CN2786436Y - Vertical type internal combustion wet-back water pipe three-pass coke boiler - Google Patents

Vertical type internal combustion wet-back water pipe three-pass coke boiler Download PDF

Info

Publication number
CN2786436Y
CN2786436Y CN 200520072107 CN200520072107U CN2786436Y CN 2786436 Y CN2786436 Y CN 2786436Y CN 200520072107 CN200520072107 CN 200520072107 CN 200520072107 U CN200520072107 U CN 200520072107U CN 2786436 Y CN2786436 Y CN 2786436Y
Authority
CN
China
Prior art keywords
shell
backhaul
tube
water
boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520072107
Other languages
Chinese (zh)
Inventor
谢峰
孙瑾娟
缪建平
卢全龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGYIN DONGDA BOILER MANUFACTURING Co Ltd
Original Assignee
JIANGYIN DONGDA BOILER MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGYIN DONGDA BOILER MANUFACTURING Co Ltd filed Critical JIANGYIN DONGDA BOILER MANUFACTURING Co Ltd
Priority to CN 200520072107 priority Critical patent/CN2786436Y/en
Application granted granted Critical
Publication of CN2786436Y publication Critical patent/CN2786436Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The utility model relates to a three-pass coke boiler with vertical type internal combustion wet-back water pipes, which comprises a boiler shell (6), a boiler liner (7), a U-shaped foot ring (3), a base (1), a fire grate (19), a fire grate pipe (17), inter water wall pipes (8), outer water wall pipes (16), a water inlet pipe (18), a steam outlet pipes (11) and (13), a lower smoke chamber (22) and a smoke collecting chamber (15), wherein the boiler liner (7) is arranged in the boiler shell (6), the boiler shell (6), the boiler liner (7) and the U-shaped foot ring (3) form a water isolating sleeve (23) which is arranged on the base (1), the fire grate (19) is breadthways arranged on the base (1), the inter water wall pipes (8) are axially and uniformly distributed on the inner wall surface of the boiler liner (7), the outer water wall pipes (16) are axially and uniformly distributed on the outer wall surface of the boiler shell (6), the water inlet pipe (18) is arranged on the lower part of the shell wall of the boiler shell (6), the steam outlet pipes (11) and (13) are connected to the upper part of the boiler shell (6), a passage between the water isolating sleeve (23) and the base (1) forms the lower smoke chamber (22), and the smoke collecting chamber is positioned on the upper parts of the outer water wall pipes (16). The utility model has the advantages of high heat transfer efficiency, convenient deashing, convenient maintenance and exchange and long service life.

Description

The vertical internal combustion backwater pipe three backhaul coke boilers that wet
Technical field:
The utility model relates to a kind of boiler, especially relates to the wet backwater pipe three backhaul coke boilers of a kind of vertical internal combustion.Belong to the heat transmission equipment technical field.
Background technology:
Make following, conventional coke boiler at the utility model the wet back of the body of vertical internal combustion fire tube three return-stroke types are arranged.Mainly there is following deficiency in it:
1, flue gas is walked tube side, and fire tube and flue gas contact area are little, and heat transfer coefficient is low.
2, the easy dust stratification obstruction of mouth is advanced in the fire tube end, and dust stratification is removed difficulty, and boiler operatiopn is safe and reliable poor.
3, fire tube is assemblied in the water spacer, can't keep in repair.
4, flue gas flow rate is fast in the fire tube, and is easy to wear to the brute force of washing away of fire tube, and service life is short.
Summary of the invention:
The purpose of this utility model is to overcome above-mentioned deficiency, provides that a kind of heat transfer efficiency height, deashing are convenient, the maintenance transposing is convenient, the wet backwater pipe three-pass boiler of vertical internal combustion long service life
The purpose of this utility model is achieved in that a kind of vertical internal combustion backwater pipe three backhaul coke boilers that wet, it comprises shell, flue, U type pin circle, base, fire grate, furnace grate tube, interior waterwall tube, outer waterwall tube, water inlet pipe, steam outlet pipe, following smoke-box and fume collecting chamber, described flue places in the shell, U type pin circle is connected in flue and shell lower end, shell, flue and U type pin circle constitute the water spacer, the water spacer places on the base, fire grate is horizontally placed on the base, furnace grate tube places the fire grate top, be distributed on the inboard wall of furnace face on the interior waterwall tubular axis, outer waterwall tube axially is distributed on the shell outside wall surface, water inlet pipe is arranged at shell shell wall bottom, be connected with the water spacer, the water spacer is connected with interior waterwall tube and outer waterwall tube respectively, and steam outlet pipe is connected in shell top, be connected with the water spacer, passage between water spacer and the base constitutes smoke-box down, and fume collecting chamber is positioned at outer waterwall tube top, and the inner chamber of interior waterwall tube constitutes first backhaul of flue gas; Constitute second backhaul of flue gas between interior waterwall tube and the inboard wall of furnace; Constitute the 3rd backhaul of flue gas between shell outer wall and the outer waterwall tube, first backhaul is connected with the top of second backhaul by interior waterwall tube, and second backhaul is connected with the 3rd backhaul by following smoke-box, and the 3rd backhaul is connected with fume collecting chamber.
Flue gas by first backhaul through interior waterwall tube overhead stream through second backhaul, flow to the 3rd backhaul through following smoke-box again, after fume collecting chamber and after dust removal process, discharging by chimney.
Waterwall tube and outer waterwall tube in water is entered by water spacer bottom by water inlet pipe, the water vapour that the heating back produces is discharged by the steam outlet pipe at water spacer top.
Compare with the traditional wet back of the body of vertical internal combustion fire tube three-pass boiler coke, the utlity model has following advantage:
1, water is walked tube side, and water pipe has adopted extended surface tube, and water pipe and flue gas contact area improve greatly, have strengthened heat transfer, realizes efficient burning.
2, adopt water pipe to solve fire tube end dust stratification, and deashing is convenient, can guarantees the long-term efficient operation of boiler, safe and reliable.
3, water pipe is installed in outside the water spacer, and the maintenance transposing is convenient.
4, avoided flue gas that the high speed of tube bank is washed away long service life.
Description of drawings:
Fig. 1 is the body construction schematic diagram of the wet backwater pipe three backhaul coke boilers of the vertical internal combustion of the utility model.
Fig. 2 is the A-A cut-away view of Fig. 1.
Fig. 3 is a general structure schematic diagram of the present utility model.
Fig. 4 is the vertical view of Fig. 3.
The specific embodiment:
Referring to Fig. 1~3, the utility model is the wet backwater pipe three backhaul coke boilers of a kind of vertical internal combustion.Mainly form by base 1, ash hole 2, U type pin circle 3, hand hole 4, fire door circle 5, shell 6, flue 7, interior waterwall tube 8 (extended surface tube), stay bolt bar 9, water gage 10, secondary steam outlet pipe 11, steam-water separator 12, main-steam outlet pipe 13, manhole 14, fume collecting chamber 15, outer waterwall tube 16, furnace grate tube 17, water inlet pipe 18, fire grate 19, blow-off pipe 20, air channel 21, following smoke-box 22, water spacer 23, ash removing opening 24, safety valve 25 and Pressure gauge 26 (referring to Fig. 4) etc.
Flue 7 places in the shell 6, and U type pin circle 3 is connected in flue 7 and shell 6 lower ends, and stay bolt bar 9 is connected between flue 7 top end sockets and the shell 6 top end sockets.Shell 6, flue 7 and U type pin circle 3 are enclosed the water spacer 23 of a sealing.Water spacer 23 places on the base 1.Be distributed on flue 7 internal faces on 8 of the interior waterwall tubes.Outer waterwall tube 16 axially is distributed on shell 6 outside wall surface.Water inlet pipe 18 is arranged at shell 6 shell wall bottoms, is connected with water spacer 23.Water spacer 23 is connected with interior waterwall tube 8 and outer waterwall tube 16 respectively.Main-steam outlet pipe 13 and secondary steam outlet pipe 11 are connected in shell 6 tops, are connected with water spacer 23.Fire grate 19 is horizontally placed on the base 1, and furnace grate tube 17 is inclined in flue 7 inwall bottoms, and places fire grate 19 tops.Passage between water spacer 23 and the base 1 constitutes smoke-box 21 down, and fume collecting chamber 15 is positioned at outer waterwall tube 16 tops.The inner chamber of interior waterwall tube 8 constitutes first backhaul of flue gas; Constitute second backhaul of flue gas between interior waterwall tube 8 and flue 7 inwalls; Constitute the 3rd backhaul of flue gas between shell 6 outer walls and the outer waterwall tube 16.First backhaul is connected with the top of second backhaul by interior waterwall tube 8, and second backhaul is connected with the 3rd backhaul by following smoke-box 22, and the 3rd backhaul is connected with fume collecting chamber 15.
Ash hole 2, ash removing opening 24 and air channel 21 all are arranged on the base 1.Ash hole is used to clear up after-flame lime-ash outlet on the fire grate.Ash removing opening is used to clear up down the thin ash of smoke-box inner accumulated.It is combustion-supporting that the air channel is used for the air intake of fire grate.
Hand hole 4 and manhole 14 all are installed on the shell 6.Be convenient to inspection and cleaning in the water spacer.Fire door circle 5 is installed on the water spacer, between shell and flue.Water gage 10, safety valve 25 and Pressure gauge 26 all are installed on the shell 6.Steam-water separator 12 is installed on main-steam outlet pipe 13 bottoms, places in the shell 6.Blow-off pipe 20 is installed on U type pin circle 3 bottoms.

Claims (2)

1, a kind of vertical internal combustion backwater pipe three backhaul coke boilers that wet, it is characterized in that it comprises shell (6), flue (7), U type pin circle (3), base (1), fire grate (19), furnace grate tube (17), interior waterwall tube (8), outer waterwall tube (16), water inlet pipe (18), steam outlet pipe (11,13), following smoke-box (22) and fume collecting chamber (15), described flue (7) places in the shell (6), U type pin circle (3) is connected in flue (7) and shell (6) lower end, shell (6), flue (7) and U type pin circle (3) constitute water spacer (23), water spacer (23) places on the base (1), fire grate (19) is horizontally placed on the base (1), furnace grate tube (17) places fire grate (19) top, be distributed on flue (7) internal face on interior waterwall tube (8) axle, outer waterwall tube (16) axially is distributed on shell (6) outside wall surface, water inlet pipe (18) is arranged at shell (6) shell wall bottom, be connected with water spacer (23), the water spacer is connected with interior waterwall tube (8) and outer waterwall tube (16) respectively, steam outlet pipe (11,13) be connected in shell (6) top, be connected with water spacer (23), passage between water spacer (23) and the base (1) constitutes smoke-box (22) down, fume collecting chamber (15) is positioned at outer waterwall tube (16) top, and the inner chamber of interior waterwall tube (8) constitutes first backhaul of flue gas; Constitute second backhaul of flue gas between interior waterwall tube (8) and flue (7) inwall; Constitute the 3rd backhaul of flue gas between shell (6) outer wall and the outer waterwall tube (16), first backhaul is connected with the top of second backhaul by interior waterwall tube (8), second backhaul is connected with the 3rd backhaul by following smoke-box (22), and the 3rd backhaul is connected with fume collecting chamber (15).
2, the wet backwater pipe three backhaul coke boilers of a kind of vertical internal combustion according to claim 1 is characterized in that furnace grate tube (17) is inclined in fire grate (19) top.
CN 200520072107 2005-05-19 2005-05-19 Vertical type internal combustion wet-back water pipe three-pass coke boiler Expired - Fee Related CN2786436Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520072107 CN2786436Y (en) 2005-05-19 2005-05-19 Vertical type internal combustion wet-back water pipe three-pass coke boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520072107 CN2786436Y (en) 2005-05-19 2005-05-19 Vertical type internal combustion wet-back water pipe three-pass coke boiler

Publications (1)

Publication Number Publication Date
CN2786436Y true CN2786436Y (en) 2006-06-07

Family

ID=36775010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520072107 Expired - Fee Related CN2786436Y (en) 2005-05-19 2005-05-19 Vertical type internal combustion wet-back water pipe three-pass coke boiler

Country Status (1)

Country Link
CN (1) CN2786436Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104913289A (en) * 2014-03-15 2015-09-16 段晓宏 Valve control tubular steam generator integrated type safety boiler
CN110566926A (en) * 2019-09-11 2019-12-13 湖北贝思特智能科技有限公司 Fuel oil and gas pipe-in-pipe three-return-stroke vertical steam generator

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104913289A (en) * 2014-03-15 2015-09-16 段晓宏 Valve control tubular steam generator integrated type safety boiler
CN110566926A (en) * 2019-09-11 2019-12-13 湖北贝思特智能科技有限公司 Fuel oil and gas pipe-in-pipe three-return-stroke vertical steam generator

Similar Documents

Publication Publication Date Title
WO2021258647A1 (en) Natural circulation box structure for ferrosilicon waste heat boiler
CN2786436Y (en) Vertical type internal combustion wet-back water pipe three-pass coke boiler
CN205481729U (en) High -efficient energy -saving pot stove of vertical extreme misery pipe
CN212377955U (en) Box structure of natural circulation ferrosilicon waste heat boiler
CN210717515U (en) Chain type grate multi-return biomass boiler
CN2788088Y (en) Smoke-fire-tube external circulating multi-return boiler
CN110630995A (en) Positive pressure horizontal water pipe waste heat boiler
CN219956162U (en) Sodium bichromate calcining kiln waste heat steam boiler
CN2583509Y (en) Close arranged diam-reducing water-tube oil-fired, gas-fired boiler
CN212157133U (en) Structure for preventing combustible gas at top of separator from gathering
CN212618210U (en) Steam boiler for burning natural gas
CN210891593U (en) Positive pressure horizontal water pipe waste heat boiler
CN219955653U (en) Novel biomass-fired hot water boiler
CN219222432U (en) Waste heat exchange mechanism of heat accumulating type incinerator
CN220229243U (en) Biomass cross-flow boiler body
CN2391098Y (en) Hot-tube type steam generator
CN219674180U (en) Biomass steam generator
CN206890563U (en) Flue dust isolating construction in stove
CN213019567U (en) Biomass-fired steam boiler
CN217653839U (en) Flue gas waste heat utilization boiler structure of electrolytic heating furnace
CN2484527Y (en) Normal-pressure heat-pipe efficient energy-saving dust-smoke-free boiler
CN206890496U (en) Depositing dust maintenance structure in Boiler Furnace
CN2233508Y (en) Vertical boiler with steam dust-removing device
CN206890565U (en) Brick baffle structure in a kind of stove
CN103017183B (en) A kind of for burning containing the ash block tube bundle of the more residual oil injection boiler of silt

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060607

Termination date: 20120519