DE102012009394A1 - Method manufacturing batteries for vehicles, involves inserting an electrical energy in electrical energy storage of transport unit, where electrical energy is delivered during unloading of one of batteries - Google Patents
Method manufacturing batteries for vehicles, involves inserting an electrical energy in electrical energy storage of transport unit, where electrical energy is delivered during unloading of one of batteries Download PDFInfo
- Publication number
- DE102012009394A1 DE102012009394A1 DE201210009394 DE102012009394A DE102012009394A1 DE 102012009394 A1 DE102012009394 A1 DE 102012009394A1 DE 201210009394 DE201210009394 DE 201210009394 DE 102012009394 A DE102012009394 A DE 102012009394A DE 102012009394 A1 DE102012009394 A1 DE 102012009394A1
- Authority
- DE
- Germany
- Prior art keywords
- electrical energy
- batteries
- battery
- transport
- energy storage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/44—Methods for charging or discharging
- H01M10/441—Methods for charging or discharging for several batteries or cells simultaneously or sequentially
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L3/00—Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
- B60L3/12—Recording operating variables ; Monitoring of operating variables
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L50/00—Electric propulsion with power supplied within the vehicle
- B60L50/50—Electric propulsion with power supplied within the vehicle using propulsion power supplied by batteries or fuel cells
- B60L50/60—Electric propulsion with power supplied within the vehicle using propulsion power supplied by batteries or fuel cells using power supplied by batteries
- B60L50/64—Constructional details of batteries specially adapted for electric vehicles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L58/00—Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
- B60L58/10—Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
- B60L58/12—Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/385—Arrangements for measuring battery or accumulator variables
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M2220/00—Batteries for particular applications
- H01M2220/20—Batteries in motive systems, e.g. vehicle, ship, plane
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/70—Energy storage systems for electromobility, e.g. batteries
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Power Engineering (AREA)
- Transportation (AREA)
- Life Sciences & Earth Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- General Chemical & Material Sciences (AREA)
- Secondary Cells (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Abstract
Description
Die Erfindung betrifft ein Verfahren zum Fertigen von Batterien für Fahrzeuge, bei welchem zum Prüfen der Batterien auf Funktionsfähigkeit eine jeweilige Batterie zumindest teilweise geladen und anschließend zumindest teilweise entladen wird. Des Weiteren betrifft die Erfindung eine Fertigungsanordnung zum Fertigen von Batterien für Fahrzeuge.The invention relates to a method for manufacturing batteries for vehicles, in which a respective battery is at least partially charged and subsequently at least partially discharged for testing the batteries for functionality. Furthermore, the invention relates to a manufacturing arrangement for manufacturing batteries for vehicles.
Bei der Herstellung von Batterien, welche als Traktionsbatterien in Elektrofahrzeugen oder Hybridfahrzeugen zum Einsatz kommen, ist es notwendig, diese im Rahmen der Fertigung einer Prüfung zu unterziehen. Hierbei wird die jeweils hergestellte Batterie zunächst einmal geladen und sodann wieder entladen, wobei derartige Lade- und Entladevorgänge in der Regel wiederholt vorgenommen werden. Aufgrund elektrischer Eigenschaften der Batterien, die sich beim Laden und Entladen zeigen, sowie gegebenenfalls aufgrund von an der Batterie zutage tretenden Defekten lässt sich erkennen, ob die Batterie voll funktionsfähig ist.In the manufacture of batteries, which are used as traction batteries in electric vehicles or hybrid vehicles, it is necessary to subject them during the production of a test. In this case, the battery produced in each case is first charged once and then discharged again, such loading and unloading operations are usually carried out repeatedly. Due to the electrical characteristics of the batteries that appear during charging and discharging, and possibly due to defects on the battery, it can be seen whether the battery is fully functional.
In der
Gemäß der
Des Weiteren beschreibt die
Aufgabe der vorliegenden Erfindung ist es, ein Verfahren der eingangs genannten Art sowie eine Fertigungsanordnung zum Fertigen von Batterien für Fahrzeuge zu schaffen, welches bzw. welche eine besonders energiesparende Fertigung ermöglicht.Object of the present invention is to provide a method of the type mentioned above and a manufacturing arrangement for the manufacture of batteries for vehicles, which or which allows a particularly energy-saving production.
Diese Erfindung wird durch ein Verfahren mit den Merkmalen des Patentanspruchs 1 und durch eine Fertigungsanordnung mit den Merkmalen des Patentanspruchs 7 gelöst. Vorteilhafte Ausgestaltungen mit zweckmäßigen Weiterbildungen der Erfindung sind in den abhängigen Patentansprüchen angegeben.This invention is achieved by a method having the features of claim 1 and by a manufacturing arrangement having the features of claim 7. Advantageous embodiments with expedient developments of the invention are specified in the dependent claims.
Bei dem erfindungsgemäßen Verfahren wird die beim Entladen wenigstens einer der Batterien abgegebene elektrische Energie zumindest teilweise in einen elektrischen Energiespeicher zumindest einer Transporteinrichtung eingebracht, welche beim Fertigen der Batterien für den Transport von Material verwendet wird.In the method according to the invention, the electrical energy emitted when discharging at least one of the batteries is at least partially introduced into an electrical energy store of at least one transport device which is used for the transport of material during the manufacture of the batteries.
Dem liegt die Erkenntnis zugrunde, dass die elektrischen Energiespeicher von Transporteinrichtungen, wie sie in der Fertigung von Traktionsbatterien für Fahrzeuge Verwendung finden, üblicherweise an Ladestationen geladen werden. Diese Ladestationen sind ihrerseits an das öffentliche, zum Beispiel kommunale Stromnetz angeschlossen. Das Laden der elektrischen Energiespeicher der Transporteinrichtungen benötigt also zusätzliche Energie, welche dem öffentlichen Stromnetz entnommen wird. Andererseits steht beim Entladen der gefertigten Fahrzeugbatterien elektrische Energie zur Verfügung, welche beim die Fertigung abschließenden Prüfvorgang im Rahmen des Entladens dieser Batterien frei wird. Anstatt nun diese beim Entladen der Batterien abgegebene elektrische Energie wieder in das öffentliche Stromnetz zurückzuspeisen, wird diese elektrische Energie vorliegend den elektrischen Energiespeichern der Transporteinrichtungen zugeführt.This is based on the finding that the electrical energy storage of transport devices, such as those used in the manufacture of traction batteries for vehicles, are usually charged to charging stations. These charging stations are in turn connected to the public, for example, municipal power grid. The charging of the electrical energy storage of the transport devices thus requires additional energy, which is taken from the public power grid. On the other hand, when unloading the manufactured vehicle batteries, electrical energy is available, which is released during the final testing process during the discharge of these batteries. Instead of feeding back these discharged when discharging the batteries electrical energy back into the public grid, this electrical energy is presently supplied to the electrical energy storage of the transport devices.
Dies bringt Kostenvorteile mit sich, da die elektrische Energie zum Laden der Batterie für das Fahrzeug mit einem Preis zu bezahlen ist, der höher ist als das Entgelt für das Zurückführen der Ladung in das öffentliche Stromnetz. Zudem braucht im Rahmen der Fertigung der Batterien weniger elektrische Energie aus dem öffentlichen Stromnetz entnommen zu werden, sodass bezogen auf diese Energie aus dem öffentlichen Stromnetz eine besonders energiesparende Fertigung der Batterien erreicht wird. Durch die Einbindung der zumindest einen Transporteinrichtung in die Energiebilanzierung kann also Energie gespart werden, und es ist ein nachhaltiger, umweltschonender Fertigungsprozess erreichbar.This entails cost advantages, since the electric energy for charging the battery for the vehicle is to be paid at a price which is higher than the charge for returning the charge to the public power grid. In addition, as part of the production of batteries less electrical energy needs to be removed from the public power grid, so based on this energy from the public power grid, a particularly energy-efficient production of the batteries is achieved. By integrating the at least one transport device in the energy balancing so energy can be saved, and it is a sustainable, environmentally friendly manufacturing process achievable.
Die Transporteinrichtungen können dazu ausgelegt sein, an Material sowohl Komponenten der Batterien als auch fertige Batterien sowie Zubehör für die Batterien im Rahmen der Fertigung derselben zu transportieren. Selbstverständlich können jedoch derartige Transporteinrichtungen auch Leerfahrten durchführen, also Fahrten, bei welchen sie nicht mit Material beladen sind. Der elektrische Energiespeicher der Transporteinrichtung versorgt bevorzugt ein Antriebsaggregat, welches dem Sich-Fortbewegen der Transporteinrichtung dient.The transport means may be adapted to material both components of the batteries as well as finished batteries as well To transport accessories for the batteries in the production of the same. Of course, however, such transport facilities can also carry empty runs, ie trips in which they are not loaded with material. The electrical energy storage of the transport device preferably supplies a drive unit, which serves to move the transport device itself.
In einer vorteilhaften Ausgestaltung wird als Transporteinrichtung wenigstens ein Flurförderfahrzeug verwendet. Flurförderfahrzeuge sind nämlich in Bezug auf die Steuerung besonders einfach und aufwandsarm in der Fertigung von Batterien einsetzbar. Insbesondere gleislose Flurförderfahrzeuge können des Weiteren besonders flexibel beim Transport von Material in der Batteriefertigung eingesetzt werden.In an advantageous embodiment, at least one industrial truck is used as the transport device. Forklift vehicles are in fact particularly simple and low-effort in terms of the control in the production of batteries used. In particular, trackless industrial trucks can also be used particularly flexibly in the transport of material in battery production.
Zusätzlich oder alternativ kann als Transporteinrichtung wenigstens ein fahrerloses Transportfahrzeug verwendet werden, wodurch eine besonders effiziente Fertigung der Batterien erreichbar ist.Additionally or alternatively, at least one driverless transport vehicle can be used as a transport device, whereby a particularly efficient production of the batteries can be achieved.
Als weiter vorteilhaft hat es sich gezeigt, wenn der elektrische Energiespeicher der zumindest einen Transporteinrichtung zumindest teilweise mit der beim Entladen der wenigstens einen Batterie abgegebenen elektrischen Energie geladen wird, bevor ein im Hinblick auf das Fortbewegen der Transporteinrichtung kritischer Ladezustand des elektrischen Energiespeichers erreicht ist. Der Auslöser für das Laden des elektrischen Energiespeichers der Transporteinrichtung ist also nicht ein Sich-Annähern des elektrischen Energiespeichers an den kritischen Ladezustand, sondern das Bereitstellen von elektrischer Energie aufgrund des Entladens der wenigstens einen Batterie für das Elektrofahrzeug oder Hybridfahrzeug. So wird besonders wirkungsvoll vermieden, dass von der wenigstens einen Batterie beim Entladen abgegebene elektrische Energie in das öffentliche Stromversorgungsnetz rückgeführt wird.As a further advantage, it has been shown that the electrical energy storage of the at least one transport device is at least partially charged with the discharged during discharging the at least one battery electrical energy before a critical in terms of moving the transport device critical state of charge of the electrical energy storage is achieved. The trigger for charging the electrical energy storage of the transport device is therefore not an approach of the electrical energy storage to the critical state of charge, but the provision of electrical energy due to the discharge of the at least one battery for the electric vehicle or hybrid vehicle. Thus, it is particularly effectively avoided that electrical energy released by the at least one battery during discharging is returned to the public power grid.
Von Vorteil ist es weiterhin, wenn beim Entladen der wenigstens einen Batterie abgegebene elektrische Energie erst dann einem Stromversorgungsnetz zugeführt wird, wenn eine Aufnahmefähigkeit des elektrischen Energiespeichers der zumindest einen Transporteinrichtung erschöpft ist. So kann eine rasche Fertigung aufrechterhalten werden, da immer eine Möglichkeit gegeben ist, die beim Entladen der Batterie abgegebene elektrische Energie loszuwerden. Dennoch wird das Zurückführen von elektrischer Energie in das Stromversorgungsnetz minimiert.It is furthermore advantageous if electrical energy released during discharge of the at least one battery is only supplied to a power supply network when a capacity of the electrical energy store of the at least one transport device is exhausted. Thus, a rapid production can be maintained, since there is always a way to get rid of the discharged when discharging the battery electrical energy. Nevertheless, the return of electrical energy is minimized in the power grid.
Schließlich hat es sich als vorteilhaft gezeigt, wenn die elektrische Energie zum zumindest partiellen erstmaligen Laden der wenigstens einen Batterie einem Stromversorgungsnetz entnommen wird. So kann nämlich besonders gut sichergestellt werden, dass stets die zum erstmaligen Laden der Batterien notwendige elektrische Energie zur Verfügung steht.Finally, it has proven to be advantageous if the electrical energy for at least partial initial charging of the at least one battery is taken from a power supply network. This is because it is particularly easy to ensure that the electrical energy necessary for charging the batteries for the first time is always available.
Die erfindungsgemäße Fertigungsanordnung zum Fertigen von Batterien für Fahrzeuge umfasst wenigstens einen Prüfstand zum Prüfen wenigstens einer der Batterien auf Funktionsfähigkeit. An dem Prüfstand ist wenigstens eine zumindest teilweise geladene Batterie zumindest teilweise entladbar. Des Weiteren ist die wenigstens eine Batterie galvanisch mit einem elektrischen Energiespeicher zumindest einer Transporteinrichtung gekoppelt, welche beim Fertigen der Batterien für den Transport von Material verwendbar ist. Hierbei ist die beim Entladen der wenigstens einen Batterie abgegebene elektrische Energie zumindest teilweise in den elektrischen Energiespeicher der zumindest einen Transporteinrichtung einbringbar.The manufacturing arrangement for manufacturing batteries for vehicles according to the invention comprises at least one test stand for testing at least one of the batteries for operability. At least one at least partially charged battery can be at least partially discharged at the test stand. Furthermore, the at least one battery is galvanically coupled to an electrical energy store of at least one transport device, which can be used during the manufacture of the batteries for the transport of material. In this case, the electrical energy released when the at least one battery is discharged can be introduced at least partially into the electrical energy store of the at least one transport device.
Durch das Einspeisen der bei dem – im Rahmen der Prüfung notwendigen – Entladen ohnehin zur Verfügung stehenden elektrischen Energie der Batterie in den elektrischen Energiespeicher der wenigstens einen Transporteinrichtung lässt sich eine besonders energiesparende Fertigung der Batterien erreichen.By feeding in the - necessary in the context of the test - discharging already available electrical energy of the battery in the electrical energy storage of at least one transport device can be a particularly energy-saving production of batteries reach.
Die für das erfindungsgemäße Verfahren beschriebenen Vorteile und bevorzugten Ausführungsformen gelten auch für die erfindungsgemäße Fertigungsanordnung und umgekehrt.The advantages and preferred embodiments described for the method according to the invention also apply to the manufacturing arrangement according to the invention and vice versa.
Die vorstehend in der Beschreibung genannten Merkmale und Merkmalskombinationen sowie die nachfolgend in der Figurenbeschreibung genannten und/oder in der Figur alleine gezeigten Merkmale und Merkmalskombinationen sind nicht nur in der jeweils angegebenen Kombination, sondern auch in anderen Kombinationen oder in Alleinstellung verwendbar, ohne den Rahmen der Erfindung zu verlassen.The features and feature combinations mentioned above in the description as well as the features and feature combinations mentioned below in the figure description and / or shown alone in the figure can be used not only in the respectively specified combination, but also in other combinations or in isolation, without the scope of To leave invention.
Weitere Vorteile, Merkmale und Einzelheiten der Erfindung ergeben sich aus den Ansprüchen, der nachfolgenden Beschreibung bevorzugter Ausführungsformen sowie anhand der Zeichnung.Further advantages, features and details of the invention will become apparent from the claims, the following description of preferred embodiments and from the drawing.
Diese zeigt stark schematisiert eine Fertigungsanordnung zum Fertigen von Hochvoltbatterien für Elektrofahrzeuge oder Hybridfahrzeuge, wobei die beim Entladen einer Hochvoltbatterie abgegebene elektrische Energie einem Flur förderfahrzeug zugeführt wird.This shows very schematically a manufacturing arrangement for manufacturing high-voltage batteries for electric vehicles or hybrid vehicles, wherein the discharged during discharging a high-voltage battery electrical energy is supplied to a corridor conveyor vehicle.
Eine Fertigungsanordnung
Im Rahmen der am Ende der Fertigung der Hochvoltbatterie
In der Figur ist ein Fertigungsschritt bei der Fertigung der Hochvoltbatterie
Vielmehr kommt diese elektrische Energie einem Flurförderfahrzeug
Vorliegend wird jedoch die beim Entladen der Hochvoltbatterie
Dem liegt die Erkenntnis zugrunde, dass es wirtschaftlich ungünstig ist, die beim Entladevorgang der zu prüfenden Hochvoltbatterie
Die primäre Energiequelle zum erstmaligen Laden der Hochvoltbatterie
Zusätzlich oder alternativ zu dem Flurförderfahrzeug
Lediglich wenn beim Entladen der Hochvoltbatterien
Das Flurförderfahrzeug
Durch die Einbindung der Flurförderfahrzeuge
ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION
Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.
Zitierte PatentliteraturCited patent literature
- DE 19652173 B4 [0003, 0004, 0004] DE 19652173 B4 [0003, 0004, 0004]
- DE 202011100865 U1 [0005] DE 202011100865 U1 [0005]
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102012009394.2A DE102012009394B4 (en) | 2012-05-11 | 2012-05-11 | Method of manufacturing batteries for vehicles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102012009394.2A DE102012009394B4 (en) | 2012-05-11 | 2012-05-11 | Method of manufacturing batteries for vehicles |
Publications (2)
Publication Number | Publication Date |
---|---|
DE102012009394A1 true DE102012009394A1 (en) | 2013-11-14 |
DE102012009394B4 DE102012009394B4 (en) | 2017-02-16 |
Family
ID=49475286
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102012009394.2A Active DE102012009394B4 (en) | 2012-05-11 | 2012-05-11 | Method of manufacturing batteries for vehicles |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102012009394B4 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102015015324A1 (en) * | 2015-11-27 | 2017-06-01 | Eaton Protection Systems Ip Gmbh & Co. Kg | Cycle test methods |
WO2021161110A1 (en) * | 2020-02-14 | 2021-08-19 | Techtronic Cordless Gp | Battery charging and discharging using a battery bank during battery manufacture |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19652173B4 (en) | 1996-12-14 | 2004-12-02 | Vb Autobatterie Gmbh | Procedure for checking the functionality of accumulators |
DE102009044161A1 (en) * | 2009-10-01 | 2010-04-08 | Grönniger, Stefan | Method for coordinated control of power generation-, storage- and/or consumption units of e.g. industrial truck, involves coupling energy production unit with consumption unit such that energy is adjusted by energy production unit |
DE202011100865U1 (en) | 2011-05-18 | 2011-08-03 | Helmut Richter | Charging system for electrically operable vehicles and charging station with such a charging system and at least one source of regenerative voltage |
DE102010027854A1 (en) * | 2010-04-16 | 2011-10-20 | Fuelcon Ag | Device for alternately charging and discharging battery utilized in e.g. electronic device, has net-coupled power supply carrying out compensation of energy losses emerging during charging and discharging batteries |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3141622C2 (en) * | 1981-10-20 | 1984-07-05 | Peter 8190 Wolfratshausen Gürlich | "Device for commissioning charging of secondary elements" |
JPH11289676A (en) * | 1998-04-01 | 1999-10-19 | Toyo System Kk | Power unit for secondary battery charging and discharging device |
-
2012
- 2012-05-11 DE DE102012009394.2A patent/DE102012009394B4/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19652173B4 (en) | 1996-12-14 | 2004-12-02 | Vb Autobatterie Gmbh | Procedure for checking the functionality of accumulators |
DE102009044161A1 (en) * | 2009-10-01 | 2010-04-08 | Grönniger, Stefan | Method for coordinated control of power generation-, storage- and/or consumption units of e.g. industrial truck, involves coupling energy production unit with consumption unit such that energy is adjusted by energy production unit |
DE102010027854A1 (en) * | 2010-04-16 | 2011-10-20 | Fuelcon Ag | Device for alternately charging and discharging battery utilized in e.g. electronic device, has net-coupled power supply carrying out compensation of energy losses emerging during charging and discharging batteries |
DE202011100865U1 (en) | 2011-05-18 | 2011-08-03 | Helmut Richter | Charging system for electrically operable vehicles and charging station with such a charging system and at least one source of regenerative voltage |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102015015324A1 (en) * | 2015-11-27 | 2017-06-01 | Eaton Protection Systems Ip Gmbh & Co. Kg | Cycle test methods |
WO2021161110A1 (en) * | 2020-02-14 | 2021-08-19 | Techtronic Cordless Gp | Battery charging and discharging using a battery bank during battery manufacture |
US11404887B2 (en) | 2020-02-14 | 2022-08-02 | Techtronic Cordless Gp | Battery charging and discharging using a battery bank during battery manufacture |
Also Published As
Publication number | Publication date |
---|---|
DE102012009394B4 (en) | 2017-02-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2387524B1 (en) | Onboard network and voltage transformer for a vehicle and method for controlling a multi-voltage on-board network | |
DE102014004790A1 (en) | Method for operating an energy storage device in a motor vehicle and motor vehicle | |
DE102014016620A1 (en) | Method for operating an energy storage device in a motor vehicle and motor vehicle | |
EP3331720A1 (en) | Electric vehicle charging station and method for controlling an electric vehicle charging station | |
DE102015109272A1 (en) | Loading and unloading device | |
DE102018129905A1 (en) | Method for using at least one loading unit, vehicle, loading unit, and transport system | |
DE102018118945A1 (en) | Batteries and a suitable quick-change system for batteries for vehicles | |
DE102019108930A1 (en) | Quick change stations for e-cars | |
DE102017221033A1 (en) | Method for operating an electrical energy storage device for a motor vehicle and corresponding energy storage device | |
DE102013211764A1 (en) | LOADER | |
EP3578413A1 (en) | Mobile discharge device for an energy storage device of an electric vehicle | |
WO2010089077A2 (en) | Dynamic rechargeable battery management | |
DE102012009394B4 (en) | Method of manufacturing batteries for vehicles | |
DE102018005797A1 (en) | A method of estimating the time required for a full charge of a rechargeable electrochemical energy storage device | |
DE102016000920A1 (en) | Method for loading a traction battery of at least partially electrically driven vehicles and charging station | |
DE102011079242A1 (en) | Charging station for charging of high-voltage battery such as lithium-ion battery used in electric vehicle, controls energy charging function of buffer memory by control device, until target charge is reached | |
DE102011053853A1 (en) | Method for operating e.g. traction battery in e.g. electric vehicle, involves operating electrical energy storage device in long-term charge mode when stationary phase of motor vehicle exceeds defined period | |
DE202016105619U1 (en) | Smart accumulator | |
DE102009028500A1 (en) | Method for operating rechargeable energy storage i.e. accumulator, of e.g. hybrid vehicle, involves providing control device for selecting operating modes from different operation modes of rechargeable energy storage | |
DE102019005625A1 (en) | Charging robot for a charging station for automatically charging an electrical energy store in a vehicle, and method for operating a charging robot for a charging station | |
DE102018104711B4 (en) | Battery pack for an electrical device, charger for a battery pack and method for operating a battery pack | |
DE102015006205A1 (en) | Charging arrangement for charging a HV battery for a motor vehicle, motor vehicle, charging station and method for charging a HV battery of a motor vehicle | |
DE102015012836A1 (en) | Method for charging a traction battery of a motor vehicle, in particular a hybrid or electric vehicle | |
DE102017209712A1 (en) | Charging device for charging an energy storage device of an electrically operable motor vehicle, method for operating a charging device and rapid charging device | |
DE102020133925A1 (en) | FUEL CELL VEHICLE |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R012 | Request for examination validly filed | ||
R016 | Response to examination communication | ||
R018 | Grant decision by examination section/examining division | ||
R020 | Patent grant now final |