonstabstahl 3 ist in den Vertiefungen 12 aufgenommen. Er liegt außerdem innenseitig an dem eigentlichen Bewehrungs-Halte-Gegenkörper 6a an. In den zweiten Öffnungen 40 der Erdungsleitungs-Halteeinrichtung 31 ist eine erste Erdungsleitung 27 untergebracht. Die erste Erdungsleitung 27 und der Betonstabstahl 3 verlaufen parallel zueinander und übereinander. Sie sind durch den Bewehrungs-Halte-Gegenkörper 6a räumlich voneinander getrennt.The rebar 3 is accommodated in the depressions 12 . It also rests on the inside of the actual reinforcement holding counter-body 6a. In the second openings 40 of the ground wire holder 31, a first ground wire 27 is accommodated. The first ground line 27 and the rebar 3 run parallel to each other and one above the other. They are spatially separated from one another by the reinforcement holding counter-body 6a.

Die Spannschraube 4 durchsetzt die Aussparung 35 in der Erdungsleitungs-Halteeinrichtung 31, das Durchführungsfenster 19 in dem Bewehrungs-Halte-Gegenkörper 6a und die Spannschrauben-Aufnahme 14 in dem Bewehrungs-Halte-Grundkörper 5a und somit auch die Klemmeinrichtung 2a. Diese ist wieder zwischen einer spannenden und nicht-spannenden Stellung verlagerbar.The clamping screw 4 passes through the recess 35 in the ground wire holding device 31, the lead-through window 19 in the reinforcement Retaining counter-body 6a and the clamping screw receptacle 14 in the reinforcement-retaining base body 5a and thus also the clamping device 2a. This can again be shifted between a tense and non-tense position.

Gemäß 10 durchsetzt der Bewehrungs-Halte-Grundkörper 5a mit seinem Gelenkvorsprung 42 die erste Gelenkaussparung 45, die im Vergleich zu der zweiten Gelenkaussparung 46 einen geringeren Abstand zu der zweiten Biegelinie 16 hat. Dies führt dazu, dass der Bewehrungs-Halte-Grundkörper 5a und der Bewehrungs-Halte-Gegenkörper 6a zumindest im Bereich der Vertiefungen 12 einen geringeren Abstand zueinander haben als bei der Anordnung gemäß 9. Die Klemmeinrichtung 2a ist so an einem Betonstabstahl 3a mit geringerem Durchmesser sicher klemmend festlegbar.According to 10 the reinforcement holding base body 5a with its joint projection 42 passes through the first joint recess 45 which, in comparison to the second joint recess 46, is at a smaller distance from the second bending line 16. The result of this is that the reinforcement-retaining base body 5a and the reinforcement-retaining counter-body 6a are at a smaller distance from one another, at least in the region of the depressions 12, than in the arrangement according to FIG 9 . The clamping device 2a can thus be securely clamped to a reinforcing steel bar 3a with a smaller diameter.

Bei einer Relativschwenkbewegung zwischen dem Bewehrungs-Halte-Grundkörper 5a und dem Bewehrungs-Halte-Gegenkörper 6a zum Verschwenken derselben in deren Öffnungsstellung oder Haltestellung wälzt sich im Wesentlichen die Lagerfläche 43 an der die jeweilige Gelenkaussparung 45 bzw. 46 begrenzenden Wandung 47 des Verbindungsstücks 7a ab.During a relative pivoting movement between the reinforcement-holding base body 5a and the reinforcement-holding counter-body 6a to pivot them into their open position or holding position, the bearing surface 43 essentially rolls on the wall 47 of the connecting piece 7a that delimits the respective joint recess 45 or 46 .

Gemäß 11 ist die Erdungsleitungs-Halteeinrichtung 31 um 90° gegenüber der Anordnung gemäß 9, 10 um die Spannschraube 4 verschwenkt, so dass der Betonstabstahl 3 und die erste Erdungsleitung 27 einander senkrecht kreuzend, übereinander angeordnet sind.According to 11 the ground wire holder 31 is 90° from the arrangement of FIG 9 , 10 pivoted about the clamping screw 4, so that the rebar 3 and the first grounding line 27 crossing each other perpendicularly are arranged one above the other.

Gemäß 12 ist die Erdungsleitungs-Halteeinrichtung 31 in einer Zwischenstellung in Bezug auf die in den 9/10 und 1 1gezeigten Stellungen um die Spannschraube 4 geschwenkt. Die erste Erdungsleitung 27 verläuft somit schräg zu dem Betonstabstahl 3.According to 12 the ground wire holder 31 is in an intermediate position with respect to that shown in FIGS 9 /10 and 1 1 is pivoted about the clamping screw 4 in the positions shown. The first grounding line 27 thus runs obliquely to the reinforcing steel bar 3.

Gemäß 13 durchsetzt eine zweite Erdungsleitung 34 die ersten Öffnungen 39. Die zweite Erdungsleitung 34 verläuft parallel und seitlich versetzt zu dem Betonstabstahl 3.According to 13 A second grounding line 34 passes through the first openings 39. The second grounding line 34 runs parallel and laterally offset to the reinforcing steel bar 3.

Gemäß 14 ist die Erdungsleitungs-Halteeinrichtung 31 gegenüber 13 um 90° um die Spannschraube 4 verschwenkt, so dass die zweite Erdungsleitung 34 und der Betonstabstahl 3 einander senkrecht kreuzen.According to 14 is the ground line holder 31 opposite 13 pivoted by 90° about the clamping screw 4, so that the second grounding line 34 and the rebar 3 cross each other perpendicularly.

Gemäß 15 durchsetzt die erste Erdungsleitung 27 die zweiten Öffnungen 40, während die zweite Erdungsleitung 34 die ersten Öffnungen 39 durchdringt. Die Erdungsleitungen 27, 34 verlaufen somit parallel nebeneinander und sind durch die Erdungsleitungs-Halteeinrichtung 31 klemmend außenseitig gegen den Bewehrungs-Halte-Gegenkörper 6a gedrückt.According to 15 the first ground line 27 passes through the second openings 40 while the second ground line 34 penetrates the first openings 39 . The grounding lines 27, 34 thus run parallel to one another and are clamped by the grounding line holding device 31 and pressed against the reinforcement holding counter-body 6a on the outside.

Bei der Bewehrungsklemmen-Anordnung 1a sind auch andere Erdungsleitungs-Halteeinrichtungen 31 einsetzbar.Other ground wire holding devices 31 can also be used in the rebar clamp arrangement 1a.

Claims (9)

Erdungsklemmen-Anordnung zum Anschluss mindestens einer Erdungsleitung (27, 34) an eine Bewehrung (3), a) mit einer Klemmeinrichtung (2a), die umfasst i) einen Bewehrungs-Halte-Grundkörper (5a), ii) einen Bewehrungs-Halte-Gegenkörper (6a), der - mit dem Bewehrungs-Halte-Grundkörper (5a) in Verbindung steht, wobei der Bewehrungs-Halte-Grundkörper (5a) und der Bewehrungs-Halte-Gegenkörper (6a) relativ zueinander zum klemmenden Anordnen der Klemmeinrichtung (2a) an der Bewehrung (3) in eine Haltestellung verschwenkbar sind, und iii) mindestens einen Rückhaltevorsprung (18a) zum Rückhalten von mindestens einer Erdungsleitung (27) in der Klemmeinrichtung (2a), b) mit einer Spanneinrichtung (4) zum Halten der Klemmeinrichtung (2a) in der Haltestellung und Beaufschlagen der Klemmeinrichtung (2a) mit einer auf die Bewehrung (3) wirkenden Klemmkraft, und c) mit mindestens einem Erdungsleitungs-Aufnahmemittel (39, 40) zum Halten mindestens einer Erdungsleitung (27, 34) an der Klemmeinrichtung (2a) in, in Bezug auf die Bewehrung (3) verschiedenen Erdungsleitungs-Verlaufsrichtungen, d) wobei die Klemmeinrichtung (2a) und das mindestens eine Erdungsleitungs-Aufnahmemittel (39, 40) derart angeordnet und ausgebildet sind, dass eine kreuzende Anordnung der Bewehrung (3) und mindestens einer Erdungsleitung (27, 34) möglich ist, und e) wobei der Bewehrungs-Halte-Grundkörper (5a) und der Bewehrungs-Halte-Gegenkörper (6a) separate Teile sind und unter Bildung einer Schwenkachse miteinander in gelenkigem Eingriff stehen.Grounding clamp arrangement for connecting at least one grounding line (27, 34) to a reinforcement (3), a) with a clamping device (2a), which includes i) a reinforcement holding base body (5a), ii) a reinforcement holding counter body (6a), the - is connected to the reinforcement-retaining base body (5a), the reinforcement-retaining base body (5a) and the reinforcement-retaining counter-body (6a) relative to one another for the clamping arrangement of the clamping device (2a) on the reinforcement (3 ) can be pivoted into a holding position, and iii) at least one retaining projection (18a) for retaining at least one ground wire (27) in the clamping device (2a), b) with a clamping device (4) for holding the clamping device (2a) in the holding position and subjecting the clamping device (2a) to a clamping force acting on the reinforcement (3), and c) with at least one grounding wire receiving means (39, 40) for holding at least one grounding wire (27, 34) on the clamping device (2a) in different directions of the grounding wire in relation to the reinforcement (3), d) the clamping device (2a) and the at least one grounding wire receiving means (39, 40) being arranged and designed in such a way that a crossing arrangement of the reinforcement (3) and at least one grounding wire (27, 34) is possible, and e) wherein the reinforcement-retaining base body (5a) and the reinforcement-retaining counter-body (6a) are separate parts and are in articulated engagement with one another to form a pivot axis. Erdungsklemmen-Anordnung nach Anspruch 1, dadurch gekennzeichnet, dass die Spanneinrichtung (4) direkt oder indirekt an dem Bewehrungs-Halte-Grundkörper (5a) und/oder an dem Bewehrungs-Halte-Gegenkörper (6a) angreift.grounding terminal arrangement claim 1 , characterized in that the clamping device (4) acts directly or indirectly on the reinforcement-retaining base body (5a) and/or on the reinforcement-retaining counter-body (6a). Erdungsklemmen-Anordnung nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Spanneinrichtung (4) eine, vorzugsweise nur eine einzige, betätigbare Spannschraube umfasst.grounding terminal arrangement claim 1 or 2 , characterized in that the clamping device (4) comprises one, preferably only a single, operable clamping screw. Erdungsklemmen-Anordnung nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, dass der Bewehrungs-Halte-Grundkörper (5a) mindestens eine Halte-Aufnahme (12) zum Aufnehmen der Bewehrung (3) aufweist.Earthing clamp arrangement according to one of the preceding claims, characterized in that the reinforcement-retaining base body (5a) min at least one holding receptacle (12) for receiving the reinforcement (3). Erdungsklemmen-Anordnung nach einem der vorherigen Ansprüche, gekennzeichnet durch eine benachbart zu der Klemmeinrichtung (2a) schwenkbar angeordnete Erdungsleitungs-Halteeinrichtung (31) zum Halten von mindestens einer Erdungsleitung (27, 34).Earthing terminal arrangement according to one of the preceding claims, characterized by an earthing wire holding device (31) arranged pivotably adjacent to the clamping device (2a) for holding at least one earthing wire (27, 34). Erdungsklemmen-Anordnung nach Anspruch 5, dadurch gekennzeichnet, dass die Erdungsleitungs-Halteeinrichtung (31) auf der Spanneinrichtung (4) sitzt und in der nicht-spannenden Stellung der Spanneinrichtung (4) um diese verschwenkbar ist, wobei vorzugsweise die Erdungsleitungs-Halteeinrichtung (31) in der spannenden Stellung der Spanneinrichtung (4) durch diese gegenüber der Klemmeinrichtung (2a) örtlich festgelegt ist.grounding terminal arrangement claim 5 , characterized in that the grounding wire holding device (31) is seated on the clamping device (4) and can be pivoted about the clamping device (4) in the non-clamping position, the grounding wire holding device (31) preferably being in the clamping position of the Clamping device (4) is fixed locally by this relative to the clamping device (2a). Erdungsklemmen-Anordnung nach Anspruch 5 oder 6, dadurch gekennzeichnet, dass mindestens ein Erdungsleitungs-Aufnahmemittel (39, 40) in der Erdungsleitungs-Halteeinrichtung (31) angeordnet ist.grounding terminal arrangement claim 5 or 6 , characterized in that at least one ground wire receiving means (39, 40) is arranged in the ground wire holding device (31). Erdungsklemmen-Anordnung nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, dass der Bewehrungs-Halte-Grundkörper (5a) mindestens ein Gelenkmittel (42) und der Bewehrungs-Halte-Gegenkörper (6a) mindestens ein Gegen-Gelenkmittel (45, 46) zum gelenkigen Eingriff mit dem mindestens einen Gelenkmittel (42) umfasst, wobei vorzugsweise das mindestens eine Gegen-Gelenkmittel (45, 46) als Aussparung oder Vertiefung und das mindestens eine Gelenkmittel (42) als Gelenkvorsprung ausgeführt sind.Grounding clamp arrangement according to one of the preceding claims, characterized in that the reinforcement-holding base body (5a) has at least one joint means (42) and the reinforcement-holding counter-body (6a) has at least one counter-joint means (45, 46) for the articulated Engaging with the at least one joint means (42), the at least one counter-joint means (45, 46) preferably being designed as a recess or indentation and the at least one joint means (42) being designed as a joint projection. Erdungsklemmen-Anordnung nach Anspruch 8, dadurch gekennzeichnet, dass das mindestens eine Gelenkmittel (42) als Gelenkvorsprung ausgeführt ist und eine gekrümmte Lagerfläche (43) zur Anlage an dem Bewehrungs-Halte-Gegenkörper (6a) aufweist.grounding terminal arrangement claim 8 , characterized in that the at least one joint means (42) is designed as a joint projection and has a curved bearing surface (43) for contact with the reinforcement holding counter-body (6a).
DE102014200228.1A 2014-01-09 2014-01-09 Ground Clamp Arrangement Active DE102014200228B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102014200228.1A DE102014200228B4 (en) 2014-01-09 2014-01-09 Ground Clamp Arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102014200228.1A DE102014200228B4 (en) 2014-01-09 2014-01-09 Ground Clamp Arrangement

Publications (2)

Publication Number Publication Date
DE102014200228A1 DE102014200228A1 (en) 2015-07-09
DE102014200228B4 true DE102014200228B4 (en) 2023-04-27

Family

ID=53443342

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102014200228.1A Active DE102014200228B4 (en) 2014-01-09 2014-01-09 Ground Clamp Arrangement

Country Status (1)

Country Link
DE (1) DE102014200228B4 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017201224B3 (en) 2017-01-26 2018-06-21 J. Pröpster GmbH Earthing clamp arrangement and holding devices
DE102017202677B3 (en) 2017-02-20 2018-08-09 J. Pröpster GmbH Chuck arrangement
AT17851U1 (en) * 2022-01-25 2023-05-15 Sc Betak Sa clamp assembly

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2216309A (en) 1938-02-11 1940-10-01 Crouse Hinds Co Grounding fitting
US3118720A (en) 1961-11-15 1964-01-21 Gamma Res Lab Corp Electrical connector
DE8632107U1 (en) 1986-11-29 1987-01-22 Georg Fischer Ag, Schaffhausen, Ch, Niederlassung: Georg Fischer Ag, 7700 Singen, De
US5752860A (en) 1996-11-05 1998-05-19 Greaves; Christopher G. Rebar clamp
US6347967B1 (en) 2000-05-18 2002-02-19 Pan Electric Corporation Electrical connector
DE102006044991A1 (en) 2006-09-23 2008-04-03 J. Pröpster GmbH Clamp for connecting round wires for earthing concrete armors, has attachment recess provided in base plates for fastening screws, and clamping jaws connected with one another at angle of preset degrees
DE10035795B4 (en) 2000-07-22 2009-01-02 J. Pröpster GmbH Clamping shoe arrangement
DE10035793B4 (en) 2000-07-22 2009-01-02 J. Pröpster GmbH Connection terminal for lightning protection systems
US8007293B2 (en) 2008-12-29 2011-08-30 Hubbell Incorporated Grounding rebar connector
DE202012000989U1 (en) 2012-02-01 2013-05-08 J. Pröpster GmbH Clamping device for clamping at least one electrical conductor

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2216309A (en) 1938-02-11 1940-10-01 Crouse Hinds Co Grounding fitting
US3118720A (en) 1961-11-15 1964-01-21 Gamma Res Lab Corp Electrical connector
DE8632107U1 (en) 1986-11-29 1987-01-22 Georg Fischer Ag, Schaffhausen, Ch, Niederlassung: Georg Fischer Ag, 7700 Singen, De
US5752860A (en) 1996-11-05 1998-05-19 Greaves; Christopher G. Rebar clamp
US6347967B1 (en) 2000-05-18 2002-02-19 Pan Electric Corporation Electrical connector
DE10035795B4 (en) 2000-07-22 2009-01-02 J. Pröpster GmbH Clamping shoe arrangement
DE10035793B4 (en) 2000-07-22 2009-01-02 J. Pröpster GmbH Connection terminal for lightning protection systems
DE102006044991A1 (en) 2006-09-23 2008-04-03 J. Pröpster GmbH Clamp for connecting round wires for earthing concrete armors, has attachment recess provided in base plates for fastening screws, and clamping jaws connected with one another at angle of preset degrees
US8007293B2 (en) 2008-12-29 2011-08-30 Hubbell Incorporated Grounding rebar connector
DE202012000989U1 (en) 2012-02-01 2013-05-08 J. Pröpster GmbH Clamping device for clamping at least one electrical conductor

Also Published As

Publication number Publication date
DE102014200228A1 (en) 2015-07-09

Similar Documents

Publication Publication Date Title
EP3610541A1 (en) Strain relief for quick assembly for a cable carrier
DE102009045499A1 (en) Line setter
DE102014200228B4 (en) Ground Clamp Arrangement
DE202018104252U1 (en) Lightning protection and earthing terminal
DE102011052198A1 (en) fuse terminal
EP3776743B1 (en) Conductor connection terminal, clamping spring of a conductor connection terminal and terminal block
EP3776741B1 (en) Conductor connection terminal
DE102013216561B4 (en) Connection component for lightning conductors
DE102008019009A1 (en) Electrical plug-type connector for use in industrial area e.g. in wet environment, has clamping elements assigned to locking brackets, respectively, so that brackets are encroached in closed position of locking clamp by holding arm
DE102014211290B4 (en) Ground Clamp Arrangement
DE10035795B4 (en) Clamping shoe arrangement
DE102012011364B3 (en) clamping device
EP3406952B1 (en) Pivotable cable holder
EP4068519A1 (en) Conductor connecting terminal, clamping spring of a conductor terminal and terminal block
DE102006044993B4 (en) Clamp for laying ribbon conductors on flat roofs
EP1852942A2 (en) Rapid-release clamp for battery terminals
DE102005061221A1 (en) Contact element for electrically contacting a bolt comprises a holder arranged on the outer edge of a connecting plate and formed as a bracket open to the geometric center of the connecting plate
DE102013008728A1 (en) cover
DE102014215360A1 (en) Lightning protection seam clamps arrangement
EP3658787B1 (en) Shaped component, method for connecting at least one metal-sheet component to a shaped component, and system of a metal-sheet construction
DE1915865A1 (en) Swiveling box clamp
EP1731812A2 (en) Cable mounting clip for easier mounting, opening and closing
AT510445B1 (en) CLAMP
EP3625854A1 (en) Connection device for connecting at least one electrical conductor to a stud terminal
WO2018141327A1 (en) Plug with protective conductor bridge

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R002 Refusal decision in examination/registration proceedings
R125 Request for further processing filed
R126 Request for further processing allowed
R016 Response to examination communication
R018 Grant decision by examination section/examining division
R020 Patent grant now final