DD281993A5 - STORAGE COMPLEX FOR THE DISPOSAL OF A FLEXIBLE REPAIR PROCESS - Google Patents

STORAGE COMPLEX FOR THE DISPOSAL OF A FLEXIBLE REPAIR PROCESS Download PDF

Info

Publication number
DD281993A5
DD281993A5 DD32585989A DD32585989A DD281993A5 DD 281993 A5 DD281993 A5 DD 281993A5 DD 32585989 A DD32585989 A DD 32585989A DD 32585989 A DD32585989 A DD 32585989A DD 281993 A5 DD281993 A5 DD 281993A5
Authority
DD
German Democratic Republic
Prior art keywords
warehouse
production
complex
storage
repair
Prior art date
Application number
DD32585989A
Other languages
German (de)
Inventor
Bernd Geipel
Juergen Seifert
Joerg Janicke
Winfried Schenke
Heike Schmidt
Original Assignee
Zentralwerkstatt Regis Db Fors
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zentralwerkstatt Regis Db Fors filed Critical Zentralwerkstatt Regis Db Fors
Priority to DD32585989A priority Critical patent/DD281993A5/en
Publication of DD281993A5 publication Critical patent/DD281993A5/en

Links

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

Die Erfindung betrifft einen Lagerkomplex zur Ver- und Entsorgung eines flexiblen Instandsetzungsprozesses, insbesondere zur Materialversorgung und Schadstoffentsorgung. Dabei ist von besonderer Bedeutung, dasz jedes Reparaturobjekt eine andere Reparaturtechnologie erfordert. Daraus folgernd ergibt sich fuer jedes Reparaturobjekt ein anderer Ver- und Entsorgungsbedarf. Erfindungsgemaesz steuert ein Prozeszrechner einen untergeordneten Lagerrechner, der wiederum alle Funktionen des Lagerkomplexes ueberwacht und steuert, wobei auch der Prozeszrechner Zugriff zu bestimmten Funktionen des Lagerkomplexes hat. Im Lagerkomplex werden die Systemkomponenten Stoffflusz, Information und systemuebergreifend Bearbeitung koordiniert und durch technische Mittel untersetzt. Fig. 1{Instandsetzungsprozesz, flexibel; Versorgung; Entsorgung; Material; Schadstoffe; Reparaturobjekt; Reparaturtechnologie; Lagerkomplex; Prozeszrechner; Lagerrechner; Systemkomponenten; Information; Stoffflusz; Bearbeitung}The invention relates to a storage complex for supply and disposal of a flexible repair process, in particular for material supply and pollutant disposal. It is of particular importance that each repair object requires a different repair technology. As a result, there is a different supply and disposal requirement for each repair object. According to the invention, a process computer controls a subordinate warehouse computer, which in turn monitors and controls all the functions of the warehouse complex, the process computer also having access to certain functions of the warehouse complex. In the warehouse complex, the system components material flow, information and cross-system processing are coordinated and supported by technical means. Fig. 1 {repair process, flexible; Care; Disposal; Material; pollutants; Repair object; Repair technology; Warehouse complex; Prozeszrechner; Storage computer; System components; Information; Stoffflusz; processing}

Description

Hierzu 1 Seite ZeichnungFor this 1 page drawing

Anwendungsgebiet der ErfindungField of application of the invention

Die Erfindung findet Anwendung bei der flexiblen Instandsetzung von Reparaturobjekten als Bestandteil eines flexiblen Reparatursystems.The invention finds application in the flexible repair of repair objects as part of a flexible repair system.

Sie kann auch als selbständig arbeitender Lagerkomplex genutzt werden.It can also be used as a stand-alone warehouse complex.

Charakteristik des bekannten Standes der TechnikCharacteristic of the known state of the art

Die Auswertung des Standes der Technik für automatisiert arbeitende Lager ergab, daß eine direkte Verbindung von Materialkommissioniorung und Materialentsorgung in gleichen Transportbehältern, gesteuert durch eine rechnergestützte Lagerhaltung, nicht bekannt ist.The prior art evaluation of automated warehouses revealed that a direct link between material picking and material disposal in the same shipping containers controlled by computerized warehousing is not known.

Gleiches trifft auf die automatisierte Verknüpfung zwischen einer reparaturobjektbezogenen Materialkommissicnierung und der Ein- und Auslagerung der Transportbehälter mit entsprechender Bereitstellung zur Produktion zu.The same applies to the automated linkage between a repair object-related material commissariat and the storage and retrieval of the transport containers with appropriate provision for production.

Eine Integration von Lagertechnik und Produktion, in der die Systemkomponenten Bearbeitung, Stofffluß und Information enthalten sind, ist für Instandsetzungstechnologien in dieser Komplexität und Intensität nicht bekannt.An integration of warehouse technology and production, which includes the system components processing, material flow and information, is not known for repair technologies in this complexity and intensity.

Eine Lagertechnologierealisierung in höhenmäßig drei Ebenen konnte, abgesehen von Hochregalspeichern, ebenfalls nicht ermittelt werden.A warehouse technology implementation in eleven levels could also not be determined, apart from high-bay storage.

Ziel der ErfindungObject of the invention

Ziel der Erfindung ist die termingerechte Ver- und Entsorgung eines flexiblen automatisierten Instandsetzungsprozesses. Dabei soil ein hoher Automatisierungsgrad realisiert werden. Außerdem muß eine hohe Flexibilität garantiert sein.The aim of the invention is the timely supply and disposal of a flexible automated repair process. In this case, a high level of automation should be realized. In addition, a high degree of flexibility must be guaranteed.

Darlegung des Wesens der ErfindungExplanation of the essence of the invention

Der Erfindung liegt die Aufgabe zugrunde, einen Lagerkomplex zu entwickeln, mit dem eine termingerechte Ver- und Entsorgung eines Instandsetzungsprozesses gesichert werden kann. Dabei ist zu beachten, daß die einzelnen Reparaturobjekte unterschiedliche Reparaturtechnologien erfordern. Daraus folgernd ergibt sich für jedes Reparaturobjekt ein anderer Ver- und Entsorgungsbedarf.The invention has for its object to develop a warehouse complex, with the on-time supply and disposal of a repair process can be secured. It should be noted that the individual repair objects require different repair technologies. As a result, there is a different supply and disposal requirement for each repair object.

Erfindungsgemäß wird die Aufgabe dadurch gelöst, daß unter Berück^chtigung instandsetzungsspezifischer Eigenheiten der durch einen Prozeßrechner auf der Grundlage einer vorlaufenden S :hadensaufnahme ermittelte Material- und Ersatzteilbedarf dem Lagerrechner eines automatisierten Lagerkomplexes übermittelt wird. Dieser nimmt nachfolgend einen prüfenden Vergleich zwischen dem benötigten und dem vorhandenen Material vor. Bei positivem Entscheid des Lagerrechners erfolgt die Aufnahme des Bearbeitungsauftrages in den Prozeßrechner. Das bedeutet, daß der Lagerrechner auf Anweisung des Prozeßrechners zeitlich abgestimmt mit der Zuführung dor Reparaturobjekte in den Instandsetzungsprozeß, vorlaufend den Kommissionierungsbefehl erteilt.According to the invention, the object is achieved in that, taking into account repair-specific characteristics of the determined by a process computer on the basis of a preceding S: Haden record material and spare parts required to the warehouse computer of an automated warehouse complex is transmitted. This subsequently performs a checking comparison between the required and the existing material. If the warehouse computer decides positively, the processing job is added to the process computer. This means that the storage computer on the instructions of the process computer timed with the supply of repair objects in the repair process, issued in advance the order picking.

Mit Befehlserteilung wird dem Kommissionierungsbereich ein materialentsorgter Transportbehälter zugeführt. Durch einen verfahrbaren Kommissionierbalancer erfolgt entsprechend dem Kommissionierauftrag die Beladung der Transportbehälter mit den verschiedenen Ersatz- und Verschleißteilen reparaturobjektbezogen. Die benötigten Ersatz- und Verschleißteile werden aus einem Hochregallager entnommen bzw. von einem Speziallager zugeführt. Nach der Abarbeitung des Kommissionierungsauftrages werden die Materialtransportbehälter in ein Produktionsbereitstellungslager eingeordnet. Das erfolgt durch ein Produktionslagerbediengerät, welches direkt mit dem Lagerrechner gekoppelt ist.When the command is issued, a material-transported transport container is fed to the picking area. By a movable order balancer is carried out according to the order picking the loading of the transport container with the various spare and wear parts repair object related. The required spare and wear parts are removed from a high-bay warehouse or fed from a special warehouse. After processing the picking order, the material transport containers are placed in a production supply warehouse. This is done by a production warehouse operating device, which is coupled directly to the storage computer.

Die rechnergesteuerte Auslagerung der Transportbehälter aus dem Produktionsbereitstellungslager wird durch das Produktionslagerbediengerät vorgenommen in der Weise, daß die auszulagernden Transportbehälter einem Übergabeboroich zur Produktion zugeführt und mittels eines positionierbaren Querverschiebewagens auf einen Materialtransportroboter übergeben werden.The computer-controlled removal of the transport containers from the production supply warehouse is carried out by the production warehouse operating device in such a way that the outsourced transport containers are fed to a transfer bakery for production and transferred by means of a positionable Querverschiebewagens on a material handling robot.

Die Zuführung der Materialtransportbehäller und der Abtransport der leeren Transportbehälter zum bzw. vom Lagerkomplex, speziell dem Hochregallager, werden mit einer Unterflurtransportanlage, die mit Hub- und Senkvorrichtungen ausgerüstet ist, automatisch durchgeführt.The supply of the material transport container and the removal of the empty transport containers to or from the warehouse complex, especially the high-bay warehouse, are automatically carried out with an underfloor transport system, which is equipped with lifting and lowering devices.

Die zur Kommissionierung benötigten Transportbehälter kommen vom Teilkomplex Materialentsorgung, der nach folgendom Prinzip funktioniert.The transport containers required for order picking come from the sub-complex material disposal, which works according to the following principle.

Die vom Komplex Materialentsorgung kommenden Transportbehälter erreichen über den Übergabebereich zum Lagerkomplex eine Transportstrecke, die die direkte Zuführung des Schadmaterials zu Sammelcontainern gewährleistet.The transport containers coming from the complex material disposal reach via the transfer area to the warehouse complex a transport route, which ensures the direct supply of the harmful material to collecting containers.

Durch eine Übergabeeinheit wird die Zuführung der entleerten Transportbehälter zum Kommissionierbereich realisiert.By a transfer unit, the supply of the emptied transport container is realized for picking.

Ausführungsbeispielembodiment

Die Erfindung wird nachstehend am Beispiel eines Lagerkomplexes für die Baggereimerreparatur, getrennt nach Transpurt·, Umschlag- und Lagerungslösungen (Hochregal- und Bodenlagerung), näher erläutert.The invention will be explained in more detail below using the example of a storage complex for baggage bucket repair, separated into transpallion, transshipment and storage solutions (high-bay and ground storage).

Die dazugehörige Zeichnung zeigt die prinzipielle Gesamtlösung des automatisiert arbeitenden Lagerkomplexes.The accompanying drawing shows the basic overall solution of the automated warehouse complex.

Die informationsseitigen Verknüpfungen sind nicht graphisch dargestellt.The information-side links are not shown graphically.

Die Anlieferung der benötigten standardisierten und nichtstandardisierten Ersatzteile erfolgt nach konventionellen Transporttechnologien, d. h. je nach Bedarfsfall mittels verschiedener Flurfördermittel bzw. per Gleisanschluß. Grundsätzlicher Anfahrpunkt ist dabei der Wareneingangsbereich. Alie Eingänge werden durch den Lagerrechner registriert, der mit dem die Bearbeitungstechnologie erstellenden Prozeßrechner gekoppe't ist.The delivery of the required standardized and non-standard spare parts is based on conventional transport technologies. H. as required by means of various floor conveyors or by rail connection. The fundamental starting point is the goods receipt area. All entrances are registered by the warehouse computer, which is linked to the process computer creating the processing technology.

Im Wareneingangsbereich werden die im Hochregallager 2 einzulagernden Ersatzteile und Hilfsmaterialien in bereitstehende Leerpaletten eingelagert bzw. es wird eine dem Sortiment entsprechende Palette zur mengenmäßigen Komplettierung angefordert. Der Einlagerungsvorgang wird über eine Unterflurpalettentransportanlage 3 und mit zwei im Wareneingangsbereich und am Hochregallager 2 angeordneten Hub- und Senkvorrichtung 4 realisiert.In the goods receiving area, the spare parts and auxiliary materials to be stored in the high-bay warehouse 2 are stored in waiting empty pallets or a pallet corresponding to the assortment is requested for quantitative completion. The storage process is implemented by means of an underfloor pallet transport system 3 and with two lifting and lowering devices 4 arranged in the goods receiving area and at the high-bay warehouse 2.

Das Hochregallager 2 ist mit einem zielgesteuerten Regalbediengerät 5 ausgerüstet.The high-bay warehouse 2 is equipped with a purpose-controlled storage and retrieval unit 5.

Die Transport- und Umschlagarbeiten werden im Bereich der Bodenlagerung mit einem Brückenkran durchgeführt.The transport and handling operations are carried out in the field of ground storage with a bridge crane.

Für jeden im Produktionsprozeß reparierten bzw. neugefertigten Baggereimer wird ein spezifisches Ersatzteilsortiment benötigt.A specific spare parts assortment is needed for every dredge bucket repaired or newly made in the production process.

Diese reparaturobjektbezogenen Ersatzteile werden in einer Spezialpalette 6 im Produktionslager kommissioniert, zwischengelagert und nach entsprechender Anforderung vom Prozeßrechner dem Produktionsprozeß zugeführt.These repair object-related spare parts are picked in a special pallet 6 in the production warehouse, stored temporarily and fed to the production process after appropriate request from the process computer.

Zur Bestückung der Spezialpalette 6 müssen aus dem Hochregallager 2 Paletten vom Regalbediengerät 5 automatisch dem Hochregallageraustrag 7 zur Kommissionierbereits' allung transportiert werden. Die nach der Nutzung im Produktionskomplex zurückgeführten Spezialpaletten 6 (Schrott- und Leerpaletten) werden vom Übergabebereich 8 an den Palettenspeicher 9 übergeben. In einar Doppelfunktion muß der unter dem Produktionsbereitstellungslager 17 stationierte Palettenspeicher 9 den automatischen Transport der Spezialpaletten 6 zur Übergabeeinheit- Kommissionierstrecke 10 und die Speicherung der Paletten auf der Transportbahn gewährleisten, wobei der Palettenspeicher 8 ein integrierter Bestandteil des Produktionsbereitstellungslagers 17 ist.To load the special pallet 6 pallets must be automatically transported from the high-bay warehouse 2 from the stacker crane 5 the high-bay warehouse discharge 7 to Kommissionierbereits' allung. The returned after use in the production complex special pallets 6 (scrap and empty pallets) are transferred from the transfer area 8 to the pallet store 9. In a double function, the pallet storage 9 stationed under the production supply warehouse 17 must ensure the automatic transport of the special pallets 6 to the transfer unit picking line 10 and the storage of the pallets on the transport path, the pallet storage 8 being an integral part of the production supply warehouse 17.

Die Übergabeeinheit- Kommissionierstrecke 10 hat folgende Aufgaben automatisch zu lösen:The transfer unit picking line 10 has the following tasks to be solved automatically:

- Weitertransport der Schrottpaletten von Pdatenspeicher 9 zur Palettenstrecke - Schrottentleerung 11- Further transport of the scrap pallets from data storage 9 to the pallet line - scrap unloading 11

- Quertransport der Leerpaletten zur Kommissionierstrecke 112.- Transverse transport of empty pallets to Kommissionierstrecke 112.

Von der Palettenstrecke - Schrottentleerung 11 werden die von der Übergabeeinheit - Kommissionierstrecke 10 einzeln übernommenen mit Schrott gefüllten Spezialpalette : 6 automatisch zu einer Entladestelle transportiert, positioniert, über einen Kippmechanismus entleert und wieder der Übergabeeinheit zugeführt. Die Schrottsammelbehälter 13 werden mittels Transportwagens 14 aus dem Lagerkomplex verfahren.From the pallet conveyor scrap removal 11, the special pallet 6 individually filled with scrap delivered by the transfer unit 10 are automatically transported to an unloading point, positioned, emptied via a tilting mechanism and returned to the transfer unit. The scrap container 13 are moved by means of transport carriage 14 from the warehouse complex.

Die auf der Kommissionierstrecke 112 befindlichen Spezialpaletten 6 werden aus den parallel dazu bereitstehenden Hochregallagerpaletten mit Ersatzteilen beschickt. Für die Kommissionierung sind zwei verfahrbare Kommissionierbalancer 15 vorgesehen. Der Inhalt jeder Spezialpalette 6 wird durch den Lagerrechner im Auftrag des Prozeßrechners festgelegt.The special pallets 6 located on the order-picking route 112 are supplied with spare parts from the high-bay storage pallets that are available in parallel. For picking two movable Kommissionierbalancer 15 are provided. The content of each special pallet 6 is determined by the warehouse computer on behalf of the process computer.

Nach dem Durchlauf der Kommissionierstrecke 112 werden die Spezialpaletten 6 von der Übergabestelle 116 aufgenommen und in das Produktionsbereitstellungslager 17 eingeordnet.After passing through the picking section 112, the special pallets 6 are picked up by the transfer point 116 and placed in the production supply warehouse 17.

Zur Aufnahme von Teilen außerhalb des Hochregallagers 2 werden die Spezialpaletten 6 über die Kommissionierstrecke Il 18 auf Extraplätee 19 verschoben und durch den Brückenkran 22 vom Lagerbereich „nichtstandardisierte Teile" 23 beschickt.To accommodate parts outside of the high-bay warehouse 2, the special pallets 6 are moved over the order picking line Il 18 on Extraplätee 19 and fed by the bridge crane 22 from the storage area "non-standard parts" 23.

Nach Abschluß des Kommissioniervorganges werden die Spezialpaletten 6 an der Übergabestelle Il 20 automatisch von einem Bediengerät 21 des Produktionsbereitstellungslagers 17 aufgenommen und in diesem eingelagert.After completion of the picking process, the special pallets 6 are automatically picked up at the transfer point Il 20 by an operating device 21 of the production supply warehouse 17 and stored in this.

Das Produktionsbereitstellungslager 17 ist das Bindeglied zwischen Produkt'onslager und Produktionsbereich, d.h. die im Produktionslager komn lissionierten Spezialpaletten 6 werden durch das automatisiert arbeitende Bediengerät 21 in das mit differenzierten Fachgrößen ausgerüstete Produktionsbereitstellungslager 17 eingelagert und entsprechend der Befehle des Prozeßrechners dem Produktionsbereich zugeführt. Die Schnittstelle zwischen Produktionslager und Reparaturbereich bildet der Übergabebereich 8.The production supply store 17 is the link between product storage and production area, i. the special pallets 6 removed in the production warehouse are stored by the automated operating device 21 in the production supply warehouse 17 equipped with differentiated compartment sizes and fed to the production area in accordance with the instructions of the process computer. The interface between the production warehouse and the repair area forms the transfer area 8.

Das Produktionsbereitstellungslager 17 ermöglicht mit seiner Kapazität die Zwischenlagerung der für eine Arbeitsschicht erforderlichen Ersateteile und Hilfsmaterialien.With its capacity, the production provision store 17 enables the temporary storage of the replacement parts and auxiliary materials required for a working shift.

Claims (5)

1. Lagerkomplex tür Ver- und Entsorgung eines flexiblen Instandsetzungsprozesses, gekennzeichnet dadurch, daß der Lagerbereich aus dem komplexen Produktionslager, Kommissionierstrecken I und Il (12; 18), einem Hochregallager (2) und einem zwischen letzteren verfahrbaren Kommissionierbala^cer (15) besteht und funktionell mit einem Lagerrechner, der einem Prozeßrechner untergeordnet ist, verbunden ist, wobei der Prozeßrechner Direktzugriffsmöglichkeiten zum Lagerbereich besitzt.1. Storage complex for supply and disposal of a flexible repair process, characterized in that the storage area from the complex production warehouse, picking I and Il (12; 18), a high-bay warehouse (2) and a movable between the latter order picking ^ cer (15) and functionally connected to a storage computer subordinate to a process computer, the process computer having direct access to the storage area. 2. Lagerkomplex nach Anspruch 1, gekennzeichnet dadurch, daß der Lagerrechner auf der Grundlage von durch den Prozeßrechner unter Berücksichtigung des vorhandenen Materialbestandes erarbeiteten objektbezogenen Einzeltechnologien für ein zeitlich definiertes Reparaturlos zur Ermittlung und Festsetzung der Zeitpunkte für die Einlagerung, die Komrnissionierung, die Produktionsbereitstellung bzw. die Übergabe an den Produktionsprozeß sowie für die Entsorgung des Produktionsprozesses und übergreifend für die Lagerbestandhaltung vorgesehen ist.2. warehouse complex according to claim 1, characterized in that the storage computer on the basis of elaborated by the process computer, taking into account the existing material inventory object-related individual technologies for a timely repair lot for determining and fixing the times for warehousing, Komrnissionierung, production provision or the transfer to the production process as well as for the disposal of the production process and overarching for the stock keeping is provided. 3. Lagerkomplex nach Anspruch 1, gekennzeichnet dadurch, daß die Verknüpfung von Lager- und Produktionsbereich mittels eines Bediengerätes (21) über ein Produktionsbereitstellungslager (17) realisiert ist.3. warehouse complex according to claim 1, characterized in that the combination of storage and production area by means of an operating device (21) via a production production warehouse (17) is realized. 4. Lagerkomplex nach Anspruch 1, gekennzeichnet dadurch, daß ein automatisch arbeitender Übergebebereich (8) durch einen Materialtransportroboter mit dem Produktionskomplex verbunden ist.4. warehouse complex according to claim 1, characterized in that an automatically operating transfer area (8) is connected by a material handling robot with the production complex. 5. Lagerkomplex nach Anspruch 1, gekennzeichnet dadurch, daß das Hochregallager (2) über eine Jnterflurpalettentransportanlage (3) mit dem Wareneingangsbereich in Verbindung steht.5. warehouse complex according to claim 1, characterized in that the high-bay warehouse (2) via a Jnterflurpalettentransportanlage (3) is in communication with the goods receiving area.
DD32585989A 1989-02-20 1989-02-20 STORAGE COMPLEX FOR THE DISPOSAL OF A FLEXIBLE REPAIR PROCESS DD281993A5 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DD32585989A DD281993A5 (en) 1989-02-20 1989-02-20 STORAGE COMPLEX FOR THE DISPOSAL OF A FLEXIBLE REPAIR PROCESS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DD32585989A DD281993A5 (en) 1989-02-20 1989-02-20 STORAGE COMPLEX FOR THE DISPOSAL OF A FLEXIBLE REPAIR PROCESS

Publications (1)

Publication Number Publication Date
DD281993A5 true DD281993A5 (en) 1990-08-29

Family

ID=5607206

Family Applications (1)

Application Number Title Priority Date Filing Date
DD32585989A DD281993A5 (en) 1989-02-20 1989-02-20 STORAGE COMPLEX FOR THE DISPOSAL OF A FLEXIBLE REPAIR PROCESS

Country Status (1)

Country Link
DD (1) DD281993A5 (en)

Similar Documents

Publication Publication Date Title
DE102011116081B3 (en) System and method for manual batch picking using the goods-to-man principle
DE102009019511B3 (en) Storage and picking system and method of operating the same in batch mode
DE3782968T2 (en) METHOD AND SYSTEM FOR SORTING GOODS.
DE69427215T2 (en) Method and device for the schedule control of parts delivery devices and method for managing the parts delivery devices
EP3826943B1 (en) Storage and order-picking system with a reduced processing time and method for operating same
EP3810530B1 (en) Storage and order-picking system and method for picking ordered articles from a suspension pocket and another load carrier
EP1754676B1 (en) Method for storing rolls of material
WO2019241817A1 (en) Storage and picking system and picking method with improved goods transfer between two storage locations
DE69920533T2 (en) AUTOMATIC SYSTEM FOR HANDLING OF PALLETIZED GOODS
WO2015039818A1 (en) Order-picking system comprising rack units having buffer trays for order picking onto a central belt
DE10200077B4 (en) Picking system with decoupling buffer
DE102012002482A1 (en) Shelf storage device for selectively storing / retrieving stored goods and method for operating such a shelf storage device
EP1307396A1 (en) Method for automatically loading and unloading transport units, especially units for transporting goods
EP1612170B1 (en) Method of roll stockage
DE4332315C2 (en) Process for distributing returns by mail order, in particular clothing
AT17770U1 (en) Storage and picking system and picking method with improved goods transfer between two storage areas
EP3870527B1 (en) Storage and commissioning system and method for automatic and manual commissioning of goods
DD281993A5 (en) STORAGE COMPLEX FOR THE DISPOSAL OF A FLEXIBLE REPAIR PROCESS
WO2009065448A1 (en) Method for handling transport events in underground mining
EP0742164A1 (en) Method and device for storing articles especially small pieces
DE102017005991A1 (en) Procedure for the disposition of incoming and outgoing goods
EP4444637A1 (en) Picking shuttle and method for picking within a shuttle rack aisle
DE3107465A1 (en) Mechanised retrieval method and an installation for carrying out the method
EP0708043A1 (en) Transport system

Legal Events

Date Code Title Description
VZ Disclaimer of patent (art. 11 and 12 extension act)