CN2885975Y - Two-purpose steel bar fixing support - Google Patents

Two-purpose steel bar fixing support Download PDF

Info

Publication number
CN2885975Y
CN2885975Y CN 200620072242 CN200620072242U CN2885975Y CN 2885975 Y CN2885975 Y CN 2885975Y CN 200620072242 CN200620072242 CN 200620072242 CN 200620072242 U CN200620072242 U CN 200620072242U CN 2885975 Y CN2885975 Y CN 2885975Y
Authority
CN
China
Prior art keywords
groove
recess
utility
model
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620072242
Other languages
Chinese (zh)
Inventor
张金明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620072242 priority Critical patent/CN2885975Y/en
Application granted granted Critical
Publication of CN2885975Y publication Critical patent/CN2885975Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A dual-purpose steel bar stationary barrier comprises a base and at least one pair of annular arms, wherein the annular arms are respectively provided with a first recess, the base is further provided with at least one second recess, and the bottom surface of the second recess is lower than that of the first recess. The utility model provides the first recess and the second recess of different heights to support steels, so the casting of steel concrete with thicknesses of different armour coats is satisfied, simultaneously is applicable the erection of double steel. The utility model is simple in structure and high in intensity, the quality of the steel concrete can be ensured. As plastics injection molding is adopted, the cost is low, and the utility model is convenient for commercial manufacture.

Description

Dual-purpose reinforcing bar fixed support
Technical field
The utility model belongs to building material field, is used for fixing the support of reinforcing bar during particularly a kind of casting reinforced concrete.
Background technology.
In building trade; for guaranteeing the necessary thickness of concrete cover in the steel concrete; the phenomenon that reinforcing bar exposes takes place when preventing form removal; usually need be at the reinforcing bar underlay to lack steel material or concrete mortar cushion block in order to rim and fixing reinforcing bar; and then carry out the cast of steel concrete, but since short steel material not only easy-to-rust also cause the waste of material, the concrete mortar bulk strength is lower; easily crisp broken, therefore make the difficult quality guarantee of steel concrete.
Summary of the invention
The purpose of this utility model provides a kind of dual-purpose reinforcing bar fixed support, and it can guarantee the necessary thickness of topping in the steel concrete, and is with low cost again, intensity is higher, can guarantee the quality of steel concrete.
The technical solution of the utility model is: a kind of dual-purpose reinforcing bar fixed support, comprise base, be positioned at least one pair of annular arm on the top of described base, have first groove on described each annular arm: also have at least one second groove on the described base, the groove bottom of described second groove is lower than the bottom surface of described first groove.
Described second groove is positioned at the central authorities at the top of described base.
The diameter of the inner circumferential surface of described annular arm is greater than the groove width of described second groove.
The bottom of described base also has spike.
The utility model compared with prior art has following advantage: the utility model provides first groove of differing heights and second groove to come bearing bar; therefore can satisfy the cast of the steel concrete of different protective layer thickness, also be applicable to setting up of double steel bar simultaneously.The utility model is simple in structure, and intensity is higher, can guarantee the quality of steel concrete, owing to adopt the plastic cement injection mo(u)lding, and therefore with low cost, and be convenient to industrial production.
Description of drawings
Accompanying drawing 1 is the schematic diagram of user mode one of the present utility model;
Accompanying drawing 2 is the schematic diagram of user mode two of the present utility model;
Accompanying drawing 3 is a vertical view of the present utility model;
Wherein: 1, base; 2, annular arm; 3, second groove; 4, reinforcing bar; 5, spike; 6, first groove.
The specific embodiment
Consult accompanying drawing 1 to accompanying drawing 3; a kind of dual-purpose reinforcing bar fixed support; comprise base 1; be positioned at least one pair of annular arm 2 on the top of described base 1; has first groove 6 on described each annular arm 2; it is characterized in that: also have at least one second groove 3 on the described base 1; the groove bottom of described second groove 3 is lower than the bottom surface of described first groove 6; described annular arm 2 is formed overall structure with base 1; be base 1 the lower surface on earth the distance between a groove 6 or second groove 3 be reinforcing bar 4 and the distance between template, the i.e. thickness of being fixed of reinforcement cover.
Described second groove 3 is positioned at the central authorities at the top of described base 1.
The diameter of the inner circumferential surface of described annular arm 2 is greater than the groove width of described second groove 3.
The bottom of described base 1 also has spike 5.
Accompanying drawing 1 is depicted as user mode one of the present utility model, is applicable to the thicker steel concrete of cast topping.During use, its base 1 is fixing, and reinforcing bar 4 is set up on described first groove 6, carries out concrete pouring and gets final product.
Accompanying drawing 2 is depicted as user mode two of the present utility model, is applicable to the steel concrete that the cast topping is relatively thinner.During use, its base 1 is fixing, and reinforcing bar 4 is set up on described second groove 3, carries out concrete pouring and gets final product.
When setting up double steel bar if desired, only need two reinforcing bars 4 to be intersected and be placed on respectively in second groove 3 and first groove 6, and pour into a mould and get final product.

Claims (4)

1, a kind of dual-purpose reinforcing bar fixed support, comprise base (1), be positioned at least one pair of annular arm (2) on the top of described base (1), has first groove (6) on described each annular arm (2), it is characterized in that: also have at least one second groove (3) on the described base (1), the groove bottom of described second groove (3) is lower than the bottom surface of described first groove (6).
2, dual-purpose reinforcing bar fixed support according to claim 1, it is characterized in that: described second groove (3) is positioned at the central authorities at the top of described base (1).
3, dual-purpose reinforcing bar fixed support according to claim 1, it is characterized in that: the diameter of the inner circumferential surface of described annular arm (2) is greater than the groove width of described second groove (3).
4, dual-purpose reinforcing bar fixed support according to claim 1, it is characterized in that: the bottom of described base (1) also has spike (5).
CN 200620072242 2006-04-07 2006-04-07 Two-purpose steel bar fixing support Expired - Fee Related CN2885975Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620072242 CN2885975Y (en) 2006-04-07 2006-04-07 Two-purpose steel bar fixing support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620072242 CN2885975Y (en) 2006-04-07 2006-04-07 Two-purpose steel bar fixing support

Publications (1)

Publication Number Publication Date
CN2885975Y true CN2885975Y (en) 2007-04-04

Family

ID=37961065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620072242 Expired - Fee Related CN2885975Y (en) 2006-04-07 2006-04-07 Two-purpose steel bar fixing support

Country Status (1)

Country Link
CN (1) CN2885975Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107338912A (en) * 2016-04-08 2017-11-10 陈键 A kind of building iron protective layer clamping device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107338912A (en) * 2016-04-08 2017-11-10 陈键 A kind of building iron protective layer clamping device

Similar Documents

Publication Publication Date Title
CN208072950U (en) A kind of combination set shaped steel formwork
CN203145267U (en) Prefabricated composite floor slab
CN105040732A (en) Prefabricated type reinforced concrete underground comprehensive pipe gallery and production mold thereof
CN2885975Y (en) Two-purpose steel bar fixing support
CN2417223Y (en) Floor structure cast in situ with reinforcement inside
CN2885974Y (en) Two-purpose steel bar fixing support
CN2885973Y (en) Steel bar spacer
CN201908244U (en) Massive road precast slab
CN201372571Y (en) All-steel large template upper port positioning plate
CN2885972Y (en) Steel bar fixing support
CN200971587Y (en) Plum-blossom shaped reinforced bar protection layer pad and production mould thereof
CN206309010U (en) Concrete cast-in-situ wall, dike assembling die and its concrete mold
CN2749653Y (en) Rapid forming die set for cement tank applied for farmland irrigation
CN108032426A (en) The laminated type preparation method of trough plate
CN207988494U (en) A kind of novel big section square column formwork system
CN2546170Y (en) Concrete heel block precast mould
CN103286854A (en) Manufacturing and lap construction methods of ultra-wide autoclaved aerated concrete cantilever slabs
CN203092732U (en) Mold for preparing reinforced concrete test block
CN207244964U (en) A kind of difference of height floor constructing structure for steel building
CN101684676A (en) Perlite polyphenylene compound filling block, method for preparing same and filled floor plate construction method
CN105350718A (en) Reinforcement permanency beam formwork and manufacturing method for concrete structural member with shearing resistance
CN2841800Y (en) Lightweight is exempted from the close rib template of detachment bed die
CN201620360U (en) Vertical precasting pedestal for arch rib of bowstring arch bridge
CN204024051U (en) The assembled column template of a kind of high-strength die mould of gradual change undergauge
CN212045250U (en) Novel interlocking piece prefabricating mold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Suzhou Jinming Plastic Co., Ltd.

Assignor: Zhang Jinming

Contract record no.: 2010320001011

Denomination of utility model: Two-purpose steel bar fixing support

Granted publication date: 20070404

License type: Exclusive License

Record date: 20100723

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070404

Termination date: 20130407