CS217068B1 - The way of bringing the waste water treatment plant in - Google Patents

The way of bringing the waste water treatment plant in Download PDF

Info

Publication number
CS217068B1
CS217068B1 CS804646A CS464680A CS217068B1 CS 217068 B1 CS217068 B1 CS 217068B1 CS 804646 A CS804646 A CS 804646A CS 464680 A CS464680 A CS 464680A CS 217068 B1 CS217068 B1 CS 217068B1
Authority
CS
Czechoslovakia
Prior art keywords
activation
tank
filled
tanks
mixture
Prior art date
Application number
CS804646A
Other languages
Czech (cs)
Inventor
Vladimir Spilka
Stanislav Polasek
Original Assignee
Vladimir Spilka
Stanislav Polasek
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vladimir Spilka, Stanislav Polasek filed Critical Vladimir Spilka
Priority to CS804646A priority Critical patent/CS217068B1/en
Publication of CS217068B1 publication Critical patent/CS217068B1/en

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Activated Sludge Processes (AREA)

Abstract

Vynález se týká způsebu uvedení čistírny edpadních ved sestávající z nékelika aktivačních nádrži pracujících ne principu aktivačního přečešu de převozu. Pedstaíeu vynález je, že u čistírny pracující s několika ed sebe oddělenými aktivačními nádržemi se naplní čisteu vodeu peuze jedna aktivační nádrž de niž se začne za šeuČasné funkce prevzdušňovacíhe zařízení připeuštět edpadní veda. V ní se začne vytvářet aktivační směs jejíž přebytek se přepouští de další aktivační nádrže, která se takte plní. Aby nedocházela k znehednecení aktivační směsi je nutné tute neustále vracet de první aktivační nádrže e pedle možnosti i prevzdušňevat. 1'ekte se postupuje až de naplnění všech aktivačních nádrží. Při temte způsebu jsou možné různé kombinace postupu plnění i vracení aktivační směsi. Aktivační směs může přetékat postupně ed nádrže de níž přitéká edpadní veda všemi nádržemi až do nádrže plněné nebe naopak se pe neplnění druhé nádrže přitek do ní zruší a začne se plnit další nádrž. Rovněž tak vracení aktivační směsi z plněné nádrže může být převedeno de některé již naplněné nádrže nebe 1 rezdělene de více nádrží.The invention relates to a method of introducing a wastewater treatment plant consisting of several activation tanks operating on the principle of activation transfer. The present invention is that in a treatment plant operating with several separate activation tanks, only one activation tank is filled with clean water, to which the wastewater begins to be added during the temporary function of the aeration device. An activation mixture begins to form in it, the excess of which is discharged to another activation tank, which is also being filled. In order to prevent the activation mixture from becoming contaminated, it is necessary to constantly return the first activation tank and, if possible, aerate it. This process is continued until all activation tanks are filled. In this method, various combinations of the filling and return of the activation mixture are possible. The activation mixture can flow gradually from the tank from which the waste water flows through all tanks to the tank being filled or vice versa, if the second tank is not filled, the flow into it is canceled and the next tank begins to be filled. Likewise, the return of the activation mixture from the filled tank can be transferred to some already filled tank or divided into several tanks.

Description

Vynález se týká způsebu uvedení čistírny edpedních vod s několika aktivačními nádržemi pracujícími na principu aktivačníha přečešu do provazu tak, že jedna z aktivačních nádrží se naplní čisteu vodau a uvede da provozu načež se do ní začne připauštšt adpadní vada. Přebytek tvořící se aktivační směsi se přepouští do druhé aktivační nádrže, která se takto plní a část da ní přitékající aktivační směsi se vrací do první aktivační nádrže tak dlouhá, až se druhá aktivační nádrž naplní a uvede do provozu načež se stejným způsobem začne plnit další nádrž a proces se postupně opakuje až do naplnění všech aktivačních nádrží.The invention relates to a method of bringing eded water treatment plant with several activation tanks operating on the principle of activation sieves into a rope so that one of the activation tanks is filled with pure water and put into operation and afterwards a defect is admitted. The excess activation mixture is transferred to the second activation tank, which is thus filled, and a portion of the fed activation mixture returns to the first activation tank until the second activation tank is filled and put into operation, and the next tank begins to fill in the same way. and the process is repeated until all activation tanks are filled.

Doposud známé způsoby uvádění čistíren do provozu požadují naplnění všech nádrží čisteu vodou, ^eprve potom se začne do naplněných nádrží napouštět odpadní voda. Zajištění petřebného ebjemu vady si vyžádá značných nákladů a je i časevě nárečné. V případě, že zdroj vody slouží i pro jiné účely může vést omezení kapacity zdroje i k delším negativním dopadům na ostatní spotřebitele, čistírna uvedená do provozu doposud známými způsoby vypouští od prvního okamžiku po uvedení do provozu odpadní vodu proměnlivé kvality do recipientu. Zapracování a dosažení projektových parametrů trvá obvykle 2 měsíce a po tuto dobu je tudíž recipient nadměrně zatěžován. Delší nevýhodou je, že po dobu zapracování čistírny provzdušňuje provzdušňovací zařízení zbytečně aktivační nádrže naplněné zpočátku pouze čistou vodou.The previously known methods of commissioning treatment plants require the filling of all the tanks of the cleaned water with water before the waste water is started to be filled into the filled tanks. Ensuring the need for defects requires considerable costs and is also time-consuming. If the water source is used for other purposes, the limitation of the capacity of the source may lead to longer negative impacts on other consumers, the treatment plant put into operation by known methods discharges waste water of variable quality into the recipient from the first moment after commissioning. The implementation and achievement of project parameters usually takes 2 months and during this period the recipient is overburdened. A longer disadvantage is that during the treatment plant treatment the aeration device unnecessarily activates the activation tank filled initially with pure water only.

Výše uvedené nedostatky odstraňuje způsob uvedení čistírny odpadních vod s několika akti» vačními nádržemi pracujícími na principu aktivačního procesu do provozu, jehož podstatou je, že jedna z aktivačních nádrží se naplní čisteu vodou a uvede do provozu spuštěním provzdušňevecihe zařízení. Da takto připravené aktivační nádrže se začne připouštět odpadní voda, čímž se v ní začne vytvářet aktivační směs. Přebytek aktivační směsi se edvádí do další aktivační nádrže,' která se takto plní. Aby nedocházelo k znehodnocení aktivační směsi, je nutno tuto neustále vracet do první aktivační nádrže a takto ji recirkulevat. Po naplnění druhé aktivační nádrže se v ní uvede da provozu provzdušňovací zařízení a aktivační směsí je možno plnit další nádrž. Takte se postupuje až do úplného naplněni všech nádrží, kdy se čistírna převede do normálního provážu. S přihlédnutím k druhu aktivačního procesu je možno z nádrže^ která byla uvedena da provozu jako první plnit postupně všechny nádrže tak, že přítok z naplněné nádrže se převede ďe další a nádrž naplněná jaka první se jen pravzdušňuje nebo aktivační směs nechat protékat všemi již naplněnými nádržemi do nádrže plnící se.The aforementioned drawbacks are eliminated by the method of commissioning a wastewater treatment plant with several activation tanks operating on the principle of the activation process, which is based on the fact that one of the activation tanks is filled with pure water and put into operation by starting aeration of the equipment. Waste water is then admitted to the activation tank thus prepared, thereby forming an activation mixture. The excess activation mixture is transferred to another activation tank to be filled. In order to avoid deterioration of the activation mixture, it must be continuously returned to the first activation tank and recirculated. After the second activation tank has been filled, the aeration device is put into operation and another tank can be filled with the activation mixture. Then proceed until all tanks are completely filled, when the treatment plant is transferred to a normal bonding plant. Depending on the type of activation process, it is possible to fill all tanks one after another from the tank first put into operation so that the inflow from the filled tank is transferred to the next and the first full tank is just aerated or the activation mixture flows through all the tanks already filled. into the tank filling.

Výhodou popsaného Způsebu uvádění čistírny, odpadních vod do provozu je to, že se mnoho/ násobně sníží spotřeba čisté vady potřebné pro spuštění do provozu. Množství uspořené vody záleží na pečtu aktivačních nádrží. Z tahota hlediska je vhodné celkový aktivační prostar rezdělit na co nejvíce samostatných nádrží. Další výhodou je to, že po dobu uvádění čistírny do provozu není v provozu provzdušňovací zařízení v těch nádržích, které nejsou naplněny. Doba spuštění provzdušňavacíha zařízení da provazu je závislá na jeha druhu, Sapř. při pravzdušňování tlakovým vzduchem hluboce ponořenými rošty lee intensitu provzdušňovánl postupně zvyšovat s postupujícím plněním nádrže. Naopak stabilní pevrchevý aeráter lze uvést do provazu až pa naplnění celé aktivační nádrže. V tamto případě je nutná recirkulevat větší množství tvořící se aktivační směsi. Kanečně lze v průběhu uvádění čistírny do provazu kantrolevat kvalitu aktivační směsi v jednotlivých aktivačních nádržích a padle toho určit nádrž, ze které se odpadní vada začne vypauštět do recipientu. S přihlédnutím k této okolnosti bude obvykle volen způsob nepouštění nádrží.An advantage of the described method of commissioning the wastewater treatment plant is that the consumption of the clean defect required for commissioning is reduced many times. The amount of water saved depends on the seal of the activation tanks. From this point of view, it is advisable to divide the total activation space into as many separate tanks as possible. Another advantage is that during the commissioning of the treatment plant, the aeration device in the tanks that are not filled is not in operation. The start time of the aeration device and the rope depends on the needle of the species, for example. when aerating with deeply submerged grates, the lee intensity of aeration gradually increased with the progressive filling of the tank. Conversely, a stable, aerated aerator can only be tied up to fill the entire activation tank. In this case, it is necessary to recirculate larger amounts of the activating mixture to be formed. The quality of the activation mixture in the individual activation tanks can be canvassed and the tank from which the waste defect begins to be discharged into the recipient can be canvassed. Taking into account this circumstance, the method of not releasing the tanks will usually be chosen.

Zpravidla, bude v případě postupného napouštění z jedné nádrže de druhé nejčistší veda v poslední nádrži e při nepouštění vody z první nádrže' do druhé a dalších bude nejčistší voda v nádrži druhé, která je prcvzdušňována nejdelší dobu bez přítoku odpadní vody. Tato výhoda se výrazně uplatní u vyseče znečištěných edpadních vad, kdy doba napeuštění se řevná přibližné době ebvykléhe zapracování čistírny. Recipient je pctom zatěžován od počátku na projektované parametry.As a rule, in the case of successive impregnation from one tank to the other, the cleanest water in the last tank will be the no water from the first tank to the other and the next will be the cleanest water in the second tank, which has been aerated for the longest time This advantage is particularly useful in the sector of polluted waste defects, when the purging time is approximately equal to the time usually used for the treatment plant. Recipient is burdened with the design parameters from the beginning.

Jako příkled kenkrétníhe řešení použití způsobu uvedení čistírny edpadních vad s někelika aktivačními nádržemi de převozu lze uvést čistírnu s osmi aktivačními nádržemi pracujícími metodou postupného toku přičemž každá nádrž má prostor 700 m^. -^rvní aktivační nádrž se naplní 700 b čisté vody, uvede se do provozu provzdušňovacízzařízení načež se do aktivační 'nádrže začne připouštět normální přítok odpadní vody v množství 1 1/s. V první aktivační 'nádrži se vytváří aktivační směs, jejíž přebytek rovnající se množství přiteklé surové odpadní vody přetéká do další aktivační nádrže o obsahu 700 b^. Část zde se shromažďující aktivační směsi se neustále vrací do první nádrže. Po naplněni druhé nádrže se uvede do převozu její provzdušňovací zařízení a začne se stejným způsobem plnit nádrž třetí a tak dále sž do 'neplnění nádrže osmé. Při tomto způsobu uvedení čistírny do provozu bylo nutno použít pouze 700 m^ čisté vody. Prs naplnění zbývajících 7 x 700 = 4 900 m^ aktivačního prostoru bylo použito surové odpadni vody. Po dobu plnění sedmi aktivačních nádrží s prostorem 4 90Q m' ineodtékals z čistírny žádná voda. V tomto případě asi 56 dnů není vůbec zatěžován recipient vypouštěnou vyčištěnou odpadní vodou.As an example of a particular solution for the use of a method for introducing an effluent treatment plant with multiple activation tanks de transport, there may be mentioned a treatment plant with eight activation tanks operated by the progressive flow method, each tank having a space of 700 m 2. The first activation tank is filled with 700 b of pure water, the aeration device is put into operation, and then the normal effluent flow of 1 l / s is admitted to the activation tank. An activation mixture is formed in the first activation tank, the excess of which is equal to the amount of raw effluent leaked into another 700 b @ 3 activation tank. Part of the activating mixture collected here is constantly returned to the first tank. After the second tank has been filled, its aeration device is brought into transport and the third tank is started to be filled in the same way and so on until the eighth tank is not filled. In this method of commissioning the plant, only 700 m @ 2 of pure water had to be used. Raw waste water was used to fill the remaining 7 x 700 = 4900 m m activation space. During the filling of seven activation tanks with a space of 4 902 m 'ineodtékals from the treatment plant no water. In this case, about 56 days, the recipient discharged by the treated waste water is not burdened at all.

Způsob uvedení čistírny odpadních vod pracující na principu aktivačního procesu do provozu lze výhodně využít u všech čistíren, kde aktivační prostor je rozdělen do dvou nebo více samostatných celků, které jsou spolu uzaviratelnč propojeny.The method of commissioning a wastewater treatment plant operating on the principle of the activation process can be advantageously used in all treatment plants, where the activation space is divided into two or more separate units which are lockable interconnected.

Claims (3)

1. Způsob uvedení čistírny odpadních vod s někelika aktivačními nádržemi pracujícími na principu aktivačního procesu do provozu vyznačující se tím,'že jedna z aktivačních nádrží se naplní čistou vodou a uvede do provozu načež se do ní začne připouštět odpadní voda a přebytek tvořící se aktivační směsi se přepouští čo druhé aktivační nádrže, která se takto plní a část do ní přitékající aktivační směsi se vrací do první aktivační nádrže tak dlouho, až se druhá aktivační nádrž naplní a uvede do provozu načež se začne stejným způsobem plnit z první nádrže další nádrž a proces se postupně opakuje až čo naplnění všech aktivačních nádrži a zpracovaná odpadní voda začne odtékat do recipientu.1. A method of commissioning a sewage treatment plant having a plurality of activation tanks operating on the principle of the activation process, characterized in that one of the activation tanks is filled with clean water and put into operation, after which the waste water and excess of the forming activation mixture the second activation tank which is thus filled and the part of the activation mixture flowing into it is returned to the first activation tank until the second activation tank is filled and put into operation and the next tank and process is started in the same way from the first tank is gradually repeated as soon as all the activation tanks are filled and the treated waste water begins to flow to the recipient. 2. Způsob uvedení čistírny edpadních vod s několika aktivačními nádržemi pracujícími na principu aktivačního procesu do provozu podle bodu 1, vyznačující se tím, ze z první aktivační nádrže protéká aktivační směs postupně s postupujícím plněním do druhé a další nádrže plnící se, z níž se aktivační směs vrací do první aktivační nádrže.2. A method of commissioning an effluent treatment plant having several activation tanks operating on the principle of the activation process according to claim 1, characterized in that the activation mixture flows gradually from the first activation tank with progressive filling into the second and further filling tanks from which the activation the mixture returns to the first activation tank. 3. Způsob uvedení čistírny edpadních vod s několika aktivačními nádržemi pracujícími na principu aktivačního procesu do provozu podle bodu 1 a 2, vyznačující se tím, že část aktivační směsi nebo všechna směs vracející se do první aktivační nádrže je postupně s plnícími se aktivačními nádržemi vracena do dalších již naplněných aktivačních nádrží.3. A method of commissioning an effluent treatment plant having a plurality of activation tanks operating according to the activation process principle according to items 1 and 2, characterized in that part or all of the mixture returning to the first activation tank is gradually returned to the first activation tank. other activation tanks already filled.
CS804646A 1980-06-30 1980-06-30 The way of bringing the waste water treatment plant in CS217068B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CS804646A CS217068B1 (en) 1980-06-30 1980-06-30 The way of bringing the waste water treatment plant in

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CS804646A CS217068B1 (en) 1980-06-30 1980-06-30 The way of bringing the waste water treatment plant in

Publications (1)

Publication Number Publication Date
CS217068B1 true CS217068B1 (en) 1982-12-31

Family

ID=5389696

Family Applications (1)

Application Number Title Priority Date Filing Date
CS804646A CS217068B1 (en) 1980-06-30 1980-06-30 The way of bringing the waste water treatment plant in

Country Status (1)

Country Link
CS (1) CS217068B1 (en)

Similar Documents

Publication Publication Date Title
DE69507897T2 (en) METHOD AND DEVICE FOR TREATING WASTEWATER
US7445715B2 (en) System for treating wastewater and a controlled reaction-volume module usable therein
US5611927A (en) System for removing nutrients from wastewater
US7135110B2 (en) Denitrification system for nitrified wastewater or nitrified water
JPS5849497A (en) Biological sewage purification plant and its operation method
US20060163156A1 (en) Degradation treatment process and system for organics in organically-polluted water
DE4110026A1 (en) Biological waste water clarifier with inert gas recirculation - in which gas is circulated through vessel so that oxygen@ content is reduced and water is agitated without introducing oxygen@
González-Martínez et al. Aerobic submerged biofilm reactors for wastewater treatment
KR100266085B1 (en) Sewage treatment apparatus using an artificial swamp
CS217068B1 (en) The way of bringing the waste water treatment plant in
Barnard Design consideration regarding phosphate removal in activated sludge plants
DE4225967A1 (en) Process for the treatment of oil-water emulsions, in particular from car washes
DE102007037179A1 (en) Processing of organically loaded wastewater with high portions of mineral oils, surfactants and surface-active protective components from autoworkshops, comprises supplying the wastewater into bioreactor after flowing through settling tank
CN110143726B (en) Improved AAO water treatment system and sewage treatment method thereof
US2389357A (en) System of sewage clarification and sludge removal
Kayser Activated sludge process
Dohare et al. A review on wastewater treatment using sequential batchreactor
Muniz et al. Start-up strategy for SBR treatment of complex industrial wastewater
Progulny et al. A low-productivity plant for cleaning domestic wastewater in non-canalized areas
WO2022200895A2 (en) Method and apparatus for the removal of nitrogen, phosphorus and organic pollutants from wastewater in a shuttle mode
DK168989B1 (en) Biological removal of nitrogen from waste water - involves using series-connected tanks, 1st tank operated anaerobically and successive tank aerobically
US1247543A (en) Purification of sewage and analogous liquids.
RU2467959C2 (en) Method of launching biological treatment plants
Bongards et al. Principles of operation and experimental results for a small wastewater treatment plant of 300 population equivalents
Hagin A study of the system treating potato processing wastes at Fairfield Products Inc., Clark, South Dakota