DE102007000775A1 - Device for double layered coating of liquid to pasty coating medium on paper, cardboard or other fiber material web moving in running direction, comprises two curtain coating nozzles arranged above the fiber material web - Google Patents

Device for double layered coating of liquid to pasty coating medium on paper, cardboard or other fiber material web moving in running direction, comprises two curtain coating nozzles arranged above the fiber material web Download PDF

Info

Publication number
DE102007000775A1
DE102007000775A1 DE200710000775 DE102007000775A DE102007000775A1 DE 102007000775 A1 DE102007000775 A1 DE 102007000775A1 DE 200710000775 DE200710000775 DE 200710000775 DE 102007000775 A DE102007000775 A DE 102007000775A DE 102007000775 A1 DE102007000775 A1 DE 102007000775A1
Authority
DE
Germany
Prior art keywords
coating
curtain
medium
fiber material
material web
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE200710000775
Other languages
German (de)
Inventor
Stefan Reich
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Voith Patent GmbH
Original Assignee
Voith Patent GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Voith Patent GmbH filed Critical Voith Patent GmbH
Priority to DE200710000775 priority Critical patent/DE102007000775A1/en
Publication of DE102007000775A1 publication Critical patent/DE102007000775A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C5/00Apparatus in which liquid or other fluent material is projected, poured or allowed to flow on to the surface of the work
    • B05C5/005Curtain coaters
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C9/00Apparatus or plant for applying liquid or other fluent material to surfaces by means not covered by any preceding group, or in which the means of applying the liquid or other fluent material is not important
    • B05C9/06Apparatus or plant for applying liquid or other fluent material to surfaces by means not covered by any preceding group, or in which the means of applying the liquid or other fluent material is not important for applying two different liquids or other fluent materials, or the same liquid or other fluent material twice, to the same side of the work
    • DTEXTILES; PAPER
    • D21PAPER-MAKING; PRODUCTION OF CELLULOSE
    • D21HPULP COMPOSITIONS; PREPARATION THEREOF NOT COVERED BY SUBCLASSES D21C OR D21D; IMPREGNATING OR COATING OF PAPER; TREATMENT OF FINISHED PAPER NOT COVERED BY CLASS B31 OR SUBCLASS D21G; PAPER NOT OTHERWISE PROVIDED FOR
    • D21H23/00Processes or apparatus for adding material to the pulp or to the paper
    • D21H23/02Processes or apparatus for adding material to the pulp or to the paper characterised by the manner in which substances are added
    • D21H23/22Addition to the formed paper
    • D21H23/46Pouring or allowing the fluid to flow in a continuous stream on to the surface, the entire stream being carried away by the paper
    • D21H23/48Curtain coaters

Landscapes

  • Paper (AREA)
  • Coating Apparatus (AREA)

Abstract

The device for double layered coating of liquid to pasty coating medium on paper, cardboard or other fiber material web (5) moving in running direction, comprises two curtain coating nozzles (2, 3) arranged above the fiber material web for the coating of two medium layers. The number of curtain coating nozzles corresponds to the number of medium layers to be coated. Each curtain coating nozzle delivers a curtain (2a) moving under the effect of gravitation. Two coating units (8, 10) are arranged one above the other in plain for coating the curtain. The device for double layered coating of liquid to pasty coating medium on paper, cardboard or other fiber material web (5) moving in running direction, comprises two curtain coating nozzles (2, 3) arranged above the fiber material web for the coating of two medium layers. The number of curtain coating nozzles corresponds to the number of medium layers to be coated. Each curtain coating nozzle delivers a curtain (2a) moving under the effect of gravitation. Two coating units (8, 10) are arranged one above the other in plain for coating the curtain and are constructionally connected with one another. Screw-, welding- or plug connections are intended for connection path. The coating units are parallely arranged to each other in such a way that the coating medium delivered from each coating unit and/or from each plain is flowed off in running direction of the fiber material web. The coating units are arranged downstream to the last or first curtain coating nozzle at the flow side or inlet side of the fiber material web for the fiber material web moving in running direction. A guiding plate is arranged beneath the curtain coating nozzles during the stretching process, passing over all nozzles and arranged up to the height of one of the coating units and/or plain. The curtain coating nozzle, the guiding plate and/or the coating units are movable relative to each other. The guiding plate is arranged parallel to running fiber material web in order to transmit coating medium absorbed from single or several curtains on the fiber material web to be coated. A further coating unit is slidable to the first and/or inlet side curtain coating nozzle and is suited in order to transmit the coating medium absorbed from the coating unit on the guiding plate or to collect and/or discharge the medium separated from the other medium. The coating units are formed as grooves and/or tubs and are arranged parallel to the running fiber material web.

Description

Die Erfindung betrifft eine Vorrichtung zum mindestens zweischichtigen Auftragen wenigstens eines flüssigen bis pastösen Auftragsmediums auf eine sich in Laufrichtung bewegende Papier-, Karton- oder andere Faserstoffbahn, aufweisend oberhalb der Faserstoffbahn angeordnete Vorhangauftragsdüsen für das Auftragen der mindestens zwei Mediumsschichten, wobei die Anzahl an Vorhangauftragsdüsen der Anzahl der aufzubringenden Mediumsschichten entspricht und wobei jede Auftragsdüse einen sich im wesentlichen schwerkraftbedingt bewegenden Vorhang abgibt und wobei zwischen den Vorhangauftragsdüsen und der Faserstoffbahn Auffangeinrichtungen zum separaten Auffangen jedes Vorhanges vorgesehen sind.The The invention relates to a device for at least two-layered Apply at least one liquid to pasty Application medium on a moving in the direction of paper, Cardboard or other fibrous web, having above the fibrous web arranged curtain application nozzles for application the at least two media layers, wherein the number of curtain applicator nozzles the number of medium layers to be applied and corresponds each applicator nozzle is essentially gravitational emits moving curtain and being between the curtain application nozzles and the fibrous web collecting means for separate collection each curtain are provided.

Eine derartige Vorrichtung ist aus der DE 103 59 122 A1 bekannt. Allerdings ist diese Vorrichtung recht aufwändig in ihrer Konstruktion. Außerdem nehmen die nebeneinander und kreuzweise übereinander angeordneten Rinnen bei bestimmten Maschinenbreiten einen so großen Platz ein, dass dieser nur schlecht vom Bedienpersonal der Vorrichtung eingesehen werden kann.Such a device is known from DE 103 59 122 A1 known. However, this device is quite expensive in its construction. In addition, take the side by side and crosswise superimposed gutters at certain machine widths so large a place that it can be poorly viewed by the operator of the device.

Der Erfindung liegt die Aufgabe zugrunde, eine Vorrichtung der eingangs genannten Art dahingehend zu verbessern, dass die Nachteile des Standes der Technik nicht auftreten.Of the Invention is the object of a device of the initially mentioned type to improve that the disadvantages of Prior art does not occur.

Die Aufgabe der Erfindung wird dadurch gelöst, dass mindestens zwei Auffangeinrichtungen vorgesehen und mindestens zwei dieser Auffangeinrichtungen in Ebenen übereinander angeordnet sind. Sie bilden damit eine kompakte, raumsparende Baueinheit.The The object of the invention is achieved in that at least two collecting devices provided and at least two of these Receiving devices arranged in layers one above the other are. They thus form a compact, space-saving structural unit.

Sehr vorteilhaft ist dabei, dass die Anzahl an Auffangeinrichtungen mindestens der Anzahl der aufzubringenden Schichten entspricht. Damit ist ein separates Auffangen von unterschiedlichen Medien (Art, Zusammensetzung, Rheologie) möglich. Dabei können auch weniger Auffangeinrichtungen als aufzufangende Medien vorhanden sein. Beispielsweise könnte daran gedacht sein, nur teure vorhandene Medien separat aufzufangen.Very It is advantageous that the number of receiving devices at least the number of layers to be applied. This is a separate one Collection of different media (type, composition, rheology) possible. It can also have fewer receiving devices be present as catching media. For example, could Remember to collect only expensive existing media separately.

Diese übereinander angeordneten Auffangeinrichtungen sind im Wesentlichen parallel übereinander angeordnet.These one above the other arranged collecting devices are substantially parallel to each other arranged.

Ein kreuzweises Abführen bzw. Abführen in Richtung beider Bahnränder und die damit verbundenen aufwändigen Rückführungsmaßnahmen werden bei der erfindungsgemäßen Losung vermieden. Die erfindungsgemäße Vorrichtung ist dennoch kompakt.One criss-cross discharge or discharge in the direction Both web edges and the associated complex Return operations will be carried out at the inventive solution avoided. The inventive Device is still compact.

Ein weiterer Vorteil besteht darin, dass die Auffangeinrichtungen mit anderen Bauteilen, wie einem die Bahn führenden und umlenkenden Airturn nicht kollidieren können.One Another advantage is that the collecting devices with other components, such as the railway leading and deflecting Airturn can not collide.

Darüber hinaus sind die zur Faserstoffbahn über ihre Länge hin geneigten, übereinander angeordneten Auffangeinrichtungen vom Bedienpersonal besser einsehbar und auch handhabbar, d. h. leichter zu reinigen und zu warten als die kreuzweise angeordneten aus dem Stand der Technik.About that In addition to the fibrous web over its length tilted, stacked collecting devices better visible and manageable by operating personnel, d. H. easier too clean and maintain as the crosswise arranged from the stand of the technique.

Das aufgefangene Auftragsmedium kann aufgrund der geneigten Anordnung immer in Laufrichtung der Faserstoffbahn abfließen, wodurch Verstopfungen oder Verkrustungen bzw. Anbackungen auf der Auffangfläche vermieden werden. Reinigungsarbeiten werden, wie gesagt, einfacher oder sind dann seltener notwendig.The Trapped application medium can due to the inclined arrangement always flow in the direction of the fibrous web, which Blockages or encrustations or caking on the collecting surface be avoided. Cleaning, as I said, easier or are less necessary then.

Weitere vorteilhafte Ausgestaltungen ergeben sich aus weiteren Unteransprüchen.Further advantageous embodiments will become apparent from further subclaims.

Anhand von Ausführungsbeispielen soll die Erfindung näher erläutert werden.Based of embodiments, the invention is intended to be closer be explained.

Es zeigen:It demonstrate:

1: eine schematische Darstellung der erfindungsgemäßen Vorrichtung mit zwei hintereinander angeordneten Vorhangauftragsdüsen zum Aufbringen einer Doppelschicht auf eine Papier-, Karton- oder andere Faserstoffbahn in Bereitschaftsposition unmittelbar vor dem Beschichtungsvorgang 1 : A schematic representation of the device according to the invention with two successively arranged curtain application nozzles for applying a double layer on a paper, cardboard or other fibrous web in the ready position immediately before the coating process

2: die Vorrichtung gemäß 1, allerdings in Betriebsposition 2 : the device according to 1 , but in operating position

3: die Vorrichtung von 1 ebenfalls wieder in Bereitschaftsposition, hier allerdings mit verändertem Auffangen der von den Vorhangauftragsdüsen abgegebenen zwei Vorhänge 3 : the device of 1 also in ready position again, here however with changed collection of the two curtains delivered by the curtain applicator nozzles

4: eine weitere Alternative zur 1 bzw. 3 4 : another alternative to 1 respectively. 3

5: eine schematische Darstellung der erfindungsgemäßen Vorrichtung mit drei hintereinander angeordneten Vorhangauftragsdüsen zum Aufbringen einer Dreifachschicht auf eine Papier-, Karton- oder andere Faserstoffbahn in Bereitschaftsposition 5 : A schematic representation of the device according to the invention with three successively arranged curtain application nozzles for applying a triple layer on a paper, cardboard or other fibrous web in the ready position

6: die Vorrichtung gemäß 6, allerdings in Betriebsposition 6 : the device according to 6 , but in operating position

7: die Vorrichtung gemäß 6, ebenfalls wieder in Bereitschaftsposition, hier allerdings mit verändertem Auffangen der von den Vorhangauftragsdüsen abgegebenen drei Vorhänge 7 : the device according to 6 , again in stand-by position, but here with changed interception of the delivered by the curtain applicator nozzles three curtains

8: eine weitere Alternative zur 5 8th : another alternative to 5

9: die Vorrichtung gemäß 8, allerdings in Betriebsposition 9 : the device according to 8th , but in operating position

10: die Vorrichtung gemäß 8 ebenfalls wieder in Bereitschaftsposition, hier allerdings mit verändertem Auffangen der von den Vorhangauftragsdüsen abgegebenen drei Vorhänge 10 : the device according to 8th Again in ready position, here, however, with changed interception of the delivered by the curtain applicator nozzles three curtains

In den Figuren bedeuten gleiche Bezugszeichen gleiche Bauteile bzw. Funktionen. In den einzelnen Figuren soll die Erläuterung nur insoweit erfolgen, wie Änderungen gegenüber vorherigen Figuren bestehen.In the same reference numerals mean the same components or Functions. In the individual figures, the explanation only as far as changes are made previous figures exist.

In der 1 ist schematisch eine erfindungsgemäße Auftragsvorrichtung 1 mit zwei hintereinander angeordneten Vorhangauftragsdüsen 2 und 3.In the 1 is schematically an applicator device according to the invention 1 with two successively arranged curtain application nozzles 2 and 3 ,

Die Anzahl an Vorhangauftragsdüsen 2 und 3 entspricht hierbei der Anzahl der aufzubringenden Mediumsschichten auf eine sich in Laufrichtung L schräg abwärts bewegende Papier-, Karton- oder andere Faserstoffbahn 5. Das heißt die Vorhangauftragsdüse 2 und die Vorhangauftragsdüse 3 erzeugen zwei Schichten bzw. eine nicht extra dargestellte Doppelschicht 4 während des Streichbetriebes, also im Betriebszustand.The number of curtain application nozzles 2 and 3 In this case, the number of medium layers to be applied corresponds to a paper, board or other fibrous web moving obliquely downward in the direction of travel L. 5 , That is the curtain application nozzle 2 and the curtain application nozzle 3 produce two layers or a double layer not shown separately 4 during the coating operation, ie in the operating state.

In 1 soll die die Bereitschaftsposition unmittelbar vor dem Beschichtungsvorgang gezeigt sein. In dieser Position haben sich bereits die von den Vorhangauftragsdüsen 2 und 3 abgegebenen Vorhänge 2a und 3a auf einer unterhalb schräg angeordneten Leitfläche 6 in zwei Lagen übereinander gelegt und bilden nach dem Passieren der Leitfläche 6 einen auf die Oberfläche der Faserstoffbahn 5 fallenden, doppelschichtigen Vorhang 6a aus.In 1 should be shown the ready position immediately before the coating process. In this position, already have of the curtain applicator nozzles 2 and 3 delivered curtains 2a and 3a on a diagonally arranged guide surface below 6 superimposed in two layers and form after passing the guide surface 6 one on the surface of the fibrous web 5 falling, double-layered curtain 6a out.

Wie man sieht, sind die beiden Vorhangauftragsdüsen 2 und 3 oberhalb der Faserstoffbahn 5 angeordnet. Sie sind darüber hinaus in ihrem Abstand zur schräg über Leitwalzen 7.1 und 7.2 nach unten laufenden Bahn 5 in unterschiedlicher Höhe angeordnet. Die erste Vorhangauftragsdüse 2 ist höher als die zweite Düse 3 angeordnet. Beide Düsen 2 und 3 sind in waagerechter Richtung, siehe Doppelpfeile a und c und in senkrechter Richtung, siehe Doppelpfeilen b und d, verstellbar. Dies kann im einfachsten Fall manuell erfolgen. Damit ist sowohl ein horizontaler Abstand y zwischen den beiden Vorhangauftragsdüsen 2 und 3 und jeweils ein vertikaler Abstand z1 und z2 zur Faserstoffbahn 5 hin einstellbar.As you can see, the two curtain application nozzles 2 and 3 above the fibrous web 5 arranged. In addition, they are at an angle to the guide rollers 7.1 and 7.2 down moving track 5 arranged at different heights. The first curtain application nozzle 2 is higher than the second nozzle 3 arranged. Both nozzles 2 and 3 are in horizontal direction, see double arrows a and c and in vertical direction, see double arrows b and d, adjustable. This can be done manually in the simplest case. This is both a horizontal distance y between the two curtain applicator nozzles 2 and 3 and in each case a vertical distance z1 and z2 to the fibrous web 5 adjustable.

Im Raum zwischen den beiden Vorhangauftragsdüsen 2 und 3 und der hier schräg nach unten laufenden Faserstoffbahn 5 ist mindestens eine der Breites der Vorhänge bzw. der Vorrichtung 1 angepasste Auffangeinrichtung 8 für die Vorhänge 2a und 3a vorgesehen.In the space between the two curtain application nozzles 2 and 3 and the here obliquely downgoing fibrous web 5 is at least one of the width of the curtains or the device 1 adapted catcher 8th for the curtains 2a and 3a intended.

Im Beispiel gemäß der 1 besteht die Auffangeinrichtung 8 aus zwei parallelen Auffangrinnen bzw. Auffangwannen 8.1 und 8.2, die übereinander angeordnet und miteinander verbunden sind. Deren Anzahl entspricht im Übrigen hier genau der Anzahl der getrennt voneinander aufzufangenden Vorhänge 2a und 3a bzw. der daraus resultierenden zwei Schichten, bzw. der Doppelschicht 4. Die Auffangeinrichtungen 8.1, 8.2 bilden dabei zwei Ebenen I und II, wobei sie so angeordnet sind, dass aus jeder Ebene I, II das vom jeweiligen Vorhang 2a, 3a abgegebene Auftragsmedium M1, M2 in Laufrichtung L der Faserstoffbahn 5 nach unten und in Richtung der laufenden Faserstoffbahn abfließen kann.In the example according to the 1 there is the catcher 8th from two parallel gutters or drip pans 8.1 and 8.2 which are arranged one above the other and connected to each other. Incidentally, their number here corresponds exactly to the number of curtains to be collected separately from each other 2a and 3a or the resulting two layers, or the double layer 4 , The reception facilities 8.1 . 8.2 form two levels I and II, where they are arranged so that from each level I, II of the respective curtain 2a . 3a dispensed application medium M1, M2 in the direction L of the fibrous web 5 can flow down and in the direction of the continuous fibrous web.

Wichtig dabei ist, dass eine der Auffangrinnen, das ist im Beispiel die untere Rinne 8.1, sowohl ein einzelnes Medium, als auch aus allen Vorhängen resultierendes Medium M1, M2 (bzw. Mn bei weiteren Vorhängen bzw. aufzubringenden Schichten), welches über die Leitfläche 6 abläuft, auffangen kann.It is important that one of the gutters, that is the lower gutter in the example 8.1 , both a single medium, as well as from all curtains resulting medium M1, M2 (or Mn in other curtains or applied layers), which over the guide surface 6 expires, can catch.

Wie aus der 1 erkennbar, sind die Rinnen 8.1 und 8.2 über Verbindungsstege 9 miteinander verbunden und als kompakte Einheit oberhalb der Bahnumienkwalze 7.2 angeordnet, von der bzw. zu der sie in Pfeilrichtung "e" an- und abschwenkbar sind. Das Abschwenken können rotatorische oder translatorische Bewegungen sein. Dadurch hat das Bedienpersonal der Vorrichtung genügend Platz für die Überwachung und Wartung sowohl in der Betriebs-, als auch in der Wartungs- oder Bereitschaftsposition der Vorrichtung.Like from the 1 recognizable, are the gutters 8.1 and 8.2 over connecting bridges 9 connected together and as a compact unit above the Bahnumienkwalze 7.2 arranged, from and to which they are in the direction of arrow "e" and swung back and forth. The pivoting can be rotational or translational movements. Thus, the operator of the device has enough space for monitoring and maintenance in both the operating, as well as in the maintenance or standby position of the device.

In Laufrichtung L der Faserstoffbahn gesehen, ist vor der ersten Vorhangauftragsdüse 2 noch eine weitere Auffangeinrichtung bzw. Auffangrinne bzw. – wanne 10 vorhanden, die in den ersten Vorhang 2a zum getrennten Auffangen dieses Vorhanges gemäß Pfeilrichtung f hineingefahren werden kann.Seen in the running direction L of the fibrous web is in front of the first curtain application nozzle 2 Yet another catcher or gutter or trough 10 present in the first curtain 2a for separate collection of this curtain according to the direction of arrow f can be driven.

Diese Rinne 10 ist geeignet, das von ihr aufgefangene Auftragsmedium an die Leitfläche 6 bzw. ein Führungsblech weiterzugeben.This groove 10 is suitable, the captured by her order medium to the guide surface 6 or pass on a guide plate.

Diese Leitfläche 6 ist geneigt angeordnet und daher auch geeignet, aufgefangenes Auftragsmedium, resultierend von einem einzelnen oder von mehreren Vorhängen, an die zu beschichtende Faserstoffbahn 5 weiterzugeben.This guide surface 6 is arranged inclined and therefore also suitable trapped application medium, resulting from a single or multiple curtains, to be coated fibrous web 5 pass.

Oberhalb der ersten Leitwalze 7.1 ist auch ein sogenannter Aircut 11 kurz oberhalb der Faserstoffbahn 5 vorhanden, um die mit der schnell laufenden Bahn 5 mitströmende Luftschichten entfernen bzw. von den Vorhängen 2a und 3a fernhalten zu können. Auch dieser Aircut ist in horizontaler Richtung zwecks notwendiger Überführvorgänge der Faserstoffbahn verschiebbar, wie mit Doppelpfeil g angegeben ist.Above the first guide roller 7.1 is also a so-called Aircut 11 just above the fibrous web 5 available to those with the fast-moving train 5 remove co-flowing layers of air or from the curtains 2a and 3a to be able to keep away. Also this Aircut is in horizontal Rich for the purpose of necessary transfer operations of the fibrous web displaceable, as indicated by double arrow g.

Die 2 zeigt ebenfalls die in 1 dargestellte Vorrichtung 1, wobei die 2 die Betriebsposition darstellt.The 2 also shows the in 1 illustrated device 1 , where the 2 represents the operating position.

Man erkennt, dass die Vorhangauftragsdüsen 2 und 3 ihre Vorhänge 2a und 3a an die darunter befindliche Leitfläche 6 abgeben, von der der gemeinsame doppelschichtige Vorhang 6a direkt auf die Oberfläche der Faserstoffbahn 5 als Doppelschicht 4 gelangt. Die Auffangeinrichtung 8 mit ihren einzelnen Rinnen 8.1 und 8.2 bleiben hier unbenutzt. Ebenso bleibt die Auffangrinne 10 unbenutzt.It can be seen that the curtain application nozzles 2 and 3 their curtains 2a and 3a to the underlying guide surface 6 from which the common double-layered curtain 6a directly on the surface of the fibrous web 5 as a double layer 4 arrives. The catcher 8th with their individual gutters 8.1 and 8.2 stay here unused. Likewise, the gutter remains 10 unused.

Die 3 zeigt ebenfalls wieder die Vorrichtung gemäß der 1 bzw. 2 in einer Bereitschaftsposition, bei der alle Auftragsmedien, bzw. der Vorhang 2a und auch der Vorhang 3a getrennt voneinander aufgefangen werden. Die Vorhangauftragsdüse 2 ist deshalb weiter nach links verschoben worden, damit die Auffangeinrichtung 10 hier für den Vorhang 2a Platz hat. Auch die Vorhangauftragsdüse 3 ist verschoben, aber hier nach rechts, so dass sie oberhalb der Auffangeinrichtung 8 bzw. der übereinander angeordneten Auffangrinnen 8.1 und 8.2 steht, so dass der Vorhang 3a in die obere Rinne 8.2 gelangen und von da aus abfließen kann. Im Übrigen besitzt die Auffangrinne 10 einen Überlauf 10a zur Leitfläche 6, so dass der Farbstrom schnell und definiert zwischen den Positionen 10 und 6 bei deren relativer Bewegung zueinander wechseln kann.The 3 again shows the device according to the 1 respectively. 2 in a standby position where all job media, or the curtain 2a and also the curtain 3a be collected separately from each other. The curtain application nozzle 2 has therefore been moved further to the left, so the catcher 10 here for the curtain 2a Has space. Also the curtain application nozzle 3 is moved, but here to the right, so they are above the catcher 8th or the collecting troughs arranged one above the other 8.1 and 8.2 stands, so the curtain 3a in the upper channel 8.2 reach and drain from there. Incidentally, has the gutter 10 an overflow 10a to the guide surface 6 so that the color flow is fast and defined between positions 10 and 6 in their relative movement can switch to each other.

Die 4 stellt eine Alternative zur in 3 gezeigten Vorrichtung 1 in Bereitschaftsposition dar. Anstelle des ersten Vorhangs 2a mit der Einzel-Auffangeinrichtung bzw. -rinne 10 aufzufangen, wird hier nur die Leitfläche 6 benutzt. Von der Leitfläche 6 aus fließt das Medium M1 weiter stromabwärts in die untere Rinne 8.1 der kompakten Auffangeinrichtung 8. Der Vorhang 3a bzw. das Medium M2 gelangt wie bei 3 in die obere Rinne 8.2.The 4 represents an alternative to in 3 shown device 1 in the ready position. Instead of the first curtain 2a with the individual catcher or gutter 10 to catch, here is only the guide surface 6 used. From the guide surface 6 From the medium M1 flows further downstream into the lower channel 8.1 the compact catcher 8th , The curtain 3a or the medium M2 arrives as at 3 in the upper channel 8.2 ,

In 5 ist schematisch eine weitere erfindungsgemäße Vorrichtung in Bereitschaftsposition dargestellt und mit 20 bezeichnet. Diese Vorrichtung entspricht im Wesentlichen jener von 1, weshalb die aus den vorherigen Figuren benutzten Bezugszeichen prinzipiell beibehalten, aber um den Betrag 20 vermehrt angegeben werden.In 5 schematically another device according to the invention shown in the ready position and with 20 designated. This device essentially corresponds to that of 1 Therefore, the reference numerals used from the previous figures are kept in principle, but by the amount 20 be increasingly indicated.

Im Beispiel der 5 sind drei hintereinander angeordnete Vorhangauftragsdüsen vorhanden, d. h. eine erste Vorhangauftragsdüse 22, eine zweite Vorhangauftragsdüse 23 und zusätzlich eine dritte Vorhangauftragsdüse 50 zwecks Aufbringen einer Dreifachschicht 24 auf eine Papier-, Karton- oder andere Faserstoffbahn 25. Alle Düsen 22, 23, 50 sind oberhalb der Leitfläche 26 angeordnet, so dass ein gemeinsamer Ablauf aller drei Medien M1, M2, und M3 in die untere bzw. die erste Auffangrinne 28.1 der kompakten Auffangeinrichtung 28 vor (Startvorgang) oder auch nach (Stoppvorgang) dem Beschichtungsprozess erfolgen kann. Die linke Einzelrinne 30 bleibt hierbei unbenutzt und verbleibt in einer nach links versetzten Position.In the example of 5 There are three successively arranged curtain applicator nozzles, ie a first curtain application nozzle 22 , a second curtain application nozzle 23 and additionally a third curtain applicator nozzle 50 for the purpose of applying a triple layer 24 on a paper, cardboard or other fibrous web 25 , All nozzles 22 . 23 . 50 are above the guide surface 26 arranged so that a common flow of all three media M1, M2, and M3 in the lower and the first gutter 28.1 the compact catcher 28 before (startup) or after (stop) the coating process can take place. The left single trough 30 remains unused and remains in a left-shifted position.

Die 6 zeigt die vorher erläuterte Vorrichtung 20 gemäß 5, allerdings nun in Betriebsposition (Streichprozess). Dazu sind die drei Vorhangauftragsdüsen 22, 23 und 50 sowie die darunter befindliche schräg gestellte Leitfläche 26 weiter nach links verschoben, damit der erzeugte dreischichtige Vorhang 26a direkt auf die Oberfläche der Faserstoffbahn 25 fallen kann und dort eine Dreifachschicht 34 bilden kann. Die ebenfalls vorhandenen übereinander angeordneten Auffangeinrichtungen 28, 28.1 und 28.2 bleiben unbenutzt.The 6 shows the previously explained device 20 according to 5 , but now in operating position (painting process). These are the three curtain applicator nozzles 22 . 23 and 50 as well as the slanted guide surface underneath 26 moved further to the left, so that the generated three-layer curtain 26a directly on the surface of the fibrous web 25 can fall and there is a triple layer 34 can form. The likewise existing stacked collecting devices 28 . 28.1 and 28.2 stay unused.

In der 7 ist ebenfalls wieder die Vorrichtung 20 dargestellt, zeigt sie aber wieder in gegenüber 5 veränderten Bereitschaftsposition. Hierbei werden alle drei abgegebenen Medien M1 bis M3 separat und mit verschiedenen Einrichtungen aufgefangen. Der erste Vorhang 22a (M1) wird von der Auffangrinne 30, der zweite Vorhang 23a (M2) von der Führungsfläche 26 und der dritte Vorhang 50a (M3) von der zweiten bzw. oberen Auffangrinne 28.2 der kompakten Auffangeinrichtung 28 aufgefangen. Die Leitfläche 26 transportiert das von ihr aufgefangene Medium an die untere Rinne 28.1 der kompakten Auffangeinrichtung 28.In the 7 is also the device again 20 shown, but shows again in opposite 5 changed standby position. In this case, all three delivered media M1 to M3 are collected separately and with different facilities. The first curtain 22a (M1) is from the gutter 30 , the second curtain 23a (M2) from the guide surface 26 and the third curtain 50a (M3) from the second or upper gutter 28.2 the compact catcher 28 collected. The guide surface 26 transports the medium collected by her to the lower gutter 28.1 the compact catcher 28 ,

Die 8 zeigt eine weitere erfindungsgemäße Vorrichtung 200, weshalb alle Bezugszeichen (das heißt die in den anderen Figuren bereits enthaltenen selben Bauteile) um 200 vermehrt angegeben, aber hier nicht mehr erläutert werden sollen.The 8th shows a further device according to the invention 200 , which is why all reference numerals (that is, the same components already included in the other figures) to 200 increasingly indicated, but should not be explained here.

Diese Variante stellt eine Alternative zur in 5 gezeigten Anordnung dar und arbeitet ebenfalls wieder mit drei nebeneinander angeordneten Vorhangauftragsdüsen, die hier mit 220, 230 und 250 bezeichnet sind. In diesem Ausführungsbeispiel sind anstelle von nur zwei Rinnen, drei Auffangrinnen 228.1, 228.2 und 228.3 vorhanden. Die dritte Auffangrinne 228.3 gehört ebenfalls zur kompakten Auffangeinrichtung 228, weshalb sie eine dritte Ebene III bildet.This variant provides an alternative to in 5 shown arrangement and also works again with three juxtaposed curtain applicator, here with 220 . 230 and 250 are designated. In this embodiment, instead of just two gutters, three gutters 228.1 . 228.2 and 228.3 available. The third gutter 228.3 also belongs to the compact catcher 228 which is why it forms a third level III.

9 zeigt dieselbe Vorrichtung 200, wie bei 8, welche hier aber die Betriebsposition (Beschichtungsvorgang) angibt. Man erkennt einen dreischichtigen Vorhang 226a, resultierend aus den drei Vorhangauftragsdüsen 220, 230, 250 mit den jeweiligen Auftragsmedien M1 bis M3, die sich auf der Leitfläche 226 übereinander legen und gemeinsam ablaufen. Auf der Oberfläche der Faserstoffbahn 225 bilden diese dann eine Dreifachschicht 234. 9 shows the same device 200 , as in 8th , which indicates here but the operating position (coating process). You can see a three-layered curtain 226a resulting from the three curtain application nozzles 220 . 230 . 250 with the respective application media M1 to M3, located on the guide surface 226 superimpose and run together. On the surface of the fibrous web 225 These then form a triple layer 234 ,

Schließlich zeigt die 10 die Vorrichtung 200 in einer gegenüber der 8 veränderten Bereitschaftsposition. Hier werden die von den einzelnen Vorhangauftragsdüsen 220, 230 und 250 abgegebenen drei Vorhänge 220a, 230a und 250a jeweils getrennt voneinander aufgefangen.Finally, the shows 10 the device 200 in one opposite the 8th changed standby position. Here are those of the individual curtain application nozzles 220 . 230 and 250 delivered three curtains 220a . 230a and 250a each collected separately.

Das Medium M1 bzw. der erste Vorhang 220a wird von der Leitfläche 226 zunächst aufgefangen und danach an die unterste bzw. erste Auffangrinne 228.1 (Ebene I) abgegeben. Das Medium M2 bzw. der zweite Vorhang 230a gelangt in die zweite Auffangrinne 228.2 (Ebene II) und das dritte Medium M3 bzw. der Vorhang 250a wird von der dritten, d. h. der obersten Auffangrinne 228.3 (Ebene III) der kompakten Auffangeinrichtung 228 aufgenommen.The medium M1 or the first curtain 220a gets off the baffle 226 first collected and then to the lowest or first gutter 228.1 (Level I). The medium M2 or the second curtain 230a enters the second gutter 228.2 (Level II) and the third medium M3 or the curtain 250a is from the third, ie the uppermost gutter 228.3 (Level III) of the compact catcher 228 added.

Ebenfalls wie die anderen Bereitschaftsfiguren zeigen, kann bei dieser Konfiguration das separat aufgefangene Medium jeweils in Laufrichtung der geneigten Faserstoffbahn 225 gut ablaufen und steht damit separat einer sortenreinen Wiederverwendung bzw. Zufuhr in den Farbkreislauf (ggf. mit entsprechender Aufbereitung, wie Entlüftung, Filterung) zur Verfügung.Also, as the other standby figures show, in this configuration, the separately collected medium can each be in the direction of the inclined fibrous web 225 run well and is thus separately a sort of pure reuse or supply to the paint circuit (possibly with appropriate treatment, such as ventilation, filtering) available.

Nachzutragen ist, dass anstelle der dargestellten zwei bzw. drei Vorhangauftragsdüsen und der zwei bzw. drei übereinander angeordneten Auffangrinnen eine jeweils höhere Anzahl an Bauteilen innerhalb der betreffenden Vorrichtung denkbar ist.Begrudge is that instead of the illustrated two or three curtain application nozzles and the two or three superposed gutters a higher number of components within each Device is conceivable.

Nachzutragen ist außerdem, dass die in den Figuren gezeigten Anordnungen auch gedreht bzw. die Laufrichtung L der Faserstoffbahn 5, 25, 225 entgegengesetzt sein könnten.It should also be added that the arrangements shown in the figures are also rotated or the running direction L of the fibrous web 5 . 25 . 225 could be opposite.

Die übereinander angeordneten Auffangeinrichtungen 8, 28, 228 können deshalb sowohl der Zulaufseite (das ist jene Seite, an der die Bahn den Vorhangsauftragsdüsen zuläuft), als auch der Ablaufseite (das ist jene Seite, von der die Bahn von den Vorhangsauftragsdüsen weg- bzw. abläuft) zugeordnet sein. Da der Aircut 11 sich an der Zulaufseite befindet, ist aber die Anordnung der übereinander angeordneten Auffangeinrichtungen an der besagten Ablaufseite günstiger, wodurch Platzkonflikte mit dem Aircut vermieden werden.The stacked collecting devices 8th . 28 . 228 Therefore, both the feed side (that is, the side where the web approaches the curtain application nozzles) and the drain side (that is, the side from which the web is away from the curtain application nozzles) may be associated. As the Aircut 11 is located on the inlet side, but the arrangement of stacked collecting devices on the said outlet side is cheaper, causing space conflicts with the Aircut be avoided.

Sind die besagten Ablaufeinrichtungen – wie in den Figuren gezeigt- an der Ablaufseite angeordnet, so läuft die Faserstoffbahn über die Umlenkeinrichtung und von dieser aus nach unten weg. An der Auftrefflinie der Vorhänge ist in diesem Fall eine fallende Bahnführung vorteilhaft.are said drainage devices - as shown in the figures- arranged on the discharge side, the fibrous web runs over the deflection and from this downwards away. At the impact line the curtains in this case is a falling web guide advantageous.

Sind die besagten übereinander angeordneten Ablaufeinrichtungen – wie in den Figuren nicht gezeigt- an der Zulaufseite angeordnet, so läuft die Faserstoffbahn von unten nach oben und danach über die Umlenkeinrichtung den Vorhangauftragsdüsen zu. An der Auftrefflinie der Vorhänge ist in diesem Fall eine steigende Bahnführung vorteilhaft.are the said stacked drainage devices - such not shown in the figures on the inlet side, so The fibrous web runs from bottom to top and then over the deflection to the curtain applicator nozzles. At the The impact line of the curtains is a rising one in this case Web guide advantageous.

Die Bahnführung der jeweils anderen Seite ist beliebig gestaltbar.The Web guide of the other side can be designed as desired.

1, 20, 2001, 20, 200
Vorrichtungcontraption
2, 22, 2202, 22, 220
erste Vorhangauftragsdüsefirst Vorhangauftragsdüse
2a, 22a, 220a2a, 22a, 220a
Vorhangcurtain
3, 23, 2303, 23, 230
zweite Vorhangauftragsdüsesecond Vorhangauftragsdüse
3a, 23a, 230a3a, 23a, 230a
Vorhangcurtain
44
Doppelschichtbilayer
5, 25, 2255, 25, 225
FaserstoffbahnFibrous web
6, 26, 2266 26, 226
Leitflächebaffle
6a6a
doppelschichtiger Vorhangdouble layer curtain
7.1, 7.27.1 7.2
Leitwalzeguide roll
8, 28, 2288th, 28, 228
Auffangeinrichtungcatcher
8.1, 28.1, 228.18.1 28.1, 228.1
Auffangrinne bzw. -wannecollecting channel or tub
8.2, 28.2, 228.28.2 28.2, 228.2
zweite Auffangrinne bzw. -wannesecond Gutter or trough
228.3228.3
dritte Auffangrinne bzw. -wannethird Gutter or trough
9, 299 29
Verbindungsstegconnecting web
10, 3010 30
Auffangeinrichtungcatcher
1111
AircutAircut
26a, 226a26a, 226a
dreischichtiger Vorhangthree-layer curtain
34, 23434 234
DreifachschichtTriple layer
250250
dritte Vorhangauftragsdüsethird Vorhangauftragsdüse
a, b, c, d, e, fa, b, c, d, e, f
Verstellrichtungadjustment
I, II, IIII, II, III
Ebenelevel
LL
Laufrichtungdirection
M1M1
erstes Mediumfirst medium
M2M2
zweites Mediumsecond medium
M3M3
drittes Mediumthird medium
YY
Abstanddistance
z, z1, z2z, z1, z2
Abstanddistance

ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list The documents listed by the applicant have been automated generated and is solely for better information recorded by the reader. The list is not part of the German Patent or utility model application. The DPMA takes over no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • - DE 10359122 A1 [0002] - DE 10359122 A1 [0002]

Claims (17)

Vorrichtung (1, 20, 200) zum mindestens zweischichtigen Auftragen wenigstens eines flüssigen bis pastösen Auftragsmediums (M1, M2, M3) auf eine sich in Laufrichtung (L) bewegende Papier-, Karton- oder andere Faserstoffbahn (5, 25, 225), aufweisend oberhalb der Faserstoffbahn angeordnete Vorhangauftragsdüsen (2, 3, 22, 23, 220, 230, 250) für das Auftragen der mindestens zwei Mediumsschichten (4), wobei die Anzahl an Vorhangauftragsdüsen (2, 3, 22, 23, 220, 230, 250) der Anzahl der aufzubringenden Mediumsschichten entspricht und wobei jede Vorhangauftragsdüse (2, 3, 22, 23, 220, 230, 250) einen sich im wesentlichen schwerkraftbedingt bewegenden Vorhang (2a, 3a, 22a, 23a, 220a, 230a, 250a) abgibt, und wobei Auffangeinrichtungen (8, 28, 228) zum Auffangen der Vorhänge (2a, 3a, 22a, 23a, 220a, 230a, 250a) vorgesehen sind, dadurch gekennzeichnet, dass mindestens zwei Auffangeinrichtungen (8, 28, 228) vorgesehen sind und mindestens zwei dieser Auffangeinrichtungen in Ebenen (I, II, III) übereinander angeordnet sind.Contraption ( 1 . 20 . 200 ) for applying at least two layers of at least one liquid to pasty application medium (M1, M2, M3) to a paper, board or other fibrous web moving in the running direction (L) ( 5 . 25 . 225 ), comprising above the fibrous web arranged curtain applicator nozzles ( 2 . 3 . 22 . 23 . 220 . 230 . 250 ) for the application of the at least two medium layers ( 4 ), whereby the number of curtain applicator nozzles ( 2 . 3 . 22 . 23 . 220 . 230 . 250 ) corresponds to the number of medium layers to be applied, and wherein each curtain applicator nozzle ( 2 . 3 . 22 . 23 . 220 . 230 . 250 ) a curtain moving substantially by gravity ( 2a . 3a . 22a . 23a . 220a . 230a . 250a ) and receiving devices ( 8th . 28 . 228 ) to catch the curtains ( 2a . 3a . 22a . 23a . 220a . 230a . 250a ) are provided, characterized in that at least two receiving devices ( 8th . 28 . 228 ) are provided and at least two of these collecting devices in planes (I, II, III) are arranged one above the other. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Anzahl an Auffangeinrichtungen (8, 28, 228) mindestens der Anzahl der aufzubringenden Schichten (4, 34, 234) entspricht.Apparatus according to claim 1, characterized in that the number of receiving devices ( 8th . 28 . 228 ) at least the number of layers to be applied ( 4 . 34 . 234 ) corresponds. Vorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die in Ebenen (I, II, III) übereinander angeordneten Auffangeinrichtungen (8, 28, 228) baulich miteinander verbunden sind.Apparatus according to claim 1 or 2, characterized in that in levels (I, II, III) arranged one above the other receiving devices ( 8th . 28 . 228 ) are structurally connected. Vorrichtung nach Anspruch 3, dadurch gekennzeichnet, dass die Auffangeinrichtungen (8, 28, 228) miteinander verbunden sind, wofür beispielsweise Verbindungsstege (9), Schraub-, Schweiß-, oder Steckverbindungen vorgesehen sind.Apparatus according to claim 3, characterized in that the collecting means ( 8th . 28 . 228 ), for which, for example, connecting webs ( 9 ), Screw, welding or plug connections are provided. Vorrichtung nach wenigstens einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass die mindestens zwei in Ebenen übereinander angeordneten Auffangeinrichtungen (8, 28, 228) parallel zueinander derart angeordnet sind, dass aus jeder Auffangeinrichtung bzw. aus jeder Ebene (I, II, III) das vom jeweiligen Vorhang (2a, 3a) abgegebene Auftragsmedium (M1, M2) in Laufrichtung (L) der Faserstoffbahn (5, 25, 225) abfließt.Device according to at least one of the preceding claims, characterized in that the at least two collecting devices arranged one above another in planes ( 8th . 28 . 228 ) are arranged parallel to one another such that from each catching device or from each plane (I, II, III) that of the respective curtain ( 2a . 3a ) delivered application medium (M1, M2) in the running direction (L) of the fibrous web ( 5 . 25 . 225 ) drains off. Vorrichtung nach wenigstens einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass die Auffangeinrichtungen (8, 28, 228) in Laufrichtung (L) der Faserstoffbahn (5, 25, 225) gesehen, der letzten Vorhangauftragsdüse (3, 50, 250) nachgeordnet sind.Device according to at least one of claims 1 to 5, characterized in that the collecting devices ( 8th . 28 . 228 ) in the running direction (L) of the fibrous web ( 5 . 25 . 225 ), the last curtain applicator nozzle ( 3 . 50 . 250 ) are subordinate. Vorrichtung nach wenigstens einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass die Auffangeinrichtungen (8, 28, 228) in Laufrichtung (L) der Faserstoffbahn (5, 25, 225) gesehen, der ersten Vorhangauftragsdüse (2, 22, 220) nachgeordnet sind.Device according to at least one of claims 1 to 5, characterized in that the collecting devices ( 8th . 28 . 228 ) in the running direction (L) of the fibrous web ( 5 . 25 . 225 ), the first curtain application nozzle ( 2 . 22 . 220 ) are subordinate. Vorrichtung nach wenigstens einem vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Auffangeinrichtungen (8, 28, 228) an der Ablaufseite der Faserstoffbahn angeordnet sind.Device according to at least one of the preceding claims, characterized in that the collecting devices ( 8th . 28 . 228 ) are arranged on the discharge side of the fibrous web. Vorrichtung nach wenigstens einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass die Auffangeinrichtungen (8, 28, 228) an der Zulaufseite der Faserstoffbahn angeordnet sind.Device according to at least one of claims 1 to 7, characterized in that the collecting devices ( 8th . 28 . 228 ) are arranged on the inlet side of the fibrous web. Vorrichtung nach wenigstens einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass die Auffangeinrichtungen (8, 28, 228) oberhalb einer Umlenkeinrichtung (7.2, 27.2, 227.2) für die sich in Laufrichtung (L) bewegende Faserstoffbahn (5, 25, 225) angeordnet sind.Device according to at least one of the preceding claims, characterized in that the collecting devices ( 8th . 28 . 228 ) above a deflection device ( 7.2 . 27.2 . 227.2 ) for the in the running direction (L) moving fibrous web ( 5 . 25 . 225 ) are arranged. Vorrichtung nach wenigstens einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass unterhalb der Vorhangauftragsdüsen (2, 3, 22, 23, 220, 230, 250) während des Streichbetriebes ein über alle Düsen reichendes und bis in Höhe einer der übereinander angeordneten Auffangeinrichtungen (8, 28, 228) bzw. Ebenen (I, II, III) Führungblech (6, 26, 226) angeordnet ist.Device according to at least one of the preceding claims, characterized in that below the curtain application nozzles ( 2 . 3 . 22 . 23 . 220 . 230 . 250 ) during the coating operation a reaching across all nozzles and up to the level of one of the stacked collecting devices ( 8th . 28 . 228 ) or levels (I, II, III) guide plate ( 6 . 26 . 226 ) is arranged. Vorrichtung nach Anspruch 11, dadurch gekennzeichnet, dass die Vorhangauftragsdüsen (2, 3, 22, 23, 220, 230, 250), das Führungsblech (6, 26, 226) und/oder die Auffangeinrichtungen (8, 28, 228) relativ zueinander bewegbar sind.Apparatus according to claim 11, characterized in that the curtain application nozzles ( 2 . 3 . 22 . 23 . 220 . 230 . 250 ), the guide plate ( 6 . 26 . 226 ) and / or the reception facilities ( 8th . 28 . 228 ) are movable relative to each other. Vorrichtung nach Anspruch 11 oder 12, dadurch gekennzeichnet, dass das Führungsblech (6, 26, 226) im Wesentlichen parallel zur laufenden Faserstoffbahn (5, 25, 225) angeordnet und geeignet ist, um von einem einzelnen oder von mehreren Vorhängen (2a, 3a, 22a, 23a, 220a, 230a, 250a) aufgefangenes Auftragsmedium (M1, M2, M3, Mn) an eine der übereinander angeordneten Auffangeinrichtungen (8, 28, 228), vorzugsweise an die unterste Auffangeinrichtung (8.1; 28.1; 228.1) weiterzugeben.Apparatus according to claim 11 or 12, characterized in that the guide plate ( 6 . 26 . 226 ) substantially parallel to the running fibrous web ( 5 . 25 . 225 ) and is adapted to be separated from a single or multiple curtains ( 2a . 3a . 22a . 23a . 220a . 230a . 250a ) collected order medium (M1, M2, M3, Mn) to one of the stacked receiving devices ( 8th . 28 . 228 ), preferably to the lowest collecting device ( 8.1 ; 28.1 ; 228.1 ) pass on. Vorrichtung nach Anspruch 10 bis 13, dadurch gekennzeichnet, dass das Führungsblech (6, 26, 226) geeignet ist, um von einem einzelnen oder von mehreren Vorhängen (2a, 3a, 22a, 23a, 220a, 230a, 250a) aufgefangenes Auftragsmedium (M1, M2, M3, Mn) an die zu beschichtende Faserstoffbahn (5, 25, 225) weiterzugeben.Apparatus according to claim 10 to 13, characterized in that the guide plate ( 6 . 26 . 226 ) is suitable for use with a single or multiple curtains ( 2a . 3a . 22a . 23a . 220a . 230a . 250a ) collected coating medium (M1, M2, M3, Mn) to the fibrous web to be coated ( 5 . 25 . 225 ) pass on. Vorrichtung nach wenigstens einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass eine weitere Auffangeinrichtung (10, 30) vorzugsweise der ersten bzw. zulaufseitig angeordneten Vorhangauftragsdüse (22, 220) zuordenbar bzw. unter diese oder von dieser weg schiebbar ist, wobei diese weitere Auffangeinrichtung (10, 30) geeignet ist, um das von ihr aufgefangene Auftragsmedium (M1) an das Führungsblech (6, 26) weiterzugeben oder um aufgefangenes Medium separat von den anderen Medien zu sammeln bzw. abzuführen.Device according to at least one of the preceding claims, characterized in that a further collecting device ( 10 . 30 ) preferably the first or inlet side arranged curtain application nozzle ( 22 . 220 ) or un ter is slidable or away from this, this further collecting device ( 10 . 30 ) is suitable to the order captured by her application medium (M1) to the guide plate ( 6 . 26 ) or to collect collected media separately from the other media or dissipate. Vorrichtung nach wenigstens einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass die Auffangeinrichtungen (10, 30, 8.1, 8,2, 28.1, 28.2, 228.1; 228.2, 228.3) als Rinnen bzw. Wannen ausgebildet sind.Device according to at least one of the preceding claims, characterized in that the collecting devices ( 10 . 30 . 8.1 . 8th . 2 . 28.1 . 28.2 . 228.1 ; 228.2 . 228.3 ) are formed as gutters or trays. Vorrichtung nach wenigstens einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass dass die Auffangeinrichtungen (8, 28, 228) annähernd parallel zur laufenden Faserstoffbahn (5, 25, 225) hin geneigt angeordnet sind.Device according to at least one of the preceding claims, characterized in that the collecting devices ( 8th . 28 . 228 ) approximately parallel to the running fibrous web ( 5 . 25 . 225 ) are arranged inclined towards.
DE200710000775 2007-09-27 2007-09-27 Device for double layered coating of liquid to pasty coating medium on paper, cardboard or other fiber material web moving in running direction, comprises two curtain coating nozzles arranged above the fiber material web Withdrawn DE102007000775A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE200710000775 DE102007000775A1 (en) 2007-09-27 2007-09-27 Device for double layered coating of liquid to pasty coating medium on paper, cardboard or other fiber material web moving in running direction, comprises two curtain coating nozzles arranged above the fiber material web

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200710000775 DE102007000775A1 (en) 2007-09-27 2007-09-27 Device for double layered coating of liquid to pasty coating medium on paper, cardboard or other fiber material web moving in running direction, comprises two curtain coating nozzles arranged above the fiber material web

Publications (1)

Publication Number Publication Date
DE102007000775A1 true DE102007000775A1 (en) 2009-04-02

Family

ID=40383953

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200710000775 Withdrawn DE102007000775A1 (en) 2007-09-27 2007-09-27 Device for double layered coating of liquid to pasty coating medium on paper, cardboard or other fiber material web moving in running direction, comprises two curtain coating nozzles arranged above the fiber material web

Country Status (1)

Country Link
DE (1) DE102007000775A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008054916A1 (en) 2008-12-18 2010-07-01 Voith Patent Gmbh Curtain coater for coating moving paper-, cardboard- or other fibrous material web with liquid to pasty coating medium in form of single- or multi-layered curtain, comprises curtain coating head, by which curtain falls on substrate surface

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10359122A1 (en) 2003-12-17 2005-07-14 Voith Paper Patent Gmbh applicator

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10359122A1 (en) 2003-12-17 2005-07-14 Voith Paper Patent Gmbh applicator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008054916A1 (en) 2008-12-18 2010-07-01 Voith Patent Gmbh Curtain coater for coating moving paper-, cardboard- or other fibrous material web with liquid to pasty coating medium in form of single- or multi-layered curtain, comprises curtain coating head, by which curtain falls on substrate surface

Similar Documents

Publication Publication Date Title
DE2707536A1 (en) DEVICE FOR APPLYING LIQUID TO MOVING MATERIAL
DE102007029646A1 (en) Application process as well as curtain applicator
EP2533907B1 (en) System for coating, in particular painting, objects, in particular vehicle bodies
DE102008040403A1 (en) Curtain applicator
EP1544353A1 (en) Curtain coater
DE102008040419A1 (en) Curtain-coating unit for coating paper, cardboard or other fiber web with fluid to pasty coating medium in the form of single or multilayered curtain, comprises a discharge nozzle, a drip pan and/or an air barrier removing unit
EP2277630A2 (en) Device for coating a strip of material passing through a system
EP2396121A1 (en) Curtain application unit
DE102007000775A1 (en) Device for double layered coating of liquid to pasty coating medium on paper, cardboard or other fiber material web moving in running direction, comprises two curtain coating nozzles arranged above the fiber material web
EP2198975B1 (en) Curtain application unit
DE102005036667A1 (en) Application process
EP2111925A1 (en) Curtain application device
DE102007000776A1 (en) Device for applying single-layer or multi-layer curtains with a liquid to pasty application medium on a moving paper-, cardboard- or other fibrous-material web, comprises an application unit, and a deflecting plate and/or collecting groove
WO2005059250A1 (en) Curtain application system
EP1818450B1 (en) Curtain-coater
EP2596171B1 (en) Curtain applicator
EP2014376A2 (en) Curtain coating machine
EP2082811A2 (en) Multiple curtain painting device
DE102008040405A1 (en) Curtain-coating unit for coating a moving paper, cardboard or other fiber web with fluid to pasty coating medium, comprises a curtain coating head arranged above the fiber material web for obtaining single or multi-layered curtain
DE102007000779A1 (en) Device for applying a liquid to pasty application medium onto a machine for the production and/or conversion of moving paper-, cardboard- or other fibrous-material web, comprises curtain application nozzles, and a sliding plate
DE102008040414A1 (en) Curtain-coating unit for coating a moving paper, cardboard or other fiber web with fluid to pasty coating medium in the form of one or more layered curtain, comprises a function unit of curtain coating head and drip pan
EP2070600B1 (en) Method for coating a running web of paper, cardboard or another fibrous material using curtain coating
DE102007034838A1 (en) applicator
DE102008040406A1 (en) Curtain applicator
DE102008040402A1 (en) Curtain-coating unit for coating a moving paper, cardboard or other fiber web with fluid to pasty coating medium in the form of one or more layered curtain, comprises a function unit of curtain coating head and drip pan

Legal Events

Date Code Title Description
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee

Effective date: 20130403