DE102004052854B4 - Method for the long-term storage of caverns and cavern systems - Google Patents

Method for the long-term storage of caverns and cavern systems Download PDF

Info

Publication number
DE102004052854B4
DE102004052854B4 DE102004052854A DE102004052854A DE102004052854B4 DE 102004052854 B4 DE102004052854 B4 DE 102004052854B4 DE 102004052854 A DE102004052854 A DE 102004052854A DE 102004052854 A DE102004052854 A DE 102004052854A DE 102004052854 B4 DE102004052854 B4 DE 102004052854B4
Authority
DE
Germany
Prior art keywords
cavern
suspension
solid
flowable
caverns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Revoked
Application number
DE102004052854A
Other languages
German (de)
Other versions
DE102004052854A1 (en
Inventor
Peter Prof.Dr. Knoll
Kurt Dr. Schmitz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GTS GRUBE TEUTSCHENTHAL SICHER
Gts Grube Teutschenthal Sicherungs & Co KG GmbH
Original Assignee
GTS GRUBE TEUTSCHENTHAL SICHER
Gts Grube Teutschenthal Sicherungs & Co KG GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=36217086&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=DE102004052854(B4) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by GTS GRUBE TEUTSCHENTHAL SICHER, Gts Grube Teutschenthal Sicherungs & Co KG GmbH filed Critical GTS GRUBE TEUTSCHENTHAL SICHER
Priority to DE102004052854A priority Critical patent/DE102004052854B4/en
Publication of DE102004052854A1 publication Critical patent/DE102004052854A1/en
Application granted granted Critical
Publication of DE102004052854B4 publication Critical patent/DE102004052854B4/en
Anticipated expiration legal-status Critical
Revoked legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B1/00Dumping solid waste
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B3/00Destroying solid waste or transforming solid waste into something useful or harmless
    • B09B3/20Agglomeration, binding or encapsulation of solid waste
    • B09B3/25Agglomeration, binding or encapsulation of solid waste using mineral binders or matrix
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/002Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/004Sealing liners
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/16Modification of mine passages or chambers for storage purposes, especially for liquids or gases

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Hydrology & Water Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

Verfahren zur sicheren Langzeitverwahrung von mit gesättigter Sole gefüllter Kavernen und Kavernensysteme im Salzgebirge unter Verwendung der in der Kaverne befindlichen Salzlösung und einem aus Abfallstoffen hergestellten Feststoff, die nach Aufbereitung als Suspension in die Kaverne eingeleitet werden dadurch gekennzeichnet, dass als Baustoff für die Herstellung eines, den Kavernenraum ausfüllenden Festkörpers unter ständiger Aufrechterhaltung der Kavernenbefüllung mit Sole und ggf. eines zusätzlichen stabilisierenden Kopfdruckes schrittweise gesättigte Sole aus der Kaverne entnommen und mit einem feinkörnigen Abfallstoff und einem Bindemittel zu einer fließfähigen und abbindefähigen Feststoffsuspension vermischt werden, die so aufbereitete Feststoffsuspension danach in die Kavernen eingeleitet wird, wo sie ohne Entmischung zum Kavernenboden absinkt und überschusswasserfrei zu einem Festkörpers aushärtet.Method for the safe long-term storage of saturated brine caverns and cavern systems in the salt marshes using the saline solution in the cavern and a solid made from waste materials, which are introduced into the cavern after treatment as a suspension, characterized in that as a building material for the production of a the cavern space-filling solid under constant maintenance of cavern filling with brine and optionally an additional stabilizing head pressure gradually saturated brine taken from the cavern and mixed with a fine-grained waste and a binder to a flowable and settable solid suspension, the so prepared solid suspension then in the caverns is initiated, where it sinks without segregation to the cavern floor and hardens without excess water to a solid.

Figure 00000001
Figure 00000001

Description

Die Erfindung betrifft ein Verfahren zur sicheren Langzeitverwahrung von mit gesättigter Sole gefüllten Kavernen und Kavernensystemen nach endgültiger Aufgabe ihrer bestimmungsgemäßen Verwendung, beispielsweise als Untertagespeicher für fließfähige Medien.The The invention relates to a method for safe long-term storage from with saturated Brine filled Caverns and cavern systems after final abandonment of their intended use, For example, as an underground storage for flowable media.

Kavernen im Salzgebirge werden im Solverfahren durch gezielte Auflösung des Salzgesteins mittels Süßwasser hergestellt. Die dabei entstehende Lösung an weitgehend gesättigter Sole, deren Volumen das entstandene Volumen der Kaverne weit übersteigt, wird entweder einer wirtschaftlichen Nutzung zugeführt oder entsorgt. Um die Standsicherheit der Kaverne zu gewährleisten verbleibt ein Teile der Sole in der Kavernen oder muss gegen ein anderes geeignetes Medium ausgetauscht werden, damit der geostatische Gebirgsdruck kompensiert wird und es in Verbindung mit dem Kriechen des Salzgesteins nicht zu einer zu großen Volumenverringerung kommt oder gar ein Zusammenbruch (Verbruch) der Kaverne eintritt.caverns in the Salzgebirge are in the Solverfahren by targeted dissolution of the Salt rock by means of fresh water produced. The resulting solution is largely saturated Brine, the volume of which far exceeds the volume of the cavern, is either supplied for economic use or disposed of. To ensure the stability of the cavern remains a part of the brine in the caverns or must be against other suitable medium should be exchanged so that the geostatic Mountain pressure is compensated and it in connection with the creep the salt rock does not come to a large volume reduction or even a collapse (break) of the cavern occurs.

Im Speicherbetrieb wird die Sole gegen das zu speichern Medium (Gas oder Flüssigkeit) ausgetauscht und zum Ausspeichern des Speichergutes zwischengelagert, wobei der für die Standsicherheit der Kaverne erforderliche Kaverneninnendruck auch über das in die Kaverne ganz oder teilweise eingelagerte Speichermedium durch dessen Eigengewicht oder einen zusätzlichen Kopfdruck aufrechterhalten werden muss.in the Storage mode will use the brine against the medium to be stored (gas or liquid) exchanged and temporarily stored for the storage of the stored material, being the for Cavity internal pressure required for the stability of the cavern also over the storage medium completely or partially stored in the cavern be maintained by its own weight or an additional head pressure got to.

Durch die nicht vollkommen unterdrückbare Kriechverformung des anstehenden Salzgesteins oder durch andere Defekte an der Kaverne oder an der Kavernenbohrung ist die Nutzungsdauer der Kaverne begrenzt. Kavernen verfügen im allgemeinen über ein sehr großes Volumen von mehreren hundert tausend Kubikmetern, die bei eintretender Instabilität zur einer Beeinträchtigung der Erdoberfläche und der Erdstruktur führen und/oder durch die anhaltende Konvergenz des Salzgesteins zum Austritt hochmineralisierter NaCl-Lösung bzw. von anderen Medien führen, die eine Gefährdung oder zumindest eine erhebliche Beeinträchtigung der Biosphäre nach sich ziehen.By the not completely suppressed creep deformation of the upcoming salt rock or other defects at the cavern or at the cavern bore the useful life of the cavern is limited. Caverns in general about a huge one Volume of several hundred thousand cubic meters, the entering Instability to an impairment the earth's surface and the earth structure and / or by the continued convergence of the rock salt to the exit highly mineralized NaCl solution or from other media, the one hazard or at least a significant impairment of the biosphere after to pull oneself.

Daraus entstehen bei Aufgabe ihrer bestimmungsgemäßen Verwendung Forderungen nach einer stabilen Langzeitverwahrung der Kavernen, um auf Dauer ein Auspressen von in der Regel schädlichen Medien und/oder einen Verbruch der Kavernen zu verhindern. Um dieses Ziel zu erreichen müssen die Konvergenz der Kaverne unterbunden und Mittel und Wege gefunden werden den ständig wirksamen geostatischen Druck auf Dauer wirksam zu kompensieren bzw. die Gebirgsspannungen des anstehenden Salzgesteins auf Dauer sicher aufzunehmen.from that arise in abandonment of their intended use requirements after a stable long-term safekeeping of the caverns, in the long run a squeezing out of usually harmful media and / or one Preventing the caverns from breaking. To reach this goal must they Convergence of cavern prevented and found ways and means be the constant Effectively compensate for effective geostatic pressure over time or the mountain tensions of the upcoming salt rock in the long run to record safely.

Zur sicheren Langzeitverwahrung von Kavernen wurden daher bereits verschiedene Verfahren untersucht. In einem Forschungsvorhaben (BMBF Projekt 02 WA 8937: Gerardi u. a.: Experimentaluntersuchungen zur Ablagerung von Abfällen in Solkavernen; NGS m. b. H; 1989) wurde eine Feststofffüllung der Kavernen mit einem trockenen rieselfähigem Feststoff untersucht und theoretisch für möglich befunden.to safe long-term safekeeping of caverns were therefore already different Procedures examined. In a research project (BMBF project 02 WA 8937: Gerardi u. a .: Experimental studies on deposition of waste in Solkavernen; NGS m. b. H; 1989) was a solid filling the Caverns with a dry free-flowing solid examined and theoretically for possible.

Der Austausch des zu ihrer Standsicherung in der Kaverne befindlichen Mediums durch einen Feststoff muss aber so geschehen, dass die Kaverne zu keiner Zeit lufterfüllt ist und ständig unter einem zusätzlichen, sichernden Innendruck steht. Anderenfalls würde der Gebirgsdruck, der in großen Teufen von ca. > 500 m bis < 2.000 m, in der sich die Kaverne befindet, ansteht, eine beschleunigte Konvergenz auslösen, die zu erheblichen Schäden an der Kaverne, an der zur Erdoberfläche führenden Kavernenbohrung und an der Erdoberfläche selbst führt.Of the Replacement of the to their stability in the cavern located However, medium through a solid must be done so that the cavern too no time filled with air is and constantly under an additional, locking internal pressure is available. Otherwise, the rock pressure in huge Teufen of about> 500 m to <2,000 m, in which the cavern is located, pending, trigger an accelerated convergence, the to considerable damage at the cavern, at the cavern bore leading to the earth's surface, and at the earth's surface leads yourself.

Für die Anwendung des vorstehend beschriebenen Verfahrens war jedoch die Kaverne zuvor zu entleeren. Mit der Entleerung der Kaverne kann auch der zu ihrer Standsicherheit notwendige Innendruck nicht mehr aufgebracht werden. Das bedeutet, dass die mit Fortfall des sichernden Innendruckes verbundenen Nachteile in Kauf zu nehmen waren. Die Dickstoff-Technologie und die Verfüllung mit rieselförmigem trockenen Feststoff wurde daher als nicht durchführbar verworfen.For the application However, in the above-described method, the cavern was previously to empty. With the emptying of the cavern can also be to their Stability required internal pressure can no longer be applied. This means that with the elimination of the captive internal pressure associated disadvantages were to be accepted. The thick matter technology and the backfilling with free-flowing dry solid was therefore discarded as unworkable.

In einer anderen Untersuchung (D.-A. Becker: Entwicklung und Anwendung eines Nahbereichsmodells zur Analyse der Langzeitsicherheit von Salzkavernen mit chemisch-toxischen Abfällen; GRS mbH und GFS GmbH; GRS 128, 08/1996; FKZ: 02 C 0153 und 02 C 04551) wurde das Dickstoff-Verfahren als weniger gut anwendbar gefunden und eine trockene Schüttung vorgeschlagen. Zur Durchführung dieses Verfahrens ist wiederum eine vollständige Entfernung der NaCl-Lösung aus der Kaverne erforderlich, was aus Gründen der Bergsicherheit, wie vorstehend beschrieben, äußerst bedenklich ist und daher verworfen werden musste. Darüber hinaus ist die Herstellung des Dickstoffes unter Verwendung von Wasser als Anmischflüssigkeiten aufgrund der Wasserlöslichkeit des Salzgebirges nachteilig und löst nach Einbringen des Dickstoffes in die Kaverne unerwünschte Solprozesse in den Kontaktzonen zwischen dem Salzgestein und dem Dickstoff aus.In another study (D.-A. Becker: Development and Application a short-range model for analyzing the long-term safety of salt caverns with chemically toxic waste; GRS mbH and GFS GmbH; GRS 128, 08/1996; FKZ: 02 C 0153 and 02 C 04551), the thick matter method was found to be less applicable and a dry bed proposed. To carry out this Procedure is again a complete removal of the NaCl solution the cavern required what for reasons of mountain safety, as above described, extremely questionable is and therefore had to be discarded. In addition, the production is of the thick substance using water as mixing liquids due to water solubility the salt mountain disadvantageous and dissolves after introduction of thick matter unwanted in the cavern Solprozesse in the contact zones between the salt rock and the Thick matter out.

Bekannt sind ferner Verfahren – beispielsweise DE 27 54 269 A1 und DE 38 17 549 C2 – nach denen geeignete Hohlräume im Salzgestein zur Endlagerung von radioaktiven und anderen umweltgefährdenden Abfällen genutzt und diese Abfälle als feste Gebinde in einer sicheren Umhüllung, die den Kontakt und die Aufnahme von Wasser durch den Abfallstoff verhindert, über eine Rohrtour oder eine Sonde in den Hohlraum eingelagert werden. Eine sichere Langzeitverwahrung von Kavernen ist mit diesen Lösungen ebenfalls nicht möglich, da die eingelagerten Stoffe lediglich lose Verfüllungen bilden, die nicht oder erst nach sehr langer Zeit in der Lage sind, der Konvergenz der Kaverne entgegenzuwirken, die Gebirgsspannungen sicher aufzunehmen und auf das anstehende Gestein zu übertragen.Also known methods - for example DE 27 54 269 A1 and DE 38 17 549 C2 - after which suitable cavities used in the salt rock for the disposal of radioactive and other environmentally hazardous waste and this wastes as solid containers in a safe enclosure, which prevents the contact and the ingestion of water by the waste, are stored in the cavity via a tube or probe. A safe long-term storage of caverns is also not possible with these solutions, since the stored substances form only loose backfills that are not or only after a very long time in a position to counteract the convergence of the cavern, safely absorb the mountain stresses and on the upcoming rocks transferred to.

DE 197 17971 C1 und DE 102 07 969 A1 beschreiben Verfahren zur Herstellung von Dickstoffen zur Verwendung als Bergversatz, der in standsicherheits gefährdete und instabile bergmännisch aufgefahrene Hohlräume und Abbauräume eingebracht wird. Diese Hohl- und Abbauräume sind vor dem Einbringen der aufbereiteten Dickstoffe leer, d. h. nicht verfüllt und in der Regel begehbar. Die Dickstoffe werden unter Einhaltung vorgegebener Bedingungen mit Wasser angemischt und erreichen nach dem Einbringen eine hohe Eigenfestigkeit vor Ort. Damit unterliegen die Dickstoffe den Forderungen an einen „Baustoff-Ersatz”. Für die sichere Langzeitverwahrung von Kavernen ist die technische Lehre aus DE 197 17971 C1 und DE 102 07 969 A1 nicht uneingeschränkt anwendbar, da die Einsatzbedingungen durch die mit gesättigter Sole gefüllten und unter einem Sicherungsinnendruck stehenden Hohlräume von Kavernen völlig anders sind. DE 197 17971 C1 and DE 102 07 969 A1 describe methods for the production of thick materials for use as Bergversatz, which is introduced into stable safety and unstable mined cavities and processing spaces. These cavities and processing spaces are empty before introducing the processed thick matter, ie not filled and usually walkable. The thick materials are mixed in compliance with specified conditions with water and achieve a high intrinsic strength on site after introduction. Thus, the thick fabrics are subject to the requirements for a "building material replacement". For the safe long-term storage of caverns, the technical teaching is out DE 197 17971 C1 and DE 102 07 969 A1 not fully applicable because the conditions of use are very different due to the cavities filled with saturated brine and under an internal pressure of the back-up.

Ein Verfahren zum Ein- oder Endlagern von festen, kleinteiligen Abfallstoffen in Salzkavernen ist ferner aus DE 34 11 998 C2 bekannt. Nach diesem Verfahren wird in sich wiederholenden Stufen fester, feinteiliger Abfallstoff mit der aus der Kaverne entnommenen Steinsalzlösung zu einem pumpfähigen Gemisch aufbereitet und anschließen in die Kavernen eingeleitet, wo die festen Abfallstoffe nach Einschaltung einer Ruhezeit am Boden der Kaverne sedimentieren und den Kavernenhohlraum allmählich verfüllen. Sofern die technischen und technologischen Voraussetzungen bestehen, kann der eingelagerte Feststoff jederzeit wieder entnommen und bei Bedarf einer Wiederverwertung zugeführt werden. Die nach diesem Verfahren aus der Kaverne entnommen Sole dient ausnahmslos als Transportflüssigkeit für das Einbringen der Feststoffe, wobei der infolge der Verfüllung des Kavernenhohlraumes entstehende Überschuss an Sole auf andere Weise entsorgt wird, beispielsweise durch Verpressen oder Versenken in geeignete poröse Gesteinsformationen. Das Verfahren nach DE 34 11 998 C2 ist mit den gleichen Nachteilen, wie vorstehend beschrieben, behaftet und für eine sichere Langzeitverwahrung von solegefüllten Kavernen nicht anwendbar, da die im Kavernenhohlraum sedimentierten Feststoffe, die im wesentliche eine lockere Schüttung bilden, nicht in der Lage sind, die sich aus der Konvergenz des Salzgesteins ergebenden geomechanischen Kräfte aufzunehmen und zu übertragen.A method for storage or disposal of solid, small-scale waste in salt caverns is also out DE 34 11 998 C2 known. According to this process solid, finely divided waste material is treated with the extracted from the cavern rock salt solution to a pumpable mixture and then introduced into the caverns, where the solid waste sediment after switching on a rest period at the bottom of the cavern and gradually fill the cavern cavity. If the technical and technological requirements exist, the stored solid can be removed again at any time and recycled if necessary. The brine extracted by this method from the cavern invariably serves as a transport liquid for the introduction of the solids, whereby the surplus of brine resulting from the backfilling of the cavern cavity is otherwise disposed of, for example by pressing or sinking into suitable porous rock formations. The procedure according to DE 34 11 998 C2 suffers from the same disadvantages as described above and is inapplicable for safe long-term storage of brine-filled caverns, since the solids sedimented in the cavern cavity, which essentially form a loose bed, are unable to recover from the convergence of the salt rock absorb and transmit resulting geomechanical forces.

Ein weiteres Verfahren zur Endlagerung von pumpfähigen Abfallstoffen in Kavernen, die im Salzgestein errichtet worden sind und geschlossen werden sollen, ist aus DE 31 41 884 A1 bekannt. Nach diesem Vorschlag werden den in die Kaverne einzuführenden, wasserhaltigen, flüssigen und pumpfähigen Abfallstoffen, die auch Feststoffe suspendiert enthalten können, lösliche oder gelöste Salze, die unter Bindung von Kristallwasser kristallisieren, oder organische Stoffe, die sich in der flüssigen Phase des Kaverneninhaltes verfestigen oder die Dichte des Kaverneninhaltes erhöhen, oder anderweitige Feststoffe zugeführt. Für die sichere Langzeitverwahrung von solegefüllten Kavernen ist dieser Lösungsvorschlag ebenfalls nicht anwendbar.Another method for the disposal of pumpable waste in caverns that have been built in salt rock and are to be closed, is out DE 31 41 884 A1 known. According to this proposal, the hydrous, liquid and pumpable waste materials to be introduced into the cavern, which may also contain suspended solids, soluble or dissolved salts which crystallize with binding of water of crystallization, or organic substances which solidify in the liquid phase of the cavern content or increase the density of the cavern content, or otherwise fed solids. For the safe long-term storage of brine-filled caverns this solution proposal is also not applicable.

Wenn die den Abfallstoffen zugefügten löslichen oder gelösten Salze tatsächlich unter den in der Kaverne veränderten Temperaturbedingungen ganz oder teilweise unter Bindung von Kristallwasser direkt oder nach chemischer Umwandlung auskristallisieren, bilden sich in der Lösung einzelne Salzkristalle oder Salzkristallgruppen in einer insgesamt breiigen Konsistenz innerhalb des flüssigen Kaverneninhaltes. Es bildet sich jedoch aus dem Kaverneninhalt kein Gesamtfestkörper, der eine eigene Scherfestigkeit besitzt oder im Zeitverlauf entwickelt und somit sofort oder nach einer bestimmten Abbindezeit die Gebirgsspannungen dauerhaft aufnehmen kann. Das gilt ebenso für die Beimengung fester, zerkleinerter Abfallstoffe. Diese sedimentieren am Kavernenboden, ohne einen Festkörper mit Scherfestigkeit zu bilden und setzen der Gebirgskonvergenz keinen ausreichenden Deformationswiderstand entgegen, der die Gebirgsspannungen dauerhaft im Gleichgewicht halten kann. Die Bildung eines Stoffgemenges mit höherer Dichte als der ursprüngliche Kaverneninhalt kann die Geschwindigkeit der Gebirgskonvergenz um einen bestimmten Betrag reduzieren, kann sie jedoch nicht – wie für die Langzeitsicherheit erforderlich – dauerhaft unterbinden.If the added to the waste soluble or dissolved Salts actually among those changed in the cavern Temperature conditions wholly or partially with binding of water of crystallization crystallize out directly or after chemical conversion form yourself in the solution individual salt crystals or salt crystal groups in a total pasty consistency within the liquid cavern content. It However, no total solids is formed from the cavern content has its own shear strength or developed over time and thus immediately or after a certain setting time the rock tensions can record permanently. This also applies to the addition of solid, crushed Waste. These sediment at the bottom of the cavern, without a solid body Shear strength and do not set the mountain convergence sufficient Deformation resistance, the mountain voltages permanently can keep in balance. The formation of a substance mixture with higher Density as the original one Cavern content can increase the speed of mountain convergence However, it can not reduce a certain amount - as it does for long-term security required - permanently prevention.

Es ist weiterhin nicht gewährleistet, dass bei der Umbildung bzw. Kristallisation der zugemischten löslichen oder gelösten Salze die Bildung von freiem Kristallwasser, das den Löseprozess in dem die Kaverne umgebenden leicht löslichen Salzgestein fortsetzen kann, sicher auszuschließen ist.It is still not guaranteed that in the remodeling or crystallization of the admixed soluble or dissolved Salts the formation of free water of crystallization, which is the dissolving process continue in the slightly soluble salt rock surrounding the cavern can, for sure is.

Gegenstand der DD 272 972 A3 sind silikatische Zuschlagstoffe mit denen die Festigkeits- und sonstigen Eigenschaften von selbsterhärtenden, organischen und anorganischen Bindemitteln verbessert werden sollen. Derartig verbesserte Bindemittel werden beispielsweise zur Herstellung zementierter Intervalle in bzw. an Kavernenbohrungen eingesetzt. Einen Hinweis auf die sichere Langzeitverwahrung von Kavernen enthält diese Veröffentlichung nicht.Subject of the DD 272 972 A3 are silicate aggregates with which the strength and other properties of self-hardening, organic and inorganic binders are to be improved. Such improved binders are used, for example, to produce cemented intervals in or on cavern bores. An indication of safe long-term safekeeping caverns does not contain this publication.

Der Erfindung liegt daher die Aufgabe zugrunde ein Verfahren zu entwickeln, mit dem die gesättigte Sole in der Kaverne so verfestigt wird, dass der entstehende Block das Kavernenvolumen vollständig ausfüllt, eine eigene Scherfestigkeit entwickelt und somit in der Lage ist, die Konvergenz zu blockieren und die Gebirgsspannungen sicher aufzunehmen und zu übertragen.Of the The invention is therefore based on the object to develop a method with which the saturated Brine in the cavern is solidified so that the resulting block the cavern volume completely fills developed its own shear strength and thus is able to to block the convergence and to safely absorb the mountain tensions and transfer.

Erfindungsgemäß wird diese Aufgabe durch ein Verfahren nach den Merkmalen des Patentanspruches gelöst. Vorteilhafte Weiterbildungen des erfindungsgemäßen Verfahrens ergeben sich aus den Unteransprüchen 2 bis 13According to the invention this Task by a method according to the features of claim solved. Advantageous developments of the method according to the invention arise from the dependent claims 2 to 13

Um eine mit gesättigter NaCL-Lösung gefüllte Kavernen oder ein äquivalentes Kavernensystem ohne Beeinträchtigung ihrer Standsicherheit auf effektive und kostengünstige Weise dauerhaft und sicher zu verwahren, wird die in der Kaverne enthaltene Sole über eine daraus hergestellte Feststoffsuspension, die in die mit Sole gefüllte Kaverne bodennah eingeleitet wird, zu einem Füllkörper mit Festkörpereigenschaften verfestigt, der in der Lage ist, den geostatischen Gebirgsdruck auf Dauer aufzunehmen und zu übertragen und durch Verhinderung der Konvergenz die endgültige, dauerhafte Stabilisierung der Kaverne herbei zu führen.Around one with saturated NaCl solution filled Caverns or an equivalent Cavern system without impairment their stability in an effective and cost effective way permanently and safe to keep, the brine contained in the cavern is over a solid suspension prepared therefrom into the brine filled with brine is introduced near the ground, to a packing with solid state properties solidified, which is capable of the geostatic rock pressure permanently record and transmit and by preventing convergence, the ultimate, lasting stabilization to lead the cavern.

Nach der vorgeschlagenen Lösung wird zunächst ein geringer Anfangsanteil anderweitig verfügbarer gesättigte Sole übertage unter Zusatz eines Feststoffes und erforderlichenfalls eines Bindemittels zur Herstellung einer fließfähigen und pumpbaren Feststoffsuspension eingesetzt. Die so aufbereitete Feststoffsuspension wird nach dem Prinzip des Dickstoffversatzes anschließend über eine Förderrohrtour bodennah in die Kaverne eingeleitet, wo sie sich am Karvernenboden absetzt und überschusswasserfrei zu einem festen Festkörper aushärtet.To the proposed solution will be first a low initial fraction of otherwise available saturated brine overground with the addition of a solid and, if necessary, a binder for Production of a flowable and used pumpable solid suspension. The thus prepared solid suspension After the principle of Dickstoffversatzes then over a Production tubing tour near the ground into the cavern, where they meet at the Karvernenboden settles and excess water free to a solid solid cures.

Für das Einleiten der übertage aufbreiteten Feststoffsuspension in die Kaverne sollte der Rohrschuh der Förderrohrtour zunächst möglichst nahe im Bereich des Kavernenbodens positioniert werden, um auf diese relativ einfache Weise unterstützend beizutragen, dass keine Entmischung der Feststoffsuspension erfolgt, die nachteilige Folgen für den Ablagerungs- und Aushärtungsprozess und für die Weiterverwendbarkeit der vom Festkörper verdrängten und entnommenen Überschuss-Sole hätte.For the initiation the overground Spread solids suspension into the cavern should the pipe shoe the conveyor tube tour first preferably be positioned close to the area of the cavern floor to access this relatively easy way to contribute supportively, that no segregation of the solid suspension takes place, the disadvantageous Consequences for the deposition and curing process and for the reusability of surplus brine displaced and removed by the solid would have.

Für die Herstellung der fließfähigen Feststoffsuspension werden vorzugsweise partikelförmige Rückstände aus der Müllverbrennung oder Schlämme (z. B. kontaminierte Hafensedimente) eingesetzt werden, wobei der partikelförmige Feststoff vorzugsweise eine Korngrößenverteilung von 0 bis 500 μm und eine maximale Korngrößen von 0,5 bis 0,8 mm aufweist sollte, die eine rasche Sedimentation der Feststoffanteile ermöglichen und eine Entmischung der Suspension verhindern.For the production the flowable solid suspension are preferably particulate Residues from the waste incineration or mud (eg contaminated harbor sediments), the particulate Solid preferably a particle size distribution of 0 to 500 microns and a maximum particle sizes of 0.5 to 0.8 mm, which is a rapid sedimentation of Allow solid fractions and prevent segregation of the suspension.

Vorteilhafter Weise wird der fließfähigen Feststoffsuspension unmittelbar vor Einleitung in die Kaverne eine weitere Feststofffraktion unmittelbar am Eintritt in das Verfüllbohrloch an der Kaverne zugeführt, deren Korngröße weit über der Korngröße der in der Suspension enthaltenen Feststoffe, jedoch deutlich unterhalb des Durchlassquerschnittes der Förderrohrtour liegt. Dabei darf der Anteil dieser grobkörnigen Phase nur so groß sein, dass die feinkörnige Phase in der Lage ist, die entstehenden Porenräume vollständig auszufüllen. Auf diese Weise kann ein besserer Verfestigungseffekt in der Kaverne erzielt werden. Die Porenräume müssen von den feinkörnigen Anteilen der Suspension vollständig ausgefüllt werden, damit keine freien Restmengen der Kavernenflüssigkeit in der Kaverne verbleiben.Favorable The way is the flowable solid suspension another solids fraction immediately before discharge into the cavern fed directly at the entrance to the backfilling at the cavern whose Grain size far above the Grain size of in the suspension contained solids, but well below the passage cross section of the conveyor tube lies. The proportion of this coarse-grained phase may only be so great that the fine-grained Phase is able to completely fill the resulting pore spaces. This way you can a better solidification effect can be achieved in the cavern. The pore spaces have to from the fine-grained Shares of the suspension are completely filled out, so that no free residual quantities of cavern liquid remain in the cavern.

Die Suspension wird in jedem Fall so eingestellt, dass sie sich nach Einleitung in die Kaverne am Boden absetzt und sich zu einem Festkörper verfestigt, wobei die Verfestigung vorrangig durch die Eigenschaften des eingesetzten partikelförmigen Feststoffes in Verbindung mit der NaCl-Lösung eintritt oder gegebenenfalls durch Zugabe eines Bindemittels in geringen Mengen erreicht wirdThe In any case, suspension is adjusted so that it relaxes Discharges into the cavern at the bottom and solidifies into a solid, wherein the solidification primarily by the properties of the used particulate Solid in conjunction with the NaCl solution occurs or optionally is achieved by adding a binder in small amounts

Als Bindemittels können beispielsweise Zement, Stein- bzw. Braunkohlenfilteraschen oder andere geeignete Stoffe mit Abbindeeigenschaften verwendet werden, die bei der Aufbereitung der Suspension dem Mischvorgang zuzusetzen sind, wobei der Bindemittelanteile in der Feststoffsuspension in etwa 5% bis 10% betragen sollte.When Binders can For example, cement, stone or lignite filter bags or other suitable substances with setting properties are used, to add in the preparation of the suspension to the mixing process are, wherein the binder components in the solid suspension in should be about 5% to 10%.

Der Zusatz von Bindemittel wird insbesondere bei der Verfüllung der Kaverne und der Verfestigung der Sole im oberen Kavernenbereich vorgenommen, um höhere Festigkeiten der sich verfestigenden Suspension insbesondere im oberen Kavernenbereich zu erzielen und damit das Auspressen evtl. nicht vollständig verfestigter Suspensionsanteile sicher zu verhindern.Of the Addition of binder is especially in the backfilling of Cavern and the solidification of the brine in the upper cavern area made to higher Strengths of the solidifying suspension in particular in upper cavern area to achieve and thus the squeezing possibly. not completely solidified suspension components to prevent safe.

Vor Einleitung der fließfähigen Feststoffsuspension in die Kavernen werden die beim Mischen des partikelförmigen Feststoffes mit der gesättigten Sole eventuell entstehenden Gase und eventuelle Reste des in der Kaverne eingelagerten Mediums, die in der aus der Kaverne entnommenen Sole mitgeführt werden, durch Scherung der aufbereiteten Suspension in einem Rührwerk freigesetzt und kontrolliert abgeführt. Durch Scherung in einem Rührwerk werden auch eventuell vorhandene tixotrophe Eigenschaften der aufbereiteten, fließfähigen Suspension durch mechanische Behandlung verändert, bis eine Feststoffsuspension mit konstanten rheologischen Fließeigenschaften entstanden ist.Before introducing the flowable solids suspension into the caverns, the gases possibly formed during mixing of the particulate solid with the saturated brine and any residues of the medium stored in the cavern, which are carried in the brine taken from the cavern, by shearing the treated suspension in a Agitator released and discharged controlled. By shearing in a stirrer and any existing tixotrophe properties of the prepared, flowable suspension are changed by mechanical treatment until a Solid suspension has formed with constant rheological flow properties.

Durch online-Messungen, vorzugsweise in einem Rührwerk, das der Mischanlage nachgeschaltet ist, werden die Fließeigenschaften der Suspension fortlaufend erfasst und über eine elektronische Rückkopplung zur Mischanlage werden die Streuungen in den Eigenschaften der Komponenten der partikelförmigen Feststoffe so ausgeregelt, dass immer eine Suspension mit weitgehend konstanten rheologischen Eigenschaften in die Kaverne eingeleitet wird.By online measurements, preferably in a stirrer, the mixing plant is downstream, the flow properties of the suspension continuously recorded and over an electronic feedback the mixing plant becomes the scattering in the properties of the components the particulate Solids so regulated that always a suspension with largely constant rheological properties is introduced into the cavern.

Zur dauerhaften und sicheren Langzeitverwahrung wird der gesamte Kavernenhohlraum nach dem vorgeschlagenen Verfahren solange verfüllt, bis in der gesamten Kaverne ein fester Füllkörper entstanden ist, der zu etwa 50% aus der ehemals enthaltenen NaCl-Lösung (Kavernensole) und zu weiteren Teilen aus dem eingesetzten partikelförmigen Feststoff besteht und in der Lage ist, auf Dauer den Gebirgsdruck aufzunehmen und die Konvergenz zu verhindern. Der Überschuss an gesättigter Sohle, ca. 50% des vormaligen Kavernenvolumens, die für die Soleverfestigung und zur Verfüllung der Kaverne nicht benötigt wird, wird auf an sich bekannte Weise ausgelagert und entsorgt oder zwischengelagert.to permanent and safe long-term custody becomes the entire cavern cavity filled according to the proposed method as long as throughout the cavern a solid filler emerged is about 50% of the formerly contained NaCl solution (cavernous brine) and to further parts of the particulate solid used exists and is able to absorb the mountain pressure in the long term and to prevent convergence. The excess of saturated Sole, about 50% of the former cavern volume, which is used for brine hardening and for backfilling the cavern is not needed is outsourced and disposed of in a known per se or stored.

Da die Kavernen von vornherein in mächtigen Steinsalzformationen angelegt wurden, bleiben die Strukturen der Steinsalzformationen im Umfeld der Kavernen auch nach ihrer Verfüllung gemäß dem vorgeschlagenen Verfahren und der Ausbildung eines festen Füllkörpers erhalten. Deformationen in den geologischen Strukturen werden dadurch dauerhaft verhindert und die Kaverne bleibt dauerhaft dicht.There the caverns from the beginning in mighty Rock salt formations were created, the structures of the Rock salt formations in the vicinity of the caverns even after their backfilling according to the proposed Process and the formation of a solid packing obtained. deformations in the geological structures are thus permanently prevented and the cavern remains permanently sealed.

Für die Durchführung des erfindungsgemäßen Verfahrens muss die unter Sicherheitsdruck stehende und mit gesättigter Sole gefüllte Kaverne zu keinem Zeitpunkt entleert oder druckentlastet werden. Ihre Standsicherheit ist somit immer gewährleistet und niemals gefährdet.For the implementation of the inventive method must be under pressure and saturated Brine filled Cavern at any time be emptied or depressurized. Your stability is thus always guaranteed and never endangered.

Ein weiterer, nicht unwesentlicher Vorteil des erfindungsgemäßen Verfahrens besteht darin, dass in der Absetzphase und bei der Aushärtung der in die Kaverne eingeleiteten Feststoffsuspension keine Lösungen freigesetzt werden, die weitere Solprozesse in den Kontaktzonen zwischen dem anstehenden Salzgestein und dem sich ausbildenden festen Füllkörper auslösen könnten.One further, not insignificant advantage of the method according to the invention is that in the settling phase and during curing of the in the cavern initiated solid suspension releases no solutions be the other sol processes in the contact zones between the could trigger upcoming salt rock and the forming solid packing.

Die nach dem Verfahren verfestigte Kaverne erfüllt die gesetzlichen Anforderungen der Langzeitsicherheit. Aus diesem Grunde können als partikelförmige Feststoffe auch gefährliche Abfallstoffe im Sinne einer Verwertung nach KrWAbfG verwendet werden, wie beispielsweise Rückstände aus der Müllverbrennung und andere, für die Herstellung der Feststoffsuspension geeignete Abfallstoffe. Damit ist das Verfahren zugleich wirtschaftlich und vorteilhaft für die Umwelt.The cavern solidified by the process meets the legal requirements the long-term security. For this reason, as particulate solids also dangerous Waste materials are used in the sense of recycling according to KrWAbfG, such as residues the waste incineration and others, for the preparation of the solid suspension suitable waste. Thus, the process is both economical and beneficial to the environment.

Die Erfindung soll nachstehend an Beispielen näher erläutert werden. Die dazugehörige Zeichnung zeigt in schematischer Darstellung eine mögliche Anlage zur Aufbereitung der fließfähigen Feststoffsuspension und zur Durchführung des Verfahrens.The Invention will be explained in more detail below by way of examples. The accompanying drawing shows a schematic representation of a possible plant for processing the flowable solid suspension and to carry of the procedure.

Beispiel 1example 1

Das in einer Speicherkaverne, die im Salzgestein errichtet worden war, eingelagerte Speichermedium wird durch die Einleitung von Treibsole – gesättigte NaCl-Lösung – vollständig ausgelagert und der Flüssigkeitsinhalt der Kaverne wird auf diese Weise ausgetauscht. Die Treibsole verbleibt in der Kaverne und übernimmt die Funktion einer Stützflüssigkeit für den Kavernenhohlraum. Zur Kompensation des anstehenden geostatischen Gebirgsdruckes wird die mit Sole gefüllte Kaverne mit einem erforderlichen Druck beaufschlagt und steht ständig unter diesem Innendruck.The in a storage tavern that was built in salt rock, stored storage medium is completely outsourced by the introduction of driving brine - saturated NaCl solution and the liquid content the cavern is replaced in this way. The Treibsole remains in the cavern and takes over the function of a support fluid for the Cavern cavity. To compensate for the upcoming geostatic Mountain pressure becomes the brine-filled cavern with a required pressure is charged and stands constantly under this internal pressure.

Für eine sichere und dauerhafte Langzeitverwahrung der Kaverne wird nach dem erfindungsgemäßen Verfahren gesättigte Sole aus der Kaverne entnommen und übertage zur Herstellung einer fließfähigen und pumbaren Feststoffsuspension eingesetzt. Die Suspension wird mit partikelförmigen Rückständen aus der Müllverbrennung und NaCl-Lösung aus der Kaverne so hergestellt, dass eine suspensionsstablile Mischung für den Leitungstransport und für den Eintrag in die Kaverne entsteht. Über die für den Speicherbetrieb installierte Förderrohrtour wird die über Tage mit der NaCl-Lösung angemischte Suspension unter gleichzeitiger Verdrängung der in der Kaverne befindlichen NaCl-Lösung bodennah eingebracht. Beim Eintritt in die Kaverne sinkt die Suspension ohne Vermischung mit der in der Kaverne befindlichen Sole zum Kavernenboden ab und in der Suspension setzt der Verfestigungsprozess ein, wobei der Verfestigungs- bzw. Abbindeprozess zur Ausbildung eines festen Füllkörpers im Innern der Kaverne führt. Ist die Kaverne auf diese Weise mit sich verfestigender Suspension gefüllt, sinkt die Kavernenkonvergenz nach kurzer Dauer auf Null. Die Gebirgsspannungen werden von dem entstandenen Festkörper aufgenommen. Die Kaverne bleibt stabil, gesättigte NaCL-Lösung oder eine durch den eingetragenen Feststoff kontaminierte Lösung können nicht mehr ausgepresst werden. Die Feststoffsuspension kann auch wie im Beispiel 2 angegeben hergestellt werden.For a safe and permanent long-term storage of the cavern is according to the inventive method saturated Brine taken from the cavern and surface for making a flowable and used pumpable solid suspension. The suspension is with particulate Residues the waste incineration and NaCl solution the cavern is made to be a suspension stable mixture for the Line transport and for the entry into the cavern arises. About the installed for the memory operation Production tubing tour will the over Days with the NaCl solution mixed suspension with simultaneous displacement of the placed in the cavern NaCl solution near the ground. When entering the cavern, the suspension sinks without mixing with the brine in the cavern to the bottom of the cavern and in the suspension starts the solidification process, wherein the Hardening or setting process for forming a solid packing in the Inside the cavern leads. Is the cavern in this way with solidifying suspension filled, The cavern convergence decreases after a short period to zero. The mountain tensions are absorbed by the resulting solid. The cavern stays stable, saturated NaCl solution or a contaminated by the registered solid solution can not be squeezed out more. The solid suspension can also be as in Example 2 can be produced.

Die für die Herstellung der Feststoffsuspension nicht benötigte, überschüssige NaCl-Lösung wird auf an sich bekannte Weise entsorgt. Da das Abbinden der eingebrachten Feststoffsuspension nach entsprechend gestalteter Rezeptur der Mischung verfahrensgemäß überschusswasserfrei erfolgt, kann nur während des Prozesses des Einbringens der sich verfestigenden Suspension eine nicht kontaminierte NaCl-Lösung aus dem Kavernenvolumen oberhalb der am Boden verfestigten Suspension ausgetragen werden. Nach vollständiger Füllung der Kaverne mit der verfestigten Suspension wird keine Sole mehr ausgetragen.The for the production of Feststoffsuspensi Unnecessary, excess NaCl solution is disposed of in a conventional manner. Since the hardening of the introduced solid suspension according to the formulation of the mixture according to the method is excess water-free, only during the process of introducing the solidifying suspension can an uncontaminated NaCl solution be discharged from the cavern volume above the suspension solidified on the ground. After complete filling of the cavern with the solidified suspension no brine is discharged.

Beispiel 2Example 2

Der Feststoffsuspension kann bei Fehlen des erforderlichen Eigenabbindevermögens des verwendeten Feststoffs ein geeignetes Bindemittel zugesetzt werden, wobei je nach Feststoffart eine Suspension von etwa 50% NaCl-Lösung und 50% Feststoff zur Anwendung kommt. Der Feststoffanteil besteht zu etwa 90 bis 95% aus einem partikelförmigen Feststoff, beispielsweise aus Rückständen aus der Müllverbrennung, und zu etwa 5 bis 10% aus einem Bindemittel. Die Komponenten sind je nach der chemischen Zusammensetzung der verwendeten Feststoffe und der Bindemittel im Vorfeld durch Versuche festzulegen. Als Bindemittel können Zement, Filterasche aus der Braun- und Steinkohleverbrennung, oder Bypassstäube aus der Zementindustrie verwendet werden.Of the Solid suspension may, in the absence of the required Eigenabbindvermögenmögens of a suitable binder is added to the solid used, depending on the type of solid, a suspension of about 50% NaCl solution and 50% solid is used. The solids content is too about 90 to 95% of a particulate solid, for example from residues the waste incineration, and about 5 to 10% of a binder. The components are depending on the chemical composition of the solids used and to set the binder in advance by experiments. As a binder can Cement, filter ash from brown and hard coal combustion, or bypass dust used in the cement industry.

Eine mögliche Anlage zur Durchführung des erfindungsgemäßen Verfahrens und zur Aufbereitung der Feststoffsuspension ist in der angefügten Zeichnung und schematisch dargestellt.A possible Plant for implementation the method according to the invention and for the preparation of the solid suspension is in the attached drawing and shown schematically.

Mit 1 ist die mit gesättigter NaCl-Lösung gefüllte und unter einem Innendruck stehende Speicherkaverne bezeichnet, die in einem geeigneten Salzgebirge errichtet worden war und deren Speicherhohlraum nach Beendigung des Speicherbetriebes zur Gewährleistung der notwendigen Bergsicherheit dauerhaft und sicher verwahrt werden muss. Zur Herstellung einer geeigneten Feststoffsuspension, die zur Verfestigung der in der Kaverne enthaltenen Sole und zur Ausbildung eines dauerhaft festen Füllkörpers im Innern der Kaverne 1 dient, wird über ein Steigrohr 2 gesättigte NaCl-Lösung aus der Kaverne 1 entnommen und in eine Mischanlage 3 geleitet. Mit rechnergesteuerter Dosierung wird über die Zuführung 9 eine Feststoffkomponente und über die Zuführung 10 gegebenenfalls ein zusätzliches Bindemittel in die Mischanlage 3 eingebracht und mit der gesättigten NaCl-Lösung zu einer fließfähigen und pumpbaren Feststoffsuspension verarbeitet. Die so aufbereitete Feststoffsuspension wird anschließend in einen Scherbehälter/Rührwerk 4 geleitet, um die beim Mischen des partikelförmigen Feststoffes mit der gesättigten Sole eventuell entstandenen Gase freizusetzen und kontrolliert über die Ableitung 11 auszuleiten und eventuell vorhandene oder entstandene tixotrophe Eigenschaften der aufbereiteten Suspension durch Scherung mechanisch zu behandeln und die rheologischen Fließeigenschaften der Feststoffsuspension einzustellen. Die aufbereitete und behandelte Feststoffsuspension wird kontinuierlich messtechnisch überwacht und die Daten in einer Messstation, in der die relevanten Daten wie beispielsweise Suspensionsdruck an verschiedenen Stellen der Transportleitung, Temperatur der Suspension, stoffliche Zusammensetzung, rheologische Eigenschaften etc. erfasst und registriert werden, verarbeitet. Die Ergebnisse werden über eine Rückkopplung 13 zur Änderung und Einstellung der Dosierung an die Mischstation 3 gegeben. Mit Hilfe der Suspensionspumpe 6 wird die Feststoffsuspension über die Förderrohrtour 7 in die Kaverne 1 eingeleitet, wo die Feststoffanteile der Suspension auf dem Kavernengrund sedimentieren und unter Verfestigung der Sole zu einem festen Füllkörper aushärten.With 1 is called filled with saturated NaCl solution and under an internal pressure storage tavern, which had been built in a suitable salt marshes and the storage cavity must be kept permanently and safely after completion of the storage operation to ensure the necessary mountain safety. For producing a suitable solid suspension, for solidifying the brine contained in the cavern and for forming a permanently solid packing in the interior of the cavern 1 serves, is via a riser 2 saturated NaCl solution from the cavern 1 taken and in a mixing plant 3 directed. With computer-controlled dosage is via the feeder 9 a solid component and via the feed 10 optionally an additional binder in the mixing plant 3 introduced and processed with the saturated NaCl solution to a flowable and pumpable solid suspension. The thus prepared solid suspension is then placed in a shear vessel / agitator 4 passed to release the gases possibly formed during the mixing of the particulate solid with the saturated brine and controlled by the discharge 11 derive and mechanically treat any existing or resulting tixotrophe properties of the treated suspension by shearing and adjust the rheological flow properties of the solid suspension. The prepared and treated solids suspension is continuously monitored by measurement and the data processed in a measuring station in which the relevant data such as suspension pressure at various points of the transport line, temperature of the suspension, material composition, rheological properties, etc. are recorded and registered. The results will be feedbacked 13 for changing and adjusting the dosage to the mixing station 3 given. With the help of the suspension pump 6 the solid suspension is via the conveyor tube 7 into the cavern 1 introduced where sediment the solid fractions of the suspension on the bottom of the cavern and harden to a solid filler with solidification of the brine.

Der Rohrschuh der Förderrohrtour ist zum Beginn des Verwahrungsprozesses möglichst im unmittelbaren Bereich des Kavernenbodens positioniert und wird dem sich im Laufe des Verfahrens bis zur vollständigen Verfüllung des Kaverneninnenraumes ständig ändernden Spiegel der eingebrachten Feststoffsuspension nachgeführt.Of the Pipe shoe of the conveyor tube is as close to the beginning of the custody process as possible the cavern floor is positioned and will become in the course of the procedure until the complete backfilling of the cavern interior constantly changing Mirror tracked the introduced solid suspension.

Die für die Durchführung des Verfahrens nicht benötigte, überschüssige NaCl-Lösung wird über die Leitung 8 abgeleitet und einer Zwischenlagerung oder einer Entsorgung zugeführt.The excess NaCl solution, which is not required for carrying out the process, is passed over the line 8th derived and fed to a temporary storage or disposal.

Claims (13)

Verfahren zur sicheren Langzeitverwahrung von mit gesättigter Sole gefüllter Kavernen und Kavernensysteme im Salzgebirge unter Verwendung der in der Kaverne befindlichen Salzlösung und einem aus Abfallstoffen hergestellten Feststoff, die nach Aufbereitung als Suspension in die Kaverne eingeleitet werden dadurch gekennzeichnet, dass als Baustoff für die Herstellung eines, den Kavernenraum ausfüllenden Festkörpers unter ständiger Aufrechterhaltung der Kavernenbefüllung mit Sole und ggf. eines zusätzlichen stabilisierenden Kopfdruckes schrittweise gesättigte Sole aus der Kaverne entnommen und mit einem feinkörnigen Abfallstoff und einem Bindemittel zu einer fließfähigen und abbindefähigen Feststoffsuspension vermischt werden, die so aufbereitete Feststoffsuspension danach in die Kavernen eingeleitet wird, wo sie ohne Entmischung zum Kavernenboden absinkt und überschusswasserfrei zu einem Festkörpers aushärtet.Method for the safe long-term storage of saturated brine caverns and cavern systems in the salt marshes using the saline solution in the cavern and a solid made from waste materials, which are introduced into the cavern after treatment as a suspension, characterized in that as a building material for the production of a the cavern space-filling solid under constant maintenance of cavern filling with brine and optionally an additional stabilizing head pressure gradually saturated brine taken from the cavern and mixed with a fine-grained waste and a binder to a flowable and settable solid suspension, the so prepared solid suspension then in the caverns is initiated, where it sinks without segregation to the cavern floor and hardens without excess water to a solid. Verfahren nach Anspruch 1 dadurch gekennzeichnet, dass für die Herstellung der fließfähigen Feststoffsuspension partikelförmige Rückstände aus der Müllverbrennung eingesetzt werden.A method according to claim 1, characterized in that for the preparation of the flowable solid suspension particulate residues the waste incineration are used. Verfahren nach Anspruch 1 dadurch gekennzeichnet, dass für die Herstellung der fließfähigen Feststoffsuspension geeignete Schlämme, beispielsweise kontaminierte Hafensedimente eingesetzt werdenMethod according to claim 1, characterized that for the preparation of the flowable solid suspension suitable sludges, For example, contaminated harbor sediments can be used Verfahren nach Anspruch 1, 2 und 3, dadurch gekennzeichnet, dass der partikelförmige Feststoff vorzugsweise eine Korngrößenverteilung von 0 bis 500 μm und eine maximale Korngrößen von 0,5 bis 0,8 mm aufweist, die ein rasches und entmischungsfreies Absinken der Suspension ermöglichen.Method according to Claims 1, 2 and 3, characterized that the particulate Solid preferably a particle size distribution of 0 to 500 microns and a maximum particle sizes of 0.5 to 0.8 mm, which is a rapid and unmixed Allow the suspension to fall. Verfahren nach Ansprüchen 1 bis 4, dadurch gekennzeichnet, dass der fließfähigen Feststoffsuspension unmittelbar vor Einleitung in die Kaverne eine weitere Feststofffraktion zugeführt wird, deren Korngröße weit über der Korngröße der in der Suspension enthaltenen Feststoffe liegt.Process according to Claims 1 to 4, characterized that of the flowable solid suspension another solids fraction immediately before discharge into the cavern supplied whose grain size is far above the Grain size of in the suspension contained solids. Verfahren nach Anspruch 1 bis 4 dadurch gekennzeichnet, dass der fließfähigen Feststoffsuspension ein zusätzliches Bindemittel zugemischt wird.Method according to claims 1 to 4, characterized that of the flowable solid suspension an additional Binder is mixed. Verfahren nach Anspruch 6, dadurch gekennzeichnet, dass als Bindemittel Zement, oder Filterasche aus der Braun- und Steinkohleverbrennung, oder Bypassstäube aus der Zementindustrie oder ähnliche feinkörnige Stoffe mit Abbindeeigenschaften verwendet werden und der Bindemittelanteil in der fließfähigen Feststoffsuspension ca. 5% bis 10% beträgt.Method according to Claim 6, characterized that as binder cement, or filter ash from the brown and Hard coal combustion, or bypass dusts from the cement industry or similar fine-grained Substances with setting properties are used and the binder content in the flowable solid suspension about 5% to 10%. Verfahren nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass das Bindemittel der fließfähigen Feststoffsuspension vorzugsweise zum Verfüllen der Kaverne im oberen, bohrlochnahen Bereich zugemischt wird.Method according to one of claims 1 to 7, characterized that the binder of the flowable solid suspension preferably for filling the cavern in the upper borehole near area is mixed. Verfahren nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass vor Einleitung der fließfähigen Suspension in die Kaverne die bei der Mischung des partikelförmigen Feststoffes mit der gesättigten Sole eventuell entstehenden Gase durch Scherung der aufbereiteten Suspension in einem Rührwerk freigesetzt und kontrolliert abgeführt werden.Method according to one of claims 1 to 8, characterized that before the introduction of the flowable suspension into the cavern when mixing the particulate solid with the saturated Brine possibly resulting gases by shearing the treated Suspension in a stirrer be released and controlled discharged. Verfahren nach den Ansprüchen 1 bis 3 und 9, dadurch gekennzeichnet, dass eventuell vorhandene tixotrophe Eigenschaften der aufbereiteten, fließfähigen Suspension solange durch Scherung in einem Rührwerk mechanisch behandelt werden, bis konstante rheologische Fließeigenschaften entstanden sind.Process according to claims 1 to 3 and 9, characterized characterized in that any existing tixotrophic properties the prepared, flowable suspension while mechanically treated by shearing in a stirrer be until constant rheological flow properties have arisen. Verfahren nach einem der Ansprüchen 1 bis 10, dadurch gekennzeichnet, dass die Fließeigenschaften der Suspension durch online-Messung in einem Rührwerk, das der Mischanlage nachgeschaltet ist, erfasst und über eine elektrische Rückkopplung zur Mischanlage Streuungen in den Eigenschaften der Komponenten der partikelförmigen Feststoffe so ausgeregelt werden, dass eine Suspension mit weitgehend konstanten rheologischen Eigenschaften in die Kaverne eingeleitet wird.Method according to one of claims 1 to 10, characterized that the flow properties the suspension by online measurement in a stirrer, the mixing plant is downstream, captured and over an electrical feedback to Mixing plant dispersions in the properties of the components of particulate Solids are adjusted so that a suspension with largely constant rheological properties introduced into the cavern becomes. Verfahren nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, dass der Rohrschuh der Förderrohrtour, über die die fließfähige Suspension in die Kaverne eingeleitet wird, unmittelbar über den Kavernensumpf positioniert ist und dem sich mit dem Grad der Verfüllung ändernden Spiegelstand der eingebrachten Suspension nachgeführt wird.Method according to one of claims 1 to 11, characterized that the pipe shoe of the conveyor tube tour, over the the flowable suspension is introduced into the cavern, positioned directly above the cavernous sump is and with the degree of backfilling changing mirror level of the introduced Tracking tracked becomes. Verfahren nach einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, dass Überschuss an gesättigter Sohle, die zu ihrer Verfestigung und zur Verfüllung der Kaverne nicht benötigt wird, ableitet und auf an sich bekannte Weise zwischengelagert oder entsorgt wird.Method according to one of claims 1 to 12, characterized that excess saturated Sole, which is not needed for its consolidation and for the filling of the cavern, derives and intercalated or disposed of in a known manner becomes.
DE102004052854A 2004-10-27 2004-10-27 Method for the long-term storage of caverns and cavern systems Revoked DE102004052854B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102004052854A DE102004052854B4 (en) 2004-10-27 2004-10-27 Method for the long-term storage of caverns and cavern systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102004052854A DE102004052854B4 (en) 2004-10-27 2004-10-27 Method for the long-term storage of caverns and cavern systems

Publications (2)

Publication Number Publication Date
DE102004052854A1 DE102004052854A1 (en) 2006-05-11
DE102004052854B4 true DE102004052854B4 (en) 2010-03-04

Family

ID=36217086

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102004052854A Revoked DE102004052854B4 (en) 2004-10-27 2004-10-27 Method for the long-term storage of caverns and cavern systems

Country Status (1)

Country Link
DE (1) DE102004052854B4 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007023595B4 (en) 2007-05-21 2014-08-28 K-Utec Ag Salt Technologies Method for the long-term safekeeping of solution-filled caverns by means of underlays with industrial wastes and a further use of the displaced solution inventory in industrial processes
EP2818256B1 (en) * 2013-06-27 2015-11-04 MINERALplus GmbH Method and device for the processing of substances for backfilling
CN111379588B (en) * 2020-04-10 2024-07-12 昆明理工大学 Mine filling slurry settlement segregation control system and method based on low-frequency pulse

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3141884A1 (en) * 1981-10-22 1983-05-05 Wintershall Ag, 3100 Celle "METHOD FOR THE FINAL STORAGE OF PUMPABLE WASTE MATERIALS"
DE3411998C2 (en) * 1984-03-31 1989-10-05 Wintershall Ag, 3100 Celle, De
DD272972A3 (en) * 1987-08-24 1989-11-01 Wismut Sdag Silicate additive for self-hardening organic and inorganic binders and process for its preparation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3141884A1 (en) * 1981-10-22 1983-05-05 Wintershall Ag, 3100 Celle "METHOD FOR THE FINAL STORAGE OF PUMPABLE WASTE MATERIALS"
DE3411998C2 (en) * 1984-03-31 1989-10-05 Wintershall Ag, 3100 Celle, De
DD272972A3 (en) * 1987-08-24 1989-11-01 Wismut Sdag Silicate additive for self-hardening organic and inorganic binders and process for its preparation

Also Published As

Publication number Publication date
DE102004052854A1 (en) 2006-05-11

Similar Documents

Publication Publication Date Title
AT391872B (en) FASTENING INJECTION AGENT FOR IMPROVING SOFT ORGANIC MATERIAL CONTAINING FLOOR
DE69127355T2 (en) HYDRAULIC STORAGE OF WASTE IN UNDERGROUND FORMATIONS
DE3141884C2 (en) Process for the final disposal of pumpable waste materials
EP0050371A1 (en) Method for the harmless dumping of waste
DE3141885C2 (en) &#34;Process for the storage of wholly or partially reusable liquid waste in underground salt-enclosed cavities or salt caverns&#34;
EP1994995B1 (en) Method for safe long term custody of solution-filled cavities through sub-layers with industrial waste and further use of the displaced solution in industrial processes
EP0026301B1 (en) Process for the removal or intermediate storage of wastes
DE3641786A1 (en) Process for disposing of fly dusts and/or slags from refuse incineration plants
EP0500199B1 (en) Process for treating contaminated sediments from water
DE102004052854B4 (en) Method for the long-term storage of caverns and cavern systems
DE2728469A1 (en) PROCEDURE AND EQUIPMENT FOR CONSOLIDATING IN PARTICULAR RADIOACTIVE POLLUTANTS AND WASTE MATERIALS
DE102007024057B4 (en) Process for the consolidation and / or sealing of loose geological formations in the course of geotechnical construction measures
DE2225664A1 (en) Underground storage system - for radioactive or poisonous waste prods in liq or free flowing solid form
EP4065774A2 (en) Method and device for the layer-by-layer filling and compaction of cohesive building materials in boreholes
DE4101347C2 (en)
WO2005121277A1 (en) Method for treatment of a conglomerate and method and device for production of an additive for the same
DE3041086C2 (en)
AT393975B (en) METHOD FOR THE DISPOSAL OF WASTE
EP3633143B1 (en) Methods and materials for producing a closure structure
DE2810593C2 (en) Method and device for the introduction of radioactive waste into an underground cavity
CH717173A2 (en) Procedure for securing a cavern.
DE102020127927A1 (en) Treatment of mineral construction waste
DE102013109521A1 (en) Closure structure and methods and materials for its production
DE3929162C2 (en)
DE19846361B4 (en) Process for filling underground cavities

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8363 Opposition against the patent
R037 Decision of examining division or of federal patent court revoking patent now final

Effective date: 20130803

R107 Publication of grant of european patent rescinded

Effective date: 20131107