DE102007060456A1 - Method for detecting the operating stand-by of a European train control system (ETCS) section comprises matching section imaging data to track-geometric measuring data - Google Patents

Method for detecting the operating stand-by of a European train control system (ETCS) section comprises matching section imaging data to track-geometric measuring data Download PDF

Info

Publication number
DE102007060456A1
DE102007060456A1 DE102007060456A DE102007060456A DE102007060456A1 DE 102007060456 A1 DE102007060456 A1 DE 102007060456A1 DE 102007060456 A DE102007060456 A DE 102007060456A DE 102007060456 A DE102007060456 A DE 102007060456A DE 102007060456 A1 DE102007060456 A1 DE 102007060456A1
Authority
DE
Germany
Prior art keywords
track
data
etcs
train control
route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE102007060456A
Other languages
German (de)
Inventor
Norbert Dipl.-Ing. Apel
Jenny Dipl.-Ing. Strahl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Priority to DE102007060456A priority Critical patent/DE102007060456A1/en
Publication of DE102007060456A1 publication Critical patent/DE102007060456A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/60Testing or simulation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
    • B61L2027/202Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation using European Train Control System [ETCS]

Abstract

Method for detecting the operating stand-by of a European train control system (ETCS) section comprises matching section imaging data to track-geometric measuring data. Preferred Features: The imaging data is subjected to a quality evaluation based on corresponding track-geometric measuring data.

Description

Die Erfindung betrifft ein Verfahren zum Nachweis der Betriebsbereitschaft einer ETCS(European Train Control System)-Strecke hinsichtlich der Interoperabilität ortsgebundener Einrichtungen, insbesondere zur Zugsteuerung, Zugsicherung und Signalgebung, wobei Streckenabbilddaten zur Positionierung der Einrichtungen zugrunde gelegt werden.The The invention relates to a method for proving operational readiness ETCS (European Train Control System) route in terms of interoperability of localized Facilities, in particular for train control, command and signaling, where track image data is used to position the devices be placed.

Gemäß Artikel 6, Absatz 1 der EG-Richtlinie 96/48 aus 2002 ist für ETCS-Strecken der Nachweis der Betriebsbereitschaft gefordert. Das betrifft insbesondere die technische Spezifikation für die Interoperabilität des Teilsystems Zugsteuerung, Zugsicherung und Signalgebung des transeuropäischen Hochgeschwindigkeitsbahnsystems ETCS.According to Article 6, paragraph 1 of the EC Directive 96/48 from 2002 is for ETCS routes proof of operational readiness is required. This applies in particular the technical specification for the interoperability of the control - command and signaling subsystem trans-European high-speed rail system ETCS.

Zu diesem Nachweis wurden bisher Prozesse und Regeln genutzt, die auf Streckenabbilddaten beruhen, die vom Betreiber der ETCS-Strecke dem Systemlieferanten zur Verfügung gestellt werden. Diese Planunterlagen liegen üblicherweise in rechtsverbindlicher Papierform vor. Es hat sich gezeigt, dass die Planunterlagen häufig kein ausreichend genaues Abbild der konkreten Strecke repräsentieren und untereinander teilweise inkonsistent sind. Infolgedessen sind zusätzliche Streckenvermessungen durch den Systemlieferanten unabdingbar, um Übereinstimmung zwischen den Planunterlagen des Streckenbetreibers und der tatsächlichen Streckentopologie herzustellen. Der dazu erforderliche Aufwand ist unverhältnismäßig hoch, wobei andererseits bei Verzicht auf eine zusätzliche Streckenvermessung Implementierungsfehler resultieren können, die erst nach der Projektierung der ortsgebundenen Einrich tungen an der Strecke eindeutig erkannt werden können. Zu diesem späten Zeitpunkt sind jedoch bereits alle inhaltlichen und formalen Prüfungen und Begutachtungen abgeschlossen, so dass die Offenbarung dieser Fehler einen erneuten kompletten Durchlauf durch alle Engineeringschritte, d. h. von der Projektierung bis zur Implementierung, erfordern. Ungünstigerweise kann diese Engineeringschleife erst zu einem Zeitpunkt erfolgen, an dem das Projekt terminlich kurz vor dem Abschluss und damit vor Übergabe an den Streckenbetreiber steht. Damit stellt die Implementierung der projektierten Streckenabschnittdaten ein unkalkulierbares Risiko bezüglich des Nachweises der Betriebsbereitschaft dar. Bei erheblichen Abweichungen der zugrunde gelegten Streckenabbilddaten oder deren ungenügende Korrektur durch punktuelle Streckenvermessungen können auch mehrere Engineeringschleifen notwendig sein. Aber auch eine Vorabstreckenvermessung führt nicht zwangsläufig zu fehlerfreien Planunterlagen, da wegen des enormen Aufwandes nicht alle relevanten Punkte der Strecke erfasst werden können.To This proof has so far used processes and rules that are based on Track map data is based on the operator of the ETCS route available to the system supplier be put. These planning documents are usually legally binding Paper form before. It has been shown that the plan documents often no represent sufficiently accurate image of the concrete route and partially inconsistent with each other. As a result, additional Track surveying by the system supplier is essential to consistency between the plan documents of the track operator and the actual Establish route topology. The required effort is disproportionately high, on the other hand, in the absence of an additional distance measurement implementation error can result only after the configuration of the local facilities can be clearly recognized on the track. At this late date However, all content and formal exams are already and Completed appraisals, so that the disclosure of these mistakes a new complete run through all engineering steps, d. H. from project engineering to implementation. Unfortunately, This engineering loop can only be done at a time, at which the project dates shortly before the conclusion and thus before delivery to the track operator stands. Thus, the implementation of the configured route segment data an incalculable risk in terms of proof of operational readiness. In case of significant deviations the underlying track data or their insufficient correction Due to punctual distance surveys, several engineering loops can be used to be necessary. But a pre-distance measurement does not necessarily lead to flawless plan documents, because of the enormous effort not all relevant points of the route can be recorded.

Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren der gattungsgemäßen Art anzugeben, bei dem zusätzliche Engineeringschleifen reduziert werden können.Of the Invention is based on the object, a method of the generic type indicate, with the additional Engineering loops can be reduced.

Erfindungsgemäß wird die Aufgabe dadurch gelöst, dass die Streckenabbilddaten mit gleisgeometrischen Vermessungsdaten abgeglichen werden. Solche gleisgeometrischen Vermessungsdaten werden üblicherweise von übergeordneten Bahnverwaltungsinstanzen vorgehalten, da diese Vermessungsdaten für gänzlich andere Zwecke, beispielsweise für oberbautechnische Planungen, benötigt werden. Diese Vermessungsdaten liegen in elektronischer Form vor und können über eine intelligente Schnittstelle zur Beaufschlagung der Planunterlagen, d. h. der Streckenabbilddaten des Bahnbetreibers, zum Zwecke des Abgleichs, d. h. zur Verifizierung, dieser Streckenabbilddaten verwendet werden. Damit ist zu einem frühen Zeitpunkt eine Fehlerkorrektur der übergebenen Planunterlagen möglich. Letztlich ergibt sich eine Reduzierung zusätzlicher Engineeringschleifen. Die für die Projektierung und Implementierung erforderlichen Streckenabbilddaten lassen sich auf diese Weise über Plausibilitätsbetrachtungen interpolieren. Das Risiko nicht erkannter Fehler in den Planunterlagen wird reduziert. Der Engineeringprozess kann von vornherein mit qualitativ verbesserten Planunterlagen erfolgen. Dabei kann davon ausgegangen werden, dass die gleisgeometrischen Vermessungsdaten unabhängig von den Streckenabbilddaten der Planunterlagen erstellt wurden, da die übergeordnete Bahnverwaltungsinstanz als Eigner der gleisgeometrischen Vermessungsdaten überwiegend nicht identisch mit dem Bahnbetreiber ist, der die Planunterlagen erstellt. Die dem Systemlieferanten übergebenen Planunterlagen werden quasi einer Eingangsprüfung mittels einer unabhängigen Datenquelle unterzogen. Dadurch werden Differenzen sehr frühzeitig erkannt und können ggf. durch zusätzliche punktuelle Überprüfung bzw. Neuvermessung sehr frühzeitig berichtigt werden. Ganz erhebliche Spätfolgen, die sich erst bei Implementierung der ortsgebundenen Einrichtungen an der Strecke zeigen, werden vermieden.According to the invention Task solved by that the route image data with track geometry survey data be matched. Such track geometry survey data usually becomes from parent Bahnverwaltungsinstanzen held, as these surveying data for completely different Purposes, for example, for structural engineering Planning, needed become. These survey data are available in electronic form and can about one intelligent interface for loading the planning documents, d. H. track data of the railway operator, for the purpose of comparison, d. H. be used for verification of this route map data. This is too early Time an error correction of the submitted plan documents possible. Ultimately there is a reduction of additional Engineering loops. The for the configuration and implementation of required route image data can be over this way plausibility considerations interpolate. The risk of unrecognized errors in the plan documents is reduced. The engineering process can from the outset with qualitative Improved planning documents. It can be assumed be that the track geometry survey data independent of the routing image data of the plan documents were created because the parent Bahnverwaltungsinstanz as the owner of the track geometry surveying data predominantly is not identical to the railway operator, the plan documents created. The plan documents submitted to the system supplier almost an entrance examination by means of an independent Data source subjected. This makes differences very early recognized and can possibly by additional punctual inspection or Remeasurement very early be rectified. Very significant late effects, which only at Implementation of local facilities along the route show are avoided.

Gemäß Anspruch 2 ist vorgesehen, dass die Streckenabbilddaten anhand festgestellter Abweichungen von korrespondierenden gleisgeometrischen Vermessungsdaten einer Qualitätsbewertung unterzogen werden. Diese Qualitätsbewertung kann automatisiert und standardisiert erfolgen. Der Qualitätsnachweis der Streckenabbilddaten kann die Umsetzung der Anforderungen zur Qualität und Genauigkeit der bereitgestellten Streckenabbilddaten gemäß UNISIG Subset 091 zur Gewährleistung höchster Ansprüche nach SIL (Safety Integrity Level) 4 unterstützen.According to claim 2 it is provided that the route image data based on identified Deviations from corresponding track geometry survey data subjected to a quality assessment become. This quality rating can be automated and standardized. The proof of quality The route image data can be used to implement the requirements for quality and accuracy of the provided route image data according to UNISIG Subset 091 for warranty highest claims to SIL (Safety Integrity Level) 4 support.

Die abgeglichenen Streckenabbilddaten und die gleisgeometrischen Vermessungsdaten werden gemäß Anspruch 3 zur Implementierung der ortsgebundenen Einrichtungen verwendet, wobei die Interoperabilität der Einrichtungen mittels betrieblicher Testszenarien erprobt wird. Durch die Nutzung der gleisgeometrischen Vermessungsdaten für die Erprobung der Interoperabilität ist zusammen mit den projektierten Daten der Nachweis der Betriebsbereitschaft der ETCS-Strecke über einen unabhängigen Weg, d. h. unabhängig von den ursprünglichen Planunterlagen, möglich.The adjusted route image data and the track geometric survey data are used according to claim 3 for the implementation of the fixed facilities, the interoperability of the facilities is tested by means of operational test scenarios. By using the geometry data for testing the interoperability, together with the projected data, it is possible to prove the operational readiness of the ETCS route via an independent route, ie independently of the original plan documents.

Die Erfindung wird nachfolgend anhand einer figürlichen Darstellung näher erläutert.The The invention will be explained in more detail with reference to a figurative representation.

Die Figur zeigt einen schematischen Ablauf zum Nachweis der Betriebsbereitschaft einer ETCS-Strecke.The FIG. 1 shows a schematic sequence for proving readiness for operation an ETCS track.

Bisher wurden für den Nachweis der Betriebsbereitschaft ausschließlich die Streckenabbilddaten 1 verwendet. Die Projektierung 2 der Funktionalitäten ortsgebundener Einrichtungen an der Strecke, d. h. der Feldelemente, wurde nach Verifizierung 3 und Test 4 im Engineeringprozess bis zur Implementierung 5 durchgeführt, wobei Fehler in den Streckenabbilddaten 1 zu Problemen hinsichtlich der Interoperabilität der Feldelemente führen konnten. Nur sukzessive konnte nach Durchlaufen mehrerer Engineeringschleifen von der Projektierung 2 bis zur Implementierung 5 ausreichende Interoperabilität erreicht werden. Erst danach konnte die Freigabe 6 der ETCS-Strecke und die Inbetriebnahme 7 durch den Streckenbetreiber erfolgen.Previously, only the route image data was used to prove the operational readiness 1 used. The project planning 2 the functionalities of localized facilities on the line, ie the field elements, after verification 3 and test 4 in the engineering process to implementation 5 performed, with errors in the route image data 1 could lead to problems regarding the interoperability of the field elements. Only successively, after passing through several engineering loops of the project planning 2 until the implementation 5 sufficient interoperability can be achieved. Only then could the release 6 ETCS track and commissioning 7 done by the track operator.

Um mehrere Engineeringschleifen zu vermeiden, werden erfindungsgemäß die Streckenabbilddaten 1 mittels unabhängig erstellter gleisgeometrischer Vermessungsdaten 8 abgeglichen.In order to avoid multiple engineering loops, according to the invention the track image data 1 using independently generated track geometry survey data 8th adjusted.

Dazu dient eine intelligente Schnittstelle 9. Die abgeglichenen Daten werden zur Projektierung 2 und Verifizierung 3 verwendet und wie auch die gleisgeometrischen Vermessungsdaten 8 mit betrieblichen Szenarien 10 beaufschlagt, wodurch der Nachweis der Betriebsbereitschaft 11 entsprechend EG-Richtlinie 12 bereits vor der Implementierung 5.1 möglich ist. Letztlich können die Freigabe 7.1 und die Inbetriebnahme 7.1 schneller und gesicherter erfolgen, da das Risiko einer unkalkulierbaren Anzahl von Engineeringschleifen erheblich verringert ist.This is served by an intelligent interface 9 , The reconciled data becomes the configuration 2 and verification 3 used as well as the track geometry survey data 8th with operational scenarios 10 subjected to proof of operational readiness 11 according to EC directive 12 already before the implementation 5.1 is possible. Ultimately, the release 7.1 and commissioning 7.1 faster and more secure because the risk of an incalculable number of engineering loops is significantly reduced.

Claims (3)

Verfahren zum Nachweis der Betriebsbereitschaft (11) einer ETCS-Strecke hinsichtlich der Interoperabilität ortsgebundener Einrichtungen, insbesondere zur Zugsteuerung, Zugsicherung und Signalgebung, wobei Streckenabbilddaten (1) zur Positionierung der Einrichtungen zugrunde gelegt werden, dadurch gekennzeichnet, dass die Streckenabbilddaten (1) mit gleisgeometrischen Vermessungsdaten (8) abgeglichen werden.Method for proving operational readiness ( 11 ) of an ETCS route with regard to the interoperability of localized facilities, in particular train control, command and signaling, whereby route image data ( 1 ) are used as a basis for the positioning of the devices, characterized in that the route image data ( 1 ) with track geometry survey data ( 8th ). Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Streckenabbilddaten (1) anhand festgestellter Abweichungen von korrespondierenden gleisgeometrischen Vermessungsdaten (8) einer Qualitätsbewertung unterzogen werden.Method according to Claim 1, characterized in that the route image data ( 1 ) on the basis of identified deviations from corresponding track geometry survey data ( 8th ) are subjected to a quality assessment. Verfahren nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass die abgeglichen Streckenabbilddaten und die gleisgeometrischen Vermessungsdaten (8) zur Implementierung (5.1) der ortsgebundenen Einrichtungen verwendet werden, wobei die Interoperabilität der Einrichtungen mittels betrieblicher Testszenarien (10) erprobt wird.Method according to one of the preceding claims, characterized in that the aligned track image data and the track geometry survey data ( 8th ) for implementation ( 5.1 ) of the local facilities, the interoperability of the facilities being 10 ) is tested.
DE102007060456A 2007-12-12 2007-12-12 Method for detecting the operating stand-by of a European train control system (ETCS) section comprises matching section imaging data to track-geometric measuring data Withdrawn DE102007060456A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102007060456A DE102007060456A1 (en) 2007-12-12 2007-12-12 Method for detecting the operating stand-by of a European train control system (ETCS) section comprises matching section imaging data to track-geometric measuring data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102007060456A DE102007060456A1 (en) 2007-12-12 2007-12-12 Method for detecting the operating stand-by of a European train control system (ETCS) section comprises matching section imaging data to track-geometric measuring data

Publications (1)

Publication Number Publication Date
DE102007060456A1 true DE102007060456A1 (en) 2009-06-25

Family

ID=40689467

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102007060456A Withdrawn DE102007060456A1 (en) 2007-12-12 2007-12-12 Method for detecting the operating stand-by of a European train control system (ETCS) section comprises matching section imaging data to track-geometric measuring data

Country Status (1)

Country Link
DE (1) DE102007060456A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103569161A (en) * 2012-07-30 2014-02-12 北京西南交大盛阳科技有限公司 Railway signal equipment operation alarming method based on data comparison and logical analysis

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103569161A (en) * 2012-07-30 2014-02-12 北京西南交大盛阳科技有限公司 Railway signal equipment operation alarming method based on data comparison and logical analysis
CN103569161B (en) * 2012-07-30 2015-11-04 北京西南交大盛阳科技有限公司 Railway signals equipment based on comparing and logic analysis runs alarm method

Similar Documents

Publication Publication Date Title
CA3101079C (en) Linear assets inspection system
Dale et al. Continuous quality improvement: why some organisations lack commitment
EP3237266B1 (en) Method and positioning device for determining the position of a track-guided vehicle, in particular a rail vehicle
ITUD980071A1 (en) METHOD AND APPARATUS FOR DETECTING ANOMALIES IN RAILWAY AND TRAM EQUIPMENT
EP2121409B1 (en) Method, mobile control unit, and arrangement for the transmission of data to a route element used in guided ground transport
DE10307365A1 (en) Motor vehicle fault diagnosis system has a fault diagnosis model that used error codes or fault symptoms as input and calculates the most likely cause, optimally using a fault database in an expert system analogous manner
EP2013417B1 (en) Method and arrangement for determining distances between points along a track
EP3388307A2 (en) Merging of infrastructure-related data, in particular of infrastructure-related data for railway vehicles
DE102007060456A1 (en) Method for detecting the operating stand-by of a European train control system (ETCS) section comprises matching section imaging data to track-geometric measuring data
EP3464000B1 (en) Method and device for automatically checking brakes of a track-bound vehicle
CN114140096B (en) Test detection data filling method based on BIM technology
DE102017212179A1 (en) Correction of a measured position value of a rail-bound vehicle
DE102020213777A1 (en) Simulation device and method for simulating a journey of a rail vehicle
DE102014116127A1 (en) Method of manufacturing a test piece, using a test piece, test piece and set of several test pieces and digital description file
DE102014225683A1 (en) Method for position data acquisition and related rail vehicle
DE3147772A1 (en) Transportable measuring device for the optical measurement of pipe bends
EP3606801A1 (en) Method for generating infrastructure data, apparatus and system for performing the method, and corresponding computer program product
DE19924497C2 (en) Procedure for checking the consistency of information about lines
DE102004040345A1 (en) Checking abutment region of bonded fiber material webs laid on backing, by measuring distance to surface and evaluating to determine if overlap or gap is present
DE102005044274A1 (en) Automobile bodywork quality control, at the production line, scans the contour for the actual contour to be compared with a three-dimensional nominal contour
Zasadzień et al. Use of methods of quality management for improving the repair process illustrated with the example of rolling stock
EP4087766B1 (en) Arrangement for testing etcs level 2 functionalities in rail transport
Rusu et al. The use of laser based trolley for railway switch and crossing inspection
Atapin et al. The new approach to the assessment of the status of switches
DE102007032083A1 (en) Quality control, in the production of rail vehicles, automatically tests the vehicle and fitted components at the end of each production stage for the results to be stored in a fault register database