CS226606B1 - Apparatus for setting paving and wall tiles - Google Patents

Apparatus for setting paving and wall tiles Download PDF

Info

Publication number
CS226606B1
CS226606B1 CS310879A CS310879A CS226606B1 CS 226606 B1 CS226606 B1 CS 226606B1 CS 310879 A CS310879 A CS 310879A CS 310879 A CS310879 A CS 310879A CS 226606 B1 CS226606 B1 CS 226606B1
Authority
CS
Czechoslovakia
Prior art keywords
rulers
guide
screws
dividing
cladding
Prior art date
Application number
CS310879A
Other languages
Czech (cs)
Inventor
Vaclav Jezek
Original Assignee
Vaclav Jezek
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vaclav Jezek filed Critical Vaclav Jezek
Priority to CS310879A priority Critical patent/CS226606B1/en
Publication of CS226606B1 publication Critical patent/CS226606B1/en

Links

Landscapes

  • Finishing Walls (AREA)

Description

Vynález se týká zařízeni pro pokládání dlaždic a obkladaček, nebo jiných podobných výrobků při obkládání ploch, s využitím ve stavebnictví.BACKGROUND OF THE INVENTION The present invention relates to a device for laying tiles, or other similar products in the field of surface cladding, for use in construction.

Jsou známá některá zařízení pro obkládání stěnových obkladů, obkladaček.Some devices for tiling wall and wall tiles are known.

Pokládáni se provádí za použití tzv. rastrovacích latí, na které může být jedna řada obkladaček jednotlivě postavena a potom položena. Pracovní postup začíná od nejhořejší řady. Rastrovací latě jsou připevněny na svislých sloupech. Když je nejhořejší řada položena, posune se rastrovací lat níže o výšku obkladového materiálu včetně mezery.Laying is carried out using so-called raster strips, on which one row of tiles can be individually set and then laid. The workflow starts from the top row. Scanning strips are attached to vertical columns. When the uppermost row is laid, the raster latch moves down by the height of the tile, including the gap.

Dosud známé zařízení mají nevýhodu v tom, že neurychlují podstatněji práci při obkládání a že nezabezpečují požadovanou kvalitu provedeného obkladu, anebo podstatně zvyšují výrobní náklady. Uvedený patentní spis má nevýhodu v tom, že při pokládání jednotlivých obkladových materiálů, zejména obkládaček na tzv. rastrové latě jsou mezery mezi obkladovými materiály nepravidelné, protože jsou závislé pouze na obsluze provádějící tyto práce.The hitherto known devices have the disadvantage that they do not significantly accelerate the work of the cladding and that they do not ensure the required quality of the cladding or significantly increase the production costs. This patent has the disadvantage that when laying individual cladding materials, in particular tiles on so-called raster battens, the gaps between the cladding materials are irregular, since they depend only on the operator carrying out the work.

Tyto nevýhody odstraňuje zařízení podle vynálezu. Jeho podstatou je jednoduchý rozebíratelný obdélníkový rám, který se při obkládáni vodorovných ploch přiloží na plochu, při obkládáni svislých ploch se připevní ke stěně.These disadvantages are overcome by the device according to the invention. Its essence is a simple removable rectangular frame, which is applied to the surface when facing horizontal surfaces, while the vertical surfaces are attached to the wall.

Sestává ze dvou stejně dlouhých vzájemně rovnoběžných obdélníkových vodicích pravítek. Každé vodicí pravítko je na lícní straně opatřeno otvory a vnitřními závity rozmístěnými v pravidelných roztečích odpovídajícím výšce obkladového.materiálu včetně mezery mezi obkladovým materiálem. Každé vodicí pravítko je opatřeno třemi otvory s vnitřními závity, ve kterých jsou odtlačovaci šrouby pro jejich ustavení. Vodicí pravítka jsou na jednom konci opatřena přírubou a otvorem s vnitřním závitem pro stavěči ěrouby k výškovému ustavení pro obkládáni svislých ploch. Dále sestává ze dvou rozdělovačích pravítek, z nichž každé je opatřeno na obou koncích otvory shodnými se závity v pravítkách vodicích. Rozdělovači pravítka jaou na jedné z bočních stěn opatřena stavitelnými narážkami. Rozteče narážek odpovídají šířce obkladového materiálu včetně mezer. Tlouěíka narážek je užší než mezera mezi obkladovým materiálem. Pravítka rozdělovači jsou svými konci položena na pravítkách vodicích do obdélníkového rámu a jejich vzájemné poloha je kolmé. Vzájemné spojení pravítek do obdélníkového rámu je pomocí 4 šroubů. Nanášení stejnoměrná vrstvy cementového potěru nebo spojovacího tmelu se po ustavení rámu provádí pomocí stěrky vedené po vodicích nebo rozdělovačích pravítkách.It consists of two equally long rectangular guides. Each guide ruler is provided on the face side with holes and internal threads spaced at regular intervals corresponding to the height of the cladding material, including the gap between the cladding material. Each guide ruler is provided with three internally threaded holes in which the setscrews are provided for alignment. The guide rulers are provided at one end with a flange and an internal threaded hole for adjusting screws for height adjustment for facing vertical surfaces. Furthermore, it consists of two dividing rulers, each of which is provided at both ends with holes identical to the threads in the guide rulers. The dividing rulers are provided with adjustable stops on one of the side walls. The spacing of the stops corresponds to the width of the cladding material including the gaps. The thickness of the cues is narrower than the gap between the cladding material. The rulers of the divider are laid with their ends on the rulers guiding into the rectangular frame and their relative position is perpendicular. The rulers are connected to the rectangular frame by 4 screws. After application of the frame, a uniform layer of cement screed or joint sealant is applied by means of a trowel guided on guide or distribution rulers.

Kladením dlaždic a obkládaček a jiných výrobků na vodorovné i svislé plochy podle vynálezu se dosahuje vyššího účinku tím, že umožňuje nanášeni a vytváření stejnoměrné vrstvy cementového potěru nebo spojovacího tmelu, dále tím, že se dosahuje zvýšené kvality obkladu, pravidelnosti, rovnoměrnosti, pravoúhlosti a rovinnosti průběžných spár v podélném i příčném směru, průběžně v jednotlivých řadách postupně, nebo při obkládání svislých ploch střídavě shora a pak od středu kladené plochy směrem dolů. Tím je umožněno pomocí rozdělovačích pravítek přidržení obkladového materiálu do doby zatuhnutí spojovacího tmelu.By laying tiles and other products on horizontal and vertical surfaces according to the invention, a higher effect is achieved by allowing the application and formation of a uniform layer of cement screed or joint sealant, as well as achieving improved tile quality, regularity, uniformity, squareness and flatness. continuous joints in longitudinal and transverse direction, continuously in individual rows gradually, or when facing vertical surfaces alternately from above and then from the center of the laid surface downwards. This makes it possible to use the dividing rulers to hold the cladding material until the joint sealant has set.

Dalšího vyššího účinku se dosahuje odstraněním ztrátových časů, zvyšuje se produktivita práce, při snížení zrakové únavy. Vyššího účinku se dosahuje i tím, že kladečské práce podle vynálezu mohou provádět i pracovníci bez řemeslné kvalifikace, po pouhém krátkém zacvičení používání zařízení. Zařízení podle vynálezu je schematicky znázorněno na přiloženém výkresu, kde na obr. 1 je celková soustava v nérysu a na obr. 2 je půdorys zařízení.Another higher effect is achieved by eliminating loss times, increasing labor productivity while reducing visual fatigue. A higher effect is also achieved by the fact that the laying work according to the invention can also be carried out by non-skilled workers after a brief training in the use of the device. The device according to the invention is shown schematically in the accompanying drawing, in which Fig. 1 shows the overall assembly in an irregularity and Fig. 2 shows a plan view of the device.

Zařízení sestává ze dvou stejně dlouhých vzájemně rovnoběžných vodicích pravítek £ obdélníkového průřezu. Každé vodicí pravítko £ je opatřeno otvory £, s vnitřními závity v pravidelných roztečích se středy na lícní ploše a otvory s vnitřními závity ve stejných pravidelných roztečích pro šrouby s otočnými křidly £. Rozteče otvorů 2 odpovídají výšce obkladového materiálu včetně mezery mezi obkladovým materiálem. Vodicí pravítko £ je déle opatřeno na lícní ploše třemi otvory s vnitřními závity pro odtlačovací šrouby £. Vodicí pravítko £ je na jednom konci opatřeno přírubou a otvorem s vnitrním závitem pro stavěči šroub £. Déle sestává ze dvou stejně dlouhých rozdělovačích pravítek 6 obdélníkového průřezu, opatřených na jedné z bočných ploch v pravidelných roztečích stavitelnými nebo pevnými narážkami £, které jsou užší než mezera mezi obkladovými materiály £0. Rozdělovači pravítka 6 jsou na koncích opatřena otvory stejnými jako jsou otvory 2 ve vodicích pravítkách £ a jsou s vodícími pravítky spojena pomooi šroubů 8. Vzájemná poloha vodicích pravítek £ a rozdělovačích pravítek 6 je kolmé. Připevnění rámu ke svislým stěnám je provedeno pomocí zednických spon, nebo hmoždinek se ěrouby £.The device consists of two equally long parallel guides of rectangular cross-section. Each guide ruler 8 is provided with holes 8 with internal threads at regular intervals with centers on the face and holes with internal threads at the same regular intervals for the rotary-wing screws 6. The spacing of the apertures 2 corresponds to the height of the facing material including the gap between the facing material. The guide ruler 8 has been provided with three internally threaded holes on the face surface for the push screws 8. The guide ruler 8 is provided at one end with a flange and an internal threaded hole for the set screw 8. Further, it consists of two equal-length dividing rulers 6 of rectangular cross-section, provided on one of the lateral surfaces at regular intervals with adjustable or fixed stops 6 which are narrower than the gap between the cladding materials 60. The divider rulers 6 are provided at the ends with holes similar to the holes 2 in the guide rulers 4 and are connected to the guide rulers by means of screws 8. The relative position of the guide rulers 6 and the divider rulers 6 is perpendicular. The fixing of the frame to the vertical walls is carried out by means of masonry clips or dowels with screws.

Příklad použití vynálezuExample of use of the invention

Zařízeni podle vynálezu je vytvořeno například tak, že sestává z rozebíratelného obdélníkového rámu. Při obkládání vodorovných ploch se zařízení pouze položí na obkládanou plochu a ustaví do správné polohy a vyrovná pomocí odtlačovacích šroubů £. Při obkládání svislých ploch se připevní pomocí zednických spon nebo hmoždinek se šrouby £. Spojení vodicích pravítek £ s pravítky rozdělovacími 6 je provedeno pomocí šroubů 6 a jejich vzájemná poloha je kolmé. Rám pro obkládání se ustaví tak, aby obkladový materiál £0, položený k boční ploše rozdělovacího pravítka 6 na jeho jednom konci a přitlačený ke stavitelné narážce 2 lícoval 8 okrajem obkládané plochy. Licní plocha vodicích pravítek £ a spodní plocha rozdělovačích pravítek 2 j® P° ustavení rámu pomocí odtlačovacích šroubů £ v takové vzdálenosti od obkládané plochy, aby po srovnání naneseného cementového potěru, nebo spojovacího tmelu ££ pomocí stěrky vedené přes rozdělovači pravítka 6, nebo vodicí pravítka £, v šířce, kterou je obkladač při kladení vodorovných ploch schopen obsáhnout, tj. 50 až 80 cm, byl obkladový materiál při položení a přitlačení k narážkám podepřen o boční plochu rozdělovacího pravítka.The device according to the invention is designed, for example, to consist of a removable rectangular frame. When tiling horizontal surfaces, the device is only placed on the tiled surface and positioned and aligned with the ejector screws šroub. When tiling vertical surfaces, it is fastened by means of masonry clips or dowels with screws 8. The guide rulers 6 are connected to the dividing rulers 6 by means of screws 6 and their relative position is perpendicular. The cladding frame is set so that the cladding material 40, laid against the side surface of the divider ruler 6 at one end thereof and pressed against the adjustable stop 2, aligns 8 with the edge of the cladding surface. The guide surface of the guide rulers 6 and the lower surface of the divider rulers 32 are aligned with the pusher bolts 6 at a distance from the surface to be coated such that after comparing the applied cement screed or bonding compound 34 with a trowel over the dividing rulers 6 or In the width that the tiler is able to accommodate when laying horizontal surfaces, i.e. 50 to 80 cm, the facing material has been supported on the side surface of the divider during placement and pressing against the stops.

Při obkládání svislých ploch se vodicí pravítka X výškově ustaví pomocí stavěčích Šroubů £ tak, aby rozdělovači pravítka 6 byla ve vodorovné poloze. Není-li možné při obkládání svislých ploch na jednom z konců rozdělovačích pravítek 6 provést spojení s vodicím pravítkem X, které je mimo obkládanou plochu, pomocí Šroubů 8, provede se podepření a připevnění rozdělovačích pravítek 6 k vodícímu pravítku X pomocí Šroubů s otočnými křídly X v místě, kde vodici pravítko X je připevněno k obkládané ploěe obvyklým způsobem.When tiling vertical surfaces, the guide rulers X are height-adjusted by means of adjusting screws 6 so that the dividing rulers 6 are in a horizontal position. If it is not possible to make a connection with the guide ruler X which is outside the facing surface with screws 8 when facing vertical surfaces at one of the ends of the dividing rulers 6, support and attach the dividing rulers 6 to the ruling ruler X with the swivel wing screws at the point where the guide ruler X is attached to the work surface in the usual manner.

Vodicí pravítka X včetně celého rámu se mohou postupně podélně i příčně posunout, neodpovídé-li délka vodicích pravítek X a rozdělovačích pravítek X rozměru kladené plochy. Je-li rozměr kladené plochy několikanásobně větěí než je délka rozdělovačích pravítek 6, rám se rozebere a přesune, kromě vodícího pravítka X ve směru postupu kladení, které zůstane na místě a od něho se přípravek znovu ustaví pro kladení další části plochy. Neodpovídá-li délka kladené plochy násobku délky rozdělovačích pravítek X, postupuje se tím způsobem, že se ze zbývající části délky kladené plochy položí zbytek přesahující délku rozdělovačích pravítek 6, kterou možno položit uvedeným přípravkem a ukončení se pak provede v délce odpovídající rozdělovacím pravítkům £. Při zručnosti obsluhy lze také kladení provádět pomocí rozdělovačích pravit:k 6 vždy s vynecháním jedné řady, to znamená přesunutím rozdělovacího pravítka X o dvě rozteče, provést položení obkladu v této řadě a do takto vzniklé mezery přesně vymezené a rozdělené provést kladení ručně, čímž se urychlí manipulace při posouváni rozdělovacího pravítka 6.The guide rulers X, including the entire frame, can be shifted lengthwise and transversely if the length of the guide rulers X and the divider rulers X do not match the size of the surface to be laid. If the dimension of the area to be laid is several times greater than the length of the dividing rulers 6, the frame is disassembled and moved, except for the guide ruler X in the direction of the laying procedure, which remains in place. If the length of the laying surface does not correspond to the multiple of the length of the dividing rulers X, the rest of the length of the laying surface is laid with a rest exceeding the length of the dividing rulers 6 which can be laid by said jig. With the operator's skill, it is also possible to use the dividing rule: k 6 by omitting one row, that is by moving the dividing ruler X by two pitches, placing the tile in this row and placing the dividing line precisely defined and divided into the gap thus accelerates handling when moving divider ruler 6.

Po přiměřeném ztuhnuti obkladu se vyplňuji spáry běžně používaným způsobem a přebytečný spojovací materiál se po mírném zatuhnutí odstraní.After adequate hardening of the cladding, the joints are filled in a conventional manner and excess bonding material is removed after a slight setting.

Claims (1)

Zařízení pro pokládání dlaždic a obklédaček, sestávající ze dvou stejně dlouhých vzájemně rovnoběžných obdélníkových vodicích pravítek, opatřených na lícní straně otvory se závity, rozmístěnými v pravidelných roztečích, a ze dvou rozdělovačích pravítek, opatřených na konci dvěma otvory pro připevnění k vodicím pravítkům šrouby, přičemž vodící pravítka jsou opatřena opěrkou a šrouby pro výškové ustavení, vyznačené tím, že rozdělovači pravítka (6), připevněná na koncích k vodicím pravítkům šrouby (8), jsou ne jedné ze svých podélných bočních stěn opatřena narážkami (7), stavitelnými podél tohoto vodícího pravítka.Tile and tile installation, consisting of two equally long, parallel, rectangular guide rulers with threaded holes spaced at regular intervals on the face side, and two dividing rulers provided with two holes at the end for fastening to the guide rulers with screws, the guide rulers are provided with an abutment and screws for height adjustment, characterized in that the dividing rulers (6) attached at the ends to the guide rulers by screws (8) are provided with stops (7) adjustable along the guide rail on one of their longitudinal side walls rulers.
CS310879A 1979-07-03 1979-07-03 Apparatus for setting paving and wall tiles CS226606B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CS310879A CS226606B1 (en) 1979-07-03 1979-07-03 Apparatus for setting paving and wall tiles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CS310879A CS226606B1 (en) 1979-07-03 1979-07-03 Apparatus for setting paving and wall tiles

Publications (1)

Publication Number Publication Date
CS226606B1 true CS226606B1 (en) 1984-04-16

Family

ID=5370193

Family Applications (1)

Application Number Title Priority Date Filing Date
CS310879A CS226606B1 (en) 1979-07-03 1979-07-03 Apparatus for setting paving and wall tiles

Country Status (1)

Country Link
CS (1) CS226606B1 (en)

Similar Documents

Publication Publication Date Title
US20130074425A1 (en) Spacer and Associated Method for Laying Tile
KR101574329B1 (en) Mortar spreading device for constructing tile
US3823910A (en) Staircase mold assembly
US3866644A (en) Work table for fabricating panel structures
DE4201553A1 (en) Flat heating or cooling radiator
CN201381651Y (en) Grout spreading board for laying bricks
US4967689A (en) Apparatus and method for evenly coating building tile with mortar
US10676926B2 (en) Device and method for adhering brick slips to a panel
US20140317869A1 (en) Tool for applying mortar
CS226606B1 (en) Apparatus for setting paving and wall tiles
CN215889263U (en) Floor tile fast typesetting and brick paving die
CN201372575Y (en) Architectural tool clamping device
RU2375531C1 (en) Device for manufacturing cement and sand lining for tile laying
WO2016024115A1 (en) Pointing tool and method
RU2163287C2 (en) Method and device for finishing interior of houses
GB1143103A (en) A method and apparatus for laying a tiled surface
DE10007101A1 (en) Levelling device for flat surfaces consists of battens held together by height adjustable fish plates
CN211923595U (en) Masonry mortar laying device
US1710891A (en) Screed support
CN113123577B (en) Ground decorative plate mounting structure and construction method
CN113982292A (en) Mortar laying tool for wall building
EP4155479A1 (en) Levelling system and levelling method for panels
US2174394A (en) Method of building
RU2592584C2 (en) Set of elements for tile floors
CN222862937U (en) Adjustable masonry mortar paving box