CN206890496U - Depositing dust maintenance structure in Boiler Furnace - Google Patents

Depositing dust maintenance structure in Boiler Furnace Download PDF

Info

Publication number
CN206890496U
CN206890496U CN201720398311.7U CN201720398311U CN206890496U CN 206890496 U CN206890496 U CN 206890496U CN 201720398311 U CN201720398311 U CN 201720398311U CN 206890496 U CN206890496 U CN 206890496U
Authority
CN
China
Prior art keywords
boiler
tube
heating surface
door closure
collecting chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720398311.7U
Other languages
Chinese (zh)
Inventor
张红
任宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG BOILER MANUFACTURING Co Ltd
Original Assignee
SHENYANG BOILER MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG BOILER MANUFACTURING Co Ltd filed Critical SHENYANG BOILER MANUFACTURING Co Ltd
Priority to CN201720398311.7U priority Critical patent/CN206890496U/en
Application granted granted Critical
Publication of CN206890496U publication Critical patent/CN206890496U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Gasification And Melting Of Waste (AREA)

Abstract

Depositing dust maintenance structure belongs in Boiler Furnace depositing dust maintenance structure in depositing dust service technique field, more particularly to a kind of Boiler Furnace in Boiler Furnace.The utility model offer is a kind of to improve boiler efficiency, saves depositing dust maintenance structure in the energy and the Boiler Furnace of easy access deashing.The utility model includes furnace wall, outlet smokestack tube is provided with furnace wall, outlet smokestack tube one end is connected with upper collecting chamber after boiler, the outlet smokestack tube other end is connected with lower header after boiler, its structural feature outlet smokestack tube includes the vertical heating surface pipe vertical with flue gas flow direction direction, the top and bottom of vertical heating surface pipe are bent to opposite transverse direction, the fin of grit in multiple stop flue gases is vertically provided with vertical heating surface pipe, ash dropping hopper is provided with below vertical heating surface pipe, the ash tube outlet of ash dropping hopper lower end is connected with pit.

Description

Depositing dust maintenance structure in Boiler Furnace
Technical field
The utility model belongs in Boiler Furnace depositing dust maintenance knot in depositing dust service technique field, more particularly to a kind of Boiler Furnace Structure.
Background technology
Most of heating boilers operationally, because the coal dust burdening of use is larger, tail are brought to down to volume of smoke Portion's heating surface, back-end surfaces are caused with certain abrasion, the safe operation to boiler causes certain harm, also reduces boiler Service life.And when boiler at low load is run or during blowing out, this this flue dust can be attached on the tube wall of back-end surfaces, Boiler heat-transfer is influenceed, reduces boiler efficiency.
The content of the invention
The utility model is aiming above mentioned problem, there is provided one kind can improve boiler efficiency, save the energy and easy access Depositing dust maintenance structure in the Boiler Furnace of deashing.
To achieve the above object, the utility model adopts the following technical scheme that, the utility model includes furnace wall, is set in furnace wall Outlet smokestack tube is equipped with, outlet smokestack tube one end is connected with upper collecting chamber after boiler, the outlet smokestack tube other end and next part after boiler Case is connected, and its structural feature outlet smokestack tube includes the vertical heating surface pipe vertical with flue gas flow direction direction, vertical heating surface The top and bottom of pipe are bent to opposite transverse direction, and dirt in multiple stop flue gases is vertically provided with vertical heating surface pipe The fin of grain, ash dropping hopper is provided with below vertical heating surface pipe, and the ash tube outlet of ash dropping hopper lower end is connected with pit.
Position on the furnace wall corresponding to vertical heating surface pipe is provided with maintenance deashing fire door;The ash dropping hopper is remote From being provided with laterally snakelike roof tube and down-comer above boiler upper collecting chamber side, upper collecting chamber before one end of roof tube and boiler It is connected, the other end of roof tube is connected with the drum of boiler.
The upper end of the down-comer is connected with boiler side upper collecting chamber, and the lower end of down-comer is connected with boiler side lower header;Pot Furnace side upper collecting chamber is connected with upper collecting chamber, afterbody boiler export connecting leg before boiler respectively;Upper collecting chamber before lower header and boiler before boiler, Boiler side lower header is connected.
The maintenance deashing fire door includes doorframe and door closure, and door closure side is connected by hinge with doorframe, door closure opposite side Handle is provided with, handle front portion is connected by bearing pin screw with door closure, and handle front end is provided with fixture block, and handle is corresponded on doorframe Front end is provided with snib, and fixture block is provided with neck on snib;It is provided with the middle part of door closure and sees hole, is seen that Kong Chu is provided with and see hole Lid, sees that port lid upper end is connected by bearing pin screw with door closure;Described door closure the inner both sides are provided with refractory concrete soil block, and fire resisting mixes It is provided with solidifying soil block and draws brick hook, drawn brick hook outer end through door closure and be provided with external screw thread, a nut, which is threaded onto, draws brick hook outer end On external screw thread brick hook will be drawn to be fixed on door closure.
It is described in the utility model to see on port lid the plate for being provided with lordosis as a kind of preferred scheme.
As another preferred scheme, the utility model is each provided with two arranged up and down on the refractory concrete soil block Individual drawing brick hook.
The utility model beneficial effect.
After the utility model, the flue dust for being brought to back-end surfaces is greatly reduced, and the abrasion of boiler reduces, pipe The service life of son significantly improves, and ensures boiler safety reliability service.And because afterbody pipe dust stratification is reduced, heat-transfer effect is not It can substantially be reduced with the increase using the time, save mass energy.
Using before this utility model, wasted time and energy because tube wear retubes, clears up tube wall dust stratification, and workload Greatly, after using this utility model, workload greatly reduces, and has saved a large amount of maintenance costs.
The utility model can be applicable in a variety of type of furnaces, with the investment of very little, solve boiler manfacturing and fortune for a long time Row enterprise is for the excessive puzzlement of boiler tail dust stratification.
When the grit in flue gas is beaten on pipe or fin, grit kinetic energy reduces, and can be fallen along tube wall or fin, fall on pipe In the ash dropping hopper for arranging bottom, most of flue dust can be stopped by installing this device, prevent volume of smoke from flowing in next stage heating surface.
The utility model, which is set, overhauls the maintenance deashing that deashing fire door is easy to associated components.
The utility model door closure the inner both sides are provided with refractory concrete soil block, can effectively prevent from overhauling deashing fire door by high temperature Damage.
It is provided with the utility model refractory concrete soil block and draws brick hook, is drawn brick hook outer end through door closure and be provided with outer spiral shell Line, a nut, which is threaded onto on the external screw thread for drawing brick hook outer end, will draw brick hook to be fixed on door closure;Be easy to refractory concrete soil block installation, Dismounting, change, be easy to adjust the thickness of refractory concrete soil block.
Laterally snakelike roof tube is provided with above the utility model ash dropping hopper Keep away from boiler upper collecting chamber side;Ash dropping hopper is remote Top from boiler upper collecting chamber side is the high-temperature area in furnace wall, sets laterally snakelike roof tube here, is easy to horizontal snake Liquid in shape roof tube preferably absorbs heat.
Brief description of the drawings
The utility model is described further with reference to the accompanying drawings and detailed description.Scope of protection of the utility model It is not only limited to the statement of herein below.
Fig. 1 is the utility model structure diagram.
Fig. 2 is Fig. 1 A-A sectional views.
Fig. 3 is the utility model maintenance deashing door structure schematic diagram.
Fig. 4 is the utility model section view.
In figure, 1 it is rear upper collecting chamber, 2 is heated coiled pipe, 3 is ash dropping hopper, 4 is outlet smokestack tube, 5 is fin, 6 is inspection Repair deashing fire door, 7 be boiler drum, 8 be roof tube, 9 be down-comer, 10 be ash tube, 11 to see that port lid, 12 are bearing pin spiral shell Nail, 13 be doorframe, 14 be door closure, 15 be handle, 16 be snib, 17 be bearing pin screw, 18 be refractory concrete soil block, 19 be drawing brick Hook, 20 be nut, 21 be furnace wall, 22 be outlet flue, 23 be smoke inlet, 24 be preceding brick baffle, 25 be hinge, 26 be after every cigarette Wall, 27 be plate, 29 be neck, 30 be fixture block.
Embodiment
As illustrated, the utility model includes furnace wall, outlet smokestack tube is provided with furnace wall, exports smokestack tube one end and pot Upper collecting chamber is connected after stove, and the outlet smokestack tube other end is connected with lower header after boiler, and outlet smokestack tube includes and flue gas flow direction side To vertical vertical heating surface pipe, the top and bottom of vertical heating surface pipe are bent to opposite transverse direction, vertical heating surface The fin of grit in multiple stop flue gases is vertically provided with pipe, ash dropping hopper is provided with below vertical heating surface pipe, The ash tube outlet of ash dropping hopper lower end is connected with pit.
Position on the furnace wall corresponding to vertical heating surface pipe is provided with maintenance deashing fire door;The ash dropping hopper is remote From laterally snakelike roof tube and down-comer is provided with after boiler above upper collecting chamber side, above collect before one end of roof tube and boiler Case is connected, and the other end of roof tube is connected with the drum of boiler.
The upper end of the down-comer is connected with boiler side upper collecting chamber, and the lower end of down-comer is connected with boiler side lower header;Pot Furnace side upper collecting chamber is connected with lower header before upper collecting chamber, afterbody boiler export connecting leg, boiler before boiler respectively;Before boiler lower header with Upper collecting chamber, boiler side lower header are connected before boiler.
The maintenance deashing fire door includes doorframe and door closure, and door closure side is connected by hinge with doorframe, door closure opposite side Handle is provided with, handle front portion is connected by bearing pin screw with door closure, and handle front end is provided with fixture block, and handle is corresponded on doorframe Front end is provided with snib, and fixture block is provided with neck on snib;It is provided with the middle part of door closure and sees hole, is seen that Kong Chu is provided with and see hole Lid, sees that port lid upper end is connected by bearing pin screw with door closure;Described door closure the inner both sides are provided with refractory concrete soil block, and fire resisting mixes It is provided with solidifying soil block and draws brick hook, drawn brick hook outer end through door closure and be provided with external screw thread, a nut, which is threaded onto, draws brick hook outer end On external screw thread brick hook will be drawn to be fixed on door closure.
It is described to see on port lid the plate for being provided with lordosis.Set plate to be easy to see the rotation of port lid, expose and see hole.
The two drawing brick hooks arranged up and down are provided with each refractory concrete soil block;It is easy to the steady of refractory concrete soil block Fixed connection.
The ash dropping hopper is provided with heated coiled pipe in the furnace wall on the outside of the ash dropping hopper of boiler upper collecting chamber side, and be heated snake Shape pipe is arranged on after vertical heating surface pipe in the flue gas transmission path of pole, and be heated coiled pipe one end and boiler tail import connecting leg It is connected, the heated coiled pipe other end is connected with boiler tail outlet connecting leg, boiler tail outlet connecting leg and boiler side upper collecting chamber phase Even.Ash dropping hopper is provided with heated coiled pipe in the furnace wall on the outside of the ash dropping hopper of boiler upper collecting chamber side, is easy to absorb by perpendicular The heat of flue gas after to heating surface pipe, reduce exhaust gas temperature.
The total length of the fin is 700mm~800mm.
The fin welds with vertical heating surface pipe.
The fin uses heat-resisting steel sheet and plate.
The vertical heating surface pipe is six;Six vertical heating surface pipes are in parallel, and upper and lower side links together;Six Vertical heating surface pipe is divided into three groups, every group of two vertical heating surface tubes, and three groups of vertical heating surface pipes are along flue gas flow direction direction It is sequentially arranged, every group two vertical heating surface tubes are along vertical flue gas flow direction direction lateral arrangement.By experiment, using this vertically by The hot sub- set-up mode of facial canal, reach good dust blocking effect.
Fin on each vertical heating surface pipe is two row, and the angle of two row fins is 120 degree, two row fins The centerline direction of angle is consistent with flue gas flow direction direction, and the direction of 120 degree of angles is relative with flue gas flow direction direction.Two row fins Angle be 120 degree, when the grit in flue gas is beaten on pipe or fin, a part of grit kinetic energy reduces, due to Action of Gravity Field It can be fallen along tube wall or fin, after another part grit forms eddy flow due to distinctive angle, carry a part of grit and also fall on In the ash dropping hopper of pipe row bottom, and boiler exterior is drained into by ash tube, most of flue dust can be stopped, prevent volume of smoke from flowing to In back-end surfaces, corrosive wear is carried out to back-end surfaces.
There is interval between the neighbouring fin of each column fin on each vertical heating surface pipe.This structure can prevent Due to fin part distortion different and caused from the coefficient of expansion of pipe.
The ash dropping hopper upper end edge flue gas flow direction direction both sides are provided with preceding brick baffle and rear brick baffle, described vertical heated Facial canal is arranged between preceding brick baffle and rear brick baffle, is every on smoke-box, preceding brick baffle between preceding brick baffle and rear brick baffle Upper end smoke inlet is provided between end and furnace wall ceiling, rear brick baffle lower end is provided with horizontal lower end outlet flue.When flue gas flows through Preceding brick baffle enters when smoke-box, and the actual internal area of flue gas becomes big suddenly, and dust kinetic energy dies down in flue gas, the ash of larger particles Dirt is because in Action of Gravity Field meeting ash dropping hopper, stop of a part of dust due to exporting smokestack tube is also fallen into ash dropping hopper, and also one Part flue dust is beaten on rear brick baffle, is also fallen into ash dropping hopper, and drains into boiler exterior by ash tube, and installing this device can hinder Most of flue dust is kept off, allows flue dust to be separated in boiler internal by primary, prevents volume of smoke from flowing in back-end surfaces, reduces and enters The fume amount of boiler tail, to reduce the abrasion to back-end surfaces.
The drawing brick hook uses heat resisting steel hook.
It is understood that above with respect to specific descriptions of the present utility model, it is merely to illustrate the utility model and is not The technical scheme described by the utility model embodiment is limited to, it will be understood by those within the art that, still can be with The utility model is modified or equivalent substitution, to reach identical technique effect;As long as satisfaction uses needs, all in this reality Within new protection domain.

Claims (3)

1. depositing dust maintenance structure in Boiler Furnace, including furnace wall, outlet smokestack tube is provided with furnace wall, exports smokestack tube one end and pot Upper collecting chamber is connected after stove, outlet the smokestack tube other end be connected with lower header after boiler, it is characterised in that outlet smokestack tube including with The vertical vertical heating surface pipe in flue gas flow direction direction, the top and bottom of vertical heating surface pipe are bent to opposite transverse direction, The fin of grit in multiple stop flue gases is vertically provided with vertical heating surface pipe, the lower section of vertical heating surface pipe is set There is ash dropping hopper, the ash tube outlet of ash dropping hopper lower end is connected with pit;
Position on the furnace wall corresponding to vertical heating surface pipe is provided with maintenance deashing fire door;The ash dropping hopper is away from pot Laterally snakelike roof tube and down-comer, one end of roof tube and upper collecting chamber phase before boiler are provided with above stove upper collecting chamber side Even, the other end of roof tube is connected with the drum of boiler;
The upper end of the down-comer is connected with boiler side upper collecting chamber, and the lower end of down-comer is connected with boiler side lower header;Boiler side Upper collecting chamber is connected with upper collecting chamber, afterbody boiler export connecting leg before boiler respectively;Lower header and upper collecting chamber, boiler before boiler before boiler Side lower header is connected;
The maintenance deashing fire door includes doorframe and door closure, and door closure side is connected by hinge with doorframe, and door closure opposite side is set There is handle, handle front portion is connected by bearing pin screw with door closure, and handle front end is provided with fixture block, and handle front end is corresponded on doorframe It is provided with snib, fixture block is provided with neck on snib;It is provided with the middle part of door closure and sees hole, is seen that Kong Chu is provided with and see port lid, See that port lid upper end is connected by bearing pin screw with door closure;Described door closure the inner both sides are provided with refractory concrete soil block, refractory concrete It is provided with soil block and draws brick hook, drawn brick hook outer end through door closure and be provided with external screw thread, a nut, which is threaded onto, draws the outer of brick hook outer end On screw thread brick hook will be drawn to be fixed on door closure.
2. depositing dust maintenance structure in Boiler Furnace according to claim 1, it is characterised in that described see is provided with lordosis on port lid Plate.
3. depositing dust maintenance structure in Boiler Furnace according to claim 1, it is characterised in that on each refractory concrete soil block It is provided with the two drawing brick hooks arranged up and down.
CN201720398311.7U 2017-04-17 2017-04-17 Depositing dust maintenance structure in Boiler Furnace Expired - Fee Related CN206890496U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720398311.7U CN206890496U (en) 2017-04-17 2017-04-17 Depositing dust maintenance structure in Boiler Furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720398311.7U CN206890496U (en) 2017-04-17 2017-04-17 Depositing dust maintenance structure in Boiler Furnace

Publications (1)

Publication Number Publication Date
CN206890496U true CN206890496U (en) 2018-01-16

Family

ID=61324283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720398311.7U Expired - Fee Related CN206890496U (en) 2017-04-17 2017-04-17 Depositing dust maintenance structure in Boiler Furnace

Country Status (1)

Country Link
CN (1) CN206890496U (en)

Similar Documents

Publication Publication Date Title
CN104832934B (en) A kind of boiler smoke dedusting waste heat recovering energy conserving device
CN204986938U (en) Energy -conserving dust removal troilite exhaust -heat boiler
CN103363517B (en) A kind of high bed temperature CFBB of 700 DEG C and above steam parameter
CN103528186B (en) Cylindrical high-temperature biomass hot blast furnace
CN102128439B (en) Assembly type heat-pipe steam generator of kiln furnace
CN201053752Y (en) Zigzag stream type coal-fired hot-water boiler
CN206890496U (en) Depositing dust maintenance structure in Boiler Furnace
CN204648206U (en) Horizontal double-deck water pipe furnace grate many backhauls water bath dust-removing flashback coal burning boiler
CN206890563U (en) Flue dust isolating construction in stove
CN206890565U (en) Brick baffle structure in a kind of stove
CN204513362U (en) A kind of power economized boiler with waste heat recovery
CN206572529U (en) A kind of heat-pipe air preheater
CN205919305U (en) High cloud of dust gas disposal of smoke treatment device and rotary hearth furnace high temperature and waste heat utilization system
CN104315872B (en) Boiler flue gas waste heat recycling and energy-saving device with boiler flue gas dust removing effect
CN205878210U (en) Biomass boiler energy -saving appliance
CN205388305U (en) Novel low temperature second grade economizer
CN209386313U (en) Segmented water- to-water heat exchanger
CN106195968A (en) Flue gas processing device and rotary hearth furnace high-temperature high dust smoke processing system
CN204214285U (en) The residual heat from boiler fume having boiler smoke dustproof function concurrently reclaims energy saver
CN103759239B (en) Detachable steam generator
CN207487135U (en) Pipeline energy-saving hot blast furnace
CN205940178U (en) Rotary hearth furnace flue gas waste heat utilization system
CN102692071A (en) Energy-saving and environment-friendly furnace system
CN207230498U (en) A kind of smoke and waste steam boiler for preventing dust stratification
CN202002070U (en) Component type heat pipe steam generator for furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180116

CF01 Termination of patent right due to non-payment of annual fee