CN2868761Y - Rigid accessory box of binding type large-volume high-pressure gas cylinder transport vehicle - Google Patents

Rigid accessory box of binding type large-volume high-pressure gas cylinder transport vehicle Download PDF

Info

Publication number
CN2868761Y
CN2868761Y CN 200520024761 CN200520024761U CN2868761Y CN 2868761 Y CN2868761 Y CN 2868761Y CN 200520024761 CN200520024761 CN 200520024761 CN 200520024761 U CN200520024761 U CN 200520024761U CN 2868761 Y CN2868761 Y CN 2868761Y
Authority
CN
China
Prior art keywords
pressure gas
transport trolley
gas cylinder
accessory case
high pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200520024761
Other languages
Chinese (zh)
Inventor
王会赏
王红霞
王五开
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Enric Gas Equipment Co Ltd
Original Assignee
Shijiazhuang Enric Gas Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Enric Gas Equipment Co Ltd filed Critical Shijiazhuang Enric Gas Equipment Co Ltd
Priority to CN 200520024761 priority Critical patent/CN2868761Y/en
Application granted granted Critical
Publication of CN2868761Y publication Critical patent/CN2868761Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model relates to an improvement to the big volume high-pressure gas cylinder transport vechicle annex case of bundling. The improved accessory box is fixed at the tail part of the transport vehicle, a gas inlet pipeline, a gas outlet pipeline, a sewage pipeline and a matched valve which are led out from a rear end plug of a high-pressure gas cylinder are arranged inside the improved accessory box, a base which is fixed at the rear tail part of a longitudinal auxiliary beam of the transport vehicle in a welding mode, a framework which is fixedly connected with the base and is of a cuboid truss structure and is formed by welding 50-80 equilateral angle steels together, and a side guard plate, a rear supporting plate and a hinge-connected accessory box door plate which are welded into a whole with the framework to form a rigid anti-collision structure.

Description

The big capacity high pressure gas cylinder of cluster transport trolley rigid attachment case
Technical field
The utility model relates to the improvement to the big capacity high pressure gas cylinder of cluster transport trolley structural acessory.
Background technology
Special gas has become the important component part in daily life and the production practice, particularly natural fuels as a kind of product.Because the situation complexity is transformed in the overbalance of economic development, city planning, natural gas line can not enter all regions of city or surrounding city in a short time.To pipe network stretch and less than regional transport natural gas become market one big demand.Many city gas Vehicle Fueling Station are distributed in city traffic hinge area, many gas stations all can't with the gas line network direct connection, the source of the gas at these gas stations replenish can only lean on the high pressure gas transport trolley from the pipe network door station (female station) or other source of the gas ship.The secondth, urban economy development is very fast, and the inaccessible residential quarter of gas distributing system, gas supply also relies on the transportation of high pressure gas transport trolley.Use high pressure gas natural fuels very widely at present, known together by countries in the world as cleaning, high efficient energy sources.Calculate according to the expert, most economical on 300 kilometers on gas distributing system periphery with interior area use natural fuels, mode is that pipe network 0.6MPa low pressure natural gas is pressurized to 20MPa easily, uses the high-pressure gas bottle transport trolley to transport to natural fuels then and uses zone, particularly backcountry.At other industrial circles, the market demand of multiple high pressure gas such as hydrogen, helium rapidly increases, and the transportation of gas also is the task of top priority.The enterprise that is to use above gas that worth people notes is distributed in backwoodsman chemical plant.
At present, used on the market is the small steel cylinder transport trolley, and the shortcoming of small steel cylinder transport trolley is: the quantity of steel cylinder is many, volume is little, and the point of connection of steel cylinder and connecting line is many, the leak point is many.The volume to weight ratio of steel cylinder is low, the weight of medium is few, and efficient is low, and developed country eliminates.In view of the foregoing, my company develops big capacity high pressure gas cylinder, as the equipment of transportation high pressure gas.Every steel cylinder is by bottle, front end plug screw and rear end plug screw are formed, bottle is no welding line structure, two ends are the spherical shell cover of spin forming, the bottle two ends are provided with big opening necking down straight section, straight section portion separates endoporus and machining internal thread, front end plug screw and rear end plug screw are installed on the negative thread, the place is provided with safety device in the bottle front end exit, and bottle rear end plug screw connects input and output gas pipeline and blowoff line, by charge and discharge valve loading and unloading high pressure gas, the high-pressure gas bottle transport trolley of this big volume, the quantity of steel cylinder is few, and volume is big, and point of connection is few, leak point is few, can improve the conveying efficiency and the product design of product.
The volume and weight of high-pressure gas bottle is big, inertia is big, safety factor is low, particularly present employed only be will vertically pile up neatly the big capacity high pressure gas cylinder of putting by means of at least two binding steel to be bundled on the chassis, the stability extreme difference, forward and backward play and upper and lower beating can be directed at the generation of grave accident under the poor slightly situation of road conditions.In major tuneup carrying structure and transportation fixing device, expose the potential safety hazard of afterbody behind the big capacity high pressure gas cylinder of the cluster transport trolley again.For the convenience of loading, unloading gas and blowdown cleaning work, on the port plug that pipeline, the valve of gas turnover and blowdown all concentrate the afterbody that is arranged on transport trolley, be connected the high-pressure gas bottle rear port, the concentrated back afterbody that is set in car.This is the weakness of this transport trolley, the hidden danger of safety.Any slight rear-end collision all may cause the leakage of pipeline, is directed at great disaster.
Summary of the invention
Goal of the invention of the present utility model is that safe, the crashproof accessory structure to afterbody behind the big capacity high pressure gas cylinder of the cluster transport trolley makes improvements design; design a box-shaped rigidity anticollision device; to be in back pipeline of afterbody and valve and protect in incasing, thereby and in original transportation fixing device organically combine with further raising fasten fixed bit reliability and with the anti-ability of jolting of the more effective raising the design of chassis binding integrated degree.
Basic design philosophy of the present utility model is that the device after improving still is fixed on the transport trolley afterbody, inside is provided with the gas of drawing the high-pressure gas bottle rear end beyond the Great Wall and advances, go out pipeline, blowoff line and supporting valve, crucial design is the rigid unitary structure design, it is by the base that is weldingly fixed on afterbody behind the vertical auxiliary girder of transport trolley, what be fixed together the end with base is the skeleton of the cuboid truss structure formed of the equal angle weld together of 50-80mm with the specification, with skeleton integrally welded side backplate and rear bearing sheet, an and rigidity collision protection structure being combined to form of the attachment part chamber door plate that connects in skeleton strand.The skeleton that angle steel is made and add door-plate that plate iron makes by means of base in the longitudinal bearer of transport trolley through integrally welded can bear bigger come from the rear to bump, make pipeline, valve in the case be able to effective must the protection.As further taking enhancements then the interaction energy of accessory case further to be strengthened on solid mode and the combined connecting structure fastening.
How further specify the purpose of this utility model below in conjunction with accompanying drawing realizes.
Description of drawings
Fig. 1 accessory case reaches at big capacity high pressure gas cylinder transport trolley installation site scheme drawing
Fig. 2 is that the C of Fig. 1 is to view
The postnotum of Fig. 3 accessory case, i.e. the rear port supporting plate structure scheme drawing of high-pressure gas bottle
F among Fig. 4 Fig. 3 is to partial enlarged drawing
The structural representation of the base of Fig. 5 accessory case
The sequence number of structure member and title are described as follows in the above accompanying drawing:
The back back plate of 5-1 high-pressure gas bottle port is stablized pull bar
Longitudinal bearer on 7 body with frames
The vertical auxiliary girder of 7-0
The horizontal auxiliary girder that 7-1 and vertical auxiliary girder are connected
7-3 accessory case base
The 7-4 horizontal support
Be connected frid between the vertical auxiliary girder of 7-5 (7-0) and the longitudinal bearer (7)
The inclined bearing beam of the vertical auxiliary girder upper support of 7-9 accessory case
The overhang bracket beam of the vertical auxiliary girder upper support of 7-10 accessory case
The posterior transversal support beam of the vertical 1 auxiliary girder upper support accessory case of 7-11
7-12 accessory case bottom supporting brace panel
8 big capacity high pressure gas cylinders
The rear port stay bearing plate of 10 big capacity high pressure gas cylinders
11 represent the accessory case assembly
11-0 represents the accessory case door-plate
11-4 annex chamber door is fastened
Be enclosed within the through hole on the high-pressure gas bottle rear port on 16 back plates (10)
The oval shape bolt hole that the binding bolt of 17 back plates (10) and locating flange (20) passes
18 rear bumpers
20 locating flange dishes
21 represent the longitudinal length of accessory case apart from rear bumper (18)
The specific embodiment
Can clearly be seen that the content of this technological improvement in conjunction with the accompanying drawings, is the potential safety hazard of afterbody behind the big capacity high pressure gas cylinder of the pin transport trolley.Device after the improvement is fixed on the transport trolley afterbody, inside is provided with the gas of drawing the high-pressure gas bottle rear end beyond the Great Wall into and out of pipeline, blowoff line and supporting valve, this accessory case 11 is by the base 7-3 that is weldingly fixed on afterbody behind the vertical auxiliary girder 7-0 of transport trolley, what be fixed together with base 7-3 is to be the skeleton of the cuboid truss structure formed of the equal angle weld together of 50-80mm with the specification, add with skeleton integrally welded side guard plate and rear port stay bearing plate 10, and the rigidity collision protection structure being combined to form of accessory case door-plate (11-0) of strand downlink connection.Specification is that the skeleton of the cuboid truss structure formed of the equal angle weld together of 50-80mm is positioned at by the door-plate 11-0 of back port fagging 10, base 7-3 and steel and forms one on the chassis and have higher crashproof ability.
Rear port stay bearing plate 10 promptly is to be connected two symmetrically arranged backs between the back horizontal auxiliary girder 7-1 two ends in backboard both sides and the transport trolley chassis bogey of accessory case to stablize pull bar 5-1; such structure make whole accessory case by the 20 tight entrance pressures of the locating flange on the rear port stay bearing plate 10 on shin shoulder at the bottom of high-pressure gas bottle 8 rear ports; can effectively the kinetic energy that impact load brings be must absorb, further protection inlet, outlet pipeline and valve played.In order to realize above effect, rear port stay bearing plate 10 is provided with and the high-pressure gas bottle quantity that is bundled and the cooresponding positioning through hole 16 that distributes, high-pressure gas bottle 8 rear ports pass positioning through hole 16 and put in accessory case 11, and are fixed on rear port stay bearing plate 10 by locating flange dish 20 and the binding bolt group of passing locating flange dish 20.On.Be provided with the oval shape bolt hole 17 that the binding bolt of flange 20 passes around the positioning through hole 16 on the rear port stay bearing plate 10.
In order to realize accessory case 11 and two to connect intensity at the bottom of the car body carrying structure, the base 7-3 of accessory case 11 be by comprise horizontal support 7-4 each to support beam (7-9,7-10,7-11) form rectangular box with reinforced rib 7-12 assembly welding, it is fixed on vertical auxiliary girder 7-0, is not less than 150mm. apart from the distance 21 of rear bumper 18.

Claims (5)

1, the big capacity high pressure gas cylinder of cluster transport trolley rigid attachment case, be fixed on the transport trolley afterbody, inside is provided with the gas of drawing the high-pressure gas bottle rear end beyond the Great Wall and advances, go out pipeline, blowoff line and supporting valve, it is characterized in that this accessory case (11) is by the base (7-3) that is weldingly fixed on the vertical auxiliary girder of transport trolley (7-0) back afterbody, what be fixed together with base (7-3) is to be the skeleton of the cuboid truss structure that is welded to form of the equal angle of 50-80mm with the specification, is combined to form a rigidity collision protection structure with the integrally welded side guard plate of skeleton and the accessory case door-plate (11-0) of rear port stay bearing plate (10) and strand downlink connection.
2, the big capacity high pressure gas cylinder of cluster according to claim 1 transport trolley rigid attachment case is characterized in that being connected two symmetrically arranged backs and stablizes pull bars (5-1) between back horizontal auxiliary girder (7-1) two ends in rear port stay bearing plate (10) both sides and the transport trolley chassis bogey.
3, the big capacity high pressure gas cylinder of cluster according to claim 1 transport trolley accessory case, it is characterized in that rear port stay bearing plate (10) is provided with and the high-pressure gas bottle quantity that is bundled and the cooresponding positioning through hole (16) that distributes, high-pressure gas bottle (8) rear port passes positioning through hole (16) and puts in accessory case (11), and is fixed on the port stay bearing plate (10) by the locating flange dish (20) and the binding bolt group of passing locating flange dish (20).
4, the big capacity high pressure gas cylinder of cluster according to claim 3 transport trolley accessory case is characterized in that positioning through hole (16) on the rear bearing sheet (10) is provided with the oval shape bolt hole (17) that the binding bolt of flange (20) passes all around.
5, the big capacity high pressure gas cylinder of cluster according to claim 2 transport trolley accessory case, the base (7-3) that it is characterized in that accessory case (11) be by comprise horizontal support (7-4) each to support beam (7-9,7-10,7-11) and reinforced rib (7-12) assembly welding form rectangular box, it is fixed on vertical auxiliary girder (7-0), is not less than 150mm. apart from the distance (21) of rear bumper (18).
CN 200520024761 2005-08-30 2005-08-30 Rigid accessory box of binding type large-volume high-pressure gas cylinder transport vehicle Expired - Lifetime CN2868761Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520024761 CN2868761Y (en) 2005-08-30 2005-08-30 Rigid accessory box of binding type large-volume high-pressure gas cylinder transport vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520024761 CN2868761Y (en) 2005-08-30 2005-08-30 Rigid accessory box of binding type large-volume high-pressure gas cylinder transport vehicle

Publications (1)

Publication Number Publication Date
CN2868761Y true CN2868761Y (en) 2007-02-14

Family

ID=37723693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520024761 Expired - Lifetime CN2868761Y (en) 2005-08-30 2005-08-30 Rigid accessory box of binding type large-volume high-pressure gas cylinder transport vehicle

Country Status (1)

Country Link
CN (1) CN2868761Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101927779A (en) * 2010-08-27 2010-12-29 仝崇楼 Combined multifunctional dolly capable of being disassembled and assembled into multiple obstacle-detouring rescue equipment
CN101774404B (en) * 2009-11-25 2012-08-29 新兴能源装备股份有限公司 19m3 high pressure gas long pipe semitrailer
CN105173443A (en) * 2015-08-12 2015-12-23 新兴能源装备股份有限公司 720 pipe bundle type container with seven pipes

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101774404B (en) * 2009-11-25 2012-08-29 新兴能源装备股份有限公司 19m3 high pressure gas long pipe semitrailer
CN101927779A (en) * 2010-08-27 2010-12-29 仝崇楼 Combined multifunctional dolly capable of being disassembled and assembled into multiple obstacle-detouring rescue equipment
CN101927779B (en) * 2010-08-27 2012-10-17 仝崇楼 Combined multifunctional dolly capable of being disassembled and assembled into multiple obstacle-detouring rescue equipment
CN105173443A (en) * 2015-08-12 2015-12-23 新兴能源装备股份有限公司 720 pipe bundle type container with seven pipes

Similar Documents

Publication Publication Date Title
CN2871297Y (en) Binding type large-volume high-pressure gas cylinder transport vehicle
CN202911538U (en) Double-liquefied-natural-gas (LNG)-cylinder frame
US7481411B2 (en) Rear impact shock absorbing structure for fuel cell vehicle
CN206124751U (en) Hydrogen supply system of vertical assembly of bottle
CN103066225A (en) Power battery pack assembly structure of all-electric vehicle
CN2868761Y (en) Rigid accessory box of binding type large-volume high-pressure gas cylinder transport vehicle
CN203713546U (en) Liquefied natural gas (LNG) post-arranged double-bottle lightweight support
CN2846221Y (en) Fastening device for binding type large-volume high-pressure gas cylinder transport vehicle
CN105946977A (en) Automobile body framework
CN213167743U (en) Hydrogen storage and power battery system fixing device of fuel cell vehicle
CN101508264A (en) Tube rotation preventive apparatus of movable tube trailer for refueling compressed natural gas
KR102456289B1 (en) Combined Renewable Energy Production System With Offshore Floating Platform For Wave, Wind And Solar Power Generation
CN213323383U (en) Steel-aluminum mixed lightweight van-type container for light truck
CN204688698U (en) Open-top car pipeline transportation frame
US20050212281A1 (en) Hydrogen fueling trailer
CN112644271A (en) Fuel cell tractor with hydrogen storage tank placing rack
CN108001473A (en) A kind of modularization lightweight diesel locomotive car body
CN205931909U (en) Detachable multi -functional special container
CN215474507U (en) Combined hydrogen storage system installation assembly for hydrogen fuel commercial vehicle and vehicle
CN202130743U (en) Tank container and end frame thereof
CN204488995U (en) Lightweight all aluminium alloy particle material transportation semitrailer
CN207889530U (en) Fuel gas bottle shielded frame and the vehicle for using the frame
CN209653532U (en) A kind of pin-connected panel angle steel tripartite's Guywire tower
CN203047370U (en) Long tube trailer without continuous beam
CN207453101U (en) Aluminium alloy container house corner post connection structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Expiration termination date: 20150830

Granted publication date: 20070214

EXPY Termination of patent right or utility model