CS252302B1 CS833639A CS363983A CS252302B1 CS 252302 B1 CS252302 B1 CS 252302B1 CS 833639 A CS833639 A CS 833639A CS 363983 A CS363983 A CS 363983A CS 252302 B1 CS252302 B1 CS 252302B1
Authority
CS
Czechoslovakia
Prior art keywords
embankment
base
pit
solid
rigid elements
Prior art date
Application number
CS833639A
Other languages
Czech (cs)
Other versions
CS363983A1 (en
Inventor
Jan Kucza
Original Assignee
Jan Kucza
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jan Kucza filed Critical Jan Kucza
Priority to CS833639A priority Critical patent/CS252302B1/en
Publication of CS363983A1 publication Critical patent/CS363983A1/en
Publication of CS252302B1 publication Critical patent/CS252302B1/en

Links

Abstract

Ochranný poval, použitelný pro prohlubování důlních jam, sestávající z pevná báze povalu, zachycovacím násypu volně uložených tuhých prvků, technologického potrubí a střeěního krytu, spočívá v tom, že pevná báze povalu je vestavěna do zapouštěcích kapes ve zdivu jámy, přičemž je na ní zbudován bud samostatný zachycovací násyp nebo zachycovací násyp s volně uloženou nejméně jednou vrstvou tuhých prvků, tvořících zachycovací štít, které jsou od pevné báze i navzájem odděleny.Protective cover, usable for deepening mine pits, consisting of solid the base of the mud, the entrainment embankment freely stored rigid elements, technological piping and roofing cover, that the solid base of the coating is built into the recess pockets in a masonry pit taking them on it built a separate capture embankment or entrainment embankment at least one layer of rigid elements, forming a capture shield that are from solid bases are separated from each other.

Description

Vynález se týké ochranného povelu, použitelného zejména v hornictví, vyplňujícího celý profil jámy a užívaného hlavně v jámách hlubinných dolů při provádění prohlubovacích prací.The invention relates to a protective command, particularly useful in mining, which fills the entire profile of a pit and is mainly used in pits of underground mines for the execution of deepening operations.

Dosud používané ochraně povály a jiná zařízení pro ochranu pracovníků v prohlubovaném úseku jam hlubinných dolů byly řešeny zpravidla pomocí horninových celíků, vzpěradlových povalů a povalů z rychletuhnoucí stavební hmoty využívajících případné ocelové zpevňovací armáže. Dosavadní konstrukce jsou technologicky náročné, mají velkou stavební výšku, jejich zřizováni je pracná a Sasové náročné. Při jejich zhotovování je třeba provádět rozměrný zásek do jámového zdivá, při stavbě i demontáži je nutné dočasně zastavit provoz jámy. Po likvidaci povalů v jámě je u takových konstrukcí nutno provádět náročnou asanaci jámového zdivá i výstroje.The hitherto used protection of the post and other equipment for the protection of workers in the deepened section of the pits of underground mines were usually solved by means of rock cells, buckling and quick-fasting building materials using potential steel reinforcement armies. The existing structures are technologically demanding, have a high construction height, their construction is laborious and Saxons demanding. During their construction it is necessary to make a large block into the pit masonry, during construction and disassembly it is necessary to temporarily stop the operation of the pit. After disposal of sludge in the pit, it is necessary to carry out demanding decontamination of pit masonry and equipment.

Uvedené nedostatky jsou odstraněny ochranným povalem tvořeným pevnou bází povalů, v zachycovacím násypu volně uloženými tuhými prvky, technologickým potrubím, větracím potrubím a střešním krytem, podle vynálezu, jehož podstata spočívá v tom, že sestává z pevná báze vestavěné do zapouitěcích kapes ve zdivu jámy, na které je zřízen zachycovaci násyp, provedený samostatně, nebo zachycovaci násyp, ve kterém je vestavěn volně uložený vSesměrně tuhý, zachycovaci Štít, složený z jedné nebo více vrstev uložených tuhých prvků oddělených mezi sebou i od pevné báze zachycovacím násypem.These drawbacks are overcome by a protective coating consisting of a solid base of the claddings, a free-flowing solid element in the embankment, a technological duct, a ventilation duct and a roof covering according to the invention, which consists in a solid base on which a gripping embankment, provided separately, or a gripping embankment in which a loosely embedded in a directionally rigid, gripping shield comprising one or more layers of embedded rigid elements separated from each other and from the solid base by the gripping embedded is provided.

Ochranný poval dle vynálezu má tu výhodu, že minimalizuje práce pro zřízení a demontáž povalů v dole tak, že odstraňuje horninový celík a v dosavadních konstrukcích povalů odstraňuje celík z rychletuhnoucí stavební hmoty umístěný v záseku ve zdivu jámy. Funkci těchto celíků přebírá pevná báze ochranného povalů, přičemž se odstraní potřeba dodatečné likvidace horninového celíku a. zřizování rozměrného záseku do zdivá jámy spolu s pracným odléváním celíku z rychletuhnoucí hmoty. Zjednoduší se tak konstrukce celého povelu, zkrátí se čas na jeho zřizování i likvidaci, zkrátí se čas přerušení těžby v jámách.The protective coating according to the invention has the advantage that it minimizes the work for the installation and dismantling of the cladding in the mine by removing the rock unit and in the existing cladding structures removing the unit from the rapid-setting building material located in the pit in the masonry of the pit. The function of these units is taken over by a solid base of protective coatings, eliminating the need for additional disposal of the rock unit and the establishment of a large ditch in the masonry pit along with laborious casting of the unit from the rapid-setting mass. This will simplify the construction of the entire command, shorten the time for its establishment and disposal, shorten the time of interruption of mining in the pits.

Konstrukci lze využít u jam svislých i šikmých, včetně slepých jam a svážných jakéhokoliv tvaru a plochy průřezu. Lze respektovat umístění stávající výstroje jámy, lze zřizovat potřebná technologické průchody, řeěení je přijatelné i pro jámy velkých hloubek, poval chrání i proti pádu úzkých a hmotných předmětů, nevyžaduje se instalace zařízení v tuzemsku obtížně dosažitelných, nebo zařízeni z dovozu, součásti povalů jsou snadno zhotovitelné a několikanásobně použitelné. Zřízení povalů je energeticky méně náročné, snadněji se v úseku likvidace povelu doplní potřebná výstroj jámy, odpadá zřizování dodatečných podpor. Poval dle vynálezu je nezávislý na těžním i prohlubovacím zařízení v jámě.The structure can be used for vertical and inclined pits, including blind pits and slopes of any shape and cross-sectional area. It is possible to respect the location of the existing pit equipment, it is possible to set up the necessary technological passages, the solution is acceptable even for pits of great depths, the coating protects against falling narrow and tangible objects, does not require installation of equipment difficult to reach inland, or equipment from import workable and reusable. Establishment of sludge is less energy intensive, it is easier to fill in the area of disposal of necessary pit equipment, no need to establish additional supports. The poval according to the invention is independent of the extraction and excavation equipment in the pit.

Poval lze zhotovit z nedělených nosníků. Konstrukci lze dimenzovat na celý rozsah funkčních podmínek povalů od mělkých jam až po jámy sahající do velkých hloubek. V případě využití zachycovacího štítu je možné výrazně snížit výšku konstrukce ochranného povelu dle vynálezu. Poval lze zřídit i preventivně a při své funkci nevyvolává žádné nepříznivé vlivy, nepoužívá žádná pohyblivé součásti, přináší společenský přínos zejména ve zvýšení těžby a urychlení otvírky dalších částí ložiska.Poval can be made from undivided beams. The construction can be dimensioned for the entire range of functional conditions of the sludge from shallow pits to pits reaching great depths. If a gripping shield is used, it is possible to significantly reduce the height of the protective command construction of the invention. Poval can also be set up preventively and does not cause any adverse effects in its function, does not use any moving parts, brings social benefits especially in increasing mining and speeding up the opening of other parts of the bearing.

Přiložené výkresy schematicky znázorňují příklady provedení ochranného povalů, použivatelného zejména v hornictví a vyplňujícího celý profil jámy, kde obr. 1 představuje svislý řez jámou s alternativním umístěním ochranného povalů nad nebo pod spodním patrem, obr. 2 představuje svislý řez ochranným povalem, obr. 3 znázorňuje horizontální řez A-A provedením prvné báze povalů. Na obr. 4 je znázorněna funkce volně uloženého věesměrně tuhého zachycovacího Štítu.The accompanying drawings schematically illustrate examples of protective coatings particularly useful in mining and filling the entire pit profile, wherein Figure 1 is a vertical section of a pit with an alternative location of the protective layers above or below the lower deck, Figure 2 is a vertical section of the protective layer; shows a horizontal section AA of an embodiment of the first base of the coatings. Fig. 4 illustrates the function of a loosely positioned, non-directional rigid gripping shield.

Hlavní částí ochranného povalů je dle obrázku 2. pevná báze 10 povalů, zhotovená ku příkladu z profilových železobetonových nebo kovových nosičů, zapuštěných do zapouštěclch kapes 13 umístěných ve zdivu jámy 6. Pevná báze 10 může být tvořena nosiči, umístěnými v jedné nebo více rovinách.The main part of the protective cladding is, according to Figure 2, a solid cladding base 10, made, for example, of profiled reinforced concrete or metal carriers embedded in recess pockets 13 located in the masonry of the pit 6. The solid base 10 may consist of carriers placed in one or more planes.

Nad pevnou bázi 10 povalu je zhotoven zachycovací násyp 1, provedený ze sypkého materiálu jako Škvára, písek, StSrk a podobně. V tomto zachycovacím násypu 2 je Ole potřeby vestavěn všesměrně tuhý volně uložený zachyeovací štít, tvořený nejméně jednou vrstvou volně uložených prvků 8, 2i které jsou zachycovacím násypem 2 pevné báze 10 i navzájem odděleny. Celá popsaná sestava povalu je zhotovena pod střešním krytem 14. Funkční propojení částí jámy i nad a pod povalem umožňují technologické průchody JJ, a větrací potrubí 12. zhotovené v povalu s oboustranným přesahem. Volně uložené tuhé prvky ve vrstvách 8, 2 zachycovacího štítu i střešní kryt 14 mohou být tvořeny na příklad stavebními panely, plošnými nebo profilovými stavebními dílci z kovu nebo železobetonu, betonu a podobně. Na obrázku i je ochranný poval J bez celíku z rychletuhnoucí hmoty vyplňující celý profil jámy, umístěný alternativně nad nebo pod úrovní spodního patra 2 v jámě 2 a tvoří tak ochranu proti pádu předmětů na dno jáoty £ nebo do prohlubovaného úseku jámy 2·Above the solid base 10 of the slurry, a collecting embankment 1 made of loose material such as cinder, sand, sand and the like is made. An omnidirectionally rigid, loosely laid retaining shield, comprising at least one layer of loosely embedded elements 8, 21, which are separated from each other by the latching platform 2 of the solid base 10, is installed in this catching funnel 2. The whole described assembly of the sludge is made under the roof cover 14. The functional interconnection of the pit parts as well as above and below the sludge is enabled by technological passages 11 and a ventilation duct 12 made in the sludge overlap. The loosely rigid elements in the gripping shield layers 8, 2 and the roof cover 14 may be formed, for example, by building panels, sheet or profiled components of metal or reinforced concrete, concrete and the like. In Fig. 1, the protective coating J without the whole of the quick-setting mass fills the entire profile of the pit, located alternatively above or below the level of the lower tray 2 in the pit 2, thus providing protection against falling objects to the bottom of the pit.

Při pádu břemene na poval J dochází k jeho zahořování do zachycovacího násypu 2> tím se mění pohybová energie břemen na práci. Vznikající dynamická síla je přes zachycovací násyp 2 přenášena do pevné báze povalu 10. V případě použití volně uloženého všesměrně tuhého zachycovacího štítu složeného z nejméně jedné nebo více volně uložených vrstev tuhých prvků 8, 2, od pevné báze 10 i navzájem oddělených zachycovacím násypem 2 je dle obr. 4 dynamická síla rozptýlena do plochy průřezu ochranného povalu J a přenášena přes zachycovací násyp 2 éo pevné báze 10 povalu, znázorněné na obr. 2, která je tak příznivěji namáhaná. Při využití i nevyužití tuhých prvků 8, 2 zachycovacího ětítu dochází k absorbci dynamické síly v pevné bázi 10 povalu, která je jeho hlavní částí. Zachycovací násyp 2 ochraňuje též pevnou bázi 10 povalu před přímým nárazem tuhých prvků 8, 2 volně uloženého zachycovacího štítu při nárazu břemene.When the load falls on the cladding J, it is burned into the collecting embankment 2, thereby changing the movement energy of the loads for work. The resulting dynamic force is transmitted through the engagement chute 2 to the solid base of the slurry 10. In the case of using a loosely mounted omnidirectionally rigid engagement shield composed of at least one or more loosely deposited layers of rigid elements 8, 2, According to FIG. 4, the dynamic force is dissipated into the cross-sectional area of the protective coating J and transmitted through the gripping embankment 2 of the solid base 10 shown in FIG. 2, which is thus more favorably loaded. By using and not utilizing the rigid gripping elements 8, 2, the dynamic force is absorbed in the solid base 10 of the slurry, which is a major part of it. The gripping embankment 2 also protects the solid base 10 from the direct impact of the rigid elements 8, 2 of the loosely mounted gripping shield in the event of a load.

hle obr. 4 jsou volně uložené tuhé prvky v zachycovacím štítu dimenzovány na ohyb dle výpočtu, uvažujícího odvození s uložením celých prvků na poddajné podložce. Pro maximální ohybový moment ve středu prvků byl odvozen vztah ve tvaru:According to Fig. 4, the loosely mounted rigid elements in the gripping shield are dimensioned for bending according to a calculation considering deduction of the placement of the entire elements on a flexible substrate. For the maximum bending moment in the center of the elements, the following formula was derived:

«max = 8 * -a/íta/ «Max = 8 * ( - - a/ ít /

Význam symbolů je tento:The meaning of the symbols is as follows:

q - dynamické zatížení od pádu břemene; /N/m/ qj- dynamické zatíženi před zachycovacím štítem /N/m/;q - dynamic load since the load falls; / N / m / qj - dynamic load in front of the catch shield / N / m /;

- rozsah dynamického zatížení od pádu břemene /m/.- dynamic load range since the load falls / m /.

D - délka tuhých prvků volně uloženého zachycovacího štítu /m/.D - length of the rigid elements of the loosely laid gripping shield (m).

Obecně lze zásadní sestavu konstrukce povalu bez použití celíku z rychletuhnoucí stavební hmoty využít všude tam, kde se jedná o zachycení a utlumení pohybové energie předmětů, pohabujících se ve svislé, šikmé nebo horizontální rovině v uzavřeném i otevřeném prostoru. Využití může být přitom zaměřeno nejen pro ochranu okolí pohybujícího se předmětu, nýbrž taky pro ochranu předmětu samotného, jakož i pro ochranu okolí i pohybujícího se předmětu současně.Generally, the basic assembly of the structure without the use of a cellular structure of fast-setting building material can be used wherever it is to capture and attenuate the kinetic energy of objects moving in a vertical, inclined or horizontal plane in both closed and open space. The use can be directed not only to protect the surroundings of the moving object, but also to protect the object itself as well as to protect the environment and the moving object at the same time.

Principiálně tak lze postavit zachycovací konstrukce povrchové i důlní, sloužící ku příkladu k ochraně objektů, ohrožených padáním předmětů, ochraně objektů v blízkosti dopravních tras, krytů .-a podobně. Výhodou takovýchto ochranných konstrukcí je jejich kompaktnost a trvanlivost při zachování velké energetické jímavosti. Formu provedeni lze přitom přizpůsobit požadavkům. Místo zachycovacího násypu 2 ze sypkého materiálu lze do ochranné konstrukce aplikovat ku příkladu pružnou nebo poddajnou hmotu (pryž, molitan atd.). Sestava zachycovacího štítu z volně uložených tuhých prvků 8, 2 může býti zhotovena ku příkladu z umělé hmoty nebo plechových i pancéřových plátů, plošných tvarovek, dřevěných desek a podobně. Střešní kryt 14 může býti přizpůsoben jako vnější ochrana stavby, pevná báze 10 může býti provedena ku příkladu ve formě samotného ochráněného objektu.In principle, it is possible to construct surface and mining interception structures, which serve, for example, to protect objects threatened by falling objects, to protect objects near transport routes, covers, and the like. The advantage of such protective structures is their compactness and durability while maintaining high energy absorption. The design can be adapted to the requirements. Instead of the gripping embankment 2 of bulk material, a flexible or flexible material (rubber, foam, etc.) can be applied to the protective structure, for example. The gripping shield assembly of loosely mounted rigid elements 8, 2 may be made, for example, of plastic or sheet metal, armor plates, sheet fittings, wood panels and the like. The roof cover 14 may be adapted to provide external protection for the building, and the solid base 10 may, for example, be in the form of a protected object itself.

Claims (1)

P ft E D M É T VYNALEZUP ft E D ME T OF THE INVENTION Ochranný poval, použitelný pro prohlubováni důlních jam, sestávající z pevná báze povalu, v zachycovacim násypu volná uložených tuhých prvků, technologického a větracího potrubí a střešního krytu, vyznačující se tím, že pevná báze (10) povalu je vestavěna do zapouětěcích kapes (13) ve zdlvu jámy (6), přičemž je na ní zbudován bud samostatný zachycovací násyp (7) nebo zachycovací násyp (7) s volně uloženou nejméně jednou vrstvou tuhých prvků (8), (9), tvořících zachycovací štít, které jsou zachycovaclm násypem (7) od pevné báze (10) i navzájem odděleny.A protective coating, usable for deepening of mine pits, consisting of a solid base of the base, loosely held rigid elements, technological and ventilation ducts and a roof cover in the collecting embankment, characterized in that the fixed base (10) of the base is embedded in encapsulating pockets (13) in the pit shaft (6), there being built either a separate catching embankment (7) or a catching embankment (7) with at least one layer of rigid elements (8), (9), which form a catching embankment (7). 7) separated from the solid base (10).
CS833639A 1983-02-14 1983-02-14 Protective platform CS252302B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CS833639A CS252302B1 (en) 1983-02-14 1983-02-14 Protective platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CS833639A CS252302B1 (en) 1983-02-14 1983-02-14 Protective platform

Publications (2)

Publication Number Publication Date
CS363983A1 CS363983A1 (en) 1987-01-15
CS252302B1 true CS252302B1 (en) 1987-08-13

Family

ID=5377011

Family Applications (1)

Application Number Title Priority Date Filing Date
CS833639A CS252302B1 (en) 1983-02-14 1983-02-14 Protective platform

Country Status (1)

Country Link
CS (1) CS252302B1 (en)

Also Published As

Publication number Publication date
CS363983A1 (en) 1987-01-15

Similar Documents

Publication Publication Date Title
KR101277967B1 (en) Underground shelter
US4018396A (en) Embedded housing for ore crusher
CN113152928B (en) Dismantling method for super high-rise building
CN105865276A (en) Efficient shock absorption blasting and excavation method adopting fishbone-shaped construction guide grooves for large rock deep foundation pit in dense building area
US20200041243A1 (en) Anti-Explosion Protection System For Damping Barriers
CS252302B1 (en) Protective platform
Singh et al. A semi-empirical method for the design of support systems in underground openings
CS252301B1 (en) Sectional protective platform
JP6422206B2 (en) Reactor building
US3062158A (en) Explosives processing building
RU2797171C1 (en) Horizontal initiating screen for railway tunnel protection
CN112538866B (en) Underground engineering reverse construction method
CS264511B1 (en) Safety bulkhead for vertical openings and wells
CN210766912U (en) Structure for restraining upward floating of interval tunnel
Synitsyn Blasting operations in conditions of buildings and facilities reconstruction
RU2254554C2 (en) Sectional-monolithic localizing structure
Kao Literature Survey of Underground Construction Methods for Application to Hardened Facilities
RU2766876C1 (en) Method for construction of escalator cascade complex for the entrance to the metro station, constructed using cut-and-cover method
KR102024506B1 (en) Blasting Protector Structure for Vertical Hole Construction and Vertical Hole Construction Method Using by This
Unrug Shaft design criteria
RU2056654C1 (en) Method for working sheltered radioactive mass goaf
SU941595A1 (en) Form for erecting concrete roof support of vertical mine working
RU1802138C (en) Method for lowering large object into underground space