DE10117110A1 - Machine for laying pipes on sea bed comprises long floating hull moored so that current is channelled through nozzles in its base, producing ditch into which pipe is laid - Google Patents
Machine for laying pipes on sea bed comprises long floating hull moored so that current is channelled through nozzles in its base, producing ditch into which pipe is laidInfo
- Publication number
- DE10117110A1 DE10117110A1 DE2001117110 DE10117110A DE10117110A1 DE 10117110 A1 DE10117110 A1 DE 10117110A1 DE 2001117110 DE2001117110 DE 2001117110 DE 10117110 A DE10117110 A DE 10117110A DE 10117110 A1 DE10117110 A1 DE 10117110A1
- Authority
- DE
- Germany
- Prior art keywords
- laid
- nozzles
- current
- channelled
- ditch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/02—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
- E02F5/10—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables
- E02F5/104—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables for burying conduits or cables in trenches under water
- E02F5/107—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables for burying conduits or cables in trenches under water using blowing-effect devices, e.g. jets
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/02—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
- E02F5/10—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables
- E02F5/104—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables for burying conduits or cables in trenches under water
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
Description
Verlegung von Leitungen, vorzugsweise wenig biegbaren Rohrleitungen, im Meeresboden, vorzugsweise in küstennahen Bereichen mit flachem Wasser und starken Strömungen.Laying of pipes, preferably pipes which are not very flexible, in the seabed, preferably in coastal areas with shallow water and strong currents.
Leitungsgräben können gebaggert werden.Trenches can be excavated.
Bei biegbaren Leitungen ist ein Einbau mit gutem Verlegfortschritt unter aktiver Energiezufuhr durch Einpflügen bzw. durch Aufspülung des Bodens ähnlich den zusätzlichen Merkmalen gemäß Teilanspruch 5 möglich.In the case of bendable cables, installation is a good step forward with active energy supply by plowing in or by washing up the soil similar to the additional features possible according to claim 5.
Beide Vorgehensweisen setzen ausreichende Wassertiefen für die Zugänglichkeit der Trasse mit einem entsprechenden Antriebsschiff voraus, wie sie z. B. in Nähe des Wattenmeers nicht immer gegeben ist.Both approaches set sufficient water depths for the accessibility of the route with an appropriate propulsion vessel ahead, as z. B. not near the Wadden Sea is always given.
Bei steifen (Rohr-) Leitungen würde ein Pflug eine extrem lange Pflugeinrichtung voraussetzen. In Bereichen mit starker Strömung oder sich bis zum Meeresboden auswirkendem Wellengang erfordert die Rohrverlegung daher sehr breite Gräben (z. B. Neigung 1 : 10), da steilere Gräben zu schnell durch verfrachtete Sedimente geschlossen würden. Bis zum Einbau der Leitung kann sich bereits Schlick in dem Graben abgesetzt haben und die Bettungseigenschaften nachteilig verändern.With rigid (pipe) lines, a plow would be an extremely long plow device presuppose. In areas with strong currents or down to the sea floor the resulting swell therefore requires very wide trenches (e.g. Inclination 1:10), because steeper trenches are closed too quickly by transported sediments would. Until the pipeline is installed, silt can already be deposited in the trench have and adversely change the bedding properties.
Die Naturkräfte Strömung und Gezeiten werden genutzt, um einen Leitungsgraben zu erstellen und freizuhalten, indem ein Körper als Strömungshindernis im Wasser fixiert wird. Dadurch wird die Strömung in Richtung Meeresboden umgelenkt bzw. dort konzentriert, wodurch ein Bodenabtrag (Kolkung) erfolgt. In dem entstehenden Graben wird die Leitung verlegt.The natural forces of current and tides are used to create a trench create and keep clear by fixing a body as a flow obstacle in the water. This redirects or concentrates the current towards the seabed, whereby soil is removed (scouring). The line is in the trench relocated.
Ansprüche 2 bis 5 sind zweckmäßige Ausformungen des Anspruchs 1.Claims 2 to 5 are expedient versions of claim 1.
Anspruch 6 ermöglicht es, die frisch verlegte Leitung schnell abzudecken und damit zu stabilisieren, bevor sie selber als Strömungshindernis eine eigene Kolkbildung auslöst. Die gezielte Zumischung von Schüttgut ermöglicht es auch, die Korngrößenmischung in dem natürlicherweise eindriftenden Sediment zu ändern und damit den sich absetzenden Boden zu stabilisieren.Claim 6 enables the freshly laid line to be covered quickly and thus stabilize before it triggers its own scouring as a flow obstacle. The The targeted addition of bulk material also makes it possible to mix the grain sizes in the change naturally drifting sediment and thus the settling soil to stabilize.
Die Verfüllung könnte über die gesamte Länge des Kolkbaggers gleichzeitig geschehen, der gleich danach in Verlegerichtung verschoben würde, um eine erneute Kolkung zu vermeiden. Das Schüttgut könnte bei kontinuierlichem Verlegefortschritt auch am in Verlegerichtung hinteren Ende des Kolkbaggers abgeladen werden, vorzugsweise so, daß es nur noch wenig der Kolkungswirkung des Kolkbaggers ausgesetzt ist.The backfilling could take place over the entire length of the scraper at the same time immediately afterwards would be moved in the direction of installation in order to avoid renewed scouring. With continuous laying progress, the bulk material could also be in the laying direction rear end of the scraper be unloaded, preferably so that there is little left is exposed to the scouring effect of the scouring excavator.
Geringerer Einsatz von Fremdenergie, geringere Grabenbreite und damit kleinerer Eingriff in die natürliche Umwelt, Ablagerung des freigesetzten Materials teilweise in Nähe des Grabens (beruhigte Zone) und damit leichterer Wiedereinbau.Less use of external energy, smaller trench width and thus less intervention in the natural environment, deposit of the released material partly near the trench (calm zone) and thus easier reinstallation.
Der längliche Körper (1 - Verlegeeinrichtung) wird mit Spannseiten (2) an zuvor gesetzten Ankerpfählen (3) in Position gehalten. Die Strömung greift (im Beispiel von links) an und konzentriert sich unter dem Strömungshindernis. Der Boden wird dadurch weggerissen und setzt sich teilweise in dem beruhigten Bereich hinter dem Hindernis ab (4). Dieser Vorgang wird durch Düsen (5) an der Unterseite der Verlegeeinrichtung unterstützt. Dadurch entsteht eine längliche Mulde (6), in der die Leitung (8) verlegt wird. Günstig ist die Nähe der Wasseroberfläche (7).The elongated body ( 1 - laying device) is held in position with tensioning sides ( 2 ) on previously placed anchor posts ( 3 ). The current attacks (from the left in the example) and concentrates under the flow obstacle. The floor is thereby torn away and partially settles in the calm area behind the obstacle ( 4 ). This process is supported by nozzles ( 5 ) on the underside of the laying device. This creates an elongated trough ( 6 ) in which the line ( 8 ) is laid. The proximity of the water surface ( 7 ) is favorable.
Der Querschnitt zeigt die Leitung (8) bereits während der Absenkung aus der in der Verlegerichtung vorgeformten Aufnahmerinne (9), dadurch entsteht eine weitere Strömungsverstärkung. Eine Absenkvorrichtung ist erforderlich, wenn der Kolkbagger abschnittsweise arbeitet und jeweils nach Verlegung eines Leitungsabschnitts fortbewegt wird. Wenn der Kolkbagger mit kontinuierlichem Vorschub arbeitet, kann eine geeignete Ausformung über die Länge des Kolkbaggers eine passive Absenkung bewirken. Nach Absenken der Leitung öffnet sich eine Klappe (10) mit Schüttgut zur Stabilisierung der Leitung.The cross section shows the line ( 8 ) already during the lowering from the receiving channel ( 9 ) preformed in the laying direction, this results in a further flow amplification. A lowering device is required if the scraper excavator works in sections and is moved after each laying of a line section. If the scraper works with a continuous feed, a suitable shape along the length of the scraper can cause a passive lowering. After lowering the line, a flap ( 10 ) with bulk material opens to stabilize the line.
Claims (6)
- 1. 1.1 ein länglicher Körper
- 2. 1.2 in der Nähe des Meeresbodens positioniert wird,
- 3. 1.3 dadurch Strömungen induziert werden,
- 4. 1.4 die den Meeresboden abtragen und damit
- 5. 1.5 eine längliche Mulde erzeugen,
- 6. 1.6 in die eine Leitung eingebracht werden kann.
- 1. 1.1 an elongated body
- 2. 1.2 is positioned near the seabed,
- 3. 1.3 currents are thereby induced,
- 4. 1.4 who erode the seabed and thus
- 5. 1.5 create an elongated trough,
- 6. 1.6 into which a line can be introduced.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2001117110 DE10117110B4 (en) | 2001-04-06 | 2001-04-06 | Kolkbagger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2001117110 DE10117110B4 (en) | 2001-04-06 | 2001-04-06 | Kolkbagger |
Publications (2)
Publication Number | Publication Date |
---|---|
DE10117110A1 true DE10117110A1 (en) | 2001-10-31 |
DE10117110B4 DE10117110B4 (en) | 2004-02-05 |
Family
ID=7680576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE2001117110 Expired - Fee Related DE10117110B4 (en) | 2001-04-06 | 2001-04-06 | Kolkbagger |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE10117110B4 (en) |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1573444A (en) * | 1976-02-12 | 1980-08-20 | Hanab Bv | Method and apparatus for burying and pipeline laid out on the bottom of a body of water |
-
2001
- 2001-04-06 DE DE2001117110 patent/DE10117110B4/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
DE10117110B4 (en) | 2004-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2815673A1 (en) | DEVICE FOR LAYING OUTSIDE CABLES | |
US4379658A (en) | Method and apparatus for constructing slurry walls | |
EP3653795B1 (en) | Construction trench enclosures | |
DE3216685A1 (en) | SELF-DRIVING DEVICE FOR UNDERGROUND LAYING AND DIGGING UNDERWAY PIPES | |
EA021881B1 (en) | System for laying underground a continuous elongated member in a bed of a body of water | |
DE3923113A1 (en) | Arrangement for cleaning sea beds contaminated by pumpable material - has underwater vehicle with stirring system and pump in underside hopper | |
DE4001630C1 (en) | ||
US2992537A (en) | Plow for laying and uncovering pipe | |
NO153619B (en) | DEVICE FOR UNDERGRADING OF AN ELEVATIVE RELIABLE RUBBER SHAPE ARTICLE, LIKE A CABLE OR WIRE ON THE SEA. | |
DE2730853A1 (en) | DEVICE FOR BURNING A PIPE IN A WATER SOIL | |
DE10117110A1 (en) | Machine for laying pipes on sea bed comprises long floating hull moored so that current is channelled through nozzles in its base, producing ditch into which pipe is laid | |
EP4374015A1 (en) | Assembly and method for trenching underwater cables | |
US4470720A (en) | Underwater trenching & pipelaying apparatus | |
DE2024850C3 (en) | ||
DE2623811A1 (en) | Trenchless cable and pipeline laying machine - has buoyancy tanks with adjustable mountings and ducts allowing alteration of ballast effect | |
DE1801994C3 (en) | Device for inserting pipelines into the bottom of a body of water | |
DE2029813A1 (en) | Excavation process | |
US20180112367A1 (en) | Device for the installation of vacuum consolidation dewatering horizontal drains for dewatering sludge ponds | |
DE2628698C3 (en) | Process for underwater laying of lines, e.g. pipelines, in the seabed | |
DE3337560C2 (en) | Device for laying at least one pipeline underwater | |
DE102016119188A1 (en) | Method for dredging a body of water and water near areas and suction dredger | |
DE2017718C3 (en) | Method for operating a suction dredger in open water | |
DE1759981A1 (en) | Device for dredging and for transporting the dredged material | |
SU1703775A1 (en) | Method for preparing water area of beach for service | |
DE2514939A1 (en) | DEVICE AND METHOD FOR ANCHORING A DRILLING PLATFORM ON THE SEA FLOOR |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OAV | Applicant agreed to the publication of the unexamined application as to paragraph 31 lit. 2 z1 | ||
OP8 | Request for examination as to paragraph 44 patent law | ||
8122 | Nonbinding interest in granting licenses declared | ||
8364 | No opposition during term of opposition | ||
8339 | Ceased/non-payment of the annual fee |