DE102008051004B3 - Pipe i.e. district heating pipeline, holder renovating method, involves drilling boreholes in U-shaped region in base of holder, fixing support elements in boreholes, connecting support elements with bearing device and/or with pipe - Google Patents

Pipe i.e. district heating pipeline, holder renovating method, involves drilling boreholes in U-shaped region in base of holder, fixing support elements in boreholes, connecting support elements with bearing device and/or with pipe Download PDF

Info

Publication number
DE102008051004B3
DE102008051004B3 DE200810051004 DE102008051004A DE102008051004B3 DE 102008051004 B3 DE102008051004 B3 DE 102008051004B3 DE 200810051004 DE200810051004 DE 200810051004 DE 102008051004 A DE102008051004 A DE 102008051004A DE 102008051004 B3 DE102008051004 B3 DE 102008051004B3
Authority
DE
Germany
Prior art keywords
pipe
carrier
support
foundation
elements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DE200810051004
Other languages
German (de)
Inventor
Gerd Dipl.-Ing. Barkhoff
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BOCKMEYER BAUUNTERNEHMEN GmbH
Original Assignee
BOCKMEYER BAUUNTERNEHMEN GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BOCKMEYER BAUUNTERNEHMEN GmbH filed Critical BOCKMEYER BAUUNTERNEHMEN GmbH
Priority to DE200810051004 priority Critical patent/DE102008051004B3/en
Application granted granted Critical
Publication of DE102008051004B3 publication Critical patent/DE102008051004B3/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
    • F16L3/18Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in axial direction

Abstract

The method involves removing a part of two support elements (10, 12), drilling boreholes (22, 24) in a U-shaped region in a base (4) of a pipe holder, and subsequently fixing the support elements in the boreholes. The support elements are connected with a bearing device (16) e.g. guide bearing, and/or with a pipe (56) i.e. district heating pipeline. The region is partially surrounded by the support elements. A third support element (48) is welded with one of the two support elements for fixation into one of the boreholes, the bearing device and/or the pipe. An independent claim is also included for a renovated pipe holder comprising support elements.

Description

Die Erfindung betrifft ein Verfahren zum Sanieren einer Rohrhalteeinrichtung bzw. eine sanierte Rohrhalteeinrichtung, welche ein Fundament, zwei teilweise in diesem Fundament angeordnete Trägerelemente und eine an diesen Trägerelementen befestigte Lagereinrichtung zur Lagerung eines Rohres, insbesondere einer Fernwärmeleitung, aufweist.The The invention relates to a method for refurbishing a pipe holding device or a renovated pipe holding device, which is a foundation, two partially arranged in this foundation support elements and one of these support elements fixed bearing means for supporting a pipe, in particular a district heating pipe, having.

Rohre bzw. Fernwärmeleitungen von Fernwärmenetzen transportieren ein erwärmtes Medium, insbesondere Wasser, um Wärmeenergie, welche an einem Ort übermäßig vorliegt, an anderen Orten nutzbar zu machen. Die Rohre können hierbei metallisch sein, eine Ummantelung aus einem Isoliermaterial aufweisen und, insbesondere unterirdisch, in Haubenkanälen aus Beton verlegt sein. Eine derartige Anordnung von Rohren in einem Haubenkanal ist bspw. aus US 1 861 436 A bekannt.Pipes or district heating pipelines of district heating networks transport a heated medium, in particular water, in order to utilize heat energy, which is excessive at one location, at other locations. The tubes may in this case be metallic, have a casing of an insulating material and, in particular underground, be installed in hood ducts made of concrete. Such an arrangement of tubes in a hood channel is, for example. Off US Pat. No. 1,861,436 A known.

Die Rohre liegen hierbei nicht direkt auf dem Beton auf, sondern werden auf verstärkten Fundamenten von den Trägerelementen bzw. Lagereinrichtungen getragen. Als Lagereinrichtungen sind Festpunkte, Führungslager und Gleitlager vorgesehen. An einem Festpunkt ist das Rohr starr fixiert. Ein Führungslager und ein Gleitlager erlaubt hingegen eine Verschiebung des Rohres relativ zu der Lagereinrichtung in axialer Richtung, um eine Ausdehnung des Rohres in Abhängigkeit seiner Temperatur zu ermöglichen. Ein Gleitlager ermöglicht hierbei zusätzlich eine Seitwärtsbewegung des Rohres in horizontaler radialer Richtung.The Tubes are not directly on the concrete, but are on reinforced Foundations of the support elements or storage facilities worn. Storage facilities are fixed points, guide bearing and plain bearings provided. At a fixed point, the pipe is rigid fixed. A guide camp and a sliding bearing, however, allows a displacement of the tube relative to the bearing device in the axial direction to an extent of the pipe in dependence to allow its temperature. A plain bearing allows here additionally one sideways movement of the tube in the horizontal radial direction.

In den Haubenkanälen sammelt sich oftmals Wasser, welches mit den Trägerelementen in Kontakt tritt und Korrosion an diesen Trägerelementen begünstigt. Nach einiger Zeit ist die Korrosion derart fortgeschritten, dass die Trägerelemen te ihre tragende Funktion nicht mehr hinreichend erfüllen können und die Rohrleitung entweder stillgelegt und erneuert oder die Rohrhalteeinrichtung saniert werden muss.In the hood channels Water often collects which comes into contact with the carrier elements and corrosion on these support elements favored. After some time, the corrosion has progressed so much that the Trägerelemen te can no longer sufficiently fulfill their supporting function and the pipeline either shut down and renewed or the pipe holding device needs to be rehabilitated.

Zur Erneuerung bzw. Sanierung könnte das bestehende Rohr demontiert, eine neue Rohrhalterung installiert und das Rohr nachfolgend an dieser neuen Rohrhalteeinrichtung befestigt werden. Nachteilig hieran wäre, dass das Rohr hierfür zeitweilig stillgelegt werden müsste und die Sanierung sehr teuer wäre.to Renewal or renovation could dismantled the existing pipe, installed a new pipe support and the pipe subsequently attached to this new pipe support become. The disadvantage of this would be that the pipe for this temporarily be shut down and the renovation would be very expensive.

Alternativ wäre es denkbar, neue Fundamente neben den bisherigen Fundamenten zu erstellen und in bzw. auf diesen Fundamenten neue Rohrhalteeinrichtungen zu montieren. Dies wäre jedoch ebenfalls sehr teuer und erforderte zudem neben den Rohrleitungen zusätzlichen seitlichen Platz zur Aufnahme von Fundamenten.alternative would it be conceivable to create new foundations next to the previous foundations and in or on these foundations new pipe holding devices to assemble. This would be However, also very expensive and also required in addition to the piping additional lateral space for supporting foundations.

Der Erfindung liegt daher das Problem zugrunde, eine sanierte Rohrhalteeinrichtung und ein Verfahren hierzu anzugeben, bei der bzw. mittels dem ohne zwischenzeitliche Stilllegung des Rohres und ohne zusätzlichen seitlichen Platzverbrauch eine kostengünstige Herstellung erreicht werden kann.Of the The invention is therefore based on the problem, a renovated pipe holding device and to provide a method for this, in or by means of without Interim decommissioning of the pipe and without additional lateral space consumption achieved a cost-effective production can be.

Die Erfindung löst dieses Problem mit einem Verfahren gemäß Anspruch 1 und einer sanierten Rohrhalteeinrichtung gemäß Anspruch 13.The Invention solves this problem with a method according to claim 1 and a renovated pipe holding device according to claim 13th

Die Erfindung hat erkannt, dass die Rohrhalteeinrichtung auf einfache Weise saniert werden kann, indem zumindest jeweils ein Teil der Trägerelemente entfernt und Bohrlöcher in das bestehende Fundament gebohrt werden. Nachfolgend werden Trägereinrichtungen in die Bohrlöcher eingebracht und dort fixiert und entweder mit der vorhandenen Lagereinrichtung oder einer diese Lagereinrichtung ersetzenden neuen Lagereinrichtung und/oder mit dem Rohr selbst verbunden. Die Lagereinrichtung kann hierbei obere Abschnitte der abgetrennten Trägerelemente aufweisen bzw. diese ersetzen.The Invention has recognized that the tube holding device to simple Can be rehabilitated by at least one part of each support elements removed and drilled holes be drilled into the existing foundation. The following are carrier devices in the boreholes introduced and fixed there and either with the existing storage facility or a new bearing device replacing this bearing device and / or connected to the pipe itself. The storage facility can in this case have upper portions of the separated support elements or replace them.

Mit der Erfindung kann die Rohrhalteeinrichtung kostengünstig saniert werden, ohne dass hierfür das Rohr zeitweilig ausgebaut werden müsste oder neue Fundamente neben dem Rohr erstellt werden müssten.With the invention, the pipe holding device can be rehabilitated cost be without this Pipe would need to be temporarily expanded or new foundations next to it the pipe would have to be created.

Vorteilhafterweise wird das Bohrloch in einem teilweise von dem Trägerelement umgebenen Bereich in das Fundament gebohrt. Das Trägerelement bzw. der in dem Fundament angeordnete Abschnitt des bestehenden Trägerelements weist hierbei insbesondere ein U-Profil auf, wobei sich das Bohrloch innerhalb dieses U-Profils erstreckt. Hierdurch kann die Trägereinrichtung nachfolgend an einem Ort im Fundament fixiert werden, welcher teilweise von einem Abschnitt des Trägerelements umgeben ist und deshalb bereits für die Aufnahme von Lasten ausgelegt ist.advantageously, the borehole is in a partially surrounded by the support member area drilled in the foundation. The carrier element or arranged in the foundation section of the existing support element Here in particular has a U-profile, with the borehole extends within this U-profile. As a result, the carrier device be subsequently fixed in a place in the foundation, which partially from a portion of the support element is surrounded and therefore already designed for the absorption of loads is.

Vorteilhafterweise werden mehrere, insbesondere drei, Löcher in das Fundament gebohrt, welche miteinander verbunden sind und zusammen das Bohrloch bilden. Hierdurch wird eine Form des Bohrlochs erreicht, welche das Bohrloch nahe an das Trägerelement heranragen lässt und zur Aufnahme der Trägereinrichtung sehr gut geeignet ist.advantageously, are several, especially three holes drilled in the foundation, which are connected together and together form the borehole. As a result, a shape of the borehole is reached, which the borehole close to the carrier element to ask and for receiving the carrier device very well suited.

Vorteilhafterweise wird die Trägereinrichtung zur Fixierung der Trägereinrichtung in dem Bohrloch, insbesondere mit einem durch das Bohrloch zumindest teilweise freigelegten Abschnitt des Trägerelements, verschweißt. Hierfür wird insbesondere wenigstens eine Schweißnaht an einer Kante der Trägereinrichtung angebracht. Hierdurch können Kräfte vorteilhaft von der Trägereinrichtung über den im Fundament verbleibenden Abschnitt des Trägerelements auf das Fundament übertragen werden.Advantageously, the support means for fixing the support means in the wellbore, in particular with a through the borehole at least partially exposed portion of the support member, welded. For this purpose, in particular at least one weld is attached to an edge of the support means. As a result, forces can advantageously from the support means on the remaining portion in the foundation of the Trägerele be transferred to the foundation.

Vorteilhafterweise wird zur Fixierung das Bohrloch, nachdem die Trägereinrichtung in dieses Bohrloch eingebracht und ggf. verschweißt wurde, verfüllt, wobei als Füllmaterial insbesondere Vergussbeton verwendet wird.advantageously, is used to fix the borehole after the support device in this hole introduced and possibly welded was, filled, being used as filler in particular grouting concrete is used.

Vorteilhafterweise wird die Trägereinrichtung in einem außerhalb des Fundaments angeordneten Abschnitts dieser Trägereinrichtung mit der vorhandenen Lagereinrichtung, insbesondere einem oberen Abschnitt eines abgetrennten Trä gerelements, bzw. mit einer diese Lagereinrichtung ersetzenden neuen Lagereinrichtung bzw. mit dem Rohr selbst verschweißt. Hierdurch wird eine stabile Verbindung zwischen der Lagereinrichtung und Trägereinrichtung hergestellt. Vorteilhafterweise weist die Trägereinrichtung ein Flachprofil auf, da die Trägereinrichtung hierdurch vorteilhaft in das Bohrloch eingebracht und ggf. vorteilhaft mit einem Abschnitt des Trägerelements verschweißt werden kann, insbesondere wenn dieses aus drei Löchern gebildet ist.advantageously, the carrier device is in one outside the foundation arranged portion of this support means with the existing Bearing device, in particular an upper portion of a separated Carrier element, or with a bearing device replacing this new storage facility or welded to the pipe itself. This will be a stable Connection made between the bearing device and support means. Advantageously, the carrier device a flat profile, since the carrier device thereby advantageously introduced into the wellbore and possibly advantageous with a portion of the support element welded can be, especially if this is made up of three holes.

In einer vorteilhaften Weiterbildung weist die Trägereinrichtung zwei jeweils ein Flachprofil aufweisende Elemente auf, welche mit jeweils einer flachen Seite aneinander zugewandt angeordnet und miteinander verschweißt sind. Diese Elemente werden hierbei vor dem Einbringen der Trägereinrichtung in das Bohrloch miteinander verschweißt. Vorteilhaft an der derart gebildeten Trägereinrichtung ist die kostengünstige Herstellung der Trägereinrichtung, wobei eine ausreichende Dicke für eine hohe Stabilität erreicht wird und die Trägereinrichtung kostengünstig herstellbar ist, da die verwendeten Elemente gebräuchliche, in großen Stückzahlen und deshalb kostengünstig herstellbare Standardelemente sind.In According to an advantageous development, the carrier device has two each a flat profile having elements, which each with a flat side facing each other arranged and welded together. These elements are in this case before the introduction of the carrier device welded together in the borehole. Advantageous to the so formed carrier device is the cost-effective Production of the carrier device, being a sufficient thickness for a high stability is achieved and the carrier device inexpensive to produce is, as the elements used common, in large numbers and therefore inexpensive can be produced standard elements.

Vorteilhafterweise weist die Trägereinrichtung derart an das Trägerelement und das Bohrloch angepasste Abmessungen auf, dass diese Trägereinrichtung, insbesondere an einer breiten Seite der Trägereinrichtung, mit einem Abschnitt des Trägerelements verschweißbar ist. Hierdurch wird der vom Profil des Trägerelements vorgegebene Raum für das Bohrloch in vorteilhafter Weise ausgenutzt und die Trägereinrichtung fest mit dem im Fundament verbleibenden Abschnitt des Trägerelements verbunden.advantageously, has the carrier device such to the support element and the borehole adapted dimensions, that this support means, in particular on a broad side of the carrier device, with a section the carrier element weldable is. As a result, the predetermined by the profile of the support member space for the Borehole advantageously exploited and the support means fixed to the remaining in the foundation portion of the support element connected.

Die Lagereinrichtung kann vorteilhafterweise als Führungslager bzw. Zwangsführungslager ausgebildet sein, welches eine Bewegung des Rohres in radialer Richtung in dieser Lagereinrichtung ermöglicht, einer Bewegung in axialer Richtung, insbesondere in Richtung des Fundaments und in horizontaler radialer Richtung, jedoch entgegenwirkt. In radialer Richtung wirkende Kräfte werden mittels der erfindungsgemäßen Trägereinrichtung vorteilhaft auf das Fundament übertragen.The Bearing device can advantageously as a guide bearing or forced control bearing be formed, which is a movement of the tube in the radial direction in this storage facility allows a movement in the axial direction, in particular in the direction of Foundation and in the horizontal radial direction, but counteracts. Radially acting forces be by means of the carrier device according to the invention advantageously transferred to the foundation.

Alternativ kann die Lagereinrichtung als Festpunkt ausgebildet sein, wobei sowohl in axialer als auch in radialer Richtung wirkende Kräfte mittels der Trägereinrichtung auf das Fundament übertragen werden. Vorteilhafterweise ist die Lagereinrichtung in diesem Fall fest mit dem Rohr verschweißt.alternative the bearing device may be formed as a fixed point, wherein both in the axial and in the radial direction acting forces by means of support means be transferred to the foundation. Advantageously, the bearing device is fixed in this case welded to the pipe.

In einer dritten Alternative kann die Lagereinrichtung als Gleitlager ausgebildet sein, wobei das Rohr relativ zu dem Gleitlager in radialer Richtung horizontal verschiebbar ist und hierbei auf einem Gleitelement gleitet.In a third alternative, the bearing device as a sliding bearing be formed, wherein the tube relative to the sliding bearing in radial Direction is horizontally displaceable and this on a sliding element slides.

In allen drei alternativen Ausführungen weist die Lagereinrichtung einen Horizontalträger auf, welcher sich zwischen zwei Trägereinrichtungen erstreckt und von diesen beiden Trägereinrichtungen getragen wird. Das Rohr liegt im Falle der Ausbildung der Lagereinrichtung als Fixpunkt fest auf dem Horizontalträger auf und ist vorteilhafterweise mit dem Horizontalträger verschweißt. Diese Lagereinrichtung bildet somit ein Festlager.In all three alternative versions the bearing device on a horizontal support, which is located between two carrier devices extends and is supported by these two carrier devices. The tube is in the case of training the storage facility as Fixed point firmly on the horizontal support and is advantageous with the horizontal beam welded. This storage device thus forms a fixed bearing.

Im Falle der Ausbildung der Lagereinrichtung als Führungslager oder Gleitlager kann das Rohr auf dem Horizontalträger aufliegen, kann sich jedoch auch in vertikaler radialer Richtung von dem Horizontalträger abheben. Zwischen dem Horizontalträger und dem Rohr kann hierbei ein Gleitelement angeordnet sein, wodurch ein reibungs- und geräuscharmes Gleiten des Rohres auf dem Horizontalträger ermöglicht wird.in the Case of the formation of the bearing device as a guide bearing or plain bearings however, the pipe may rest on the horizontal beam, but may well lift off in vertical radial direction from the horizontal beam. Between the horizontal beam and The tube may in this case be arranged a sliding element, whereby a low-friction and low-noise Sliding of the tube on the horizontal support is made possible.

Weitere Ausführungsformen ergeben sich aus den Ansprüchen sowie aus den anhand der Zeichnung näher erläuterten Ausführungsbeispielen. In der Zeichnung zeigen:Further embodiments arise from the claims and from the exemplary embodiments explained with reference to the drawing. In show the drawing:

1 einen Schnitt von sanierten Rohrhalteeinrichtungen mit mittels als Festpunkte ausgebildeten Lagereinrichtungen gelagerten Rohren; 1 a section of rehabilitated pipe support means mounted by means of fixed bearing means designed as tubes;

2 einen Schnitt A-A der Rohrhalteeinrichtung gemäß 1; 2 a section AA of the pipe holding device according to 1 ;

3 einen Schnitt B-B des Trägerelements und der Trägereinrichtung gemäß 1; 3 a section BB of the support member and the support means according to 1 ;

4 einen Schnitt von sanierten Rohrhalteeinrichtungen mit Rohren, welche von als Führungslager ausgebildeten Lagereinrichtungen gelagert werden; 4 a section of rehabilitated pipe holding devices with pipes, which are stored by bearing devices designed as a guide bearing;

5 einen Schnitt A-A der Rohrhalteeinrichtung gemäß 4; 5 a section AA of the pipe holding device according to 4 ;

6 einen Schnitt B-B des Trägerelements und der Trägereinrichtung gemäß 4 und 6 a section BB of the support member and the support means according to 4 and

7 eine Draufsicht von zwei Trägereinrichtungen und einem dazwischen angeordneten Horizontalträger mit Gleitelement der Rohrhalteeinrichtung gemäß 4. 7 a top view of two support means and a horizontal carrier arranged therebetween with sliding element of the pipe holding device according to 4 ,

1 zeigt einen Schnitt einer sanierten Rohrhalteeinrichtung 1 nebst einer baugleichen sanierten Rohrhalteeinrichtung 2. Die Rohrhalteeinrichtungen 1 und 2 weisen ein gemeinsames Fundament 4 auf, in welchem Trägerelemente 6 und 8 der Rohrhalteeinrichtung 1 und Trägerelemente 10 und 12 der Rohrhalteeinrichtung 2 fixiert sind. Die Trägerelemente 6 und 7 ragen aus dem Fundament 4 vertikal heraus und tragen eine Lagereinrichtung 14. Entsprechend ragen die Trägerelemente 10 und 12 aus dem Fundament 4 heraus und tragen eine Lagereinrichtung 16. 1 shows a section of a renovated pipe holding device 1 together with a structurally renovated pipe holding device 2 , The pipe holding devices 1 and 2 have a common foundation 4 on, in which carrier elements 6 and 8th the pipe holding device 1 and support elements 10 and 12 the pipe holding device 2 are fixed. The carrier elements 6 and 7 stick out of the foundation 4 vertically out and carry a storage facility 14 , Accordingly, the support elements protrude 10 and 12 from the foundation 4 out and carry a storage facility 16 ,

Die Trägerelemente 6, 8, 10 und 12 weisen ein U-Profil auf und sind vor der Sanierung der Rohrhalteeinrichtung möglicherweise im Bereich oberhalb des Fundaments 4 durch Korrosion beschädigt. Zur Sanierung der Rohrhalteeinrichtung 1 bzw. 2 werden deshalb aus dem Fundament 4 herausragende Abschnitte der Trägerelemente 6 und 8 bzw. 10 und 12 bspw. mittels eines Trennschleifers oder mittels Trennschweißen von den im Fundament 4 verbleibenden Abschnitten der Trägerelemente 6 und 8 bzw. 10 und 12 abgetrennt und entfernt. Im Folgenden werden mit den Trägerelementen 6, 8, 10 und 12 die im Fundament 4 verbliebenen Abschnitte der vor der Sanierung teilweise aus diesem Fundament 4 herausragenden Trägerelemente 6, 8, 10 und 12 bezeichnet.The carrier elements 6 . 8th . 10 and 12 have a U-profile and may be in the area above the foundation prior to rehabilitation of the pipe support 4 damaged by corrosion. For refurbishment of the pipe holding device 1 respectively. 2 Therefore, be out of the foundation 4 outstanding sections of the support elements 6 and 8th respectively. 10 and 12 For example, by means of a cut-off or by means of separating welding of those in the foundation 4 remaining portions of the support elements 6 and 8th respectively. 10 and 12 separated and removed. The following are with the support elements 6 . 8th . 10 and 12 those in the foundation 4 Remaining sections of the pre-renovation part of this foundation 4 outstanding support elements 6 . 8th . 10 and 12 designated.

Die Trägerelemente 6, 8, 10 und 12 weisen ein U-Profil auf und umgeben mit Beton gefüllte Bereiche des Fundaments 4. Für die Sanierung der Rohrhalteeinrichtung 1 bzw. 2 werden Bohrlöcher 18 und 20 bzw. 22 und 24 in diese zumindest teilweise von den Trägerelementen 6 und 8 bzw. 10 und 12 umgebenen Bereiche in den Beton gebohrt. Die Bohrlöcher 18, 20, 22 und 24 sind hierbei parallel zu den Trägerelementen 6, 8, 10 und 12 ausgerichtet und erstrecken sich im Wesentlichen in vertikaler Richtung bzw. senkrecht zu einer Oberfläche des Fundaments 4.The carrier elements 6 . 8th . 10 and 12 have a U-profile and surrounded with concrete filled areas of the foundation 4 , For the rehabilitation of the pipe holding device 1 respectively. 2 become boreholes 18 and 20 respectively. 22 and 24 in this at least partially from the support elements 6 and 8th respectively. 10 and 12 surrounded areas drilled in the concrete. The holes 18 . 20 . 22 and 24 are parallel to the carrier elements 6 . 8th . 10 and 12 aligned and extend substantially in the vertical direction or perpendicular to a surface of the foundation 4 ,

Zwei jeweils ein Flachprofil aufweisende Elemente 26 und 28, welche insbesondere Flacheisen bzw. Stahlträger jeweils mit einer Breite von bspw. 30 mm und einer Dicke von bspw. 5 mm sind, werden mit jeweils einer flachen Seite einander zugewandt angeordnet und an ihrer Fuge umlaufend mittels einer bspw. 4 mm dicken Schweißnaht S1 miteinander verschweißt. Gleichartige Elemente 30 und 32, 34 und 36 bzw. 38 und 40 werden auf analoge Weise mittels gleichartiger Schweißnähte S2, S3 und S4 miteinander verbunden. Eine Trägereinrichtung 42 weist die Elemente 26 und 28 auf, wird erfindungsgemäß mit einem ersten Abschnitt in das Bohrloch 18 eingebracht und ragt mit einem zweiten Abschnitt aus diesem Bohrloch 18 bzw. aus dem Fundament 4 heraus. Auf analoge Weise werden Trägereinrichtungen 44, 46 und 48, welche die Elemente 30 und 32 bzw. 34 und 36 bzw. 38 und 40 aufweisen, in das Bohrloch 20 bzw. 22 bzw. 24 teilweise eingebracht. Die Trägereinrichtungen 42, 44, 46 und 48 weisen zumindest in ihrem ersten Abschnitt ein Flachprofil mit einer Breite von 30 mm und einer Dicke von bspw. 5 mm und damit derart an das Bohrloch 18 bzw. 20 bzw. 22 bzw. 24 angepasste Abmessungen auf, dass die Trägereinrichtung 42 bzw. 44 bzw. 46 bzw. 48 an einer breiten Seite nur einen geringen Abstand zu dem Trägerelement 6 bzw. 8 bzw. 10 bzw. 12 aufweist bzw. an diesem Trägerelement 6 bzw. 8 bzw. 10 bzw. 12 anliegt.Two each having a flat profile elements 26 and 28 which are in particular flat iron or steel beams, each with a width of, for example, 30 mm and a thickness of, for example, 5 mm, are arranged facing each other with a flat side and at their joints circumferentially by means of, for example. 4 mm thick weld S1 together welded. Similar elements 30 and 32 . 34 and 36 respectively. 38 and 40 are connected in an analogous manner by means of similar welds S2, S3 and S4. A carrier device 42 assigns the elements 26 and 28 is, according to the invention with a first section in the borehole 18 introduced and projects with a second section of this hole 18 or from the foundation 4 out. In a similar way, carrier devices 44 . 46 and 48 which are the elements 30 and 32 respectively. 34 and 36 respectively. 38 and 40 have, in the borehole 20 respectively. 22 respectively. 24 partially introduced. The carrier devices 42 . 44 . 46 and 48 have at least in their first section a flat profile with a width of 30 mm and a thickness of eg. 5 mm and thus to the wellbore 18 respectively. 20 respectively. 22 respectively. 24 customized dimensions on that the carrier device 42 respectively. 44 respectively. 46 respectively. 48 on a broad side only a small distance to the support element 6 respectively. 8th respectively. 10 respectively. 12 has or on this support element 6 respectively. 8th respectively. 10 respectively. 12 is applied.

Zur Fixierung der Trägereinrichtung 42 in dem Bohrloch 18 wird diese Trägereinrichtung 42 an dieser breiten Seite im Bereich einer Oberfläche des Fundaments 4 mittels einer bspw. 4 mm dicken Schweißnaht S5 mit dem Trägerelement 6 verschweißt. Entsprechend werden die Trägereinrichtungen 44, 46 und 48 in dem Bohrloch 20 bzw. 22 bzw. 24 fixiert bzw. mit dem Trägerelement 8 bzw. 10 bzw. 12 mittels einer gleichartigen Schweißnaht S6 bzw. S7 bzw. S8 verschweißt. Die Bohrlöcher 18, 20, 22 und 24 sind nicht vollständig von dem Trägerelement 6 bzw. 8 bzw. 10 bzw. 12 ausgefüllt. Verbleibende Freiräume werden zur Fixierung der Trägereinrichtung 42 bzw. 44 bzw. 46 bzw. 48 mit Beton, bspw. Vergussbeton, verfüllt. Auch einem Eindringen von Feuchtigkeit wird hierdurch entgegengewirkt.For fixing the support device 42 in the borehole 18 becomes this carrier device 42 on this broad side in the area of a surface of the foundation 4 by means of, for example, a 4 mm thick weld S5 with the carrier element 6 welded. Accordingly, the carrier devices 44 . 46 and 48 in the borehole 20 respectively. 22 respectively. 24 fixed or with the carrier element 8th respectively. 10 respectively. 12 welded by means of a similar weld S6 or S7 or S8. The holes 18 . 20 . 22 and 24 are not completely from the support element 6 respectively. 8th respectively. 10 respectively. 12 filled. Remaining free spaces are used to fix the carrier device 42 respectively. 44 respectively. 46 respectively. 48 filled with concrete, eg grouting concrete. Also a penetration of moisture is counteracted thereby.

Die Lagereinrichtung 14 der Rohrhalteeinrichtung 1 trägt bzw. lagert ein Rohr 52 und wird ihrerseits von den Trägereinrichtungen 42 und 44 gemeinsam getragen bzw. ist an diesen Trägereinrichtungen 42 und 44 befestigt bzw. angeschweißt. Entsprechend weist die Rohrhalteeinrichtung 2 die Lagereinrichtung 16 auf, welche ein Rohr 56 trägt bzw. lagert und von den Trägereinrichtungen 46 und 48 gemeinsam getragen wird bzw. an diesen Trägereinrichtungen 46 und 48 befestigt bzw. angeschweißt ist.The storage facility 14 the pipe holding device 1 carries or stores a pipe 52 and in turn is from the carrier devices 42 and 44 worn together or is on these support devices 42 and 44 attached or welded. Accordingly, the tube holding device 2 the storage facility 16 on which a pipe 56 carries or stores and from the carrier devices 46 and 48 is worn together or on these carrier devices 46 and 48 attached or welded.

Bei dem erfindungsgemäßen Verfahren zum Sanieren der Rohrhalteeinrichtung 1 bzw. 2 wird die Lagereinrichtung 14 mit den Trägereinrichtungen 42 und 44 verschweißt, nachdem die Trägereinrichtungen 42 und 44 in dem Bohrloch 18 bzw. 20 fixiert wurden. Ggf. kann die Reihenfolge dieser Verfahrensschritte jedoch auch vertauscht sein. Entsprechendes gilt für die Lagereinrichtung 16 in Bezug auf die Trägereinrichtungen 46 und 48.In the inventive method for refurbishing the pipe holding device 1 respectively. 2 becomes the storage facility 14 with the carrier devices 42 and 44 welded after the carrier devices 42 and 44 in the borehole 18 respectively. 20 were fixed. Possibly. however, the order of these method steps may also be reversed. The same applies to the storage facility 16 in relation to the carrier devices 46 and 48 ,

Die Lagereinrichtung 14 bzw. 16 weist Vertikalträger 58 und 60 bzw. 62 und 64 auf, welche mit der Trägereinrichtung 42 bzw. 44 bzw. 46 bzw. 48 mittels bspw. 6 bis 8 mm dicken vertikal verlaufenden Schweißnähten S9 und S10 bzw. S11 und S12 bzw. S13 und S14 bzw. S15 und S16 sowie einer horizontal angeordneten Schweißnaht S17 bzw. S18 bzw. S19 bzw. S20 verschweißt werden. Diese Vertikalträger 58, 60, 62 und 64 sind obere entfernte Abschnitte der Trägerelemente 6, 8, 10 und 12 bzw. treten an deren Stelle und weisen insbesondere ein vergleichbares U-Profil auf. Darüber hinaus weist die Lagereinrichtung 50 bzw. 54 einen Horizontalträger 66 bzw. 68 auf, welcher zwischen den Trägereinrichtungen 42 und 44 bzw. 46 und 48 horizontal bzw. senkrecht zu diesen Trägereinrichtungen 42 und 44 bzw. 46 und 48 ausgerichtet ist und auf welchem das Rohr 52 bzw. 56 aufliegt. Der Horizontalträger 46 bzw. 48 weist ein quadratisches Hohlprofil mit einer Kantenlänge von bspw. 120 mm und einer Stärke von bspw. 5 mm auf. Der Horizontalträger 46 bzw. 48 wird mittels bspw. 5 mm oder auch 3,5 mm dicken Schweißnähten S21 und S22 bzw. S23 und S24 mit den Trägereinrichtungen 42 und 44 bzw. 46 und 48 verschweißt.The storage facility 14 respectively. 16 has vertical support 58 and 60 respectively. 62 and 64 on, which with the support means 42 respectively. 44 respectively. 46 respectively. 48 by means of, for example, 6 to 8 mm thick vertically extending Welded seams S9 and S10 or S11 and S12 or S13 and S14 or S15 and S16 and a horizontally arranged weld S17 or S18 or S19 or S20 are welded. These vertical beams 58 . 60 . 62 and 64 are upper removed portions of the support members 6 . 8th . 10 and 12 or occur in their place and have in particular a comparable U-profile. In addition, the storage facility points 50 respectively. 54 a horizontal beam 66 respectively. 68 on which between the carrier devices 42 and 44 respectively. 46 and 48 horizontal or perpendicular to these support means 42 and 44 respectively. 46 and 48 is aligned and on which the pipe 52 respectively. 56 rests. The horizontal beam 46 respectively. 48 has a square hollow profile with an edge length of, for example, 120 mm and a thickness of, for example, 5 mm. The horizontal beam 46 respectively. 48 is by means of, for example. 5 mm or 3.5 mm thick welds S21 and S22 or S23 and S24 with the support means 42 and 44 respectively. 46 and 48 welded.

Die Lagereinrichtungen 14 und 16 sind in der Abbildung gemäß 1 als Festpunkte ausgebildet, welche das Rohr 52 bzw. 56 starr fixieren. Die Vertikalträger 58, 60, 62 und 64 weisen ein Verbindungselement 70 bzw. 72 bzw. 74 bzw. 76 auf, mittels dem sie mit dem Rohr 52 bzw. 56 in Kontakt treten. Ggf. können die Verbindungselemente 70 und 72 bzw. 74 und 76 mit dem Rohr 52 bzw. 56 verschweißt werden. Das Rohr 52 bzw. 56 kann zudem mit dem Horizontalträger 66 bzw. 68 verschweißt werden.The storage facilities 14 and 16 are in the picture according to 1 formed as a fixed points, which the pipe 52 respectively. 56 rigidly fix. The vertical beams 58 . 60 . 62 and 64 have a connecting element 70 respectively. 72 respectively. 74 respectively. 76 on, by means of which they with the pipe 52 respectively. 56 contact. Possibly. can the fasteners 70 and 72 respectively. 74 and 76 with the pipe 52 respectively. 56 be welded. The pipe 52 respectively. 56 can also with the horizontal beam 66 respectively. 68 be welded.

2 zeigt einen Schnitt A-A der Rohrhalteeinrichtung 2 gemäß dem ersten Ausführungsbeispiel von 1. Das im Wesentlichen ein U-Profil aufweisende Verbindungselement 76 weist wenigstens zwei Einzelelemente auf, welche an gegenüberliegenden Seiten des Vertikalträgers 64 angeordnet sind. Gleiche Bezugszeichen bezeichnen gleiche Bauteile. 2 shows a section AA of the pipe holding device 2 according to the first embodiment of 1 , The essentially a U-profile connecting element 76 has at least two individual elements which on opposite sides of the vertical support 64 are arranged. Like reference numerals designate like components.

3 zeigt einen Schnitt B-B des Trägerelements 12 und der Trägereinrichtung 48 der Rohrhalteeinrichtung 2 gemäß dem ersten Ausführungsbeispiel von 1. Die Trägereinrichtung 48 bzw. die miteinander verschweißten Elemente 38 und 40 sind in dem Bohrloch 24 angeordnet, welches aus drei runden Löchern 78, 80 und 82 jeweils mit einem Durchmesser von bspw. 80 mm gebildet ist. Insbesondere werden zur Herstellung des Bohrlochs 24 nacheinander die Löcher 78, 80 und 82 als Kernbohrungen in unmittelbarer Nähe zu der Trägereinrichtung 48 gebohrt, wobei die Löcher 78, 80 und 82 sich derart überlappen, dass sie zusammen das Bohrloch 24 bilden. Die Bohrlöcher 18, 20 und 22 werden auf entsprechende Weise hergestellt. 3 shows a section BB of the support element 12 and the carrier device 48 the pipe holding device 2 according to the first embodiment of 1 , The carrier device 48 or the elements welded together 38 and 40 are in the borehole 24 arranged, which consists of three round holes 78 . 80 and 82 each with a diameter of, for example. 80 mm is formed. In particular, for the production of the borehole 24 one after the other the holes 78 . 80 and 82 as core holes in close proximity to the support means 48 drilled, with the holes 78 . 80 and 82 overlap so that they together the hole 24 form. The holes 18 . 20 and 22 are produced in a corresponding manner.

Schließlich zeigt 3 einen Stahlträger 84, welcher ein U-Profil aufweist und mit dem Trägerelement 12 verschweißt ist.Finally shows 3 a steel beam 84 which has a U-profile and with the carrier element 12 is welded.

4 zeigt einen Schnitt von sanierten Rohrhalteeinrichtungen 1' und 2', welche das Rohr 52 bzw. 56 zwangsgeführt tragen bzw. lagern. Insbesondere sind die Rohre 52 und 56 im Wesentlichen nur axial relativ zu der Rohrhalteeinrichtung 1' bzw. 2' verschiebbar. 4 shows a section of renovated pipe holding devices 1' and 2 ' which the pipe 52 respectively. 56 carry or store forcibly guided. In particular, the pipes 52 and 56 essentially only axially relative to the tube holding device 1' respectively. 2 ' displaceable.

Wesentlicher Unterschied der Rohrhalteeinrichtungen 1' und 2' gegenüber den Rohrhalteeinrichtungen 1 und 2 gemäß 1 ist zudem, dass die Rohrhalteeinrichtungen 1' und 2' zwar Trägerelemente 6', 8', 10' und 12' aufweisen, welche den Trägerelementen 6, 8, 10 und 12 gemäß 1 gleichen, insbesondere ebenfalls ein U-Profil aufweisen. Jedoch sind die Trägerelemente 6', 8', 10' und 12' derart angeordnet, dass Öffnungen im U-Profil in Richtung des Trägerelements 6', 8', 10', 12' derselben Rohrhalteeinrichtung 1' bzw. 2' weisen, während die Öffnungen im U-Profil der Trägerelemente 6 und 8 bzw. 10 und 12 gemäß 1 von dem jeweils anderen Trägerelement 6 bzw. 8 bzw. 10 bzw. 12 wegweisen.Significant difference of pipe holding equipment 1' and 2 ' opposite the pipe holding devices 1 and 2 according to 1 is also that the pipe holding devices 1' and 2 ' although carrier elements 6 ' . 8th' . 10 ' and 12 ' have, which the support elements 6 . 8th . 10 and 12 according to 1 same, in particular also have a U-profile. However, the carrier elements are 6 ' . 8th' . 10 ' and 12 ' arranged such that openings in the U-profile in the direction of the support element 6 ' . 8th' . 10 ' . 12 ' the same pipe holding device 1' respectively. 2 ' while the openings in the U-profile of the support elements 6 and 8th respectively. 10 and 12 according to 1 from the respective other carrier element 6 respectively. 8th respectively. 10 respectively. 12 face away.

Lagereinrichtungen 14' und 16' sind als Führungslager bzw. Zwangsführungslager ausgebildet und tragen bzw. führen die Rohre 52 und 56.Storage facilities 14 ' and 16 ' are designed as a guide bearing or positive guide bearing and carry or guide the pipes 52 and 56 ,

Zum Sanieren der Rohrhalteeinrichtung 1' bzw. 2' werden wiederum aus dem Fundament 4 herausragende Abschnitte der Trägerelemente 6', 8', 10' und 12' entfernt und nachfolgend Bohrlöcher 18', 20', 22' und 24' im Bereich der Trägerelemente 6', 8', 10' und 12' in das Fundament gebohrt.For rehabilitating the pipe holding device 1' respectively. 2 ' turn out of the foundation 4 outstanding sections of the support elements 6 ' . 8th' . 10 ' and 12 ' removed and subsequently drilled holes 18 ' . 20 ' . 22 ' and 24 ' in the area of the carrier elements 6 ' . 8th' . 10 ' and 12 ' drilled in the foundation.

In die Bohrlöcher werden Trägereinrichtungen 43', 44', 46' und 48' eingebracht, welche im Wesentlichen den Trägereinrichtungen 42, 44, 46 und 48 von 1 gleichen. Insbesondere weist die Trägereinrichtung 42' zwei Elemente 26' und 28' auf, welche aus Flacheisen bzw. Stahlträgern gebildet sind und den Elementen 26 und 28 gemäß 1 gleichen. Entsprechend sind die Trägereinrichtungen 44', 46' und 48' aus Elementen 30' und 32' bzw. 34' und 36' bzw. 38' und 40' gebildet. Die Elemente 26' und 28' bzw. 30' und 32' bzw. 34' und 36' bzw. 38' und 40' sind dabei mittels einer Schweißnaht S1' bzw. S2' bzw. S3' bzw. S4' im Bereich einer Fuge umlaufend miteinander verschweißt.In the holes are carriers 43 ' . 44 ' . 46 ' and 48 ' introduced, which are essentially the carrier devices 42 . 44 . 46 and 48 from 1 same. In particular, the carrier device 42 ' two elements 26 ' and 28 ' on, which are made of flat iron or steel beams and the elements 26 and 28 according to 1 same. Accordingly, the carrier devices 44 ' . 46 ' and 48 ' from elements 30 ' and 32 ' respectively. 34 ' and 36 ' respectively. 38 ' and 40 ' educated. The Elements 26 ' and 28 ' respectively. 30 ' and 32 ' respectively. 34 ' and 36 ' respectively. 38 ' and 40 ' are welded together by means of a weld S1 'or S2' or S3 'or S4' in the region of a joint circumferentially.

Im Gegensatz zu den Trägereinrichtungen 42 bis 48 bzw. den Elementen 26 bis 40 sind die Trägereinrichtungen 42' bis 48' bzw. die Elemente 26' bis 40' kürzer ausgebildet und ragen demzufolge weniger weit aus dem Fundament 4 heraus. Hierdurch wird eine Befestigung der Lagereinrichtung 14' bzw. 16' anstelle der Lagereinrichtung 14 bzw. 16 ermöglicht, nachdem die Trägereinrichtungen 42', 44', 46' und 48' in dem Bohrloch 18' bzw. 20' bzw. 22' bzw. 24' in analoger Weise zu der im Zusammenhang mit 1 beschriebenen Fixierung fixiert, insbesondere mittels Schweißnähten S5', S6', S7' und S8' mit den Trägereinrichtungen 42', 44', 46' und 48' verschweißt, wurden.Unlike the carrier devices 42 to 48 or the elements 26 to 40 are the carrier devices 42 ' to 48 ' or the elements 26 ' to 40 ' shorter trained and therefore protrude less far from the foundation 4 out. As a result, an attachment of the bearing device 14 ' respectively. 16 ' instead of the storage facility 14 respectively. 16 allows after the carrier devices 42 ' . 44 ' . 46 ' and 48 ' in the borehole 18 ' respectively. 20 ' respectively. 22 ' respectively. 24 ' in an analogous way to that associated with 1 Fixing described fixed, in particular by means of welds S5 ', S6', S7 'and S8' with the support means 42 ' . 44 ' . 46 ' and 48 ' welded, were.

Die Lagereinrichtung 14' bzw. 16' weist Vertikalträger 58' und 60' bzw. 62' und 64' auf, welche mit der Trägereinrichtung 42' bzw. 44' bzw. 46' bzw. 48' mittels 6 bis 8 mm dicker Schweißnähte S9', S10', S11', S12', S13', S14', S15' und S16' sowie mittels Schweißnähten S17', S18', S19' und S20' verschweißt werden. Ein Horizontalträger 66' bzw. 68' der Lagereinrichtung 14' bzw. 16' wird sowohl mit der Trägereinrichtung 42' als auch mit der Trägereinrichtung 44' bzw. sowohl mit der Trägereinrichtung 46' als auch mit der Trägereinrichtung 48' mittels einer Schweißnaht S21' bzw. S22' bzw. S23' bzw. S24' verschweißt.The storage facility 14 ' respectively. 16 ' has vertical support 58 ' and 60 ' respectively. 62 ' and 64 ' on, which with the support means 42 ' respectively. 44 ' respectively. 46 ' respectively. 48 ' welded by means of 6 to 8 mm thick welds S9 ', S10', S11 ', S12', S13 ', S14', S15 'and S16' and by means of welds S17 ', S18', S19 'and S20'. A horizontal beam 66 ' respectively. 68 ' the storage facility 14 ' respectively. 16 ' comes with both the carrier device 42 ' as well as with the carrier device 44 ' or both with the carrier device 46 ' as well as with the carrier device 48 ' welded by means of a weld S21 'or S22' or S23 'or S24'.

Für die zwangsgeführte Lagerung des Rohres 52 bzw. 56 sind bzw. werden an das Rohr 52 bzw. 56 als Führungselemente 86 und 88 bzw. 90 und 92 ausgebildete Stahlträger mit einem U-Profil angeschweißt. Das Führungselement 86 greift hierbei oberhalb der Trägereinrichtung 42' in eine Aussparung des Vertikalträgers 58' ein. Entsprechendes gilt für die Führungselemente 88, 90 und 92 in Bezug auf die Trägereinrichtungen 44', 46' und 48' bzw. die Vertikalträger 60', 62' und 64'.For the positively guided storage of the pipe 52 respectively. 56 are or will be on the pipe 52 respectively. 56 as guide elements 86 and 88 respectively. 90 and 92 trained steel beams welded with a U-profile. The guide element 86 engages above the carrier device 42 ' in a recess of the vertical support 58 ' one. The same applies to the guide elements 88 . 90 and 92 in relation to the carrier devices 44 ' . 46 ' and 48 ' or the vertical support 60 ' . 62 ' and 64 ' ,

Um ein geräusch- und verschleißarmes Gleiten des Rohres 52 bzw. 56 auf dem Horizontalträger 66' bzw. 68' zu ermöglichen, weist dieser Horizontalträger 66' bzw. 68' ein Gleitelement 94 bzw. 96 auf, auf welchem das Rohr 52 bzw. 56 aufliegt. Das Gleitelement 94 bzw. 96 ist insbesondere eine quadratische Platte mit einer Kantenlänge von bspw. 80 mm und einer Dicke von bspw. 10 mm, welche Polytetrafluorethylen (PTFE) aufweist bzw. aus PTFE hergestellt ist. Zur Fixierung ist das Gleitelement 94 bzw. 96 von vier aus Flachstahl gebildeten jeweils bspw. 3 mm dicken, 15 mm breiten und bis zu 110 mm langen Halteelementen 98 bzw. 100 umgeben, welche mit dem Horizontalträger 66' bzw. 68' verschweißt sind.To a noise and low-wear sliding of the tube 52 respectively. 56 on the horizontal beam 66 ' respectively. 68 ' to allow this horizontal carrier 66 ' respectively. 68 ' a sliding element 94 respectively. 96 on which the pipe is 52 respectively. 56 rests. The sliding element 94 respectively. 96 is in particular a square plate with an edge length of, for example, 80 mm and a thickness of, for example, 10 mm, which polytetrafluoroethylene (PTFE) has or is made of PTFE. For fixing the sliding element 94 respectively. 96 of four formed from flat steel each example. 3 mm thick, 15 mm wide and up to 110 mm long holding elements 98 respectively. 100 surrounded, which with the horizontal beam 66 ' respectively. 68 ' are welded.

5 zeigt einen Schnitt A-A der Rohrhalteeinrichtung 2' gemäß dem zweiten Ausführungsbeispiel von 4. Insbesondere zeigt 5 deutlich das Führungselement 92, welches in die Aussparung des Vertikalträgers 64' eingreift und das Rohr 56 hiermit zwangslagert. 5 shows a section AA of the pipe holding device 2 ' according to the second embodiment of 4 , In particular shows 5 clearly the guide element 92 , which in the recess of the vertical support 64 ' engages and the pipe 56 hereby forcibly stored.

6 zeigt einen Schnitt B-B des Trägerelements 12' und der Trägereinrichtung 48' gemäß dem zweiten Ausführungsbeispiel von 4 und gleicht hierbei in weiten Teilen dem Schnitt B-B der Rohrhalteeinrichtung 2 gemäß 3. Insbesondere ist die Abbildung gemäß 6 im Wesentlichen durch eine Spiegelung an einer senkrecht zur Betrachtungsebene verlaufenden Spiegelebene in die Abbildung gemäß 3 überführbar. 6 shows a section BB of the support element 12 ' and the carrier device 48 ' according to the second embodiment of 4 and is similar in many parts to the section BB of the pipe holding device 2 according to 3 , In particular, the figure is according to 6 essentially by a reflection at a plane perpendicular to the viewing plane mirror plane in the figure according to 3 transferable.

Das Bohrloch 24' ist aus drei Löchern 78', 80' und 82' gebildet. Zudem ist das Trägerelement 12' mit einem Stahlträger 84' verschweißt.The borehole 24 ' is from three holes 78 ' . 80 ' and 82 ' educated. In addition, the carrier element 12 ' with a steel beam 84 ' welded.

7 zeigt den an den Trägereinrichtungen 46' und 48' angeschweißten Horizontalträger 68' mit dem Gleitelement 96 der Rohrhalteeinrichtung 2' gemäß dem zweiten Ausführungsbeispiel von 4. 7 shows the at the carrier devices 46 ' and 48 ' welded horizontal beam 68 ' with the sliding element 96 the pipe holding device 2 ' according to the second embodiment of 4 ,

Alternativ zu der Ausbildung der Lagereinrichtungen 14 und 16 als Festlager bzw. 14' und 16' als Führungslager können ggf. auch modifizierte Lagereinrichtungen vorgesehen sein, welche als Gleitlager ausgebildet sind und eine Bewegung des Rohres 52 bzw. 56 in horizontaler radialer Richtung erlauben.Alternatively to the training of storage facilities 14 and 16 as a permanent or 14 ' and 16 ' If necessary, modified bearing devices can also be provided as a guide bearing, which are designed as slide bearings and a movement of the tube 52 respectively. 56 allow in horizontal radial direction.

Die Lagereinrichtungen 14 und 16 bzw. 14' und 16', welche an die Trägereinrichtungen 42 und 44 sowie 46 und 48 bzw. 42' und 44' sowie 46' und 48' angeschweißt werden, können Lagereinrichtungen sein, welche das Rohr 52 bzw. 56 schon vor der Sanierung gelagert haben. Alternativ können jedoch auch Lagereinrichtungen verwendet werden, welche die vor der Sanierung vorhandenen Lagereinrichtungen ersetzen.The storage facilities 14 and 16 respectively. 14 ' and 16 ' which are attached to the carrier devices 42 and 44 such as 46 and 48 respectively. 42 ' and 44 ' such as 46 ' and 48 ' can be welded, can be storage facilities, which the pipe 52 respectively. 56 already stored before the renovation. Alternatively, however, it is also possible to use storage facilities which replace the storage facilities present before the refurbishment.

Claims (20)

Verfahren zum Sanieren einer Rohrhalteeinrichtung (1, 2), welche ein Fundament (4), zwei teilweise in diesem Fundament (4) angeordnete Trägerelemente (10, 12) und eine an diesen Trägerelementen (10, 12) befestigte Lagereinrichtung (16) zur Lagerung eines Rohres (56), insbesondere einer Fernwärmeleitung, aufweist, dadurch gekennzeichnet, dass zumindest jeweils ein Teil der Trägerelemente (10, 12) entfernt und Bohrlöcher (22, 24) in das Fundament (4) gebohrt werden und nachfolgend Trägereinrichtungen (46, 48) in den Bohrlöchern (22, 24) fixiert und mit dieser Lagereinrichtung (16) oder mit einer diese Lagereinrichtung (16) ersetzenden Lagereinrichtung und/oder mit dem Rohr (56) verbunden werden.Method for rehabilitating a pipe holding device ( 1 . 2 ), which is a foundation ( 4 ), two partially in this foundation ( 4 ) arranged carrier elements ( 10 . 12 ) and one of these support elements ( 10 . 12 ) attached storage facility ( 16 ) for the storage of a pipe ( 56 ), in particular a district heating pipe, characterized in that at least in each case a part of the carrier elements ( 10 . 12 ) and drilled holes ( 22 . 24 ) in the foundation ( 4 ) and subsequently support means ( 46 . 48 ) in the boreholes ( 22 . 24 ) and with this storage device ( 16 ) or with a storage facility ( 16 ) replacing the bearing device and / or with the pipe ( 56 ) get connected. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass das Bohrloch (22, 24) in einem teilweise von dem, insbesondere ein U-Profil aufweisenden, Trägerelement (10, 12) umgebenen Bereich in das Fundament (4) gebohrt wird.Method according to claim 1, characterized in that the borehole ( 22 . 24 ) in a partially of the, in particular a U-profile having, carrier element ( 10 . 12 ) surrounded area in the foundation ( 4 ) is drilled. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass mehrere, insbesondere drei, Löcher (78, 80, 82) in das Fundament (4) gebohrt werden, welche miteinander verbunden sind und zusammen das Bohrloch (24) bilden.Method according to claim 1 or 2, characterized in that several, in particular three, holes ( 78 . 80 . 82 ) in the foundation ( 4 ), which are interconnected and together the wellbore ( 24 ) form. Verfahren nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, dass die Trägereinrichtung (48) zur Fixierung der Trägereinrichtung (48) in dem Bohrloch (24) mit dem Trägerelement (12) verschweißt wird.Method according to one of the preceding claims, characterized in that the carrier device ( 48 ) for fixing the support device ( 48 ) in the borehole ( 24 ) with the carrier element ( 12 ) is welded. Verfahren nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, dass das Bohrloch (24), nachdem die Trägereinrichtung (48) in dieses Bohrloch (24) eingebracht wurde, zur Fixierung der Trägereinrichtung (48) in dem Bohrloch (24), insbesondere mit Beton, verfüllt wird.Method according to one of the preceding claims, characterized in that the borehole ( 24 ) after the carrier device ( 48 ) into this borehole ( 24 ) was introduced, for fixing the support device ( 48 ) in the borehole ( 24 ), in particular with concrete, is filled. Verfahren nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, dass die Trägereinrichtung (48) mit der Lagereinrichtung (16) bzw. mit dem Rohr (52) verschweißt wird.Method according to one of the preceding claims, characterized in that the carrier device ( 48 ) with the storage facility ( 16 ) or with the pipe ( 52 ) is welded. Verfahren nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, dass eine Trägereinrichtung (48) verwendet wird, die ein Flachprofil aufweist.Method according to one of the preceding claims, characterized in that a carrier device ( 48 ) is used, which has a flat profile. Verfahren nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, dass zur Herstellung der Trägereinrichtung (48) zwei jeweils ein Flachprofil aufweisende Elemente (38 und 40) mit jeweils einer flachen Seite einander zugewandt angeordnet und miteinander verschweißt werden.Method according to one of the preceding claims, characterized in that for the production of the carrier device ( 48 ) two each having a flat profile elements ( 38 and 40 ) are arranged facing each other with a flat side and welded together. Verfahren nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, dass eine Trägereinrichtung (48) verwendet wird, die derart an das Trägerelement (12) und das Bohrloch (24) angepasste Abmessungen aufweist, dass diese Trägereinrichtung (48), insbesondere an einer breiten Seite der Trägereinrichtung (48), mit einem Abschnitt des Trägerelements (12) verschweißbar ist.Method according to one of the preceding claims, characterized in that a carrier device ( 48 ) used in such a way to the support element ( 12 ) and the borehole ( 24 ) has adapted dimensions that this support means ( 48 ), in particular on a broad side of the support device ( 48 ), with a portion of the support element ( 12 ) is weldable. Verfahren nach einem der vorherigen Ansprüche, gekennzeichnet durch eine Ausbildung der Lagereinrichtung (16') als Führungslager.Method according to one of the preceding claims, characterized by a design of the bearing device ( 16 ' ) as a guide camp. Verfahren nach einem der Ansprüche 1 bis 9, gekennzeichnet durch eine Ausbildung der Lagereinrichtung (16) als Festlager.Method according to one of Claims 1 to 9, characterized by a design of the bearing device ( 16 ) as a fixed camp. Verfahren nach einem der Ansprüche 1 bis 9, gekennzeichnet durch eine Ausbildung der Lagereinrichtung als Gleitlager.Method according to one of claims 1 to 9, characterized by a design of the bearing device as a plain bearing. Sanierte Rohrhalteeinrichtung (1, 2), welche ein Fundament (4), zwei teilweise in diesem Fundament (4) angeordnete Trägerelemente (10, 12) und eine an diesen Trägerelementen (10, 12) befestigte Lagereinrichtung (16, 16') zur Lagerung eines Rohres (56), insbesondere einer Fernwärmeleitung, aufweist, gekennzeichnet durch in dem Fundament (4) verbliebene Abschnitte der oberhalb des Fundaments (4) abgetrennten Trägerelemente (10, 12), Bohrlöcher (22, 24) in dem Fundament (4) und Trägereinrichtungen (46, 48), die zumindest teilweise in den Bohrlöchern (22, 24) fixiert und mit der Lagereinrichtung (16) oder mit einer die Lagereinrichtung (16) ersetzenden Lagereinrichtung und/oder mit dem Rohr (56) verbunden sind.Renovated pipe holding device ( 1 . 2 ), which is a foundation ( 4 ), two partially in this foundation ( 4 ) arranged carrier elements ( 10 . 12 ) and one of these support elements ( 10 . 12 ) attached storage facility ( 16 . 16 ' ) for the storage of a pipe ( 56 ), in particular a district heating pipe, characterized by in the foundation ( 4 ) remaining sections of above the foundation ( 4 ) separated carrier elements ( 10 . 12 ), Drill holes ( 22 . 24 ) in the foundation ( 4 ) and carrier devices ( 46 . 48 ), at least partially in the boreholes ( 22 . 24 ) and with the storage facility ( 16 ) or with a storage facility ( 16 ) replacing the bearing device and / or with the pipe ( 56 ) are connected. Sanierte Rohrhalteeinrichtung nach Anspruch 13, dadurch gekennzeichnet, dass die Trägereinrichtung (48) ein Flachprofil aufweist.Restored pipe holding device according to claim 13, characterized in that the carrier device ( 48 ) has a flat profile. Sanierte Rohrhalteeinrichtung nach einem der Ansprüche 13 oder 14, dadurch gekennzeichnet, dass die Trägereinrichtung (46, 48) zwei jeweils ein Flachprofil aufweisende Elemente (38 und 40) aufweist, welche mit jeweils einer flachen Seite einander zugewandt angeordnet und miteinander verschweißt sind.Renovated pipe support device according to one of claims 13 or 14, characterized in that the support device ( 46 . 48 ) two each having a flat profile elements ( 38 and 40 ), which are arranged facing each other with a flat side and welded together. Sanierte Rohrhalteeinrichtung nach einem der Ansprüche 13 bis 15, dadurch gekennzeichnet, dass die Trägereinrichtung (46, 48) an das Trägerelement (10, 12) und an das Bohrloch (22, 24) angepasste Abmessungen aufweist und, insbesondere an einer breiten Seite der Trägereinrichtung (46, 48), mit einem Abschnitt des Trägerelements (10, 12) verschweißt ist.Restored pipe holding device according to one of claims 13 to 15, characterized in that the carrier device ( 46 . 48 ) to the carrier element ( 10 . 12 ) and to the borehole ( 22 . 24 ) has adapted dimensions and, in particular on a broad side of the support device ( 46 . 48 ), with a portion of the support element ( 10 . 12 ) is welded. Sanierte Rohrhalteeinrichtung nach einem der Ansprüche 13 bis 16, gekennzeichnet durch eine Ausbildung der Lagereinrichtung (16') als Führungslager.Renovated pipe support device according to one of claims 13 to 16, characterized by a design of the bearing device ( 16 ' ) as a guide camp. Sanierte Rohrhalteeinrichtung nach einem der Ansprüche 13 bis 16, gekennzeichnet durch eine Ausbildung der Lagereinrichtung (16) als Festlager.Renovated pipe support device according to one of claims 13 to 16, characterized by a design of the bearing device ( 16 ) as a fixed camp. Sanierte Rohrhalteeinrichtung nach einem der Ansprüche 13 bis 16, gekennzeichnet durch eine Ausbildung der Lagereinrichtung als Gleitlager.Refurbished pipe holding device according to one of claims 13 to 16, characterized by an embodiment of the storage device as Bearings. Sanierte Rohrhalteeinrichtung nach einem der Ansprüche 13 bis 19, dadurch gekennzeichnet, dass die sanierte Rohrhalteeinrichtung mit dem Verfahren nach einem der Ansprüche 1 bis 12 hergestellt ist.Refurbished pipe holding device according to one of claims 13 to 19, characterized in that the rehabilitated pipe holding device prepared by the method according to any one of claims 1 to 12.
DE200810051004 2008-10-13 2008-10-13 Pipe i.e. district heating pipeline, holder renovating method, involves drilling boreholes in U-shaped region in base of holder, fixing support elements in boreholes, connecting support elements with bearing device and/or with pipe Active DE102008051004B3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE200810051004 DE102008051004B3 (en) 2008-10-13 2008-10-13 Pipe i.e. district heating pipeline, holder renovating method, involves drilling boreholes in U-shaped region in base of holder, fixing support elements in boreholes, connecting support elements with bearing device and/or with pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200810051004 DE102008051004B3 (en) 2008-10-13 2008-10-13 Pipe i.e. district heating pipeline, holder renovating method, involves drilling boreholes in U-shaped region in base of holder, fixing support elements in boreholes, connecting support elements with bearing device and/or with pipe

Publications (1)

Publication Number Publication Date
DE102008051004B3 true DE102008051004B3 (en) 2010-05-20

Family

ID=42105460

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200810051004 Active DE102008051004B3 (en) 2008-10-13 2008-10-13 Pipe i.e. district heating pipeline, holder renovating method, involves drilling boreholes in U-shaped region in base of holder, fixing support elements in boreholes, connecting support elements with bearing device and/or with pipe

Country Status (1)

Country Link
DE (1) DE102008051004B3 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITNA20110013A1 (en) * 2011-03-15 2012-09-16 Domenico Piatti DISASSEMBLY SUPPORT FOR PIPES ADJUSTED TO MONORAIL AND TRANSPORT OF FIREWATER OR OTHER FLUIDS.
CN110355870A (en) * 2019-07-16 2019-10-22 湖北东方化工有限公司 One kind being based on pipe support maintenance process process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1861436A (en) * 1928-10-05 1932-06-07 Johns Manville Underground conduit system
US20030041550A1 (en) * 2001-08-28 2003-03-06 Pangburn Daniel Wesley Wood fence post repair device
US20040134161A1 (en) * 2002-10-17 2004-07-15 Lockwood James D. System and method for strengthening towers
DE102004048365A1 (en) * 2004-10-01 2006-04-13 Conari Ag Radio tower, has three oblong stabilization units such as flat rolled steels which are connected with tower and which are arranged around tower such that their narrow sides are facing tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1861436A (en) * 1928-10-05 1932-06-07 Johns Manville Underground conduit system
US20030041550A1 (en) * 2001-08-28 2003-03-06 Pangburn Daniel Wesley Wood fence post repair device
US20040134161A1 (en) * 2002-10-17 2004-07-15 Lockwood James D. System and method for strengthening towers
DE102004048365A1 (en) * 2004-10-01 2006-04-13 Conari Ag Radio tower, has three oblong stabilization units such as flat rolled steels which are connected with tower and which are arranged around tower such that their narrow sides are facing tower

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITNA20110013A1 (en) * 2011-03-15 2012-09-16 Domenico Piatti DISASSEMBLY SUPPORT FOR PIPES ADJUSTED TO MONORAIL AND TRANSPORT OF FIREWATER OR OTHER FLUIDS.
CN110355870A (en) * 2019-07-16 2019-10-22 湖北东方化工有限公司 One kind being based on pipe support maintenance process process
CN110355870B (en) * 2019-07-16 2021-06-01 湖北东方化工有限公司 Maintenance process flow based on pipe frame

Similar Documents

Publication Publication Date Title
DE102013107059A1 (en) Process for the production and erection of a tubular tower construction
DE2221016A1 (en) Nuclear reactor
DE2026962A1 (en) Ceiling construction, especially for suspended ceilings
DE102008051004B3 (en) Pipe i.e. district heating pipeline, holder renovating method, involves drilling boreholes in U-shaped region in base of holder, fixing support elements in boreholes, connecting support elements with bearing device and/or with pipe
DE102013015299B4 (en) Jacket for a wind turbine and method of manufacture
DE202007011041U1 (en) Lost formwork body
EP1088943A2 (en) Mounting support system with installation aid
DE3345666C2 (en) Pipe support
DE3302075A1 (en) Prestressed concrete or reinforced concrete bending support
DD281635A5 (en) METHOD AND DEVICE FOR RE-PUTTING DEVICED, NON-COVERABLE STRAIGHT CHANNELS
DE4138781C2 (en) Method and hose element for evenly placing a load on a support surface
DE3941513C2 (en) Free fall pipe, especially for waste water
DE102017127941B4 (en) Arrangement for cementless fastening of tubular structures
DE69724514T2 (en) Reinforcement of masonry
DE3635715C2 (en)
DE2836936C2 (en) Concrete sewer with at least one pipeline laid in it
AT384455B (en) Process for retrospectively installing dampproofing courses against rising damp in masonry work, and arrangement for carrying out the process
DE2526509B2 (en) TWO-LEVEL CROSS FRAME FOR A SKELETON CONSTRUCTION FOR INDUSTRIAL BUILDINGS
DE1675394A1 (en) Holder for pipes, especially pipe slides
DE3218516A1 (en) SHUTDOWN DEVICE FOR SLOT WALL LAMPS
AT345332B (en) SLIDING TILT BEARING FOR MOVING THE SUPERSTRUCTURE OF BRIDGES
DE1434730C (en) Method for creating a reinforced concrete or prestressed concrete mast consisting of several detachably connected parts and a mast manufactured according to the method
DE3105474C2 (en) Earth-covered container
AT506594A4 (en) Parallelly arranged plate-shaped elements i.e. combustion-sided inner wall elements, connecting device for fastening at external wall element in boiler, has bar-shaped fuse element removably arranged in common channel
EP1493875A2 (en) Method and device for refurbishing a manhole shaft

Legal Events

Date Code Title Description
8364 No opposition during term of opposition