CN86101147A - Combined steel pipe scaffold - Google Patents

Combined steel pipe scaffold Download PDF

Info

Publication number
CN86101147A
CN86101147A CN86101147.3A CN86101147A CN86101147A CN 86101147 A CN86101147 A CN 86101147A CN 86101147 A CN86101147 A CN 86101147A CN 86101147 A CN86101147 A CN 86101147A
Authority
CN
China
Prior art keywords
scaffold
cross bar
vertical rod
rod
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN86101147.3A
Other languages
Chinese (zh)
Other versions
CN1022430C (en
Inventor
徐荣俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 86101147 priority Critical patent/CN1022430C/en
Publication of CN86101147A publication Critical patent/CN86101147A/en
Application granted granted Critical
Publication of CN1022430C publication Critical patent/CN1022430C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The invention relates to a steel pipe scaffold, wherein the traditional scaffold adopts fasteners to connect rod pieces, so that the building of the scaffold is labor-consuming and time-consuming, the needed structural materials are more, and the needed connecting pieces are more. The scaffold provided by the invention has the advantages that the connecting seat is mainly adopted as the connecting piece, and the scaffold structural members such as the vertical rods, the transverse rods and the base are combined, so that the scaffold erecting efficiency is remarkably improved, the structural materials are saved, the safety of the scaffold is ensured, and the scaffold is mainly suitable for a floor type outer frame for building buildings and can also be used as a steel formwork support for indoor use.

Description

Composite steel pipe scaffolding
The present invention relates to steel pipe scaffold, relate in particular to building and build by laying bricks or stones and use the console mode steel pipe scaffold.Existing building is built by laying bricks or stones with console mode steel pipe scaffold system, its main component mainly comprises rod member and fastener and pedestal etc., described rod member mainly comprises vertical rod, leger and little cross bar, system adopts the steel pipe manufacturing of unified diameter specifications, described fastener mainly contains the perpendicular type fastener, yi word pattern fastener and rotary type fastener etc., in addition except that must establishing the wall connecting rod, still need and install strut (diagonal brace or bridging), be used for strengthening the integral rigidity of scaffold, in addition also attached scaffold floor of this scaffold and stair device etc.Existing this type scaffold uses also more extensive at present, also has and for example sets up flexibly, and easy accessibility can be set up into higher advantages such as height, the also firm and safety of in general this scaffold.But the problem that this type steel pipe scaffold mainly exists is that to set up the artificial or amount of labour of scaffold institute spend big, thereby make the speed of application of setting up scaffold slow, can not adapt to current builing industry, especially develop the needs of high-rise building, secondly, this type scaffold desired structure material is more and loss is also bigger, and also there is the problem of fool proof inadequately aspect such as reliable in this in addition scaffold.These problems that exist in the above-mentioned scaffold mainly are that the rod member connected mode that adopts owing to this scaffold and the form of structure of scaffold member produce.The rod member of this class steel pipe scaffold adopts fastener to connect, this connected mode, refer in particular in the vertical rod and the so-called laterally tie point between the cross bar of scaffold, because it is many to carry out the rod member of this connection, and a fastener can only connect two rod members, form a contact, thereby the contact that forms on rod member is many, make the scaffold building operation task heavy, also be easy to generate mistake.Now in setting up, to use maximum perpendicular type fasteners to be example as laterally connecting, it is to contact with two external cylindrical surfaces that intersect rod members respectively by the inner cylinder face of two different directions on the fastener, and tighten by the bolt on the fastener and to realize connecting, because described fastener is generally the last moulding of casting, add that described contact is the face contact, therefore allowing to produce effective clamping force is restricted, the influence that tends to be set up operating personnel's skill or experience like this and be subjected to factors such as various natural climate conditions, make the junction of rod member loosening through generation long afterwards, therefore especially must the installing strut when setting up the scaffold of high height.In addition, because the fastener that this scaffold adopted is many, the rod member length that is adopted is long and kind is many, different in size, all brings many troubles for management and carrying.
The present invention overcomes the above problems in order to consider exactly, special proposition is a kind of can guarantee that structural safety is reliable, and can make set up simple to operate, improve erection construction efficient, and the system that can save the structure material material and reduce the loss of structural meterials and can make the combined steel pipe scaffold of management and member convenient in carrying.
Scaffold device of the present invention proposes a kind of tube connector mainly as the connection between vertical rod, a kind of Connection Block mainly is connected as between vertical rod and cross bar, described tube connector is to fix a projection respectively at two of a short tube, along the short tube longitudinal direction and pass described projection and establish a straight-through breach, and on described projection and along the short tube horizontal direction, be provided with tapped through hole respectively, limit a hole, garden that can allow vertical rod slide through on the short tube, described Connection Block is one to comprise the integrated member of a cross section major part II and a cross section smaller portions I, heart position limits a cylindrical hole that can allow vertical rod slide through therein, around it, limit four and pass the part II, and cylindrical hole that relative centered cylinder axially bored line is symmetrical or a plurality of little teeth of even formation on this cylindrical hole inner cylinder face, holes around these is axially arranged with a straight-through breach respectively, and establish a tapped through hole along two of the vertical direction of described breach respectively, also along one of described center cylindrical hole vertically establish straight-through breach, and establish a tapped through hole along the vertical direction of this breach, and the radial direction along the other end of described center cylindrical hole is established a tapped through hole, a kind of rod assembly, a kind of base assembly, a kind of cross bar assembly, described rod assembly is that an a kind of end at its vertical rod one end and a described tube connector is fixedly connected, the position is provided with the location apical pore at a certain distance therebetween, install and fix the combining structure member of a described Connection Block respectively at described apical pore place, described cross bar assembly is a kind of cross bar assembly or a kind of cross bar assembly with variable-length with regular length, and be provided with little axle respectively at the two ends of described cross bar assembly, the cross section that this little axle has garden shape or regular polygon shape, described base assembly is a kind of bedframe that comprises a fixedly connected adapter sleeve thereon, one regulates screw mandrel is fixed in the described adapter sleeve combined member that an end of a described tube connector and the nut of described adjusting screw mandrel install and fix.Scaffold proposed by the invention also must lay wall connecting rod, but can not establish strut, the also attached scaffold floor of described scaffold device, over brace, the stair device, promote equipment etc., adopt the blank of the steel pipe all identical with the material specification as this connection system for guide rail rod member with the diameter of existing scaffold use.
Because the present invention has used connected mode as described above, therefore no matter in the connection between the vertical rod or more solid and reliable in the connection between vertical rod and the cross bar with existing connection system for guide rail, this be since the connection of the connected mode that the present invention adopts in addition part make with connected piece between to contact can be the line contact, in addition, because what this connection system for guide rail adopted is elastic connection way, can contact other part to connection easily and apply enough elasticity clamping forces, thereby can guarantee to connect closely reliable and difficult loosening.Scaffold building of the present invention is easy for installation, the efficiency of construction height, and this is because all modularization and normalization of structural member of scaffold of the present invention, and all connectors all are installed together with connected piece in advance, makes on-the-spot easier for installation.Because the normalization and other part count of the structural member of scaffold of the present invention significantly reduce, and bring convenience to field supervision, can also save the structural steel tube material.Scaffold member manufacturing of the present invention is simple, and cost is low, implements easily.
Connection system for guide rail of the present invention can mainly be built by laying bricks or stones with the outer shelf of console mode as building, and the scaffold that is particularly suited for setting up high-rise scaffold or has various different facade shapes also can be used for steel form and is supported on indoor use, and saves construction timber.
The present invention is further elaborated below in conjunction with the drawings and specific embodiments.
Fig. 1 is scaffold agent structure assembling schematic diagram of the present invention.
Fig. 2 is above-mentioned scaffold upright rod modular construction schematic diagram.
Fig. 3 is above-mentioned scaffold Connection Block structural representation.
Fig. 4 is the enlarged diagram of described Connection Block partial structurtes.
Fig. 5 has regular length cross bar modular construction schematic diagram for above-mentioned scaffold.
Fig. 6 has variable-length cross bar modular construction schematic diagram for above-mentioned scaffold.
Fig. 7 is above-mentioned scaffold base assembly structural representation.
Fig. 8 is that above-mentioned scaffold general structure is formed schematic diagram.
Fig. 9 sets up for above-mentioned connection system for guide rail and promotes the equipment configuration schematic diagram.
Figure 10 is attached scaffold floor structure of above-mentioned connection system for guide rail and uses thereof explanation schematic diagram.
Figure 11 is the attached over brace structural representation of above-mentioned connection system for guide rail.
Identical number is represented identical or suitable parts or part in above each figure.
Referring now to Fig. 1, (1) is the rod assembly of a fixedly connected tube connector 2 thereon and a plurality of (only representing 1 among the figure) Connection Block 4, an end that has tube connector 2 of this rod assembly can be connected with another rod assembly, its other end then is connected with tube connector 2 on the base assembly (7), described crossbar member (3) thus on last little axle 3a and the Connection Block 4 around in the hole arbitrary hole be connected and constitute the fundamental of described scaffold device agent structure.
With reference to Fig. 2, figure (2-1) is the vertical structure schematic diagram of described rod assembly (1), figure (2-2) is its transversary schematic diagram, tube connector 2 is fixedly attached on the end of vertical rod 1 by weld 1b, the length of vertical rod 1 of the present invention can be designed to have from the shortest be 0.5 meter or 0.25 meter, the longest is that three meters or three meters are with first-class several specifications, when vertical rod length is three meters, then on described shaft, can establish five location apical pore 1a every half meter, use for installing described Connection Block, when vertical rod length is two meters, then establish three such location apical pores, when its length is one meter, then establish such apical pore, make and set up when described scaffold is installed, can select scaffold as required is one meter or one and half along the spacing between short transverse adjacent transverse tie point, available set screw tentatively is fixedly connected on the position of the 1a in the vertical rod 1 Connection Block 4, set screw has the effect that the power from Connection Block 4 is passed to vertical rod simultaneously concurrently, have two protruding 2a on the described tube connector 2, roughly along the straight-through breach 2b of axially having of tube connector 2, and roughly the vertical direction along breach 2b is provided with tapped through hole at its two respectively, described tube connector 2 can be processed by cold-working and finish, and the pipe of tube connector 2 can be selected seamless steel pipe for use.
Referring now to Fig. 3 and Fig. 4, figure (3-1) is the transversary schematic diagram of described Connection Block 4, figure (3-2) is the left view of (3-1), and not straight-through breach 4a is vertically established along it in the center garden hole of a for allowing described vertical rod slide through, radially have a positioning screw hole 4aa along hole, garden, described center, Connection Block 4 tentatively is fixed on the 1a position in the vertical rod by set screw, b, c, d, e is expressed as the cylindrical hole symmetrical to described center cylindrical hole a respectively, at cylindrical hole b, c, d, the interior garden Zhou Shangke of e forms 30 equally distributed little teeth, and the tooth cross section of this little tooth can be triangle, and cylindrical hole axially all has a straight-through breach 4b around described, 4c, 4d and 4e are roughly respectively along described breach 4b, 4c, 4d and 4e vertical direction are provided with two tapped through holes, and are distributed in two of described breach.With reference to Fig. 4,3a represents the little axle on the described cross bar assembly two ends, the shape of cross section of little axle 3a can be positive nonagon or garden shape, find out that by Fig. 4 having shape of cross section is that the little axle 3a of positive nonagon is placed among the denticulate hole b of tool, when tightening with bolt, can roughly always there be three compacted formation lines of rib to connect contact, make firm and reliable connection and difficult becoming flexible.Described Connection Block 4 can adopt malleable cast iron to be cast into blank, then makes by last shaping of cold and hot working.
Referring now to Fig. 5, (3) are described cross bar assembly with regular length, and the little axle 3a with positive nonagon or garden shape shape of cross section can be fixedly attached to the two ends of cross bar 3 with welding method, and the total length of cross bar assembly (3) can be about one meter.
Referring now to Fig. 6, (10) the cross bar assembly for having variable-length, it is by loop bar 10, expansion link 10c forms, end at loop bar 10 has described little axle 10a, fix the adapter sleeve 10b that an available bolt is tightened at its other end, the end of expansion link 10c has little axle 10a, its other end slidably extend into the inside of loop bar 10 and clamped at adapter sleeve 10b place, expansion link 10c goes up and is carved with scale, can regulate to 1.3 meters left and right sides scopes about 0.7 meter when using, it can be mainly used to the vertical cross bar when setting up the scaffold with curve form.The planform of little axle 10a and 3a is identical.
Referring now to Fig. 7, (7) be described base assembly, the bedframe 7 of the adapter sleeve 7a that it is tightened by fixedly connected one available bolt thereon, can fixedly mount one by adapter sleeve 7a and regulate screw mandrel 5, one end of tube connector 2 and the nut 6 of described screw mandrel 5 are fixedly connected, its other end can be used to install and connects a rod assembly (1), and stretching out partly of screw mandrel 5 is enclosed within the rod assembly (1), can fill in the described bedframe with wooden foamed plastics of generation.
Referring now to Fig. 8, main assembly schematic diagram when Fig. 8 represents to adopt the present invention to set up into high-rise scaffold, figure (8-1) is for setting up into double planar shaped scaffold, it (builds the one side of plane parallel by laying bricks or stones with building) longitudinally, and structure is formed schematic diagram, figure (8-2) forms schematic diagram for horizontal (building the perpendicular one side in plane by laying bricks or stones with building) structure of above-mentioned figure (8-1), and figure (8-3) is the structural representation when setting up into three row's curved face type scaffolds.Among Fig. 8,14 are the described wall of building by laying bricks or stones, 13 is wall connecting rod, (8) be horizontal support (with reference to Figure 11), (22) expression stair device, as seen from Figure 8, base assembly (7) is placed on the smooth solid ground, but in order to make along all the horizontal tie points on the first order of scaffold short transverse, be that Connection Block 4 on the described rod assembly (1) is on the sustained height, can regulate by the screw mandrel of base assembly (7) and realize, thereby can guarantee that the at different levels horizontal tie point more than the described first order all is on the sustained height substantially, may be selected to be one meter or one and half along the adjacent spacing between at different levels of short transverse.In described plane connection system for guide rail, longitudinally or the spacing of each horizontal adjacent transverse tie point keep identical, and guarantee by structure length substantially with regular length cross bar assembly (3), in described curved face type connection system for guide rail, except the link to each other spacing of contact of each adjacent transverse longitudinally can adopt variable-length cross bar assembly (10) regulates, all the other situations all situation with above-mentioned plane scaffold building are identical, scaffold Connection Block 4 of the present invention is to carry out horizontal being connected to four direction simultaneously, thereby simple to operate, speed of application is fast.In connection system for guide rail of the present utility model, the revolution fastener that just when installing to stair device (22) on the described scaffold member, has adopted a spot of existing scaffold to use, (not shown).Over brace (8) can be used to widen the aisle and as the supporting member (not shown) of above-mentioned stair device (22) on the horizontal tie point of any one-level of described scaffold.Being provided with of over brace (8) and wall connecting rod 13 all can utilize Connection Block 4 to be connected.This reaches equally and makes the purpose of setting up scaffold raising efficiency of construction simple to operate.
Referring now to Fig. 9, figure (9-1) is that the general structure of described lifting equipment is formed schematic diagram, 11 is two guide pegs, 16 is slinging beam, 20 for promoting the bracketplant of one ton of heavy load approximately, figure (9-2) is that described guide peg 11 and crossbeam 16 assemble the syndeton schematic diagram mutually with described scaffold member, 15 connectors that are connected with Connection Block 4 for guide rod 11, figure (9-3) schematically illustrates described lifting appliance in described connection system for guide rail present position for overlooking, figure (9-4) is the lifting piece structural representation of described lifting appliance, connector 15 is one to be connected by the nuts 17 that are fixed in the guide rod 11 with a bolt 18 and in the horizontal direction, and be fixedly attached on the guide peg 11, by fixedly establish a little axle 9a that can be connected in the vertical direction of described connector 15 with Connection Block 4, thereby guide rod 11 and rod assembly (1) are fused, described slinging beam 16 by fix respectively at its two one can with the short tube 21 of tube connector 2 mounts, crossbeam 16 is installed and fixed on the top of two rod assemblies (1), 19 of guide wheel assemblies can be along guide rod 11 operations, and described crossbeam 16 can link to each other with bracketplant 20 by pulley assembly.The cross section that little axle 9a has garden shape or positive nonagon shape.
Referring now to Figure 10, figure (10-1) is the structural representation of described scaffold floor (12), 12c can adopt thick 1m/m left and right sides steel sheet to make as covering to have rectangular plate body, the limit 12a that makes at the fixedly connected respectively available angle steel in the two ends of plate body 12c also has attachment screw hole etc. thereon, link the limit 12b that available steel sheet is converted into respectively in the both sides of plate body 12a, and have attachment screw hole etc. therein, with two described scaffold floors (12) altogether its size be about one square metre, when need of work, can easily it be inserted in the framework of described scaffold, when engineering finishes, can utilize the described scaffold floor of polylith (12) to be assembled into greatly, in, the chest of little three kinds of different sizes, can pack the assembly of all scaffolds in the case into, be convenient to management and transportation, reduce the scaffold member loss, increase economic efficiency, figure (10-2) is the elevation of described chest, and figure (10-3) is the top view of figure (10-2).
Among Figure 11, (8) be described over brace, it mainly is about half meter cross bar 8 by length and forms as the tripod of cross bar 8 stressed supports and the support pad 8c that is positioned at tripod straight-bar lower end, the little axle 8a that can be connected with Connection Block 4 at the end fixedly connected of cross bar 8, can be used to connect the connection pipe box 8b that railing is used at its other end fixedly connected, support pad 8c is used for being supported by on the pipe outer wall of vertical rod 1, and available bolt regulates, the power of bearing with transmission.The cross section that little axle 8a has garden shape or positive nonagon shape.
After the preceding revisal of the capable revisal of file name page or leaf
Manual 2 11 and can make management and member and can make scaffold construction
Carrying is on-the-spot ... and scaffold member
19 limit four limits more than two
20 holes, or in the hole, and
Described these breach of 22 described breach
35 one kinds have a kind of of regular length and have respectively ... length
Cross bar assembly or a kind of and variable-length
Has variable-length
7 have garden shape or regular polygon that regular polygon is arranged ... cross section
The cross section of shape ... be used for and described Connection Block dress
Join fixedly connected,
The fixing combined member dress of 10 dresses is fixing, its other end with
Described rod assembly assembling
Combined member.
The connection of the employing of 16 connected modes that adopt is part in addition
Connect other part
17 can be the contact of line contact can formation line
4 17 Fig. 1, (1) is Fig. 1, Fig. 1 represents
19 (7), /
20 (3),3a /,3-1
23 figure (2-1), (1) figure (2-a) expression ,/
24 figure (2-2), 16 figure (2-b), 1-2
5 3 1a 1-1
4 Connection Blocks Connection Block 4 usefulness
8 1a 1-1
9 2a 2-2
10 2b,2b 2-2,2-2
13 figure (3-1) figure (3-a) expression
14 figure (3-2) are that (3-1) figure (3-b) is (3-a)
…,a …,4-11
15 4a 4-1
16 4aa 4-6
17 1a, b, c, d, e ... hole a, 1-1,4-12,4-13,4-14
4-15, hole 4-11
18 hole b, c, d, e hole 4-12,4-13,4-14,
4-15
20 breach 4b, 4c, 4d and 4e, breach 4-2,4-3,4-4 and
4b 4-5,4-2
21 4c, the vertical side 4-3 of 4d with 4e, 4-4 is vertical with 4-5
Be respectively equipped with to being provided with direction
22 3a,3a 3-1,3-1
24 3a, hole b 3-1, hole 4-12
64 (3) are ... assembly, tool Fig. 5 schematically illustrates ... assembly
Have ... figure (5-b) is figure (5-a)
Elevation, have
5 3a 3-1
6 (3) /
7 (10) schematically illustrate for Fig. 6
8 10c,10a 10-3,10-1
9-10 10b,10c,10a,10b 10-2,10-3,10-1,10-2
11 10c 10-3
6 13 10a,3a 10-1,3-1
14 (7) for Fig. 7 schematically illustrate into
15 7a,7a 7-1,7-1
17 (1) /
18 are enclosed within vertical rod ... (1) is enclosed within a vertical rod ... /
20 figure (8-1) scheme (8-a)
21 figure (8-2) scheme (8-b)
22 figure (8-1) scheme (8-a)
23 figure (8-3) scheme (8-c)
24 (8) is 8 to be illustrated as
71 (22) expressions, Fig. 8,22 schematically illustrate, Fig. 8 a ,/
(7)
3 (1) /
4 (7) /
8 (3) /
10 (10) /
13 (22) 22
15 (8) /
16 (22) 22
17 (8) /
19 figure (9-1) scheme (9-a)
21 figure (9-2) scheme (9-b)
22 figure (9-3) scheme (9-3)
23-24 figure (9-4) figure (9-d)
8 3 9a,(1) 9-1,/
5 (1) /
7 9a have garden shape or 9-1 have circular respectively and
8 figure (10-1) (12), 12c schemes (10-a) ,/, 12-3
Schematically illustrate
10 12c,12a 12-3,12-1
11-12 12a,12-b,(12) 12-1,12-2,/
13 insert its they are inserted
14 (12) /
17 (10-2) scheme (10-3) (10-b), (10-c),
, figure (10-2) figure (10-b)
18 (8) for schematically illustrate for
20 pad 8c pad 8-3
21 8a,8b 8-1,8-2
22 pad 8c pad 8-3
23 8a have garden shape or 8-1 have circular respectively and

Claims (4)

1, a kind of console mode steel-tube scaffold device, it comprises and is shelved on smooth solid ground base, assemble the vertical rod that is connected and fixed with described base, as the connector that connects between described vertical rod, assemble the cross bar that is connected and fixed mutually at vertical and horizontal with described vertical rod, as the connector that is connected between described vertical rod and cross bar, and the attached member of described scaffold, it is characterized in that described is a kind ofly to allow described vertical rod slide through as the connector that connects between vertical rod, and and the short tubular member tube connector 2 that is connected and fixed of described vertical rod, described is a kind of Connection Block 4 as the connector that is connected between vertical rod and cross bar, described Connection Block 4 is for having the integrated member of stairstepping, heart position limits a cylindrical hole 4-11 who allows described vertical rod slide through therein, and and described vertical rod assembling be connected and fixed, around it, limit the through hole of plural cylindrical shape, described vertical rod is a kind of rod assembly that described vertical rod and described tube connector 2 and Connection Block 4 assemblings are connected and fixed, described cross bar is a kind ofly to make described cross bar by the little axle with garden shape cross section on it and the described Connection Block 4 cross bar assembly of mount mutually, described base is that a kind of two ends of described bedframe 7 by tube connector 2 that make are connected and fixed with described rod assembly assembling with the nut 6 of screw mandrel 5 respectively, the base assembly that screw mandrel 5 and bedframe 7 assemblings are connected and fixed.
2, scaffold device according to claim 1, it is characterized in that described tube connector 2, linking respectively at its two has a projection 2-1, and form one with tube connector 2, along short tube vertically and pass described projection 2-1 and be provided with a straight-through breach 2-2, and respectively at projection 2-1 place, and the vertical direction along breach 2-2 is provided with tapped through hole, described Connection Block 4, the hole 4-12 that around it, limits with cylindrical shape, 4-13,4-14, evenly form a plurality of little teeth on the face of cylinder of 4-15, and the axis of these holes relative opening 4-11 is symmetrical, respectively along described hole 4-12,4-13,4-14 and 4-15 vertically are provided with straight-through breach 4-2,4-3,4-4 and 4-5 two, and respectively at described breach 4-2,4-3,4-4 and 4-5 two, and the vertical direction along these breach is provided with tapped through hole, the breach 4-1 that vertically cannot not be provided with straight-throughly along described hole 4-11, and be provided with tapped through hole along the vertical direction of breach 4-1, on Connection Block 4, be provided with the other end of breach 4-1, and radially be provided with tapped through hole 4-6 along hole 4-11, described rod assembly is that the end at an end of vertical rod 1 and a tube connector 2 fixes binding, partly more than one position is corresponding in the middle of described vertical rod 1 is provided with more than one location apical pore 1-1, install and fix more than one Connection Block 4 at apical pore 1-1 place, described location respectively and form, described cross bar assembly is a kind of cross bar assembly that has regular length respectively, with have length-adjustable cross bar assembly, being respectively equipped with shape of cross section respectively at the two ends of described these cross bar assemblies is the little axle 3-1 and the 10-1 of regular polygon, described base assembly is by the bedframe 7 with adapter sleeve 7-1, the adjusting screw mandrel 5 of mount on described adapter sleeve 7-1, and with the nut 6 of described screw mandrel 5 and a tube connector 2 one mount and forming mutually.
3, scaffold device according to claim 1, it is characterized in that the structure length of described vertical rod 1 has the length of more than one specifications, make the formation series matching, described cross bar assembly comprises loop bar 10 and expansion link 10-3, one end of loop bar 10 has little axle 10-1, its other end has adapter sleeve 10-2, and an end of expansion link has little axle 10-1, and it is interior and clamped at adapter sleeve 10-2 place that loop bar 10 is slidably stretched in its other end.
4, scaffold device according to claim 1, it is characterized in that it comprises over brace, the scaffold floor of metal construction and lifting equipment, described over brace comprises cross bar 8, as the triangle support of the stressed support of cross bar 8 and the support pad 8-3 that is positioned at the vertical rod lower end of triangle bracket, one end of cross bar 8 has little axle 8-1, the cross section that little axle 8-1 has garden shape and regular polygon shape respectively, its other end has adapter sleeve 8-2, described lifting equipment comprises crossbeam 16, guide rod 11, guide wheel 19 assemblies and bracketplant 20, has the short tube 21 that can be connected and fixed with adjacent rod assembly top tube connector 2 respectively at the two ends of described crossbeam 16, make the crossbeam 16 can be across on the top that is fixed on two adjacent rod assemblies, and by pulley assembly with promote bracketplant 20 and link mutually, by being connected with nut 17 in being fixedly placed in guide rod 11 with a bolt 18 in its horizontal direction, the connector 15 that has one little 9-1 below its vertical direction can fuse guide rod 11 and rod assembly, the cross section that little axle 9-1 has garden shape and regular polygon shape respectively, bracketplant 20 can be along guide rod 11 operations by guide wheel assembly 19, described scaffold floor has the plate body 12-3 of the metal sheet roof covering system of a rectangular shape, fixedly have respectively with both sides at the two ends of plate body 12-3 and can make the interconnective metal edges rib 12-1 that is connected means of plate 12-3,12-2.
CN 86101147 1986-02-21 1986-02-21 Composite steel pipe scaffolding Expired - Fee Related CN1022430C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 86101147 CN1022430C (en) 1986-02-21 1986-02-21 Composite steel pipe scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 86101147 CN1022430C (en) 1986-02-21 1986-02-21 Composite steel pipe scaffolding

Publications (2)

Publication Number Publication Date
CN86101147A true CN86101147A (en) 1987-02-11
CN1022430C CN1022430C (en) 1993-10-13

Family

ID=4801309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 86101147 Expired - Fee Related CN1022430C (en) 1986-02-21 1986-02-21 Composite steel pipe scaffolding

Country Status (1)

Country Link
CN (1) CN1022430C (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102191851A (en) * 2010-03-18 2011-09-21 王云剑 Novel support system
CN105350757A (en) * 2015-12-10 2016-02-24 润邦卡哥特科工业有限公司 Movable workbench
CN114197848A (en) * 2021-11-25 2022-03-18 中建八局第二建设有限公司 Novel elevator well promotion formula bracing operation steel platform
CN114278077A (en) * 2022-01-26 2022-04-05 淮安市博彦土木工程科学研究院有限公司 Platform pole setting base

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101372864B (en) * 2007-08-22 2011-08-24 卢兴明 Multi-direction centralized connection type composed scaffold

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102191851A (en) * 2010-03-18 2011-09-21 王云剑 Novel support system
CN102191851B (en) * 2010-03-18 2013-04-24 王云剑 Novel support system
CN105350757A (en) * 2015-12-10 2016-02-24 润邦卡哥特科工业有限公司 Movable workbench
CN114197848A (en) * 2021-11-25 2022-03-18 中建八局第二建设有限公司 Novel elevator well promotion formula bracing operation steel platform
CN114278077A (en) * 2022-01-26 2022-04-05 淮安市博彦土木工程科学研究院有限公司 Platform pole setting base
CN114278077B (en) * 2022-01-26 2022-09-23 淮安市博彦土木工程科学研究院有限公司 Platform pole setting base

Also Published As

Publication number Publication date
CN1022430C (en) 1993-10-13

Similar Documents

Publication Publication Date Title
CN1250820C (en) Prestressed composite truss grider and construction method of the same
CN107795120B (en) Multi-curved-surface free-telescopic building formwork system equipment
CN109882363B (en) Assembling tool and assembling method thereof
CN210395652U (en) Steel structure for assembly type building
CN86101147A (en) Combined steel pipe scaffold
CN102828614B (en) Building template system capable of being quickly detached and installed and installation method thereof
US8769907B2 (en) Construction elements and method of using and making same
CN111335605B (en) Integral adjustable scaffold for slope construction
CN112900837A (en) Detachable assembly type building mould
CN2381689Y (en) Steel frame structure for house construction
CN213011597U (en) ALC board mounting machine
CN111456426B (en) Split type steel construction building crossbeam of dismantling
CN86200965U (en) Combined steel tube scaffold
CN1752370A (en) Steel reinforced concrete hidden rib contignation system and construction method thereof
CN113006471A (en) Detachable steel bar truss floor support plate template system and integral construction method
KR101959068B1 (en) Jig structure for construction of building outer wall
CN111335357A (en) Pipe gallery formwork supporting system and construction method thereof
CN2573611Y (en) Combined ground steel pipe scaffold
CN1252477A (en) Steel frame structure for stell-structure building
CN209755571U (en) Steel reinforcement cage mould
CN2500744Y (en) Tool type pole
CN212607891U (en) Plate conveying line transition device
CN217079763U (en) Steel construction rag bolt group wholly assembles construction system
CN214005962U (en) Novel log cabin of shockproof structure
CN214575530U (en) Elevator shaft operating platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
C19 Lapse of patent right due to non-payment of the annual fee