DE102010064132A1 - Method for managing planning activities data stored in computer-implemented planning system for smart electric meter in large retail store, involves reporting completed planning for local region to computer-implemented planning system - Google Patents
Method for managing planning activities data stored in computer-implemented planning system for smart electric meter in large retail store, involves reporting completed planning for local region to computer-implemented planning system Download PDFInfo
- Publication number
- DE102010064132A1 DE102010064132A1 DE102010064132A DE102010064132A DE102010064132A1 DE 102010064132 A1 DE102010064132 A1 DE 102010064132A1 DE 102010064132 A DE102010064132 A DE 102010064132A DE 102010064132 A DE102010064132 A DE 102010064132A DE 102010064132 A1 DE102010064132 A1 DE 102010064132A1
- Authority
- DE
- Germany
- Prior art keywords
- planning
- computer
- implemented
- planning system
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Abstract
Description
Die Erfindung betrifft ein Verfahren und eine Anordnung zum Datenmanagement zur Planung von Aktivitäten sowie ein entsprechendes Computerprogramm und ein entsprechendes computerlesbares Speichermedium, welche insbesondere einsetzbar sind für Planungsvorhaben mit einer großen Zahl von planungsrelevanten Objekten, wie beispielsweise zu installierende Geräte, und wobei zur Planung der Datenbestand von operativen Planungstools, wie beispielsweise von einem System zur Planung von Unternehmensressourcen (Enterprise Resource Planning [ERP] System) genutzt wirdThe invention relates to a method and an arrangement for data management for planning activities and a corresponding computer program and a corresponding computer-readable storage medium, which are particularly suitable for planning projects with a large number of planning-relevant objects, such as devices to be installed, and wherein for planning the data Operational planning tools such as enterprise resource planning (ERP) systems are used
Hintergrund der ErfindungBackground of the invention
Die Installation und Instandhaltung einer großen Menge an gleichartigen technischen Geräten, Bauteilen und Baugruppen führt naturgemäß zu einer langen Durchführungsdauer der Aktivitäten.The installation and maintenance of a large number of similar technical devices, components and assemblies naturally leads to a long implementation period of the activities.
Hierbei sind zwei Phasen zu unterscheiden:
- 1. Die Phase der Vorplanung in der die Aufgaben statisch auf eine Zeitlinie zu bringen sind. Im Folgenden wird diese Planung. auch Langfristplanung bezeichnet.
- 2. Die Phase der physikalischen Durchführung der Arbeiten, in der neben den vorgeplanten Aufgaben auch ad-hoc Aufgaben und Störungen in den Tagesablauf einfließen müssen. Im Folgenden wird diese Planung auch Kurzfristplanung bezeichnet.
- 1. The phase of pre-planning in which the tasks are to be brought statically on a timeline. Below is this planning. also termed long-term planning.
- 2. The phase of the physical execution of the work, in addition to the pre-planned tasks and ad-hoc tasks and disturbances must be incorporated into the daily routine. In the following, this planning is also referred to as short-term planning.
Die Phase der Vorplanung ist dadurch gekennzeichnet, dass in einem mehr oder weniger statischen Umfeld Arbeiten nach definierten Kriterien aufgeteilt und den vermeintlich zukünftig zur Verfügung stehenden Ressourcen zugeteilt werden. Diese Phase ist durch mehr oder weniger fundiertes Wissen über die tatsächliche Dauer und den tatsächlichen Aufwand der kommenden Auftragsausführung geprägt.The phase of the preliminary planning is characterized by the fact that, in a more or less static environment, work is divided up according to defined criteria and allocated to the resources supposedly available in the future. This phase is characterized by more or less well-founded knowledge of the actual duration and actual effort of the upcoming order execution.
Die Phase der Durchführung wiederum ist geprägt von äußeren Faktoren, wie Reklamationen, Änderungen des ursprünglichen Arbeitsplans aufgrund von Ressourcenänderungen oder Änderung der Durchführungsvoraussetzungen. Die vorher eher statisch (und längerfristig in die Zukunft) durchgeführte Planung durchläuft nun also bei der Durchführung den Einfluss der Umwelt, die jeden Tag eine mehr oder weniger flexible Anpassung des tatsächlichen Arbeitsvorrates und -ablaufes erfordert. Bei derartigen Planungsansätzen liegen Planung und Auftragsdurchführung zeitlich sehr dicht beisammen. Charakteristisch sind dabei genaue Kenntnisse über konkrete Durchführungsschritte des Auftrags, die zum Durchführen des Auftrags notwendigen Mitarbeiter und Materialressourcen und die Verteilung der Arbeitslast in einem bekannten Zeitraum.The implementation phase, in turn, is characterized by external factors such as complaints, changes to the original work plan due to resource changes or changes in implementation conditions. The planning, which used to be more static (and longer term in the future), now undergoes the influence of the environment, which requires a more or less flexible adaptation of the actual work supply and process every day. In such planning approaches, planning and order execution are very close in time. Characteristic are precise knowledge about concrete implementation steps of the order, the employees and material resources necessary for the execution of the order and the distribution of the workload in a known period.
Hieraus ergibt sich eine Problemstellung, die der vorliegenden Erfindung zugrunde liegt:
Wie kann die eher statische, aber von großen Datenmengen geprägte Vorplanung so ausgeführt werden, dass sie
a. möglichst nahe an ein Optimum herangeführt werden kann ohne aufwendige mathematische Algorithmen zu verwenden. Erfahrungen sollen in die Ausführung von noch nicht an die Kurzfristplanung übergebenen Aufträgen einfließen?
b. Wie kann die Last der Massendatenverarbeitung in dem genutzten IT-System bei der zu erwartenden großen Datenmenge performant verteilt werden?This results in a problem that underlies the present invention:
How can the more static planning, which is characterized by large amounts of data, be carried out in such a way that it can be used
a. as close as possible to an optimum can be used without elaborate mathematical algorithms. Experiences should flow into the execution of orders not yet transferred to short-term planning?
b. How can the load of mass data processing in the used IT system be distributed at high performance with the expected large amount of data?
In bisher bekannten Planungsmethoden versuchte man derartige Anforderungen mit marktüblichen operativen Planungstools zur Disposition zu begegnen. Planungsgrundlage ist hier typischerweise der vorher angelegte Auftrag, der auf ein Zieldatum disponiert wird.In previously known planning methods, attempts were made to meet such requirements with standard operational planning tools for disposition. The planning basis here is typically the previously created order, which is scheduled for a target date.
Bei den operativen Planungstools ergibt sich dabei eine Überschneidung aus zukünftig auszuführenden (und aus der Vorplanung kommenden) Tätigkeiten, laufenden Aktivitäten (der Durchführung) und dem Rücklauf aus bereits durchgeführten Installations- und Wartungsarbeiten. Dies führt zu einer steigenden Menge zu realisierender Aufträge und damit zu einer Zunahme der Prozesskomplexität.In the case of the operative planning tools, this results in an overlap of future activities (and those coming from the preliminary planning), ongoing activities (the execution) and the return from already performed installation and maintenance work. This leads to an increasing amount of orders to be realized and thus to an increase in process complexity.
Ein alternatives Vorgehensmodell dazu bestand üblicherweise in einer Arbeitsweise auf Basis einer separaten Tabellenkalkulation und/oder Textverarbeitung für die Vorplanung um sich außerhalb des operativen Datenbestandes bewegen zu können. Dies führt zwangsläufig zu einem separaten Datenbestand, der zyklisch mit den Daten der Produktionssysteme abgeglichen werden muss. Oft manuell durch die Bearbeiter.An alternative procedure model was usually a procedure based on a separate spreadsheet and / or word processing for the preliminary planning in order to move outside the operative database. This inevitably leads to a separate database which has to be synchronized cyclically with the data of the production systems. Often manually by the engineer.
Die Aufgabe der Erfindung besteht somit darin, ein Verfahren und eine Anordnung zum Datenmanagement zur Planung von Aktivitäten sowie ein entsprechendes Computerprogramm und ein entsprechendes computerlesbares Speichermedium bereitzustellen, welche die Nachteile der bekannten Lösungen beheben sowie insbesondere zu einer Verringerung der Rechenlast bei der Planung der Aktivitäten führen.The object of the invention is therefore to provide a method and an arrangement for data management for planning activities, as well as a corresponding computer program and a corresponding computer-readable storage medium, which eliminate the disadvantages of the known solutions and, in particular, lead to a reduction in the workload in the planning of the activities ,
Diese Aufgabe wird erfindungsgemäß durch die Merkmale in den Ansprüchen 1, 8 bis 10 gelöst. Zweckmäßige Ausgestaltungen der Erfindung sind in den Unteransprüchen enthalten.This object is achieved by the features in
Ein besonderer Vorteil der Erfindung besteht darin, dass bei dem erfindungsgemäßen Verfahren zum Datenmanagement bei der Planung von Aktvitäten mit einer hohen Anzahl von auszuwertenden Planungsobjekten auf den Datenbestand eines ersten computerimplementierten Planungssystems zurückgegriffen werden kann, dabei aber die möglicherweise rechenaufwändigen Algorithmen des ersten Planungssystems nicht verwendet werden müssen. Bei dem ersten computerimplementierten Planungssystem kann es sich beispielsweise um ein operatives Planungstool, wie z. B. ein ERP-System, handeln. Bei einem ERP-System handelt es sich um eine komplexe Anwendungssoftware, die für weitgehend alle Geschäftsprozesse eine zentrale Basis der Datenhaltung zur Verfügung darstellt. Auf einer zentralen Datenbasis werden mittels einer Programmiersprache betriebswirtschaftliche Prozesse hinsichtlich der unternehmerischen und gesetzlichen Vorgaben abgebildet. In derartigen ERP-Systemen werden daher bei der Anlage eines Auftrags stets eine Vielzahl von Daten abgeglichen und Berechnungen ausgeführt, wie Beispielsweise die Prüfung der Verfügbarkeit von Material. Dadurch wird ein Computersystem stark belastet, insbesondere, wenn eine Vielzahl von Planungsobjekten berücksichtigt werden muss. Die Erfindung vermeidet diese hohe Rechenbelastung, indem ein zweites computerimplementiertes Planungssystem genutzt wird, in dem eine Vorplanung durchgeführt wird. Durch die zu planende Aktivität sind die Planungsobjekte wie z. B. zu installierende Geräte, Bauteile, Einbauorte, Mitarbeiter, Verteilung der Arbeitslast o. dgl., und/oder Attribute der Planungsobjekte vorgegeben. Die Daten, welche die Planungsobjekte beschreiben und in dem ersten computerimplementierten Planungssystem vorhanden sind, werden aus dem ersten computerimplementierten Planungssystem ausgelesen, beispielsweise durch Import dieser Daten aus dem ersten in das zweite computerimplementierte Planungssystem. Der Import dieser Daten kann am Beginn der Planung für alle Planungsobjekte erfolgen. Es kann sich aber als vorteilhaft erweisen, wenn die Daten nur importiert werden, wenn das zweite computerimplementierte Planungssystem sie benötigt. Für den Datenimport erweist es sich als vorteilhaft, wenn die Daten, die durch die Aktivitäten vorgegebenen Planungsobjekte und/oder Attribute beschreiben, unter Verwendung eines Filters aus dem ersten computerimplementierten Planungssystem gewonnen werden.A particular advantage of the invention is that in the inventive method For data management in the planning of activities with a high number of planning objects to be evaluated, the data stock of a first computer-implemented planning system can be used, but the potentially computationally expensive algorithms of the first planning system do not have to be used. The first computer-implemented planning system can be, for example, an operational planning tool, such as a planning tool. B. an ERP system act. An ERP system is a complex application software that provides a central basis for data management for most of all business processes. On a central database, business processes with regard to the entrepreneurial and legal requirements are mapped by means of a programming language. In such ERP systems, therefore, when creating a job, a large amount of data is always compared and calculations carried out, such as checking the availability of material. As a result, a computer system is heavily loaded, in particular if a large number of planning objects has to be taken into account. The invention avoids this high computational burden by using a second computer-implemented planning system in which pre-planning is performed. Due to the activity to be planned, the planning objects such as B. devices to be installed, components, installation locations, employees, distribution of workload o. The like., And / or attributes of the planning objects specified. The data describing the engineering objects and present in the first computer-implemented planning system is read from the first computer-implemented planning system, for example by importing this data from the first computer-implemented planning system into the second. The import of this data can be done at the beginning of the planning for all planning objects. However, it may prove advantageous if the data is only imported if the second computer-implemented planning system requires it. For the data import, it proves to be advantageous if the data describing the planning objects and / or attributes given by the activities are obtained using a filter from the first computer-implemented planning system.
Erfindungsgemäß ist weiter vorgesehen, dass das Planungsgebiet, in dem die Aktivitäten durchgeführt werden sollen, in kleinere örtliche Bereiche unterteilt wird. In einer beispielhaften Ausführungsform der Erfindung ist vorgesehen, dass durch das zweite computerimplementierte Planungssystem hierfür eine Karte zumindest eines Teils des Planungsgebiets auf einem Visualisierungsmittel, wie beispielsweise einem Display, dargestellt wird und ein Nutzer auf der Karte unter Verwendung von Eingabemitteln, wie z. B. einer Computermaus oder einem Touchscreen, zumindest einen örtlichen Bereich innerhalb des Planungsgebiets für die durchzuführenden Aktivitäten definiert.According to the invention, it is further provided that the planning area in which the activities are to be carried out is subdivided into smaller local areas. In an exemplary embodiment of the invention, it is provided that by the second computer-implemented planning system for this a map of at least a part of the planning area on a visualization means, such as a display, is displayed and a user on the map using input means, such as. As a computer mouse or a touch screen, at least one local area within the planning area for the activities to be performed defined.
Durch Definition eines örtlichen Bereichs werden auch die zu dem örtlichen Bereich gehörigen Planungsobjekte und/oder Attribute bestimmt. Zumindest der örtliche Bereich und die zu diesem gehörigen Planungsobjekte und/oder Attribute werden einander zugeordnet und im folgenden als Planungsszenario bezeichnet. Die die Planungsobjekte und/oder Attribute beschreibenden Daten können nun für jeden örtlichen Bereich aus dem ersten computerimplementierten Planungssystem importiert werden, wenn sie nicht bereits im Voraus für das gesamte Planungsgebiet importiert wurden. Das gesamte Planungsgebiet wird so in mehrere kleinere örtliche Bereiche eingeteilt, so dass die Komplexität der Planungsaufgabe reduziert wird. Für jedes erstellte Planungsszenario werden die die Planungsobjekte und/oder Attribute beschreibenden Daten ausgewertet und bezüglich mindestens eines vorgebbaren Kriteriums bewertet. Eine bevorzugte Ausführungsform der Erfindung sieht vor, dass durch die Auswertung Kennzahlen ermittelt werden, wobei die Kennzahlen beispielsweise die zur Durchführung der Aktivität in dem entsprechenden örtlichen Bereich erforderliche Zeit und/oder Materialien beschreiben. Als vorteilhaft erweist es sich auch, wenn die Kennzahlen die Arbeitsbelastung für die Aktivitäten in dem entsprechenden örtlichen Bereich angeben. Hierfür werden vorzugsweise ein dem Planungsszenario zugeordneter Arbeitsplan und die Menge der dem Planungsszenario zugeordneten Planungsobjekte ausgewertet.By defining a local area, the planning objects and / or attributes belonging to the local area are also determined. At least the local area and the associated planning objects and / or attributes are assigned to each other and referred to below as a planning scenario. The data describing the engineering objects and / or attributes can now be imported for each local area from the first computer-implemented planning system, if they have not already been imported in advance for the entire planning area. The entire planning area is thus divided into several smaller local areas, so that the complexity of the planning task is reduced. For each planning scenario created, the data describing the engineering objects and / or attributes are evaluated and evaluated with regard to at least one predefinable criterion. A preferred embodiment of the invention provides that characteristic numbers are determined by the evaluation, wherein the codes describe, for example, the time and / or materials required to carry out the activity in the corresponding local area. It also proves to be advantageous if the key figures indicate the workload for the activities in the corresponding local area. For this purpose, a routing assigned to the planning scenario and the quantity of planning objects assigned to the planning scenario are evaluated.
Ergibt die Auswertung, dass zumindest ein Kriterium nicht erfüllt wird, weil beispielsweise die Arbeitslast für einen örtlichen Bereich zu hoch ist, kann der örtliche Bereich verkleinert und die Auswertung erneut ausgeführt werden. Die Reduzierung der Arbeitslast erfolgt mittels Maus oder Touchpad, indem Planungsobjekte einem anderen Bereich zugeordnet werden oder ein separates Planungsszenario erstellt wird. Ergibt die Auswertung, dass beispielsweise die Arbeitslast für einen örtlichen Bereich zu gering ist, kann der örtliche Bereich vergrößert werden, beispielsweise indem er mit einem anderen Bereich zusammengeführt wird. Für die neu gebildeten örtlichen Bereiche werden wieder Planungsszenarien definiert und eine Auswertung durchgeführt. Allgemein kann bei Nichterfüllung eines der Kriterien ein vollkommen neuer örtlicher Bereich definiert werden, für den ein neues Planungsszenario definiert und die Auswertung erneut durchgeführt wird.If the evaluation shows that at least one criterion is not fulfilled, for example because the workload for a local area is too high, the local area can be reduced and the analysis can be carried out again. The workload is reduced by using a mouse or touchpad by assigning planning objects to another area or creating a separate planning scenario. If the evaluation shows that, for example, the workload for a local area is too low, the local area can be increased, for example, by bringing it together with another area. For the newly formed local areas, planning scenarios are defined again and an evaluation carried out. In general, if one of the criteria is not met, a completely new local area can be defined for which a new planning scenario is defined and the evaluation is carried out again.
Ergibt die Auswertung, dass ein Teil der Kriterien, vorzugsweise alle Kriterien, für einen örtlichen Bereich erfüllt sind, wird dem ersten computerimplementierten Planungssystem mitgeteilt, dass die Planung für diesen örtlichen Bereich abgeschlossen ist. Eine solche Mitteilung kann insbesondere Angaben umfassen, welche die Einbauplätze, die Geräte, die Arbeitspläne für die Aktivität(en) o. dgl. beschreiben, die dem örtlichen Bereich zugeordnet sind, dessen Planung abgeschlossen ist. Darüber hinaus kann die Mitteilung Angaben über den Zeitraum der Aktivitäten in dem örtlichen Bereich umfassen. Bei den Angaben kann es sich insbesondere um:
- – eine eindeutige Kennung (Schlüssel) des Planungsszenarios im zweiten computerimplementierten Planungssystem,
- – einen Schlüssel des Einbauplatzes oder Geräteplatzes,
- – einen Schlüssel des Arbeitsplans der Aktwität wie bspw. einer Installation,
- – einen Schlüssel des einzubauenden Gerätetyps,
- – den Beginn des Ausführungszeitraums und/oder
- – das Ende des Ausführungszeitraums
- A unique identifier (key) of the planning scenario in the second computer-implemented planning system,
- - a key of the slot or device slot,
- A key of the activity plan of the activity, such as an installation,
- A key of the device type to be installed,
- - the start of the execution period and / or
- - the end of the execution period
Dem ersten computerimplementierten Planungssystem werden in einer bevorzugten Ausführungsform Angaben zu dem Planungsszenario, wie beispielsweise Grenzen des örtlichen Bereichs, die dem örtlichen Bereich zugeordneten Planungsobjekte und/oder Arbeitspläne, übergeben. Eine alternative Ausführungsform sieht vor, dass alle oder zumindest ein Teil der Angaben zu dem Planungsszenario, wie beispielsweise Grenzen des örtlichen Bereichs, die dem örtlichen Bereich zugeordneten Planungsobjekte und/oder Arbeitspläne, ausschließlich in dem zweiten computerimplementierten Planungssystem genutzt werden (und auch dort verbleiben, d. h. nicht übergeben werden). Dem ersten computerimplementierten Planungssystem werden dann im Ergebnis der Planung nur die Ausführungsaufträge übergeben. Diese Aufträge basieren auf der Auswertung der für den örtlichen Bereich gefassten Grenzen. In einer bevorzugten Ausführungsform wird basierend auf diesen Daten in dem ersten computerimplementierten Planungssystem ein Auftrag ausgelöst, so dass nun in dem ersten computerimplementierten Planungssystem alle Berechnungsalgorithmen ausgeführt werden, die das erste computerimplementierte Planungssystem hierfür vorsieht. Eine weitere bevorzugte Ausführungsform sieht vor, dass die Mitteilung an das erste computerimplementierte Planungssystem – und damit die Auftragsgenerierung in dem ersten computerimplementierten Planungssystem – für einen oder mehrere der örtlichen Bereiche separat erfolgt. Es entsteht so eine im Vergleich zu einer Planung der Aktivitäten für das gesamte Planungsgebiet geringe Rechenbelastung, indem diese Berechnungen erfindungsgemäß schrittweise, nach Beendigung der Vorplanung innerhalb des zweiten computerimplementierten Planungssystems für einen örtlichen Bereich, und nur für einen örtlichen (Teil-)Bereich des gesamten Planungsgebiets in dem ersten computerimplementierten Planungssystem durchgeführt werden. Die Verringerung der Rechenbelastung wird durch zwei Faktoren erreicht: erstens durch die geringe Anzahl von Planungsobjekten innerhalb eines örtlichen Bereichs, und zweitens durch die schrittweise Übergabe der Angaben zu dem Planungsszenarien von örtlichen Bereichen, für die die Planung einzeln durchgeführt wurde.In a preferred embodiment, the first computer-implemented planning system is provided with details of the planning scenario, such as boundaries of the local area, the planning objects and / or work plans assigned to the local area. An alternative embodiment provides that all or at least some of the information on the planning scenario, such as boundaries of the local area, the planning objects and / or routings assigned to the local area, are used exclusively in the second computer-implemented planning system (and also remain there, ie not be handed over). As a result of the planning, only the execution orders are transferred to the first computer-implemented planning system. These orders are based on the evaluation of the boundaries set for the local area. In a preferred embodiment, an order is triggered based on these data in the first computer-implemented planning system, so that now in the first computer-implemented planning system, all the calculation algorithms that the first computer-implemented planning system provides for this are executed. A further preferred embodiment provides that the notification to the first computer-implemented planning system - and thus the order generation in the first computer-implemented planning system - is made separately for one or more of the local areas. This results in a low computational burden compared to planning the activities for the whole planning area, according to the invention, step by step, after completion of the preliminary planning within the second computer-implemented planning system for a local area, and only for a local (partial) area of the whole Planning area are performed in the first computer-implemented planning system. The reduction in computational burden is achieved by two factors: first, by the small number of planning objects within a local area, and second, by the step-by-step presentation of the planning scenarios of local areas for which planning has been carried out individually.
In einer bevorzugten Ausführungsform der Erfindung ist vorgesehen, dass in dem zweiten computerimplementierten Planungssystem eine Modellierung der Auswertung von Planungsszenarien insbesondere eine Modellierung von Aufträgen, erfolgt. Bei der Modellierung werden vorzugsweise die technischen Lokationen und deren Attribute als Planungsobjekte herangezogen. Während in dem ersten computerimplementierten Planungssystem, z. B. einem ERP-System, bei einer Planung Arbeitsaufträge zusätzlich zu der technischen Lokation mit weiteren Parametern bzw. Subsystemen des ersten computerimplementierten Planungssystems verknüpft sind, werden in dem zweiten computerimplementierten Planungssystem bei einer Modellierung der Planung von Aktivitäten, wie z. B. Arbeitsaufträgen, mit einer im Vergleich zu der Planung im ersten computerimplementierten Planungssystem reduzierten Zahl von Verknüpfungen ausgeführt. Die Komplexität der Auswertung in der Modellierung wird somit gegenüber der Auswertung im ersten computerimplementierten Planungssystem deutlich reduziert. Dies wird in einer bevorzugten Ausführungsform dadurch erreicht, dass für die Modellierung anstelle von Daten, die erst durch eine Anfrage an ein Subsystem des ersten computerimplementierten Planungssystems (dynamisch) ermittelt werden, statische Daten, wie z. B. Platzhalter für (anonymes) Personal, statische Flags, die anzeigen, dass notwendiges Material vorhanden ist, o. dgl., genutzt werden, bzw. es wird bei der Modellierung auf Anfragen verzichtet, die für die Vorplanung der Aktivitäten nicht von Bedeutung sind, wie beispielsweise Anfragen nach dem Lagerbestand oder Verfügbarkeit von Personal. In einer bevorzugten Ausführungsform wird zur Vereinfachung von einer 100%igen Verfügbarkeit von Material und Ressourcen ausgegangen. Eine reduzierte Verfügbarkeit wird durch eine geänderte Bewertung der Kennziffern erreicht. Es wird ein Puffer geschaffen, in dem die Zielergebnisse der Kennzifferberechnung bewusst niedriger angesetzt werden.In a preferred embodiment of the invention, it is provided that in the second computer-implemented planning system a modeling of the evaluation of planning scenarios, in particular a modeling of orders, takes place. In modeling, the technical locations and their attributes are preferably used as planning objects. While in the first computer-implemented planning system, e.g. As an ERP system, in a planning work orders in addition to the technical location with other parameters or subsystems of the first computer-implemented planning system are linked in the second computer-implemented planning system in a modeling of the planning of activities such. As work orders, executed with a reduced compared to the planning in the first computer-implemented planning system number of links. The complexity of the evaluation in the modeling is thus significantly reduced compared to the evaluation in the first computer-implemented planning system. This is achieved in a preferred embodiment in that instead of data that are determined only by a request to a subsystem of the first computer-implemented planning system (dynamic) for the modeling, static data, such. B. placeholder for (anonymous) staff, static flags indicating that necessary material is present, o. Like., Are used, or it will be waived in the modeling on requests that are not important for the pre-planning of activities such as requests for inventory or availability of personnel. In a preferred embodiment, for the sake of simplicity, a 100% availability of material and resources is assumed. Reduced availability is achieved by changing the rating. A buffer is created in which the target results of the ratio calculation are deliberately set lower.
Nach dem die Planung der Aktivitäten für einen oder mehrere örtliche Bereiche abgeschlossen und der Abschluss dem ersten computerimplementierten Planungssystem mitgeteilt wurde, wird der Auswerteprozess mit allen Verknüpfungen in dem ersten computerimplementierten Planungssystem durchgeführt. In einer bevorzugten Ausführungsform der Erfindung umfasst der Auswerteprozess zumindest den Prozess der Auftragsgenerierung. Die Planung erfolgt somit, vorzugsweise modellgestützt, in dem zweiten computerimplementierten Planungssystem. Im Ergebnis dieser Planung liegen ein oder mehrere Aufträge vor, die als Basis für die Auftragsauslösung innerhalb des ersten computerimplementierten Planungssystems dienen.After the planning of the activities for one or more local areas has been completed and the completion has been communicated to the first computer-implemented planning system, the evaluation process is carried out with all the links in the first computer-implemented planning system. In a preferred embodiment of the invention, the evaluation process comprises at least the process of order generation. The Planning thus takes place, preferably model-based, in the second computer-implemented planning system. As a result of this planning, there are one or more orders which serve as the basis for the order release within the first computer-implemented planning system.
Eine Anordnung nach der Erfindung weist mindestens einen Chip und/oder Prozessor auf und ist derart eingerichtet, dass ein Verfahren zum Datenmanagement zur Planung von Aktivitäten ausführbar ist, wobei Planungsobjekte definiert werden und wobei Daten genutzt werden, die in einem ersten computerimplementierten Planungssystem gespeichert werden. Erfindungsgemäß wird ein zweites computerimplementiertes Planungssystem bereitgestellt und zumindest ein Teil der in dem ersten computerimplementierten Planungssystem gespeicherten Daten dem zweiten computerimplementierten Planungssystem zur Verfügung gestellt. In dem zweiten computerimplementierten Planungssystem werden folgende Schritte ausgeführt:
- i. Definition von zumindest einem örtlichen Bereich (Planungsszenario) für mindestens einen Teil der durchzuführenden Aktivitäten,
- ii. Zuordnung von mindestens einem Planungsobjekt zu dem definierten zumindest einen örtlichen Bereich (Planungsszenario),
- iii. Auswertung von das mindestens eine zugeordnete Planungsobjekt beschreibenden Daten hinsichtlich eines oder mehrerer vorgebbaren Kriterien,
- iv. in Abhängigkeit des Ergebnisses der Auswertung Durchführung von zumindest – einer Modifikation des zumindest einen örtlichen Bereichs und einer erneuten Durchführung der Schritte ii und iii auf Basis des modifizierten zumindest einen örtlichen Bereichs, oder – einer Mitteilung an das erste computerimplementierte Planungssystem, dass die Planung für den zumindest einen örtlichen Bereich abgeschlossen ist.
- i. Definition of at least one local area (planning scenario) for at least part of the activities to be carried out,
- ii. Assignment of at least one engineering object to the defined at least one local area (planning scenario),
- iii. Evaluating data describing the at least one assigned engineering object with regard to one or more predefinable criteria,
- iv. performing at least: - a modification of the at least one local area and a re-execution of steps ii and iii based on the modified at least one local area, or - a message to the first computer-implemented planning system that the planning for the at least one local area is completed.
Ein erfindungsgemäßes Computerprogramm ermöglicht es einer Datenverarbeitungseinrichtung, nachdem es in Speichermittel der Datenverarbeitungseinrichtung geladen worden ist, ein Verfahren zum Datenmanagement zur Planung von Aktivitäten durchzuführen, wobei Planungsobjekte definiert werden und wobei Daten genutzt werden, die in einem ersten computerimplementierten Planungssystem gespeichert werden, und wobei weiter ein zweites computerimplementiertes Planungssystem bereitgestellt, und zumindest ein Teil der in dem ersten computerimplementierten Planungssystem gespeicherten Daten dem zweiten computerimplementierten Planungssystem zur Verfügung gestellt wird, und in dem zweiten computerimplementierten Planungssystem folgende Schritte ausgeführt werden:
- i. Definition von zumindest einem örtlichen Bereich für mindestens einen Teil der durchzuführenden Aktivitäten,
- ii. Zuordnung von mindestens einem Planungsobjekt zu dem definierten zumindest einen örtlichen Bereich,
- iii. Auswertung von das mindestens eine zugeordnete Planungsobjekt beschreibenden Daten hinsichtlich eines oder mehrerer vorgebbaren Kriterien,
- iv. in Abhängigkeit des Ergebnisses der Auswertung Durchführung von zumindest – einer Modifikation des zumindest einen örtlichen Bereichs und einer erneuten Durchführung der Schritte ii und iii auf Basis des modifizierten zumindest einen örtlichen Bereichs, oder – einer Mitteilung an das erste computerimplementierte Planungssystem, dass die Planung für den zumindest einen örtlichen Bereich abgeschlossen ist.
- i. Definition of at least one local area for at least part of the activities to be carried out,
- ii. Assignment of at least one planning object to the defined at least one local area,
- iii. Evaluating data describing the at least one assigned engineering object with regard to one or more predefinable criteria,
- iv. performing at least: - a modification of the at least one local area and a re-execution of steps ii and iii based on the modified at least one local area, or - a message to the first computer-implemented planning system that the planning for the at least one local area is completed.
In einer weiteren bevorzugten Ausführungsform der Erfindung ist vorgesehen, dass das erfindungsgemäße Computerprogramm modular aufgebaut ist, wobei einzelne Module auf verschiedenen Teilen der Datenverarbeitungseinrichtung installiert sind.In a further preferred embodiment of the invention, it is provided that the computer program according to the invention has a modular structure, wherein individual modules are installed on different parts of the data processing device.
Vorteilhafte Ausführungsformen sehen zusätzlich Computerprogramme vor, durch welche weitere in der Beschreibung angegebene Verfahrensschritte oder Verfahrensabläufe ausgeführt werden können.Advantageous embodiments additionally provide computer programs by which further method steps or method sequences specified in the description can be executed.
Solche Computerprogramme können beispielsweise (gegen Gebühr oder passwortgeschützt) downloadbar in einem Daten- oder Kommunikationsnetz bereitgestellt werden. Die so bereitgestellten Computerprogramme können dann durch ein Verfahren nutzbar gemacht werden, bei dem ein Computerprogramm nach Anspruch 9 aus einem elektronischen Datennetz, wie beispielsweise aus dem Internet, auf eine an das Datennetz angeschlossene Datenverarbeitungseinrichtung heruntergeladen wird.Such computer programs can be provided, for example (for a fee or password-protected) downloadable in a data or communication network. The computer programs thus provided can then be made usable by a method in which a computer program according to claim 9 is downloaded from an electronic data network, such as for example from the Internet, to a data processing device connected to the data network.
Um das erfindungsgemäße Datenmanagementverfahren durchzuführen, ist vorgesehen, ein computerlesbares Speichermedium einzusetzen, auf dem ein Programm gespeichert ist, das es einer Datenverarbeitungseinrichtung ermöglicht, nachdem es in Speichermittel der Datenverarbeitungseinrichtung geladen worden ist, ein Verfahren zum Datenmanagement zur Planung von Aktivitäten durchzuführen, wobei Planungsobjekte definiert werden und wobei Daten genutzt werden, die in einem ersten computerimplementierten Planungssystem gespeichert werden, und wobei weiter ein zweites computerimplementiertes Planungssystem bereitgestellt, und zumindest ein Teil der in dem ersten computerimplementierten Planungssystem gespeicherten Daten dem zweiten computerimplementierten Planungssystem zur Verfügung gestellt wird, und in dem zweiten computerimplementierten Planungssystem folgende Schritte ausgeführt werden:
- i. Definition von zumindest einem örtlichen Bereich für mindestens einen Teil der durchzuführenden Aktivitäten,
- ii. Zuordnung von mindestens einem Planungsobjekt zu dem definierten zumindest einen örtlichen Bereich,
- iii. Auswertung von das mindestens eine zugeordnete Planungsobjekt beschreibenden Daten hinsichtlich eines oder mehrerer vorgebbaren Kriterien,
- iv. in Abhängigkeit des Ergebnisses der Auswertung Durchführung von zumindest – einer Modifikation des zumindest einen örtlichen Bereichs und einer erneuten Durchführung der Schritte ii und iii auf Basis des modifizierten zumindest einen örtlichen Bereichs, oder – einer Mitteilung an das erste computerimplementierte Planungssystem, dass die Planung für den zumindest einen örtlichen Bereich abgeschlossen ist.
- i. Definition of at least one local area for at least part of the activities to be carried out,
- ii. Assignment of at least one planning object to the defined at least one local area,
- iii. Evaluating data describing the at least one assigned engineering object with regard to one or more predefinable criteria,
- iv. performing at least: - a modification of the at least one local area and a re-execution of steps ii and iii based on the modified at least one local area, or - a message to the first computer-implemented planning system that the planning for the at least one local area is completed.
Die Erfindung schafft einen von der operativen Planung/Durchführung, z. B. von einem ERP-System, losgelösten, unabhängigen Arbeitsbereich für den Aufbau von Planungsszenarien im Sinne einer Vorplanung. In dem Arbeitsbereich erfolgt eine Modellierung von in sich geschlossenen, gleichartigen Planungsszenarien. Ein Planungsszenario wird bestimmt durch die Grenzen eines bestimmten geografischen Gebietes (örtlichen Bereiches) und durch den durchzuführenden Arbeitsplan. Einem Planungsszenario sind Einbauplätze (Adressen) technischer Geräte, Bauteile oder Baugruppen und deren Attribute zugeordnet. Diese Einbauplätze werden im Folgenden als Planungsobjekte bezeichnet.The invention provides one of the operational planning / implementation, z. For example, from an ERP system, detached, independent workspace for the development of planning scenarios in the sense of a pre-planning. In the work area a modeling of self-contained, similar planning scenarios takes place. A planning scenario is determined by the boundaries of a specific geographical area (local area) and by the work plan to be carried out. A planning scenario is assigned slots (addresses) of technical devices, components or assemblies and their attributes. These bays are referred to below as planning objects.
Es erfolgt somit die Langfristplanung in einem von den üblichen Kurzfristplanungen abgekoppelten Datenbereich.Thus, long-term planning takes place in a data area which is decoupled from the usual short-term planning.
Die Bildung von Planungsszenarien erfolgt durch Interaktion (Polygonzug zur Objektselektion) mit einer geografischen Karte, auf der die technischen Geräteplätze angezeigt werden. Dabei werden die technischen Plätze als Planungsobjekt einem Planungsszenario zugeordnet.Planning scenarios are formed by interaction (traverse to object selection) with a geographical map showing the technical device locations. The technical locations are assigned as a planning object to a planning scenario.
Planungsszenarien sind vorteilhafterweise hierarchisch aufgebaut; d. h. ein Planungsszenario kann n-beliebig viele untergeordnete Planungsszenarien haben.Planning scenarios are advantageously hierarchical; d. H. A planning scenario can have any number of subordinate planning scenarios.
Die Anzahl der Planungsobjekte je Planungsszenario richtet sich nach den Wünschen des Anwenders. Die kleinste, sinnvolle untere Menge ist ein Planungsobjekt pro Planungsszenario. Die obere Grenze zugeordneter Planungsobjekte richtet sich nach der Handhabbarkeit durch den Anwender.The number of engineering objects per planning scenario depends on the wishes of the user. The smallest, meaningful lower quantity is an engineering object per planning scenario. The upper limit of associated planning objects depends on the user's ability to handle.
In einer bevorzugten Ausführungsform der Erfindung ist der Aufbau von Musterszenarien, die kopiert werden können, vorgesehen. Die Kopien der Muster sollen auf die zum Planungszeitpunkt vorhandenen Gegebenheiten angepasst werden, ohne dass der Master, d. h. das Musterszenario, beeinflusst wird. Das bedeutet, dass in Kopien untergeordnete Planungsszenarien angelegt oder gelöscht werden. Damit wird die verarbeitbare Menge an Aufgaben an die jeweilige Situation angepasst.In a preferred embodiment of the invention, the construction of pattern scenarios that can be copied is provided. The copies of the samples should be adapted to the circumstances existing at the time of planning, without the master, d. H. the pattern scenario is influenced. This means that subordinate planning scenarios are created or deleted in copies. This adjusts the workable amount of tasks to the respective situation.
Die Erfindung beruht auf einer mehrstufigen Segmentierbarkeit des Planungsgebietes in einer separaten Softwarekomponente. Es wird von einer großen Menge von planungsrelevanten Objekten ausgegangen. Durch die Erfindung wird Nutzern die Möglichkeit zur selbständigen Definition von Arbeitspaketen eingeräumt. Diese Arbeitspakete können unabhängig von laufenden Tätigkeiten des Tagesgeschäftes manipuliert/bearbeitet werden. Erst mit Aktivierung des Planungsszenarios werden für die Kurzfristplanung des Tagesgeschäftes die konkreten ausführbaren Aufträge zur Durchführung und „Feinplanung” erzeugt.The invention is based on a multi-level segmentability of the planning area in a separate software component. It is assumed that a large amount of planning-relevant objects. The invention gives users the opportunity to independently define work packages. These work packages can be manipulated / edited independently of the day-to-day activities. Only when the planning scenario is activated are the concrete executable orders for execution and "detailed planning" created for the short-term planning of the day-to-day business.
Ein weiterer Vorteil der Erfindung besteht in folgendem: Bei dem hier beschriebenen Problem liegen zum Zeitpunkt der Planung keine Informationen zur Verfügbarkeit von personellen und materiellen Ressourcen vor. Erst durch die analytische Beurteilung der zu erbringenden Leistungen in dem erfindungsgemäßen Auswerteschritt kann entschieden werden, wer die Leistung vollständig oder teilweise erbringen soll (die eigene Firma oder spezialisierte Dienstleister).Another advantage of the invention is as follows: In the case of the problem described here, at the time of planning there is no information on the availability of human and material resources. It is only through the analytical assessment of the services to be provided in the evaluation step according to the invention that it is possible to decide who is to perform the service completely or partially (own company or specialized service provider).
Bis ein Auftrag oder ein regionales Gebiet in die tatsächliche Bearbeitung kommt, kann es zu Entscheidungen kommen, die die eigentliche Auftragsdurchführung ändern. Ein Beispiel ist die Änderung der Art der Leistung für eine Region. Es soll z. B. Zählertyp B statt Zählertyp A installiert werden. Ohne die erfindungsgemäße Vorplanung unter Verwendung des zweiten computerimplementierten Planungssystems müsste eine große Anzahl von Aufträgen geändert werden. Es handelt sich daher bei der Erfindung um eine strategische Planung oder auch Langfristplanung.Until an order or a regional area comes into the actual processing, it can come to decisions, which change the actual order execution. An example is the change in the type of service for a region. It should be z. B. Counter type B instead of counter type A can be installed. Without the preplanning according to the invention using the second computer-implemented planning system, a large number of orders would have to be changed. It is therefore in the invention to a strategic planning or long-term planning.
Nachstehend wird die Erfindung in einem Ausführungsbeispiel anhand der beigefügten Zeichnungen näher erläutert. Es zeigen:The invention will be explained in more detail in an embodiment with reference to the accompanying drawings. Show it:
Die Erfindung soll nachstehend anhand einer Planung der Installation einer Vielzahl von Smart Meter (Intelligente Stromzähler) im Energiesektor in größerem Detail erläutert werden, wobei die Erfindung nicht auf die Installation von intelligenten Stromzählern beschränkt ist, sondern die Planung von Aktivitäten allgemein umfasst, solange nur die Merkmale der unabhängigen Ansprüche realisiert werden. Gemäß diesem Ausführungsbeispiel wird die Durchführung von zum Teil mehreren Millionen Aufträgen „langfristig” vorgeplant, um dann in einem definierten Zeitraum für eine definierbare Anzahl von technischen Elementen umgesetzt zu werden.The invention will be explained in more detail below by planning the installation of a plurality of smart meters in the energy sector, the invention not being limited to the installation of smart meters, but comprising the planning of activities in general, as long as only Features of the independent claims are realized. According to this embodiment, the execution of sometimes several million orders is "long-term" pre-planned, in order then to be implemented in a defined period for a definable number of technical elements.
In
Die erfindungsgemäße Langfristplanung baut auf einem IT System (ERP-System, Enterprise Resource Planning System) als erstem computerimplementierten Planungssystem auf, mit dessen Hilfe Ressourcen und Mitarbeiter eines Unternehmens im Rahmen ihrer unternehmerischen Aufgabe möglichst effizient für den betrieblichen Ablauf eingesetzt werden und somit die Steuerung von Unternehmensprozessen optimiert wird. Bei einem ERP-System handelt es sich um eine komplexe Anwendungssoftware, die für weitgehend alle Geschäftsprozesse eine zentrale Basis der Datenhaltung zur Verfügung darstellt. Auf einer zentralen Datenbasis werden mittels einer Programmiersprache betriebswirtschaftliche Prozesse hinsichtlich der unternehmerischen und gesetzlichen Vorgaben abgebildet. Das ERP-System hält dabei zentral die Daten, wie Kundenadressen, technische Plätze (z. B. Einbauorte), Geräte etc., für die Langfristplanung vor. Die erfindungsgemäße Langfristplanung bereitet die Daten des ERP-Systems für den funktionalen Zweck der Planung auf und stellt diese dem Anwender in funktional angemessener Art und Weise dar. Sollten zusätzliche Daten für die Planung benötigt werden, so sind diese vor der Nutzung in das ERP-System zu importieren und den Basisdaten der Planung maschinell oder manuell zuzuordnen.The long-term planning according to the invention is based on an IT system (ERP system, enterprise resource planning system) as the first computer-implemented planning system, with the help of which resources and employees of a company are used as efficiently as possible for the operational sequence within their entrepreneurial task and thus the control of Business processes is optimized. An ERP system is a complex application software that provides a central basis for data management for most of all business processes. On a central database, business processes with regard to the entrepreneurial and legal requirements are mapped by means of a programming language. The ERP system centrally stores the data, such as customer addresses, technical locations (eg installation locations), devices etc., for long-term planning. The long-term planning according to the invention prepares the data of the ERP system for the functional purpose of planning and presents this to the user in a functionally appropriate manner. If additional data is required for the planning, these are before being used in the ERP system to import and assign to the basic data of the planning machine or manually.
Bei einer operativen Planung handelt es sich um ein Planungsinstrument, das bereits auf Basis von erzeugten Arbeitsaufträgen eine Planung der Auftragsdurchführung ermöglicht. Es werden dabei Mitarbeiter, Fahrzeuge und Ressourcen zusammengeführt und für die Durchführung des Auftrages freigegeben.An operative planning is a planning instrument that already enables a planning of the order execution on the basis of generated work orders. Employees, vehicles and resources are brought together and released for the execution of the order.
Bei der erfindungsgemäßen Langfristplanung dagegen existieren die durchzuführenden Aufträge noch nicht. Es werden virtuelle Aufträge in Form von Planungsobjekten erzeugt. Diese Planungsobjekte sind als Platzhalter für künftige Aufträge der operativen Planung zu verstehen. Durch die Menge und die Eigenschaften der Planungsobjekte kann bereits im Vorfeld der eigentlichen Durchführung eine Kalkulation des zu erwartenden Arbeitsaufwandes vorgenommen werden. Auf Basis der Kalkulation der Langfristplanung kann die Menge an notwendigen Ressourcen und Dienstleistungen bestimmt werden. In dieser Stufe erfolgt keine Zusammenführung von Mitarbeitern, Fahrzeugen und Ressourcen. Wer die Arbeiten tatsächlich erbringen wird, ist in der Langfristplanung weder bekannt noch von Interesse. Die Langfristplanung dient der Segmentierung einer großen Menge von Aufträgen.In contrast, in the case of the long-term planning according to the invention, the orders to be carried out do not yet exist. Virtual jobs are created in the form of engineering objects. These planning objects are to be understood as placeholders for future orders of operational planning. Due to the quantity and the properties of the planning objects, a calculation of the expected workload can be carried out in advance of the actual implementation. On the basis of the calculation of the long-term planning, the amount of necessary resources and services can be determined. There is no merge of employees, vehicles, and resources at this stage. Anyone who will actually do the work is neither known nor of interest in long-term planning. Long-term planning is used to segment a large number of orders.
In Stufe
Die importierten Planungsobjekte werden in Schritt
In Schritt
Erweist sich die Arbeitsbelastung als zu hoch, dann kann das Planungsszenario in Schritt
Der Modellierungsvorgang wird mit der Aktivierung eines Planungsszenarios in Schritt
Durch diese Aufteilung eines Gebietes in mehrere Planungsszenarien, die separat aktiviert werden, ergibt sich zwangsläufig die Möglichkeit einer Verteilung von Rechenlast bei der Erzeugung von Aufträgen, da eben eine zeitliche Entzerrung der Erzeugung von Aufträgen erzeugt wird. Somit können die systembelastenden Aufträge „scheibchenweise” auf der Zeitachse verteilt dem System zugeführt werden, genau so, dass die Gesamtsystembelastung eben nicht durch eine unnötig hohe Anzahl von Aufträgen über seine Grenzen geführt wird.This division of an area into several planning scenarios, which are activated separately, inevitably results in the possibility of a distribution of computing load during the generation of orders, since a temporal equalization of the generation of orders is generated. Thus, the system-loading orders can be distributed "slice by slice" on the time axis distributed to the system, just so that the overall system load just is not led by an unnecessarily high number of orders beyond its limits.
Der PlanungsbereichThe planning area
Die Einführung eines Planungsbereichs ist ein technisches Objekt der in diesem Ausführungsbeispiel beschriebenen Erfindung. Das Objekt wird in zweierlei Hinsicht im Prozess genutzt. Zum Einen ist es eine Schablone für den Import von Daten, die den im Planungsbereich definierten Kriterien entsprechen.The introduction of a planning area is a technical object of the invention described in this embodiment. The object is used in the process in two ways. On the one hand, it is a template for importing data that meets the criteria defined in the planning area.
Kriterien zur Selektion des Datenimportes sind beispielsweise:
- – die Planungsverantwortlichen – registrierte Nutzer des Systems,
- – die zu planenden Geräte,
- – die Werke, Organisationseinheiten/Betriebsstätten, die in einem Gebiet tätig sind und
- – die regionale Eingrenzung mach Orten, Postleitzahlen oder nach Straßen.
- - the project managers - registered users of the system,
- - the equipment to be planned,
- - the works, organizational units / permanent establishments operating in an area and
- - the regional boundaries make places, postal codes or streets.
Zum Anderen steuert der Planungsbereich die Rechte der Anwender in der Planung selber – welcher Nutzer darf Zugriff zum Planungsbereich haben.On the other hand, the planning area controls the rights of users in the planning itself - which user may have access to the planning area.
Im separaten Planungsbereich erfolgt, wie oben erwähnt die Planung des Gebietes in den Schritten
Der Planungsbereich ergänzt das Ladeprogramm
Das Ladeprogramm
Mit der ersten Stufe des Imports in Schritt
Im Ladeprogramm
In einer zweiten Stufe erfolgt die Einschränkung der Daten auf Basis eines durch den Anwender einstellbaren Planungsbereichs. Das Ladeprogramm
Nach dem Laden der Daten durch den Import in Schritt
Mit der technischen Umsetzung der Systemkopplung in Form eines Ladeprogramms
Neue Objekte können mit der hier beschriebenen technischen Umsetzung identifiziert, visualisiert und maschinell abgeglichen werden.New objects can be identified, visualized and adjusted automatically using the technical implementation described here.
Durch die Softwarekomponente zur Aktualisierung und Synchronisation wird ein Abgleich der Planungsobjekte automatisiert durchgeführt. Nutzer müssen Änderungsdaten nicht mehr manuell angleichen und erhalten sofort einen Überblick über neue Planungsobjekte, die einem Planungsszenario zugeordnet werden können. Für die Herausstellung neuer Objekte wird in einem Planungsbaum
Der Planungsbaum
Der Planungsbaum
Der Aufbau und die ausführbaren Funktionen des Planungsbaums
Die Gesamtmenge der Planungsobjekte kann auf diese Art und Weise in verwaltbare „Portionen” zerlegt werden. Für die einzelnen Knoten werden Leistungskennziffern berechnet.The total amount of engineering objects can be broken down into manageable "portions" in this way. Performance indices are calculated for each node.
Beispiel:Example:
Die Leistung von Planungsrevier[1]
Neue Planungsobjekte werden dem Knoten
Für die Identifizierung der nicht zugeordneten Objekte (Knoten „nicht zugeordnet”) wird ein Algorithmus (Programmlogik) verwendet.For the identification of the unassigned objects (node "not assigned") an algorithm (program logic) is used.
Zentrale Elemente der technischen Realisierung ist die Erstellung der Softwareobjekte „Planungsszenario”
Das Planungsszenario
- • einen eindeutigen Identifier (Schlüssel)
- • das übergeordnete Planungsszenario,
- • das zuständige Werk (Zuständiger für die Durchführung/Kontrolle der späteren Realisierung),
- • den zuständigen Arbeitsplan (dem Katalog der durchzuführenden Arbeitsschritten),
- • den Realisierungszeitraum.
- • a unique identifier (key)
- • the higher-level planning scenario,
- • the responsible plant (responsible for the implementation / control of the later realization),
- • the relevant work plan (the catalog of work steps to be carried out),
- • the realization period.
Das Planungsszenario
Das zweite technische Objekt ist das Planungsobjekt
- • Referenz zum Planungsszenario
- • Referenz zum technischen Gerät im ERP System
- • Reference to the planning scenario
- • Reference to the technical device in the ERP system
In
Alternativer PlanungsbaumAlternative planning tree
Eine Differenzierung nach Gerätetypen je Adresse ist mit dem oben beschriebenen Planungsbaum
Beispiel:Example:
An einer Adresse
Dieser Gedanke des Planungsobjekts beherbergt den zweiten entscheidenden Ansatz für diese Lösungsstrategie:This idea of the planning object accommodates the second decisive approach for this solution strategy:
Aktivierung Planungsszenario oder PlanungsrevierActivation of planning scenario or planning area
Anstatt in der Vorplanung bereits auf kompletten Arbeitsaufträgen zu planen, werden hier nur die technischen Lokationen und deren Attribute als Planungsobjekt herangezogen. Dieses Vorgehen birgt einen entscheidenden Vorteil: Ein Arbeitsauftrag ist – neben der technischen Lokation – stets mit vielen Zusatzbereichen einer ERP-Software verbunden (z. B. Einkaufs- oder Verkaufsprozess für Dienstleistungen). Dies führt zu einer enormen Systembelastung, da diese Verflechtungen stets „mitgeschleppt” werden, sobald eine Umplanung des Auftrages erfolgt. So prüft ein Auftrag häufig im Hintergrund Lagerbestände, generiert ggf. Aufträge zur Materialbeschaffung, prüft die Verfügbarkeit einzelner namentlicher Personen oder bucht entsprechende Relationen in ein Controllingsystem.Instead of planning for complete work orders in the preliminary planning, only the technical locations and their attributes are used as the engineering object. This procedure has a decisive advantage: In addition to the technical location, a work order is always associated with many additional areas of ERP software (eg purchasing or sales process for services). This leads to an enormous system load, since these connections are always "dragged along", as soon as a rescheduling of the order takes place. For example, an order often checks stock levels in the background, generates orders for material procurement if necessary, checks the availability of individual names or posts corresponding relationships to a controlling system.
Alle diese Informationen sind aber in einer Simulation in Form einer Vorplanung anhand von Szenarien noch irrelevant! So zum Beispiel ist es unwichtig wie groß ein Lagerbestand heute ist, da die Planung so langfristig in die Zukunft durchgeführt wird. Der notwendige Bestellprozess wird termingerecht gestartet oder entfällt bei Vergabe der Leistung an einen externen Dienstleister.However, all of this information is still irrelevant in a simulation in the form of preliminary planning based on scenarios! So, for example, it does not matter how big a stock is today, because the planning is done so long term in the future. The necessary order process is started on time or does not apply when the service is outsourced to an external service provider.
Der Lagerbestand ist also nicht auf dem kritischen Entscheidungspfad und muss daher im Vorplanungsprozess nicht berücksichtigt werden! Erst wenn nach Abschluss des Vorplanungsprozesses auf dessen Basis tatsächliche Aufträge generiert werden, muss dieser Bestellprozess (z. B. nach vorheriger Lagerbestandsprüfung) angestoßen werden.The stock is therefore not on the critical decision path and therefore does not need to be considered in the pre-planning process! Only when actual orders are generated after completion of the pre-planning process on the basis of this, must this order process be triggered (eg after a previous inventory check).
Das gleiche gilt zum Beispiel für die verfügbare personelle Ressource! Es ist unwichtig, ob namentlich Herr x oder Herr y verfügbar sind (was regelmäßig durch einen Auftrag gegen zum Beispiel ein Personalwesensystem geprüft wird). Es reicht vollkommen aus vorzugeben, dass eine Personalstärke von x Leuten zur Durchführung der Arbeiten zur Verfügung zu stehen hat – die namentliche Verfügbarkeit der Ressource wird wiederum nach der Vorplanung durch die sich daran anschließende Auftragsgenerierung geprüft und entsprechende Organisationsprozesse angestoßen. Auch hier gilt: Die „Vorplanung” wird langfristig genug aufgesetzt um die operativen Aktionen rechtzeitig in die Wege zu leiten.The same applies, for example, to the available human resources! It does not matter if Mr. x or Mr. y is available by name (which is regularly audited by an order against, for example, a human resources system). It is completely sufficient to pretend that a staff of x people has to be available to carry out the work - the availability of the resource by name in turn is checked after the preliminary planning by the subsequent order generation and appropriate organizational processes initiated. Again, the "pre-planning" is set up long enough to initiate the operational actions in time.
Zur Erzeugung der tatsächlich ausführbaren Arbeitsaufträge ist eine technische Funktion der Aktivierung auf Ebene der Tourreviere und des Planungsszenarios vorgesehen. Auf diesem Weg kann jede einzelne Ebene aktiviert werden.To generate the actual executable work orders, a technical function of the activation at the level of the tour areas and the planning scenario is provided. In this way every single level can be activated.
Die Vorplanung auf Basis von Planungsszenarien, Planungsrevieren und Planungsobjekten erspart also die (unnötig) frühe Generierung von Aufträgen mit all ihren Folgen an Verfügbarkeits-, Konsistenz- und Plausibilitätsprüfungen für die Systembelastung aufgrund ihrer komplexen Verflechtung in einem modernen ERP-System.The preliminary planning on the basis of planning scenarios, planning areas and planning objects thus saves the (unnecessarily) early generation of orders with all their consequences for availability, consistency and plausibility checks for the system load due to their complex interdependence in a modern ERP system.
In der technischen Umsetzung zur Planung auf Basis von Planungsszenarien, Planungsrevieren und Planungsobjekten werden geografische Karteninformationen eingebunden. Auf der Karte erfolgt die Darstellung von farblich markierten Planungsrevieren und den zu dem jeweiligen Revier gehörenden Planungsobjekten.Geographic map information is included in the technical implementation for planning on the basis of planning scenarios, planning areas and planning objects. The map shows the presentation of color-coded planning areas and the planning objects belonging to the respective area.
Die technische Implementierung der künftigen Planungsgrundlage führt zu einer Zwischenpufferung von Daten. Dies ermöglicht eine Erzeugung der tatsächlichen benötigten Ausführungsaufträge zu bedarfsgerechten Zeitpunkten.The technical implementation of the future planning basis leads to an intermediate buffering of data. This allows generation of the actual required execution orders at timely conditions.
Die Erfindung beschränkt sich in ihrer Ausführungsform nicht auf die vorstehend angegebenen bevorzugten Ausführungsbeispiele. Vielmehr ist eine Anzahl von Varianten denkbar, die von der erfindungsgemäßen Anordnung und dem erfindungsgemäßen Verfahren sowie von dem erfindungsgemäßen Computerprogramm und dem erfindungsgemäßen computerlesbaren Speichermedium auch bei grundsätzlich anders gearteten Ausführungen Gebrauch macht.The invention is not limited in its embodiment to the above-mentioned preferred embodiments. On the contrary, a number of variants are conceivable which make use of the arrangement according to the invention and the method according to the invention as well as of the computer program according to the invention and the computer-readable storage medium according to the invention, even in fundamentally different embodiments.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102010064132A DE102010064132A1 (en) | 2010-12-23 | 2010-12-23 | Method for managing planning activities data stored in computer-implemented planning system for smart electric meter in large retail store, involves reporting completed planning for local region to computer-implemented planning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102010064132A DE102010064132A1 (en) | 2010-12-23 | 2010-12-23 | Method for managing planning activities data stored in computer-implemented planning system for smart electric meter in large retail store, involves reporting completed planning for local region to computer-implemented planning system |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102010064132A1 true DE102010064132A1 (en) | 2012-06-28 |
Family
ID=46508822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102010064132A Withdrawn DE102010064132A1 (en) | 2010-12-23 | 2010-12-23 | Method for managing planning activities data stored in computer-implemented planning system for smart electric meter in large retail store, involves reporting completed planning for local region to computer-implemented planning system |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102010064132A1 (en) |
-
2010
- 2010-12-23 DE DE102010064132A patent/DE102010064132A1/en not_active Withdrawn
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE10206902A1 (en) | Engineering process and engineering system for industrial automation systems | |
CH703073B1 (en) | Comparing models a complex system. | |
EP3049920A1 (en) | Method and device for the automated production and provision of at least one software application | |
CH703081B1 (en) | Analysis of a model of a complex system. | |
EP1561180A2 (en) | Device and method for producing a processing tool | |
DE10206903A1 (en) | Software application, software architecture and method for creating software applications, especially for MES systems | |
DE102010004192A1 (en) | Process for the construction of industrial plants | |
WO2004083982A2 (en) | Modelling a complex system | |
EP3364257A1 (en) | Method for operating an engineering system for an industrial process automation system and control program | |
WO2011023589A1 (en) | Method of assistance in the planning of a technical system | |
DE102010021382A1 (en) | Method and system for generating an integration model | |
DE102010064132A1 (en) | Method for managing planning activities data stored in computer-implemented planning system for smart electric meter in large retail store, involves reporting completed planning for local region to computer-implemented planning system | |
DE10249482A1 (en) | Project risk analysis method, by generating checklists, exporting data from hierarchical database to relational database and performing risk analysis by accessing relational database | |
EP1839240A1 (en) | Workflow management method and module | |
EP1527400A1 (en) | Method for computer-supported control of production processes | |
DE102012202802A1 (en) | Method for selecting proposed solution for predetermined process for dynamic optimization function for e.g. production control in industrial enterprise, involves selecting proposed solution based on rating of fragments of current solution | |
EP3896579A1 (en) | Method for integration and coordination of measurement and / or control systems | |
EP2164022A1 (en) | Method for assigning access authorisation to a computer-based object in an automation system, computer program and automation system | |
DE112016007465T5 (en) | Program development support apparatus and method for managing program components | |
DE4007998A1 (en) | Process planning method for multiple computer system - using process control table from which computer are selected for each process | |
Montini et al. | Service-Centered Operation Methodology (MOCA) application supported by computer science to improve continuously care quality in public services | |
DE202021004368U1 (en) | Compartmentalization of a process | |
EP2010974B1 (en) | Engineering system and method for planning an automation system | |
EP4092496A1 (en) | Engineering system for projecting an operator observation view for an automation device | |
DE102013006949A1 (en) | Method for ensuring the functionality of a technical system with regard to its configuration during installation or removal of components |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R012 | Request for examination validly filed | ||
R016 | Response to examination communication | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |
Effective date: 20130702 |