CN2811465Y - Prestressed carbon fiber plastic plate anchoring system - Google Patents

Prestressed carbon fiber plastic plate anchoring system Download PDF

Info

Publication number
CN2811465Y
CN2811465Y CN 200520043980 CN200520043980U CN2811465Y CN 2811465 Y CN2811465 Y CN 2811465Y CN 200520043980 CN200520043980 CN 200520043980 CN 200520043980 U CN200520043980 U CN 200520043980U CN 2811465 Y CN2811465 Y CN 2811465Y
Authority
CN
China
Prior art keywords
stretch
carbon fiber
draw
fiber plastic
plastic plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520043980
Other languages
Chinese (zh)
Inventor
薛伟辰
曾磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN 200520043980 priority Critical patent/CN2811465Y/en
Application granted granted Critical
Publication of CN2811465Y publication Critical patent/CN2811465Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a kind of prestressing carbon fiber plastic plate anchor system, comprise anchored end and stretch-draw end two parts, anchored end and stretch-draw end respectively are provided with a clamping device, this clamping device comprise lower plate and between the last lower plate lower bolster, connect with a plurality of securing members between the last lower plate.The stretch-draw end of this anchor system is provided with a connector, and connector one end is held mechanism with the fire of stretch-draw end and is connected, and the other end is connected with pull bar, utilizes common hydraulic jack can realize stretch-draw and anchoring to the carbon fiber plastic plate.The utility model is simple and reasonable, and is workable, and Practical Performance is good, and with low cost.

Description

Prestressing carbon fiber plastic plate anchor system
Technical field
The utility model belongs to field of civil engineering, is specifically related to a kind of prestressing carbon fiber plastic plate anchor system.
Background technology
Fibre reinforced plastics (Fiber Reinforced Plastics) are called for short FRP, be applied to up to now in the fiber-like material field of civil engineering the earliest, technology is the most ripe, consumption is maximum a kind of high-tech material.According to the difference of kinds of fibers, the FRP material can be divided three classes: CFRP (carbon fiber plastic), GFRP (fiberglass plastic), AFRP (aramid fiber plastics).Wherein not only tensile strength and modulus of elasticity are the highest for CFRP, and acid and alkali resistance, salt, drying and watering cycle and other chemical solvent and more the ability of difference ring border condition also obviously be better than GFRP and AFRP.According to different product forms, FRP can be divided into: FRP section bar, FRP sheet material (cloth material and sheet material) and FRP bar etc.
The CFRP plate is pasted on the tension face of concrete beam, can effectively improves the anti-bending bearing capacity and the rigidity of beam, the control crack width.Than traditional reinforcement means, the advantage of CFRP plate reinforcing method has: 1. intensity height, and CFRP plate tensile strength can reach 3000MPa, and consolidation effect is good; 2. volume and deadweight are little, increase the size and the weight of structure hardly; 3. there is not unnecessary welding node; 4. durability and corrosion resistance are good; 5. easy construction.
But CFRP plate reinforcing method also exists deficiency, and correlation test is the result show: when common CFRP plate reinforcement took place to destroy, the tensile stress of CFRP plate only was 10%~20% of its tensile strength, and the high strength of CFRP plate is not in full use.
After the CFRP plate applied prestressing force, the CFRP plate had just been brought into play suitable intensity before joist support is subjected to load, so not only can make full use of the high strength of CFRP plate, improve the stress and the performance of beam, effectively improve the cracking load and the yield load of beam, can also further suppress the distortion of beam and the development in crack.
Because CFRP plate shear strength is very low, realize the stretch-draw to the CFRP plate, need special ground tackle, domestic research to the Prestressed CFRP beaverboard anchorage at present still is blank.
The utility model content
The technical problems to be solved in the utility model is to develop a kind of anchor system that can carry out stretch-draw and anchoring to the prestressing carbon fiber plastic plate.
In order to solve the problems of the technologies described above, the utility model adopts following technical scheme: a kind of prestressing carbon fiber plastic plate anchor system, comprise anchored end and stretch-draw end two parts, described anchored end and stretch-draw end respectively are provided with a clamping device, this clamping device comprise lower plate and between the last lower plate lower bolster, connect with a plurality of securing members between the last lower plate.
The stretch-draw end of this anchor system also is provided with a connector, one end of connector is connected by pin with the clamping device of stretch-draw end, the other end is provided with screw, is connected with pull bar by screw thread, utilizes common hydraulic jack can realize stretch-draw and anchoring to the carbon fiber plastic plate.
Anchor system of the present utility model is simple and reasonable, and is workable, and Practical Performance is good, and with low cost.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is the structural representation of anchor system stretch-draw end of the present utility model.
Fig. 2 is the vertical view of stretch-draw end shown in Figure 1.
Fig. 3 is the sectional view of connector in the anchor system of the present utility model.
Fig. 4 is the structural representation of anchor system anchored end of the present utility model.
Fig. 5 is the vertical view of anchored end shown in Figure 4.
The specific embodiment
Prestressing carbon fiber plastic plate anchor system of the present utility model comprises anchored end and stretch-draw end two parts, the structure of stretch-draw end as shown in Figure 1 and Figure 2, the structure of anchored end such as Fig. 4, shown in Figure 5, anchored end and stretch-draw end respectively are provided with a clamping device, this clamping device comprise lower plate 3,3 ' and between the last lower plate lower bolster 4,4 ', connect with a plurality of securing members 2 between the last lower plate 3,3 '.In the present embodiment, described securing member 2 is a bolt, and the stretch-draw end also is provided with a connector 1, and connector 1 is connected with the clamping device of stretch-draw end.In use, the two ends of carbon fiber plastic plate 5 are clipped between the lower bolster 4,4 ' and can carry out stretch-draw and anchoring it.
In the present embodiment, an end of connector 1 is provided with screw 11, follows pull bar to be connected to make things convenient for connector, utilizes common hydraulic jack can realize stretch-draw and anchoring to carbon fiber plastic plate 5, and control stress for prestressing can reach 1500MPa.Be connected by pin 6 between the last lower plate 3 of connector 1 and stretch-draw end, 3 ', be equipped with the pin-and-hole that matches with pin on the last lower plate of connector 1 and stretch-draw end 3,3 '.Last lower plate 3,3 ' is made by steel plate, and last lower bolster 4,4 ' is made by aluminium flake.
To do an explanation to the using method and the stretching process of the utility model prestressing carbon fiber plastic plate anchor system below:
(1) two ends that the anchored end and the stretch-draw end of anchor system is clamped in the carbon fiber plastic plate respectively, carbon plate glue evenly is applied to the contact surface of carbon fiber plastic plate and backing plate and the contact surface of backing plate and clamping plate, and screw securing member 2 and make it to clamp, then anchored end is utilized expansion bolt 7 to be fixed on the concrete beam.
(2) stickup of carbon fiber plastic plate: primer, equating glue are applied to concrete surface successively, can smear down a kind of glue behind a kind of glue dry to touch before treating, last a kind of carbon plate glue evenly is applied to the surface of carbon fiber plastic plate 5, then carbon fiber plastic plate 5 is pasted the surface of concrete beam, above-mentioned primer, equating glue and carbon plate glue are and the supporting glue special of carbon fiber plastic plate, can buy from market.
(3) take advantage of glue and carbon fiber plastic plate 5 is carried out stretch-draw when uncured.
(4) after stretch-draw finishes, utilize expansion bolt 7 that the stretch-draw end is anchored on the concrete beam.

Claims (4)

1. prestressing carbon fiber plastic plate anchor system, comprise anchored end and stretch-draw end two parts, it is characterized in that: described anchored end and stretch-draw end respectively are provided with a clamping device, this clamping device comprises lower plate (3,3 ') lower bolster (4 and between the last lower plate, 4 '), connect with a plurality of securing members (2) between the last lower plate (3,3 ').
2. prestressing carbon fiber plastic plate anchor system according to claim 1 is characterized in that: described securing member (2) is a bolt.
3. prestressing carbon fiber plastic plate anchor system according to claim 1 is characterized in that: described stretch-draw end is provided with a connector (1), and described connector (1) is connected with the clamping device and the jack of stretch-draw end.
4. prestressing carbon fiber plastic plate anchor system according to claim 3, it is characterized in that: an end of described connector (1) is provided with screw (11), the last lower plate (3 of connector (1) and stretch-draw end, 3 ') be connected by pin (6) between, be equipped with the pin-and-hole that matches with pin (6) on the last lower plate (3,3 ') of described connector (1) and stretch-draw end.
CN 200520043980 2005-08-02 2005-08-02 Prestressed carbon fiber plastic plate anchoring system Expired - Fee Related CN2811465Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520043980 CN2811465Y (en) 2005-08-02 2005-08-02 Prestressed carbon fiber plastic plate anchoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520043980 CN2811465Y (en) 2005-08-02 2005-08-02 Prestressed carbon fiber plastic plate anchoring system

Publications (1)

Publication Number Publication Date
CN2811465Y true CN2811465Y (en) 2006-08-30

Family

ID=36937852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520043980 Expired - Fee Related CN2811465Y (en) 2005-08-02 2005-08-02 Prestressed carbon fiber plastic plate anchoring system

Country Status (1)

Country Link
CN (1) CN2811465Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798876A (en) * 2010-04-28 2010-08-11 赵正义 Structure for reducing reinforcement stresses before tension withdrawing
CN102296755A (en) * 2011-06-16 2011-12-28 上海维固工程实业有限公司 Carbon fiber sheet anchorage device with corrugated splint and soft base plate
CN102304958A (en) * 2011-09-05 2012-01-04 长沙理工大学 Prestressing fixture for embedding fiberboard strip for reinforcing concrete structure on surface layer
CN103541514A (en) * 2013-10-22 2014-01-29 张涛涛 Multipurpose connector, anchor head and assembly for connecting FRP (Fiber Reinforced Plastic) rebars
CN103590540A (en) * 2013-11-15 2014-02-19 哈尔滨工业大学 Anchoring connection device of carbon fiber reinforced resin base composite material plate
CN104126045A (en) * 2012-02-21 2014-10-29 Sika技术股份公司 Device for introducing a force into tension members made of fiber-reinforced flat-strip plastic lamellas
CN105952175A (en) * 2016-05-11 2016-09-21 山东大学 Reusable pre-stress carbon fiber sheet material clamping piece type clamp and method
CN110682131A (en) * 2019-10-28 2020-01-14 天津工业大学 Carbon fiber composite milling support fixture

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798876A (en) * 2010-04-28 2010-08-11 赵正义 Structure for reducing reinforcement stresses before tension withdrawing
CN101798876B (en) * 2010-04-28 2012-09-12 赵正义 Structure for reducing reinforcement stresses before tension withdrawing
CN102296755A (en) * 2011-06-16 2011-12-28 上海维固工程实业有限公司 Carbon fiber sheet anchorage device with corrugated splint and soft base plate
CN102304958A (en) * 2011-09-05 2012-01-04 长沙理工大学 Prestressing fixture for embedding fiberboard strip for reinforcing concrete structure on surface layer
CN104126045A (en) * 2012-02-21 2014-10-29 Sika技术股份公司 Device for introducing a force into tension members made of fiber-reinforced flat-strip plastic lamellas
CN103541514A (en) * 2013-10-22 2014-01-29 张涛涛 Multipurpose connector, anchor head and assembly for connecting FRP (Fiber Reinforced Plastic) rebars
CN103541514B (en) * 2013-10-22 2015-09-16 张涛涛 A kind of multiplex connector, anchor head and composite member connected for FRP muscle material
CN103590540A (en) * 2013-11-15 2014-02-19 哈尔滨工业大学 Anchoring connection device of carbon fiber reinforced resin base composite material plate
CN103590540B (en) * 2013-11-15 2016-03-23 哈尔滨工业大学 The anchoring hookup of carbon fiber enhancement resin base composite material plate
CN105952175A (en) * 2016-05-11 2016-09-21 山东大学 Reusable pre-stress carbon fiber sheet material clamping piece type clamp and method
CN110682131A (en) * 2019-10-28 2020-01-14 天津工业大学 Carbon fiber composite milling support fixture

Similar Documents

Publication Publication Date Title
CN2811465Y (en) Prestressed carbon fiber plastic plate anchoring system
CN201704877U (en) Wave-shaped-gear-grip anchorage for gripping high-strength fiber thick composite material
CN101074578B (en) Special anchoros for wedged variable-corrugated clamped sheets
CN101033646A (en) Reinforcement method for reinforced concrete beam plate
CN102094536B (en) Array type waved tooth clamp anchor
CN109781619A (en) A kind of fixture and detection method detecting fiber cement substrates adhesive property
CN1743626A (en) Method for reinforcing steel beam
CN202017304U (en) Automatic centering tensioning anchoring device for prestress sheet material clamp type anchor
CN2856239Y (en) Anchoring means for prestressed fiber cloth reinforced concrete structure
CN212514210U (en) FRP muscle and concrete bonding performance hold lotus test device
CN1760154A (en) Method for applying prestressing force on concrete enhanced by fiber weaved net
CN201695706U (en) Tensioning device of prestress fiber cloth for reinforcing reinforced concrete column
CN201162355Y (en) Pressing device of wave-shaped tooth clamper anchor
CN101285333B (en) Special anchorage for combined variable-corrugated fiber sheets and prestressing force stretching method thereof
CN202543911U (en) Support cantilever pile with composite structure of prestress reinforced plastic bars and prestress steel nooses
CN1173104C (en) Dome structure stretched by strengthen flexible rigging
CN201952981U (en) Fiber reinforce plastic (FRP) sheet fabricated end anchorage device for reinforcing building body
CN205804981U (en) The original position tensioning system of integral type pre-stress fibre plate reinforcing slab plate
CN202131716U (en) Array-type waveform tooth clamp anchor
CN212359200U (en) Reverse stretch-draw anchor subassembly of prestressing force FRP board
CN201209292Y (en) Anchorage special for combination corrugation changing fibre sheet material
CN202543915U (en) Shoring cantilever pile provided with reinforced plastic stirrup
CN218937974U (en) Be suitable for muscle material and eccentric drawing test device of concrete
CN205805013U (en) A kind of device of pre-stress fibre sheet material reinforced column
CN106088654B (en) FRP ruggedized construction ductility Enhancement Methods based on preload

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060830