CN2883469Y - Concrete formwork for bridge - Google Patents
Concrete formwork for bridge Download PDFInfo
- Publication number
- CN2883469Y CN2883469Y CN 200620056177 CN200620056177U CN2883469Y CN 2883469 Y CN2883469 Y CN 2883469Y CN 200620056177 CN200620056177 CN 200620056177 CN 200620056177 U CN200620056177 U CN 200620056177U CN 2883469 Y CN2883469 Y CN 2883469Y
- Authority
- CN
- China
- Prior art keywords
- truss
- utility
- model
- cope match
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Moulds, Cores, Or Mandrels (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620056177 CN2883469Y (en) | 2006-03-15 | 2006-03-15 | Concrete formwork for bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620056177 CN2883469Y (en) | 2006-03-15 | 2006-03-15 | Concrete formwork for bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2883469Y true CN2883469Y (en) | 2007-03-28 |
Family
ID=37956530
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200620056177 Expired - Fee Related CN2883469Y (en) | 2006-03-15 | 2006-03-15 | Concrete formwork for bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2883469Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102192386A (en) * | 2010-03-19 | 2011-09-21 | 江苏金羊能源环境工程有限公司 | Device for manufacturing large body |
-
2006
- 2006-03-15 CN CN 200620056177 patent/CN2883469Y/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102192386A (en) * | 2010-03-19 | 2011-09-21 | 江苏金羊能源环境工程有限公司 | Device for manufacturing large body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101487332B (en) | Prefabricated hollow superposed beam, and cast-in-situ construction method for beam and precast slab | |
CN108590163B (en) | Integrated into one piece aluminum alloy building templates | |
CN108643429A (en) | A kind of height-adjustable assembled laminated floor slab | |
CN2883469Y (en) | Concrete formwork for bridge | |
CN201970033U (en) | Turn-buckle drag hook type board unit welding reverse deformation jig frame | |
CN210216896U (en) | Prefabricated plate skeleton and prefabricated plate | |
CN201614551U (en) | Prefabricated small box girder cross slope adjusting side mould | |
CN201970395U (en) | Large-scale groove style base for pre-stressing hollow slab preparation | |
CN208701705U (en) | It is a kind of one concrete revetment pour mold | |
CN207775696U (en) | A kind of lattice-type steel truss pylon cable-stayed bridge | |
CN108004908A (en) | A kind of lattice-type steel truss pylon cable-stayed bridge | |
CN203878460U (en) | Prefabricated assembly combined type portal pier | |
CN207509451U (en) | A kind of assembly concrete beam mould | |
CN207314518U (en) | One kind is exempted to support layered assembling type steel structure | |
CN206034272U (en) | External prestress steel anchor | |
CN218557478U (en) | Prefabricated steel reinforced concrete coincide roof beam template system with adjustable | |
CN220867989U (en) | Hoop steel template | |
CN201502136U (en) | Integrated plate truss structure | |
CN211104617U (en) | Angle-adjustable end die for prestressed prefabricated box girder of highway | |
CN217802376U (en) | Novel bridge beam body assembled steel pedestal | |
CN218948039U (en) | Prefabricated superimposed sheet truss reinforcing bar location frock | |
CN203401587U (en) | Box girder bottom die pedestal | |
CN214574899U (en) | Truss floor plate | |
CN216634800U (en) | Quick installation positioning structure of precast beam template | |
CN215631027U (en) | Load-bearing type large-span prestressed hollow slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Shaoguan Tieyou Construction Machine Co., Ltd. Assignor: Yu Haibin Contract fulfillment period: 2009.10.28 to 2015.10.27 Contract record no.: 2010990000022 Denomination of utility model: New concrete pouring formwork for bridge Granted publication date: 20070328 License type: Exclusive license Record date: 20100111 Assignee: Shaoguan Tieyou Construction Machine Co., Ltd. Assignor: Yu Haibin Contract fulfillment period: 2008.10.28 to 2014.10.27 Contract record no.: 2010990000038 Denomination of utility model: New concrete pouring formwork for bridge Granted publication date: 20070328 License type: Exclusive license Record date: 20100119 |
|
LIC | Patent licence contract for exploitation submitted for record |
Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2008.10.28 TO 2014.10.27; CHANGE OF CONTRACT Name of requester: SHAOGUAN CITY TIEYOU CONSTRUCTION MACHINARY CO., L Effective date: 20100119 Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.10.28 TO 2015.10.27; CHANGE OF CONTRACT Name of requester: SHAOGUAN CITY TIEYOU CONSTRUCTION MACHINARY CO., L Effective date: 20100111 |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20070328 Termination date: 20110315 |