CN85108014A - The elevator portfolio management system - Google Patents

The elevator portfolio management system Download PDF

Info

Publication number
CN85108014A
CN85108014A CN85108014.6A CN85108014A CN85108014A CN 85108014 A CN85108014 A CN 85108014A CN 85108014 A CN85108014 A CN 85108014A CN 85108014 A CN85108014 A CN 85108014A
Authority
CN
China
Prior art keywords
railway carriage
floor
mentioned
time
corridor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN85108014.6A
Other languages
Chinese (zh)
Other versions
CN1010670B (en
Inventor
植谷健一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of CN85108014A publication Critical patent/CN85108014A/en
Publication of CN1010670B publication Critical patent/CN1010670B/en
Expired legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B15/00Attaching articles to cards, sheets, strings, webs, or other carriers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D71/00Bundles of articles held together by packaging elements for convenience of storage or transport, e.g. portable segregating carrier for plural receptacles such as beer cans or pop bottles; Bales of material
    • B65D71/50Bundles of articles held together by packaging elements for convenience of storage or transport, e.g. portable segregating carrier for plural receptacles such as beer cans or pop bottles; Bales of material comprising a plurality of articles held together only partially by packaging elements formed otherwise than by folding a blank
    • B65D71/504Bundles of articles held together by packaging elements for convenience of storage or transport, e.g. portable segregating carrier for plural receptacles such as beer cans or pop bottles; Bales of material comprising a plurality of articles held together only partially by packaging elements formed otherwise than by folding a blank the element being formed from a flexible sheet provided with slits or apertures intended to be stretched over the articles and adapt to the shape of the article

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Elevator Control (AREA)

Abstract

In elevator with the designated button that is installed on corridor, according to an estimation equation and with regard to each catchword of each designated button, each railway carriage is distributed to each catchword, so that select in the estimation of best railway carriage, the present invention is to wailing each catchword of button based on appointment, wait time and the riding time in railway carriage all as the estimation key element, and after the passenger enters railway carriage, the degree of crowding according to railway carriage, the present invention passes through weighting service time, finish corridor is wailed the railway carriage distribution estimation that responds, so the degree of crowding in the railway carriage has just relaxed.

Description

The elevator portfolio management system
The present invention relates to the improvement of elevator portfolio management system, any one in wherein many elevator railway carriages (be called for short down railway carriage) all wailed the railway carriage of wailing cooresponding designated floor with corridor and responded and be its service.
Usually, elevator is structure and operation like this, promptly by pressing the button of going upstairs or go downstairs that is loaded on corridor, corridor is wailed indicated, and wails according to this corridor then and distributes railway carriage.
When railway carriage arrived, the passenger entered in the case, indicated designated floor in case, and indicated appointment is wailed and responded, and finished up to a series of service operations.
If the someone proposes in suggestion now, and the control panel of wherein being furnished with designated button is contained in each floor road, therefore presses corresponding button, and designated floor just is presented in the corridor.Because arrive before each floor (hereinafter being referred to as " initial floor ") of having imported catchword at railway carriage, designated floor is known, thereby has improved the usefulness of portfolio management.For example Japan " open practical new case communique " 53-40843 number (the Official Gazettes of Japanes e Utinity Model Application Publication No.53-40843) and " openly speciallyying permit communique " 54-14382 number (Japanese Patent Applicati on Publication No.54-14382) have introduced such system.
These apply for proposing: when selecting railway carriage, also will consider satisfactory service time, so that the service that provides in response to the railway carriage of the designated button that is pressed in the corridor and indicates is best, and the designated floor of response railway carriage will be indicated in corridor.
In the aforesaid existing elevator portfolio management system, considered satisfactory service time, but the degree of crowding of railway carriage is not taken in as the distribution estimation factor that comprises the time of taking a lift, this just goes wrong, and causes to enter the service time (taking a lift the time) that railway carriage begins from the passenger and always can not shorten; Also have a problem to be, people's the sense of feeling bad is increased because railway carriage is crowded.
The objective of the invention is and will address the above problem, for this reason, must provide a kind of elevator portfolio management system, it can relax the crowded of railway carriage, thereby reduces the sense of feeling bad of crowded generation.
According to the elevator portfolio management system that the present invention makes, be furnished with following array apparatus: by the response time to each railway carriage, and the railway carriage response is instructed in the estimation of later service time of the appointment catchword of corridor, selects the device of railway carriage; According to the degree of crowding of above-mentioned each railway carriage, to the device of weighting service time; And the device that sends service order to selected above-mentioned each railway carriage of railway carriage selecting arrangement.
In the present invention, according to the response time and the service time of railway carriage, each railway carriage being distributed estimation, wherein, is from railway carriage response beginning service time, is weighted according to its crowded program; Select thereby finish railway carriage, realize above-mentioned purpose of the present invention.
Fig. 1 is a block scheme, and an embodiment of the elevator portfolio management system of making according to the present invention is shown;
Fig. 2 is a block scheme, and expression is according to railway carriage control setup and combination managing device in the elevator portfolio management system of the present invention's making;
Fig. 3 is a planar view, and expression is contained in the corridor designated button in the second layer corridor, and it is used for this elevator portfolio management system;
Fig. 4 is a scheme drawing, and the floor of indication is wailed in the appointment of expression indication in the specified control panel, and this panel is contained in each floor, and it is used for this elevator portfolio management system;
Fig. 5 is a scheme drawing, represents each railway carriage is distributed to the situation of the designated button of having indicated in each floor road, and it is used to this elevator portfolio management system;
Fig. 6 (a) is a scheme drawing, is used for illustrating the catchword indication of indication designated floor, and these catchwords are that the corridor in this elevator portfolio management system is wailed; Fig. 6 (b) is a scheme drawing, is used for illustrating the state of each railway carriage in this eleva-tor bank assembly system; Fig. 6 (c) is a scheme drawing, is used for illustrating in this elevator portfolio management system, and stable condition is really wailed in response in to railway carriage distribution floor;
Fig. 7 and 8 is a diagram of circuit, and expression is by the process of this elevator portfolio management system executive routine separately;
Fig. 9 is a scheme drawing, is used for explanation, for all directions, press segmented mode, calculates the situation of the service time of each floor with the present invention;
Figure 10 and 11 is a diagram of circuit, separately the expression with the cooresponding situation of Fig. 9 under treatment step, wherein, according to the degree of crowding of railway carriage, by the riding time weighting is come the calculation services time.
Introduce embodiments of the invention referring now to accompanying drawing.
Fig. 1 is a block scheme, the configuration of expression one embodiment of the present of invention.Among the figure, number 1 expression service order device, number 2 expressions can respond railway carriage estimating device and railway carriage selecting arrangement.
Can respond railway carriage estimating device and railway carriage selecting arrangement 2, to the catchword of having indicated, the distribution of each ground estimation railway carriage so that select, distribute railway carriage, and is delivered to service order device 1 to selection result.
According to the output that can respond railway carriage estimating device and railway carriage selecting arrangement 2, service order device 1 is delivered to elevator railway carriage 6B to response instruction.
On the other hand, corridor is wailed control panel and is installed on every floor road, is used to refer to corridor and wails, and when any one on being arranged in this panel specifies catchword button 6A to be pressed, just has a signal to deliver to appointment and wails indicating device 5.And when specifying catchword button 6A to be pressed, this specifies catchword indicating device 5 just to show a catchword, and this indication is eliminated in response to railway carriage.
Specify the output of wailing indicating device 5, deliver to response wait time and service time prediction device 4, weighting device 3 and can respond the railway carriage estimating device and railway carriage selecting arrangement 2.
Response wait time and service time prediction device 4, prediction is also calculated railway carriage and is arrived the used time (response wait time) till that floor of having indicated catchword; Prediction and calculating passenger enter railway carriage arrives designated floor to railway carriage time (equaling riding time service time).Then, device 4 is delivered to these results and can be responded railway carriage estimating device and railway carriage selecting arrangement 2, or weighting device 3.
Weighting device 3 prediction railway carriages are in the load of each floor, represent its degree of crowding with the load of railway carriage, predetermined weight factor is added on the service time of calculating according to the degree of crowding (railway carriage load) again according to response wait time and service time prediction device 4; Weighting device 3 can respond railway carriage estimating device and railway carriage selecting arrangement 2 to weighted results as delivering to service time.Like this, according to the degree of crowding of railway carriage, riding time is weighted, and in can responding railway carriage estimating device and railway carriage selecting arrangement 2 riding time is done further estimation then.
Below with reference to Fig. 2, introduce railway carriage control setup 10 and combination managing device 11.Introduce railway carriage control setup 10 earlier.This railway carriage control setup 10 is made of microcomputer.In Fig. 2, only illustrate and a cooresponding railway carriage control setup 10 of railway carriage.
Railway carriage control setup 10 the configuration on before patent application, for example Japan 51-53354 number (the official Gazette of Japanese Patent Application Laying-open No.51-53354) such as " openly speciallyying permit communique " narrated similar.It is made of central processing unit (calling " CPU " in the following text) 10A, memory device 10B, transmission equipment 10C and conversion equipment 10D.Wherein, 10B is made up of such as the random access memory (calling " RAM " in the following text) of result of calculation one class data read-only memory (ROM) that comprises stored programme and fixed value data (calling " ROM " in the following text) and temporary transient storage.
Transmission equipment 10C exchanges the data between the transmission equipment 11C in it and the combination managing device 11.In addition, it and elevator railway carriage 6B(of conversion equipment 10D exchange comprises drive control apparatus) between data.
Introduce the configuration of combination managing device 11 below.This combination managing device 11 also is made of microcomputer, and is similar with railway carriage control setup 10, and it is made of CPU11A, storage equipment 11B, transmission equipment 11C and conversion equipment 11E; Wherein, 11E is connected with corridor designated button 6A.
Corridor designated button 6A and each floor dispose accordingly, like this, do not draw among the designated button 6A1(figure) be contained in the ground floor corridor, designated button 6A2 is contained in second layer corridor.
Among transmission equipment 10C and the 11C each is carried out serial transmission, transmits 1 information at every turn.
Fig. 3 represents the corridor designated button 6A2 in the second layer corridor.Among the figure, symbol #1~#3 represents the corridor door of railway carriage 1~3 respectively; Symbol 1B, 3B and 4B~8B represent respectively to wail (it is N/R that button is wailed in the appointment of second floor, because this corridor is at second floor) with the cooresponding appointment of first floor, third story layer and the 4th to the 8th floor.
Fig. 4 represents specify to wail indication floor table H, the H table be provided in the corresponding specified control panel of each floor corridor in.Initial floor i(=1,2 ...) expression is equipped with each floor of control panel, designated floor j is illustrated in the designated floor of the control panel in the respective storey i, for example, Hij=" 1 " expression, the designated button that appointment will be arrived the j floor is indicated in the corridor of i floor.
Fig. 5 represent to be assigned to each floor road indication each railway carriage state of designated button.Distribution state w1~w3 corresponds respectively to railway carriage 1~3, does not draw among the distribution state wk(figure) corresponding to railway carriage K.Each distribution state w1~w3 is similar to Fig. 4, for example w1ij=" 1 " expression, and railway carriage 1 is distributed to initiating terminal (promptly being pressed indicated at the corresponding button of i layer) arrives the j floor in i floor and appointment catchword.
The data of table H and table w1~w3 are stored in as DS Data Set in the RAM of combination managing device 11.
Fig. 6 (a), 6(b) and 6(c) the expression catchword position of having indicated and the operation conditions of railway carriage.From Fig. 6 (a) as can be seen, specify for four and wail indication (the appointment catchword indication of promptly having only four corridors is in total system) in the corridor of four floors, this is indicated as table H.These are wailed and result from the first, the 5th, the 6th and the 8th floor respectively, specify arrival floor to be respectively the 7th, first, the 8th and the 4th floor.
The running state of Fig. 6 (b) expression railway carriage.Now, railway carriage 1 descends at the 4th floor, and has a railway carriage that will arrive first floor to wail indication (just having a catchword to result from the railway carriage 1).Equally, railway carriage 2 also descending, and railway carriage 3 rises at the 4th floor at the third story layer.
Moreover corridor is wailed w1~w3 that (being the catchword that each corridor produces) distributes to each railway carriage by this way, makes:
1. shown in Fig. 6 (c), railway carriage 1 is distributed to the catchword shown in the table w1, promptly makes a start at the catchword of layer 6 and appointment arrival the 8th floor;
2. shown in the table w2 of Fig. 6 (c), railway carriage 2 is distributed to and is occurred in first floor and specify the catchword that arrives the 7th floor;
3. shown in the table w3 of Fig. 6 (c), railway carriage 3 is distributed to and is occurred in the 5th floor and the 8th floor respectively and specify the catchword that arrives first floor and the 4th floor respectively.
When designated floor j was corresponding with corridor i, each railway carriage delivered in these catchwords that distributed.When the corridor catchword that distributes was responded, each railway carriage was indicated corresponding railway carriage to specify and is wailed, or is positioned at each catchword that initiating terminal is specified that floor of catchword.
Supposition indicates the corridor designated button of the 6th floor to be pressed in the ground floor corridor now, shown in dashed circle among Fig. 6 (a); Because railway carriage 2 distributed to first floor, therefore, as described in the prior art, railway carriage 2 must be gone out the response of first floor, like this, because response time lacks, so the wait time in corridor is also lacked.Yet, when all situations considered at that time, because railway carriage 2 has been distributed to will be from the catchword of first floor to the, seven floors, if above-mentioned appointment will go the 6th floor and indication to wail at the corridor that has just shown of first floor that also to distribute to railway carriage 1(seemingly should be that 2-translator annotates), so will must be at this railway carriage borough chief time waiting to the people that the 7th floor goes.Specifically, the people that arrive the 7th floor must wait at the 6th floor, just can be removed the 7th floor until attending back (promptly walking out this railway carriage) to the people of the 6th floor.Therefore, the time that he not only stays in this railway carriage will prolong, and (comparatively long service time) also takies railway carriage.
On the other hand, railway carriage 1 has been distributed to the corridor catchword that will arrive the 8th floor at the 6th floor.Therefore, apparent, in any case railway carriage 1 will stop at the 6th floor, also distribute to railway carriage 1 if go the corridor of just having indicated of the 6th floor to wail, this just loses time hardly.
In this case, the corridor of aforementioned firm indication is wailed and is distributed to railway carriage 1, and does not distribute to railway carriage 2, and this obviously is that actv. improves, and generally speaking can improve service quality, and this is by the comprehensive estimate that comprises service time is realized.
Because passenger's their designated floor before climbing up foregoing railway carriage is known, distribute the estimation factor of time to take in so the riding time in railway carriage also can be used as railway carriage, and service quality also can improve.But from further rising to passenger's service quality, no matter whether railway carriage is crowded, all use identical estimation criterion, that is inappropriate.Therefore should to the riding time weighting, can consider the patient degree of crowding of passenger in each railway carriage in the lump as the estimation factor together with used service time according to the degree of crowding of railway carriage.
Therefore, introduce concrete grammar below.Fig. 7 and 8 some programs of expression, they are stored in the ROM of the storage equipment 11B in the combination managing device 11.In Fig. 7, step S1 finishes the i that corridor is wailed initial floor scanning 0Preset, step S2 carries out the j that corridor is wailed designated floor 0Preset.
Then, step S3 is updated to first floor to initial floor scanning, enters i 0+ 1, and step S4 is updated to first floor to designated floor scanning, enters j 0+ 1.
At step S5, determine whether that handle will be from i 0Floor is to j 0Floor (is Hi 0j 0) corridor wail initial indication in H table (being shown in Fig. 6's (a)).If this corridor is wailed and is instructed to, then program enters step S6, there, determine whether to distribute at once a railway carriage to give i 0Floor (in other words, originates in i if any one in the railway carriage 1~3 is assigned at once 0Floor will arrive j 0The words of the catchword of floor).At step S6, wail Hi if determine corridor 0j 0Still be not assigned to a certain railway carriage, then auxiliary program WARI(is shown in Fig. 8) in step S7 operation, carry out corridor at step S7 and wail Hi 0j 0(promptly originate in i 0The predetermined j that arrives of floor 0The catchword of the floor of floor) distribution.
After auxiliary program WARI carries out, determine at step S8 whether the scanning of corridor being wailed predetermined floor is finished, determine at step S9 whether the scanning of corridor being wailed initial floor finishes, and this must carry out, control flows is to just arriving outlet.
In the step S7 of Fig. 7 operation auxiliary program WARI, control flows shown in Figure 8 to, select corridor is wailed Hi 0j 0(promptly originate in i 0The predetermined j that arrives of floor 0The corridor of floor is wailed) distribute to its that railway carriage.
With reference to Fig. 8, as presetting before the scanning, the railway carriage of removing storage at step S11 distributes temporal data.Thereafter, maximum value (promptly as this initial value of value, it is used for and the railway carriage estimated value that calculates is made comparisons, and has minimum estimated value so that determine which railway carriage) is stored in temporary transient storage estimated value estimation result's memory device E 0In.
For railway carriage is scanned, the scanning car case number (CN) is all preset, and upgrades the scanning car case number (CN) one by one at step S12, and subsequently, control flows is carried out data pre-processing together to entering step S13 and S14, so that the data handing that step S15 carries out.
Railway carriage K 0Examination is distributed to will be from i 0Floor is to j 0Under the situation that the corridor of floor is wailed, with regard to all corridors of all railway carriages were wailed (Hij), step S13 calculated the time of advent (RKij) of expection.In a word, arrive the time of run of floor separately along direction separately from its present position, can calculate their time of advent at last, method of calculating and prior art similar by predicting each railway carriage.So it is introduced in detail and has omitted.Wail for each corridor, though can calculate the time of advent of expection, but suppose here, (the i.e. initial floor of wailing with respect to corridor under the identical situation of railway carriage service direction, any one direction in rising and the descent direction), for wailing from the initial corridor of same floor, be identical the time of advent.
Distribute railway carriage K in examination 0Giving will be from i 0Floor is to j 0Under the situation of the catchword of floor, with regard to (Hij) wailed in all appointments of all railway carriages, the step S14 calculation services time (SKij).This describes in detail with reference to Fig. 9~11.
Wail Hi for corridor 0j 0, step S15 calculates the distribution estimated value of each railway carriage.
Distribute railway carriage K in examination 0Situation under, wail from all corridors of each corridor and (to comprise and to distribute to K 0The catchword of railway carriage), this computing comprehensive estimate wait time, and the passenger enters the service time behind the railway carriage.
Usually, wail Hij(promptly as calculating, originate in the corridor catchword that the i floor will arrive the j floor at step S13 for corridor), RKij represents that railway carriage K arrives the Expected Arrival Time of the initial floor i of corridor catchword; Because will be since the indication of the catchword of j floor (bonded assembly time) from the i floor, Tij represents time of having pass by; SKij represents after the K railway carriage response corridor catchword Hij, by predicting from the i floor to resulting service time of the time of advent of j floor.Distribute each unit WKij of floor to multiply each other among numerical value (RKij+Tij+SKij) and Fig. 5, promptly originate in the corridor catchword that the i floor will arrive the j floor when railway carriage K distributes to corridor catchword Hij() time, this value is for " 1 ", and when not distributing to it, this value is " 0 ".
That is to say EK 0Be like this estimation, all corridors of wherein indicating, distributing wail (corridor that has distributed is wailed, may have wait time and by the service time that catchword extended of reallocation i floor) to the j floor according to ∑ ∑ ∑ K λ j(RKij+Tij+SKij) * WKij, be added to will be from the i floor to the catchword of j floor service estimated value (RK 0i 0j 0+ Ti 0j 0+ SK 0i 0j 0) get on.
Though there is not to introduce in detail the method for calculating Tij, the method for wailing this time T of calculating ij according to rise and fall, the method used with common combination managing device system is identical.In addition, because before railway carriage arrives, it is known that designated floor is instructed in the i floor, therefore, by using corridor starter gear of the present invention, the not only service of initial floor, and according to the service of indication in the designated floor of initial floor, all can in the calculating of catchword being distributed to railway carriage, use as the key element of determining.
Then, in step S16, the resulting estimated value EK of determining step S15.Whether less than resulting optimum estimation value EK so far 0If the former is less than the latter, then in step S17, car case number (CN) K 0Be stored in memory device K, optimum estimation value EK 0Be stored in E 0In.
When the scanning of judging all railway carriages among the step S18 had finished already, just the best railway carriage K that obtains so far is appointed as the railway carriage that is assigned with at step S19, therefore a series of computings finish.
Should be noted that when a corridor indicated many appointments to wail, the passenger must take advantage of that railway carriage that arrives at first.The designated floor of each railway carriage is all shown, can overcome this shortcoming, described as Japan's " open practical new case communique " 53-40843 number.
Below with reference to Fig. 9~11, introduce the calculation services time (SKij) in detail and according to the method for riding time (the step S14 of Fig. 8 is illustrated) of railway carriage degree of crowding weighting.
Fig. 9 is a scheme drawing, expresses the program of each floor prediction and calculation service time process.As can be seen from this figure, need obtain with the mode of segmentation each process along all directions.As an example, when railway carriage carries the passenger and rises, 1. first handler is that the floor that is positioned from railway carriage 6B is to top layer, 2. next handler is from top to bottom, 3. last handler is the location floor from bottom to this railway carriage, these programs are carried out continuously, here by service time it being predicted.This is common processing method.
The handler of Fig. 9 1. in, the prediction railway carriage each floor (just along rise to, railway carriage is with respect to the position of top layer) the step of load, narrate with reference to Figure 10.
In Figure 10, step S21 presets railway carriage scanning, so that scan each railway carriage.Then, step S22 upgrades one to the railway carriage that just is being scanned.Thereafter, be scanning railway carriage K, the processing of program in 1. is performed.Yet if determine in step S23, the railway carriage that just is being scanned withdraws from this program so in carrying descends, and control flow moves on to the program that railway carriage descent direction railway carriage load is predicted in shown in Figure 10 being used for.
In step S23, when definite railway carriage K is not during at descent direction, then control flow moves to step S24, and S24 is at supposition railway carriage K 0Examination is distributed to from i 0Floor is initial, to j 0Handle under the catchword prerequisite of floor.Therefore be K at the scanning car case number (CN) 0Situation under, its tested distributing to from i 0Floor is initial to j 0The catchword of floor.In step S25, as the pretreatment of floor scanning, LO is preset the existing load of railway carriage, and LN is preset " O ", and the scanning floor is preset railway carriage present position floor.Preloading LO is used to refer to the existing load of railway carriage each floor (hereinafter being referred to as " preceding floor ") that how much will persist in above the railway carriage present position, and as shown in Figure 9, when the railway carriage state from handler 2. change to 3. and from 1 change to 2(seemingly should for from 1. change to 2.-translator annotates) time, this value always is zero.In addition, in the preceding floor situation of getting on or off the bus, the load LN that gets on the bus of preceding floor is used to refer to the remaining load of getting on the bus according to the passenger.
The floor that next step S26 more is scanned the first month of the lunar year is i ← i+1; Get on the bus load value LI and the get off load value LG of step S27 preliminary evaluation on scanning i floor.More particularly, estimate LI: distribute to the railway carriage K that is in the i floor if go the appointment of loft to wail number, then from the i floor in so a kind of mode Σ j = i WKij will multiply each other with predetermined value (for example 5%).
LG tries to achieve in the following manner: wail for appointment that will be from railway carriage position floor to the i floor, the railway carriage position is initial floor ix, and the designated floor that is assigned with railway carriage K is the i floor, then i x Σ = i WKixi will multiply each other with predetermined value KL.Method of calculating is not limited to above-described; The detector that detects the patronage of waiting for can be loaded in each corridor rightly, so that distribute each to specify the load value of wailing according to its output, perhaps adopts learning manipulation, appropriately predicts load value from past value.
In step S28, the component of getting off of LO and LN reduces, and more particularly, makes LO reduce to be to finish under such hypothesis, promptly use from the present position floor of railway carriage go top layer ( i x = Σ i CKix) railway carriage is wailed the existing load value of number removal and is obtained LO component (rectangular distribution), and at top layer, all passengers get off; And this component is under the jurisdiction of the railway carriage catchword of indication at i floor (CKi=" 1 ") at least.Here, CKi represents whether the railway carriage K that is in the i floor existed any railway carriage of having indicated to wail at that time.The component LG that is calculated at step S27 makes LN reduce (certainly, when LN<LG, determining that LN is " 0 ").
In step S29, the component LI that obtains at step S27 adds up later in the processing that reduces of step S28.In step S30, the LO+LN value of calculating in step S29 is determined as the railway carriage load LUKi in the prediction of i floor.This load must obtain on all directions as shown in Figure 9, and 1. it becomes the value LUKi of ascent direction under the situation in program.
Step S31 judges whether the scanning floor has been updated to loft.When satisfying decision condition, step S24 set to railway carriage K 0Examination distribute and to be disengaged (step S32); In step S33, judge whether all railway carriages all were scanned, so control flow finishes.
2. and execution 3. and above-mentioned similar therefore program repeats no more among Fig. 9.Situation when in addition, its computing also descends with railway carriage is similar.Do not have at railway carriage then to finish load estimation under the situation of whereabouts according to Figure 10.
Be described referring now to Figure 11.
This illustrates each calculation procedure of specifying the service time of wailing, and service time, load was weighted according to railway carriage.In this case, 2. and 3. (similar with Figure 10 situation) has only among Fig. 9 program situation 1. to need explanation, and program, and the situation that railway carriage is in the service that descends needn't explain because the service time under these three kinds of situations similarly method calculate.
Enter after the program shown in Figure 11, in step S41, preset scanning railway carriage (K ← 0), and at next step S42 to its renewal (K ← K+1).Thereafter, the processing of program in 1. that relates among Fig. 9 of scanning railway carriage K is performed.In step S43, if determine railway carriage along the descent direction service, then this program withdraws from, and is calculated, handled service time by another program (not drawing among the figure).
In step S43, when being judged to be "No", that is to say, judge railway carriage K just along the ascent direction service, then control flow moves to step S44, makes pretreatment for floor is scanned in step S44, railway carriage position floor is preset as the termination floor S of initial floor, " 0 " as being predisposed service time among the scratchpad memory x, and x is used for the accumulating value of service time of storage computation, preset and railway carriage position floor begins layer j as the scanning of designated floor.
After this, in step S45~S51, in the following manner each initial floor i being estimated that promptly each floor is scanned to railway carriage present position floor from the j floor with being reversed the service time of each designated floor j.At this, step S45 upgrades designated floor j, and step S46 presets initial floor i becomes j, so that determine floor with respect to designated floor j reverse scan.Step S47 oppositely upgrades and determines floor, and step S48 calculates the service time from initial floor i to the j floor, and promptly in this service time, the passenger who enters railway carriage from the i floor arrives the j floor.At this, from the service time of i floor to the (i+1) floor, be added to again again last till i.e. service time of accumulating value x[of resulting service time from (i+1) floor to the j floor].Definite method of service time is: promptly according to the load (LUKi) of railway carriage at the i floor, to using functional value f(LUKi from the i floor to the riding time of j floor) weighting.Here, as an example, f(LUKi) provide by following formula:
f(LUKi)=LUKi/β+α
In the formula, α and β are constants, for example, and α=1/2, β=5%(railway carriage load).
In step S49, only distribute to from the i floor and send will be to the catchword of j floor the time when railway carriage, just the accumulating value x of service time is defined as SKij service time.Step S50 judges the end of scan of initial floor, and step S51 judges the end of scan of designated floor, and step S52 judges the end of scan to railway carriage.
As mentioned above, according to the present invention, after the passenger enters railway carriage, according to the crowded degree of railway carriage, by to weighting service time, carry out the railway carriage Distribution Calculation of wailing in response to corridor. Therefore can relax the crowded degree of railway carriage, reduce the passenger and enter the sense of feeling bad behind the railway carriage.
Term in the accompanying drawing
Fig. 1:
1 service order device
2 can respond railway carriage estimating device and railway carriage selecting arrangement
3 weighting devices
4 response wait times and service time prediction device
5 specify catchword indication device
The 6A corridor is wailed the appointment of control panel and is wailed button
6B elevator railway carriage
Fig. 2:
The 10B memory storage
The 10C transmitting device
The 10D transfer device
The 11B memory storage
The 11C transmitting device
The 11E transfer device
6A specifies and wails button
6B elevator railway carriage (comprising actuating device)
Fig. 4:
(1) initial floor
(2) corridor is specified the indication floor
(3) designated floor
Fig. 5:
(1) initial floor
(2) distribute floor
(3) designated floor
Fig. 7:
(1) inlet
(2) preset the initial floor of scanning
(3) preset the scanning designated floor
(4) upgrade the initial floor of scanning
(5) upgrade the scanning designated floor
(6) indication of the catchword from the i floor to the j floor?
Is not (7) any railway carriage assigned with yet?
(8) railway carriage is distributed to catchword from the i floor to the j floor
Does (9) designated floor scanning finish?
Does (10) initial floor scanning finish?
(11) outlet
Fig. 8:
(1) inlet
(2) presetting before the scanning of car case number (CN)
(3) remove memory allocated
(4) determine to be in the estimated value storage E ← maximum value of maximum value
(5) maximum value
(6) preset the scanning car case number (CN).
(7) upgrade the scanning car case number (CN).
(8) distribute railway carriage K to give from the i floor under the situation of the catchword of j floor in examination, all appointments of all railway carriages are wailed, calculate the time of advent of expection.
(9) distribute railway carriage K to give under the situation of catchword in examination, the calculation services time is wailed in all appointments of all railway carriages from the i floor to room, j building.
(10) to distributing to catchword, calculate the estimated value of railway carriage K from the i floor to the j floor.
(11) is estimated value less than the former?
(12) upgrade distribution railway carriage and renewal estimated value.
Does (13) scanning of car case number (CN) finish?
(14) railway carriage is distributed to catchword from the i floor to the j floor.
(15) outlet
Figure 10:
(1) inlet
(2) preset the scanning railway carriage
(3) upgrade the scanning railway carriage
Does (4) railway carriage K carry passenger's decline?
(5) the railway carriage K that tentatively distributes examination to distribute
(6) presetting before floor scanning
(7) determine initial load
(8) the existing load of railway carriage
(9) remove preceding floor load
(10) scanning load
(11) railway carriage position
(12) upgrade the scanning floor
(13) calculate at the load value of getting on the bus (LI) of i floor and the load value of getting off (LG)
(14) loft
(15) ix=railway carriage position
(16) reduce the get on the bus component of getting off of load (LN) of preloading (LO) and preceding floor at the i floor
(17) component of getting on the bus of i floor is increased in the load of getting on the bus of preceding floor
(18) determine in of the railway carriage load of i floor along ascent direction
Does (19) the scanning floor upgrade and finishes?
(20) examination of removing railway carriage K distributes
Does (21) renewal to railway carriage scanning finish?
(22) outlet
Figure 11:
(1) presetting before floor scanning
(2) determine the scanning stop layer of initial floor
(3) railway carriage position
(4) remove the temporary transient storage of service time
(5) scanning of determining designated floor begins floor
(6) upgrading the scanning floor specifies
(7) preset initial floor scanning
(8) upgrade initial floor scanning
(9) calculating is temporarily stored to the service time of j floor from the i floor
(10) definite service time from the i floor to the j floor
(11) initial floor scanning renewal is finished?
(12) designated floor scanning renewal is finished?

Claims (6)

1, in a kind of portfolio management system of elevator, wherein, the device that indication specify to be wailed is contained in each floor road, and in many railway carriages any one wailed by specifying call signal apparatus automatically to be distributed to specify;
A kind of elevator portfolio management system comprises:
(a) computer device of response wait time, with regard to above-mentioned each railway carriage, it is used for calculating the wait time of being spent before with the corresponding railway carriage of corridor location, in this corridor indicating device is housed, and this device is used for controlling the indication of specifying catchword;
(b) service time computer device, with regard to above-mentioned each railway carriage, it is used for the calculation services time, is during this period of time to arrive the time of the designated floor that is instructed to from railway carriage response beginning up to its;
(c) a kind of device, it above-mentioned wait time computer device and above-mentioned service time result of calculation the basis on reception information, and carry out the distribution estimation of above-mentioned each railway carriage, so that select best railway carriage;
(d) send the device of service order to the selected railway carriage of selecting arrangement, whereby above-mentioned railway carriage is distributed to specify and wail;
(e) weighting device, it is used for receiving the result of calculation of above-mentioned service time of computer device, then according to the degree of crowding of railway carriage, to aforementioned calculation weighting as a result.
2, elevator portfolio management system according to claim 1, wherein, above-mentioned weighting device, when above-mentioned railway carriage arrives the designated floor that is instructed to, the load of preliminary evaluation railway carriage is then according to the load of above-mentioned railway carriage, to the result of calculation weighting of above-mentioned service time of computer device.
3, elevator portfolio management system according to claim 2, wherein, when the prediction load of railway carriage was heavier, above-mentioned weighting device was used bigger weight, and when above-mentioned load was light, it used less weight.
4, in the elevator portfolio management system according to claim 2, wherein, above-mentioned weighting device, according to the load of getting on or off the bus at preceding floor of present load of railway carriage and expectation, the prediction railway carriage is in the load of designated floor.
5, elevator portfolio management system according to claim 4, wherein, above-mentioned weighting device utilizes in the expectation of the designated floor of the having distributed railway carriage load of getting on or off the bus, and calculates weight.
6, elevator portfolio management system according to claim 1, wherein, above-mentioned weighting device is used for to every section weighting service time, and these sections comprise: first terminal floor from the present position floor of railway carriage to the railway carriage service direction; Rightabout second terminal floor from above-mentioned first terminal floor to the railway carriage service direction, and present position floor from second terminal floor to above-mentioned railway carriage.
CN85108014A 1984-12-05 1985-11-02 The elevator portfolio management system Expired CN1010670B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP256919/84 1984-12-05
JP59256919A JPS61136883A (en) 1984-12-05 1984-12-05 Group controller for elevator
JP256919/1984 1984-12-05

Publications (2)

Publication Number Publication Date
CN85108014A true CN85108014A (en) 1986-05-10
CN1010670B CN1010670B (en) 1990-12-05

Family

ID=17299197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN85108014A Expired CN1010670B (en) 1984-12-05 1985-11-02 The elevator portfolio management system

Country Status (2)

Country Link
JP (1) JPS61136883A (en)
CN (1) CN1010670B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101546188B (en) * 2008-03-25 2011-02-09 上海宝信软件股份有限公司 Intelligent building energy-saving system based on security system
CN108408514A (en) * 2018-03-14 2018-08-17 南京理工大学 A kind of multi-connected machine team control type elevator scheduling method

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5307903A (en) * 1988-01-29 1994-05-03 Hitachi, Ltd. Method and system of controlling elevators and method and apparatus of inputting requests to the control system
JP2607597B2 (en) * 1988-03-02 1997-05-07 株式会社日立製作所 Elevator group management control method
JPH075237B2 (en) * 1988-06-15 1995-01-25 株式会社日立製作所 Elevator control equipment
JP4888117B2 (en) * 2005-04-21 2012-02-29 三菱電機株式会社 Elevator group management control device
JP7031770B1 (en) * 2021-03-18 2022-03-08 三菱電機株式会社 Group management device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS541978B2 (en) * 1973-10-08 1979-01-31
JPS59190171A (en) * 1983-04-13 1984-10-27 三菱電機株式会社 Register for calling of elevator

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101546188B (en) * 2008-03-25 2011-02-09 上海宝信软件股份有限公司 Intelligent building energy-saving system based on security system
CN108408514A (en) * 2018-03-14 2018-08-17 南京理工大学 A kind of multi-connected machine team control type elevator scheduling method
CN108408514B (en) * 2018-03-14 2020-04-21 南京理工大学 Multi-connected machine group control type elevator dispatching method

Also Published As

Publication number Publication date
CN1010670B (en) 1990-12-05
JPH0553712B2 (en) 1993-08-10
JPS61136883A (en) 1986-06-24

Similar Documents

Publication Publication Date Title
CN1220614C (en) Targeted call control for lifts
CN101054140A (en) Lift group management control method and system
CN1193924C (en) Elevator group controller
CN1071698C (en) Group management control method for elevator
CN1124744C (en) Remote-controlled camera-picture broadcast system
CN1030248C (en) Elevator controlling apparatus
CN1898141A (en) Elevator group management controller
CN1127442C (en) Elavator management control apparatus
CN1192962C (en) Elevator system and its cabin distributing and controlling method
CN1083223C (en) Moving communication system
CN1047997C (en) Elevator grouping management control method
CN1197966A (en) Method and apparatus for optimizing works distribution
CN1288519C (en) Robotic system control
CN1231409C (en) Optimum managing method for elevator group
CN1838077A (en) Schedulability determination method and real-time system
CN85108014A (en) The elevator portfolio management system
CN1230267A (en) Scheduling system and scheduling method for reentrant line processes
CN1908407A (en) Engine control apparatus, control method and control system
CN1837004A (en) Elevator group supervisory control system
CN1159021A (en) System clock setting device
CN1499387A (en) System for taxi, portable terminal therein, and method of such system
CN1829341A (en) Session processing system, server, communication terminal, session processing method and program
JP2012502863A (en) Dynamic departure management of elevator cars during modernization of elevator equipment.
CN1020577C (en) Rescuing apparatus in elevators
CN1885942A (en) Conference terminal device of electronic conference system, electronic conference system, image control method

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C13 Decision
C14 Grant of patent or utility model
C19 Lapse of patent right due to non-payment of the annual fee