CN2878588Y - Overhead working used inverting supporter - Google Patents
Overhead working used inverting supporter Download PDFInfo
- Publication number
- CN2878588Y CN2878588Y CN 200620070307 CN200620070307U CN2878588Y CN 2878588 Y CN2878588 Y CN 2878588Y CN 200620070307 CN200620070307 CN 200620070307 CN 200620070307 U CN200620070307 U CN 200620070307U CN 2878588 Y CN2878588 Y CN 2878588Y
- Authority
- CN
- China
- Prior art keywords
- bracket
- support frame
- soft band
- soft belt
- high altitude
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a retroflexion lifting device, which is applied to the working at high altitude. This device is characterized in that a bracket is connected to the arm of overhead working truck. The bracket is connected to the res support frame fixedly by two mutually perpendicular swinging mechanisms. A fastening oil cylinder is arranged upon the res support frame. The cylinder rod is connected to one foot of the swinging mechanisms. A soft belt is fixed upon the other foot of swinging mechanisms. The open-end of the soft belt is connected to the bolt sleeve of the res support frame by the bolt. The utility model is provided with the advantages that the tensioner is arranged upon the soft belt in order to adjust length of the soft belt. More than two bolt sleeves are arranged at the different positions of the res support frame. The retroflexion lifting device is stable and reliable for the working at high altitude. The operation is smooth and convenient. The work efficiency is obviously increased. When the pipeline of the device is installing at high altitude, it is provided with the swinging function as follows: a tension function, and an automatic release function. It can accommodate the various pipelines with the different diameters.
Description
Technical field
The utility model relates to a kind of construction machinery, is specifically related to the upset that a kind of work high above the ground uses and lifts device.
Background technology
At present, at the top in cavern, tunnel or sidewall and other engineering when high-altitude pipe laying and post, beam, method commonly used is: will pipeline to be installed or beam, post firm with the rope binding, machinery winches to the installation site, and the workman carries out installation exercise on high-altitude operation vehicle, when pipe joint has dislocation, the workman aloft will manage to proofread and correct, after installing, rope be untied aloft, operation can be finished.This method of operating labor strength is big, poor stability.Complex operation, operating efficiency is low.
Summary of the invention
The purpose of the new shape of this practicality, the work high above the ground that will provide exactly that a kind of working stability is reliable, flexible and convenient operation, operating efficiency significantly improves is lifted device with overturning.This device can have following function when high-altitude pipe laying (or beam, down with) post operation:
1, swing function during piping erection, requires the height of pipe ends suitable, pipe ends is suitable in the distance of fore-and-aft direction.
When 2, tensioning function, pipeline are lifted in the high-altitude, need be fastening, in case on-slip falls.
3, throw off function automatically, after piping erection finished, the soft band of fastening pipeline should be able to be thrown off automatically.Can simplify the high-level operation of workman like this.
4, the pipeline that device should be able to adapt to multiple diameter is lifted in upset.
Structure of the present utility model and principle:
Device is lifted in the upset that work high above the ground is used, and it is characterized in that, is connected with carriage at the arm end of high-altitude operation vehicle, and this carriage is fixedlyed connected with bracket by two swing mechanisms that are provided with that are perpendicular to one another; Bracket is provided with fastening oil cylinder, and the piston rod of fastening oil cylinder is connected with a pin of swing component; Be fixed with soft band on another pin of swing component, the free end of soft band is connected on the pin bushing of bracket by latch.
Described " two swing mechanisms that are perpendicular to one another and are provided with " is: one of them swing mechanism is realized horizontal hunting; Another swing mechanism is realized vertical oscillation.
During use mounted piece is placed on the bracket, fix with soft band, its fixing means is: the free end of soft band directly inserts on the pin bushing of bracket by latch after, the piston rod of fastening oil cylinder moves downward, strain soft band by the rotation of swing component, mounted piece is fastened.Except the weight lifting arm of high-altitude operation vehicle is adjusted height, can adjust the position and the angle of mounted piece by two swings of swing mechanism on two coordinate directions that are perpendicular to one another and are provided with.
The further improvement of such scheme has following prioritization scheme:
1, can on soft being with, stretcher be set, regulate the length of soft band, with the pipeline that adapts to different-diameter or beam, post.
2, the diverse location of bracket is provided with plural pin bushing, equally for the pipeline that adapts to different-diameter or beam, post.
The utility model innovative point mainly contains 3 points:
1, fastening on bracket of pipeline or post, beam utilizes the action of oil cylinder, soft band tightened up or unclamp, soft band lower end can be automatically under the latch action of gravity and guide throw off.
2, in the horizontal direction, vertical direction design has swing mechanism, when pipeline or post beam are installed in the high-altitude, can realize the swing of both direction.
3, the length of soft band can utilize stretcher to regulate, and therefore can adapt to the pipeline of different-diameter.
The new shape working stability of this practicality is reliable, flexible and convenient operation, operating efficiency significantly improve.When the pipe laying post operation of high-altitude, has the swing function; Tensioning function; Automatically throw off function.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the soft partial structurtes schematic diagram that cooperates with pin bushing on the bracket with the latch of an end.
The specific embodiment
Embodiment 1, with reference to Fig. 1, mainly by two cover swing mechanisms, compositions such as fastening oil cylinder and bracket, carriage, soft band, stretcher, latch: the arm end at high-altitude operation vehicle is connected with carriage to this device, and this carriage is fixedlyed connected with bracket by two swing mechanisms that are provided with that are perpendicular to one another; Bracket is provided with fastening oil cylinder, and the piston rod of fastening oil cylinder is connected with a pin of swing component; Be fixed with soft band on another pin of swing component, the free end of soft band is connected on the pin bushing of bracket by latch.Soft band is provided with stretcher.
Its operating principle is: the pipeline that will install or other object place on the bracket 4, utilize softly to be with 3 fasteningly, and soft band upper end links to each other with swing component 13, and soft band lower end links to each other with latch 6, and latch 6 can insert in guide 1 or the guide 2.Soft band can be adjusted to Len req by stretcher 12 according to the pipe diameter size.When the piston rod of fastening oil cylinder 11 moved downward, swing component 13 rotated, and softly had a displacement, and pipeline is fastened.Otherwise soft band unclamps.The latch 6 owing in succession in soft band lower end is subjected to the latch action of gravity, and the latch 6 and the guide 1 of the soft band of ining succession are thrown off automatically.When pipeline in installation, in off-centring when dislocation, appear, swing mechanism 8,9 can be around himself axis swing, this location centering to pipeline is very convenient.When deferent need transfer the upright position installation to by horizontal level, swing mechanism 9 swings 90 degree can be realized.
Among the figure 5,7,10 is respectively stand, carriage and Connection Block.
Claims (3)
1, device is lifted in the upset used of a kind of work high above the ground, it is characterized in that, is connected with carriage at the arm end of high-altitude operation vehicle, and this carriage is fixedlyed connected with bracket by two swing mechanisms that are provided with that are perpendicular to one another; Bracket is provided with fastening oil cylinder, and the piston rod of fastening oil cylinder is connected with a pin of swing component; Be fixed with soft band on another pin of swing component, the free end of soft band is connected on the pin bushing of bracket by latch.
2, device is lifted in the upset of using according to the described work high above the ground of claim 1, it is characterized in that, on soft being with stretcher is set, to regulate the length of soft band.
3, device is lifted in the upset of using according to claim 1 or 2 described work high above the ground, it is characterized in that the diverse location of bracket is provided with plural pin bushing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620070307 CN2878588Y (en) | 2006-03-17 | 2006-03-17 | Overhead working used inverting supporter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620070307 CN2878588Y (en) | 2006-03-17 | 2006-03-17 | Overhead working used inverting supporter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2878588Y true CN2878588Y (en) | 2007-03-14 |
Family
ID=37861003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200620070307 Expired - Fee Related CN2878588Y (en) | 2006-03-17 | 2006-03-17 | Overhead working used inverting supporter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2878588Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102162302A (en) * | 2011-04-08 | 2011-08-24 | 浙江东南网架股份有限公司 | Turnover device for processing large-sized steel member |
-
2006
- 2006-03-17 CN CN 200620070307 patent/CN2878588Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102162302A (en) * | 2011-04-08 | 2011-08-24 | 浙江东南网架股份有限公司 | Turnover device for processing large-sized steel member |
CN102162302B (en) * | 2011-04-08 | 2012-07-04 | 浙江东南网架股份有限公司 | Turnover device for processing large-sized steel member |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103630416B (en) | The test platform of hoisting mechanism | |
CN1103378A (en) | Apparatus and method for assembly of arm of crane | |
CN205662303U (en) | Forest fire prevention surveys automatic rising tower | |
CN104797778A (en) | Walking-beam pumping unit with new support | |
CN2878588Y (en) | Overhead working used inverting supporter | |
CN200949706Y (en) | Turning lifting device capable for work high above ground | |
CN2851530Y (en) | Power tong moving and positioning device | |
CN209603534U (en) | Multifunctional wall body corrects instrument | |
CN88102972A (en) | Mooring gear | |
CN204491534U (en) | Radial gate support hinge hanging apparatus | |
CN102765664B (en) | Pulley assembly and hoisting crane | |
CN108839033A (en) | A kind of municipal road lamp climbing level robot | |
CN209194364U (en) | A kind of Continuous Beam-arch Bridge sunpender bridge floor tensioning equipment | |
CN105936470A (en) | Wind power generator automatic turning lifter and mounting method | |
CN207632338U (en) | A kind of mechanical splice building pipeline lifting fixator | |
CN101459320B (en) | Large span cable bridge rack installation mold and installation method thereof | |
CN206769526U (en) | Jack up Multifunctional creeping gin pole | |
CN110043064B (en) | Ancient building roof hanging wire device and use method thereof | |
CN202744211U (en) | Pulley assembly and crane | |
CN209779465U (en) | main tower erects cable-stay bridge's string cable construction system that changes | |
CN113307162A (en) | Attachment device for tower crane wall attachment and installation process thereof | |
CN202769052U (en) | Pipeline movable cradle | |
CN219662698U (en) | Movable device for tying and hanging safety ropes for high-place operation of steel structure factory building | |
CN2828217Y (en) | Building outer form | |
CN201142537Y (en) | Large span cable bridge rack installation mold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |