CZ61695A3 - Process of making framed reinforced concrete structure - Google Patents

Process of making framed reinforced concrete structure Download PDF

Info

Publication number
CZ61695A3
CZ61695A3 CZ95616A CZ61695A CZ61695A3 CZ 61695 A3 CZ61695 A3 CZ 61695A3 CZ 95616 A CZ95616 A CZ 95616A CZ 61695 A CZ61695 A CZ 61695A CZ 61695 A3 CZ61695 A3 CZ 61695A3
Authority
CZ
Czechia
Prior art keywords
fittings
concrete
space
masonry
reinforcement
Prior art date
Application number
CZ95616A
Other languages
Czech (cs)
Inventor
Josef Kazda
Original Assignee
Josef Kazda
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Josef Kazda filed Critical Josef Kazda
Priority to CZ95616A priority Critical patent/CZ61695A3/en
Publication of CZ61695A3 publication Critical patent/CZ61695A3/en

Links

Landscapes

  • Building Environments (AREA)

Abstract

Za pomoci tvarovek se vytvoří trvalá forma konstrukce ze zdících tvarovek (1) a věncových tvarovek (2). Ze zdících tvarovek (1) se zděním na vazbu zhotoví svislá stavební konstrukce a to tak, že válcové prostory (4) každé zdící tvarovky (1) se skládají na sebe až do výšky pozedního věnce, a zároveň se vyplňuje stabilizační prostor (5). Svislé válcové prostory (4) se osadí betonářskou výztuží (6) a zalijí betonem. Tepelně izolační prostor (3) se vyplní izolační hmotou a dále se zhotoví ukončující vrstva. Ta je tvořená věncovými tvarovkami (2), uloženými vedle sebe a situovanými na vazbu vzhledem k poslední vrstvě zdících tvarovek (1). Věncové tvarovky (2) se osadí betonářskou výztuží (6), která se spojí s betonářskou výztuží (6) svislou a zalijí betonem.With the help of fittings, a permanent form of construction is formed wall fittings (1) and ring fittings (2). From the walls fittings (1) with a brick for binding make a vertical building the structure, such that the cylindrical spaces (4) of each masonry fitting (1) stack up to the height of the front rim, and at the same time filling the stabilizing space (5). Vertical cylindrical the spaces (4) are reinforced with concrete reinforcement (6) and cast with concrete. The insulation space (3) is filled with insulation and then the finishing layer is made. It is formed crown fittings (2) side by side and situated for binding to the last layer of masonry fittings (1). The corrugated fittings (2) are fitted with concrete reinforcement (6), which joins the concrete reinforcement (6) vertically and casts concrete.

Description

Způsob zhotovení rámové železobetonové stavební TTónalžřuKčeA method of making a frame reinforced concrete building

Oblast techniky r~ C« (Λ < O -H </> x> z ->BACKGROUND OF THE INVENTION r ~ C «(Λ <O -H </> x> z ->)

o _ σ — oo _ σ - o

-=----ifí— o·- = ---- ifi— o ·

Vynález se týká stavební konstrukce, monolytického typu, tvarovek.The invention relates to a building structure, monolytic type, fittings.

způsobu zhotovení rámbgé Železobetonové ί on zhotovená pOUřfcc íA method of fabricating reinforced concrete

Dosavadní stav technikyBACKGROUND OF THE INVENTION

Doposud se nosné zdivo zhotovuje z nosných cihel o určité pevnosti na tlak. Nevýhodou tohoto způsobu je nedokonalé řešení tepelné izolace stavby na úkor únosnosti zdivá. Jiným známým způsobem je zhotovení rámové železobetonové monolytické stavební konstrukce tak, že do předem připraveného bednění se umístí betonářská výztuž a zalije betonem. Po zatvrdnutí se bednění odstraní . Plášti budovy vč. tepelné jako součást nosné stavební konstrukce, řešení jev mnoha případech zasahování do izolace se neřeší Nevýhodou tohoto plošné dispozice stavby, které později omezuje rozvržení interiérů.So far, the load-bearing masonry is made of load-bearing bricks of a certain compressive strength. The disadvantage of this method is the imperfect solution of thermal insulation of the building at the expense of masonry bearing capacity. Another known method is to fabricate a frame reinforced concrete monolytic building structure by placing a concrete reinforcement in the preformed formwork and pouring concrete. After hardening the formwork is removed. Building envelope incl. thermal as a part of load-bearing building construction, the solution in many cases of interference with insulation is not solved Disadvantage of this flat layout of the building, which later limits the layout of interiors.

Podstata vynálezuSUMMARY OF THE INVENTION

Výše uvedené nevýhody odstraňuje způsob zhotovení rámové železobetonové stavební konstrukce, podle vynálezu.The aforementioned disadvantages are avoided by the method of making the frame reinforced concrete building structure according to the invention.

Pomocí tvarovek se vytvoří trvalá forma konstrukce ze 2dících tvarovek a věncových tvarovek. Vlastní stěny zdící tvarovky ohraničují tepelně izolační prostor, válcový prostor pro trvalou formu nosné konstrukce a stabilizační prostor. Vlastní stěny věncové tvarovky ohraničují tepelně izolační prostor a vytvářejí trvalou formu pro nosnou konstrukci vodorovné části rámové konstrukce, která je zároveň pozedním věncem. Podstata vynálezu spočívá v tom, že ze zdících tvarovek se zděním na vazbu zhotoví svislá stavební konstrukce a to tak, že válcové prostory se v jednotlivých vrstvách skládají na sebe na až do výšky pozedního věnce. Zároveň se vyplňuje stabilizační prostor, načež se svislé válcové prostory osadí betonářskou výztuží a zalijí betonem. Tepelně izolační prostor se vyplní izolační hmotou a dále se zhotoví ukončující vrstva, která je tvořená věncovými tvarovkami, uloženými vedle sebe a situovanými na vazbu vzhledem k poslední vrstvě zdících tvarovek, a osadí se betonářskou výztuží, která se spojí s betonářskou výztuží svislou a zalije betonem.The fittings form a permanent form of construction from 2-piece fittings and ring fittings. The walls of the masonry block itself define the thermal insulation space, the cylindrical space for the permanent form of the supporting structure and the stabilization space. The actual walls of the corrugated fitting enclose the thermal insulation space and create a permanent form for the supporting structure of the horizontal part of the frame structure, which is also a lateral corrugation. The essence of the invention is that a vertical building structure is made of masonry bricks with bonded masonry in such a way that the cylindrical spaces are stacked on each other up to the height of the late rim. At the same time, the stabilization space is filled, whereupon the vertical cylindrical spaces are fitted with concrete reinforcement and poured with concrete. The thermal insulating space is filled with insulating material and a finishing layer consisting of side-by-side corrugated fittings situated in relation to the last layer of masonry fittings is made and fitted with concrete reinforcement, which is connected with concrete reinforcement vertical and poured with concrete .

Ve výhodném provedení způsobu podle vynálezu se osazení betonářskou výztuží a zalití betonem se provede nejméně v každém druhém svislém kruhovém prostoru.In a preferred embodiment of the method according to the invention, the reinforcement and the concrete are cast in at least every second vertical circular space.

Výhodou navrhovaného řešení je to, že při stavbě svislé zdi není tato nosná, ale jen připravuje prostor pro tepelnou izolaci a vytváří se prostory pro nosnou konstrukci. Po dokončení svislé stavební konstrukce se teprve osazením zdi výztuží a zalitím betonem stává konstrukce nosnou.The advantage of the proposed solution is that in the construction of a vertical wall, it is not a load-bearing, but only prepares a space for thermal insulation and creates a space for a load-bearing structure. After completion of the vertical building structure, it is only by installing the wall reinforcement and pouring concrete that the structure becomes load-bearing.

Jinou výhodou je, že při takto zhotovené stavební konstruci se ruší většina tepelných mostů, což zvyšuje tepelnou a zvukovou izolaci budovy.Another advantage is that in this construction, the construction of the building eliminates most of the thermal bridges, which increases the thermal and acoustic insulation of the building.

Další výhodou je použití metody suchého zděni i ve více než dvou podlažích nad sebou.Another advantage is the use of dry walling even on more than two floors above each other.

Přehled obrázků na výkresechBRIEF DESCRIPTION OF THE DRAWINGS

Vynález je blíže vysvětlen pomocí výkresů, kde na obr. 1 je zdící tvarovka v půdorysu s naznačením řezu A - Á, na obr. 2 je zdící tvarovka v řezu A - Á, na obr. 3 je věncová tvarovka v příčném řezu a na obr. 4 je celkový pohled na stavební konstrukci. Obr. 5 znázorňuje rámovou železobetonovou stavební konstrukci v kosoúhlém pohledu.BRIEF DESCRIPTION OF THE DRAWINGS The invention is explained in more detail with reference to the drawings, in which FIG. 1 shows a masonry fitting in plan view showing section A-A; FIG. 2 shows a masonry fitting in section A-A; 4 is an overall view of the building structure. Giant. 5 shows a frame reinforced concrete building structure in a perspective view.

Příklad provedeni vynálezuDETAILED DESCRIPTION OF THE INVENTION

Příklad 1Example 1

Na předem připravené vybetonované základy byla založena první vrstva zdících tvarovek £. V těle zdící tvarovky £ je tepelně izolační prostor 3, dva válcové prostory 4 a mezi nimi je stabilizační prostor 5. Zdící tvarovky £ byly založeny na sraz, to znamená že mezi nimi nebyla ponechána svislá spára.A first layer of masonry blocks 6 was laid on the pre-cast concrete foundations. In the body of the masonry fitting 6 there is a heat-insulating space 3, two cylindrical spaces 4 and between them there is a stabilizing space 5. The masonry fitting 6 was based on a meeting, i.e. no vertical gap was left between them.

Na tuto vrstvu byly ukládány další vrstvy zdících tvarovek £ vždy na vazbu a zároveň tak, že válcové prostory 4 jsou umísťovány nad sebou. Při tomto zdění byl průběžně zaplňován stabilizační prostor 5 zdících tvarovek £ lehčeným betonem. Zároveň se v průběhu zdění tepelně izolační prostor 5 postupně zaplňoval sypkou tepelnou izolací v tomto případě perli tem.On this layer, further layers of masonry blocks 4 were always deposited on the binding and at the same time so that the cylindrical spaces 4 were placed one above the other. During this walling, the stabilizing space 5 of the masonry blocks 6 was continuously filled with lightweight concrete. At the same time, during the walling, the thermal insulation space 5 was gradually filled with loose thermal insulation in this case pearl.

Po dosažení výšky zdivá až k pozedňímu_ věnci byla osazena betonářská výztuž 6 do svislých válcových prostorů 4,______které vznikly při zdění a byla zalita betonem. Na poslední vrstvu zdících tvarovek i byla ihned uložena vrstva věncových tvarovek 2, které jsou ukládány vedle sebe na vazbu. Tyto vytvoří formu ke zhotovení pozedního věnce t j . vodorovné části rámu nosné konstrukce. Načež byly věncové tvarovky 2 osazeny betonářskou výztuží 6, která se svařením spojila se svislou betonářskou výztuží 6 a zalila betonem.After reaching the height of the masonry up to the rim, the concrete reinforcement 6 was installed into the vertical cylindrical spaces 4, ______ which were created during the masonry and were poured with concrete. On the last layer of the wall fittings 1 was immediately deposited a layer of ring fittings 2, which are laid side by side on the binding. These form a mold for making a late rim i.e. horizontal parts of the frame of the supporting structure. Then the ring fittings 2 were fitted with concrete reinforcement 6, which was welded to the vertical concrete reinforcement 6 and poured into concrete.

Příklad 2Example 2

Ze zdících tvarovek 1. bylo, stejným způsoben jako v předchozím příkladu, zhotoveno zdivo až k pozednímu věnci. Protože podle konstrukčních výpočtů nebyla zapotřebí příliš vysoká nosnost zdivá, byla betonářská výztuž 6 osazena pouze vždy do každého druhého svislého válcového prostoru 4 zdivá zhotoveného ze zdících tvarovek i. Další postup byl shodný s postupem uvedeným v předcházejícím příkladu.The masonry was made of masonry blocks 1, in the same way as in the previous example, up to the late rim. Since, according to the design calculations, a too high load-bearing capacity of the masonry was not required, the concrete reinforcement 6 was always installed only in every second vertical cylindrical space 4 of masonry made of masonry blocks 1. The procedure was the same as in the previous example.

Stabilizační prostor 5 po zatvrdnutí lehčeného betonu zamezuje bočnímu zborcení zdivá a přebírá tak funkci vodorovné zdící spáry, tj. zamezuje smykovému namáhání ve zdivu.The stabilization space 5, after hardening of the expanded concrete, prevents lateral collapsing of the masonry and thus takes over the function of the horizontal masonry joint, ie it prevents shear stress in the masonry.

Při použití tohoto způsobu vznikne monolytická rámová konstrukce, neboť svislá nosná část je ihned napojena a betonářskou výztuží 6 propojena s vodorovnou částí rámu.Using this method, a monolytic frame structure is created, since the vertical bearing part is immediately connected and the concrete reinforcement 6 is connected to the horizontal part of the frame.

Průmyslová využitelnostIndustrial applicability

Řešeni podle vynálezu je s výhodou využitené v bytové a občanské výstavbě, stejně jako v průmyslových a zemědělských stavbách.The solution according to the invention is advantageously used in residential and civil construction as well as in industrial and agricultural buildings.

Claims (2)

PATENOVÉ NÁROKYPATENOVÉ CLAIMS 1. Způsob zhotovení rámové železobetonové stavební--kon^Uřukcspomocí tvarovek, kterým se vytvoří trvalá forma konstrukce monolytického typu se sdících tvarovek (1) a věncových tvarovek (2), kdy vlastní stěny zdící tvarovky (1) ohraničují tepelně izolační prostor (3), válcový prostor (4) pro trvalou formu nosné konstrukce a stabilizační prostor (5) a vlastní stěny věncové tvarovky (2) ohraničují tepelně izolační prostor (3) a vytvářejí trvalou formu pro nosnou konstrukci vodorovné Části rámové konstrukce, která je zároveň pozedním věncem vyznačující se tím, že ze zdících tvarovek (1) svislá stavební konstrukce a to (4) každé zdící tvarovky (1) se na sebe až do výšky posedního věnce, a zároveň se stabilizační prostor (5), načež se svislé válcové se zděním na vazbu zhotoví tak, že válcové prostory skiádaj í vyplňuje prostory (4) osadí betonářskou výztuží (6) a zalijí betonem a tepelně izolační a dále se zhotoví věncovými tvarovkami na vazbu vzhledem prostor (3) se vyplní izolační hmotou ukončující vrstva, která je tvořená (2), uloženými vedle sebe a situovanými poslední vrstvě zdících tvarovek (1), načež se věncové tvarovky (2) osadí betonářskou výztuží (6), která se spojí s betonářskou výztuží (6) svislou a zalijí betonem.1. A method of making a frame reinforced concrete building structure by means of fittings, which form a permanent form of monolytic type construction with mating fittings (1) and ring fittings (2), where the walls of the masonry fitting (1) define the thermal insulation space (3). , the cylindrical space (4) for the permanent form of the load-bearing structure and the stabilizing space (5) and the actual walls of the crown fitting (2) define the thermal insulation space (3) and form a permanent form for the horizontal load-bearing structure. characterized in that of the masonry blocks (1) the vertical building structure (4) of each masonry block (1) is stacked up to the height of the seat rim, while at the same time stabilizing space (5), whereupon the vertical cylindrical made by the cylindrical space of the ski slopes filling the spaces (4) with concrete reinforcement (6) and pouring concrete and thermal insulation It is completed and then made with corrugated fittings for binding with respect to the space (3), filled with insulating material finishing layer consisting of (2) placed side by side and situated the last layer of masonry fittings (1). reinforcement (6), which is connected to the concrete reinforcement (6) by vertical and poured concrete. 2. Způsob zhotovení rámové železobetonové stavební konstrukce, podle nároku 1., vyznačuj ící se tím, že osazení betonářskou výztuží (6) a zalití betonem se provede nejméně v každém druhém svislém kruhovém prostoru (4).Method for producing a frame reinforced concrete building structure according to claim 1, characterized in that the reinforcement (6) and the concrete are embedded in at least every second vertical circular space (4).
CZ95616A 1995-03-10 1995-03-10 Process of making framed reinforced concrete structure CZ61695A3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CZ95616A CZ61695A3 (en) 1995-03-10 1995-03-10 Process of making framed reinforced concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CZ95616A CZ61695A3 (en) 1995-03-10 1995-03-10 Process of making framed reinforced concrete structure

Publications (1)

Publication Number Publication Date
CZ61695A3 true CZ61695A3 (en) 1996-09-11

Family

ID=5461992

Family Applications (1)

Application Number Title Priority Date Filing Date
CZ95616A CZ61695A3 (en) 1995-03-10 1995-03-10 Process of making framed reinforced concrete structure

Country Status (1)

Country Link
CZ (1) CZ61695A3 (en)

Similar Documents

Publication Publication Date Title
US9988775B1 (en) Concrete i-beam for bridge construction
US6412244B2 (en) Modular wall element
CN103797197B (en) Pre-casting integral wall and the building structure of floor
US9487943B2 (en) Component building system
EP0814946B1 (en) A process for making a lightweight, cementitious, three-dimensional structure
CN111809796B (en) Assembled concrete superposed beam and construction method thereof
KR20140110490A (en) Half precast concrete column manufacturing method using prefabricated PC panels and constructing method using the same
GB2355024A (en) Insulating building panel of polystyrene and concrete
EP2241690B1 (en) Insulated foundation element for mounting on precast base foundation
CZ61695A3 (en) Process of making framed reinforced concrete structure
EP3719229B1 (en) Concrete floor panel, method of production of such panel and floor made of this panel
ITRM20130697A1 (en) PROCEDURE FOR ASSEMBLY AND CONSTRUCTION OF A FLAT OR INCLINED FLOOR FOR CIVIL AND INDUSTRIAL USE, MONO OR BI-DIRECTIONAL ARMORING, AND MEANS FOR ITS IMPLEMENTATION
KR200178874Y1 (en) Pc concrete wall panel
JPH09295313A (en) Manufacture of immersed tube
KR100650017B1 (en) Stone Insulation Block building works method
CN213509048U (en) Single-face superposed prefabricated part node
CN214658019U (en) Assembled wallboard
CN203654564U (en) Cavity floor system with hidden frames and dense ribs
JPH07300867A (en) Method for constructing reinforced concrete retaining wall
RU8715U1 (en) BRICK WALL ACCESS JUMPER
JPH0444550A (en) Semi-precast rc building
JP3055754U (en) Large culvert by combination of precast concrete
JP2004060340A (en) Full precast hollow floor slab and integral structure of the floor slab and building frame beam
JPH02296948A (en) Construction method of reinforced concrete construction slab
JPH0351416A (en) Constructing method for continuous underground wall having pole built therein