CN2895529Y - Composite foundation of combining raft and column and external wall type foundation - Google Patents

Composite foundation of combining raft and column and external wall type foundation Download PDF

Info

Publication number
CN2895529Y
CN2895529Y CN 200620090253 CN200620090253U CN2895529Y CN 2895529 Y CN2895529 Y CN 2895529Y CN 200620090253 CN200620090253 CN 200620090253 CN 200620090253 U CN200620090253 U CN 200620090253U CN 2895529 Y CN2895529 Y CN 2895529Y
Authority
CN
China
Prior art keywords
foundation
basement
improvement
compound
raft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620090253
Other languages
Chinese (zh)
Inventor
李伟
竹内谨治
山本春行
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN 200620090253 priority Critical patent/CN2895529Y/en
Application granted granted Critical
Publication of CN2895529Y publication Critical patent/CN2895529Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A compound basement which the raft plate is combined with the pillar type and the enclosure wall type basement improvement relates to an architecture structure form. The basement applies a pillar type basement improvement with an echelon-shaped distribution in depth direction and the enclosure part of the basement also applies the compound basement of shallow wall type basement improvement. The compound basement which the raft plate is combined with the pillar tyupe and the enclosure wall type basement improvement becomes a pillar type improvement in a triangle-shaped distribution with the change of the soil layer of the compound basement, and the surrounding of the said compound basement becomes a local shallow wall type basement improvement in a triangle-shaped distribution with the change of the soil layer of the compound basement, so as to improve the horizontal resistance capability of the basement and effectively prevent the relative rising of the constitution caused by the consolidation settlement of the enclosed basement soil, maintaining the long term application performance of the architecture.

Description

The composite foundation that a kind of raft plate combines with cylindricality and outer enclosure wall formula foundation improvement
Technical field
The utility model relates to a kind of architecture structure form, particularly relates to the composite foundation that a kind of raft plate combines with cylindricality and outer enclosure wall formula foundation improvement.
The utility model relates to the composite foundation that raft plate and cylindricality foundation improvement and the improvement of outer enclosure wall formula combine, and has particularly adopted at depth direction to be the cylindricality foundation improvement of trapezoidal profile and the periphery employing shallow-layer wall formula foundation improvement on basis.Be to the improvement of existing composite foundation with replenish, belong to the composite foundation form field in the fixed buildings basis, in mid-rise building, be used as the main base form of building foundation.
Background technology
Construction of buildings on soft foundation at first needs to solve the settlement issues (bulk deposition and different sedimentations) on basis.And on soft foundation construction of buildings, generally adopt pile foundation, deep layer improvement basis, perhaps the composite foundation form that combines with raft foundation of stake.When adopting the support stake, because pile body has run through soft layer, be placed on the supporting layer of ground, and pile body is the perfect rigidity body with respect to soft layer, the peripheral soil in basis changes and during sedimentation in natural conditions etc., building will and ground between because distortion is inconsistent and segment occurred difference phenomenon causes obstacle on the functional performance of building.Thereby for keeping the functional performance of building, in recent years at home and abroad, raft foundation successively occurred to combine with foundation improvement, raft foundation combines with friction pile, composite foundation forms such as deep foundation improvement.In the very dark situation of weak soil layer, since the restriction of execution conditions, difficult stake or the deep foundation improvement worker method supported that be suitable for.And during low layer under construction (in light-duty) building, use and support stake, raft foundation combines with friction pile, during ground forms such as deep foundation improvement, with respect to upper building, tends to become the relatively poor basic worker's method of economic effect.The artificial economy that improves basic worker's method such as applicant, and the different sedimentations on control basis have proposed the basic worker method of raft foundation with following spill foundation improvement.But this worker's method is the shallow layer foundation improvement, and the supporting capacity of vertical direction is comparatively limited.
Summary of the invention
The purpose of this utility model is to provide a kind of raft plate to reach the composite foundation that outer enclosure wall formula foundation improvement combines with cylindricality, adopt the peripheral foundation improvement form of deepening of wall formula in ground edge, to improve the horizontal resistivity of ground, the relative rising of the structure that prevent effectively because the consolidation settlement of peripheral foundation soil etc. caused, thus the long-term functional performance of building kept.
The utility model is achieved through the following technical solutions:
The composite foundation that a kind of raft plate combines with cylindricality and outer enclosure wall formula foundation improvement, this basis have adopted at depth direction and have been the cylindricality foundation improvement of trapezoidal profile and the composite foundation that basic periphery adopts shallow-layer wall formula foundation improvement shape.
The composite foundation that above-mentioned a kind of raft plate combines with cylindricality and outer enclosure wall formula foundation improvement, described composite foundation are that when foundation soil changed, the column of distribution triangular in shape improved.
The composite foundation that above-mentioned a kind of raft plate combines with cylindricality and outer enclosure wall formula foundation improvement, described composite foundation is that when foundation soil changed, the ground periphery was local shallow-layer wall formula foundation improvement.
Advantage of the present utility model and effect are:
1. the utility model is carried out base integral large tracts of land trapezoidal profile column foundation improvement.
2. when the utility model reduces the settling amount of whole building,, the different settling amounts on basis can be reduced, thereby the destruction of the superstructure that causes by different sedimentations can be effectively avoided by regulating the column improvement degree of depth of diverse location.
3. the utility model has relatively large viscosity and certain compressibilty simultaneously because the conditioned soil rigidity will descend to some extent than the rigidity of pile body, can effectively absorb seismic wave energy, exempts to shake effect thereby reach.
4. the utility model adopts on-the-spot soil and the form that lime stirs or whitewashing is handled to carry out easy construction.
5. the utility model adopts the form of stirrings such as on-the-spot soil and lime to carry out owing to the foundation soil improvement, has saved the haulage process of on-the-spot roach, and economic effect is good.
6. the utility model environmental effect is good.
7. the utility model is carried out the improvement of wall formula shallow-layer at the periphery on basis, has improved horizontal resistivity greatly.
Description of drawings
Raft foundation or strip foundation and the column land reform schematic diagram on form basis that very combines when Fig. 1 is approximately evenly distributed load for the top loading;
Fig. 2 is very the combine general synoptic diagram on form basis of raft foundation or strip foundation and column land reform.
Symbol description among the figure:
1. shallow layer foundation is improved 2. outer enclosure wall formula foundation improvements
3. cylindrical foundation improvement 4. raft plate or strip foundations
5. the sedimentation that the sedimentation of not having column when improvement distributes after the improvement of 6. columns distributes
7. post 8. supporting layers
The specific embodiment
Shown in accompanying drawing 1,2, suppose that there is deep layer weak soil layer in ground supporting layer (8) top, raft plate ground is under the evenly distributed load effect, and the distortion on basis distributes shown in (5) as the sedimentation the during improvement of no column among the figure, reaches maximum, its outer edges minimum in the centre position.Be different sedimentations that solve ground and the whole holding power that improves the basis, adopted depth direction in echelon the cylindrical foundation improvement (3) of distribution combine with raft plate or strip foundation (4), and add the composite foundation of shallow layer foundation improvement (1) in raft plate or strip foundation (4) bottom, make the mild as sedimentation distribution (6) after the column improvement among the figure of sedimentation distribution trend behind the foundation improvement.Other considers the direct basis weak characteristic of relative thin in the horizontal direction, and the form of enclosure wall formula foundation improvement (2) outside ground edge adopts is to improve the horizontal resistivity of ground.When structural load mainly passed to ground by post (7), it is maximum that the sedimentation when not having improvement will reach in post (7) bottom, and be benchmark with the post this moment, needs the bottom column improvement deepen.
Be directed on the soft foundation and build medium-sized building, such as about 10 layers residential building, general shape supermarket, the warehouse, industrial buildings etc. propose with raft foundation or strip foundation and the column land reform form basis that very combines.Good for the column land reform, all carried out extensive studies at home and abroad.Because of it has easy construction, characteristic such as economic effect is good is widely used in practice.
According to raft plate ground under the evenly distributed load effect, being deformed in the centre position of basis reaches maximum, the characteristic of its outer edges minimum, this basic model has adopted at the depth direction composite foundation that combines with raft plate or strip foundation of the cylindrical foundation improvement of distribution in echelon, to control the bulk deposition and different settling amounts on basis.Other considers the direct basis weak characteristic of relative thin in the horizontal direction, adopts the peripheral foundation improvement form of deepening of wall formula in ground edge, to improve the horizontal resistivity of ground.At this point in the basic mode formula since modified body be semi-rigid material, raising declines effect to subtracting of seismic wave when, the distortion of peripheral soil is followed in the sedimentation on basis, the relative rising of the structure that can prevent effectively because the consolidation settlement of peripheral foundation soil etc. caused, thus the long-term functional performance of building kept.

Claims (3)

1. raft plate and the composite foundation that cylindricality and outer enclosure wall formula foundation improvement combine is characterized in that this basis adopted the composite foundation that is the periphery employing shallow-layer wall formula foundation improvement shape on the cylindricality foundation improvement of trapezoidal profile and basis at depth direction.
2. a kind of raft plate according to claim 1 and the composite foundation that cylindricality and outer enclosure wall formula foundation improvement combine is characterized in that described composite foundation is, when foundation soil changes, and the improvement of the column of distribution triangular in shape.
3. a kind of raft plate according to claim 1 and the composite foundation that cylindricality and outer enclosure wall formula foundation improvement combine is characterized in that described composite foundation is, when foundation soil changed, the ground periphery was local shallow-layer wall formula foundation improvement.
CN 200620090253 2006-04-06 2006-04-06 Composite foundation of combining raft and column and external wall type foundation Expired - Fee Related CN2895529Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620090253 CN2895529Y (en) 2006-04-06 2006-04-06 Composite foundation of combining raft and column and external wall type foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620090253 CN2895529Y (en) 2006-04-06 2006-04-06 Composite foundation of combining raft and column and external wall type foundation

Publications (1)

Publication Number Publication Date
CN2895529Y true CN2895529Y (en) 2007-05-02

Family

ID=38065108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620090253 Expired - Fee Related CN2895529Y (en) 2006-04-06 2006-04-06 Composite foundation of combining raft and column and external wall type foundation

Country Status (1)

Country Link
CN (1) CN2895529Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021871B (en) * 2009-09-15 2012-05-23 中国石油化工集团公司 Foundation treatment method for temporary construction subgrade on dredge fill soft foundation site
CN103469781A (en) * 2013-10-17 2013-12-25 中国建筑东北设计研究院有限公司 Complete applying method of wall-column-combined ground treatment in coastal soft soil area
CN103806474A (en) * 2014-03-12 2014-05-21 中国建筑西南勘察设计研究院有限公司 Anti-floating structure for deformation compatibility of anti-floating anchor rods and anti-floating plate
CN108824510A (en) * 2018-08-02 2018-11-16 中铁第四勘察设计院集团有限公司 The foundation stabilization construction and its construction method in shallow layer soft soil area

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021871B (en) * 2009-09-15 2012-05-23 中国石油化工集团公司 Foundation treatment method for temporary construction subgrade on dredge fill soft foundation site
CN103469781A (en) * 2013-10-17 2013-12-25 中国建筑东北设计研究院有限公司 Complete applying method of wall-column-combined ground treatment in coastal soft soil area
CN103469781B (en) * 2013-10-17 2016-06-08 中国建筑东北设计研究院有限公司 Wall column in conjunction with basement process at the complete application process in coastal soft clay area
CN103806474A (en) * 2014-03-12 2014-05-21 中国建筑西南勘察设计研究院有限公司 Anti-floating structure for deformation compatibility of anti-floating anchor rods and anti-floating plate
CN103806474B (en) * 2014-03-12 2016-05-04 中国建筑西南勘察设计研究院有限公司 The float Structure of anti-float anchor rod and the compatibility of deformation of anti-floating plate
CN108824510A (en) * 2018-08-02 2018-11-16 中铁第四勘察设计院集团有限公司 The foundation stabilization construction and its construction method in shallow layer soft soil area

Similar Documents

Publication Publication Date Title
CN201962688U (en) Diaphram wall wharf pile foundation structure
CN2895529Y (en) Composite foundation of combining raft and column and external wall type foundation
CN201843136U (en) Device for eliminating negative skin friction of pile foundation
CN110439022A (en) Marine single-pile foundation with compacting grouting and reinforcing ground
CN104420477A (en) Photovoltaic support foundation structure applicable to tidal flat photovoltaic power station and construction method
CN205421365U (en) Composite foundation loading test device
CN100465390C (en) Composite building foundation based on waste steel slag
CN111877365A (en) H-shaped steel combined steel sheet pile continuous wall combined supporting system and construction method thereof
CN103469781B (en) Wall column in conjunction with basement process at the complete application process in coastal soft clay area
CN112323838A (en) Offshore wind power suction pile foundation and installation method thereof
CN202124863U (en) Screw anchor excavated composite foundation
CN2825743Y (en) Complete covered sheet pile structure for improving bearing capability of sheet pile wall
CN2554230Y (en) Screw anchor
CN202157321U (en) Screwing-in type large bearing steel pipe pile
CN110093933A (en) A kind of foundation pit vertically draws anchor support system and its construction method
CN205662918U (en) Wind amasss husky spiral piling bar structure
US20210310209A1 (en) Helical pile and bracket module comprising the same
CN1884705A (en) Seepage-proof structure for water conservancy and hydroelectric project
CN208309513U (en) A kind of assembled shore protection suitable for complicated water front
CN201141221Y (en) Environment-protection array type dustproof curtain
CN206752447U (en) A kind of dado structure for being used to build diaphram wall
CN110409479B (en) Self-adaptive stable control fan foundation
CN2795298Y (en) large-rigidity underground continuous wall
CN201649067U (en) Settlement reducing composite sparse pile
CN1317459C (en) Marine road bed structure with horizontal barrels

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070502

Termination date: 20140406