CN2871694Y - Light wallboard with preset pipeline built-in space - Google Patents

Light wallboard with preset pipeline built-in space Download PDF

Info

Publication number
CN2871694Y
CN2871694Y CN 200520142524 CN200520142524U CN2871694Y CN 2871694 Y CN2871694 Y CN 2871694Y CN 200520142524 CN200520142524 CN 200520142524 CN 200520142524 U CN200520142524 U CN 200520142524U CN 2871694 Y CN2871694 Y CN 2871694Y
Authority
CN
China
Prior art keywords
fluting
plate
pipeline
underground
light trabs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520142524
Other languages
Chinese (zh)
Inventor
许镇辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200520142524 priority Critical patent/CN2871694Y/en
Application granted granted Critical
Publication of CN2871694Y publication Critical patent/CN2871694Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a light wall board with preset space for burying piping, comprising a plurality of panels cut to proper size, which is characterized in that a fluting is arranged on the surface of the panel and at different positions depending on actual needs or designed to widths of different dimensions. To erect the light wall panels, the worker can plan the positions for burying the piping before proper panels are cut at the factory, the cut light wall panels are delivered to the site, and panels with different fluting are arranged in line with the positions of the piping to provide a light wall paneling allowing pipe routing. After the piping is embedded, joints are filled and the painting is performed.

Description

Default pipeline is buried the Light trabs in space underground
Technical field
The utility model relates to the Light trabs that a kind of default pipeline is buried the space underground, is meant especially a kind ofly pipeline to be buried put more easy, reduces cutting and beats, and avoid generation of waste materials, to promote the Light trabs structure of operating efficiency and environmental protection quality.
Background technology
Light trabs is that a kind of weight is light and handy, easy construction, and the wall plate structure with certain intensity, is mainly used in the compartment sheet material of building.And general Light trabs mainly is by cement paste, blowing agent, and lightweight mixed material such as mixed chemical medicament is base material, and can put into reinforcing bar with strengthening structure in material.
Because Light trabs is the lightweight mixed material and constitutes, so deficiency is slightly disliked in its resistance to compression, bending resistance, crashworthiness equal strength, so its working properties is relatively poor.And more or less need to bury underground water power pipeline, this moment must on Light trabs, cut suitably fluting in the buildings in general, in order to burying underground of water power pipeline.And this grooving process certainly will cause destruction on the intensity to Light trabs, for example crackle even fracture, or because of construction angle difficulty causes quality to descend, or cut scale error and cause the sheet material waste.Even processing smoothly, the waste material that it still must cut some causes waste, or produces a large amount of dust when cutting, influences the surrounding air quality, causes construction complexity and quality to reduce.
Just commonly use the great disappearance of Light trabs on pipeline is buried underground, the inventor sets about improveing, and its mode is to produce the plate of unified specification, and presets different types of fluting on this plate, during construction then the demand of looking cut the plate of appropriate size and quantity, to form required Light trabs.
The utility model content
The purpose of this utility model promptly is to provide a kind of default pipeline to bury the Light trabs in space underground, and its pipe fitting that can quicken in the Light trabs is buried engineering underground, improves engineering efficient, and strengthens construction quality.
Another purpose of the present utility model is to provide a kind of default pipeline to bury the Light trabs in space underground, and it can reduce on-site cutting and process formed disadvantages, and the inconvenience when overcoming the water power cutting processing improves achievement.
The another purpose of the utility model is to provide a kind of default pipeline to bury the Light trabs in space underground, and the generation that it can reduce waste material allows each divide material to do the most effective utilization, reduces the degree of environment pollution simultaneously.
The default pipeline that the utility model provides is buried the Light trabs in space underground, constituted by plural plate, this plate surface is preset with fluting, and each plate optionally cuts into appropriate size and mutually combination, and the fluting on the different plate connects to a pipeline and buries path underground.
Above-mentioned Light trabs, wherein this fluting size is slightly larger than the caliber of burying pipeline underground, to increase the fixed effect of pipeline; Perhaps this fluting is made as open space, in order to the pipeline of burying inclination, bending, irregular moulding underground, or buries large articles such as pipeline access underground.
Above-mentioned Light trabs wherein should vertically be provided with by fluting, and near the arbitrary end in the plate left and right sides; Perhaps this fluting is horizontally disposed with; Perhaps this fluting is arranged on the plate margin, and the fluting of two adjacent plates combines.
Adopt the default pipeline of above scheme to bury the Light trabs in space underground, the plate that is cut into appropriate size by polylith constitutes, be preset with fluting on this plate surface, this fluting cooperates actual demand to be arranged on the diverse location, or be designed to the width of different size, the constructor is when the framework Light trabs, can plan the pipeline burial place earlier in advance, in factory, finish then and be fit to cutting of plate, and the Light trabs that will finish after cutting transports in the building site, places the plates with different flutings according to the pipeline position then, to finish the Light trabs that can bury underground for pipeline, after pipeline imbedded, carry out filling chink at last and whitewash operation and finish.
Description of drawings
See also the detailed description and the accompanying drawing thereof of following relevant the utility model one preferred embodiment, can further understand technology contents of the present utility model and purpose effect thereof; The accompanying drawing of relevant this embodiment is:
Fig. 1 is a Light trabs stereogram of the present utility model;
Fig. 2 is a Light trabs structural representation of the present utility model;
Fig. 3 is a Light trabs structural change illustration intention of the present utility model;
Fig. 4 A is a plate A stereogram of the present utility model;
Fig. 4 B is a plate B stereogram of the present utility model;
Fig. 4 C is a plate C stereogram of the present utility model;
Fig. 4 D is a plate D stereogram of the present utility model;
Fig. 4 E is a plate E stereogram of the present utility model;
Fig. 4 F is a plate F stereogram of the present utility model;
Fig. 4 G is a plate G stereogram of the present utility model;
Fig. 4 H is a plate H stereogram of the present utility model.
The primary clustering symbol description:
A, B, C, D, E, F, G, H plate
1 Light trabs, 2 flutings
3 pipelines, 4 beam columns
The specific embodiment
See also Fig. 1, Fig. 2, shown in Figure 3, the utility model is the Light trabs 1 that a kind of default pipeline is buried the space underground, and described Light trabs 1 is to be made of the plate that polylith cuts into appropriate size, and assembles on the beam column 4 of building.Be preset with fluting 2 on this plate surface, this fluting 2 is formed a pipeline and is buried path underground after Light trabs 1 is finished, can bury underground at this pipeline then various pipelines 3 required in the building are set in the path, carry out at last metope finishing, whitewash operation.
See also shown in each figure of Fig. 4, this plate can be the block of standard size, conveniently to produce in a large number.Fluting 2 on this plate is then optionally divided into some types, existing generally be divided into following several:
One, plate A: be the most basic composition, its surface is any fluting of tool not.
Two, plate B: it has open fluting 2, is mainly used in pipeline terminal portion, in order to burying large articles such as pipeline access underground, or is used for burying underground the pipeline 3 of inclination, bending, irregular moulding.
Three, plate C, D: wherein this fluting 2 is vertical designs, can be partial to the left side (plate C) or the right (plate D), in order to burying underground of pipeline 3; These 2 sizes of slotting are slightly larger than the caliber of burying pipeline 3 underground, can be arranged on this pipeline 3 can be imbedded in the fluting 2 smoothly, wall by this fluting provides pipeline support location then, this plate C is because fluting 2 is comparatively carefully narrow simultaneously, the wall that can reduce after Light trabs 1 completes is repaired action, increases the attractive in appearance of product and reduction construction cost.
Four, plate E: wherein this fluting 2 is level designs, its 2 sizes of slotting then are equal to plate C, D, and several fluting 2 is set on same plate E, then optionally cut the plate E of appropriate size during use, to adjust the height of fluting 2 on Light trabs 1, in order to burying underground of pipeline 3.
Five, plate F, G, H: wherein this fluting 2 is arranged on leftmost edge (plate F), right side edge (plate G) or both sides of the edge (plate H), and its purpose can combine at the fluting 2 that makes two adjacent plate F, G, H, closes use to adapt to different field boundarys.
Please consult Fig. 1, Fig. 2 content again, by the explanation of aforementioned various plates, the constructor can plan earlier pipeline 3 burial places in advance when framework Light trabs 1, in factory, finish cutting of suitable plate then, and the Light trabs 1 that will finish after cutting is transported in the building site.The constructor begins operation by the pipeline access then, place plate B at this place, pipeline access earlier, then according to vertical plate C, the D that slots of pipeline 3 directions assembling, horizontal device plate E, all the other are not buried pipeline 3 parts underground and then fill up with plate A, so promptly finish a Light trabs 1 that can supply pipeline to bury underground, can carry out filling chink at last and whitewash operation.Light trabs 1 operation of carrying out by this, building-site almost be can't see waste material, and also can quicken the carrying out of work, and improves the quality of product.
See also shown in Figure 3, except aforesaid job practices, in addition might be in response to factors such as landform, designs, must bury pipeline 3 underground in the corner of Light trabs 1, so be applicable aforesaid plate F, G, H, this plate F, G, H can be at Light trabs 1 both sides of the edge headspace burying pipeline 3 underground, and the fluting 2 that can be connected two contact surfaces becomes enough spaces, use to provide more flexibly.
Above-listed detailed description is specifying at a possible embodiments of the present utility model, just this embodiment is not in order to limit scope of the present utility model, allly do not break away from the equivalence that the utility model skill spirit does and implement or change, all should be contained in the claim.

Claims (5)

1. a default pipeline is buried the Light trabs in space underground, is made of plural plate, it is characterized in that:
This plate surface is preset with fluting, and each plate optionally cuts into appropriate size and mutually combination, and the fluting on the different plate connects to a pipeline and buries path underground.
2. bury the Light trabs in space underground according to the described default pipeline of claim 1, it is characterized in that: wherein this fluting size is slightly larger than the caliber of burying pipeline underground.
3. bury the Light trabs in space according to the described default pipeline of claim 1 underground, it is characterized in that: wherein this fluting vertically is provided with, and near the arbitrary end in the plate left and right sides.
4. bury the Light trabs in space underground according to the described default pipeline of claim 1, it is characterized in that: wherein this fluting is horizontally disposed with.
5. bury the Light trabs in space underground according to the described default pipeline of claim 1, it is characterized in that: wherein this fluting is arranged on the plate margin, and the fluting of two adjacent plates combines.
CN 200520142524 2005-12-05 2005-12-05 Light wallboard with preset pipeline built-in space Expired - Fee Related CN2871694Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520142524 CN2871694Y (en) 2005-12-05 2005-12-05 Light wallboard with preset pipeline built-in space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520142524 CN2871694Y (en) 2005-12-05 2005-12-05 Light wallboard with preset pipeline built-in space

Publications (1)

Publication Number Publication Date
CN2871694Y true CN2871694Y (en) 2007-02-21

Family

ID=37740040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520142524 Expired - Fee Related CN2871694Y (en) 2005-12-05 2005-12-05 Light wallboard with preset pipeline built-in space

Country Status (1)

Country Link
CN (1) CN2871694Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019218194A1 (en) * 2018-05-16 2019-11-21 增城市碧桂园物业发展有限公司 Wall system integrating high-voltage cable
CN110607861A (en) * 2019-09-27 2019-12-24 金螳螂精装科技(苏州)有限公司 Prefabricated light partition wall for building
CN112878580A (en) * 2021-01-19 2021-06-01 中国十七冶集团有限公司 Filling wallboard with reserved net grooves and manufacturing mold thereof
CN113279596A (en) * 2021-05-06 2021-08-20 中铁建工集团有限公司 Light partition wall slotting and repairing process

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019218194A1 (en) * 2018-05-16 2019-11-21 增城市碧桂园物业发展有限公司 Wall system integrating high-voltage cable
CN110607861A (en) * 2019-09-27 2019-12-24 金螳螂精装科技(苏州)有限公司 Prefabricated light partition wall for building
CN112878580A (en) * 2021-01-19 2021-06-01 中国十七冶集团有限公司 Filling wallboard with reserved net grooves and manufacturing mold thereof
CN112878580B (en) * 2021-01-19 2022-04-19 中国十七冶集团有限公司 Filling wallboard with reserved net grooves and manufacturing mold thereof
CN113279596A (en) * 2021-05-06 2021-08-20 中铁建工集团有限公司 Light partition wall slotting and repairing process

Similar Documents

Publication Publication Date Title
Orlowski Automated manufacturing for timber-based panelised wall systems
CN2871694Y (en) Light wallboard with preset pipeline built-in space
CN103088991B (en) Outdoor wood plastic floor installation structure and installation method
CN102301078A (en) Assembled Wall Board
CN203188605U (en) Building board capable of being spliced for rapid modeling, template rib, template and template structure
CN203669286U (en) Connecting structure of floors and keels of integrated house
CN103122690B (en) Splicing building board for rapid modeling and template rib, template and template structure
CN203475689U (en) Building panel
CN2665261Y (en) Lightweight building board with glass fiber mesh
CN212734661U (en) Efficient locking device for plates
CN211286527U (en) Ceramic tile mortar spreading tool
CN203669202U (en) Beam structure for integrated house
CN210308370U (en) Evaporate and press aerated concrete block cutting means
CN2871692Y (en) Light wallboard with middle partition
CN103741926A (en) Novel flooring seamless connector
CN206220441U (en) A kind of assembling type skirting board section bar component
CN207063421U (en) A kind of outdoor DIY Wood-plastic floors
CN203669287U (en) Novel floor seamless connecting piece
CN203669292U (en) Floor structure of integrated house
CN214520993U (en) Precast concrete board assembly quality of building engineering
CN203669242U (en) Integrated house simple assembly stair structure
CN203782989U (en) Heat-preserving waterproof roof for integrated house and supporting structure of roof
CN215396116U (en) Engineering floor tile cutting chamfering mechanism
CN214034377U (en) Modularization partition plate
CN204185974U (en) Panel wall package assembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee