DE102004009147A1 - Computer assisted presentation method e.g. for presentation documentation of projects consisting of severalsub projects, involves placing digitized main plan of building project in database, where to each subproject data record is recorded - Google Patents
Computer assisted presentation method e.g. for presentation documentation of projects consisting of severalsub projects, involves placing digitized main plan of building project in database, where to each subproject data record is recorded Download PDFInfo
- Publication number
- DE102004009147A1 DE102004009147A1 DE102004009147A DE102004009147A DE102004009147A1 DE 102004009147 A1 DE102004009147 A1 DE 102004009147A1 DE 102004009147 A DE102004009147 A DE 102004009147A DE 102004009147 A DE102004009147 A DE 102004009147A DE 102004009147 A1 DE102004009147 A1 DE 102004009147A1
- Authority
- DE
- Germany
- Prior art keywords
- subproject
- data
- database
- main plan
- projects
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
Description
Die vorliegende Erfindung betrifft ein Verfahren zur computergestützten Präsentation und Dokumentation von Planungs- und Bauprojekten, die aus einer Vielzahl von Teilprojekten bestehen.The The present invention relates to a method of computer-aided presentation and documentation of design and construction projects, which consist of a Variety of sub-projects exist.
Derartige Bauprojekte sind großflächige Entwicklungsvorhaben, bei denen beispielsweise ein ganzes Stadtgebiet neu erschlossen werden soll. Solche Projekte sind beispielsweise die Erschließung eines neuen Gebietes in Pudong, der Hafenbereich in Tokio, die Stadtentwicklung in Wan Chai, die Entwicklung der Doclands in London oder die Hafencity in Hamburg. Neben Bauprojekten, bei denen eine städtische Erschließung von bisher nicht genutzten Gebieten im Vordergrund steht, umfassen die Bauprojekte im Sinne der Erfindung auch eine Restrukturierung eines Stadtbereichs, so beispielsweise die Revitalisierung des Uferbereichs in Toronto.such Construction projects are large-scale development projects, in which, for example, a whole city area newly developed shall be. Such projects are, for example, the development of a new area in Pudong, the port area in Tokyo, the urban development in Wan Chai, the development of the Doclands in London or the Hafencity in Hamburg. In addition to construction projects where an urban development of previously unused areas are included in the construction projects within the meaning of the invention also a restructuring of a city area, such as the revitalization of the waterfront area in Toronto.
Allen Bauprojekten, die aus einer Vielzahl von Teilprojekten bestehen, ist gemeinsam, daß hier eine Vielzahl von Teilprojekten ausgeschrieben, geplant und koordiniert werden. Neben der Vielzahl von Teilprojekten sind an solchen Bauprojekten auch viele unterschiedliche Personengruppen mit unterschiedlichen Interessen beteiligt. Zu den Teilnehmern und Interessensgruppen bei einem solchen Bauprojekt gehören in der Regel die Stadt, Stadtplaner, Freiflächenplaner, Architekten, Produktdesigner ebenso wie Investoren, potentielle Mieter, Bürger und die Medien.all Construction projects that consist of a large number of sub-projects, is common that here is one Variety of sub-projects tendered, planned and coordinated become. In addition to the large number of sub-projects are on such construction projects also many different groups of people with different Interests involved. To the participants and interest groups belong to such a construction project usually the city, city planners, open space planners, architects, product designers as well as investors, potential tenants, citizens and the media.
Für große Bauprojekte besteht das Bedürfnis nach einem computergestützten Verfahren, das einen effizienten Ablauf des Planungsprozesses erlaubt und eine wirksame Prozeßsteuerung ermöglicht, durch die sich die Planungsdauer verkürzen und für die Beteiligten transparenter gestalten läßt.For big construction projects there is a need for a computer-aided Procedure that allows an efficient process of the planning process and effective process control allows which shorten the planning time and make it more transparent for those involved to design.
Die erfindungsgemäße Aufgabe wird computergestützt unter Verwendung einer Datenbank mit Hilfe des Verfahrens gemäß Anspruch 1 gelöst. Vorteilhafte Ausgestaltungen bilden die Gegenstände der Unteransprüche.The inventive task will be computerized using a database using the method of claim 1 solved. Advantageous embodiments form the subject of the dependent claims.
Die vorliegende Erfindung betrifft ein Verfahren zur computergestützten Präsentation und Dokumentation von Planungs- und Bauprojekten bestehend aus einer Vielzahl von Teilprojekten. In einem ersten Verfahrensschritt wird ein digitalisierter Hauptplan zu dem Bauprojekt erstellt und in einer Datenbank abgelegt. Der Hauptplan enthält Daten zu den Teilprojekten, auf die einzeln zugegriffen werden kann. In dem Hauptplan ist zu jedem Teilprojekt ein Datensatz vorgesehen, der mindestens Vorgaben für eine Planung sowie sonstige Daten enthält, vorzugsweise auch Angaben zu der geographischen Lage des Teilprojekts. Der derart aufgebaute Hauptplan wird in der Datenbank abgelegt. In einem späteren Schritt wird einem oder mehreren Benutzer(n) ein Teilprojekt zugewiesen. Dem zugewiesenen Benutzer werden der Hauptplan sowie mindestens der Datensatz zu dem zugewiesenen Teilprojekt übermittelt. Der Hauptplan wird mit einer vorbestimmten Datentiefe übermittelt, die festlegt, welche Daten zu den nicht zugewiesenen Teilprojekten mit dem Hauptplan übermittelt werden. In einem nachfolgenden Schritt werden Daten zu dem zugewiesenen Teilprojekt empfangen, wobei die Daten Vorentwürfe und/oder Entwürfe zu dem Teilprojekt enthalten. Bei der Beschreibung der Erfindung werden die Ausdrücke wie „Entwurf", „Vorentwurf", „Bauprojekt" etc. nicht im Sinne der HOAI verwendet, sondern unter einem Entwurf oder Vorentwurf wird jede graphische Darstellung für eine mögliche Gestaltung des Teilprojekts verstanden. Der Begriff „Bauprojekt" wird ebenfalls im weitesten Sinne verstanden und bezieht auch städteplanerische Vorhaben mit ein, bei denen bestehende Bauten lediglich einer anderen Nutzung zugeführt werden. Bei dem erfindungsgemäßen Verfahren werden die empfangenen Daten in einer Datenbank gespeichert, wobei in der Datenbank ein um die empfangenen Daten ergänzter Datensatz zu dem Teilprojekt in dem Hauptplan abgelegt wird. Um die Planungsdauer zu verkürzen, wird also der Planungsprozeß mit Hilfe der Datenbank dahingehend abgewandelt, daß Vorentwürfe und/oder Entwürfe zu den Teilprojekten direkt zu einer neuen Variante des Hauptplans führen und dem Teilprojekt zugeordnet werden.The The present invention relates to a method of computer-aided presentation and documentation of planning and construction projects consisting of a Variety of subprojects. In a first process step is a digitized master plan to the construction project and created in a database. The main plan contains data on the subprojects, which can be accessed individually. In the main plan is to Each subproject is provided with a data set that has at least specifications for one Planning and other data contains, preferably also information to the geographical location of the subproject. The thus constructed Main plan is stored in the database. In a later step one or more users are assigned a subproject. The assigned user will have the main plan as well as at least the record is submitted to the assigned subproject. The main plan will be transmitted at a predetermined data depth, which determines which Data on the unassigned subprojects transmitted with the main plan become. In a subsequent step, data is assigned to the assigned one Subproject received, whereby the data preliminary designs and / or drafts to the Subproject included. In the description of the invention the expressions such as "draft", "preliminary design", "construction project" etc. not in the sense the HOAI used but under a draft or preliminary draft Each graphic representation is understood as a possible design of the subproject. The term "construction project" is also used in the understood in the broadest sense and also includes urban planning projects one in which existing buildings are just another use supplied become. In the method according to the invention are the received data is stored in a database, wherein in the Database a supplemented to the received data record to the subproject is stored in the main plan. To shorten the planning time is So the planning process with Modified the help of the database to the effect that preliminary drafts and / or designs for the subprojects directly to a new variant of the main plan and assigned to the subproject.
Das erfindungsgemäße Verfahren schafft hierbei Vorteile für sämtliche an dem Planungsvorgang beteiligte Personengruppen. Einerseits können die Planer sich bei ihren eingereichten Entwürfen und Vorentwürfen sehr schnell anhand des Hauptplans einen Überblick über Entwürfe zu anderen Teilprojekten schaffen, insbesondere wenn der Hauptplan mit einer großen Datentiefe bereitgestellt wird. Hierdurch werden Entwürfe und Ansätze für die Planung von Teilprojekten vermieden, die zwar an sich geeignet sind, aber aufgrund bereits verfolgter anderer Planungsansätze für benachbarte Teilprojekte nicht umsetzbar sind. Mit dem erfindungsgemäßen Verfahren wird die Möglichkeit zu einer interaktiven Planung geschaffen, bei der bereits im sehr frühen Stadium unterschiedliche Ideen, Ansätze und Vorstellungen zusammenfließen. Ein weiterer wichtiger Vorteil besteht darin, daß den Verantwortlichen für das gesamte Bauprojekt durch die Ablage der Daten in der Datenbank ein schneller und effizienter Zugriff auf die bisher eingegangenen Entwürfe und Vorentwürfe zur Verfügung steht. Diese Information kann zu Informationszwecken für die Bürger und/oder zur Vermarktung des Bauprojektes eingesetzt werden. Das erfindungsgemäße Verfahren schafft einen Hauptplan, der mit den eingereichten Entwürfen und/oder Vorentwürfen zu den Teilprojekten eine Vielzahl von Varianten enthält. Grundsätzlich umfaßt der Hauptplan also sämtliche möglichen Kombinationen der eingegangenen Entwürfe.The inventive method provides advantages for all involved in the planning process groups of people. On the one hand, the planners can quickly create an overview of drafts for other subprojects in their submitted drafts and preliminary drafts, based on the main plan, especially if the main plan is provided with a large data depth. This avoids drafts and approaches for the planning of subprojects which, while suitable in themselves, are not feasible due to already pursued other planning approaches for neighboring subprojects. With the method according to the invention the possibility for an interactive planning is created in which different ideas, approaches and ideas flow together already at a very early stage. Another important advantage is that the persons responsible for the entire construction project have fast and efficient access to the drafts and preliminary drafts that have been received by filing the data in the database. This information can be used for information purposes for the citizens and / or for the marketing of the construction project. The method according to the invention creates a main plan, which contains a large number of variants with the submitted drafts and / or preliminary drafts for the subprojects. In principle, therefore, the main plan includes all possible combinations of the received designs.
In einer bevorzugten Ausgestaltung des erfindungsgemäßen Verfahrens werden bei der Zuweisung eines Teilprojekts bereits empfangene Daten in dem Datensatz zu dem Teilprojekt ganz oder teilweise an den Empfänger mit übermittelt. Hierdurch besteht die Möglichkeit, daß der Empfänger des Teilprojekts, der nachfolgend einen Vorentwurf oder einen Entwurf zu dem Teilprojekt erarbeitet, dies bereits in Kenntnis der vorliegen den Entwürfe tun kann. Hierdurch wird sichergestellt, daß nicht sämtliche Planungen zu dem Teilprojekt unabhängig voneinander erfolgen und nach einer Auswahl eines Entwurfs die übrigen Entwürfe verworfen werden, sondern daß bereits sehr früh in der Entwurfsphase ein Austausch von Gedanken, Ansätzen und Ideen stattfindet.In a preferred embodiment of the method according to the invention are already received data when assigning a subproject in the data set for the subproject in whole or in part to the recipient. This gives you the opportunity that the receiver of the subproject, which subsequently has a preliminary draft or a draft to the sub-project, this already in knowledge of the present drafts can do. This ensures that not all planning for the subproject independently from one another and discarded after a selection of a draft, the remaining designs be, but that already very early In the design phase, an exchange of thoughts, approaches and Ideas takes place.
In einer weiteren bevorzugten Ausgestaltung sieht das erfindungsgemäße Verfahren vor, daß bei der Zuweisung des Teilprojekts die Übermittlung des Datensatzes nur an eine vorbestimmte Gruppe von Benutzern erfolgt. Hierdurch ist es möglich, daß beispielsweise geladene Wettbewerbe oder beschränkte Ausschreibungen für spezielle Teilprojekte effizient mit dem Verfahren durchgeführt werden können. Die Zuweisung wird beispielsweise für die Teilprojekte vorab festgelegt und erfolgt dann automatisch.In Another preferred embodiment provides the inventive method before that at the Assignment of subproject submission the record is made only to a predetermined group of users. This makes it possible that, for example invited competitions or limited Tenders for special subprojects are carried out efficiently with the procedure can. For example, the assignment is predefined for the subprojects and then done automatically.
Zur effizienten Speicherung beinhalten die empfangenen Daten zu einem Teilprojekt einen Unterdatensatz mit Informationen, die die Speicherung des Entwurfs in der Datenbank betreffen. Der Unterdatensatz enthält Angaben zur Art des Entwurfs, beispielsweise ob es sich um einen Entwurf oder Vorentwurf, eine Skizze, einen Grundriß oder einen Bauplan oder dergleichen handelt, den Namen des Entwerfers und/oder Stichworte, die den Entwurf kennzeichnen. Auf diese Art und Weise wird in einfacher Weise die Möglichkeit geschaffen, auf die eingegangenen Teilprojekte nach unterschiedlichen Kriterien zurückzugreifen. Die Verwendung von Stichworten schafft auch die Möglichkeit, in den bereits vorhandenen Entwürfen ohne genaue Vorkenntnisse zu recherchieren.to efficient storage include the received data to one Subproject a subset of information that stores the Design in the database. The sub-record contains information on the nature of the design, for example, whether it is a design or preliminary design, a sketch, a plan or a blueprint or the like is the name of the designer and / or keywords that make up the draft mark. In this way, in a simple way possibility created on the sub-projects received according to different Resort to criteria. The use of keywords also creates the possibility in the already existing designs without exact knowledge to research.
Bevorzugt enthält der Unterdatensatz der empfangenen Daten auch Angaben zu den Vorgaben für die Bauplanung. Hier können beispielsweise Maße des entworfenen Baus und sonstige Kenngrößen aus den Vorgaben zu der Bauplanung angegeben werden. Bevorzugt wird vor einer Speicherung der empfangenen Daten in der Datenbank anhand des Unterdatensatzes automatisch überprüft, ob der empfangene Entwurf und/oder Vorentwurf den gegebenen Vorgaben entspricht.Prefers contains the subset of received data also provides information on the specifications for the construction planning. here we can for example, dimensions of the designed building and other parameters from the specifications of the Construction planning can be specified. Preference is given to storing the received data in the database using the subset automatically checks whether the received Draft and / or preliminary design complies with the given specifications.
Zweckmäßigerweise können sämtliche Varianten des Hauptplans sowie die Teilprojekte mit den Datensätzen unabhängig von einer Zuweisung abgerufen werden. Hierdurch wird die Möglichkeit geschaffen, sich über das Wechselspiel der eingereichten Entwürfe schnell einen Überblick zu verschaffen.Conveniently, can all Variants of the main plan as well as the subprojects with the datasets independent of an assignment can be retrieved. This will be the opportunity created, over the interplay of submitted designs quickly gives an overview To provide.
Bevorzugt können aus den Varianten des Hauptplans Kombinationen der Entwürfe für eine graphische Darstellung zusammengestellt und als ein Modell des geplanten Bauprojekts angezeigt werden.Prefers can from the variants of the main plan combinations of designs for a graphic Representation compiled and as a model of the planned construction project are displayed.
Eine bevorzugte Ausgestaltung des erfindungsgemäßen Verfahrens wird nachfolgend anhand der Figuren näher erläutert. Es zeigt:A preferred embodiment of the method according to the invention will be below closer to the figures explained. It shows:
Wie
in
In
einem nachfolgenden Schritt
In
einem nachfolgenden Verfahrensschritt
In
einem nachfolgenden Schritt
Der
Datensatz zu einem Teilprojekt, beispielsweise dem Teilprojekt A3,
beinhaltet eine Vielzahl von bereits zu dem Teilprojekt A3 eingegangenen
Entwürfen
Bei einer Übermittlung der Daten zu dem Teilprojekt A3 werden diese Datensätze mit übermittelt.at a transmission The data for the subproject A3 are transmitted with these data records.
Bei der Übermittlung des Hauptplans wird festgelegt, bis zu welcher Datentiefe auch die Daten von Teilprojekten mit übermittelt werden sollen. In der einfachsten Ausgestaltung des erfindungsgemäßen Verfahrens wird lediglich eine graphische Darstellung des Hauptplans übermittelt. In der nächsten Tiefe werden mit dem Hauptplan auch Angaben zu Teilprojekten übermittelt, die für die Gestaltung des zugewiesenen Teilprojekts relevant sind, also beispielsweise benachbarte Teilprojekte oder Teilprojekte, die für eine ähnliche Nutzung vorgesehen sind. Bei einer maximalen Datentiefe werden neben dem Datensatz von dem zugewiesenen Teilprojekt mit dem Hauptplan auch sämtliche Datensätze zu den anderen Teilprojekten übermittelt.When submitting the main plan, it is determined up to which data depth the data of subprojects should also be transmitted. In the simplest embodiment of the method according to the invention, only a graphical representation of the main plan is transmitted. At the next level, the main plan also provides information on subprojects that are relevant to the design of the assigned subproject, for example, adjacent subprojects or subprojects intended for similar use. At a maximum data depth, apart from the record from the assigned subproject with the main plan, all the records are also added to the other part projects.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102004009147A DE102004009147A1 (en) | 2004-02-23 | 2004-02-23 | Computer assisted presentation method e.g. for presentation documentation of projects consisting of severalsub projects, involves placing digitized main plan of building project in database, where to each subproject data record is recorded |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102004009147A DE102004009147A1 (en) | 2004-02-23 | 2004-02-23 | Computer assisted presentation method e.g. for presentation documentation of projects consisting of severalsub projects, involves placing digitized main plan of building project in database, where to each subproject data record is recorded |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102004009147A1 true DE102004009147A1 (en) | 2005-09-15 |
Family
ID=34853659
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102004009147A Ceased DE102004009147A1 (en) | 2004-02-23 | 2004-02-23 | Computer assisted presentation method e.g. for presentation documentation of projects consisting of severalsub projects, involves placing digitized main plan of building project in database, where to each subproject data record is recorded |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102004009147A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006001087A1 (en) * | 2006-01-04 | 2007-07-12 | Siemens Ag | Data transfer method between a first data processing unit and a second data processing unit |
DE102015005091A1 (en) * | 2015-04-22 | 2016-10-27 | Robert Carlo Fiebak | Method and system for compiling and processing data |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20010028364A1 (en) * | 2000-02-15 | 2001-10-11 | Thomas Fredell | Computerized method and system for communicating and managing information used in task-oriented projects |
-
2004
- 2004-02-23 DE DE102004009147A patent/DE102004009147A1/en not_active Ceased
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20010028364A1 (en) * | 2000-02-15 | 2001-10-11 | Thomas Fredell | Computerized method and system for communicating and managing information used in task-oriented projects |
Non-Patent Citations (2)
Title |
---|
Gerold Riempp: "Modellentwurf für Workflow Manage- ment mit verteilten Dokumenten-Datenbanken im WAN-Verbund", TH Darmstadt, 15. Juli 1994 |
Gerold Riempp: "Modellentwurf für Workflow Manage-ment mit verteilten Dokumenten-Datenbanken im WAN-Verbund", TH Darmstadt, 15. Juli 1994 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006001087A1 (en) * | 2006-01-04 | 2007-07-12 | Siemens Ag | Data transfer method between a first data processing unit and a second data processing unit |
DE102015005091A1 (en) * | 2015-04-22 | 2016-10-27 | Robert Carlo Fiebak | Method and system for compiling and processing data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ramírez Córcoles et al. | Intellectual capital in Spanish public universities: stakeholders' information needs | |
Plath | Work and Lifecourse in Japan: A Boy's Story of Loss and Survival in the Holocaust | |
DE202011110884U1 (en) | Automatic planning and rescheduling of appointments | |
DE102011106477A1 (en) | Method for providing data for search engine in internet, involves creating web address in complement document for ensuring data tapping by search engine and controlling presentation of specific data in complement document | |
DE202007019382U1 (en) | Event Search | |
Bailey et al. | Continuity and change in English further education: A century of voluntarism and permissive adaptability | |
DE102012100113A1 (en) | Method, software and computer system for handling accumulated data | |
DE102011007822A1 (en) | Method and system for simulating the timing of booking conditions | |
DE202016007836U1 (en) | Systems for facilitating the transmission of user images of locations | |
DE10247928A1 (en) | Designing recommendation systems so that they deal with general characteristics in the recommendation process | |
WO2015149884A1 (en) | Method and computer program product for analysing flight passenger ticket mass data sets | |
DE102004009147A1 (en) | Computer assisted presentation method e.g. for presentation documentation of projects consisting of severalsub projects, involves placing digitized main plan of building project in database, where to each subproject data record is recorded | |
Pilling | The changing role of the local journalist: from faithful chronicler of the parish pump to multiskilled compiler of an electronic database | |
Canina et al. | Revenue management in US hotels: 2001-2005 | |
DE19632499A1 (en) | Graphical representation system for work process e.g. change management | |
Ahamed et al. | Public policy and administration | |
DE102020133046B3 (en) | Computer-implemented method for operating a computer network structure for non-verbal communication and for coaching using at least one card set | |
DE102008012187A1 (en) | Editor for compiling data for filter functions of competence functions, has editor image displayed as competence selection list on display by user, and search algorithms executed by user | |
EP1672577A1 (en) | Method and device for creating a package tour data set | |
Morris-Lange | Countering demographic decline: How Germany’s shrinking universities attract and retain international students | |
Virginillo | How the Community Planning Association of Canada Influenced the Development of Planning in Canada, 1946-1964 | |
Prasad | An empirical study on perception and attitude of employees towards HRD practices with special reference to Western Coalfields Ltd., Nagpur | |
DE102022001690A1 (en) | System for merging data with a storage device on a computer | |
Moe et al. | The adoption of an electronic process guide in a company with voluntary use | |
Quedens | Retrospektive Konversion in den USA |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8131 | Rejection |