CN2895691Y - Multiplicative propelling structure of anchoring-rod drilling machine - Google Patents

Multiplicative propelling structure of anchoring-rod drilling machine Download PDF

Info

Publication number
CN2895691Y
CN2895691Y CN 200620042296 CN200620042296U CN2895691Y CN 2895691 Y CN2895691 Y CN 2895691Y CN 200620042296 CN200620042296 CN 200620042296 CN 200620042296 U CN200620042296 U CN 200620042296U CN 2895691 Y CN2895691 Y CN 2895691Y
Authority
CN
China
Prior art keywords
propeller
multiplication
jumbolter
oil cylinder
guy rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620042296
Other languages
Chinese (zh)
Inventor
李辉杰
暴玉森
王成
王志武
王振乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiandi Shanghai Mining Equipment Technology Co Ltd
Original Assignee
Tiandi Shanghai Mining Equipment Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiandi Shanghai Mining Equipment Technology Co Ltd filed Critical Tiandi Shanghai Mining Equipment Technology Co Ltd
Priority to CN 200620042296 priority Critical patent/CN2895691Y/en
Application granted granted Critical
Publication of CN2895691Y publication Critical patent/CN2895691Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

A double increasing propulsion structure of anchor driller, which is mainly used to solve the technical problems of improving laneway supporting operational efficiency. The technology proposal is that a rail structure is provided between a main frame and a propeller and between the propeller and an anchor driller unit, a second-class propulsion fuel tank is fixed and arranged on the propeller, and a double increasing mechanism is connected respectively with the second-class propulsion fuel tank and the propeller, and the anchor driller unit is connected with the double increasing mechanism. The structure is applicable to all kinds of airborne anchor drillers and also to other engineering mechanisms requiring long-trip propulsion.

Description

The anchor rod driller multiplication push structure
Technical field:
The utility model relates to the push structure of a kind of skyhook, particularly a kind of jumbolter.
Background technology:
Pit shaft in mining or similar operation; the tunnel; in the gallery; its top; bottom or sidewall often adopt lining cutting protection anchor pole; promptly hole in need protection place; and installation has the anchor pole that protects liner plate in this hole; above-mentioned boring is normally finished by jumbolter; jumbolter is a kind of essential equipment that is used for the tunnel active support; it collects boring; powder stick stirs; skyhook; functions such as nut is fastening are in one; usually armature boring is to dispose hydraulicdriven propulsive mechanism; the propulsive mechanism of early stage jumbolter is to adopt the one-level push structure; its structure is fairly simple; this moment, the propelling stroke of rig equaled the length that the lane space distance deducts propulsive mechanism hydraulic cylinder body itself; obviously; in extremely narrow lane space; the rig stroke that one-level advances can not be too big; therefore; the distance that the jumbolter of this structure once creeps into is the requirement that can't reach the anchor pole fitting depth of setting; during operation; need repeatedly to change drilling rod and just can finish bore operation, operating efficiency is reduced greatly.At the problems referred to above, the dealer proposes improved technical scheme, adopt jumbolter two-stage push structure, promptly in the outer hydraulic cylinder of push structure, be provided with an inner cylinder body that can move back and forth, and movably be provided with a plunger in the inner cylinder body, skyhook rig on the plunger, during operation, work fluid promotes inner cylinder body (and plunger) and finishes jumbolter first order propelling stroke in the hydraulic cylinder outside, thereupon, the fluid of working in inner cylinder body promotes plunger and finishes jumbolter second level propelling stroke, thereby the two-stage push structure and the one-level push structure that form jumbolter compare, and it once creeps into stroke can increase by 1.5 to 2.0 times, but, in limited lane space, the outer hydraulic cylinder of propulsive mechanism and the length of inner cylinder body all are subjected to very big restriction, and above-mentioned two-stage push structure still can't solve once creeps into the requirement that reaches the anchor pole fitting depth, change the drilling rod operation procedure and still exist, its effect that improves operating efficiency is not remarkable.Because stroke is little, efficient is low, traditional roof-bolter propulsive mechanism can not adapt to tunnelling equipment and used simultaneously, appearance along with efficient helldriver structure, in order to improve the operating efficiency of roadway support, press for a kind of jumbolter push structure airborne and that the roadway support operating efficiency is high that is fit to.
The utility model content:
The technical problems to be solved in the utility model is, a kind of improved anchor rod driller multiplication push structure is provided, and it can increase the propelling stroke of jumbolter effectively, improves the supporting operating efficiency, to adapt to the supporting use of efficient associating heading equipment.
The technical scheme in the invention for solving the above technical problem is: the anchor rod driller multiplication push structure includes body frame, one-level advances oil cylinder, secondary advances oil cylinder, propeller and jumbolter group, all composition all is arranged on the body frame, one-level advances on the oil cylinder piston and is connected with propeller, be characterized in: be provided with guide rail structure between body frame and the propeller, be installed with secondary on the propeller and advance oil cylinder, secondary advances on oil cylinder and the propeller and is connected with multiplication mechanism respectively, multiplication mechanism is connected with the jumbolter group, is provided with guide rail structure between propeller and the jumbolter group.During bore operation, one-level advances cylinder action, drive the jumbolter group through propeller and finish first drilling rod propelling stroke, secondary advances cylinder action, drives the jumbolter group through multiplication mechanism and finishes quite second drilling rod propelling stroke of this oil cylinder piston stroke double length.
The utility model is in the secondary progradation, the amplification stroke function of mat multiplication mechanism, in limited lane space, the operation stroke of an actual installation drilling rod of jumbolter is increased greatly, overcome traditional jumbolter stroke defect of insufficient, can obviously improve the roadway support operating efficiency, and can adapt to the supporting use of efficient associating heading equipment, its corresponding guide rail structure then can be guaranteed the reliability of bore operation.
Description of drawings:
Fig. 1 is the schematic diagram of the utility model anchor rod driller multiplication propulsive mechanism.
Fig. 2 is that the utility model anchor rod driller multiplication propulsive mechanism axle is surveyed schematic diagram.
Fig. 3 is the guide rail structure cross-sectional schematic that body frame among Fig. 1, propeller and rig fixed mount form.
Fig. 4 is a guy rope end points connection diagram among Fig. 1.
The specific embodiment:
With reference to Fig. 1,2, the anchor rod driller multiplication push structure includes body frame 1, one-level advances oil cylinder 3, and secondary advances oil cylinder 4, propeller 5, multiplication mechanism 6 and jumbolter group 7.
Body frame 1, be that the member of all forming is installed, and can directly be fixed on the heading equipment, form airborne structure, body frame is provided with a seat board 10, seat board 10 is provided with guide plate frame 11, guide plate frame 11 1 sides are formed with guide groove 12 (as Fig. 3), guide groove 12 can be V-arrangement, T shape or other similar geometric, the work plane of guide groove 12 (as V-arrangement face and bottom surface) is provided with wear-resisting support bar 110, this support bar 110 can be embedded in prefabricated caulking groove (V-arrangement face as shown in Figure 3), and also available bolt is fixing (as the bottom surface of Fig. 3) directly, and support bar 110 can be made by engineering plastics or antifriction alloy.
One-level advances oil cylinder 3, is one of thrust power of jumbolter, and its cylinder body 31 is to be installed on the seat board 10 of body frame 1, the output of its piston 32 are affixed (or hinged) propeller 5 set a roof beam in place 52, cylinder body 31 cross sections are square with the commensurate structure configured in one piece.
Secondary advances oil cylinder 4, is the another thrust power of jumbolter, and its cylinder body 41 is to be installed on the propeller 5, and the output of its piston 42 is to be fixed on the pulley yoke 62 of multiplication mechanism 6, and cylinder body 41 cross sections are square with the commensurate structure configured in one piece.
Propeller 5, it is the important component of jumbolter transferring power and guiding, its main body is a support body 51, support body 51 is a rod body, its cross section is a hollow rectangle, as shown in Figure 3, be formed with guide plate 511 in the both sides of support body 51,512, guide plate 511,512 and guide plate frame 11 guide grooves 12 of body frame 1 and fixed mount frame 71 guide grooves 72 corresponding matching of jumbolter group 7, form guide rail structure, guide plate 511,512 shape and guide groove 12, the 72 identical V-arrangements that can be, T shape or other similar geometric are when operation, each guide plate directly contacts with anti-attrition support bar in the guide groove, forms to have the moving sets that well reduces frictional resistance; One end of support body 51 is connected with sets a roof beam in place 52, and 52 other ends of setting a roof beam in place advance the piston 31 of oil cylinder 3 to be connected with one-level, and the other end of support body 51 advances the cylinder body 41 of oil cylinder 4 to fixedly connected with secondary.
Multiplication mechanism 6 includes movable pulley 61, pulley yoke 62, upper contact 63, following contact 64, guy rope 65, following movable pulley 66, wherein:
Last movable pulley 61 is to be slidingly located on the wheel shaft of pulley yoke 62 ends, and last movable pulley 61 can be sprocket wheel or smooth the wheel, and its structure should be corresponding mutually with guy rope 65 classifications of selecting for use;
Pulley yoke 62, it is the support body of a supporting carrying pulley, be respectively arranged with at its two ends can sheathed movable pulley wheel shaft, on the wheel shaft at two ends respectively slip cap be provided with upper and lower movable pulley 61,66, the upper end of pulley yoke 62 also fixedly connected (or hinged) has secondary to advance the output of the piston 42 of oil cylinder 4;
Guy rope 65, be to drive the force transfer element that rig is made ahead running, guy rope 65 can be roller chain, other pattern chains, cable wire or other are similar to the property driving member, fixing and the wrapping system of guy rope 65 is as shown in Figure 1 and Figure 4: guy rope 65 1 ends are fixedly connected on propeller 5 (upper contact 63 among Fig. 1), movable pulley 61 extends the rig fixed mount 71 (upper contact 63 ' among Fig. 4) that is connected jumbolter group 7 again on the pile warp, guy rope 65 ends are connected in rig fixed mount 71 (contact 64 ' under among Fig. 4) more in turn, and movable pulley 66 under the pile warp, be fixedly connected on propeller 5 (contact 64 under among Fig. 1) at last, expression guy rope 65 is a roller chain among Fig. 4, on, following contact 63,63 ', 64,64 ' is connected in support body 51 or rig fixed mount 71 with bearing pin, when guy rope 65 was the other types driving member, its syndeton was similar substantially;
Following movable pulley 66, its structure is identical with last movable pulley 61, and following movable pulley 66 is to be slidingly located on the wheel shaft of pulley yoke 62 the other end;
The action of multiplication mechanism 6 is, when secondary advances oil cylinder 4 to do to advance action, pulley yoke 62 drives upper and lower movable pulley 61,66 and the pile warp guy rope 65 on it and advances synchronously, because the two ends of guy rope 65 are fixed on upper and lower contact 63,64, the stroke that guy rope 65 advances equals the twice that secondary advances oil cylinder 4 pistons 42 strokes, thereby is subjected to the propelling stroke of the jumbolter group 7 of guy rope 65 tractions to obtain at double amplification.
Jumbolter group 7 includes rig 70 and rig fixed mount 7 (as Fig. 1,2), wherein:
The structure of rig 70 is identical with existing drill configuration, and the drilling rod that the band drill bit is set on the rig can carry out the bore operation that anchor pole is installed, and rig 70 is the sides that are fixedly mounted on rig fixed mount 71;
Rig fixed mount 71, it is a plate body shape structure, the one side is installed with rig 70, opposite side is formed with guide groove 72, the guide groove 12 of the structure of guide groove 72 and body frame 1 is same or similar, promptly this groove can be V-arrangement, T shape or other similar geometric, can be provided with wear-resisting support bar 110 on the work plane of guide groove 72, this support 110 can be embedded in prefabricated caulking groove, also available bolt is directly fixing, support bar 110 can be made by engineering plastics or antifriction alloy, the guide plate 512 of guide groove 72 and propeller 5 support bodys 51 forms guide rail structure, to guarantee that rig advances operation reliablely and stablely to lead, rig fixed mount 71 connects end with 65 liang of guy ropes respectively and fixedlys connected (as Fig. 1,4), make rig 70 can under the driving of guy rope 65, do boring and advance operation.
When anchor pole is installed bore operation, start one-level and advance oil cylinder 3, drive the guiding work propelling stroke first time that propeller 5 and rig 70 carry over guide rail, this pushes away interlock finish after, start secondary thereupon and advance oil cylinder 4, through multiplication mechanism 6, the guiding that is carried over guide rail by guy rope 65 drive rigs 70 is finished bore operation one time, because the function of multiplication mechanism 6 strengthens the boring stroke, be equivalent to add 1/3 of great tradition secondary propelling stroke, thereby can under the operating condition of not changing drilling rod, once finish the requirement of holing and reaching the anchor pole fitting depth of setting, improve the roadway support operating efficiency, reduce the labour intensity of underground work, thereby can adapt to the supporting use of efficient associating heading equipment, the utility model is not only applicable to various airborne anchor rod drilling machines, and is applied to the engineering machinery that other need big stroke to advance.

Claims (6)

1, a kind of anchor rod driller multiplication push structure includes body frame, one-level propelling oil cylinder, secondary propelling oil cylinder, propeller and jumbolter group, and all compositions all are arranged on the body frame, and one-level advances on the oil cylinder piston and is connected with propeller, it is characterized in that:
A. be provided with guide rail structure between body frame (1) and the propeller (5);
B. be installed with secondary on the propeller (5) and advance oil cylinder (4);
C. secondary advances on oil cylinder (4) and the propeller (5) and is connected with multiplication mechanism (6) respectively;
D. multiplication mechanism (6) is connected with jumbolter group (7);
E. be provided with guide rail structure between propeller (5) and the jumbolter group (7).
2, anchor rod driller multiplication push structure according to claim 1, it is characterized in that multiplication mechanism (6) includes movable pulley (61), pulley yoke (62), upper contact (63), following contact (64), guy rope (65), following movable pulley (66), pulley yoke (62) is connected with the piston (42) that secondary advances oil cylinder (4), pulley yoke (62) two ends are respectively arranged with, lower sheave (61,66), on, lower sheave (61,66) go up solderless wrapped connection guy rope (65) is arranged, the two ends of guy rope (65) are fixedly arranged on respectively, following contact (63,64), on, following contact (63,64) be fixedly arranged on the support body (51) of propeller (5), be connected with the fixed mount (71) of jumbolter group (7) on the guy rope (65).
3, anchor rod driller multiplication push structure according to claim 1 and 2, the guy rope (65) that it is characterized in that multiplication mechanism (6) is chain or wire rope.
4, anchor rod driller multiplication push structure according to claim 1, the V-arrangement guide groove (12) that a side that it is characterized in that propeller (5) is provided with V-arrangement guide plate (511) and body frame (1) is combined to form guide rail structure, and the V-arrangement guide groove (72) that the opposite side of propeller (5) is provided with the fixed mount (71) of another V-arrangement guide plate (512) and jumbolter (7) is combined to form guide rail structure.
5,, it is characterized in that the V-arrangement guide groove (11,72) of body frame (1) and jumbolter (7) fixed mount (71) is provided with wear-resisting support bar (110) according to claim 1 or 4 described anchor rod driller multiplication push structure.
6, anchor rod driller multiplication push structure according to claim 1 and 2 is characterized in that being connected with on the fixed mount (71) of jumbolter group (7) guy rope (65) of multiplication mechanism (6), and the fixed mount (71) of jumbolter group (7) also is provided with rig (70).
CN 200620042296 2006-05-31 2006-05-31 Multiplicative propelling structure of anchoring-rod drilling machine Expired - Fee Related CN2895691Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620042296 CN2895691Y (en) 2006-05-31 2006-05-31 Multiplicative propelling structure of anchoring-rod drilling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620042296 CN2895691Y (en) 2006-05-31 2006-05-31 Multiplicative propelling structure of anchoring-rod drilling machine

Publications (1)

Publication Number Publication Date
CN2895691Y true CN2895691Y (en) 2007-05-02

Family

ID=38065270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620042296 Expired - Fee Related CN2895691Y (en) 2006-05-31 2006-05-31 Multiplicative propelling structure of anchoring-rod drilling machine

Country Status (1)

Country Link
CN (1) CN2895691Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102434111A (en) * 2011-12-01 2012-05-02 中国煤炭科工集团太原研究院 Hydraulically-driven two-stage-feed dovetail-groove-guide symmetrically-arranged anchor rod drilling machine
CN102518401A (en) * 2011-12-01 2012-06-27 中国煤炭科工集团太原研究院 Hydraulic-driving two-level feeding cylinder-oriented symmetrically-arranged jumbolter
CN102561940A (en) * 2012-02-23 2012-07-11 河南理工大学 Mechanical single-arm type hydraulic roof-bolter
CN111878130A (en) * 2020-08-24 2020-11-03 中铁工程装备集团有限公司 Integrated anchor rod drilling machine

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102434111A (en) * 2011-12-01 2012-05-02 中国煤炭科工集团太原研究院 Hydraulically-driven two-stage-feed dovetail-groove-guide symmetrically-arranged anchor rod drilling machine
CN102518401A (en) * 2011-12-01 2012-06-27 中国煤炭科工集团太原研究院 Hydraulic-driving two-level feeding cylinder-oriented symmetrically-arranged jumbolter
CN102434111B (en) * 2011-12-01 2014-04-30 中国煤炭科工集团太原研究院 Hydraulically-driven two-stage-feed dovetail-groove-guide symmetrically-arranged anchor rod drilling machine
CN102561940A (en) * 2012-02-23 2012-07-11 河南理工大学 Mechanical single-arm type hydraulic roof-bolter
CN111878130A (en) * 2020-08-24 2020-11-03 中铁工程装备集团有限公司 Integrated anchor rod drilling machine

Similar Documents

Publication Publication Date Title
CN101082263A (en) Anchor rod driller multiplication propulsion unit
CN202325312U (en) Power device for driving drilling rod to feed by two-stage hydraulic pressure
CN205840770U (en) A kind of impact type rotary drilling rig device being applicable to heavy caliber construction
CN2895691Y (en) Multiplicative propelling structure of anchoring-rod drilling machine
CA2100411C (en) Double rod cylinder feed system
CN101577403B (en) Flexible earth anchor drilling and taking machine
CN201326382Y (en) Hydraulic outburst prevention drilling machine for coal seam gas drainage
CN200975211Y (en) Telescopic thruster for digging drill carriage
CN201598973U (en) Translational power head of full hydraulic core drilling machine
US8662199B2 (en) Feed unit for a drilling machine
CN202926253U (en) Oil cylinder type stroke multiplying propulsive rack structure
CN2900754Y (en) Double layer slide frame propeller for drill vehicle
CN103711125B (en) A kind of boring piling Combined piling machine
CN209413851U (en) A kind of oil cylinder propulsive mechanism of drilling machine
CN203716150U (en) Drilling press pile combined type pile machine
CN107435551A (en) The brill anchor manipulator of tunnelling supporting
CN205135410U (en) Balladeur train telescopic drill jumbo propeller
CN107083926B (en) A kind of feed system of large-scale mine drilling machine
CN112814585A (en) Double-cylinder feeding system of blast hole drilling machine
CN107445073B (en) Truck-mounted drilling rig combined type lifting device and application method
CN105840092A (en) Rotary drilling machine double-column structure
CN2929190Y (en) Hydraulic anchor rod machine
CN201196023Y (en) Screw pile machine
CN214532851U (en) Double-cylinder feeding system of blast hole drilling machine
CN2825593Y (en) Guide rail moving device for ocean workover rig

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070502

Termination date: 20110531