CS242809B1 - Process for the production of corundum based on calcined bauxites - Google Patents

Process for the production of corundum based on calcined bauxites Download PDF

Info

Publication number
CS242809B1
CS242809B1 CS8410399A CS1039984A CS242809B1 CS 242809 B1 CS242809 B1 CS 242809B1 CS 8410399 A CS8410399 A CS 8410399A CS 1039984 A CS1039984 A CS 1039984A CS 242809 B1 CS242809 B1 CS 242809B1
Authority
CS
Czechoslovakia
Prior art keywords
bauxites
weight
parts
production
coke
Prior art date
Application number
CS8410399A
Other languages
Czech (cs)
Other versions
CS1039984A1 (en
Inventor
Jaroslav Mann
Original Assignee
Jaroslav Mann
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jaroslav Mann filed Critical Jaroslav Mann
Priority to CS8410399A priority Critical patent/CS242809B1/en
Publication of CS1039984A1 publication Critical patent/CS1039984A1/en
Publication of CS242809B1 publication Critical patent/CS242809B1/en

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

Řešení se týká způsobu výroby korundů na bázi kalcinovaných bauxitů spočívající v tavení výrobní směsi skládající se z kalcinovaných bauxitů, vratného materiálu, železitých třísek a koksu, přičemž výrobní směs se dávkuje do elektrické obloukové pece kontinuelně.The solution relates to a method for producing corundum based on calcined bauxites, consisting of melting a production mixture consisting of calcined bauxites, returnable material, ferrous chips and coke, whereby the production mixture is continuously dosed into an electric arc furnace.

Description

Vynález se týká způsobu výroby korundů na bázi kalcinovanýoh bauxitů.The invention relates to a process for the production of corundum based on calcined bauxites.

Doposud známé a provozně používané způsoby zásypů elektrických peoí na výrobu korundů tavbou na blok řeší zásypy v určitýoh časových intervaleoh· Po zapálení pece na uhlíkatý materiál se peo v pravidelných časových intervaleoh zasýpá výrobní směsí· Tato směs se skládá z kaloinovanýoh bauxitů, vratného materiálu, železitýoh třísek a koksu· Při pravidelnýoh zásypeoh je nutné z energetických důvodů (dimenze proudovýoh ochran pecového transformátoru) snížit příkon elektrioké energie do pece· Po zásypu doohází k zneklidnění elektrického režimu peoe, oož způsobuje, že po určitou dobu nelze pec najet na plný výkon* Při zásypu doohází také k ochlazená taveniny, výrobní směs se dostává pod elektrody a průběh tavby je neklidný s častými erupoemi taveniny· Snížení příkonu elektrické energie a zneklidnění průběhu tavby způsobuje ztráty na energii a snížení hodinových výnosů pecí· Při zásypu peoe a rozhrnování výrobní směsi doohází často k ohrožení bezpečnosti práce obsluhy pecí·Known and operational methods of corundum filler filling by melt-to-block resolving the filler in certain time intervals · After the furnace is ignited for carbonaceous material, the peo is backfilled with the production mixture at regular intervals · This mixture consists of kaloinated bauxites, return material Chip and coke · Regular energy backfilling (dimension of the furnace transformer current protection) requires a reduction in the electric power input to the furnace. the melt is also cooled, the production mixture gets under the electrodes and the melting process is unstable with frequent melt eruptions peoe filling and spreading of the production mixture often endangers the safety of work of the furnace operators.

Tyto nevýhody odstraňuje vynález, jehož podstatou je způsob výroby korundů na bázi kaloinovanýoh bauxitů spočívajíoí v tavení výrobní směsi skládájíoi se z kaloinovanýoh bauxitů, vratného materiálu, železitýoh třísek a koksu vyznačujíoi se tím, že po zapálení elektrioké obloukové peoe se výrobní směs dávkuje do peoe kontinuelně, přičemž každou hodinu je nadávkováno od 55 do 75 dílů hmotnostníoh kaloinovanýoh bauxitů, od 15 do 35 dílů hmotnostníoh vratného materiálu, od 1,5 do 7 dílů hmotnostníoh železitýoh třísek a od 0,5 do 7 dílů hmotnostníoh koksu*The present invention is based on a process for the production of corundum based on kaloinated bauxites by melting the production mixture consisting of kaloinated bauxites, return material, ferrous chips and coke, characterized in that after the ignition of the electric arc furnace, the production mixture is fed continuously. from 55 to 75 parts by weight of calcoinated bauxites, from 15 to 35 parts by weight of return material, from 1.5 to 7 parts by weight of iron chips and from 0.5 to 7 parts by weight of coke are metered every hour *

Využitím způsobu výroby korundů na bázi kaloinovanýoh bauxitů podle tohoto vynálezu dojde k lsT% snížení měrné spotřeby elektrioké energie na vyrobení hmotnostní jednotky kusového korundu·By utilizing the calorinized bauxite based corundum process of the present invention, a lsT% reduction in the specific electrical energy consumption to produce a lump corundum mass unit is achieved.

Příklad 1 242 809 Example 1 242 809

Po zapálení elektrické obloukové pece s transformátoremAfter ignition of electric arc furnace with transformer

MW se peo kontinuelnš zasypává tak, aby každou hodinu bylo do peoe nadávkováno toto množství surovin 670 kg bauxituMW is continuously poured into the peo so that this amount of raw materials 670 kg bauxite is dosed into the peo

300 kg sintru (vratný materiál) kg železitýoh třísek kg hutního koksu300 kg sinter (returnable material) kg iron chips kg metallurgical coke

Doba tavby 24 hodin· Získá se 22 tun kusového hnédého korundu.Melting time 24 hours · 22 tonnes of lump brown corundum are obtained.

Příklad 2Example 2

Po zapálení elektrické obloukové peoe s transformátoremAfter ignition electric arc peoe with transformer

MW se peo kontinuelnš zasypává ták, aby každou hodinu bylo do peoe nadávkováno toto množství surovin 65Ο kg bauxituMW is continuously poured into the pens so that this amount of raw materials of 65Ο kg bauxite is dosed every hour

25Ο kg sintru (vratný materiál) kg železitýoh třísek 50 kg hutního koksu25Ο kg of sinter (returnable material) kg of iron chips 50 kg of metallurgical coke

Doba tavby 24 hodin· Získá se 22 tun kusového polokřehkého korundu·Melting time 24 hours · 22 tons of semi-brittle corundum are recovered ·

Příklad 3Example 3

Po zapálení elektrické obloukové peoe s transformátoremAfter ignition electric arc peoe with transformer

MW se peo kontinuelnš zasypává tak, aby každou hodinu bylo do peoe nadávkováno toto množství surovin 750 kg bauxituMW is continuously poured into the peo so that this amount of raw materials of 750 kg bauxite is dosed into the peo

200 kg sintru (vrathý materiál) kg železitýoh třísek 10 kg hutního koksu200 kg sinter (raw material) kg iron chips 10 kg metallurgical coke

Doba tavby 22 hodin· Získá se 23 tun kusového hnědého korundu·Melting time 22 hours · 23 tons of lump brown corundum are obtained ·

Claims (1)

PŘEDMĚT VYNÁLEZUSUBJECT OF THE INVENTION 242 809242 809 Způsob výroby korundů na bázi kaloinovanýoh bauxitů spočívají oí v tavení výrobní emSei skládájíoí se z kaloinovanýoh bauxitů, vratného materiálu, železitýoh třísek a koksufvyznačující se tím, že po zapálení elektrické obloukové pece se vý robní směs dávkuje do peoe kontinuelnč, přičemž každou hodinu je nadávkováno od 55 do 75 dílů hmotnostních kaloinovanýoh bauxitů, od 15 do 35 dílů hmotnostních vratného materiálu, odMethod for producing spinels based kaloinovanýoh bauxites consist eye at melting production Emsey skládájíoí of kaloinovanýoh bauxites, recycled material, železitýoh chips and coke f, characterized in that after the ignition of the electric arc furnace is above MALL mixture is metered into peoe kontinuelnč wherein every hour from 55 to 75 parts by weight of kaloinated bauxites, from 15 to 35 parts by weight of return material, from 1,5 do 7 dílů hmotnostních železitýoh třísek a od 0,5 do 7 dí lů hmotnostních koksu·1.5 to 7 parts by weight of ferric chips and from 0.5 to 7 parts by weight of coke ·
CS8410399A 1984-12-27 1984-12-27 Process for the production of corundum based on calcined bauxites CS242809B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CS8410399A CS242809B1 (en) 1984-12-27 1984-12-27 Process for the production of corundum based on calcined bauxites

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CS8410399A CS242809B1 (en) 1984-12-27 1984-12-27 Process for the production of corundum based on calcined bauxites

Publications (2)

Publication Number Publication Date
CS1039984A1 CS1039984A1 (en) 1985-08-15
CS242809B1 true CS242809B1 (en) 1986-05-15

Family

ID=5448680

Family Applications (1)

Application Number Title Priority Date Filing Date
CS8410399A CS242809B1 (en) 1984-12-27 1984-12-27 Process for the production of corundum based on calcined bauxites

Country Status (1)

Country Link
CS (1) CS242809B1 (en)

Also Published As

Publication number Publication date
CS1039984A1 (en) 1985-08-15

Similar Documents

Publication Publication Date Title
US4528035A (en) Composition and process to create foaming slag cover for molten steel
CN102815731A (en) Smelting technique of brown corundum
CS242809B1 (en) Process for the production of corundum based on calcined bauxites
DE3303694A1 (en) METHOD FOR PRODUCING ALUMINUM-SILICON ALLOYS
SU1638176A1 (en) Process for steel making from metallized pellets in arc furnace
US3925060A (en) Compact containing iron oxide and carbon and method for its use in steelmaking
ES8101120A1 (en) Process for producing desulfurizing agents for pig iron or steel melts.
US4010026A (en) Arc furnace steelmaking
CA1091418A (en) Process for producing graphitic agglomerates, and products obtained by it
ES8206639A1 (en) Producing Mn-Fe alloy by carbothermic reduction
CN1076330C (en) Welding pad and production method thereof
CN217604660U (en) Smelting furnace capable of improving dissolving efficiency
Rulev Improving the Efficiency of Electric Furnace Operations by the Use of Scrap Having a Low Bulk Density
KR20090017276A (en) Recovery method of high carbon and low carbon alloy iron using induction furnace from waste manganese dust
SU836163A1 (en) Method of charge preparation for smelting
Berlekamp et al. Scrap- a raw material worldwide in demand for steelmaking
Manley New Process" Could Replace" Electric Arcs
ES8202591A1 (en) System for recycling char in iron oxide reducing kilns
JPS54125102A (en) Operating method for sintering
Reyna Electric Furnace Steelmaking at SIDERPERU With Partial Substitution of Scrap by DRI
Senberger et al. The Present Situation and Perspectives for Lowering Energy Consumption in Cast Steel Production
Bardenheuer et al. The Progressive Electric Arc Furnace Plants
JPS53134716A (en) Method of melting reduced iron
Gorbenko et al. Features of the Production of Sinter From Ores Having a High Chlorine Content
Meyer et al. How UHP Furnaces Can Contribute to the Production of Special Steels