CN2897813Y - Deck chock - Google Patents
Deck chock Download PDFInfo
- Publication number
- CN2897813Y CN2897813Y CN 200620042139 CN200620042139U CN2897813Y CN 2897813 Y CN2897813 Y CN 2897813Y CN 200620042139 CN200620042139 CN 200620042139 CN 200620042139 U CN200620042139 U CN 200620042139U CN 2897813 Y CN2897813 Y CN 2897813Y
- Authority
- CN
- China
- Prior art keywords
- fairlead
- opening
- cable
- cable guide
- deck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses a deck cable guide, which is an integrated structure of cast steel; a cable opening is arranged at the central part of cable guide for the anchor chain or cable to pass through, a front piece and a rear piece of the same size are respectively arranged at the front and rear end of cable guide. The shape of the opening of cable guide is a rectangular which is approximately elliptical shape with fillet on the two ends, the horizontal opening size is 600 mm, the vertical opening size is 450 mm, the geometry surface profile of the opening is the symmetric structure and the opening surface is smooth and sleek to prevent cable and anchor chain from wearing when contacting with the surface. Horizontal, vertical, and diagonal stiffeners are arranged on the cable guide to increase the stiffness and strength of the cable guide. The utility model has the advantages of compact structure, reasonable opening, attractive appearance and practical usage; besides ordinary ships for towing or mooring, the utility model is also suitable to navigate ships in the Panama Canal waterway for towing or mooring.
Description
Technical field
The utility model relates to and is used for boats and ships support hawser or anchor chain device, more specifically refers to a kind of deck formula fairlead, utilizes this fairlead to realize the towing or the mooring of boats and ships.
Background technology
The structure that tradition is used for the deck formula fairlead 10 of the towing of boats and ships or mooring sees also Fig. 1, Fig. 2, it is the integrative-structure solid of being cast by cast steel, the centre leave be used to place hawser lead cable perforate 11, front and back are respectively equipped with anter 12, rear panel 13, anter 12 varies in size with rear panel 13, small one and large one.Though this fairlead prolongs towing or the mooring that is used for boats and ships always.But also there is following shortcoming: 1, middle perforate 11 is too small, and its upperlimit is no more than 500mm * 260mm; 2, the power that supports hawser or anchor chain is too small, can not bear large tonnage boats and ships towing or mooring; 3, can't satisfy and develop shipping demand rapidly.
Summary of the invention
The purpose of this utility model is the above-mentioned shortcoming that exists at traditional fairlead, and a kind of deck formula fairlead is provided.
For achieving the above object, the utility model has adopted following technical scheme:
This deck formula fairlead is the integral structure that cast steel is cast, and the body middle part of fairlead offers mooring pipe, and the front and back end of fairlead is respectively equipped with anter, rear panel,
Described fairlead anter is identical with the rear panel size;
The described oblong that is shaped as the double headed roller fillet of leading the cable perforate, horizontal opening is of a size of 600mm, and vertical opening size is 450mm.
Described fairlead be respectively equipped with level to, vertically to, oblique reinforced rib.
Described lead the cable perforate be shaped as the sub-elliptical shape.
In technique scheme of the present utility model, this fairlead is the integral structure that cast steel is cast, the body of fairlead middle part offer be used to place hawser or anchor chain lead the cable perforate, the front and back end of fairlead is respectively equipped with size identical anter, rear panel.Lead the oblong of the double headed roller fillet that is shaped as the sub-elliptical shape of cable perforate, horizontal opening is of a size of 600mm, vertical opening size is 450mm, and the morphology section in hole is a symmetrical structure, and the surface smoothing slyness in hole is with prevent that hawser or anchor chain from contacting with this face time wearing and tearing.Fairlead be respectively equipped with level to, vertically to, the oblique 40 ° reinforced rib in below, to increase the rigidity and the intensity of fairlead.The utility model compact conformation, opening are reasonable, both artistic and practical.Except being used for common ship towing or mooring, also being suitable for to navigate by water and being pulled or mooring in the boats and ships in Panama Canal navigation channel.
Description of drawings
Fig. 1, Fig. 2 are respectively that traditional fairlead is faced, the plan structure scheme drawing.
Fig. 3, Fig. 4 are respectively that deck of the present utility model formula fairlead is faced, the plan structure scheme drawing.
The specific embodiment
In order to understand technique scheme of the present utility model better, describe in detail further below in conjunction with drawings and Examples.
See also Fig. 3, shown in Figure 4, the integral structure that deck of the present utility model formula fairlead 30 is cast for cast steel, the body of fairlead middle part offer be used to place hawser or anchor chain lead cable perforate 31, the front and back end of fairlead 30 is respectively equipped with size identical anter 32, rear panel 33.Its horizontal opening is of a size of 600mm, vertical opening size is 450mm, leads the oblong of the double headed roller fillet that is shaped as the sub-elliptical shape of cable perforate 31, and horizontal opening is of a size of 600mm, vertical opening size is 450mm, and the morphology section in its hole is a symmetrical structure.This deck formula fairlead level and vertical direction and downwards the oblique angle locate (becoming 40 °) for 40 ° and be respectively equipped with reinforced rib 35,36,37 with the angle of horizontal stiffener, promptly, the fairlead body be provided with vertical reinforced rib 35, horizontal stiffener 36, and oblique reinforced rib 37.
When being used for boats and ships towings or mooring, this fairlead 30 is fixed on the deck, is used for pulling or the hawser or the anchor chain of mooring pass by leading cable perforate 31, can carry out artificial or power operation easily.Because it is bigger to lead cable perforate 31 openings, so even hawser or anchor chain more also can pass, and hole surface fairing slyness can obviously reduce the hawser that passes through or the wearing and tearing of anchor chain.Owing to the effect of reinforced rib, the rigidity and the intensity of fairlead are obviously strengthened simultaneously, and the bearing force safe working strength that can provide is 2000kN, and ultimate strength is 4000kN.
By foregoing description as seen, deck of the present utility model formula fairlead has comformability and working strength preferably, the front and back sheet size of this fairlead is identical, opening size is big and be provided with reinforced rib, actv. has solved problems such as original fairlead bad adaptability, working strength be low, can provide safeguard for the shipping industry that develops rapidly.
Those of ordinary skill in the art will be appreciated that, above embodiment is used for illustrating the utility model, and be not to be used as qualification of the present utility model, as long as in connotation scope of the present utility model, all will drop in claims scope of the present utility model variation, the modification of the above embodiment.
Claims (3)
1, a kind of deck formula fairlead, this fairlead is the integral structure that cast steel is cast, and the body middle part of fairlead offers leads the cable perforate, and the front and back end of fairlead is respectively equipped with anter, rear panel,
It is characterized in that:
Described fairlead anter is identical with the rear panel size;
The described oblong that is shaped as the double headed roller fillet of leading the cable perforate, horizontal opening is of a size of 600mm, and vertical opening size is 450mm, and the morphology section in hole is a symmetrical structure.
2, deck as claimed in claim 1 formula fairlead,
It is characterized in that:
Described fairlead be respectively equipped with level to, vertically to, oblique reinforced rib.
3, deck as claimed in claim 1 or 2 formula fairlead,
It is characterized in that:
Described lead the cable perforate be shaped as the sub-elliptical shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620042139 CN2897813Y (en) | 2006-05-26 | 2006-05-26 | Deck chock |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620042139 CN2897813Y (en) | 2006-05-26 | 2006-05-26 | Deck chock |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2897813Y true CN2897813Y (en) | 2007-05-09 |
Family
ID=38073150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200620042139 Expired - Fee Related CN2897813Y (en) | 2006-05-26 | 2006-05-26 | Deck chock |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2897813Y (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101634150B (en) * | 2009-09-01 | 2011-02-09 | 中铁大桥局集团第二工程有限公司 | Large-scale suspended box cofferdam location fair lead and location method thereof |
CN105620685A (en) * | 2014-10-31 | 2016-06-01 | 中国航空工业集团公司西安飞机设计研究所 | Self-adaptive adapter coupling device of lifeboat releasing system |
CN105730627A (en) * | 2016-02-04 | 2016-07-06 | 江苏科技大学 | Mooring pipe |
CN107107992A (en) * | 2014-09-19 | 2017-08-29 | 法国Nov-Blm公司 | It is intended to engage with anchor chain and for the chock for the system that floating facility is anchored to ground |
CN107933827A (en) * | 2017-11-15 | 2018-04-20 | 韩先锋 | Crude Oil at Sea transfer platform anchor chain cause lead device |
-
2006
- 2006-05-26 CN CN 200620042139 patent/CN2897813Y/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101634150B (en) * | 2009-09-01 | 2011-02-09 | 中铁大桥局集团第二工程有限公司 | Large-scale suspended box cofferdam location fair lead and location method thereof |
CN107107992A (en) * | 2014-09-19 | 2017-08-29 | 法国Nov-Blm公司 | It is intended to engage with anchor chain and for the chock for the system that floating facility is anchored to ground |
CN105620685A (en) * | 2014-10-31 | 2016-06-01 | 中国航空工业集团公司西安飞机设计研究所 | Self-adaptive adapter coupling device of lifeboat releasing system |
CN105620685B (en) * | 2014-10-31 | 2017-10-31 | 中国航空工业集团公司西安飞机设计研究所 | A kind of lifeboat throws the adaptive switching device of place system |
CN105730627A (en) * | 2016-02-04 | 2016-07-06 | 江苏科技大学 | Mooring pipe |
CN107933827A (en) * | 2017-11-15 | 2018-04-20 | 韩先锋 | Crude Oil at Sea transfer platform anchor chain cause lead device |
CN107933827B (en) * | 2017-11-15 | 2019-05-21 | 韩先锋 | Crude Oil at Sea transfer platform anchor chain cause lead device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2897813Y (en) | Deck chock | |
CN2871946Y (en) | Rigid connector of floating casing system on ocean | |
US8770124B2 (en) | Device for diminishing flow resistance in moon pool | |
CN102328733A (en) | Semi-submersible lifting living platform | |
CN201647079U (en) | 360-degree rotation fairleader | |
CN202201145U (en) | Semi-submersible type hoisting accommodation platform | |
DK2704946T3 (en) | tugboat | |
CN202657217U (en) | Guide rope structure of ship | |
CN103661831B (en) | Bow has the Z-drive tug of two anchor winch | |
CN110027671A (en) | A kind of container ship bottom structure of bottom stringers centralized arrangement | |
CN203714157U (en) | Full-rotation tugboat with two anchor winches at fore body | |
CN113602421A (en) | Roller fairlead base, roller fairlead and boats and ships | |
CN201310105Y (en) | Dredging and leveling device | |
WO2013191543A1 (en) | Off-shore installation vessel, method of operating an off-shore installation vessel | |
KR20150004186A (en) | Mooring apparatus for floating marine structure | |
CN202152101U (en) | Bow cable device for quickly releasing cable | |
CN112937754A (en) | Integrated moon pool damping device | |
CN2767319Y (en) | Combined log raft type yacht | |
KR101164279B1 (en) | Spade horn rudder | |
CN201002716Y (en) | Guiding and reduction apparatus for ship | |
CN203581342U (en) | Full circle swinging type tugboat with towing device arranged on bow | |
CN216611527U (en) | Ocean platform supply ship capable of quickly fixing drag rope | |
CN217893160U (en) | Mooring rope arrangement and recovery device suitable for deep sea floating and diving mark anchoring system | |
CN219730390U (en) | Supporting structure of low-voltage shore power winch | |
CN221367365U (en) | Cable guiding hole structure with closing function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20070509 Termination date: 20140526 |