DE102009009540A1 - Method for automatically controlling sequence of print jobs for electrophotographic high-performance printing system, involves combining orders into groups or clusters, where groups or clusters are automatically sorted according to rules - Google Patents
Method for automatically controlling sequence of print jobs for electrophotographic high-performance printing system, involves combining orders into groups or clusters, where groups or clusters are automatically sorted according to rules Download PDFInfo
- Publication number
- DE102009009540A1 DE102009009540A1 DE102009009540A DE102009009540A DE102009009540A1 DE 102009009540 A1 DE102009009540 A1 DE 102009009540A1 DE 102009009540 A DE102009009540 A DE 102009009540A DE 102009009540 A DE102009009540 A DE 102009009540A DE 102009009540 A1 DE102009009540 A1 DE 102009009540A1
- Authority
- DE
- Germany
- Prior art keywords
- processing
- group
- jobs
- groups
- length
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G03—PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
- G03G—ELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
- G03G15/00—Apparatus for electrographic processes using a charge pattern
- G03G15/50—Machine control of apparatus for electrographic processes using a charge pattern, e.g. regulating differents parts of the machine, multimode copiers, microprocessor control
-
- G—PHYSICS
- G03—PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
- G03G—ELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
- G03G2215/00—Apparatus for electrophotographic processes
- G03G2215/00025—Machine control, e.g. regulating different parts of the machine
- G03G2215/00126—Multi-job machines
-
- G—PHYSICS
- G03—PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
- G03G—ELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
- G03G2215/00—Apparatus for electrophotographic processes
- G03G2215/00362—Apparatus for electrophotographic processes relating to the copy medium handling
- G03G2215/00443—Copy medium
- G03G2215/00451—Paper
- G03G2215/00455—Continuous web, i.e. roll
Landscapes
- Engineering & Computer Science (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Factory Administration (AREA)
Abstract
Description
Die Erfindung betrifft ein Verfahren zum automatischen Steuern der Reihenfolge von Bearbeitungsaufträgen zur Bearbeitung von Materialgebinden. Insbesondere betrifft die Erfindung ein Verfahren zum automatischen Steuern der Reihenfolge von Druckaufträgen zur Abarbeitung an einer Druckvorrichtung.The The invention relates to a method for automatically controlling the order of processing jobs for processing material containers. In particular, the invention relates to a method for automatic Control the order of print jobs for processing on a printing device.
Die Bearbeitungsaufträge können bspw. mittels Materialbahnen vorbestimmter Bahnlänge abgearbeitet werden, die auf Eingangsrollen zugeführt werden, wobei bei den einzelnen Bearbeitungsaufträgen unterschiedlich lange Abschnitte bearbeitet werden können und die bearbeiteten Abschnitte der Materialbahnen auf Ausgangsrollen aufgerollt werden, und die Bearbeitungsaufträge auf mehrere Materialbahnen zu verteilen sind.The Processing orders can, for example, by means of webs be processed predetermined train length, the input rollers be fed, with the individual processing jobs different lengths sections can be edited and the processed portions of the webs on exit rollers be rolled up, and the processing jobs to several Material webs are to be distributed.
Bearbeitungsaufträge, mit welchen unterschiedlich lange Abschnitte von Materialbahnen bearbeitet werden, treten typischerweise in Hochleistungsdrucksystemen auf, bei welchen die Materialbahnen auf Rollen der Druckvorrichtung zugeführt und die bearbeiteten Materialbahnen wieder auf Rollen gewickelt werden.Processing orders with which differently long sections of material webs are typically encountered in high-performance printing systems on, in which the material webs on rollers of the printing device supplied and the processed material webs again Rolls are wound.
Die einzelnen Bearbeitungsaufträge werden herkömmlicherweise in der Reihenfolge abgearbeitet, wie sie an der Druckstation eingehen. Ein Operator kann manuell die Reihenfolge der Bearbeitungsaufträge verändern. Dies ist zweckmäßig, wenn bestimmte Bearbeitungsaufträge mit einem bestimmten Typ einer Materialbahn verarbeitet werden sollen und andere Bearbeitungsaufträge mit einem anderen Typ von Materialbahn verarbeitet werden sollen.The individual processing jobs become conventional processed in the order in which they arrive at the printing station. An operator can manually change the order of editing jobs change. This is useful if certain machining jobs with a certain type a material web to be processed and other processing jobs to be processed with another type of material web.
Eine weitergehende Optimierung der Bearbeitung ist nicht bekannt.A further optimization of the processing is not known.
Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren zum Bearbeiten von Bearbeitungsaufträgen an einer Bearbeitungsvorrichtung mit einer zentralen Station und mehreren Nachbearbeitungsgeräten zu schaffen, das eine sehr effiziente Bearbeitung der Bearbeitungsaufträge erzielt.Of the Invention is based on the object, a method for processing of processing jobs on a processing device with a central station and several post-processing devices to create a very efficient editing of editing jobs achieved.
Die Erfindung wird durch ein Verfahren mit dem Merkmal des Anspruchs 1 gelöst. Vorteilhafte Ausgestaltungen sind in den Unteransprüchen angegeben.The Invention is achieved by a method having the feature of the claim 1 solved. Advantageous embodiments are in the subclaims specified.
Beim erfindungsgemäßen Verfahren wird automatischen die Reihenfolge von Bearbeitungsaufträgen zur Bearbeitung von Materialgebinden gesteuert, wobei die Bearbeitungsaufträge auf mehrere Materialgebinde verteilt abgearbeitet werden, und vor und während der Bearbeitung die Materialgebinde in Eingangsgebinden einer Bearbeitungsvorrichtung zugeführt werden, wobei die Bearbeitung der Materialgebinde an einer zentralen Station und an mehreren der zentralen Stationen nachgeschalteten Nachbearbeitungsgeräten erfolgt, und vor der Bearbeitung die Bearbeitungsaufträge in mehrere Gruppen oder Cluster zusammengefasst werden, wobei die Gruppen oder Cluster nach vorbestimmten Regeln automatisch sortiert werden.At the inventive method is automatic the order of edit jobs for editing controlled by material containers, with the processing jobs be processed on several bundles of material, and before and during processing the material containers in input containers a processing device are supplied, wherein the Processing of material bundles at a central station and at several the central stations downstream post-processing equipment and, before processing, the processing jobs into several groups or clusters, where the Groups or clusters automatically sorted according to predetermined rules become.
Mit der Erfindung werden die Bearbeitungsaufträge vor dem Zuführen zur Bearbeitungsvorrichtung gemäß ihren Eigenschaften zu Gruppen und/oder Clustern zusammengefasst und diese Gruppen oder Cluster werden dann sortiert.With In accordance with the invention, the processing jobs are prior to feeding to the processing device according to their properties grouped and / or clusters and these groups or Clusters are then sorted.
Das automatische Zusammenfassen von Bearbeitungsaufträgen in Gruppen oder Clustern erlaubt bereits eine effiziente Auslastung der Bearbeitungsvorrichtung, denn die Bearbeitungsaufträge sind bspw. entsprechend vorbestimmter Eigenschaften in den Gruppen oder Clustern zusammengefasst, so dass sie ohne Umstellungen und ohne Nachrüstzeiten an der Bearbeitungsvorrichtung aufeinanderfolgend abgearbeitet werden können. Erfindungsgemäß werden die zu Gruppen oder Clustern zusammengefassten Bearbeitungsaufträge sortiert. Mit dem Sortieren der Gruppen oder Cluster werden kann der Arbeitsablauf sehr effizient an die Eigenarten der Bearbeitungsvorrichtung angepasst werden. Umfasst die Bearbeitungsvorrichtung eine Druckvorrichtung, so weisen in der Regel die unterschiedlichen Nachverarbeitungseinrichtungen stark unterschiedliche Durchsätze und Umrüstzeiten auf. Durch das Sortieren von in Gruppen zusammengefassten Druckaufträgen können die Nachverarbeitungseinrichtungen sehr effiziente ausgelastet werden und die Umrüstzeiten gering gehalten werden. Es sind jedoch auch Anpassungen an andere Rahmenbedingungen des Arbeitsablaufes, wie z. B. dem Lagerbestand des zu verarbeitenden Materials oder des zur Verfügung stehenden Lagers für das verarbeitete Material möglich.The automatic summarization of processing jobs in Groups or clusters already allow efficient utilization the processing device, because the processing jobs are For example, according to predetermined properties in the groups or Clusters summarized, so they without any changes and without Retrofit times on the processing device consecutively can be processed. According to the invention the processing jobs grouped into clusters or clusters sorted. By sorting the groups or clusters can be the workflow very efficiently to the peculiarities of the processing device be adjusted. Does the processing device include a printing device, as a rule, the different post-processing facilities very different throughputs and changeover times on. By sorting grouped print jobs The post-processing facilities can be very efficient be utilized and the changeover times kept low become. However, there are also adjustments to other framework conditions the workflow, such. B. the stock of the processed Material or the available warehouse for the processed material possible.
Die Bearbeitungsaufträge einer Gruppe oder eines Clusters sind vorzugsweise nach Eigenschaften sortiert, die für die Zuordnung zu einem der Nachverarbeitungsgeräte spezifisch sind, so dass die Bearbeitungsaufträge einer Gruppe oder eines Clusters jeweils an einem bestimmten Nachverarbeitungsgerät abgearbeitet werden.The Are processing jobs of a group or a cluster preferably sorted by properties required for assignment are specific to one of the post-processing devices, so that the processing jobs of a group or a cluster respectively processed on a specific post-processing device become.
Insbesondere kann die Reihenfolge zur Abarbeitung der Gruppen derart festgelegt werden, dass die Nachbearbeitungsgeräte optimal ausgelastet sind.Especially The sequence for processing the groups can be determined in this way that the post-processing equipment is optimally utilized are.
Zum Sortieren der Cluster oder Gruppen wird vorzugsweise eine oder mehrere der folgenden Regeln angewandt:
- – Die Gruppen werden in Abhängigkeit vom Durchsatz der Nachverarbeitungsgeräte sortiert, wobei die Nachverarbeitungsgeräte gleichmäßig mit Gruppen von Bearbeitungsaufträgen ausgelastet werden und den Nachverarbeitungsgeräten, die einen höheren Durchsatz besitzen, mehr Gruppen von Dokumentenbearbeitungsaufträge zugeordnet werden.
- – Gruppen mit gleichartigen Dokumentenbearbeitungsaufträgen
werden aufeinander folgend sortiert, so dass die Anzahl der Umrüstvorgänge
gering ist und/oder in Abhängigkeit von der notwendigen
Umrüstzeit, wird die Anzahl der übermittelten
Gruppen von Dokumentenbearbeitungsaufträgen, die von einem
umzurüstenden Nachverarbeitungsgerät (
16 ) bearbeitet werden, reduziert, um an diesem Nachverarbeitungsgerät (16 ) keinen Rückstau zu verursachen. - – Die Reihenfolge der einzelnen Gruppen wird in Abhängigkeit von deren Inhalt bestimmt, insbesondere wenn eine Gruppe einen oder mehrere Dokumentenbearbeitungsaufträge enthält, die einen Dringlichkeitsvermerk enthalten, so wird in Abhängigkeit des Dringlichkeitsvermerkes und/oder der Anzahl von Dringlichkeitsvermerken die Priorität der Gruppe in der Reihenfolge der Gruppen bestimmt.
- – Die Gruppen von Dokumentenbearbeitungsaufträgen werden in Abhängigkeit des Lagerstandes der unbedruckten Aufzeichnungsträger und/oder der gedruckten Produkte sortiert, wobei beispielsweise einem hohen Lagerbestand eines bestimmten Typs von Aufzeichnungsträgern dieser vorrangig abgearbeitet wird und bei einem hohen Lagerbestand eines bestimmten Produktes die Gruppe von Dokumentenbearbeitungsaufträgen, die zur Erzeugung des Produktes führen, nachrangig in die Reihenfolge einsortiert wird, um den Lagerbestand nicht unnötig zu erhöhen.
- - The groups are depending on Throughput of the post-processing equipment, the post-processing equipment are evenly loaded with groups of processing jobs and the post-processing equipment, which have a higher throughput, are assigned to more groups of document processing jobs.
- - Groups with similar document processing jobs are sorted sequentially so that the number of retooling operations is small and / or depending on the necessary retooling time, the number of submitted groups of document processing jobs to be retrofitted by a post-processing device (
16 ) are processed in order to work on this post-processing device (16 ) to cause no backwater. - The order of the individual groups is determined depending on their contents, in particular if a group contains one or more document processing orders which contain an urgent note, the priority of the group is determined in the order of priority depending on the urgency notice and / or the number of urgency notices Groups determined.
- The groups of document processing jobs are sorted according to the stock level of the unprinted record carriers and / or the printed products, whereby, for example, a high stock level of a certain type of record carrier is given priority and with a high stock of a certain product the group of document processing jobs assigned to the Produce the product, subordinated sorted in order, so as not to unnecessarily increase the stock.
Die Sortierung erfolgt insbesondere gruppenweise. Vorzugsweise enthält eine Gruppe so viele Bearbeitungsaufträge, dass bei deren Abarbeitung ein Materialgebinde im Wesentlichen aufgebraucht wird, so dass die Steuerung der Reihenfolge der Gruppen der Bearbeitungsaufträge synchron mit dem Zu- und Abführen der Materialgebinde erfolgt.The Sorting is done in groups in particular. Preferably contains a group so many editing jobs that at their Processing a material container is essentially used up, allowing the control of the order of the groups of processing jobs takes place synchronously with the supply and removal of the material container.
Nach einer Weiterbildung der Erfindung ist das Materialgebinde eine Materialbahn, das Eingangsgebinde eine Eingangsrolle, das Ausgangsgebinde eine Ausgangsrolle und die Gebindebearbeitungslänge eine Bahnlänge, wobei die Materialbahn auf der Eingangsrolle der Bearbeitungsvorrichtung zugeführt und nach der Bearbeitung auf der Ausgangsrolle aufgerollt wird.To a development of the invention, the material container is a material web, the input container has an input roller, the output container a Starting roller and the container processing length a track length, wherein the web is fed on the input roller of the processing device and rolled up on the output roll after processing.
Bei einer alternativen Weiterbildung der Erfindung ist das Materialgebinde ein Gebindestapel von Bögen vorbestimmter Anzahl und vorgegebener Größe, das Eingangsgebinde ein Eingangsstapel, das Ausgangsgebinde eine Ausgangsstapel und die Gebindebearbeitungslänge eine Gebindelänge über alle Bögen des Gebindestapels, wobei der Gebindestapel als Eingangsstapel der Bearbeitungsvorrichtung zugeführt und nach der Bearbeitung auf als Ausgangsstapel aufgestapelt wird.at an alternative development of the invention is the material container a bundle of barks of predetermined number and size, the input container an input stack, the output container a Output stack and the container processing length one pack length above all Bows of the bundle stack, with the bundle stack as input stack fed to the processing device and after processing is stacked on as a starting stack.
Vorzugsweise ist das erfindungsgemäße Verfahren zum automatischen Steuern der Reihenfolge von Druckaufträgen ausgebildet.Preferably is the inventive method for automatic Controlling the order of print jobs trained.
Falls bei einem Bearbeitungsverfahren ein regelmäßiger Anteil an Ausschuss auftritt, kann dieser bei der Bestimmung des Schwellwertes (c) berücksichtigt werden. Wenn z. B. aus der Erfahrung bekannt ist, dass ein gewisser Anteil Seiten erneut zu drucken ist, dann kann der Schwellwert reduziert werden bzw. ein Anteil der Gebindebearbeitungslänge bei der Zuordnung von Bearbeitungsaufträgen unberücksichtigt gelassen werden, so dass ein automatischer Nachdruck von fehlerhaften Seiten auf dem an sich überschüssigen Material erfolgen kann.If a regular one in a machining process Proportion of rejection occurs, this can be used in the determination of the Threshold (c) are taken into account. If z. B. off The experience is known that some share pages again is to be printed, then the threshold can be reduced or a proportion of the package processing length in the assignment disregarded from work orders so that an automatic reprint of faulty pages take place on the excess material itself can.
Dies kann insbesondere in Verbindung mit einem Expertensystem automatisiert werden, das anhand von einem oder mehreren Parametern den potentiellen Ausschuss abschätzt. Z. B. ist es bekannt, dass sehr dünnes Papier immer mit einem gewissen Ausschuss beim Bedrucken verursacht.This can in particular be automated in conjunction with an expert system be based on one or more parameters the potential Committee estimates. For example, it is known that very thin Paper always with a certain scrap caused by printing.
Ein weiterer Aspekt der Erfindung, der auch unabhängig von den vorher beschriebenen Aspekten gesehen werden kann, betrifft ein Verfahren zum automatischen Steuern der Reihenfolge von Verarbeitungsaufträgen zur Bearbeitung von Materialgebinden vorbestimmter Länge, die auf Eingangsrollen oder in Form von vorbestimmten Stapeln zugeführt werden, wobei bei den einzelnen Bearbeitungsaufträgen unterschiedlich lange Abschnitte bearbeitet werden können und die bearbeiteten Abschnitte der Materialgebinden in Ausgangsgebinden zusammengefasst werden. Dabei werden die Bearbeitungsaufträge derart in Gruppen sortiert, dass am Ende einer Gruppe nur mit geringem Ausschuss (≤ c) möglichst oft die Eingangs- und die Ausgangsgebinde gleichzeitig ausgetauscht werden können. Hierdurch wird Standzeit an der Bearbeitungsvorrichtung eingespart.One Another aspect of the invention, which is also independent of the previously described aspects a method for automatically controlling the order of processing jobs for processing material containers of predetermined length, which are supplied on input rollers or in the form of predetermined stacks, where different for the individual processing jobs long sections can be edited and edited Sections of the material bundles are summarized in original containers become. The processing jobs are in such a way Groups sorted at the end of a group with low scores (≤ c) as often as possible the input and output containers can be exchanged simultaneously. This will lead time Saved on the processing device.
Die Bearbeitungsaufträge werden dabei auf mehrere Materialgebinde verteilt und vor und während der Bearbeitung die Materialgebinde mittels Eingangsgebinde einer Bearbeitungsvorrichtung zugeführt, wobei bei den einzelnen Bearbeitungsaufträgen unterschiedlich lange Abschnitte bearbeitet werden und die bearbeiteten Abschnitte der Materialgebinde in Ausgangsgebinden zusammengefasst werden. Vor der Bearbeitung werden die Bearbeitungsaufträge in mehrere Gruppen zusammengefasst, so dass die gesamte Länge der Abschnitte der Bearbeitungsaufträge einer jeden Gruppe, die im Folgenden als Gruppenlänge bezeichnet wird, für mehrere Gruppen im Bereich zwischen einer Solllänge und der Gebindebearbeitungslänge liegt, und die Solllänge um einen vorbestimmten Schwellwert kleiner als die Gebindebearbeitungslänge ist. Bei einer Gruppe, für welche keine Gruppenlänge im Bereich zwischen der Solllänge und der Gebindebearbeitungslänge ermittelt werden kann, wird ein weiterer Bearbeitungsauftrag derart in einen ersten und einen zweiten Bearbeitungsteilauftrag unterteilt, dass der Abschnitt des ersten Bearbeitungsteilauftrages der Differenz aus der Gebindebearbeitungslänge und der Gruppenlänge entspricht und der Gruppe als letzter Bearbeitungsauftrag hinzugefügt, und der zweite Bearbeitungsteilauftrag einer weiteren Gruppe wird als erster Bearbeitungsauftrag hinzugefügt, die nachfolgend zur Gruppe mit dem ersten Bearbeitungsteilauftrag abgearbeitet wird. Die Bearbeitungsaufträge einer jeden Gruppe werden aufeinander folgend ausgeführt, und bei Gruppenlängen, deren Länge zumindest die Solllänge beträgt, werden das Eingangsgebinde, mit welchem das Materialgebinde zur Bearbeitung dieser Bearbeitungsaufträge zugeführt worden ist, und das Ausgangsgebinde, in dem das bearbeitete Materialgebinde zusammengefasst ist, gleichzeitig ausgetauscht.The processing jobs are distributed over several material bundles and supplied before and during processing the material bundles by input container of a processing device, with the individual processing jobs sections of different lengths are processed and the processed sections of the material bundles are summarized in output containers. Before editing, the machining jobs are grouped together so that the entire length of the sections of the machining order of each group, hereinafter referred to as group length is for a plurality of groups in the range between a desired length and the container processing length, and the target length is smaller by a predetermined threshold value than the container processing length. For a group for which no group length in the range between the desired length and the container processing length can be determined, a further processing order is divided into a first and a second processing part order such that the portion of the first processing part order corresponds to the difference between the container processing length and the group length and is added to the group as the last processing order, and the second processing part order is added to a further group as the first processing order, which is processed subsequently to the group with the first processing part order. The processing jobs of each group are executed consecutively, and for group lengths whose length is at least the target length, the input container, with which the material container has been supplied for processing these processing jobs, and the output container, in which the processed material package is combined, simultaneously replaced.
Dieser Aspekt der Erfindung ist auch in einer am gleichen Tag wie die vorliegende Anmeldung von der Anmelderin eingereichten deutschen Patentanmeldung mit dem Titel „Verfahren zum automatischen Steuern der Reihenfolge von Bearbeitungsaufträgen zur Bearbeitung von Materialgebinden vorbestimmter Gebindebearbeitungslänge” beschrieben, deren Inhalt hiermit durch Bezugnahme in die vorliegende Anmeldung aufgenommen wird.This Aspect of the invention is also in a same day as the present Application by the Applicant filed German patent application entitled "Method of Automatically Controlling the Order of processing jobs for processing Materialgebinden predetermined container processing length described "whose Content hereby incorporated by reference into the present application becomes.
Die Erfindung wird nachfolgend beispielhaft näher anhand der Zeichnungen beschrieben. Die Zeichnungen zeigen:The Invention will be described in more detail below by way of example Drawings described. The drawings show:
Der
Aufzeichnungsträger
Die vorliegende Erfindung ist sowohl für den Einfarben-Highlightcolour- als auch für den Vollfarbendruck geeignet. Insbesondere ist die vorliegende Erfindung für den Digitaldruck, der insbesondere elektrofotographische Druckverfahren als auch den Tintenstrahldruckverfahren umfasst, geeignet.The present invention is applicable to both Single-color highlight color as well as for full-color printing. In particular, the present invention is suitable for digital printing, including in particular electrophotographic printing processes as well as the inkjet printing process.
Der
Druckserver
Der
Druckserver
Erfindungsgemäß werden
durch die in dem Druckserver
Anhand
den
Die
Größe der Druckaufträge ist in Clicks
angegeben. Ein Click entspricht zum Beispiel einer Länge
von 12 Zoll bzw. 30,48 cm. Im Folgenden wird bei der Angabe der
Größe der Druckaufträge die Einheit weggelassen.
Die 10 Druckaufträge weisen die Größen
von 3.519, 37.528, 5.139, 1.169, 26.269, 13.326, 18.778, 10.873,
1.338 und 2.108 auf (
Eine
unbenutzte Eingangsrolle weist eine Papierbahn mit einer Länge
von 40000 auf. Die Länge der Papierbahn von unbenutzten
Eingangsrollen wird im Folgenden als Bahnlänge bezeichnet.
Es werden mindestens vier Eingangsrollen
Bei
der Abarbeitung der Druckaufträge in der zufällig
vorhandenen Reihenfolge gemäß
Nachfolgend
wird ein heuristisches Verfahren zum Optimieren des Arbeitsablaufes
der Druckaufträge erläutert. Ein Flussdiagramm
des Verfahrens ist in
Dieses
Verfahren beginnt mit dem Schritt S1. Im Schritt S2 werden die Druckaufträge
nach ihrer Größe sortiert. Bei den in
Im
Schritt S3 werden die sortierten Druckaufträge der Größe
nach neu nummeriert (
Hierzu wird im Schritt S4 zunächst eine Gruppe erzeugt.For this In step S4, a group is first generated.
Im Schritt S5 wird der größte verfügbare Druckauftrag der Gruppe zugeordnet. Mit dem Ausdruck „verfügbarer Druckaufträge” werden alle Druckaufträge bezeichnet, die noch nicht einer Gruppe zugeordnet sind.in the Step S5 becomes the largest available print job assigned to the group. With the expression "available Print jobs "will print all jobs that are not yet assigned to a group.
Da
in einer jeden Gruppe Druckaufträge einer Gruppenlänge
von maximal der Bahnlänge zugeordnet werden sollen, wird
im Schritt S5 die zur Aufnahme weiterer Druckaufträge zur
Verfügung stehende restliche Bahnlänge berechnet,
indem von der Bahnlänge (zum Beispiel 40000) die der Gruppe
zugeordneten Bahnabschnitte der Druckaufträge (zum Beispiel
37528) abgezogen werden, wodurch sich ein Rest (zum Beispiel 2472)
ergibt (
Danach wird geprüft, ob der Rest größer als ein maximaler Rest c ist (Schritt S6). Der maximale Rest c beträgt üblicherweise einige wenige Prozent der Bahnlänge (z. B. 1%–10% oder 1%–5%). Diese Prüfung entspricht einer Prüfung, ob die der Gruppe zugeordneten Druckaufträge eine Gruppenlänge aufweisen, die zumindest einer Solllänge entspricht, wobei die Solllänge die Bahnlänge abzüglich dem maximalen Rest c ist. Ist dies der Fall, so geht der Verfahrensablauf auf den Schritt S7 über, in dem geprüft wird, ob weitere Druckaufträge vorhanden sind, die kleiner als der Rest sind.After that it checks if the remainder is greater than one maximum remainder c is (step S6). The maximum residual c is usually a few percent of the web length (eg 1% -10% or 1% -5%). This test corresponds to a test, Whether the print jobs assigned to the group have a group length have, which corresponds to at least a desired length, wherein the nominal length minus the length of the track the maximum remainder is c. If this is the case, then the procedure goes to step S7, where it is checked if there are more print jobs smaller than the rest are.
Ist der Rest größer als weitere verfügbare Druckaufträge, so wird der größte verfügbare Druckauftrag, der kleiner als der Rest ist, der Gruppe zugeordnet (Schritt S8). In diesem Schritt wird der Rest neu berechnet.is the remainder larger than other available print jobs, this becomes the largest available print job, which is smaller than the rest, assigned to the group (step S8). In this step, the rest is recalculated.
Der Verfahrensablauf geht vom Schritt S8 auf den Schritt S6 über, so dass die Schritte S6, S7, S8 wiederholt werden, wenn weitere verfügbare Druckaufträge der Gruppe zugeordnet werden können.Of the Process goes from step S8 to step S6, so that the steps S6, S7, S8 are repeated if more available print jobs assigned to the group can be.
Wenn die Abfrage im Schritt S6 ergibt, dass der Rest nicht größer als der maximale Rest c ist, dann geht der Verfahrensablauf auf den Schritt S9 über, in dem ein Gruppen-Flag gesetzt wird, das bedeutet, dass die Gruppenlänge der in der Gruppe enthaltenen Druckaufträge länger als die Solllänge ist. Der Verfahrensablauf geht dann wieder auf die Schritte S7 und S8 über, mit welchen weitere Druckaufträge der Gruppe hinzugefügt werden können.If the query in step S6 shows that the remainder is not larger when the maximum remainder is c, then the procedure goes on Step S9, in which a group flag is set, that means the group length of those contained in the group Print jobs longer than the target length is. The procedure then goes back to the steps S7 and S8, with which other print jobs the Group can be added.
Wird im Schritt S7 festgestellt, dass der Rest nicht größer als zumindest ein weiterer der verfügbaren Druckaufträge ist, dann geht der Verfahrensablauf auf den Schritt S10 über, in dem geprüft wird, ob weitere Druckaufträge vorhanden sind. Sind keine weiteren Druckaufträge vorhanden, dann wird das Verfahren im Schritt S11 beendet. Sind hingegen weitere Druckaufträge vorhanden, dann geht der Verfahrensablauf auf den Schritt S12 über, in dem geprüft wird, ob das Gruppen-Flag gesetzt ist bzw. ob die Gruppenlänge größer als die Solllänge ist. Ist dies der Fall, so geht das Verfahren auf den Schritt S4 über, so dass eine weitere Gruppe erzeugt wird und im Schritt S5 der Gruppe der größte verfügbare Druckauftrag zugeordnet wird.Becomes In step S7, it is determined that the rest is not larger as at least another of the available print jobs is, then the process goes to step S10, in which is checked for more print jobs available. If there are no further print jobs, then the process is ended in step S11. Are, however, more Print jobs available, then the procedure goes to step S12, in which it is checked whether the group flag is set or the group length greater than the nominal length. Is this the If so, the procedure goes to step S4, so that a further group is generated and in step S5 the group the largest available print job assigned becomes.
Falls im Schritt S12 festgestellt wird, dass das Gruppen-Flag nicht gesetzt ist, was bedeutet, dass die Gruppenlänge nicht größer als die Solllänge ist, dann geht das Verfahren auf die Schritte S13 über, in dem geprüft wird, ob mehrere verfügbare Druckaufträge vorhanden sind, die kleiner als der zuletzt der Gruppe hinzugefügte Druckauftrag sind. Ist dies der Fall, dann geht der Verfahrensablauf auf den Schritt S14 über, in dem der zuletzt der Gruppe hinzugefügte Druckauftrag aus der Gruppe entfernt wird und durch den nächstkleineren Druckauftrag ersetzt wird.If In step S12, it is determined that the group flag is not set is, meaning the group length is not bigger than the target length, then the procedure goes to the Step S13, in which it is checked if several available print jobs exist that are smaller as the last job added to the group. If this is the case, then the procedure goes to the step S14 above in which the last one added to the group Print job is removed from the group and by the next smaller Print job is replaced.
Vom Schritt S14 geht der Verfahrensablauf den Schritt S5 über.from Step S14, the process goes to step S5.
Wird im Schritt S13 hingegen festgestellt, dass nicht zumindest zwei Druckaufträge vorhanden sind, die kleiner als der zuletzt der Gruppe hinzugefügte Druckauftrag ist, so geht der Verfahrensablauf auf den Schritt S15 über.Becomes however, in step S13, it is found that not at least two Print jobs are available that are smaller than the last one If the print job added to the group is, then the procedure goes on the step S15 via.
Im Schritt S15 wird geprüft, ob die Gruppe mehr als zwei Druckaufträge enthält und ob es weitere nicht bereits zugeordnete Druckaufträge gibt. Ist dies der Fall, so geht der Verfahrensablauf auf den Schritt S16 über. Im Schritt S16 werden die letzten beiden der Gruppe hinzugefügten Druckaufträge aus der Gruppe entfernt, wobei der bezüglich des größeren der beiden entfernten Druckaufträge nächstkleinere verfügbare Druckauftrag der Gruppe hinzugefügt wird. Im Schritt S16 werden auch die entfernten Druckaufträge vorgemerkt. Vom Schritt S16 geht der Verfahrensablauf auf den Schritt S6 über.in the Step S15 checks if the group has more than two print jobs contains and if there are more not yet assigned print jobs gives. If this is the case, the procedure goes to the step S16 over. In step S16, the last two of the Group of added print jobs from the group removed, with respect to the larger of the two remote print jobs next smaller added print job to the group becomes. In step S16, the remote print jobs also become bookmarked. From step S16, the process flow goes to the step S6 over.
Durch eine wiederholte Ausführung des Schrittes S16 kann die Zuordnung der Druckaufträge zu einer Gruppe schrittweise rückgängig gemacht werden und durch eine Neuzuordnung ersetzt werden. Hierbei wird jeweils die Zuordnung vermerkt, mit welcher die größte Gruppenlänge erzielt worden ist.By a repeated execution of the step S16, the Assignment of print jobs to a group step by step be undone and reassigned be replaced. In each case the assignment is noted, with which the largest group length has been achieved is.
Wird im Schritt S15 festgestellt, dass nicht mehr als zwei Druckaufträge in der Gruppe vorhanden sind, so geht der Verfahrensablauf auf den Schritt S17 über, mit dem die vorgemerkte(n) Zuordnung(en) von Druckaufträgen mit der längsten Gruppenlänge der Gruppe wieder zugeordnet werden. Da diese Gruppenlänge noch kleiner als die Solllänge ist, wird im Schritt S18 der größte noch nicht einer Gruppe zugeordnete Druckauftrag der Gruppe zugeordnet, wobei der sich über die Bahnlänge erstreckende Rest abgeschnitten wird.Becomes In step S15 it is determined that no more than two print jobs in the group, the procedure goes to the step S17 above, with which the marked assignment (s) of Print jobs with the longest group length be reassigned to the group. Because this group length is still smaller than the target length, in step S18 the largest not yet assigned to a group Print job assigned to the group, which is about the web length extending remainder is cut off.
Dieser Rest wird im Schritt S19 einer neuen Gruppe als erster Druckauftrag zugeordnet. Vom Schritt S19 geht der Verfahrensablauf auf den Schritt S5 über.This Remainder becomes the first print job in step S19 of a new group assigned. From step S19, the process flow goes to step S5.
Nachfolgend
wird das in
Die
Nummer ist die Nummer des Druckauftrages, der an dem jeweiligen
Knoten der Gruppe hinzugefügt wird. Der Ursprungsknoten
enthält die Nummer 0, da hier die Gruppe noch frei von
Druckaufträgen ist. Die Größe ist jeweils
die Größe des an dem jeweiligen Knoten zugeordneten
Druckauftrages. Die Summe ist die Summe der Größen
aller der Gruppe zugeordneten Druckaufträge. Der Rest ist
die Differenz aus der Bahnlänge abzüglich der
Summe der Druckaufträge. Am Ausgangsknoten ist die Größe und
die Summe 0 und der Rest 40000, was der gesamten Bahnlänge
entspricht (
Nach dem Sortieren und Nummerieren der Druckaufträge (S2, S3) wird einer erste Gruppe erzeugt (S4) und der größte verfügbare Druckauftrag der Gruppe zugeordnet (S5). Dies ist der Druckauftrag A1. Der Druckauftrag A1 besitzt eine Größe von 37528. Der Rest beträgt somit 2472.To the sorting and numbering of print jobs (S2, S3) is generated a first group (S4) and the largest available print job assigned to the group (S5). This is the print job A1. The print job A1 has a size of 37528. The remainder is therefore 2472.
Bei diesem Beispiel beträgt der maximale Rest c = 400. Da der Rest von 2472 größer als 400 ist, geht der Verfahrensablauf vom Schritt S6 direkt auf den Schritt S7, in dem festgestellt wird, dass noch Druckaufträge verfügbar sind, die kleiner als der Rest sind. Im Schritt S8 wird der nächstgrößte verfügbare Druckauftrag, nämlich der Druckauftrag A8 mit der Größe 2108 der Gruppe hinzugefügt. Der sich hierbei ergebende Rest von 364 ist kleiner als der maximale Rest c von 400, womit der Verfahrensablauf im Schritt S6 auf den Schritt S9 verzweigt und das Gruppen-Flag gesetzt wird.at In this example, the maximum remainder is c = 400 Remainder of 2472 is greater than 400, the procedure goes from step S6 directly to step S7, where it is determined that there are still print jobs available that are smaller than the rest are. In step S8, the next largest available print job, namely the print job A8 with the size 2108 added to the group. The resulting remainder of 364 is less than the maximum remainder c of 400, whereby the process flow in step S6 to the step S9 branches and the group flag is set.
Im
Schritt S7 wird geprüft, ob der Rest der Gruppe größer
als weiter verfügbare Druckaufträge ist. Dies
ist nicht der Fall, womit der Verfahrensablauf auf den Schritt S10 verzweigt,
in dem geprüft wird, ob weitere Druckaufträge
vorhanden sind. Dies ist der Fall, weshalb im Schritt S12 geprüft
wird, ob das Gruppen-Flag gesetzt ist. Da das Gruppen-Flag gesetzt
ist, geht der Verfahrensablauf auf den Schritt S4 über,
in dem ein neue Gruppe geöffnet wird. Der neuen Gruppe
wird der größte verfügbare Druckauftrag zugeordnet
(S5; Knoten 2 in
Im
Schritt S6 wird festgestellt, dass dieser Rest größer
als der maximale Rest c ist, wodurch das Verfahren wieder direkt
auf den Schritt S7 übergeht, in dem festgestellt wird,
dass der Rest von 405 nicht größer als weitere
verfügbare Druckaufträge ist. Hierdurch verzweigt
der Verfahrensablauf auf den Schritt S10, in dem geprüft
wird, ob weitere Druckaufträge vorhanden sind. Dies ist
der Fall, weshalb über die Schritte S12 und S13 geprüft
wird, ob weitere kleinere Druckaufträge als der zuletzt
der Gruppe zugeordnete Druckauftrag vorhanden sind. Der zuletzt
der Gruppe zugeordnete Druckauftrag war der Druckauftrag M. Die
Druckaufträge A5–A10 sind alle kleiner als der
Druckauftrag A4, wodurch das Verfahren auf den Schritt S14 übergeht,
in dem der Druckauftrag A4 durch den nächst kleineren Druckauftrag,
nämlich den Druckauftrag A5, ersetzt wird. Dies ist der
Knoten 5 in
Da der Rest von 2858 nach wie vor größer als der maximale Rest ist und größer als weiter verfügbare Druckaufträge ist, wird der Gruppe im Schritt S8 der Druckauftrag A9 zugeordnet, der bezüglich des Restes von 2858 von den zur Verfügung stehenden Druckaufträgen der größte Druckauftrag ist, der noch kleiner als der Rest ist.There the rest of 2858 still larger than that Maximum remainder is and greater than further available Print jobs, the group will be the print job in step S8 A9, with respect to the remainder of 2858 of the available print jobs the largest Print job is even smaller than the rest.
Hiermit
ergibt sich am Knoten 8 ein Rest von 1520 (
Weil
der Rest von 351 kleiner als der maximale Rest von 400 ist, verzweigt
das Verfahren auf den Schritt S9, in dem das Gruppen-Flag gesetzt wird.
Im Schritt S7 wird festgestellt, dass keine weiteren Druckaufträge
vorhanden sind, die kleiner als der Rest von 351 sind. Hierdurch
geht der Verfahrensablauf auf den Schritt S10, in dem geprüft
wird, ob weitere Druckaufträge vorhanden sind und auf den Schritt
S12 über, in dem das Gruppen-Flag gesetzt ist. Dies ist
der Fall, weshalb das Verfahren wieder auf den Schritt S4 verzweigt
und eine neue Gruppe erzeugt wird. Somit sind bereits zwei Gruppen
Druckaufträge zugeordnet, die in
Bei der Erzeugung der Gruppe M2 wurde die bereits erzeugte Zuordnung mit dem Druckauftrag A4 zurückgesetzt und durch eine neue Zuordnung mit den Druckaufträgen A5, A8 und A10 ersetzt. Das vorliegende Verfahren beinhaltet somit ein Rücksetzverfahren (backtracking).at the generation of group M2 became the already generated assignment reset with the print job A4 and a new one Assignment with the print jobs A5, A8 and A10 replaced. The present method thus includes a reset method (Backtracking).
In der dritten Gruppe werden die Druckaufträge A3, A4 und A6 eingefügt, wodurch sich ein Rest von 2757 ergibt. Da dieser Rest größer als der maximale Rest von 400 ist (S6) und der Rest nicht größer als weitere Druckaufträge ist (S7), aber weitere Druckaufträge vorhanden sind (S10) und das Gruppen-Flag nicht gesetzt ist (S12), wird im Schritt S13 geprüft, ob mehrere kleine Druckaufträge als der zuletzt gesetzte Druckauftrag vorhanden sind. Das Verfahren geht auf den Schritt S15 über, in dem geprüft wird, ob mehr als zwei Druckaufträge in der Gruppe vorhanden sind und ob es weitere nicht bereits zugeordnete Druckaufträge gibt. Letzteres ist nicht der Fall, weshalb der Verfahrensschritt auf den Schritt S17 übergeht, in dem nichts ausgeführt wird, da keine weiteren Druckaufträge vorgemerkt sind. Im Verfahrensschritt S18 wird der Druckauftrag A7 in zwei Teile geteilt, wobei ein Teil exakt der Länge des Restes von 2757 entspricht und der Gruppe zugeordnet wird. Der andere Teil wird dann im Schritt S19 einer neuen Gruppe zugeordnet. Da keine weiteren Druckaufträge vorhanden sind, verzweigt das Verfahren im Schritt S7 auf den Schritt S10 und von dort auf den Schritt S11, womit es beendet wird. Aufgrund der geringen Anzahl von Druckaufträgen ist die Möglichkeit der Optimierung durch das erfindungsgemäße Verfahren beschränkt. Jedoch selbst dieses Beispiel zeigt, dass nach zwei Gruppen, nämlich der Gruppe M1 und M2 die Eingangsrollen und die Ausgangsrollen gleichzeitig ausgetauscht werden können, wodurch die Stillstandszeiten eingespart werden.In the third group, the print jobs A3, A4 and A6 are inserted, giving a remainder of 2757. Since this remainder is greater than the maxi The remainder of 400 is (S6) and the remainder is not larger than other print jobs (S7), but other print jobs are present (S10) and the group flag is not set (S12), it is checked in step S13 if there are several small print jobs Print jobs are available as the last set print job. The method proceeds to step S15, which checks to see if there are more than two print jobs in the group and if there are more print jobs not already allocated. The latter is not the case, which is why the method step proceeds to step S17, in which nothing is executed, since no further print jobs are reserved. In step S18, the print job A7 is divided into two parts, one part corresponding exactly to the length of the remainder of 2757 and being assigned to the group. The other part is then assigned to a new group in step S19. Since there are no further print jobs, the process branches to step S10 in step S7, and from there to step S11, thus terminating it. Due to the small number of print jobs, the possibility of optimization by the method according to the invention is limited. However, even this example shows that after two groups, namely the groups M1 and M2, the input rollers and the output rollers can be replaced simultaneously, thus saving downtime.
Bei
diesem Beispiel (
Bei
lediglich 10 Druckaufträgen ist es auch möglich
das Optimum bzgl. des nicht verbrauchten Materials zu bestimmen.
Dieses Optimum ist in
Anhand
von
Dieses
Verfahren beginnt mit dem Schritt S20. Im Schritt S21 werden die
Druckaufträge nach Ihrer Größe sortiert.
Im Schritt S22 werden die sortierten Druckaufträge der
Größe nach neu nummeriert. Bis hierher stimmt
dieses alternative Verfahren mit dem in
Im Schritt S23 wird geprüft, ob verfügbare Druckaufträge und/oder Restdruckaufträge vorhanden sind. Als Restdruckaufträge werden Druckaufträge bezeichnet, die durch Teilen eines Druckauftrages entstehen, wie z. B. bei dem oben erläuterten Verfahren im Schritt S18. Wird im Schritt S23 festgestellt, dass zumindest ein verfügbarer Druckauftrag und/oder ein Restdruckauftrag vorhanden ist, dann wird im Schritt S24 eine Gruppe erzeugt.in the Step S23 checks if available print jobs and / or remaining print jobs are available. As residual print orders Print jobs are called by dividing a Print jobs arise, such. B. in the above explained Method in step S18. If it is determined in step S23 that at least one available print job and / or a residual print job is present, then a group is generated in step S24.
Im Schritt S25 wird geprüft, ob ein Restdruckauftrag vorhanden ist. Falls ein Restdruckauftrag vorhanden ist, wird dieser im Schritt S26 der Gruppe zugeordnet. Hierdurch wird sichergestellt, dass dieser Restdruckauftrag als erster Druckauftrag dieser Gruppe abgearbeitet wird.in the Step S25 checks if there is a residual print order is. If a residual print job is available, it will be in step S26 assigned to the group. This will ensure that this Remaining print job processed as the first print job of this group becomes.
Nach dem Schritt S26 geht der Verfahrensablauf auf den Schritt S27 über. Der Verfahrensablauf geht auch auf den Schritt S27 über, wenn bei dem Schritt S25 festgestellt wird, dass kein Restdruckauftrag vorhanden ist. Im Schritt S27 wird geprüft, ob ein Rest größer oder gleich dem kleinsten verfügbaren Druckauftrag ist. Als Rest wird die Länge bezeichnet, die sich aus der Bahnlänge abzüglich der der jeweiligen Gruppe zugeordneten Bahnabschnitte der Druckaufträge ergibt.To In step S26, the process goes to step S27. The process also goes to step S27, if it is determined in step S25 that no residual print order is available. In step S27, it is checked if a remainder greater than or equal to the smallest available print job is. The remainder refers to the length resulting from the Course length minus the respective group assigned track sections of the print jobs.
Falls der Rest größer oder gleich dem kleinsten verfügbaren Druckauftrag ist, dann wird im Schritt S28 der größte passende verfügbare Druckauftrag der Gruppe zugeordnet. Als größter passender verfügbarer Druckauftrag wird derjenige Druckauftrag der Menge der verfügbaren Druckaufträge bezeichnet, die kleiner oder gleich dem Rest sind, der am größten ist. Im Schritt S28 wird nach dem Zuordnen des größten passenden verfügbaren Druckauftrages der Rest neu berechnet. Der Verfahrensablauf geht dann wieder auf den Schritt S27 über, um zu prüfen, ob ein weiterer verfügbarer Druckauftrag vorhanden ist, der der Gruppe zugeordnet werden kann.If the rest is greater or equal to the smallest available Is print job, then in step S28, the largest matching available print job assigned to the group. As the largest suitable available print job becomes the one print job of the set of available print jobs which are less than or equal to the remainder, the largest is. In step S28, after allocating the largest matching available print jobs the rest recalculated. The process then returns to step S27, to check for another available print job exists, which can be assigned to the group.
Wenn im Schritt S27 festgestellt wird, dass der Rest kleiner als der kleinste verfügbare Druckauftrag ist, dann geht der Verfahrensablauf auf den Schritt S29 über, in dem die Zuordnung mit dem geringsten Rest vermerkt wird. Dies bedeutet, dass die der Gruppe zugeordneten Druckaufträge eine Zuordnung darstellen, die einen bestimmten Rest besitzt. Falls dieser Gruppe bereits vorher andere Druckaufträge zugeordnet worden sind, dann wird der Rest der aktuellen Zuordnung mit dem Rest der zuvor gespeicherten Zuordnung verglichen. Die Zuordnung mit dem geringeren Rest wird als die Zuordnung mit dem geringsten Rest abgespeichert.If is determined in step S27 that the remainder is smaller than that smallest available print job is, then goes the procedure to step S29, in which the assignment with the least remainder is noted. This means that of the group assigned print jobs represent an assignment that owns a certain rest. If this group already before other print jobs have been assigned then will the rest of the current association with the rest of the previously saved Allocation compared. The assignment with the smaller remainder becomes stored as the assignment with the least remainder.
Der Verfahrensablauf geht nun auf den Schritt S30 über. Im Schritt S30 wird die letzte lückenlose Folge der einzelnen Druckaufträge zur Gruppe rückgängig gemacht. Als lückenlose Folgen werden Druckaufträge verstanden, die nach dem Sortieren (S21) und nach dem Nummerieren (S22) unmittelbar aufeinander folgend angeordnet sind und in dieser Folge der Gruppe zugeordnet sind. Nach dem Zurücknehmen der lückenlosen Folge wird der Rest im Schritt S30 neu berechnet.Of the Procedure now goes to step S30. in the Step S30 becomes the last complete sequence of the individual Undo print jobs to the group. As complete consequences are understood print jobs, those after sorting (S21) and after numbering (S22) are immediately adjacent to each other following and are assigned to the group in this episode are. After taking back the complete episode the rest is recalculated in step S30.
Im Schritt S31 wird geprüft, ob die Gruppe leer ist bzw. nur einen Restdruckauftrag umfasst.in the Step S31 checks if the group is empty or only includes a residual print job.
Falls dies nicht der Fall ist, geht der Verfahrensablauf auf den Schritt S32 über, in dem die Zuordnung des zuletzt zugeordneten Druckauftrages rückgängig gemacht wird und der Rest neu berechnet wird. Der Gruppe wird der nächstkleinere Druckauftrag zu dem Druckauftrag, dessen Zuordnung rückgängig gemacht worden ist, der Gruppe zugeordnet. Der Verfahrensablauf geht auf den Schritt S27 über, so dass mit den Schritten S27 und S28 eine weitere Folge von Druckaufträgen der Gruppe zugeordnet werden.If if this is not the case, the procedure goes to the step S32 above, in which the assignment of the last assigned Undo the print job and the Rest is recalculated. The group will be the next smaller Print job to the print job, undo its assignment has been made, assigned to the group. The procedure goes to step S27, so with the steps S27 and S28 assigned another series of print jobs to the group become.
Wenn im Schritt S31 hingegen festgestellt wird, dass die Gruppe leer ist bzw. nur den Restdruckauftrag umfasst, dann geht der Verfahrensablauf auf den Schritt S33 über. Im Schritt S33 wird geprüft, ob die bisher ermittelte Zuordnung mit geringstem Rest kleiner als der maximale Rest c ist.If On the other hand, in step S31, it is determined that the group is empty is or includes only the residual pressure order, then the procedure goes to step S33. In step S33, it is checked whether the previously determined assignment with the smallest remainder less than the maximum remainder is c.
Falls der geringste Rest kleiner als der maximale Rest c ist, dann wird im Schritt S34 die Zuordnung mit dem geringsten Rest endgültig der Gruppe zugeordnet und die zugeordneten Druckaufträge als nicht verfügbare Druckaufträge vermerkt. Der Verfahrensablauf geht dann auf den Schritt S23 über, so dass, falls weitere Druckaufträge vorhanden sein sollten, eine weitere Gruppe im Schritt S24 erzeugt werden kann.If the least remainder is smaller than the maximum remainder c, then becomes in step S34, the assignment with the least remainder final assigned to the group and the assigned print jobs noted as unavailable print jobs. Of the Procedure then proceeds to step S23 so that if further print jobs should be available, one another group can be generated in step S24.
Falls im Schritt S33 festgestellt wird, dass der geringste Rest nicht kleiner als der maximale Rest c ist, dann bedeutet dies, dass der Gruppe keine Druckaufträge mit einer Gruppenlänge zugeordnet werden konnten, die zumindest der Solllänge entspricht. Der Verfahrensablauf geht dann auf den Schritt S35 über, in dem geprüft wird, ob der Rest der Gruppe größer oder gleich dem größten verfügbaren Druckauftrag ist. Beim ersten Aufrufen des Schrittes S35 ist dies sicher der Fall, denn im Schritt S31 wurde bereits geprüft, ob die Gruppe leer ist oder nur den Restdruckauftrag enthält.If In step S33, it is determined that the least residue is not is smaller than the maximum remainder c, then it means that the Group no print jobs with a group length could be assigned, at least the desired length equivalent. The process then proceeds to step S35, which checks if the rest of the group is larger or equal to the largest available print job is. At the first invocation of step S35, this is certainly the Case, because in step S31 has already been checked whether the Group is empty or contains only the remaining print job.
Im Schritt S36 wird der größte verfügbare Druckauftrag der Gruppe zugeordnet und der Rest neu berechnet. Der Verfahrensablauf geht dann wieder auf den Schritt S35 über. Durch wiederholtes Ausführen der Schritte S35 und S36 werden die größten verfügbaren Druckaufträge der Gruppe aufeinanderfolgend zugeordnet, bis im Schritt S35 festgestellt wird, dass der Rest nicht größer oder gleich dem größten verfügbaren Druckauftrag ist. Dann geht das Verfahren auf den Schritt S37 über, in dem der größte verfügbare Druckauftrag in einen ersten Bearbeitungsteilauftrag und einen zweiten Bearbeitungsteilauftrag geteilt wird, so dass der erste Bearbeitungsteilauftrag die Bearbeitungsaufträge der Gruppe exakt auf die Gruppenlänge ergänzt und der sich über die Bahnlänge erstreckende Rest den zweiten Bearbeitungsteilauftrag bildet. Dieser zweite Bearbeitungsteilauftrag wird auch als Restdruckauftrag bezeichnet. Der erste Bearbeitungsteilauftrag wird der Gruppe zugeordnet, so dass die Gruppenlänge exakt der Bahnlänge entspricht.in the Step S36 becomes the largest available print job assigned to the group and the rest recalculated. The procedure then goes back to step S35. By repeatedly executing Steps S35 and S36 will be the largest available Assigning jobs to the group consecutively, until it is determined in step S35 that the remainder is not larger or equal to the largest available print job is. Then, the process proceeds to step S37, in which the largest available print job in a first machining part order and a second machining part order is split, so that the first machining part order the machining jobs the group was added exactly to the group length and the rest extending over the length of the track forms the second machining part order. This second machining part order is also referred to as residual print order. The first machining part order is assigned to the group so that the group length is exact the path length corresponds.
Der Verfahrenablauf geht dann auf den Schritt S23 über. Da ein Restdruckauftrag vorhanden ist wird im Schritt S24 eine neue Gruppe erzeugt und mittels des Schrittes S25 und des Schrittes S26 wird der Restauftrag der neu erzeugten Gruppe zugeordnet. Danach werden mit den folgenden Schritte weitere verfügbare Druckaufträge der Gruppe zugeordnet.Of the Procedure then proceeds to step S23. There a residual print job is present in step S24 a new Group generated and by means of step S25 and step S26 the remaining order is assigned to the newly created group. After that The following steps will become available print jobs assigned to the group.
Ergibt sich im Schritt S23, dass kein verfügbarer Druckauftrag und kein Restdruckauftrag vorhanden ist, dann verzweigt der Verfahrensablauf auf den Schritt S38, in dem das Verfahren beendet ist, da alle Druckaufträge jeweils einer Gruppe zugeordnet sind.results in step S23, that no available print job and there is no residual print order, then the process flow branches to the step S38 where the process is finished since all print jobs each assigned to a group.
Dieses
Verfahren unterscheidet sich von dem in
Dieses
Verfahren wurde auf ein weiteres Beispiel mit den folgenden 42 Druckaufträgen
angewandt:
11.669, 7.294, 11.783, 19.734, 3.490, 12.416, 4.149, 7.443,
18.402, 19.006, 14.250, 13.517, 3.719, 18.166, 20.606, 1.602, 8.737,
6.265, 10.211, 649, 11.868, 4.132, 17.327, 3.111, 18.698, 11.130,
7.190, 1.361, 2.380, 11.662, 22.954, 5.354, 17.116, 23.153, 21.294,
13.060, 9.412, 22.704, 1.925, 10.331, 8.308 und 21.814This method was applied to another example with the following 42 print jobs:
11669, 7.294, 11.783, 19.734, 3.490, 12.416, 4.149, 7.443, 18.402, 19.006, 14.250, 13.517, 3.719, 18.166, 20.606, 1.602, 8.737, 6.265, 10.211, 649, 11.868, 4.132, 17.327, 3.111, 18.698, 11,130, 7,190, 1,361, 2,380, 11,662, 22,954, 5,354, 17,116, 23,153, 21,294, 13,060, 9,412, 22,704, 1,925, 10,331, 8,308 and 21,814
Die
Druckaufträge sind in einem Histogramm in
In
Wenn
diese Druckaufträge mit dem in
Wählt
man bei dem gleichen Beispiel für den maximalen Rest c
= 50, so muss nur der letzte Druckauftrag der Gruppe 11 geteilt
werden. Auf der Gruppe 12 bleiben 400 Clicks übrig. Ansonsten
werden 208 Clicks verworfen (
Wählt
man bei dem gleichen Beispiel für den maximalen Rest c
= 25, so müssen jeweils nur die letzten Druckaufträge
der Gruppen 10 und 11 geteilt werden. In der letzten Gruppe 12 bleiben
482 Clicks übrig. Ansonsten werden 126 Clicks verworfen (
Wählt man bei dem gleichen Beispiel für den maximalen Rest c = 10, so müssen jeweils nur der letzte Druckauftrag der Gruppen 8, 10 und 11 geteilt werden. Bei der Gruppe 12 bleiben 575 Clicks übrig, ansonsten werden 33 Clicks verworfen.Chooses one in the same example for the maximum remainder c = 10, only the last print job of the Groups 8, 10 and 11 are shared. Group 12 will have 575 left Clicks left, otherwise 33 clicks are discarded.
Dieses Beispiel zeigt, dass bei einer größeren Anzahl von Druckaufträgen ein erhebliches Optimierungspotenzial besteht.This Example shows that with a larger number of print jobs a considerable optimization potential consists.
In
einer Simulation wurde das in
Für kleine c benötigt man für das Verfahren erhebliche Rechenzeit, da immer seltener eine Kombination von Druckaufträgen für eine Gruppe gefunden wird, die größer als die Solllänge und kleiner als die Bahnlänge ist. Deshalb kann es zweckmäßig sein, das Verfahren derart abzuwandeln, dass nach einer gewissen Rechenzeit für eine Gruppe das Verfahren abgebrochen wird und ein Druckauftrag der Gruppe hinzugefügt wird, der dann aufgeteilt wird.For Small c is needed for the process considerably Computing time, because less and less often a combination of print jobs is found for a group that is taller as the nominal length and smaller than the track length is. Therefore, it may be appropriate to the process to be modified such that after a certain computing time for a group the process is canceled and a print job the group is added, which is then split.
Das oben beschriebene heuristische Verfahren ist sehr effizient und es lässt sich erheblich Bearbeitungszeit am Druckgerät einsparen, wobei der Ausschuss am Papier gering gehalten wird.The heuristic method described above is very efficient and It can be considerably processing time on the printing device save, while the Committee on the paper is kept low.
Das
Zuordnen bzw. Sortieren der Druckaufträge kann auch mit
einem anderen Verfahren erfolgen. Beispielsweise können
die Druckaufträge mittels der Monte-Carlo-Methode zufällig
verteilt werden, wobei mehrere Verteilungen bewertet werden und
die Reihenfolge mit der besten Bewertung ausgewählt wird.
Vorzugsweise wird die Monte-Carlo-Methode mit einem heuristischen
Verfahren kombiniert, bei dem zunächst die größten
Druckaufträge gleichmäßig auf die Gruppen
verteilt werden, und dann mittels der Monte-Carlo-Methode mehrere
Verteilungen von kleinen Druckaufträgen erzeugt werden,
die den Gruppen hinzugefügt werden. Hierdurch ergeben sich
unterschiedliche Reihenfolgen, die jeweils mit einem bestimmten
Kostenmaß bewertet werden. Das Kostenmaß wird
beispielsweise nach folgender Formel berechnet:
Alternativ
kann man auch unterschiedliche Reihenfolgen bzw. Permutationen der
Druckaufträge mit anderen Verfahren bestimmen. Zum Beispiel kann
man eine bestimmte Reihenfolge erzeugen und dann Druckaufträge
systematisch vertauschen, wobei jede Reihenfolge jeweils mit einem
Kostenmaß G bewertet wird. Vorzugsweise wird eine lexikografische
Reihenfolge (siehe
In
den
Die Erfindung ist oben für ein Verfahren zum Sortieren von Druckaufträgen erläutert worden. Die Erfindung ist jedoch auch für alle anderen Arten von Arbeitsverfahren, bei welchen Materialbahnen, die auf Rollen zu- und abgeführt werden, geeignet.The The invention is above for a method of sorting Print jobs have been explained. The invention is however also for all other types of work procedures, in which webs of material on rollers and removed be suitable.
Im Rahmen der Erfindung kann auch ein oben erläutertes Rücksetzverfahren (backtracking) mit einem statistischen Verfahren, bei dem mehrere Reihenfolgen erzeugt werden, die dann mit einem Kostenmaß (z. B. dem oben aufgeführten Kostenmaß G) bewertet und dementsprechend ausgewählt werden.in the The scope of the invention may also include a reset method as discussed above (backtracking) using a statistical procedure involving multiple orders are generated, which then with a cost measure (eg above cost G) and accordingly to be selected.
Bei obigen Verfahren werden Bearbeitungsaufträge auf Rollen zu- und abgeführten Materialbahnen zugeordnet. Im Rahmen der Erfindung können anstelle von Materialbahnen auch in vorbestimmten Stapel zugeführte Bögen bearbeitet werden.at above procedure will be editing jobs on roles assigned to and removed material webs. As part of The invention can also be used in place of webs processed predetermined stack supplied sheets become.
Bei obigem Verfahren werden Gruppen von Druckaufträgen gebildet, wobei die Gruppen alleine nach dem Kriterium der Länge der einzelnen Druckaufträge zusammengestellt werden. Nach einem weiteren Aspekt der vorliegenden Erfindung können zusätzliche oder alternative Kriterien zur Bildung der Gruppen verwendet werden.at the above method forms groups of print jobs, where the groups are alone according to the criterion of length the individual print jobs. To another aspect of the present invention additional or alternative criteria for forming the groups be used.
Nachfolgend
wird anhand von
Der
bahnförmige Aufzeichnungsträger
Die
Erfinder der vorliegenden Erfindung haben erkannt, dass die automatische
Organisation der Dokumentenbearbeitungsaufträge, insbesondere Druckaufträge,
zu einer erheblichen Effizienzsteigerung am gesamten Drucksystem
führt, wenn man die Nachverarbeitungsgeräte
Das
grundsätzliche Prinzip der automatischen Organisation der
Dokumentenbearbeitungsaufträge liegt darin, Druckaufträge,
die dem gleichen Nachverarbeitungsprozess unterzogen werden sollen,
in Gruppen so zusammenzufassen, dass diese Druckaufträge
auf einer Ausgangsrolle zusammengefasst werden, wobei die einzelnen
Gruppen von Druckaufträgen derart sortiert werden, dass
die Nachverarbeitungsgeräte
Ein erstes Kriterium zum Sortieren der Gruppen von Dokumentenbearbeitungsaufträgen liegt darin, den Durchsatz in den an das Druckgerät angeschlossenen Nachverarbeitungsprozessen zu berücksichtigen und in Abhängigkeit vom Durchsatz des jeweiligen Nachverarbeitungsprozesses die den einzelnen Nachverarbeitungsprozessen zugeordneten Gruppen derart abwechselnd zu sortieren, dass die entsprechenden Nachverarbeitungsgeräte möglichst gleichmäßig ausgelastet sind.One first criterion for sorting the groups of document processing jobs This is the throughput in the post-processing processes connected to the printing device to take into account and depending on the throughput of respective post-processing process the individual Nachverarbeitungsprozessen sort groups alternately so that the corresponding Post-processing equipment as evenly as possible are busy.
Ein zweites Kriterium des Sortierens der Gruppen von Dokumentenbearbeitungsaufträgen liegt darin, die notwendigen Umrüstzeiten bei der Festlegung der Reihenfolge der Gruppen zu berücksichtigen. Dies ist insbesondere beim digitalen Hochleistungsdruck von Bedeutung, da sich der Digitaldruck dadurch auszeichnet, dass eine Vielzahl von Druckaufträgen mit relativ kleinem Druckvolumen gedruckt werden können, ohne dass das Druckgerät hierfür umgerüstet werden muss. Im Digitaldruck sind die Druckvolumen wesentlich kleiner als beim Offsett-Druck. Kleine Druckvolumen erfordern wesentlich öfters ein Umrüsten an den Nachverarbeitungsgeräten als große Druckvolumen.One second criterion of sorting the groups of document processing jobs is in it, the necessary changeover times in setting to consider the order of the groups. This is especially in high-performance digital printing, because Digital printing is characterized by a large number of print jobs can be printed with a relatively small print volume, without the pressure device being retrofitted for this must become. In digital printing, the print volumes are much smaller as in offset printing. Small print volumes require much more often a conversion to the post-processing equipment as large print volume.
Nachfolgend
wird anhand von
Der
Druckserver
Der
Druckserver
In
Eingehende
Dokumentenbearbeitungsaufträge werden mittels der Funktion
F1 am Verteilermodul
Mit
einer Funktion F2 werden die einzelnen Dokumentenbearbeitungsaufträge
bzw. Druckaufträge anhand ihrer Merkmale bestimmten Klassen
zugeordnet. Entsprechende ihrer Klassenzuordnung werden die Dokumentenbearbeitungsaufträge
von dem Verteilermodul
Grundsätzlich ist es jedoch auch möglich, die Gruppen nach anderen Kriterien zu bilden. Insbesondere, wenn innerhalb einer Klasse relativ wenige Dokumentenbearbeitungsaufträge vorhanden sind, dann werden die vorhandenen Dokumentenbearbeitungsaufträge zu einer Gruppe zusammengefasst, wenn sie zusammen eine bestimmte Mindestlänge aufweisen, auch wenn diese Mindestlänge noch zu gering ist, um gleichzeitig die Eingangs- und Ausgangsrolle auszutauschen.In principle, however, it is also possible to form the groups according to other criteria. In particular, if within a class relatively few document processing jobs exist, then the existing document processing jobs are grouped together, if they together have a certain minimum length, even if this minimum length is still too low, at the same time the input and output exchange role.
Von
dem Verteilermodul
Regel 1:Rule 1:
Die Gruppen werden in Abhängigkeit vom Durchsatz der Nachverarbeitungsgeräte sortiert, wobei die Nachverarbeitungsgeräte gleichmäßig mit Gruppen von Bearbeitungsaufträgen ausgelastet werden und den Nachverarbeitungsgeräten, die einen höheren Durchsatz besitzen, mehr Gruppen von Dokumentenbearbeitungsaufträge zugeordnet werden.The Groups will depend on the throughput of the post-processing equipment sorted, with the post-processing equipment evenly be busy with groups of processing jobs and the post-processing equipment, which has a higher Throughput, more groups of document processing jobs be assigned.
Regel 2:Rule 2:
Es wird untersucht, ob unterschiedliche Gruppen, die am gleichen Nachverarbeitungsgerät abgearbeitet werden sollen, eine unterschiedliche Einstellung am Nachverarbeitungsgerät und damit ein Umrüsten erfordern. Wenn eine derartige Umrüstung festgestellt wird, dann werden gleichartige Gruppen von Dokumentenbearbeitungsaufträgen aufeinander folgend sortiert, so dass die Anzahl der Umrüstvorgänge gering ist und in Abhängigkeit von der notwendigen Umrüstzeit, wird die Anzahl der übermittelten Gruppen von Dokumentenbearbeitungsaufträgen, die von diesem Nachverarbeitungsgerät bearbeitet werden, reduziert, um an diesem Nachverarbeitungsgerät keinen Rückstau zu verursachen.It it is examined whether different groups, which worked on the same Nachverarbeitungsgerät should be a different setting on the post-processing device and thus require a conversion. If such a conversion is detected, then similar groups of document processing jobs to each other following, so that the number of retooling operations is low and depending on the necessary changeover time, is the number of submitted groups of document processing jobs, which are processed by this post-processing device, reduced to no backflow at this post-processing device to cause.
Regel 3:Rule 3:
Die Reihenfolge der einzelnen Gruppen wird in Abhängigkeit von deren Inhalt bestimmt. Enthält eine Gruppe mehrere Dokumentenbearbeitungsaufträge, die einen Dringlichkeitsvermerk enthalten, so wird in Abhängigkeit des Dringlichkeitsvermerkes und der Anzahl von Dringlichkeitsvermerken die Priorität der Gruppe in der Reihenfolge der Gruppen bestimmt.The Order of each group is dependent determined by their content. Contains a group of several Document processing orders that have an urgent note It shall be determined according to the urgency notice and the number of urgency notes the priority of Group determined in the order of the groups.
Regel 4:Rule 4:
Die Gruppen von Dokumentenbearbeitungsaufträgen werden in Abhängigkeit des Lagerstandes der unbedruckten Aufzeichnungsträger und/oder der gedruckten Produkte sortiert, wobei beispielsweise einem hohen Lagerbestand eines bestimmten Typs von Aufzeichnungsträgern dieser vorrangig abgearbeitet wird und bei einem hohen Lagerbestand eines bestimmten Produktes die Gruppe von Dokumentenbearbeitungsaufträgen, die zur Erzeugung des Produktes führen, nachrangig in die Reihenfolge einsortiert wird, um den Lagerbestand nicht unnötig zu erhöhen.The Groups of document processing jobs are dependent the stock level of the unprinted record carrier and / or sorted the printed products, for example, a high Stock of a particular type of record carrier this is processed priority and at a high inventory a group of document processing jobs, which lead to the production of the product, subordinate to the Order is sorted to avoid unnecessary inventory to increase.
Die
derart sortierten Gruppen von Dokumentenbearbeitungsaufträgen
werden von dem Weiterleitungsmodul
Dieses Verfahren kann dahingehend weitergebildet werden, dass die Dokumentenbearbeitungsaufträge innerhalb einer jeden Gruppe nach ihrer Dringlichkeit und/oder sonstigen Kriterien sortiert werden.This The method can be developed in such a way that the document processing jobs within each group according to their urgency and / or other Criteria are sorted.
Die oben aufgeführten Regeln können mit einer mathematisch exakt angewandt werden. Im Rahmen der vorliegenden Erfindung kann es aber auch zweckmäßig sein, die Regeln mit einer Fuzzy-Logik anzuwenden.The The rules listed above can be used with a mathematical be applied exactly. In the context of the present invention can but it also be appropriate to the rules with a Apply fuzzy logic.
Dieses
anhand von
Es
ist jedoch nicht immer möglich, vorab die Klassen festzulegen.
Ein alternatives Verfahren zum Sortieren der Gruppen ist in
Ist eine Mindestmenge von Dokumentenbearbeitungsaufträgen vorhanden, dann erfolgt eine Clusterbildung anhand der Eigenschaften der Dokumentenbearbeitungsaufträge. Hierbei werden Dokumentenbearbeitungsaufträge in einem Cluster zusammengefasst, die gleiche und/oder ähnliche Eigenschaften aufweisen. Diese Eigenschaften sind somit nicht vorab festgelegt, sondern es werden die Dokumentenbearbeitungsaufträge zu einem Cluster zusammengefasst, bei welchen möglichst viele Eigenschaften übereinstimmen oder zumindest ähnlich sind, wobei die einzelnen Eigenschaften unterschiedlich stark für die Clusterbildung gewichtet sein können.is a minimum amount of document processing jobs exists, then clustering takes place based on the properties of the document processing jobs. This document processing jobs are in one Cluster summarized, the same and / or similar Have properties. These properties are not preliminary but it will be the document processing jobs grouped into a cluster where as possible many properties are the same or at least similar, where the individual properties vary greatly for the clustering can be weighted.
Im
Schritt S43 werden die Dokumentenbearbeitungsaufträge bzw.
Druckaufträge innerhalb der jeweiligen Cluster in Gruppen
zusammengefasst, so dass eine Gruppe von Dokumentenbearbeitungsaufträgen
mit dem Aufzeichnungsträger einer Eingangsrolle abgearbeitet
werden können. Das Zusammenfassen der Gruppen kann gemäß einem
oben erläuterten Verfahren ausgeführt werden,
so dass die Gruppenlänge zumindest einer Solllänge
entspricht, die ein Stück kürzer als die Bahnlänge
ist (z. B. gemäß
Die Dokumentenbearbeitungsaufträge werden innerhalb der Gruppe bzw. Clusters sortiert (Schritt S44). Diese Sortierung erfolgt vor allem nach vorbestimmten Dringlichkeitskriterien, die in den Dokumentenbearbeitungsaufträgen enthalten sind.The Document processing jobs are within the group or clusters sorted (step S44). This sorting is done before all according to predetermined urgency criteria, in the document processing jobs are included.
Die
Gruppen bzw. Cluster werden sortiert (Schritt S45), wobei die bei
dem oben anhand von
Im Schritt S46 werden die Gruppen bzw. Cluster an das Druckgerät weitergeleitet. Mit dem Schritt S47 ist das Verfahren beendet.in the Step S46, the groups or clusters to the printing device forwarded. The process is ended with step S47.
Die Verfahrensschritt S43 und S44 sind optional, d. h., dass das Verfahren auch ohne diese beiden Verfahrensschritte ausgeführt werden kann. Wenn keine Gruppen gebildet werden, dann werden im Schritt S45 die Cluster sortiert und im Schritt S46 die Cluster an das Druckgerät weitergeleitet. Dies ist vor allem dann zweckmäßig, wenn die Größe der Cluster kleiner als die Bahnlänge des Aufzeichnungsträgers einer Eingangsrolle ist. Dann bilden somit die Cluster unmittelbar jeweils eine Gruppe.The Process steps S43 and S44 are optional, d. h. that the procedure be carried out without these two process steps can. If no groups are formed, then in step S45 sorts the clusters and, in step S46, sorts the clusters to the printing device forwarded. This is especially useful if the size of the clusters is smaller than the track length of the record carrier of an input reel. Then Thus, the clusters directly form one group each.
Durch diese automatische Clusterung und das Sortieren der Cluster bzw. der daraus gebildeten Gruppen werden die Stillstandszeiten, insbesondere an den Nachverarbeitungsgeräten, verringert und die Auslastung des gesamten Drucksystems verbessert.By this automatic clustering and the sorting of clusters or The groups formed from this are the downtime, in particular to the post-processing equipment, reduced and the utilization improved the entire printing system.
- 11
- Drucksystemprinting system
- 22
- Druckgerätprinting device
- 33
- Druckserverprint server
- 44
- Datenleitungdata line
- 55
- DruckdatencontrollerPrint Specifications Controller
- 66
- Druckwerkprinting unit
- 77
- Druckwerkprinting unit
- 88th
- Druckwerkprinting unit
- 99
- FotoleitertrommelPhotoconductor drum
- 1010
- Aufzeichnungsträgerrecord carrier
- 1111
- Eingangsrolleinput roller
- 1212
- Ausgangsrollestarting role
- 1313
- ComputerprogrammeinheitComputer program unit
- 1414
- Datenleitungdata line
- 1515
- Computercomputer
- 1616
- Nachverarbeitungsgerätpostprocessing
- 1717
- Datenleitungdata line
- 1818
- Netzwerknetwork
- 1919
- Verteilermoduldistribution module
- 2020
- Speichereinheitstorage unit
- 2121
- WeiterleitungsmodulForwarding module
ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDE IN THE DESCRIPTION
Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list The documents listed by the applicant have been automated generated and is solely for better information recorded by the reader. The list is not part of the German Patent or utility model application. The DPMA takes over no liability for any errors or omissions.
Zitierte Nicht-PatentliteraturCited non-patent literature
- - http://de.wikepedia.org/wik/lexikografische_Ordnung [0109] - http://en.wikepedia.org/wik/lexikografische_Ordnung [0109]
Claims (16)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200910009540 DE102009009540B4 (en) | 2009-02-18 | 2009-02-18 | Method for automatically controlling the order of processing jobs for processing material packages |
US13/148,697 US8634731B2 (en) | 2009-02-18 | 2010-02-09 | Method for automatically controlling the sequence of processing orders for processing material containers |
PCT/EP2010/051541 WO2010094593A1 (en) | 2009-02-18 | 2010-02-09 | Method for automatically controlling the sequence of processing orders for processing material containers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200910009540 DE102009009540B4 (en) | 2009-02-18 | 2009-02-18 | Method for automatically controlling the order of processing jobs for processing material packages |
Publications (2)
Publication Number | Publication Date |
---|---|
DE102009009540A1 true DE102009009540A1 (en) | 2010-08-26 |
DE102009009540B4 DE102009009540B4 (en) | 2012-07-26 |
Family
ID=42356602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE200910009540 Expired - Fee Related DE102009009540B4 (en) | 2009-02-18 | 2009-02-18 | Method for automatically controlling the order of processing jobs for processing material packages |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102009009540B4 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9898232B2 (en) | 2015-04-20 | 2018-02-20 | Océ Printing Systems GmbH & Co. KG | Method and device for sequencing print jobs |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10123488A1 (en) * | 2000-05-17 | 2001-11-22 | Heidelberger Druckmasch Ag | Flexible distribution of print jobs to processing stations |
JP2007163716A (en) * | 2005-12-13 | 2007-06-28 | Noritsu Koki Co Ltd | Image forming apparatus |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7099037B2 (en) * | 2003-04-22 | 2006-08-29 | Lightning Source Inc. | N-up printing |
US8149439B2 (en) * | 2007-07-31 | 2012-04-03 | Xerox Corporation | Method and system for aggregating print jobs |
-
2009
- 2009-02-18 DE DE200910009540 patent/DE102009009540B4/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10123488A1 (en) * | 2000-05-17 | 2001-11-22 | Heidelberger Druckmasch Ag | Flexible distribution of print jobs to processing stations |
JP2007163716A (en) * | 2005-12-13 | 2007-06-28 | Noritsu Koki Co Ltd | Image forming apparatus |
Non-Patent Citations (2)
Title |
---|
http://de.wikepedia.org/wik/lexikografische_Ordnung |
JP 2007163716 A, Abstract gemäß PAJ (CDROM) und elektronische Übersetzung * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9898232B2 (en) | 2015-04-20 | 2018-02-20 | Océ Printing Systems GmbH & Co. KG | Method and device for sequencing print jobs |
Also Published As
Publication number | Publication date |
---|---|
DE102009009540B4 (en) | 2012-07-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2010094593A1 (en) | Method for automatically controlling the sequence of processing orders for processing material containers | |
EP0748689B1 (en) | Information transmission system | |
DE102015118139A1 (en) | Method and device for sequencing print jobs | |
EP2159683B1 (en) | Method and apparatus for splitting a print job according to the characteristics of the print products | |
DE102014114731A1 (en) | Method for optimizing the production sequence | |
EP3151176A1 (en) | Method for planning and allocation of productions | |
DE202017007578U1 (en) | Printing system for layout and printing of images in multiple tracks with different repeat lengths | |
EP2179859A1 (en) | Device and method for manufacturing printed products | |
DE102009009540B4 (en) | Method for automatically controlling the order of processing jobs for processing material packages | |
DE102009009541B4 (en) | Method for automatically controlling the order of processing jobs for processing material packages of predetermined packaging processing length | |
DE102017205469A1 (en) | Method for determining the order during the processing of print jobs and a printing machine with control computer | |
DE102017205470A1 (en) | Method for determining the order during the processing of print jobs and a printing machine with control computer | |
DE102020122423B4 (en) | Method and device for scheduling the processing of print jobs and post-print jobs on multiple devices | |
DE102007009968A1 (en) | Machine e.g. print substrate processing machine, operating method for use in e.g. graphics industry, involves using templates with parameter set for adjustment and execution of production of print product | |
DE102004047326B4 (en) | A method and system for communicating document processing jobs from a client to a device for editing a document editing job over a network | |
DE202014010654U1 (en) | Arrangement for the production of printed products, in particular magazine-like printed products | |
DE102017205471A1 (en) | Method for determining the order during the processing of print jobs and a printing machine with control computer | |
DE60300164T2 (en) | Apparatus and method for the selective production of stacks of printed products | |
DE10248041A1 (en) | Asset tracking method in networked computer systems and devices, involves processing data files according to work flow and recording parameters which are associated with processing mechanisms in work flow | |
DE102012207289A1 (en) | METHOD FOR TRACKING SHIPMENTS IN THEIR PRODUCTION AND DEVICE FOR PRODUCING A MULTIPLE OF SHIPMENTS | |
DE10046665C2 (en) | Device and method for generating images | |
DE102004030496A1 (en) | Product e.g. book, creation process ascertaining method for graphics industry, involves describing creation of product as function of resources using network of creation processes, where network is stored in computer`s memory | |
DE102021107322A1 (en) | Method and system for providing data | |
DE102019206936A1 (en) | Page-related control data | |
WO1998009240A1 (en) | Process and device for producing and optimizing a cutting outline in a reel cutter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
R016 | Response to examination communication | ||
R016 | Response to examination communication | ||
R016 | Response to examination communication | ||
R018 | Grant decision by examination section/examining division | ||
R020 | Patent grant now final |
Effective date: 20121027 |
|
R082 | Change of representative |
Representative=s name: PATENTANWAELTE SCHAUMBURG, THOENES, THURN, LAN, DE |
|
R081 | Change of applicant/patentee |
Owner name: OCE PRINTING SYSTEMS GMBH & CO. KG, DE Free format text: FORMER OWNER: OCE PRINTING SYSTEMS GMBH, 85586 POING, DE Effective date: 20130820 |
|
R082 | Change of representative |
Representative=s name: SCHAUMBURG & PARTNER PATENTANWAELTE GBR, DE Effective date: 20130820 Representative=s name: SCHAUMBURG UND PARTNER PATENTANWAELTE MBB, DE Effective date: 20130820 Representative=s name: SCHAUMBURG & PARTNER PATENTANWAELTE MBB, DE Effective date: 20130820 Representative=s name: PATENTANWAELTE SCHAUMBURG, THOENES, THURN, LAN, DE Effective date: 20130820 |
|
R082 | Change of representative |
Representative=s name: SCHAUMBURG & PARTNER PATENTANWAELTE GBR, DE Representative=s name: SCHAUMBURG UND PARTNER PATENTANWAELTE MBB, DE Representative=s name: SCHAUMBURG & PARTNER PATENTANWAELTE MBB, DE |
|
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |