- Publication number
- DE102012023426A1 DE102012023426A1 DE102012023426.0A DE102012023426A DE102012023426A1 DE 102012023426 A1 DE102012023426 A1 DE 102012023426A1 DE 102012023426 A DE102012023426 A DE 102012023426A DE 102012023426 A1 DE102012023426 A1 DE 102012023426A1
- Authority
- DE
- Germany
- Prior art keywords
- electrical
- voltage
- arrangement
- output
- output signal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/388—Islanding, i.e. disconnection of local power supply from the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/34—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
- H02J7/35—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/22—The renewable source being solar energy
- H02J2300/24—The renewable source being solar energy of photovoltaic origin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/28—The renewable source being wind energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/10—Photovoltaic [PV]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Abstract
Beschrieben wird eine elektrische Anordnung, an die ein Generator und ein Energiespeicher anschließbar sind, die jeweils eine Gleichspannung in die Anordnung einspeisen können, und die einen Wechselrichter aufweist, welcher als Ausgangsspannung eine ein- oder mehrphasige Wechselspannung erzeugt, welche die Anordnung über mindestens eine Ausgangsleitung ausgibt, wobei die Ausgangsspannung eine derartige Spannungshöhe und Frequenz aufweist, dass sie zur Versorgung einer lokalen Installation und zur Einspeisung in ein Spannungsversorgungsnetz geeignet ist, wobei die Anordnung mehrere elektromechanische Schalter steuert, so dass die Ausgangsspannung in einer ersten Betriebsart (Netzbetrieb) an dem Spannungsversorgungsnetz anliegt, und in einer zweiten Betriebsart (Inselbetrieb) an der lokalen Installation anliegt und vom Spannungsversorgungsnetz getrennt ist, wobei die Anordnung in der zweiten Betriebsart ein Ausgangssignal erzeugt und über eine in der zweiten Betriebsart mit der lokalen Installation verbundene Ausgangsleitung ausgibt, wobei das Ausgangssignal allgemein das Vorliegen der zweiten Betriebsart oder das Vorliegen eines verminderten Energieliefervermögens des Generators und/oder des Energiespeichers signalisiert. Die Erfindung betrifft darüber hinaus eine elektrische Anlage, welche eine derartige elektrische Anordnung aufweist.An electrical arrangement is described, to which a generator and an energy store can be connected, each of which can feed a DC voltage into the arrangement, and which has an inverter which generates as an output voltage a single-phase or multi-phase AC voltage which the arrangement has at least one output line outputs, the output voltage having a voltage level and frequency such that it is suitable for supplying a local installation and for feeding into a voltage supply network, the arrangement controlling a plurality of electromechanical switches, so that the output voltage in a first operating mode (mains operation) on the voltage supply network is present, and in a second operating mode (island operation) is applied to the local installation and is separated from the power supply network, the arrangement producing an output signal in the second operating mode and using a loca in the second operating mode len installation outputs connected output line, the output signal generally signals the presence of the second operating mode or the presence of a reduced energy delivery capacity of the generator and / or the energy store. The invention also relates to an electrical system which has such an electrical arrangement.
Description
Die Erfindung betrifft eine elektrische Anordnung, an die ein Generator und ein Energiespeicher anschließbar sind, die jeweils eine Gleichspannung in die Anordnung einspeisen können, und die einen Wechselrichter aufweist, welcher als Ausgangsspannung eine ein- oder mehrphasige Wechselspannung erzeugt, welche die Anordnung über mindestens eine Ausgangsleitung ausgibt, wobei die Ausgangsspannung eine derartige Spannungshöhe und Frequenz aufweist, dass sie zur Versorgung einer lokalen Installation und zur Einspeisung in ein Spannungsversorgungsnetz geeignet ist, wobei die Anordnung mehrere elektromechanische Schalter steuert, so dass die Ausgangsspannung in einer ersten Betriebsart an dem Spannungsversorgungsnetz anliegt, und in einer zweiten Betriebsart an der lokalen Installation anliegt und vom Spannungsversorgungsnetz getrennt ist. Die Erfindung betrifft darüber hinaus eine elektrische Anlage, welche eine derartige elektrische Anordnung aufweist.The invention relates to an electrical arrangement to which a generator and an energy storage can be connected, each of which can supply a DC voltage in the arrangement, and which has an inverter which generates a single or multi-phase AC voltage as output voltage, which the arrangement via at least one Output line outputs, wherein the output voltage has such a voltage level and frequency that it is suitable for supplying a local installation and for feeding into a power supply network, the arrangement controls a plurality of electromechanical switches, so that the output voltage in a first mode is applied to the power supply network, and in a second mode is applied to the local installation and disconnected from the power supply network. The invention also relates to an electrical system having such an electrical arrangement.
Elektrische Anlagen zur Umwandlung regenerativer Energien, wie zum Beispiel Windkraft- oder Photovoltaikanlagen weisen zumeist eine Anordnung mit einem Wechselrichter auf, welcher eine Spannung in der Höhe und Frequenz der üblichen Netzwechselspannung ausgibt. Dabei ist es zumeist vorgesehen, dass die elektrische Ausgangsleistung des Wechselrichters außer in ein lokales Verbrauchernetz auch ganz oder teilweise in ein öffentliches Spannungsversorgungsnetz eingespeist werden kann.Electrical systems for the conversion of renewable energy, such as wind power or photovoltaic systems usually have an arrangement with an inverter, which outputs a voltage in the height and frequency of the usual mains AC voltage. It is usually provided that the electrical output power of the inverter can be fed in addition to a local consumer network and all or part of a public power grid.
Die zur Erfindung führende Problemstellung soll im Folgenden beispielhaft und ohne Beschränkung der Allgemeinheit anhand einer Photovoltaikanlage erläutert werden. Photovoltaikanlagen zur zumindest unterstützenden Energieversorgung von Gebäuden finden zunehmende Verbreitung. Die elektrische Leistungsabgabe eines Photovoltaikgenerators unterliegt über den Tagesverlauf starken Schwankungen und entspricht daher praktisch nie genau dem momentanen Energiebedarf der im Gebäude installierten Verbraucher, welche im Folgenden zusammenfassend mit einem lokalen Leitungsnetz als lokale Installation bezeichnet werden.The problem leading to the invention will be explained below by way of example and without restricting the general public on the basis of a photovoltaic system. Photovoltaic systems for the at least supportive energy supply of buildings are becoming increasingly widespread. The electrical power output of a photovoltaic generator is subject to fluctuations over the course of the day and therefore practically never corresponds exactly to the instantaneous energy demand of the consumers installed in the building, which in the following are collectively referred to as local installation as a local installation.
So kann eine Photovoltaikanlage während der hellen Tagesstunden eine elektrische Leistung erzeugen, die weit über den elektrischen Leistungsbedarf der lokalen Installation hinausgeht, so dass überschüssige elektrische Energie in ein öffentliches Spannungsversorgungsnetz eingespeist werden kann. In der übrigen Zeit kann es dagegen notwendig sein, zum Ausgleich von Energiedefiziten, dem öffentlichen Spannungsversorgungsnetz elektrische Energie zu entnehmen.Thus, a photovoltaic system can generate an electric power during the light hours of the day, which goes far beyond the electrical power requirements of the local installation, so that excess electrical energy can be fed into a public power grid. In the rest of the time it may be necessary to remove electrical energy from the public power supply network to compensate for energy shortages.
Photovoltaikanlagen mit einer sogenannten Eigenverbrauchsoptimierung weisen als Energiespeicher Akkumulatoren auf, welche mehrere Kilowattstunden elektrischer Energie speichern können. Die Einspeisung bzw. Entnahme elektrischer Energie aus dem öffentlichen Spannungsversorgungsnetz erfolgt hier nur noch dann, wenn das Pufferungsvermögen des Energiespeichers überschritten wird oder wenn dies aufgrund von tageszeitbezogenen Stromtarifen einträglich ist.Photovoltaic systems with a so-called self-consumption optimization have accumulators as energy storage, which can store several kilowatt hours of electrical energy. The supply or removal of electrical energy from the public power grid takes place here only when the buffering capacity of the energy storage is exceeded or if this is due to daytime electricity tariffs profitable.
Für den Betrieb solcher Anlagen sind daher unterschiedliche Betriebsarten vorgesehen, nämlich erstens der Betrieb mit Ankopplung an das Spannungsversorgungsnetz, im vorliegenden Text kurz als Netzbetrieb bezeichnet, und zweitens der vom Spannungsversorgungsnetz abgekoppelte Betrieb, der hier als Inselbetrieb benannt ist. Der Inselbetrieb ermöglicht bei einem Netzausfall einen Betrieb von Verbrauchern einer lokalen Installation über einen gewissen Zeitraum aus der Energie eines Generators und/oder eines Energiespeichers.For the operation of such systems, therefore, different modes are provided, namely, first, the operation with coupling to the power supply network, referred to in the present text as network operation, and secondly the decoupled from the power supply operation, which is named here as island operation. The island operation allows in a power failure operation of consumers of a local installation over a period of time from the energy of a generator and / or an energy storage.
Im Netzbetrieb werden die Netzspannung und die Netzfrequenz vom Spannungsversorgungsnetz vorgegeben. Eine Änderung dieser beiden Parameter durch den Wechselrichter ist nicht möglich. Der Wechselrichter arbeitet als Stromquelle und speist je nach Energieaufkommen vom Photovoltaikgenerator bzw. aus einem Energiespeicher elektrische Energie in das Spannungsversorgungsnetz ein.In mains operation, the mains voltage and the mains frequency are specified by the power supply network. A change of these two parameters by the inverter is not possible. The inverter operates as a power source and feeds depending on the amount of energy from the photovoltaic generator or from an energy storage electrical energy into the power grid.
Im Inselbetrieb ist der Wechselrichter vollständig vom Spannungsversorgungsnetz getrennt. Dabei ist es die Funktion des Wechselrichters, eine vorzugsweise dreiphasige Spannungsversorgung zur Verfügung zu stellen, wie sie im Netzbetrieb vom Spannungsversorgungsnetz bereit gestellt wird. Lastschwankungen, beispielsweise durch das Ein- und Ausschalten von angeschlossenen Verbrauchern, müssen dabei vom Wechselrichter vollständig ausgeregelt werden. Es ist das Ziel, eine vom Ausgangsstrom unabhängige Spannungsversorgung sicherzustellen. Insofern ist der Wechselrichter hier als eine Spannungsquelle zu betrachten.In isolated mode, the inverter is completely disconnected from the power supply network. It is the function of the inverter to provide a preferably three-phase power supply, as provided by the power supply network in network operation. Load fluctuations, for example due to the switching on and off of connected loads, must be completely compensated by the inverter. The goal is to ensure a voltage supply independent of the output current. In this respect, the inverter is to be regarded here as a voltage source.
Bezüglich der Verfügbarkeit von elektrischer Energie und Leistung ergeben sich aber im Vergleich zum netzgekoppelten Betrieb Einschränkungen. Zunächst ist der Ausgangsstrom des Wechselrichters durch die Dimensionierung seiner Leistungselektronik auf einen bestimmten Wert begrenzt. Außerdem kann nicht mehr elektrische Energie zur Verfügung gestellt werden, als die Summe der vom Photovoltaikgenerator aktuell gelieferten Energie und der im Energiespeicher vorhandenen Energie. Hieraus ergibt sich die Notwenigkeit eines Energie- bzw. Leistungsmanagements.With regard to the availability of electrical energy and power, however, there are restrictions compared to grid-connected operation. First, the output current of the inverter is limited by the dimensioning of its power electronics to a certain value. In addition, no more electrical energy can be made available than the sum of the energy currently supplied by the photovoltaic generator and the energy present in the energy store. This results in the necessity of energy or performance management.
Es stellte sich die Aufgabe, eine elektrische Anordnung zu schaffen, die auf besonders einfache und kostengünstige Weise ein Energiemanagement im Inselbetrieb einer elektrischen Anlage ermöglicht. It set itself the task of creating an electrical arrangement that allows a particularly simple and cost-effective way an energy management in island operation of an electrical system.
Diese Aufgabe wird erfindungsgemäß dadurch gelöst, dass die Anordnung (in der zweiten Betriebsart ein Ausgangssignal erzeugt und über eine in der zweiten Betriebsart mit der lokalen Installation verbundene Ausgangsleitung ausgibt, wobei das Ausgangssignal allgemein das Vorliegen der zweiten Betriebsart oder das Vorliegen eines verminderten Energieliefervermögens des Generators und/oder des Energiespeichers signalisiert.This object is achieved according to the invention in that the arrangement (in the second mode of operation produces an output signal and outputs via an output line connected in the second mode to the local installation, the output signal being generally the presence of the second mode or the presence of reduced power delivery capability of the generator and / or the energy storage signaled.
Vorteilhaft ist, dass die Übertragung des Ausgangssignals keine zusätzliche Leitungen und Installationen erfordert.It is advantageous that the transmission of the output signal requires no additional lines and installations.
Die Signalisierung des Vorliegens der zweiten Betriebsart, also des Inselbetriebs, beziehungsweise eines verminderten Energieliefervermögens des Generators und/oder des Energiespeichers kann auf verschiedene vorteilhafte Arten erfolgen, indem wenigstens eine elektrische Größe der Ausgangsspannung auf eine charakteristische Weise variiert wird, ohne dass die Funktion der Energieversorgung dadurch wesentlich beeinträchtigt wird. Vorgesehen sein kann insbesondere eine Spannungsabsenkung, eine Frequenzänderung oder eine mehrmalige oder insbesondere periodisch oder zyklische Variation der Höhe der Ausgangsspannung. Alle diese Signalisierungsarten können vorteilhafterweise durch Detektionsmittel innerhalb der lokalen Installation automatisch erkannt werden und geeignete Maßnahmen bezüglich eines energiesparenden Betriebs der zur lokalen Installation gehörenden Verbraucher auslösen.The signaling of the presence of the second mode of operation, ie island operation, or a reduced energy delivery capability of the generator and / or the energy storage can be done in various advantageous ways by at least one electrical variable of the output voltage is varied in a characteristic manner, without the function of the power supply This is significantly impaired. In particular, a voltage reduction, a frequency change or a repeated or in particular periodic or cyclic variation of the magnitude of the output voltage can be provided. All of these types of signaling can advantageously be detected automatically by detection means within the local installation and trigger appropriate measures regarding energy-saving operation of the consumers belonging to the local installation.
Diese Maßnahmen können vorteilhaft darin bestehen, dass bestimmte Verbraucher mit einer verminderten elektrischen Leistung betrieben oder auch ganz abgeschaltet werden. Eine Abschaltung kann dabei entweder sofort oder auch nach Ablauf einer vorgegebenen Zeit erfolgen. Es kann auch vorgesehen werden, Verbraucher vor dem Abschalten erst in einen sicheren Zustand zu überführen, also beispielsweise Computer vor dem Abschalten herunterzufahren.These measures can be advantageous in that certain consumers are operated with a reduced electrical power or even switched off completely. A shutdown can be done either immediately or after a predetermined time. It can also be provided to first convert consumers to a safe state before switching off, for example, to shut down computers before switching them off.
Für die meisten Verbraucher kann vorteilhaft eine Absenkung der Versorgungsspannung vorgesehen werden. Viele Verbraucher mit einer hohen Leistungsaufnahme weisen das elektrische Verhalten eines ohmschen Widerstands auf. Bei derartigen Verbrauchern kann die Leistungsaufnahme durch eine Spannungsabsenkung wirkungsvoll begrenzt werden, da die Leistungsaufnahme quadratisch mit Spannungsabsenkung absinkt (P ~ U2). Im Verbundnetz ist eine Spannungstoleranz von ±10% zulässig. Mit dieser Spannungsänderung ergibt sich eine Leistungsvariation von etwa ±20%. Insofern stellt eine Spannungsabsenkung eine wirkungsvolle Maßnahme zur Leistungsreduzierung dar. Es kann sogar eine noch größere Spannungsabsenkung vorgesehen werden, weil bezüglich des Inselnetzes nicht unbedingt die für ein Spannungsversorgungsnetz geltenden Toleranzgrenzen übernommen werden müssen.For most consumers can advantageously be provided a lowering of the supply voltage. Many consumers with a high power consumption exhibit the electrical behavior of an ohmic resistance. In such consumers, the power consumption can be effectively limited by a voltage reduction, since the power consumption drops quadratically with voltage reduction (P ~ U 2 ). In the interconnected network, a voltage tolerance of ± 10% is permissible. With this voltage change results in a power variation of about ± 20%. In this respect, a voltage reduction is an effective measure for power reduction. It can even be provided an even greater voltage reduction, because with respect to the island network not necessarily applicable for a power supply network tolerance limits must be adopted.
Eine Spannungsabsenkung erreicht, wichtige Verbraucher wie beispielsweise Notbeleuchtungen, Telekommunikationseinrichtungen, Kühlgeräte, möglichst lange in Betrieb zu halten. Solche Verbraucher sind in aller Regel mit elektronischen Schaltnetzteilen ausgestattet, die eine sehr viel größere Spannungsvarianz zulassen ohne Funktionseinschränkungen aufzuweisen.A voltage reduction reaches important consumers such as emergency lighting, telecommunications equipment, refrigerators, as long as possible to keep in operation. Such consumers are usually equipped with electronic switching power supplies that allow a much larger voltage variance without having functional limitations.
Besonders vorteilhaft ist, dass eine Spannungsabsenkung unmittelbar energiesparend wirksam wird, ohne auf Detektionsmittel angewiesen zu sein.It is particularly advantageous that a voltage reduction is directly energy-saving effect, without relying on detection means.
Anstelle oder zusätzlich zu einer Spannungsabsenkung kann die Inselbetriebsart der elektrischen Anordnung, und insbesondere auch ein zu Ende gehender Energievorrat des Energiespeichers durch eine zyklische Spannungsvariation signalisiert werden. Vorgesehen sein kann beispielsweise, dass die Ausgangsspannung der elektrischen Anordnung im Sekundentakt periodisch um 10% abgesenkt und wieder angehoben wird. Diese Signalisierung, die natürlich nicht dauerhaft erfolgen muss, sondern auch in zeitlichen Abständen zyklisch wiederholt werden kann, kann durch ein automatisches Detektionsmittel erkannt werden.Instead of or in addition to a voltage reduction, the island operating mode of the electrical arrangement, and in particular also an outgoing energy supply of the energy store can be signaled by a cyclic voltage variation. It can be provided, for example, that the output voltage of the electrical arrangement is lowered periodically by 10% every second and then raised again. This signaling, which of course does not have to be permanent, but can also be repeated cyclically at intervals, can be detected by an automatic detection means.
Darüber hinaus kann es zu auffälligen Effekten (wie etwa Helligkeitsschwankungen elektrischer Leuchtmittel oder Drehzahlschwankungen elektrischer Antriebe) führen, so dass diese Signalisierung auch als Hinweis für menschliche Benutzer leicht erkennbar ist. Hierdurch kann entweder das Detektionsmittel automatisch oder der Benutzer auf manuellem Weg eine geeignete Reaktion auf die signalisierte Betriebsart einleiten.In addition, it can lead to conspicuous effects (such as brightness fluctuations of electrical lamps or speed fluctuations of electric drives), so that this signaling is easily recognizable as an indication to human users. This allows either the detection means automatically or the user to initiate a suitable response to the signaled mode by manual means.
Als eine weitere Möglichkeit der Signalisierung kann eine Frequenzänderung der Ausgangsspannung vorgesehen sein. Frequenzänderungen im Promillebereich wirken sich im Allgemeinen nicht direkt auf den Betrieb elektrischer Verbraucher auf und sind daher auch durch einen Benutzer nicht direkt wahrnehmbar. Durch ein elektronisches Detektionsmittel sind derartige Frequenzänderungen aber leicht erkennbar und auswertbar.As a further possibility of the signaling, a frequency change of the output voltage can be provided. Frequency changes in the per thousand range generally do not have a direct effect on the operation of electrical consumers and are therefore not directly perceptible by a user. By an electronic detection means such frequency changes are easily recognizable and evaluated.
Im Folgenden soll die Erfindung anhand eines in der Zeichnung dargestellten Ausführungsbeispiels näher erläutert werden. Die
Zentrales Element der in den
Um die Leistungsabgabe der elektrischen Anordnung
Sowohl dem Photovoltaikgenerator
Die Ausgangsspannung U des Wechselrichters
In die Hauptleitung
Der Ausgang des Wechselrichters
Die in den
Die elektrische Anordnung
Die
Im Netzbetrieb verhält sich der Wechselrichter
Die
Diese vollständige Trennung wird erstens durch den geöffneten Trennschalter
Im Inselbetrieb wird der Wechselrichter
Grundsätzlich problematisch am Inselbetrieb ist, dass diese Betriebsart in der Regel zumeist nur über einen begrenzten Zeitraum kontinuierlich aufrecht zu erhalten ist, und zwar abhängig von der Dimensionierung des Photovoltaikgenerators
Um diesen Zeitraum für den Inselbetrieb möglichst weit auszudehnen, was besonders bei einem Ausfall des Spannungsversorgungsnetzes
Hierzu ist es wesentlich, der lokalen Installation
Daher ist es vorgesehen, ein die Inselbetriebsart mitteilendes Ausgangssignal AS zusammen mit der Ausgangsspannung U des Wechselrichters
Die
Das Detektionsmittel D1 ist hier als fest installierter Teil der lokalen Installation
Das Detektionsmittel D2 ist dagegen ein fester Bestandteil eines „intelligenten” Verbrauchers V2, so dass das Detektionsmittel D2 bei Vorliegen eines Ansteuersignals AS den Verbraucher V2 auf eine spezifische, im Verbraucher V2 intern festgelegte Weise, beeinflussen kann.On the other hand, the detection means D2 is an integral part of an "intelligent" consumer V2, so that the detection means D2 can, in the presence of a control signal AS, influence the consumer V2 in a specific manner internally determined in the consumer V2.
In Gegensatz dazu ist der Verbraucher V3 weder mit einem internen noch mit einem externen Detektionsmittel verbunden. Durch eine Absenkung der Ausgangsspannung U durch die elektrische Anordnung
Die hier vorgeschlagenen Signalisierungsarten sind in den
In der
Die zusätzliche gestrichelte Linie deutet an, dass alternativ zur vorherigen Strategie, ab einem vorgegebenen Entladungszustand, hier 50%, auch eine kontinuierlich erfolgende Spannungsabsenkung eingeleitet werden kann, bei der die Ausgangsspannung U mit steigender Entladung des Energiespeichers
Bei einer drohenden Energieverknappung besteht alternativ die Möglichkeit einer Veränderung der Frequenz f der Ausgangsspannung U in Abhängigkeit vom Entladungszustand des Energiespeichers
Die Verstellung der Ausgangsfrequenz erfolgt in einem nur kleinen Bereich von beispielsweise ±0,5 Hz, so dass die Energieübertragung selbst nicht beeinträchtigt wird. Angelehnt ist diese Form der Regelung an die sogenannte Primärregelung im Verbundnetz. Auch hier wird mittels Frequenzvariation der Energiezustand des Netzes signalisiert.The adjustment of the output frequency takes place in only a small range of, for example ± 0.5 Hz, so that the energy transfer itself is not affected. This form of regulation is based on the so-called primary control in the interconnected grid. Here, too, the energy state of the network is signaled by means of frequency variation.
Es ist vorgesehen, zukünftigen „intelligenten” Verbrauchern die Energieverknappung zu signalisieren, so dass derartige Verbraucher ihren Energiebedarf reduzieren. Als Beispiel wäre hier die Reduktion der Temperatur bei einer Waschmaschine oder die zeitliche Verlängerung eines Waschprogramms zu nennen, damit der augenblickliche Leistungsbedarf abgesenkt und somit die Energieaufnahme des Gerätes gesenkt oder zeitlich verzögert werden kann. Eine zeitliche Verzögerung der Energieaufnahme eines Gerätes birgt den Vorteil, dass unter Umständen durch den natürlichen Tagesverlauf der photovoltaischen Energieerzeugung wieder Energie von einem Solargenerator gewonnen werden kann und somit ein Zusammenbruch der kompletten Energieversorgung vermieden werden kann. Falls keine der beiden zuvor genannten Maßnahmen zum Erfolg führen, dann sollte dem Benutzer das nahende Ende der Energieversorgung erkennbar gemacht werden.It is intended to signal the shortage of energy to future "intelligent" consumers, so that such consumers reduce their energy requirements. As an example, the reduction of temperature in a washing machine or the extension of a washing program should be mentioned here, so that the current power requirement can be lowered and thus the power consumption of the device can be reduced or delayed. A time delay of the energy consumption of a device has the advantage that under certain circumstances by the natural course of the photovoltaic power generation energy can be recovered from a solar generator and thus a collapse of the entire energy supply can be avoided. If neither of the above measures is successful, the user should be made aware of the approaching end of the power supply.
Diese kann durch eine gezielte Spannungsvariation signalisiert werden, z. B. durch eine zyklische Spannungsabsenkung im Sekundentakt, wie sie in der
Das Ziel hierbei ist, dass der Benutzer wichtige Systeme in einen sicheren Zustand bringt, bevor die Energieversorgung komplett zusammenbricht. Als besonders wichtige Systeme können etwa informationstechnische Einrichtungen (Computer, Router oder ähnliches) oder auch medizinische Überwachungs- und Therapieeinrichtungen gelten.The goal here is for the user to bring important systems to a safe state before the power supply collapses completely. Particularly important systems may include information technology equipment (computers, routers or the like) or medical monitoring and therapy facilities.
BezugszeichenlisteLIST OF REFERENCE NUMBERS
- 11
- SpannungsversorgungsnetzPower supply network
- 22
- Energiezähler (bidirektional)Energy meter (bidirectional)
- 33
- lokale Installationlocal installation
- 44
- SolarenergiezählerSolar energy meters
- 55
- elektrische Anordnungelectrical arrangement
- 66
- VerbindungsknotenpunktConnection node
- 77
- Wechselrichter (DC/AC-Wandler)Inverter (DC / AC converter)
- 88th
- DC/DC-WandlerDC / DC converter
- 99
- DC/DC-Wandler (bidirektional)DC / DC converter (bidirectional)
- 7, 8, 97, 8, 9
- SpannungswandlerDC converter
- 1010
- Photovoltaikgenerator (Generator)Photovoltaic generator (generator)
- 1111
- Energiespeicherenergy storage
- 1212
- Hauptleitungmain
- 13, 1413, 14
- Ausgangsleitung(en)Output line (s)
- 12, 13, 1412, 13, 14
- Leitungencables
- 2020
- Umschaltvorrichtungswitching
- 21, 2221, 22
- (elektromechanische) Schalter(electromechanical) switches
- 3030
- Trennschalterdisconnectors
- 31, 3231, 32
- (elektromechanische) Schalter(electromechanical) switches
- ASAS
- Ausgangssignaloutput
- D1, D2D1, D2
- Detektionsmitteldetection means
- ff
- Frequenzfrequency
- UU
- Ausgangsspannungoutput voltage
- V1, V2, V3V1, V2, V3
- Verbraucherconsumer
Claims (12)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102012023426.0A DE102012023426A1 (en) | 2012-11-29 | 2012-11-29 | Electrical arrangement and electrical system with an electrical arrangement |
PCT/EP2013/074909 WO2014083083A1 (en) | 2012-11-29 | 2013-11-27 | Electrical arrangement and electrical installation comprising an electrical arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102012023426.0A DE102012023426A1 (en) | 2012-11-29 | 2012-11-29 | Electrical arrangement and electrical system with an electrical arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102012023426A1 true DE102012023426A1 (en) | 2014-03-13 |
Family
ID=49674313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102012023426.0A Withdrawn DE102012023426A1 (en) | 2012-11-29 | 2012-11-29 | Electrical arrangement and electrical system with an electrical arrangement |
Country Status (2)
Country | Link |
---|---|
DE (1) | DE102012023426A1 (en) |
WO (1) | WO2014083083A1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102014007639A1 (en) * | 2014-05-22 | 2015-11-26 | AMK Arnold Müller GmbH & Co. KG | System for feeding electrical energy into a power supply network |
DE102014007640A1 (en) * | 2014-05-22 | 2015-11-26 | AMK Arnold Müller GmbH & Co. KG | System for feeding electrical energy into a power supply network and operating method for such a system |
EP3336998A1 (en) * | 2016-12-16 | 2018-06-20 | innogy SE | Emergency power system, converter for an emergency power system and method for operating an emergency power system |
AT520273A1 (en) * | 2017-07-20 | 2019-02-15 | Xelectrix Power Gmbh | Power supply system and tracked vehicle |
DE102020114764A1 (en) | 2020-06-03 | 2021-12-09 | Westnetz Gmbh | Transmission method for a frequency-generating plant, receiving method for a generating plant or switching device, frequency-generating plant, generating plant, switching device and electrical network |
DE102020114775A1 (en) | 2020-06-03 | 2021-12-09 | Westnetz Gmbh | Method for changing a reference power of a generating plant in an electrical island network, generating plant and electrical island network |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113065234B (en) * | 2021-03-17 | 2023-02-21 | 广东电网有限责任公司计量中心 | Batch reliability risk level assessment method and system for intelligent electric meters |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998021803A2 (en) * | 1996-11-14 | 1998-05-22 | Brian Tolley Corporation Limited | Improvements relating to signalling in electricity distribution systems |
DE20218473U1 (en) * | 2002-02-19 | 2003-03-27 | Inst Solare Energieversorgungstechnik Iset | Device for connecting a building or the like. to an electrical low-voltage network |
DE102007030451A1 (en) * | 2007-06-29 | 2009-01-02 | Diehl Ako Stiftung & Co. Kg | Power supply apparatus |
US20120267957A1 (en) * | 2011-04-20 | 2012-10-25 | Czarnecki Neil A | Transfer Switch For Automatically Switching Between Alternative Energy Source And Utility Grid |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9112379B2 (en) * | 2006-12-06 | 2015-08-18 | Solaredge Technologies Ltd. | Pairing of components in a direct current distributed power generation system |
JP5685715B2 (en) * | 2009-09-28 | 2015-03-18 | パナソニックIpマネジメント株式会社 | Grid-connected power supply system |
KR101097260B1 (en) * | 2009-12-15 | 2011-12-22 | 삼성에스디아이 주식회사 | Grid-connected energy storage system and method for controlling grid-connected energy storage system |
DE202010015254U1 (en) * | 2010-11-09 | 2011-01-27 | Feuchtgruber, Raimund | Control device for controlling an energy allocation and device for providing electrical energy to a building-associated consumer group |
US7977818B1 (en) * | 2011-01-25 | 2011-07-12 | Wahl Eric R | Safety device for plug and play solar energy system |
-
2012
- 2012-11-29 DE DE102012023426.0A patent/DE102012023426A1/en not_active Withdrawn
-
2013
- 2013-11-27 WO PCT/EP2013/074909 patent/WO2014083083A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998021803A2 (en) * | 1996-11-14 | 1998-05-22 | Brian Tolley Corporation Limited | Improvements relating to signalling in electricity distribution systems |
DE20218473U1 (en) * | 2002-02-19 | 2003-03-27 | Inst Solare Energieversorgungstechnik Iset | Device for connecting a building or the like. to an electrical low-voltage network |
DE102007030451A1 (en) * | 2007-06-29 | 2009-01-02 | Diehl Ako Stiftung & Co. Kg | Power supply apparatus |
US20120267957A1 (en) * | 2011-04-20 | 2012-10-25 | Czarnecki Neil A | Transfer Switch For Automatically Switching Between Alternative Energy Source And Utility Grid |
Non-Patent Citations (2)
Title |
---|
Bereitschaftsberieb. In: Wikipedia. Die freie Enzykloädie. Stand: 16.10.2012. URL: http://de.wikipedia.org/w/index.php?title=Bereitschaftsbetrieb&oldid=109299209 [abgerufen am 07.10.2013] * |
GEIBEL, D. etal.: "Improvement of Power Quality and Reliability with multifunctional PV-inverters in distributed energy systems"; 10th International Conference on Electrical Power Quality and Utilisation, 2009. EPQU 2009. 15-17 Sept. 2009. In: IEEE Xplore. doi: 10.1109/EPQU.2009.5318856 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102014007639A1 (en) * | 2014-05-22 | 2015-11-26 | AMK Arnold Müller GmbH & Co. KG | System for feeding electrical energy into a power supply network |
DE102014007640A1 (en) * | 2014-05-22 | 2015-11-26 | AMK Arnold Müller GmbH & Co. KG | System for feeding electrical energy into a power supply network and operating method for such a system |
EP3336998A1 (en) * | 2016-12-16 | 2018-06-20 | innogy SE | Emergency power system, converter for an emergency power system and method for operating an emergency power system |
DE102016124602A1 (en) * | 2016-12-16 | 2018-06-21 | Innogy Se | Emergency power system, inverter for a network backup system and method for operating a network backup system |
AT520273A1 (en) * | 2017-07-20 | 2019-02-15 | Xelectrix Power Gmbh | Power supply system and tracked vehicle |
US11398732B2 (en) | 2017-07-20 | 2022-07-26 | Xelectrix Power Gmbh | Power supply system and tracked vehicle |
DE102020114764A1 (en) | 2020-06-03 | 2021-12-09 | Westnetz Gmbh | Transmission method for a frequency-generating plant, receiving method for a generating plant or switching device, frequency-generating plant, generating plant, switching device and electrical network |
DE102020114775A1 (en) | 2020-06-03 | 2021-12-09 | Westnetz Gmbh | Method for changing a reference power of a generating plant in an electrical island network, generating plant and electrical island network |
Also Published As
Publication number | Publication date |
---|---|
WO2014083083A1 (en) | 2014-06-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102012023426A1 (en) | Electrical arrangement and electrical system with an electrical arrangement | |
DE102009025363B9 (en) | Starting source inverter | |
EP2924839B1 (en) | Single-phase emergency operation of a three-phase inverter and corresponding inverter | |
EP2386121B1 (en) | Power system with photovoltaic generator directly feeding an hvdc transmission system | |
DE102012023424B4 (en) | Energy distribution system with a control device | |
EP2761716A2 (en) | Pv system having a safeguard against feeding into a public power distribution network | |
DE102011000394A1 (en) | Local energy supply system | |
DE102010032822A1 (en) | Power generation system and method of operating such | |
WO2020099055A1 (en) | Electrical substation of a power supply grid, and a method for operating an electrical substation | |
EP3472913B1 (en) | Electrical energy supply unit and control therefor | |
DE102011122580B4 (en) | Method for operating an electrical supply network and associated control unit | |
EP4010956A1 (en) | Energy supply system having a coupling device | |
DE102013011427A1 (en) | Electrical arrangement with an inverter and intermediate switching device for the electrical arrangement | |
DE102018111154B4 (en) | Charging system | |
EP3413422B1 (en) | Local network station with variable low voltage outputs | |
DE202011102374U1 (en) | Energy storage and / or supply device | |
DE102012002599B4 (en) | Power generation plant with inverter and energy storage system | |
EP3682522B1 (en) | Method for operating a stored energy source | |
EP3314721A1 (en) | Energy management system for an energy generation system | |
DE202012013242U1 (en) | Battery inverter and device for supplying a house with electrical energy | |
DE102020130539B4 (en) | Method for operating an energy supply system, energy supply system and control unit for an energy supply system | |
EP2802014A1 (en) | Photovoltaic system | |
DE102012009761A1 (en) | Component of system for producing direct current or alternating current, has up-converter that converts direct current input voltage at input of connection box to direct current output voltage at output terminal box | |
DE102014200464A1 (en) | Device and method for the combined operation of an electrical load with mains power and / or electrical energy from an independent energy source | |
DE202011110684U1 (en) | Device for connecting a rechargeable battery and / or a power generator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R163 | Identified publications notified | ||
R012 | Request for examination validly filed | ||
R120 | Application withdrawn or ip right abandoned |