CN2890925Y - Testing device - Google Patents

Testing device Download PDF

Info

Publication number
CN2890925Y
CN2890925Y CN 200620000420 CN200620000420U CN2890925Y CN 2890925 Y CN2890925 Y CN 2890925Y CN 200620000420 CN200620000420 CN 200620000420 CN 200620000420 U CN200620000420 U CN 200620000420U CN 2890925 Y CN2890925 Y CN 2890925Y
Authority
CN
China
Prior art keywords
circuit board
connector
test
under test
probe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620000420
Other languages
Chinese (zh)
Inventor
张锦
黄官宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inventec Corp
Original Assignee
Inventec Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inventec Corp filed Critical Inventec Corp
Priority to CN 200620000420 priority Critical patent/CN2890925Y/en
Application granted granted Critical
Publication of CN2890925Y publication Critical patent/CN2890925Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Coupling Device And Connection With Printed Circuit (AREA)

Abstract

The utility model discloses a tester which comprises a base for placing a tested circuit board which is equipped with a connection device with a plurality of stitches, and a switching component which is provided with a connection component and a probe needle. This connection component electrically connects with the connection device of the circuit plate for testing, and the connection component is electrically connected with the probe needle by a switching wire. This probe needle is applied for connecting the stitches of the tested circuit plate connection device and a loading seat is placed on the base to load the probe needles of the switching component on corresponding proper positions of the tested circuit plate of the base. The tester probe needle of the utility model with simple conformation can carry out testing operation corresponding to the stitches of the connection device and promotes the convenience and efficiency of the connecting and disconnecting operations of the connection device. The probe needle of the utility model contacts with the stitches of tested circuit board connection device only without contacting the connection device, and thereby avoiding the connection and disconnection among connection devices and promoting the service life of the connection device.

Description

Proving installation
Technical field
The utility model is about a kind of proving installation, particularly about a kind of proving installation of mechanization testing circuit board.
Background technology
At present, for example the manufacturer of electronic product such as computing machine, server all can test each circuit board of this product, to guarantee the outgoing of product before this product assembling is dispatched from the factory.Usually, whether the accessory that the test man can match this circuit board under test and a testing circuit board (for example circuit board such as heating radiator) is connected, can normally move by this this circuit board under test of test circuit board test.General these electronic products all adopt connector (connector) to carry out being connected between testing circuit board and the circuit board under test in design.When production test at present, mostly the tester is to take manual type plug-in connector back and forth, as shown in Figure 1, it is directly with the stitch (Pin) 301 ' of the connector 30 ' of testing circuit board, be plugged on the stitch 501 ' of connector 50 ' of circuit board under test, two circuit boards are electrically connected, for the follow-up test of carrying out circuit board under test.
Because the connector stitch is more and more now, in order to make connector interconnect more reliably, the design that generally has anti-mis-insertion, therefore in production test, be not easy to tester's plug, and, the plug speed of carrying out connector with manual type is quite slow, and labor intensive in a large amount of production runes, can not meet fast and demand cheaply.
Moreover, with the direct plug-in connector of artificial manual mode, for example be easy to generate artificial malfunctions such as stitch position wrong plug, and then cause short circuit to damage electronic component on this circuit board under test circuit board.
In addition, be to finish owing to electrically connect by contacting fully of two connectors, and in the board production test process, need carry out repeatedly plug to connector, the wearing and tearing of connector can be caused, the serviceable life of connector can be shortened thus greatly, thus the result of influence test.
In sum, how to avoid disadvantages of the prior art, real technical task for needing to be resolved hurrily at present.
The utility model content
For overcoming the shortcoming of above-mentioned prior art, fundamental purpose of the present utility model is to provide a kind of proving installation of mechanization test, replaces the mode of the artificial plug of tradition.
Another purpose of the present utility model is to provide a kind of proving installation, can avoid the direct connection between the connector, improve the convenience of connector plug operation, and then lifting work efficiency, with manual type connector is frequently plugged the wearing and tearing that cause connector when reducing test, promote the serviceable life of this connector
A purpose more of the present utility model is to provide a kind of connector proving installation in serviceable life that improves, and with manual type connector is frequently plugged the wearing and tearing that cause connector when reducing test.
For reaching above-mentioned and other purpose, the utility model provides a kind of proving installation, and this proving installation comprises: a pedestal, put a circuit board under test, and this circuit board under test has a connector, and this connector has a plurality of stitch; One adaptor has a connection piece and probe, and this web member and a test electrically connect with the connector of circuit board, and this web member and this probe electrically connect by a patchcord, and this probe is in order to connect the stitch of this circuit under test connector for substrate; An and load bearing seat, place on this pedestal, and the corresponding appropriate position that places the circuit board under test of this pedestal, in order to carry the probe of this adaptor, and an operating parts vertically is set on this load bearing seat, when this test is tested this circuit board under test with circuit board, operate this operating parts, the probe of this adaptor and the connector of this circuit board under test are electrically connected, this circuit board under test is tested.
The connector of this board under test is a female connectors, and this web member is a connector, and this connector is a female connectors, with test circuit board connector one public connector of the corresponding connection of this web member; This web member also can be a public connector, then is a female connectors with the test of the corresponding connection of this web member with the connector of circuit board.
This operating parts has an operating portion and follower, and this operating portion is for operator's application of force usefulness, an end of this follower be articulated in this operating portion, the other end is to be fixed in this adaptor, but this adaptor and this follower synchronization action.This operating portion is the formula handle of operating a switch.
Compared with prior art, proving installation of the present utility model utilizes the web member of an adaptor to be connected with this testing circuit board, this web member relends by a patchcord and is connected with this probe, be plugged on the stitch of the connector of this circuit board under test at last by probe, finish the electric connection of test, can carry out the test of circuit board with circuit board and circuit board under test.
Therefore, the utility model proving installation need not directly to connect the connector with anti-mis-insertion design, only need the operating parts application of force, the probe correspondence is plugged on the stitch of connector can carry out test jobs, it is simple in structure and easy to implement, can avoid having improved the convenience of connector plug operation, and then having promoted work efficiency with artificial directly plug-in connector consumed time and manpower.Simultaneously, because proving installation of the present utility model is to utilize probe and patchcord to connect operation, probe only contacts with the stitch of the connector of this circuit board under test, be not to contact with the connector of whole testing circuit board, therefore, the frequent Plug Action that also can avoid directly carrying out between the connector causes the wearing and tearing of connector, and then promotes the serviceable life of this connector.
Description of drawings
Fig. 1 is existing the test connector of circuit board and the connected mode synoptic diagram of circuit under test connector for substrate;
Fig. 2 is the stereographic map of proving installation of the present utility model; And
Fig. 3 is the start stereographic map of proving installation of the present utility model.
Embodiment
Embodiment
See also Fig. 2, it is the stereographic map of proving installation of the present utility model.As shown in the figure, proving installation 1 of the present utility model comprises: a pedestal 10, an adaptor 20 and a load bearing seat 30.
This pedestal 10 is to be a L shaped shape, and in order to put a circuit board under test 4, this circuit board under test 4 has a connector 40, and this connector 40 has a plurality of stitch 401.In the present embodiment, the connector 40 of this circuit board under test 4 is female connectors.
This adaptor 20, have a connection piece 201 and probe 202, this web member 201 is to electrically connect with the connector 50 of test with circuit board 5, and this web member 201 electrically connects by a patchcord 203 with this probe 202, and this probe 202 is the stitch 401 in order to the connector 40 that connects this circuit board under test 4.This web member 201 is a connector in the present embodiment, and this connector 40 is female connectors, is public connectors with the test of these web member 201 corresponding connections with the connector 50 of circuit board 5; This web member 201 also can be a public connector, and then corresponding this test that connects is female connectors with the connector 50 of circuit board 5, because this is to have to know that usually the knowledgeable all can spread to and understands, so other does not give unnecessary details for literary composition at this.
In the present embodiment, quantity, shape and the dimension scale of this probe 202 when reality is implemented is provided with according to quantity, shape and the dimension scale of each stitch 401 of these circuit board under test 4 connectors 40.
This load bearing seat 30, be to put on this pedestal 10, and the corresponding appropriate position that places the circuit board under test 4 of this pedestal 10, carry the probe 202 of this adaptor 20, and an operating parts 301 is set vertically on this load bearing seat 30, when this test is tested with 5 pairs of these circuit board under test 4 of circuit board, operate connector 40 electric connections that this operating parts 301 makes probe 303 with this circuit board under test 4 of this adaptor 20, this circuit board under test 4 is tested.
This operating parts 301 has an operating portion 302 and a follower 303, wherein, this operating portion 302 is for operator's application of force, one end of this follower 303 is to be articulated in this operating portion 302, the other end is to be fixed in this adaptor 20, but this adaptor 20 and these follower 303 synchronization actions, in the present embodiment, this operating parts 301 is to do displacement vertically, but not as limit.And in the present embodiment, this operating portion 302 is the formula handles of operating a switch, and when the user pressed down this operating portion 302, this follower 303 drove this load bearing seat 30 along direction A vertical moving along direction A vertical moving, and pressing also is connected to this circuit board under test 4.
See also Fig. 3, it is the start stereographic map of proving installation of the present utility model.As shown in the figure, in the time will testing this circuit board under test 4, at first the probe 202 with this adaptor 20 places on this load bearing seat 30, and this probe 202 is connected with this web member 201 by this patchcord 203, and the web member 201 that will be connected with probe 202 again is connected with the connector 50 of this test with circuit board 5, promptly finish the operation in early stage of setup test, this circuit board under test 4 that will test again places this pedestal 10, this moment, this probe 202 was aimed at the stitch 401 of the connector 40 of this circuit board under test 4, relend by the operating portion 302 of pushing this operating parts 301, make this follower 303 drive this load bearing seat 30 along direction A vertical moving, this probe 202 is plugged into the connector 40 of this circuit board under test 4, finish electric connection, can carry out test procedure.After test is finished, operating personnel can by on draw this operating portion 302, make this follower 303 along direction A ' vertical moving, drive this load bearing seat 30 along direction A ' vertical moving, make this probe 202 leave the connector 40 of this circuit board under test 4, this probe 202 and the connector 40 of this circuit board under test 4 are disengaged, and, can carry out the test of another circuit board under test 4 by the circuit board under test of changing on this pedestal 4.
By above-mentioned method of attachment, the utility model proving installation 1 need not the stitch of this test with circuit board 5 connectors 50, stitch 401 direct and circuit board under test 4 connectors 40 are pegged graft, only realize the electric connection of test between circuit board 5 and the circuit board under test 4, avoid the disadvantages of prior art by probe 202 and patchcord 203.
In sum, proving installation 1 of the present utility model utilizes the web member 201 of an adaptor 20 to be connected with circuit board 5 with this test, this web member 201 relends by a patchcord 203 and is connected with this probe 202, be plugged on the stitch 401 of these circuit board under test 4 connectors 40 at last by probe 202, finish test with the electric connection of circuit board 5, can carry out the test of circuit board with circuit board under test 4.
Correspondingly the utility model proving installation need not directly to connect the connector with anti-mis-insertion design, only need the operating parts application of force, the probe correspondence is plugged on the stitch of connector can carry out test jobs, it is simple in structure and easy to implement, can avoid expending of time of causing and manpower with artificial directly plug-in connector, improve the convenience of connector plug operation, promoted work efficiency.Simultaneously, proving installation of the present utility model utilizes probe and patchcord to connect operation, probe only contacts with the stitch of the connector of this circuit board under test, be not to contact with the connector of whole test with circuit board, therefore, also can avoid directly carrying out the wearing and tearing that frequent Plug Action between the connector causes connector, promote the serviceable life of this connector.

Claims (7)

1. a proving installation is characterized in that, this proving installation comprises:
One pedestal is put a circuit board under test, and this circuit board under test has a connector, and this connector has a plurality of stitch;
One adaptor has a connection piece and probe, and this web member and a test electrically connect with the connector of circuit board, and this web member and this probe electrically connect by a patchcord, and this probe is in order to connect the stitch of this circuit under test connector for substrate; And
One load bearing seat, place on this pedestal, and the corresponding appropriate position that places the circuit board under test of this pedestal, in order to carry the probe of this adaptor, and an operating parts vertically is set on this load bearing seat, when this test is tested this circuit board under test with circuit board, operate this operating parts, the probe of this adaptor and the connector of this circuit board under test are electrically connected, this circuit board under test is tested.
2. proving installation as claimed in claim 1 is characterized in that this pedestal is L-shaped.
3. proving installation as claimed in claim 1 is characterized in that, the connector of this circuit board under test is a female connectors.
4. proving installation as claimed in claim 1 is characterized in that this web member is a connector, and is a female connectors, is a public connector with the test circuit board connector of the corresponding connection of this web member.
5. proving installation as claimed in claim 1 is characterized in that this web member is a connector, and is a public connector, is a female connectors with the test circuit board connector of the corresponding connection of this web member.
6. proving installation as claimed in claim 1, it is characterized in that this operating parts has an operating portion and follower, this operating portion is for operator's application of force, one end of this follower be articulated in this operating portion, the other end is fixed in this adaptor, but this adaptor and this follower synchronization action.
7. proving installation as claimed in claim 6 is characterized in that, this operating portion is the formula handle of operating a switch.
CN 200620000420 2006-01-05 2006-01-05 Testing device Expired - Fee Related CN2890925Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620000420 CN2890925Y (en) 2006-01-05 2006-01-05 Testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620000420 CN2890925Y (en) 2006-01-05 2006-01-05 Testing device

Publications (1)

Publication Number Publication Date
CN2890925Y true CN2890925Y (en) 2007-04-18

Family

ID=38021589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620000420 Expired - Fee Related CN2890925Y (en) 2006-01-05 2006-01-05 Testing device

Country Status (1)

Country Link
CN (1) CN2890925Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103424641A (en) * 2012-05-21 2013-12-04 纬创资通股份有限公司 Pluggable testing device
CN105866579A (en) * 2016-04-01 2016-08-17 广州兴森快捷电路科技有限公司 Gold finger contact resistance and plugging aging test apparatus
CN109326905A (en) * 2017-11-28 2019-02-12 苏州欧肯葵电子有限公司 A kind of adapting system of automotive test
CN109459593A (en) * 2018-11-27 2019-03-12 许继集团有限公司 Switching charging tray and relay protection single-board testing device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103424641A (en) * 2012-05-21 2013-12-04 纬创资通股份有限公司 Pluggable testing device
CN105866579A (en) * 2016-04-01 2016-08-17 广州兴森快捷电路科技有限公司 Gold finger contact resistance and plugging aging test apparatus
CN105866579B (en) * 2016-04-01 2019-02-26 广州兴森快捷电路科技有限公司 A kind of golden finger contact resistance and plug ageing tester
CN109326905A (en) * 2017-11-28 2019-02-12 苏州欧肯葵电子有限公司 A kind of adapting system of automotive test
CN109459593A (en) * 2018-11-27 2019-03-12 许继集团有限公司 Switching charging tray and relay protection single-board testing device

Similar Documents

Publication Publication Date Title
CN2890925Y (en) Testing device
CN102866323B (en) Wiring detection method and device for programmable logic controller (PLC) module
CN200983225Y (en) Electric testing module
CN103529313B (en) Backlight module driving device tester table and method and power panel method for making
CN101370230A (en) Automatic test system and method for mobile phone keyboard
CN202405460U (en) Quick heavy-duty connecting device for electric actuating mechanism
CN200956047Y (en) Air conditioner electronic control board split test tool
CN204205219U (en) Connector
CN208489476U (en) A kind of jack module and socket
CN1189821C (en) Mainboard test equipment
CN216883617U (en) A kind of tool
CN212341382U (en) Automatic plug testing arrangement of square-mouth USB interface
CN207910863U (en) A kind of antenna for mobile phone test device
CN211955725U (en) PCBA board tester of ten passageways
CN2515725Y (en) Host computer panel testing device
CN202599979U (en) Tool for detecting performance of capacitive touch screen
CN217846493U (en) Aging experiment jig
CN213581039U (en) MIPI testing arrangement
CN111624468A (en) Automatic plug testing arrangement of square-mouth USB interface
CN220400207U (en) Display screen test keysets and testing arrangement
CN220671564U (en) Comprehensive test platform for power distribution system board card
CN216526105U (en) Display screen test system, structure, pressing mechanism, guide mechanism and control system
CN220232438U (en) FCT testing device for CPU board
CN219104999U (en) Bench device for detecting controller of floor washing machine
CN111856339A (en) Pogo Pin detection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070418

Termination date: 20120105