CN2883334Y - Divided-room boiling frying pot for gypsum powder - Google Patents
Divided-room boiling frying pot for gypsum powder Download PDFInfo
- Publication number
- CN2883334Y CN2883334Y CNU2006200827640U CN200620082764U CN2883334Y CN 2883334 Y CN2883334 Y CN 2883334Y CN U2006200827640 U CNU2006200827640 U CN U2006200827640U CN 200620082764 U CN200620082764 U CN 200620082764U CN 2883334 Y CN2883334 Y CN 2883334Y
- Authority
- CN
- China
- Prior art keywords
- air channel
- housing
- room
- communicates
- wind scooper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P20/00—Technologies relating to chemical industry
- Y02P20/10—Process efficiency
- Y02P20/129—Energy recovery, e.g. by cogeneration, H2recovery or pressure recovery turbines
Landscapes
- Frying-Pans Or Fryers (AREA)
Abstract
The utility model discloses a separate chamber ebullition frying pot of gypsum powder, which is provided with a housing, wherein a baffle used to divide the internal cavity of the housing into a first chamber and a second chamber is arranged in the housing, the first chamber is communicated with the second chamber at the bottom, a plurality of airways are arranged in parallel in the first chamber and the second chamber, a plurality of wind guide covers are arranged on both sides at the front and rear of the housing, the airways are connected and communicated with the wind guide covers to form a first ventilating duct which is bent to and fro, an upper cover is arranged on the top of the housing. A feed opening and a discharge opening are arranged on the upper cover. The heat generated by the hot wind is directly used for the heat treatment of the gypsum powder. With the simple structure and easy working procedure, the utility model can reduce heat loss effectively during processing. The hot wind blows to and fro along the turnings inside the frying pot, therefore the temperature of discharging gypsum powder can be controlled more precisely and the processing quality of the gypsum powder can be ensured.
Description
Technical field
The utility model relates to a kind of terra alba processing unit (plant), exactly is a kind of terra alba locellus boiling frying pan.
Background technology
At present, existing terra alba frying pan on the market, its heating work principle is: earlier heat thermal oil with hot blast, thermal oil is fed Oil Guide heating tube in the frying pan to the terra alba heat treated.The manufacturing procedure of existing apparatus is comparatively complicated, and thermal losses can't be satisfied people's user demand more greatly.And the flow direction of thermal oil in frying pan is all identical, makes the terra alba tapping temperature be difficult to the support control, is difficult for guaranteeing the processing quality of terra alba.
Summary of the invention
The purpose of this utility model has provided a kind of terra alba locellus boiling frying pan, and it directly carries out heat treated with the heat of hot blast to terra alba, and whole apparatus structure is succinct, operation is simple, can reduce the thermal losses in the course of processing effectively.Hot blast carries out crippling and flows in frying pan inside, can make people control the tapping temperature of terra alba comparatively exactly, guarantees the processing quality of terra alba.
The purpose of this utility model is achieved through the following technical solutions: terra alba locellus boiling frying pan, it has first housing, first dividing plate is installed in first housing, first dividing plate is divided into first Room and second Room with the inner chamber of first housing, the bottom of first Room and second Room communicates, the many air channels in first Room and the second indoor parallel installation, both sides are installed a plurality of wind scoopers respectively before and after first housing, the air channel is connected with wind scooper and first ventilation duct that back and forth bends of formation that communicates, loam cake is installed on the first housing top, on cover and offer opening for feed and discharge port.
For further realizing the purpose of this utility model, can also realize by the following technical solutions: first housing is connected with second housing, second partition is installed in second housing, second partition will be divided into the 3rd Room and fourth ventricle in second housing, the 3rd Room and fourth ventricle bottom communicate, many air channels are installed in second Room and the 3rd Room UNICOM the 3rd Room and the fourth ventricle, second housing is also installed a plurality of wind scoopers outward, a plurality of wind scoopers and air channel connect and compose back and forth second ventilation duct of bending, second ventilation duct is connected with first ventilation duct and communicates, and second housing is positioned at the loam cake below and is connected with loam cake.The first indoor parallel successively from top to bottom installation, first air channel, second air channel and the 3rd air channel, the second indoor parallel successively from top to bottom installation the 4th air channel, tendencies road and the 6th air channel; One end in first air channel is connected with first wind scooper respectively with an end in second air channel and communicates, one end in the other end in second air channel and the 3rd air channel is connected with second wind scooper respectively and communicates, one end in the other end in the 3rd air channel and the 4th air channel is connected with the 3rd wind scooper and communicates, the other end in the 4th air channel is connected with the 4th wind scooper with an end in tendencies road, one end in the other end in tendencies road and the 6th air channel is connected with the 5th wind scooper and communicates, and first to the 6th air channel and first to the 5th wind scooper connect and compose first ventilation duct.First housing bottom is installed first air distribution plate.First lower housing portion is installed first blast channel, and an end of first blast channel is installed first blower fan.The 3rd indoor parallel successively from top to bottom installation the 7th air channel, Bafeng road and the 9th air channel, parallel successively from top to bottom installation the tenth air channel, the 11 air channel and the 12 air channel in the fourth ventricle; One end in the 7th air channel is connected with the 6th wind scooper with an end in Bafeng road and communicates, the other end in Bafeng road is connected with the 7th wind scooper with an end in the 9th air channel and communicates, one end in the other end in the 9th air channel and the tenth air channel is connected with the 8th wind scooper and communicates, the other end in the tenth air channel is connected with the 9th wind scooper with an end in the 11 air channel and communicates, the other end in the 11 air channel is connected with the tenth wind scooper with the 12 air channel one end and communicates, the the 7th to the 12 air channel and the 6th to the tenth wind scooper connect and compose second ventilation duct, and the other end in the other end in the 7th air channel and the 6th air channel is connected with the 11 wind scooper and communicates.Second housing bottom is installed second air distribution plate.Second lower housing portion is installed second blast channel, and an end of second blast channel is installed second blower fan.
Positively effect of the present utility model is: its inside is equipped with many air channels, housing is equipped with a plurality of wind scoopers that are connected and communicate with the air channel outward, air channel and wind scooper connect and compose the ventilation duct of crippling, hot blast can directly flow along ventilation duct, terra alba is carried out heat treated, and the whole course of processing is simple, thermal losses is few.The hot blast crippling flows, and its temperature reduces gradually in flow process, and the temperature of terra alba raises gradually, and the tapping temperature that this type of heating helps controlling terra alba improves the quality of terra alba.The utility model also has advantage simple for structure, cheap for manufacturing cost, safe and convenient to use.
Description of drawings
Fig. 1 is a structural representation of the present utility model; Fig. 2 is the A-A sectional structure synoptic diagram of Fig. 1;
Fig. 3 is the B-B sectional structure synoptic diagram of Fig. 1; Fig. 4 is the C-C sectional structure synoptic diagram of Fig. 1;
Fig. 5 is the D-D sectional structure synoptic diagram of Fig. 1.
Embodiment
Terra alba locellus boiling frying pan, it has first housing 38, in first housing 38 first dividing plate 49 is installed, first dividing plate 49 is divided into first Room 32 and second Room 31 with the inner chamber of first housing 38, the bottom of first Room 32 and second Room 31 communicates, first Room 32 and 31 interior many air channels of parallel installation, second Room, both sides, first housing, 38 front and back are installed a plurality of wind scoopers respectively, the air channel is connected with wind scooper and first ventilation duct that back and forth bends of formation that communicates, loam cake 4 is installed on first housing, 38 tops, offers opening for feed 2 and discharge port 7 on the loam cake 4.First housing 38 is connected with second housing 47, in second housing 47 second partition 50 is installed, second partition 50 will be divided into the 3rd Room 33 and fourth ventricle 34 in second housing 47, the 3rd Room 33 and fourth ventricle 34 bottoms communicate, in second Room 31 and 33 UNICOMs the 3rd Room 33, the 3rd Room and the fourth ventricle 34 many air channels are installed, outside second housing 4 a plurality of wind scoopers are installed also, a plurality of wind scoopers and air channel connect and compose back and forth second ventilation duct of bending, second ventilation duct is connected with first ventilation duct and communicates, and second housing 47 is positioned at loam cake 4 belows and is connected with loam cake 4.Parallel successively from top to bottom installation the 4th air channel 28, tendencies road 30 and the 6th air channel 3 in parallel successively from top to bottom installation first air channel 1, second air channel 29 and the Room 31 27, the second, the 3rd air channel in first Room 32; One end in first air channel 1 is connected with first wind scooper 35 respectively with an end in second air channel 29 and communicates, one end in the other end in second air channel 29 and the 3rd air channel 27 is connected with second wind scooper 40 respectively and communicates, one end in the other end in the 3rd air channel 27 and the 4th air channel 28 is connected with the 3rd wind scooper 37 and communicates, the other end in the 4th air channel 28 is connected with the 4th wind scooper 51 with an end in tendencies road 30, one end in the other end in tendencies road 30 and the 6th air channel 3 is connected with the 5th wind scooper 52 and communicates, and first to the 6th air channel and first to the 5th wind scooper connect and compose first ventilation duct.One end in first air channel 1 is connected with blast pipe 41.First air distribution plate 22 is installed in first housing, 38 bottoms.First housing, 38 bottoms are installed an end of first blast channel, 21, the first blast channels 21 first blower fan 20 are installed.Parallel successively from top to bottom installation the 7th air channel 6, Bafeng road 19 and the 9th air channel 18 in the 3rd Room 33, the 10, the 11 air channel 9 and the 12 air channel 8, parallel successively from top to bottom installation the tenth air channel in the fourth ventricle 34; One end in the 7th air channel 6 is connected with the 6th wind scooper 42 with an end in Bafeng road 19 and communicates, the other end in Bafeng road 19 is connected with the 7th wind scooper 49 with an end in the 9th air channel 18 and communicates, one end in the other end in the 9th air channel 18 and the tenth air channel 10 is connected with the 8th wind scooper 44 and communicates, one end in the other end in the tenth air channel 10 and the 11 air channel 9 is connected with the 9th wind scooper 53 and communicates, the other end in the 11 air channel 9 is connected with the tenth wind scooper 54 with the 12 air channel 8 one ends and communicates, the the 7th to the 12 air channel and the 6th to the tenth wind scooper 54 connect and compose second ventilation duct, the other end in the other end in the 7th air channel 6 and the 6th air channel 3 is connected with the 11 wind scooper 5 and communicates, an end in the 12 air channel 8 and air outlet 34.Second air distribution plate 45 is installed in second housing, 47 bottoms.Second housing, 47 bottoms are installed an end of second blast channel, 15, the second blast channels 15 second blower fan 14 are installed.The first to the 12 air channel of the present utility model is that one group of four of from top to bottom being installed in first housing 38 and second housing 47 respectively is indoor with three, every chamber can install many air channels additional during manufacturing except that original air channel, make every group from top to bottom to install by four, five, the six roots of sensation or more air channels and to form, and every indoorly can also parallel installation organize the air channel more.When the utility model is made, process each component and assembling by above-mentioned requirements.46 is blast inlets among the figure.When the utility model uses, blast pipe 41 is connected with the hot blast generating apparatus with air outlet tube 34, hot blast enters first air channel 1 by blast pipe 41, flow out by air outlet tube 34 after back and forth bending is flowed in the second to the 12 air channel and the first to the 11 wind scooper, the temperature of hot blast is the highest in first air channel 1, and temperature drops to minimum in the 12 air channel 8 behind the heating terra alba that flows; Earlier terra alba is failed in first Room 32 by opening for feed 2, terra alba enters second Room 31 by the bottom of first Room 32, and the top by second Room 31 enters the 3rd Room 33 again, and the bottom by the 3rd Room 33 enters fourth ventricle then, at last by discharge port 7 dischargings.The heat treated temperature of terra alba therebetween rises gradually.The zigzag channel that is made of first to fourth Room can make terra alba heated time length, dehydration evenly.First and second gas blowers cooperate the formation air-blast system with first and second air distribution plates, it can make terra alba produce the boiling effect when heating, thereby improves the terra alba quality.The utility model also can be installed a plurality of housings again, and the shape and structure of housing is identical with first housing 38, and its interconnected relationship is identical with the annexation of first housing 38 and second shell 47.Technical scheme described in the utility model is not restricted in the scope of embodiment described in the utility model.The utility model not technology contents of detailed description is known technology.
Claims (8)
1, terra alba locellus boiling frying pan, it is characterized in that: it has first housing (38), first dividing plate (49) is installed in first housing (38), first dividing plate (49) is divided into first Room (32) and second Room (31) with the inner chamber of first housing (38), the bottom of first Room (32) and second Room (31) communicates, first Room (32) and second Room (31) interior many air channels of parallel installation, both sides are installed a plurality of wind scoopers respectively before and after first housing (38), the air channel is connected with wind scooper and first ventilation duct that back and forth bends of formation that communicates, loam cake (4) is installed on first housing (38) top, offers opening for feed (2) and discharge port (7) on the loam cake (4).
2, terra alba locellus boiling frying pan according to claim 1, it is characterized in that: first housing (38) is connected with second housing (47), second partition (50) is installed in second housing (47), second partition (50) will be divided into the 3rd Room (33) and fourth ventricle (34) in second housing (47), the 3rd Room (33) and fourth ventricle (34) bottom communicate, many air channels are installed in second Room (31) and the 3rd Room (33) UNICOM the 3rd Room (33) and the fourth ventricle (34), a plurality of wind scoopers also are installed outside second housing (4), a plurality of wind scoopers and air channel connect and compose back and forth second ventilation duct of bending, second ventilation duct is connected with first ventilation duct and communicates, and second housing (47) is positioned at loam cake (4) below and is connected with loam cake (4).
3, terra alba locellus boiling frying pan according to claim 1, it is characterized in that: parallel successively from top to bottom installation first air channel (1), second air channel (29) and the 3rd air channel (27) in first Room (32), parallel successively from top to bottom installation the 4th air channel (28), tendencies road (30) and the 6th air channel (3) in second Room (31); One end in first air channel (1) is connected with first wind scooper (35) respectively with an end of second air channel (29) and communicates, one end of the other end in second air channel (29) and the 3rd air channel (27) is connected with second wind scooper (40) respectively and communicates, one end of the other end in the 3rd air channel (27) and the 4th air channel (28) is connected with the 3rd wind scooper (37) and communicates, the other end in the 4th air channel (28) is connected with the 4th wind scooper (51) with an end of tendencies road (30), one end of the other end in tendencies road (30) and the 6th air channel (3) is connected with the 5th wind scooper (52) and communicates, and first to the 6th air channel and first to the 5th wind scooper connect and compose first ventilation duct.
4, terra alba locellus boiling frying pan according to claim 3, it is characterized in that: first air distribution plate (22) is installed in first housing (38) bottom.
5, terra alba locellus boiling frying pan according to claim 3, it is characterized in that: first blast channel (21) is installed in first housing (38) bottom, and an end of first blast channel (21) is installed first blower fan (20).
6, according to each the described terra alba locellus boiling frying pan in the claim 3 to 5, it is characterized in that: parallel successively from top to bottom installation the 7th air channel (6), Bafeng road (19) and the 9th air channel (18) in the 3rd Room (33), parallel successively from top to bottom installation the tenth air channel (10), the 11 air channel (9) and the 12 air channel (8) in the fourth ventricle (34); One end in the 7th air channel (6) is connected with the 6th wind scooper (42) with an end of Bafeng road (19) and communicates, the other end in Bafeng road (19) is connected with the 7th wind scooper (49) with an end of the 9th air channel (18) and communicates, one end of the other end in the 9th air channel (18) and the tenth air channel (10) is connected with the 8th wind scooper (44) and communicates, the other end in the tenth air channel (10) is connected with the 9th wind scooper (53) with an end of the 11 air channel (9) and communicates, the other end in the 11 air channel (9) is connected with the tenth wind scooper (54) with the 12 air channel (8) one ends and communicates, the the 7th to the 12 air channel and the 6th to the tenth wind scooper (54) connect and compose second ventilation duct, and the other end of the other end of the 7th air channel (6) and the 6th air channel (3) is connected with the 11 wind scooper (5) and communicates.
7, terra alba locellus boiling frying pan according to claim 6, it is characterized in that: second air distribution plate (45) is installed in second housing (47) bottom.
8, terra alba locellus boiling frying pan according to claim 6, it is characterized in that: second blast channel (15) is installed in second housing (47) bottom, and an end of second blast channel (15) is installed second blower fan (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2006200827640U CN2883334Y (en) | 2006-04-07 | 2006-04-07 | Divided-room boiling frying pot for gypsum powder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2006200827640U CN2883334Y (en) | 2006-04-07 | 2006-04-07 | Divided-room boiling frying pot for gypsum powder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2883334Y true CN2883334Y (en) | 2007-03-28 |
Family
ID=37956395
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2006200827640U Expired - Lifetime CN2883334Y (en) | 2006-04-07 | 2006-04-07 | Divided-room boiling frying pot for gypsum powder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2883334Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105352334A (en) * | 2015-12-09 | 2016-02-24 | 故城北新建材有限公司 | Hot smoke recycling system |
CN109574525A (en) * | 2018-11-05 | 2019-04-05 | 山东新大地环保建材有限公司 | Polymerization state gypsum, preparation method and device and application |
CN111606589A (en) * | 2020-07-03 | 2020-09-01 | 四川方大新型建材科技开发有限责任公司 | Method and equipment for producing building gypsum powder from industrial by-product gypsum |
-
2006
- 2006-04-07 CN CNU2006200827640U patent/CN2883334Y/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105352334A (en) * | 2015-12-09 | 2016-02-24 | 故城北新建材有限公司 | Hot smoke recycling system |
CN109574525A (en) * | 2018-11-05 | 2019-04-05 | 山东新大地环保建材有限公司 | Polymerization state gypsum, preparation method and device and application |
CN109574525B (en) * | 2018-11-05 | 2021-06-29 | 山东新大地环保建材有限公司 | Polymerized gypsum, preparation method and device thereof and application |
CN111606589A (en) * | 2020-07-03 | 2020-09-01 | 四川方大新型建材科技开发有限责任公司 | Method and equipment for producing building gypsum powder from industrial by-product gypsum |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107246732A (en) | A kind of electric thermal storage equipment of solid | |
CN2883334Y (en) | Divided-room boiling frying pot for gypsum powder | |
CN207230587U (en) | Heating eliminates the integral type chimney of white cigarette | |
CN101527192B (en) | Method and device for baking a forehearth area of an enamelling machine | |
CN206222479U (en) | Upright type wall-hung indoor apparatus of air conditioner and air-conditioner | |
EP2252837B1 (en) | Improved hot air unit heater | |
CN211260913U (en) | Range hood of high-efficient oil strain and flue gas waste heat utilization system | |
CN206831833U (en) | A kind of solid electricity thermal storage equipment | |
CN207779165U (en) | Condenser pipe | |
CN213208407U (en) | Air inlet device of powder block-shaped material drying room | |
CN209295269U (en) | Multiple duct air feed structure and heater with the structure | |
CN210801429U (en) | Bean product workshop defogging dehumidification system | |
CN103409580B (en) | Continuous external heating type reducing gases DRI integration unit | |
CN209326437U (en) | Coke-oven plant's primary cooler heating water waste heat recovery device | |
CN210740356U (en) | Novel high-efficiency evaporator | |
CN110923594A (en) | Aging furnace for hardening aluminum material | |
CN214892399U (en) | Heat exchange circulating furnace | |
CN216558350U (en) | Exhaust device of gypsum flue gas drying calcining kiln | |
CN210980945U (en) | Two-stage energy-saving dehumidifying zero-emission environment-friendly device | |
CN211626194U (en) | Heat exchange equipment capable of exchanging heat simultaneously and heat exchange system | |
CN111089314A (en) | Range hood of high-efficient oil strain and flue gas waste heat utilization system | |
CN213454243U (en) | Air heating type heating boiler | |
CN109386869A (en) | Multiple duct air feed structure and heater with the structure | |
CN2092063U (en) | High-efficiency horizontal hot-blast stove burning coal | |
CN104236325B (en) | Based on the air conditioner cooling tower system in half-closed space |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20070328 |
|
EXPY | Termination of patent right or utility model |